Offshore wind turbine foundation
The offshore wind foundation's multi-floor design optimizes internal space utilization by separating suspension units and junction boxes across different levels, enhancing maintenance efficiency and reducing congestion, thus facilitating easier installation and connection of components.
Patent Information
- Application Number
- JP2023080565
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-11-28
- Estimated Expiration
- 2043-05-16
AI Technical Summary
Offshore wind foundations face challenges in effectively utilizing the internal space, particularly for accommodating and managing submarine cables and junction boxes, which can lead to congestion and hinder efficient maintenance and installation processes.
The offshore wind foundation is designed with multiple floors inside the structure, allowing for the suspension units and junction boxes to be positioned on different levels, enabling easier access and reducing congestion, while also providing openings to facilitate cable passage and minimize bending.
This design effectively utilizes the internal space, allows for safer and more efficient maintenance of submarine cables and junction boxes, reduces the need for bending, and optimizes the layout for easier installation and connection of components.
Smart Images

Figure 2024164879000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an offshore wind turbine foundation. [Background technology]
[0002] An offshore wind foundation may be used to support an offshore wind turbine at sea. For example, Patent Document 1 discloses an offshore wind power generation facility including a hollow structural element, a cable inlet provided in the hollow structural element, a first platform, and a through-flow opening. In the offshore wind power generation facility, at least one active control element is flow-connected to the through-flow opening to influence the medium exchange between the inside of the hollow structural element and the outside of the hollow structural element. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Special Publication No. 2021-531436 Summary of the Invention [Problem to be solved by the invention]
[0004] For offshore wind turbine foundations, it is necessary to make effective use of the internal space of the foundation.
[0005] The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide an offshore wind turbine foundation that can effectively utilize the internal space. [Means for solving the problem]
[0006] <1> An offshore wind foundation according to a first aspect of the present invention is an offshore wind foundation that supports a tower of an offshore wind turbine, and is characterized in that it comprises a plurality of floors provided inside the offshore wind foundation.
[0007] According to the invention of aspect 1, a plurality of floors are provided inside the offshore wind power foundation, which allows the space inside the offshore wind power foundation to be used effectively.
[0008] <2> An offshore wind foundation according to aspect 2 of the present invention is the offshore wind foundation according to aspect 1, characterized in that it further comprises a first submarine cable for transmitting power from the offshore wind turbine, and a first suspension unit for suspending the first submarine cable, and the first suspension unit is provided on any one of the plurality of floors.
[0009] According to the invention of aspect 2, a first submarine cable for transmitting power from an offshore wind turbine is suspended by a first suspension unit. The first suspension unit is provided on one of a plurality of floors of the offshore wind turbine foundation. This allows a worker to perform work on the first submarine cable and the first suspension unit while positioned on a floor. This makes it easier to perform work on the first submarine cable and the first suspension unit.
[0010] <3> An offshore wind foundation according to a third aspect of the present invention is the offshore wind foundation according to the second aspect, characterized in that the first suspension unit is provided on the lowest floor of the plurality of floors.
[0011] According to the invention of aspect 3, the first suspension unit is provided on the lowest floor of the multiple floors of the offshore wind foundation. This makes it possible to, for example, prevent the first submarine cable and the first suspension unit from occupying the interior of the lowest floor by providing the first suspension unit on a floor other than the lowest floor. This makes it possible to effectively utilize the space inside the offshore wind foundation.
[0012] <4> An offshore wind foundation according to a fourth aspect of the present invention is the offshore wind foundation according to the third aspect, characterized in that the first suspension unit is provided on a floor of the lowest floor.
[0013] According to the invention of aspect 4, the first suspension unit is provided on the floor of the lowest floor. This makes it possible to easily and safely perform the task of pulling the first submarine cable into the offshore wind turbine foundation, for example.
[0014] <5> An offshore wind foundation according to aspect 5 of the present invention is an offshore wind foundation according to any one of aspects 1 to 4, further comprising a second submarine cable for transmitting power from an offshore wind turbine other than the offshore wind turbine, and a second suspension unit for suspending the second submarine cable, wherein the second suspension unit is provided on any one of the plurality of floors.
[0015] According to the invention of aspect 5, the offshore wind foundation further comprises a second submarine cable for transmitting power from an offshore wind turbine other than the offshore wind turbine supported by the offshore wind foundation. The second submarine cable is suspended by a second suspension unit. The second suspension unit is provided on one of a plurality of floors of the offshore wind foundation. This allows a worker to perform work on the second submarine cable and the second suspension unit while positioned on a floor. This makes it easier to perform work on the second submarine cable and the second suspension unit.
[0016] <6> An offshore wind foundation according to aspect 6 of the present invention is an offshore wind foundation according to any one of aspects 2 to 5, further comprising a first junction box to which the first submarine cable is connected, and the first junction box is provided on the same floor as the floor on which the first suspension unit is provided.
[0017] According to the invention of aspect 6, in the offshore wind turbine foundation, the first junction box to which the first submarine cable is connected is provided on the same floor as the floor on which the first suspension unit is provided. This allows the tip of the first submarine cable suspended by the first suspension unit to be located near the first junction box. This makes it easier to connect the first submarine cable to the first junction box.
[0018] <7> An offshore wind foundation according to aspect 7 of the present invention is an offshore wind foundation according to any one of aspects 2 to 5, further comprising a first junction box to which the first submarine cable is connected, and the first junction box is provided on a floor different from the floor on which the first suspension unit is provided.
[0019] Here, for example, in the case of an offshore wind turbine foundation, when the first submarine cable and the first junction box are installed on the same floor, it may be necessary to bend the tip of the first submarine cable toward the first junction box when connecting the first submarine cable and the first junction box. According to the invention of aspect 7, in the offshore wind foundation, the first junction box is provided on a floor different from the floor on which the first suspension unit is provided. This allows, for example, the first submarine cable to be connected from below the first junction box. This makes it possible to prevent the first submarine cable from bending, for example. Also, for example, the size of the floor can be made smaller than when the first submarine cable and the first junction box are provided on the same floor in the offshore wind foundation.
[0020] <8> An offshore wind foundation according to aspect 8 of the present invention is an offshore wind foundation according to any one of aspects 2 to 7, further comprising a first junction box to which the first submarine cable is connected and a second junction box, and the first junction box and the second junction box are provided on any of the plurality of floors.
[0021] According to the invention of aspect 8, the first junction box and the second junction box are provided on any of a plurality of floors of the offshore wind foundation. This allows a worker to perform work on the first junction box and the second junction box while being positioned on the floor. This makes it easier to perform work on the first junction box and the second junction box.
[0022] <9> An offshore wind foundation according to aspect 9 of the present invention is characterized in that, in the offshore wind foundation according to aspect 8, the first junction box and the second junction box are provided on different floors among the plurality of floors.
[0023] According to the invention of aspect 9, the first junction box and the second junction box are provided on different floors among a plurality of floors. This makes it possible to prevent congestion on the floor compared to a case in which the first junction box and the second junction box are provided on the same floor.
[0024] <9> An offshore wind foundation according to aspect 9 of the present invention is an offshore wind foundation according to any one of aspects 2 to 8, further comprising a first junction box to which the first submarine cable is connected, the first junction box being provided on one of the plurality of floors, an opening being provided in the floor one floor above the floor on which the first junction box is provided, and a position of the opening corresponding to the position of the first junction box.
[0025] According to the invention of aspect 9, an opening is provided in the floor of the floor one floor above the floor on which the first junction box is provided. The position of the opening corresponds to the position of the first junction box. This makes it easier for the cable connected to the first junction box to pass through the floor of the floor one floor above the floor on which the first junction box is provided, for example, when the cable connected to the first junction box is arranged to extend upward. This makes it possible, for example, to improve the placement of the cable inside the offshore wind foundation. Also, for example, bending of the first submarine cable can be suppressed.
[0026] <10> An offshore wind foundation according to aspect 10 of the present invention is an offshore wind foundation according to any one of aspects 1 to 9, further comprising a first submarine cable for transmitting power from the offshore wind turbine, and a first suspension unit for suspending the first submarine cable, the first suspension unit being provided on one of the plurality of floors, the floor one floor above the floor on which the first suspension unit is provided having an opening, and the position of the opening corresponding to the position of the first suspension unit.
[0027] According to the invention of aspect 10, an opening is provided in the floor of the floor one floor above the floor on which the first suspension unit is provided. The position of the opening corresponds to the position of the first suspension unit. This makes it easier for the first submarine cable to pass through the floor of the floor one floor above the floor on which the first suspension unit is provided, for example, when the first submarine cable suspended by the first suspension unit is arranged so as to extend upward. This makes it possible, for example, to improve the fit of the first submarine cable inside the offshore wind foundation. Also, for example, bending of the first submarine cable can be suppressed.
[0028] <11> An offshore wind foundation according to aspect 11 of the present invention is an offshore wind foundation according to any one of aspects 1 to 10, further comprising a first submarine cable for transmitting power from the offshore wind turbine, a first suspension unit for suspending the first submarine cable, and a first junction box to which the first submarine cable is connected, wherein the first suspension unit is provided on one of the plurality of floors, the first junction box is provided on the floor one floor above the floor on which the first suspension unit is provided, and the position of the first suspension unit corresponds to the position of the first junction box.
[0029] According to the invention of aspect 11, a first suspension unit that suspends a first submarine cable is provided on any one of a plurality of floors of an offshore wind foundation. A first junction box is provided on the floor one floor above the floor on which the first suspension unit is provided. The position of the first suspension unit corresponds to the position of the first junction box. This allows, for example, the first submarine cable to be connected from below the first junction box. This makes it possible to prevent bending of the first submarine cable, for example. Also, for example, the size of the floor can be reduced compared to a case in which the first submarine cable and the first junction box are provided on the same floor.
[0030] <12> An offshore wind foundation according to aspect 12 of the present invention is an offshore wind foundation according to any one of aspects 1 to 11, characterized in that it comprises a first submarine cable for transmitting power from the offshore wind turbine, a J tube into which the first submarine cable is inserted, and a first suspension unit that suspends the first submarine cable by suspending the J tube, and the first suspension unit is provided on any one of the plurality of floors.
[0031] According to the invention of aspect 12, a first suspension unit that suspends the first submarine cable by suspending the J tube is provided on any one of a plurality of floors. This allows a worker to perform work on the first suspension unit that suspends the J tube while positioned on a floor. This makes it easier to perform work on the first suspension unit that suspends the J tube.
[0032] <13> The offshore wind foundation of aspect 13 of the present invention is an offshore wind foundation of any one of aspects 1 to 12, further comprising a transition piece supporting the tower, and the multiple floors are provided inside the transition piece.
[0033] According to a thirteenth aspect of the present invention, in the offshore wind turbine foundation, the multiple floors are provided inside a transition piece that supports the tower of the offshore wind turbine. This makes it possible to effectively utilize the space inside the transition piece.
[0034] <14> An offshore wind foundation according to aspect 14 of the present invention is the offshore wind foundation according to aspect 13, characterized in that the offshore wind foundation is a jacket structure, the transition piece includes a center pipe supporting the tower, and the multiple floors are provided inside the center pipe.
[0035] According to a fourteenth aspect of the invention, the transition piece includes a center pipe that supports the tower. In the offshore wind foundation, the floors are provided inside the center pipe. This makes it possible to effectively utilize the space inside the center pipe in the transition piece.
[0036] <15> An offshore wind foundation according to aspect 15 of the present invention is an offshore wind foundation according to any one of aspects 1 to 14, characterized in that the uppermost floor of the multiple floors is a floor for performing work of fastening the tower and the offshore wind foundation with bolts.
[0037] According to the invention of aspect 15, the top floor of the multiple floors is a floor for performing work of fastening the tower and the offshore wind foundation with bolts. This makes it easy to perform the work of connecting the tower of the offshore wind turbine to the offshore wind foundation.
[0038] <16> An offshore wind foundation according to aspect 16 of the present invention is an offshore wind foundation according to any one of aspects 1 to 15, characterized in that the lowest floor of the multiple floors is a floor for carrying out work of suspending an undersea cable for transmitting electricity from the offshore wind turbine.
[0039] According to the invention of aspect 16, the lowest floor of the multiple floors is a floor for performing the work of suspending the submarine cable for transmitting power from the offshore wind turbine. This makes it possible to prevent, for example, objects that may interfere with the work of suspending the submarine cable from the offshore wind turbine foundation from being located around the submarine cable. Therefore, the work of suspending the submarine cable from the offshore wind turbine foundation can be easily performed.
[0040] <17> An offshore wind foundation according to aspect 17 of the present invention is an offshore wind foundation according to any one of aspects 1 to 16, characterized in that of the plurality of floors, floors other than the lowest floor and the top floor are floors for carrying out work of connecting an undersea cable for transmitting power from the offshore wind turbine to equipment.
[0041] According to the invention of aspect 17, among the multiple floors, floors other than the bottom floor and the top floor are floors for performing work to connect the submarine cable for transmitting power from the offshore wind turbine to the equipment. This makes it easy to perform the work of connecting the submarine cable suspended from the offshore wind turbine foundation to the equipment installed inside the offshore wind turbine foundation. Effect of the Invention
[0042] According to the present invention, it is possible to provide an offshore wind turbine foundation that can effectively utilize the internal space. [Brief description of the drawings]
[0043] [Figure 1] FIG. 2 is a front view of the offshore wind foundation according to the first embodiment. [Diagram 2] FIG. 2 is an enlarged view of a plurality of floors provided in the transition piece according to the first embodiment. [Diagram 3] FIG. 2 is an enlarged view of the periphery of the hanging unit according to the first embodiment. [Figure 4] FIG. 2 is a plan view of the first floor according to the first embodiment. [Diagram 5] FIG. 13 is a first example of a plan view of the second floor according to the first embodiment. [Figure 6] FIG. 2 is a second example of a floor plan of the second floor according to the first embodiment. [Figure 7] FIG. 2 is a plan view of the third floor according to the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0044] (First embodiment) Hereinafter, an offshore wind power foundation 100 according to one embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a front view of an offshore wind power foundation 100 according to this embodiment. The offshore wind foundation 100 is placed, for example, on the sea. In this way, the offshore wind foundation 100 according to this embodiment supports the tower 200T of the offshore wind turbine 200. For example, multiple offshore wind foundations 100 are installed in the same wind farm or sea area. In this case, it is preferable that the multiple offshore wind foundations 100 have a common design.
[0045] 1, the offshore wind foundation 100 according to this embodiment is a jacket structure. That is, the offshore wind foundation 100 includes a transition piece 10 including a center pipe 11 that supports a tower 200T, a plurality of legs 20 that are connected to piles P driven into the seabed and support the transition piece 10, and braces 30 that connect the plurality of legs 20 together to reinforce the structure of the offshore wind foundation 100. In this embodiment, the upper end of the center pipe 11 and the lower end of the tower 200T are connected to each other by bolting flanges TF provided on each of them, as shown in FIG. 2. Therefore, the connection point between the center pipe 11 and the tower 200T can be visually confirmed. Note that, for example, as shown in FIG. 2, the flanges TF are formed so as to extend inward from the edges of the upper end of the center pipe 11 and the lower end of the tower 200T. This allows an operator to bolt the flanges TF to each other while standing inside the center pipe 11. Note that, in order to strengthen the connection between the flanges TF, the flanges TF may be formed so as to extend inward and outward from the edges of the upper end of the center pipe 11 and the lower end of the tower 200T, respectively. Furthermore, in order to transmit power from the offshore wind turbine 200, the offshore wind foundation 100 is equipped with a submarine cable 40 in addition to the above components. In order to support the submarine cable 40, the offshore wind foundation 100 is equipped with a J tube 50, a suspension unit 60, and a junction box 70 (described in detail below).
[0046] (For multiple floors) FIG. 2 is an enlarged view of a plurality of floors provided in the transition piece 10 according to this embodiment. 2, multiple floors are provided inside the offshore wind foundation 100. The multiple floors are provided, for example, for arranging equipment for transmitting power from the offshore wind turbine 200. In addition, the multiple floors are used, for example, for connecting the offshore wind foundation 100 and the tower 200T of the offshore wind turbine 200.
[0047] 2, the multiple floors are provided inside the transition piece 10. More specifically, the multiple floors are provided inside a center pipe 11 included in the transition piece 10. At least three floors are provided. That is, in this embodiment, the offshore wind foundation 100 includes a first floor F1, a second floor F2, and a third floor F3.
[0048] FIG. 4 is a plan view of the first floor F1. The first floor F1 is the lowest floor among the multiple floors. The first floor F1 is a floor for performing work such as suspending the submarine cable 40 for transmitting power from the offshore wind turbine 200. A relatively large number of various cables including the submarine cable 40 are arranged on the first floor F1. For this reason, it is preferable that, for example, no components other than cables are arranged on the first floor F1.
[0049] FIG. 5 is a first example of a plan view of the second floor F2 according to this embodiment. FIG. 6 is a second example of a plan view of the second floor F2 according to this embodiment. The second floor F2 is a floor located one floor above the first floor F1. As described above, the offshore wind foundation 100 has at least three floors. Therefore, the second floor F2 is a floor other than the lowest floor and the highest floor among the multiple floors. The second floor F2 is, for example, a floor for performing work to connect the submarine cable 40 to equipment for transmitting power from the offshore wind turbine 200. The equipment to which the submarine cable 40 is connected is, for example, the junction box 70 described later. That is, the junction box 70, for example, is arranged on the second floor F2.
[0050] FIG. 7 is a plan view of the third floor F3 according to this embodiment. The third floor F3 is the top floor among the multiple floors. In this embodiment, the third floor F3 includes the upper end of the center pipe 11 of the transition piece 10. The third floor F3 is a floor for performing work of fastening the tower 200T of the offshore wind turbine 200 to the offshore wind foundation 100 with bolts. That is, the third floor F3 is a floor on which a worker stands when connecting the lower end of the tower 200T of the offshore wind turbine 200 to the upper end of the center pipe 11 by bolt fastening. In order to make it easier for the worker to fasten the bolts between the lower end of the tower 200T of the offshore wind turbine 200 and the upper end of the center pipe 11, the distance from the floor of the third floor F3 to the upper end of the center pipe 11 is preferably about waist height of the worker, for example, about 1.2 m. This allows the worker to perform bolt fastening from the upper side of the flange TF while standing on the floor of the third floor F3 without setting up a stepladder or the like.
[0051] As shown in Figures 5 to 7, an opening FO may be provided in the second floor F2 and the third floor F3. The opening FO is provided, for example, only when cable wiring work is performed on multiple floors. By not providing the opening FO except when cable wiring work is performed, for example, it is possible to enable workers to move safely on the floors. Alternatively, the opening FO may be provided at all times while the offshore wind foundation 100 is in service so that cables can pass between floors.
[0052] In order to facilitate the bolt fastening work on the third floor F3 described above, it is preferable that no openings FO are provided in an area at least 0.8 m from the inner wall of the center pipe 11 on the third floor F3. Other details of the opening FO provided in the floor will be described later.
[0053] (Configuration for transmitting power from offshore wind turbine 200) 1 and 2 , the offshore wind foundation 100 includes a submarine cable 40 as a component for transmitting power from the offshore wind turbine 200. The offshore wind foundation 100 includes a J-tube 50, a suspension unit 60, and a junction box 70 to support the submarine cable 40.
[0054] The submarine cable 40 is laid on the seabed. The submarine cable 40 extends upward from the seabed to be connected to equipment provided inside the offshore wind turbine foundation 100. The submarine cable 40 includes, for example, a first submarine cable 41 and a second submarine cable 42. That is, the first submarine cable 41 and the second submarine cable 42 are connected to the offshore wind turbine foundation 100. Hereinafter, when there is no need to distinguish between the first submarine cable 41 and the second submarine cable 42, they will be referred to as the submarine cable 40.
[0055] The first submarine cable 41 is provided to transmit electric power from the offshore wind turbine 200 supported by the offshore wind foundation 100. That is, the first submarine cable 41 connects, for example, the offshore wind turbine 200 supported by the offshore wind foundation 100 to a substation facility (not shown). The second submarine cable 42 is provided to transmit power from offshore wind turbines 200 other than the offshore wind turbines 200 supported by the offshore wind foundation 100 shown in Fig. 1. Here, as described above, a plurality of offshore wind foundations 100 supporting the towers 200T of the offshore wind turbines 200 are provided in the same wind farm or sea area. In other words, a plurality of offshore wind turbines 200 are provided in the same wind farm or sea area. The second submarine cable 42 connects the plurality of offshore wind turbines 200 provided as described above.
[0056] As shown in Fig. 2, the submarine cable 40 is inserted into the J tube 50. In other words, the J tube 50 accommodates the submarine cable 40 inside. The J tube 50 is provided along the up-down direction in the offshore wind foundation 100. That is, in the offshore wind foundation 100, which is a jacket structure, the J tube 50 is provided, for example, along the leg 20. In this way, the J tube 50 protects the submarine cable 40 extending upward from the seabed. The J tube 50 includes, for example, a first J tube 51 and a second J tube 52. Hereinafter, when there is no need to distinguish between the first J tube 51 and the second J tube 52, they will be referred to as J tubes 50.
[0057] The first submarine cable 41 is inserted into the first J tube 51. In this way, the first J tube 51 protects the first submarine cable 41. The first J tube 51 is provided, for example, in one of the multiple legs 20 included in the offshore wind foundation 100, which is a jacket structure. In this case, the first J tube 51 is provided, for example, in a position of the leg 20 that does not face the outside of the offshore wind foundation 100. This makes it difficult for drifting objects approaching from the outside of the jacket structure to collide with the first J tube 51.
[0058] The second submarine cable 42 is inserted into the second J tube 52. In this way, the second J tube 52 protects the second submarine cable 42. The second J tube 52 is provided, for example, in one of the multiple legs 20 included in the offshore wind foundation 100, which is a jacket structure, other than the leg 20 in which the first J tube 51 is provided. In this case, the second J tube 52 is provided, for example, in a position of the leg 20 that does not face the outside of the offshore wind foundation 100. This makes it difficult for drifting objects approaching from the outside of the jacket structure to collide with the second J tube 52.
[0059] The suspension unit 60 is used to suspend the submarine cable 40. Specifically, as shown in Fig. 3, the suspension unit 60 is attached to, for example, an end of a J tube 50, and is provided on any one of a plurality of floors of the offshore wind foundation 100. In this way, the suspension unit 60 suspends the J tube 50, thereby suspending the submarine cable 40 extending upward from the seabed. The hanging unit 60 includes, for example, a first hanging unit 61 and a second hanging unit 62. Hereinafter, when there is no need to distinguish between the first hanging unit 61 and the second hanging unit 62, they will be referred to as the hanging unit 60.
[0060] As shown in FIG. 2, the first suspension unit 61 suspends the first submarine cable 41. The first suspension unit 61 is provided on any one of a plurality of floors. In this embodiment, the first suspension unit 61 is provided on the first floor F1, which is the lowest floor among the plurality of floors. Specifically, the first suspension unit 61 is provided on the floor of the first floor F1. This allows a worker to easily and safely perform work on the first submarine cable 41 and the first suspension unit 61, i.e., for example, work of pulling the first submarine cable 41 suspended by the first suspension unit 61 into the offshore wind foundation 100.
[0061] As shown in FIG. 4 and FIG. 5, an opening FO is provided in the floor of the floor one floor above the floor on which the first suspension unit 61 is provided. That is, an opening FO is provided in the second floor F2, which is the floor one floor above the first floor F1 on which the first suspension unit 61 is provided. At this time, the position of the opening FO provided in the second floor F2 corresponds to the position of the first suspension unit 61. Specifically, for example, the opening FO of the second floor F2 is provided directly above the first suspension unit 61. In other words, when viewed along the vertical direction, the opening FO of the second floor F2 overlaps with the first suspension unit 61. This makes it easier for the first submarine cable 41 to pass through the floor of the second floor F2 when the first submarine cable 41 suspended from the first suspension unit 61 is arranged to extend upward inside the first floor F1.
[0062] As shown in FIG. 2, the second suspension unit 62 suspends the second submarine cable 42. The second suspension unit 62 is provided on any one of a plurality of floors. In this embodiment, the second suspension unit 62 is provided on the first floor F1, which is the lowest floor among the plurality of floors. Specifically, the second suspension unit 62 is provided on the floor of the first floor F1. This allows a worker to easily and safely perform work on the second submarine cable 42 and the second suspension unit 62, i.e., for example, work of pulling the second submarine cable 42 suspended by the second suspension unit 62 into the offshore wind foundation 100.
[0063] As shown in FIG. 4 and FIG. 5, an opening FO is provided in the floor of the floor one floor above the floor on which the second suspension unit 62 is provided. That is, an opening FO is provided in the second floor F2, which is the floor one floor above the first floor F1 on which the second suspension unit 62 is provided. At this time, the position of the opening FO provided in the second floor F2 corresponds to the position of the second suspension unit 62. Specifically, for example, the opening FO of the second floor F2 is provided directly above the second suspension unit 62. In other words, when viewed along the vertical direction, the opening FO of the second floor F2 overlaps with the second suspension unit 62. This makes it easier for the second submarine cable 42 to pass through the floor of the second floor F2 when the second submarine cable 42 suspended from the second suspension unit 62 is arranged to extend upward inside the first floor F1.
[0064] 4, the first hanging unit 61 and the second hanging unit 62 are preferably disposed, for example, near the center of the first floor F1. In this case, either the first hanging unit 61 or the second hanging unit 62 may be disposed so as to overlap with the central axis of the center pipe 11. This makes it easier for workers to work near the inner circumferential surface of the center pipe 11, for example.
[0065] 2, the junction box 70 is a device provided inside the offshore wind foundation 100. To the junction box 70, for example, various cables (e.g., HV cables) including the submarine cable 40 are connected. The junction box 70 is used to relay various cables including the submarine cable 40 inside the offshore wind foundation 100. That is, for example, power generated by the offshore wind turbine 200 is transmitted to the junction box 70 from a cable connected to the offshore wind turbine 200, and then transmitted to the submarine cable 40 via the junction box 70. The junction box 70 includes, for example, a first junction box 71 and a second junction box 72. Hereinafter, when there is no need to distinguish between the first junction box 71 and the second junction box 72, they will be referred to as the junction box 70.
[0066] 2, the first submarine cable 41 is connected to the first junction box 71. The first junction box 71 is provided on one of a plurality of floors. In this embodiment, the first junction box 71 is provided on a floor different from the floor on which the first suspension unit 61 is provided. 4 and 5, the first junction box 71 is provided on the floor one floor above the floor on which the first hanging unit 61 is provided. That is, in this embodiment, the first junction box 71 is provided on the second floor F2, which is the floor one floor above the first floor F1 on which the first hanging unit 61 is provided. Furthermore, the position of the first hanging unit 61 and the position of the first junction box 71 correspond to each other. Specifically, for example, the first junction box 71 is provided near an opening FO of the second floor F2 that is provided corresponding to the position of the first hanging unit 61 as described above. 6, the first junction box 71 may be provided so as to cover the opening FO of the second floor F2 provided corresponding to the position of the first hanging unit 61 as described above. In other words, the first junction box 71 may be disposed so as to overlap the first hanging unit 61 when viewed along the vertical direction. By disposing in this manner, the first submarine cable 41 fits well inside the center pipe 11 of the transition piece 10.
[0067] In this embodiment, an opening FO is provided in the floor of the floor one floor above the floor on which the first junction box 71 is provided. That is, an opening FO is provided in the third floor F3, which is the floor one floor above the second floor F2 on which the first junction box 71 is provided. At this time, the position of the opening FO provided in the third floor F3 corresponds to the position of the first junction box 71. Specifically, for example, the opening FO of the third floor F3 is provided directly above the first junction box 71. This makes it easier for the cable connected to the first junction box 71 to pass through the floor of the third floor F3 when the cable connected to the first junction box 71 is arranged to extend upward inside the second floor F2.
[0068] 2, the second submarine cable 42 is connected to the second junction box 72. The second junction box 72 is provided on one of a plurality of floors. In this embodiment, the second junction box 72 is provided on a floor different from the floor on which the second suspension unit 62 is provided. 4 and 5, the second junction box 72 is provided on the floor one floor above the floor on which the second hanging unit 62 is provided. That is, in this embodiment, the second junction box 72 is provided on the second floor F2, which is one floor above the first floor F1 on which the second hanging unit 62 is provided. Furthermore, the position of the second hanging unit 62 and the position of the second junction box 72 correspond to each other. Specifically, for example, the second junction box 72 is provided near an opening FO of the second floor F2 that is provided corresponding to the position of the second hanging unit 62 as described above. 6, the second junction box 72 may be provided so as to cover the opening FO of the second floor F2 provided in correspondence with the position of the second hanging unit 62 as described above. In other words, the second junction box 72 may be disposed so as to overlap with the second hanging unit 62 when viewed along the vertical direction. Such an arrangement improves the fit of the second submarine cable 42 inside the center pipe 11 of the transition piece 10.
[0069] In this embodiment, an opening FO is provided in the floor of the floor one floor above the floor on which the second junction box 72 is provided. That is, an opening FO is provided in the third floor F3, which is the floor one floor above the second floor F2 on which the second junction box 72 is provided. At this time, the position of the opening FO provided in the third floor F3 corresponds to the position of the second junction box 72. Specifically, for example, the opening FO of the third floor F3 is provided directly above the second junction box 72. This makes it easier for the cable connected to the second junction box 72 to pass through the floor of the third floor F3 when the cable connected to the second junction box 72 is arranged to extend upward inside the second floor F2. Furthermore, the first junction box 71 and the second junction box 72 may be located on different floors. 2, a switch cable C extending upward is connected to each of the first junction box 71 and the second junction box 72. The switch cable C connects the first junction box 71 and the second junction box 72 to a switch gear (not shown) provided in the offshore wind turbine 200. The switch gear is provided on the same floor as the first junction box 71 and the second junction box 72 or on a floor above them. In other words, the switch gear is provided, for example, on a floor provided inside the tower 200T of the offshore wind turbine 200.
[0070] As described above, according to the offshore wind foundation 100 according to this embodiment, multiple floors are provided inside the offshore wind foundation 100. This allows the space inside the offshore wind foundation 100 to be used effectively.
[0071] Furthermore, the first submarine cable 41 for transmitting power from the offshore wind turbine 200 is suspended by a first suspension unit 61. The first suspension unit 61 is provided on any one of a plurality of floors of the offshore wind foundation 100. This allows workers to perform work on the first submarine cable 41 and the first suspension unit 61 while positioned on a floor. This makes it easier to perform work on the first submarine cable 41 and the first suspension unit 61.
[0072] Furthermore, the first suspension unit 61 is provided on the lowest floor of the multiple floors of the offshore wind foundation 100. This makes it possible, for example, to prevent the first submarine cable 41 and the first suspension unit 61 from occupying the interior of the lowest floor by providing the first suspension unit 61 on a floor other than the lowest floor. This allows the space inside the offshore wind foundation 100 to be used effectively.
[0073] Moreover, the first suspension unit 61 is provided on the floor of the lowest floor. This makes it possible, for example, to easily and safely perform the task of pulling the first submarine cable 41 into the offshore wind power foundation 100.
[0074] The offshore wind foundation 100 further comprises a second submarine cable 42 for transmitting power from an offshore wind turbine 200 other than the offshore wind turbine 200 supported by the offshore wind foundation 100. The second submarine cable 42 is suspended by a second suspension unit 62. The second suspension unit 62 is provided on one of a plurality of floors of the offshore wind foundation 100. This allows a worker to perform work on the second submarine cable 42 and the second suspension unit 62 while positioned on a floor. This makes it easier to perform work on the second submarine cable 42 and the second suspension unit 62.
[0075] Here, for example, in the offshore wind foundation 100, when the first submarine cable 41 and the first junction box 71 are installed on the same floor, it may be necessary to bend the tip of the first submarine cable 41 toward the first junction box 71 when connecting the first submarine cable 41 and the first junction box 71. Therefore, in the offshore wind foundation 100, the first junction box 71 is provided on a floor different from the floor on which the first suspension unit 61 is provided. This makes it possible, for example, to connect the first submarine cable 41 from below the first junction box 71. This makes it possible, for example, to prevent the first submarine cable 41 from being bent. Also, for example, the size of the floor can be made smaller compared to a case in which the first submarine cable 41 and the first junction box 71 are provided on the same floor in the offshore wind foundation 100.
[0076] Furthermore, the first junction box 71 and the second junction box 72 are provided on any one of a plurality of floors of the offshore wind foundation 100. This allows a worker to perform work on the first junction box 71 and the second junction box 72 while being positioned on a floor. This makes it easier to perform work on the first junction box 71 and the second junction box 72.
[0077] Moreover, the first junction box 71 and the second junction box 72 are provided on different floors among a plurality of floors. This makes it possible to prevent congestion on the floor compared to a case in which the first junction box 71 and the second junction box 72 are provided on the same floor.
[0078] Also, an opening FO is provided in the floor of the floor one floor above the floor on which the first junction box 71 is provided. The position of the opening FO corresponds to the position of the first junction box 71. This makes it easier for the cable connected to the first junction box 71 to pass through the floor of the floor one floor above the floor on which the first junction box 71 is provided, for example, when the cable connected to the first junction box 71 is arranged to extend upward. This makes it possible, for example, to improve the placement of the cable inside the offshore wind foundation 100. Also, for example, bending of the first submarine cable 41 can be suppressed.
[0079] Moreover, an opening FO is provided in the floor of the floor one floor above the floor on which the first suspension unit 61 is provided. The position of the opening FO corresponds to the position of the first suspension unit 61. This makes it easier for the first submarine cable 41 to pass through the floor of the floor one floor above the floor on which the first suspension unit 61 is provided, for example, when the first submarine cable 41 suspended by the first suspension unit 61 is arranged so as to extend upward. This makes it possible, for example, to improve the fit of the first submarine cable 41 inside the offshore wind foundation 100. Also, for example, bending of the first submarine cable 41 can be suppressed.
[0080] Furthermore, the first suspension unit 61 that suspends the first submarine cable 41 is provided on one of a plurality of floors of the offshore wind foundation 100. The first junction box 71 is provided on the floor one floor above the floor on which the first suspension unit 61 is provided. The position of the first suspension unit 61 corresponds to the position of the first junction box 71. This allows, for example, the first submarine cable 41 to be connected from below the first junction box 71. This makes it possible to prevent, for example, the first submarine cable 41 from being bent. Furthermore, for example, the size of the floor can be made smaller than when the first submarine cable 41 and the first junction box 71 are provided on the same floor.
[0081] Furthermore, the first suspension unit 61 that suspends the first submarine cable 41 by suspending the J tube 50 is provided on any one of the multiple floors. This allows a worker to perform work on the first suspension unit 61 that suspends the J tube 50 while positioned above a floor. This makes it easier to perform work on the first suspension unit 61 that suspends the J tube 50.
[0082] Furthermore, in the offshore wind foundation 100, the multiple floors are provided inside the transition piece 10 that supports the tower 200T of the offshore wind turbine 200. This allows the space inside the transition piece 10 to be used effectively.
[0083] The transition piece 10 also includes a center pipe 11 that supports the tower 200T. In the offshore wind foundation 100, multiple floors are provided inside the center pipe 11. This allows the space inside the center pipe 11 in the transition piece 10 to be used effectively.
[0084] Among the multiple floors, the top floor is a floor for performing work of fastening the tower 200T and the offshore wind foundation 100 with bolts. This makes it easy to perform the work of connecting the tower 200T of the offshore wind turbine 200 to the offshore wind foundation 100.
[0085] Moreover, of the multiple floors, the lowest floor is a floor for performing the work of suspending the submarine cable 40 for transmitting power from the offshore wind turbine 200. This makes it possible, for example, to prevent objects that would interfere with the work of suspending the submarine cable 40 from the offshore wind foundation 100 from being located around the submarine cable 40. Therefore, the work of suspending the submarine cable 40 from the offshore wind foundation 100 can be easily performed.
[0086] Among the multiple floors, floors other than the bottom floor and the top floor are used for work to connect the submarine cable 40 for transmitting power from the offshore wind turbines 200 to equipment. This makes it easy to connect the submarine cable 40 suspended from the offshore wind foundation 100 to the equipment installed inside the offshore wind foundation 100.
[0087] Second embodiment Next, an offshore wind power foundation 100 according to a second embodiment of the present invention will be described. In the second embodiment, the same components as those in the first embodiment are denoted by the same reference numerals, and their description will be omitted, with only the differences being described. In the offshore wind foundation 100 according to the second embodiment, the junction box 70 is provided on the same floor as the suspension unit 60.
[0088] For example, the first junction box 71 is provided on the same floor as the floor on which the first hanging unit 61 is provided. That is, the first junction box 71 is provided on the first floor F1 together with the first hanging unit 61. In this case, the opening FO on the second floor F2, which has been described in the first embodiment as being provided directly above the first hanging unit 61, does not need to be provided.
[0089] Alternatively, the second junction box 72 is provided on the same floor as the floor on which the second hanging unit 62 is provided. That is, the second junction box 72 is provided on the first floor F1 together with the second hanging unit 62. In this case, the opening FO on the second floor F2, which has been described in the first embodiment as being provided directly above the second hanging unit 62, does not need to be provided. In the above respects, the offshore wind foundation 100 according to the second embodiment differs from the offshore wind foundation 100 according to the first embodiment.
[0090] As described above, according to the offshore wind foundation 100 according to the second embodiment, the first junction box 71 to which the first submarine cable 41 is connected is provided on the same floor as the floor on which the first suspension unit 61 is provided. This allows the tip of the first submarine cable 41 suspended by the first suspension unit 61 to be located close to the first junction box 71. This makes it easier to connect the first submarine cable 41 to the first junction box 71.
[0091] The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, the offshore wind foundation 100 has been described as a jacket structure, but may be a monopile structure. That is, the transition piece 10 of the monopile structure may be provided with the above-mentioned multiple floors, and each configuration for connecting the submarine cable 40 may be provided. Further, in the offshore wind foundation 100, at least three floors have been described as being provided, but four or more floors may be provided.
[0092] In addition, within the scope of the invention, the components in the above-described embodiments may be replaced with well-known components, and the above-described modified examples may be combined as appropriate. [Explanation of symbols]
[0093] 10 Transition Piece 11 Center pipe Leg 20 30 Brace 40 Submarine Cable 41 First Submarine Cable 42 Second Submarine Cable 50 J Tube 51 1st J tube 52 2nd J tube 60 Hanging Unit 61 First Suspension Unit 62 Second Suspension Unit 70 Junction Box 71 First Junction Box 72 Second junction box 100 Offshore Wind Fundamentals 200 Offshore Wind Turbines 200T Tower F1 1st Floor F2 2nd floor F3 3rd floor FO opening P pile
Claims
1. An offshore wind foundation supporting a tower of an offshore wind turbine, comprising: A plurality of floors provided inside the offshore wind foundation; An offshore wind foundation comprising:
2. A first submarine cable for transmitting electric power from the offshore wind turbine; a first suspension unit that suspends the first submarine cable; Equipped with The first suspension unit is provided on any one of the plurality of floors. The offshore wind foundation according to claim 1 .
3. The first suspension unit is provided on the lowest floor of the plurality of floors. The offshore wind foundation according to claim 2 .
4. The first suspension unit is provided above the floor of the lowest floor. The offshore wind foundation according to claim 3 .
5. a second submarine cable for transmitting power from an offshore wind turbine other than the offshore wind turbine; a second suspension unit that suspends the second submarine cable; Further comprising: The second suspension unit is provided on any one of the plurality of floors. The offshore wind foundation according to claim 2 .
6. a first junction box to which the first submarine cable is connected; Further comprising: The first junction box is provided on the same floor as the first suspension unit, The offshore wind power foundation according to any one of claims 2 to 5.
7. a first junction box to which the first submarine cable is connected; Further comprising: The first junction box is provided on a floor different from a floor on which the first suspension unit is provided. The offshore wind power foundation according to any one of claims 2 to 5.
8. a first junction box to which the first submarine cable is connected; A second junction box; Further comprising: The first junction box and the second junction box are provided on any one of the plurality of floors. The offshore wind power foundation according to any one of claims 2 to 5.
9. The first junction box and the second junction box are provided on different floors among the plurality of floors. The offshore wind foundation according to claim 8 .
10. a first junction box to which the first submarine cable is connected; Further comprising: the first junction box is provided on any one of the plurality of floors, An opening is provided in a floor of a floor one floor above the floor on which the first junction box is provided, The position of the opening corresponds to the position of the first junction box. The offshore wind power foundation according to any one of claims 2 to 5.
11. A first submarine cable for transmitting electric power from the offshore wind turbine; a first suspension unit that suspends the first submarine cable; Equipped with The first suspension unit is provided on any one of the plurality of floors, The floor of the floor above the floor on which the first suspension unit is provided has an opening, The position of the opening corresponds to the position of the first hanging unit. The offshore wind foundation according to any one of claims 1 to 5.
12. A first submarine cable for transmitting electric power from the offshore wind turbine; a first suspension unit that suspends the first submarine cable; a first junction box to which the first submarine cable is connected; Equipped with The first suspension unit is provided on any one of the plurality of floors, The first junction box is provided on a floor one floor above the floor on which the first suspension unit is provided, The position of the first hanging unit and the position of the first junction box correspond to each other. The offshore wind foundation according to any one of claims 1 to 5.
13. A first submarine cable for transmitting electric power from the offshore wind turbine; a J tube into which the first submarine cable is inserted; a first suspension unit that suspends the J tube to suspend the first submarine cable; Equipped with The first suspension unit is provided on any one of the plurality of floors. The offshore wind foundation according to any one of claims 1 to 5.
14. A transition piece supporting the tower; Further comprising: The plurality of floors are provided inside the transition piece.
6. An offshore wind power foundation according to claim 1 .
15. The offshore wind foundation is a jacket structure, the transition piece includes a center pipe supporting the tower; The plurality of floors are provided inside the center pipe.
15. The offshore wind foundation according to claim 14.
16. Among the plurality of floors, the top floor is a floor for performing work of fastening the tower and the offshore wind foundation with bolts. The offshore wind foundation according to any one of claims 1 to 5.
17. Among the plurality of floors, the lowest floor is a floor for performing work of suspending an undersea cable for transmitting power from the offshore wind turbine. The offshore wind foundation according to any one of claims 1 to 5.
18. Among the plurality of floors, floors other than the bottom floor and the top floor are floors for performing work to connect submarine cables to equipment for transmitting power from the offshore wind turbines. The offshore wind foundation according to any one of claims 1 to 5.
Citation Information
Patent Citations
Deep sea development platform combining Spar type floating fan and aquaculture net cage capable of moving in circumferential direction
CN112088815A
Method of installing a transmission cable arrangement
US20220235744A1
Wind power generation facility
JP2021531436A