Curing unit structure

The curing unit structure addresses the issue of object scattering by enabling separate installation and coverage of the space between pillar and beam units with a beam front curing unit and scattering prevention film, improving construction safety and efficiency.

JP2024166705APending Publication Date: 2024-11-29TAKENAKA CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023082999
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-29

Smart Images

  • Figure 2024166705000001_ABST
    Figure 2024166705000001_ABST
Patent Text Reader

Abstract

To provide a curing unit structure capable of preventing an object from scattering from between column front curing units when constructing an outer peripheral beam.SOLUTION: There is provided a column front curing unit 3 installed on the building outer side of an outer peripheral column 2 in a state of being supported by each of a plurality of outer peripheral columns 2 arranged in a building outer peripheral direction X, and a beam front curing unit 4 installed between a pair of column front curing units 3 arranged in the building outer peripheral direction X, the column front curing unit 3 and the beam front curing unit 4 are configured to be climbable separately, and the beam front curing unit 4 is supported by the pair of outer peripheral columns 2 in a state of extending over the pair of outer peripheral columns 2, and is mounted at a position different from a mounting position of the beam front curing unit 3 in the outer peripheral columns 2 in a plan view.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention includes a pre-column curing unit that is installed on the outside of a plurality of peripheral columns arranged in a circumferential direction of a building in a state where the pre-column curing unit is supported by each of the peripheral columns, and a pre-beam curing unit that is installed between a pair of the pre-column curing units arranged in a circumferential direction of the building, This relates to a curing unit structure in which the column pre-curing unit and the beam pre-curing unit are configured to be climbable separately. [Background technology]

[0002] Patent Document 1 shows a curing unit structure which comprises a pre-column curing unit (column side curing unit 10) which is installed on the outside of a number of peripheral columns (1) lined up in the normal direction of the building perimeter while being supported by each of them, and a pre-beam curing unit (beam side curing unit 20) which is installed between a pair of pre-column curing units lined up in the perimeter direction of the building, and in which the pre-column curing unit and the pre-beam curing unit are configured to be able to climb separately.

[0003] In the curing unit structure of Patent Document 1, the pre-beam curing unit is attached to the peripheral columns, and the pre-beam curing unit is attached to the peripheral beam (2) spanning a pair of the peripheral columns. After the peripheral columns are constructed, the pre-column curing unit is supported by the peripheral columns in a climbing state so as to cover the outside of the peripheral columns, and then the peripheral beams are constructed, and the pre-beam curing unit is supported by the peripheral beams in a climbing state so as to cover the outside of the peripheral beams. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-085271 Summary of the Invention [Problem to be solved by the invention]

[0005] However, when constructing the perimeter beams, there were gaps between the column curing units lined up around the perimeter of the building, leaving the outside of the perimeter beams open, so there was a risk that objects would be scattered outside the site through the gaps between the column curing units.

[0006] In view of this situation, the main object of the present invention is to provide a curing unit structure that can prevent objects from flying out from between the column pre-curing units when constructing outer perimeter beams. [Means for solving the problem]

[0007] The first characteristic configuration of the present invention includes a pre-column curing unit that is installed on the outside of a plurality of peripheral columns arranged in a building perimeter direction while being supported by each of the peripheral columns, and a pre-beam curing unit that is installed between a pair of the pre-column curing units arranged in the building perimeter direction, A curing unit structure in which the column front curing unit and the beam front curing unit are configured to be climbable separately, The pre-beam curing unit is supported by a pair of the peripheral columns in a state spanning the pair of peripheral columns, and is attached at a position on the peripheral columns which is different from the attachment position of the pre-column curing unit when viewed in a plan view.

[0008] According to this configuration, the pre-beam curing unit is attached at a position different from the attachment position of the pre-column curing unit on the peripheral columns when viewed in a plan view, so that the pre-column curing unit and the pre-beam curing unit can be configured to be climbable separately while the pre-beam curing unit can be supported on the peripheral columns.Therefore, after constructing a number of peripheral columns, the pre-beam curing unit can be installed before constructing the peripheral beams spanning a pair of peripheral columns lined up in the perimeter direction of the building, and by covering the space between the pair of pre-column curing units with the pre-beam curing unit when constructing the peripheral beams, it is possible to prevent objects from flying out from between the pre-column curing units.

[0009] The second characteristic configuration of the present invention is that the column pre-covering unit is attached to the surface of the outer perimeter column facing the outside of the building via a column pre-support material, The beam pre-covering unit is attached to the surface of the outer perimeter column facing toward the outer perimeter of the building via a beam pre-support material.

[0010] According to this configuration, the pre-column curing unit to be installed on the outside of the building of the peripheral column is attached to the surface of the peripheral column facing the outside of the building, and the pre-beam curing unit to be installed between a pair of pre-column curing units is attached to the surface of the peripheral column facing toward the outside of the building.By doing so, both the pre-column curing unit and the pre-beam curing unit can be efficiently attached to the same peripheral column without interfering with each other when they are climbed separately.

[0011] The third characteristic configuration of the present invention is that the beam front support member includes a pair of connecting members connected to a pair of the outer perimeter columns, The beam pre-covering unit includes a construction material extending between the pair of connecting materials, a vertical material rising from the construction material, and a beam pre-scattering prevention film covering the outside of the perimeter beam extending between the pair of perimeter columns, The shatterproof membrane for the front of the beam is connected to the upper end of the vertical member and supported in a suspended manner.

[0012] According to this configuration, the anti-scattering membrane in front of the beam is connected to the upper end of the vertical member rising from the erection material and supported in a suspended manner, so that the anti-scattering membrane in front of the beam can cover the area above the height at which the connecting material of the support material in front of the beam is installed (for example, the height of the upper end of the column), thereby more appropriately preventing objects from scattering between the column covering units.

[0013] The fourth characteristic configuration of the present invention is that the outer perimeter column is provided with a column side connected portion on both sides facing the outer perimeter direction of the building, Each of the pair of connecting members has a column side connecting portion connected to the column side connected portion at an end portion on the inside of the building, Both the column side connected part and the column side connecting part are provided with a plurality of column side through holes that penetrate in the vertical direction and are formed as long holes that are long in the inside and outside directions of the building, a large hole portion through which at least one of a head of a bolt and a nut of a column-side fastening member constituted by a bolt and a nut can be inserted is formed in either the column-side through hole of the column-side connected part or the column-side through hole of the column-side connecting part; The column side connecting portion is fastened and fixed to the column side connected portion by the column side fastening members inserted into the plurality of column side through holes.

[0014] According to this configuration, for example, in a state where the nut of the column-side fastening member attached to the column-side connected part is loosened, the column-side connecting part and the column-side connected part are brought closer to each other in the vertical direction, the nut of the column-side fastening member is passed through the large hole part of the column-side through hole in the column-side connected part, the column-side fastening member is moved in the building interior / exterior direction to position the shaft part of the bolt in the long hole part, and then the column-side fastening member is tightened, thereby making it possible to connect and fix the column-side connecting part to the column-side connected part without removing the nut of the column-side fastening member from the column-side connected part. In this way, since fastening can be performed without removing the column-side fastening member, it is possible to improve the workability of fastening and fixing at high places while preventing the column-side fastening member from falling off.

[0015] A fifth characteristic configuration of the present invention is that the erection material is provided with unit side connected parts at both ends in the building periphery direction, Each of the pair of connecting members has a unit side connecting portion connected to the unit side connected portion at an end portion on the outer side of the building, At least one of the unit side connected portion and the unit side connecting portion is provided with a unit side through hole penetrating in the vertical direction at only one location, and the unit side connecting portion and the unit side connected portion are configured to be swingable about an axis along the vertical direction with a unit side connecting member connecting the unit side connecting portion and the unit side connected portion being inserted into the unit side through hole, The unit side through hole is formed in a shape that allows the unit side connecting portion and the unit side connected portion to move relatively in the outer periphery of the building when the unit side connecting member is inserted therethrough.

[0016] According to this configuration, the unit side through hole is formed as a long hole that is long in the direction of the building's periphery, or as a large hole that is sufficiently larger than the insertion portion of the unit side connecting member, so that the unit side connecting part and the unit side connected part can move relatively in the direction of the building's periphery when the unit side connecting member is inserted therethrough.Therefore, even if the positions of a pair of outer periphery columns supporting the curing unit are misaligned from each other in the direction of the building's periphery, the misalignment can be absorbed by shifting the unit side connecting part and the unit side connected part in the direction of the building's periphery.In addition, because there is only one unit side through hole through which the unit side connecting member is inserted, even if the positions of the pair of outer periphery columns supporting the curing unit are misaligned from each other in the direction of the building's periphery, the misalignment can be absorbed by swinging the unit side connecting part and the unit side connected part relative to each other at the point where they are fastened and fixed. [Brief description of the drawings]

[0017] [Figure 1] Plan view of the curing unit structure [Diagram 2] Front view of the curing unit structure [Diagram 3] Plan view showing the main parts of the curing unit structure [Figure 4] Side view showing the main parts of the curing unit structure [Diagram 5] Plan view of the connected part on the column side [Figure 6] Cross-sectional plan view of the column-side connection [Figure 7] Exploded longitudinal cross-sectional view of the column-side connecting part and the column-side connected part [Figure 8] Plan view of the unit side connected part [Figure 9] Plan view of the unit side connection [Figure 10] A longitudinal section of the unit side connecting part and unit side connected part. [Figure 11] A diagram showing the procedure for climbing the curing unit structure. [Figure 12] A diagram showing the procedure for climbing the curing unit structure. [Figure 13] A diagram showing the procedure for climbing the curing unit structure. [Figure 14] A diagram showing the procedure for climbing the curing unit structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] An embodiment of a curing unit structure according to the present invention will be described with reference to the drawings. As shown in Figures 1 and 2, the curing unit structure 1 is a structure that covers the building outer side Y1 (periphery side) of a building under construction, and includes a pre-column curing unit 3 that is installed on the building outer side Y1 of the peripheral columns 2 while being supported by each of the peripheral columns 2 lined up in the building outer periphery direction X, and a pre-beam curing unit 4 that is installed between a pair of pre-column curing units 3 lined up in the building outer periphery direction X.

[0019] The curing unit structure 1 is configured so that the building outer side Y1 of the perimeter columns 2 is covered by the pre-column curing unit 3, and the building outer side Y1 of the perimeter beam 6 spanning a pair of the perimeter columns 2 aligned in the building perimeter direction X is covered by the pre-beam curing unit 4. In this embodiment, the perimeter columns 2 are made of square steel pipes spanning multiple stories (specifically, three stories), and the perimeter beam 6 is made of H-shaped steel spanning a pair of the perimeter columns 2 aligned in the building perimeter direction X. Scaffolding 9 around the columns is installed on the perimeter columns 2 to allow workers to work on the perimeter columns 2.

[0020] 3, the pre-beam curing unit 4 is supported by a pair of peripheral columns 2 in a state spanning the pair of peripheral columns 2, and is attached in a position different from the attachment position of the pre-column curing unit 3 on the peripheral columns 2 in a plan view. To explain further, the pre-column curing unit 3 is attached via a pre-column support material 7 to the surface of the peripheral column 2 facing the outside Y1 of the building, and the pre-beam curing unit 4 is attached via a pre-beam support material 8 to the surface of the peripheral column 2 facing the periphery direction X of the building.

[0021] The pre-column curing unit 3 is configured to be climbable using a crane or the like by releasing the connection with the pre-column support material 7. Moreover, since the pre-column curing unit 3 does not overlap with the pre-beam curing unit 4 and the pre-beam support material 8 in a plan view, it is possible to climb it without interfering with the pre-beam curing unit 4 or the pre-beam support material 8. In addition, the pre-beam curing unit 4 is configured to be climbable using a crane or the like by releasing the connection with the pre-beam support material 8. Moreover, since the pre-beam curing unit 4 does not overlap with the pre-column curing unit 3 and the pre-column support material 7 in a plan view, it is possible to climb it without interfering with the pre-column curing unit 3 or the pre-column support material 7. In this way, the column pre-covering unit 3 and the beam pre-covering unit 4 are configured to be climbable separately.

[0022] The pre-column curing unit 3 is configured with a height dimension capable of covering multiple stories corresponding to the height dimension of the peripheral columns 2, and with a width dimension wider than the width of the peripheral columns 2 in the building periphery direction X. In this embodiment, the pre-column curing unit 3 is configured with a height dimension capable of covering three stories of the building skeleton 5 (specifically, the height dimension of four stories), and with a width dimension wider than the width of the peripheral columns 2 plus the scaffolding 9 in the building periphery direction X. Each pre-column curing unit 3 is installed with a gap between it and another pre-column curing unit 3 adjacent to it in the outer circumferential direction X of the building, and the width dimension of the pre-column curing unit 3 is smaller than the gap between a pair of pre-column curing units 3 adjacent to each other in the outer circumferential direction X of the building.

[0023] The column front covering unit 3 is configured with a frame body 13 formed in a lattice shape by a plurality of frame members along the vertical direction Z and a plurality of frame members along the building periphery direction X, a plurality of vertical frame members 14 along the vertical direction Z located on the building inner side Y2 of the frame body 13, a connecting member 15 connecting the frame body 13 and the vertical frame members 14, and a column front shatterproof film 16 made of a net or sheet that covers the building outer side Y1 of the peripheral column 2. In this embodiment, the column front shatterproof film 16 is configured of a net part 16A made of a net and a sheet part 16B located below this part and made of a sheet. In FIG. 2, the sheet part 16B of the peripheral column 2, the scaffolding 9, etc. located on the building inner side Y2 are indicated by dashed lines.

[0024] In this embodiment, the vertical frame members 14 are provided as four vertical frame members 14, including two end vertical frame members 14A located at both ends of the pre-column protection unit 3 in the building circumferential direction X, and two middle vertical frame members 14B located midway between these two end vertical frame members 14A. The pre-column shatterproof membrane 16 is installed on the building outer side Y1 of the frame body 13, and the portion of the pre-column shatterproof membrane 16 protruding from the frame body 13 in the building circumferential direction X is folded to the building inner side Y2 and connected to the end vertical frame member 14A, so that the entire area of ​​the pre-column protection unit 3 on both sides of the building outer side Y1 and the building circumferential direction X is covered by the vertical pre-column shatterproof membrane 16.

[0025] The column support material 7 has an end portion on the inside Y2 of the building connected to the surface of the outer perimeter column 2 facing the outside Y1 of the building, and an end portion on the outside Y1 of the building connected to the column cover unit 3. To explain further, as shown in Figures 3 and 4, a number of pre-column support materials 7 are attached at intervals in the vertical direction Z, protruding from the surface of the outer periphery column 2 facing the outer side Y1 of the building toward the outer side Y1 of the building, and each of the multiple pre-column support materials 7 is connected to the intermediate vertical frame material 14B in the pre-column curing unit 3, and the pre-column curing unit 3 is attached to one outer periphery column 2 by these pre-column support materials 7.

[0026] The pre-beam curing unit 4 is configured with a height dimension capable of covering multiple stories of the building skeleton 5, similar to the pre-column curing unit 3, and a width dimension wider than the spacing between a pair of pre-column curing units 3 adjacent in the building circumferential direction X. In this embodiment, the pre-beam curing unit 4 is configured with a height dimension capable of covering three stories of the building skeleton 5, and a width dimension wider than the spacing between a pair of pre-beam curing units 4 adjacent in the building circumferential direction X and narrower than the spacing between a pair of peripheral columns 2 aligned in the building circumferential direction X. The pre-beam curing unit 4 is installed between the outer periphery column 2 and the pre-column curing unit 3 in the inside-outside direction Y of the building.

[0027] As shown in FIG. 3, the beam front support material 8 is configured with a pair of connecting members 21 connected to a pair of peripheral columns 2. The connecting member 21 on one side X1 in the building circumferential direction X of the pair of connecting members 21 is connected to a surface of the upper end portion of the peripheral column 2 on the one side X1 in the building circumferential direction X of the pair of peripheral columns 2 facing the other side X2 in the building circumferential direction X of the pair of connecting members 21. The connecting member 21 on the other side X2 in the building circumferential direction X of the pair of peripheral columns 2 is connected to a surface of the upper end portion of the peripheral column 2 on the other side X2 in the building circumferential direction X of the pair of peripheral columns 2 facing the one side X1 in the building circumferential direction X of the pair of peripheral columns 2. In this way, the beam front curing unit 4 is attached to the pair of peripheral columns 2 by the pair of connecting members 21.

[0028] The beam front curing unit 4 includes a construction material 22 spanning a pair of connecting materials 21, a vertical material 23 rising from the construction material 22, and a beam front shatterproof membrane 24 covering the building outer side Y1 of the peripheral beam 6 spanning a pair of peripheral columns 2. The beam front shatterproof membrane 24 is connected to the upper end of the vertical material 23 and supported in a suspended state.

[0029] The vertical members 23 rising from the erection material 22 are provided at both ends of the erection material 22 in the building circumferential direction X and at a middle part in the building circumferential direction X, and the beam front curing unit 4 is provided with a plurality of vertical members 23. A wire is provided at the upper end of the beam front shatterproof film 24, and the wire is connected to the plurality of vertical members 23. The upper ends of the vertical members 23 are located above the upper ends of the peripheral columns 2, and the upper ends of the beam-front shatterproof membranes 24 are also located above the upper ends of the peripheral columns 2. Therefore, when the peripheral beams 6 are constructed across the peripheral columns 2, it is possible to cover the area above the peripheral beams 6 with the beam-front shatterproof membranes 24.

[0030] Next, the connection structure between the connecting members 21 constituting the beam front support members 8 and the outer periphery columns 2 will be described. As shown in Fig. 3, the outer periphery column 2 is provided with a column-side connected part 26 on both sides facing the building outer periphery direction X, and each of the pair of connecting members 21 is provided with a column-side connecting part 27 connected to the column-side connected part 26 at its end on the building inner side Y2. As shown in Figs. 5 to 7, both the column-side connected part 26 and the column-side connecting part 27 are provided with a plurality of column-side through holes 28 that penetrate in the vertical direction Z and are formed as elongated holes long in the building inner / outer direction Y, and the column-side connecting part 27 is fastened and fixed to the column-side connected part 26 by column-side fastening members 29 inserted into the plurality of column-side through holes 28. In addition, in either one of the column-side through holes 28 of the column-side connected part 26 and the column-side through holes 28 of the column-side connecting part 27, a large hole part 28A is formed through which at least one of the head of the bolt 29A and the nut 29B of the column-side fastening member 29 composed of the bolt 29A and the nut 29B can be inserted.

[0031] In this embodiment, as shown in Figs. 5 and 6, of the column-side connected part 26 and the column-side connecting part 27, only the column-side through-hole 28 of the column-side connected part 26 has a large hole part 28A formed therein. To explain further, the connecting material 21 is made of H-shaped steel, and as shown in Fig. 6, two column-side through holes 28 are provided on each side of the web 21B in the lower flange 21A of the column-side connecting part 27 of the connecting material 21. Also, as shown in Fig. 5, the column-side connected part 26 is provided with column-side through holes 28 in four places corresponding to the column-side through holes 28 of the column-side connecting part 27. The column-side through hole 28 of the column-side connected part 26 is formed with a large hole part 28A formed in a size that allows the head of the bolt 29A and the nut 29B constituting the column-side fastening member 29 to pass through, and an elongated hole part 28B that is long in the building inside-outside direction Y and that is formed in a width that allows the shaft of the bolt 29A to be inserted but does not allow the head of the bolt 29A and the nut 29B to be inserted through, and the large hole part 28A is formed at the end of the column-side through hole 28 in the building inside-outside direction Y. The column-side through hole 28 of the column-side connecting part 27 is entirely formed by the elongated hole part 28B.

[0032] Therefore, as shown in FIG. 7, with the nut 29B of the column-side fastening member 29 attached to the column-side connected part 26 loosened, the column-side connecting part 27 and the column-side connected part 26 are brought closer to each other in the vertical direction Z, and the nut 29B of the column-side fastening member 29 is passed through the large hole portion 28A of the column-side through hole 28 in the column-side connected part 26, and then the column-side fastening member 29 is moved in the building inside-outside direction Y to position the shaft portion of the bolt 29A in the long hole portion 28B, and then the column-side fastening member 29 is tightened, whereby the column-side connecting part 27 can be connected and fixed to the column-side connected part 26 without removing the nut 29B of the column-side fastening member 29 from the column-side connected part 26.

[0033] Next, the connection structure between the connecting material 21 and the erection material 22 that constitute the beam front support material 8 will be described. As shown in Fig. 3, the erection material 22 has unit-side connected parts 31 at both ends in the building circumferential direction X, and each of the pair of connecting materials 21 has a unit-side connecting part 32 at its end on the building outer side Y1 that connects to the unit-side connected part 31. Then, as shown in Fig. 8 and Fig. 10, at least one of the unit-side connected parts 31 and the unit-side connecting parts 32 has a unit-side through-hole 33 penetrating in the up-down direction Z at only one location, and the unit-side connecting part 32 and the unit-side connected part 31 are configured to be swingable around an axis along the up-down direction Z with a unit-side connecting member 34 connecting the unit-side connecting part 32 and the unit-side connected part 31 inserted into the unit-side through-hole 33. The unit side through hole 33 is formed in a shape that allows the unit side connecting part 32 and the unit side connected part 31 to move relatively in the building outer periphery direction X when a unit side connecting member 34 that connects and fixes the unit side connecting part 32 and the unit side connected part 31 is inserted therethrough.

[0034] In this embodiment, of the unit side connected part 31 and the unit side connecting part 32, only the unit side connected part 31 is provided with the unit side through hole 33. A bolt 34A of a unit side connecting member 34 is fixed to the unit side connecting part 32 by welding or the like, and the column side through hole 28 of the unit side connected part 31 is formed as an elongated hole that allows the shaft portion of the bolt 34A of the unit side connecting member 34 inserted therethrough to move in the building periphery direction X. Then, with the bolt 34A of the unit side connecting member 34 inserted into the unit side through hole 33 of the unit side connected part 31, the unit side connecting part 32 is connected and fixed to the unit side connected part 31 by the unit side connecting member 34. In this manner, when the unit side connecting part 32 is connected and fixed to the unit side connected part 31 by the unit side connecting member 34, the bolt 34A and the nut 34B of the unit side connecting member 34 are tightened with a torque that is relatively low compared to when they are fastened, and even when connected and fixed by the unit side connecting member 34, the unit side connecting part 32 and the unit side connected part 31 can relatively easily swing relative to each other about an axis along the vertical direction Z. Also, as shown in Figs. 9 and 10, the unit side connecting part 32 is provided with a mounting base 35 installed so as to cover the head of the bolt 34A, and the unit side connected part 31 is connected to the unit side connecting part 32 in a state of being placed on the mounting base 35. The mounting base 35 is made of a channel steel and has a hole 35A through which the bolt 34A is inserted.

[0035] Therefore, as shown in Figure 10, the unit side connecting part 32 and the unit side connected part 31 are brought closer together in the vertical direction Z, and the bolt 34A of the unit side connecting member 34 fixed to the unit side connecting part 32 is passed through the unit side through hole 33 of the unit side connected part 31, and then the nut 34B is screwed onto the bolt 34A of the column side fastening member 29, thereby connecting and fixing the unit side connecting part 32 to the unit side connected part 31.

[0036] And because the unit-side through-hole 33 is formed as a long hole that is long in the building periphery direction X, even if the positions of the pair of outer periphery columns 2 supporting the pre-beam curing unit 4 are misaligned from each other in the building periphery direction X, the misalignment can be absorbed by shifting the unit-side connecting part 32 and the unit-side connected part 31 in the building periphery direction X. Also, because the unit-side through-hole 33 for inserting the unit-side connecting member 34 is provided in only one location, even if the positions of the pair of outer periphery columns 2 supporting the pre-beam curing unit 4 are misaligned from each other in the building interior / exterior direction Y, the misalignment can be absorbed by swinging the unit-side connecting part 32 and the unit-side connected part 31 relative to each other at the points where they are fastened and fixed.

[0037] Next, a procedure for climbing the curing unit structure 1 will be described for the case where the outer peripheral columns 2 are erected as shown in FIG. 14 from the state shown in FIG. 11, the pre-column curing units 3 and the pre-beam curing units 4 cover the top four stories of the building skeleton 5. In addition, the building skeleton 5 below the height at which the pre-column curing units 3 and the pre-beam curing units 4 are installed is covered with a lower shatterproof membrane 36 made of a net, sheet, or the like, and a lower shatterproof membrane 36 is also installed in the area where the pre-beam curing units 4 are installed, so that this area is doubly covered by the pre-beam curing units 4 and the lower shatterproof membrane 36.

[0038] From the state shown in Fig. 11, the peripheral columns 2 are erected as shown in Fig. 12, and before the peripheral beams 6 spanning the peripheral columns 2 are constructed, the pre-column curing unit 3 is climbed as shown in Fig. 13 to cover the building outside Y1 of the peripheral columns 2. Next, as shown in Fig. 14, the location where the pre-column curing unit 3 was installed is covered with the lower shatterproof membrane 36, and the pre-beam curing unit 4 installed on the building inside Y2 of the lower shatterproof membrane 36 is climbed to cover the building outside Y1 of the location where the new peripheral beams 6 will be constructed. In this way, the building outer side Y1 of the peripheral columns 2 is covered with the pre-column curing unit 3, and the building outer side Y1 of the location where a new peripheral beam 6 will be constructed is covered with the pre-beam curing unit 4. After that, as shown in Figure 11, the peripheral beam 6 is constructed, a handrail is installed on the constructed peripheral beam 6, and a lower shatterproof membrane 36 is installed on the handrail.

[0039] [Another embodiment] Other embodiments of the present invention will be described below. Note that the configurations of the embodiments described below are not limited to being applied alone, but may also be applied in combination with the configurations of other embodiments.

[0040] (1) In the above embodiment, the pre-column curing unit 3 is attached to the surface of the peripheral column 2 facing the outside Y1 of the building via the pre-column support material 7, and the pre-beam curing unit 4 is attached to the surface of the peripheral column 2 facing the building periphery direction X via the pre-beam support material 8. However, the positions at which the pre-column curing unit 3 and the pre-beam curing unit 4 are attached to the peripheral column 2 may be changed as appropriate, for example, by attaching the pre-column curing unit 3 to the center in the building periphery direction X of the surface of the peripheral column 2 facing the outside Y1 of the building via the pre-column support material 7, and attaching the pre-beam curing unit 4 to the end in the building periphery direction X of the surface of the peripheral column 2 facing the outside Y1 of the building via the pre-beam support material 8.

[0041] (2) In the above embodiment, the configuration has been described as an example in which the beam-front shatterproof membrane 24 is connected to and supported by being suspended from the upper end of the vertical member 23 rising from the erection material 22. However, the configuration for supporting the beam-front shatterproof membrane 24 may be changed as appropriate, for example, by providing the beam-front support material 8 in an inclined position that is higher toward the building exterior Y1, placing the erection material 22 at a higher position than in the above embodiment, and supporting the beam-front shatterproof membrane 24 by suspending it from the erection material 22.

[0042] (3) In the above embodiment, the connecting member 21 is made of an H-shaped steel. However, the connecting member 21 may be made of a channel steel, or the like. The configuration of the connecting member 21 may be changed as appropriate.

[0043] (4) In the above embodiment, a configuration has been described as an example in which the column side through hole 28 is provided only in the column side connected part 26 out of the column side connected part 26 and the column side connecting part 27. However, a configuration in which the column side through hole 28 is provided in both the column side connected part 26 and the column side connecting part 27 may also be used, or a configuration in which the column side through hole 28 is provided only in the column side connecting part 27 out of the column side connected part 26 and the column side connecting part 27 may also be used.

[0044] (5) In the above embodiment, an example has been described in which the unit side through hole 33 is provided only in the unit side connected portion 31 of the unit side connected portion 31 and the unit side connecting portion 32. However, the unit side through hole 33 may be provided in both the unit side connected portion 31 and the unit side connecting portion 32, or the unit side through hole 33 may be provided only in the unit side connecting portion 32 of the unit side connected portion 31 and the unit side connecting portion 32. [Explanation of symbols]

[0045] 1. Curing unit structure 2 Periphery pillars 3. Column pre-curing unit 4 Beam pre-curing unit 7 Support material for front of pillar 8 Support material for the front of the beam 21 Connecting material 22 Erection materials 23 Vertical members 24 Shatterproof membrane for beam front 26 Column side connected part 27 Column side connection part 28 Pillar side through hole 29 Column side fastening member 31 Unit side connected part 32 Unit side connection part 33 Unit side through hole 34 Unit side connecting member X Towards the outer periphery of the building Y1 Outside the building

Claims

1. a pre-column curing unit that is installed on the outside of a plurality of peripheral columns aligned in a circumferential direction of the building in a state supported by each of the peripheral columns; and a pre-beam curing unit that is installed between a pair of the pre-column curing units aligned in the circumferential direction of the building, A curing unit structure in which the column front curing unit and the beam front curing unit are configured to be climbable separately, A curing unit structure in which the pre-beam curing unit is supported by a pair of the peripheral columns in a state spanning the pair of peripheral columns and is attached at a position on the peripheral columns which is different from the attachment position of the pre-column curing unit when viewed in a plan view.

2. The column pre-covering unit is attached to the surface of the outer perimeter column facing the outside of the building via a column pre-support material, The curing unit structure according to claim 1 , wherein the beam pre-cure unit is attached to the surface of the outer perimeter column facing toward the outer perimeter of the building via a beam pre-support material.

3. The beam front support member includes a pair of connecting members connected to a pair of the outer perimeter columns, The beam pre-covering unit includes a construction material extending between the pair of connecting materials, a vertical material rising from the construction material, and a beam pre-scattering prevention film covering the outside of the perimeter beam extending between the pair of perimeter columns, The curing unit structure according to claim 2, wherein the anti-scattering membrane for the front of the beam is connected to the upper end of the vertical member and supported in a suspended manner.

4. The outer perimeter column is provided with a column-side connected portion on both sides facing the outer perimeter direction of the building, Each of the pair of connecting members has a column side connecting portion connected to the column side connected portion at an end portion on the inside of the building, Both the column side connected part and the column side connecting part are provided with a plurality of column side through holes that penetrate in the vertical direction and are formed as long holes that are long in the inside and outside directions of the building, a large hole portion through which at least one of a head of a bolt and a nut of a column-side fastening member constituted by a bolt and a nut can be inserted is formed in either the column-side through hole of the column-side connected part or the column-side through hole of the column-side connecting part; The curing unit structure according to claim 3 , wherein the column side connecting portion is fastened and fixed to the column side connected portion by the column side fastening members inserted into the plurality of column side through holes.

5. The erection material is provided with unit side connected portions at both ends in the building periphery direction, Each of the pair of connecting members has a unit side connecting portion connected to the unit side connected portion at an end portion on the outer side of the building, At least one of the unit side connected portion and the unit side connecting portion is provided with a unit side through hole penetrating in the vertical direction at only one location, and the unit side connecting portion and the unit side connected portion are configured to be swingable about an axis along the vertical direction with a unit side connecting member connecting the unit side connecting portion and the unit side connected portion being inserted into the unit side through hole, A curing unit structure as described in claim 3 or 4, wherein the unit side through hole is formed in a shape that allows the unit side connecting portion and the unit side connected portion to move relatively in the outer periphery of the building when the unit side connecting member is inserted therethrough.

Citation Information

Patent Citations

  • Construction method

    JP2021085271A