Bath system
The bath system integrates a shared storage tank and control unit with integrated flow paths and pumps to perform both bathtub cleaning and fine bubble generation operations, addressing high manufacturing costs by optimizing pump usage and maintaining cleanliness, thus achieving efficient and cost-effective operation.
Patent Information
- Application Number
- JP2023085620
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-12-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Bath systems capable of performing both bathtub cleaning and fine bubble generation operations tend to have high manufacturing costs due to the need for separate pumps and mechanisms for each function.
A bath system design that incorporates a shared storage tank with a backflow prevention mechanism, a detergent mixing unit, a microbubble generation unit, and a control unit, with integrated flow paths and pumps to perform both operations efficiently, reducing the need for separate cleaning pumps by utilizing a single pump for both functions.
The system allows for both bathtub cleaning and fine bubble generation operations while maintaining the microbubble generation unit's cleanliness at a relatively low cost by sharing components and optimizing pump usage, thereby reducing manufacturing costs.
Smart Images

Figure 2024168720000001_ABST
Abstract
Description
[Technical field]
[0001] The technology disclosed in this specification relates to a bath system. [Background technology]
[0002] Patent Document 1 discloses a bath system that includes a storage tank that stores hot and cold water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot and cold water from flowing back toward the water supply source, a pump that pumps the hot and cold water, a detergent mixing unit that mixes detergent into the hot and cold water, a flow path that runs from the storage tank to the bathtub via the detergent mixing unit, and a control unit. The control unit is configured to be able to execute a bathtub cleaning operation that mixes detergent into the hot and cold water sent from the storage tank by the detergent mixing unit, and supplies the hot and cold water mixed with detergent to the bathtub to clean the bathtub by controlling the bath system so that the hot and cold water flows along the flow path.
[0003] Patent Document 2 discloses a fine-bubble generating device including a pump for pumping hot water, a fine-bubble generating unit for generating fine bubbles in the hot water, and a flow path from the bathtub to the bathtub via the fine-bubble generating unit. By operating the pump, the fine-bubble generating device can perform a fine-bubble generating operation for circulating the hot water stored in the bathtub to the fine-bubble generating unit and generating fine bubbles in the hot water stored in the bathtub.
[0004] For example, by incorporating the fine bubble generator of Patent Document 2 into the bath system of Patent Document 1, a bath system capable of performing both a bathtub cleaning operation and a fine bubble generating operation can be configured. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent Publication No. 2022-82148 [Patent Document 2] JP 2017-148717 A Summary of the Invention [Problem to be solved by the invention]
[0006] Bath systems capable of both bathtub cleaning and fine bubble generating operations tend to be expensive to manufacture. This specification provides a technology that allows a bath system capable of both bathtub cleaning and fine bubble generating operations to be manufactured at a relatively low cost. [Means for solving the problem]
[0007] In a first aspect of the present technology, a bath system includes a storage tank that stores hot and cold water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot and cold water from flowing back toward the water supply source, one or more pumps that pump the hot and cold water, a detergent mixing unit that mixes detergent into the hot and cold water, a micro-bubble generating unit that generates micro-bubbles in the hot and cold water, a bath circuit connected to a bathtub and in which the storage tank, the one or more pumps, the detergent mixing unit, and the micro-bubble generating unit are provided, and a control unit. The bath circuit includes a first flow path from the storage tank to the bathtub via the detergent mixing unit, a second flow path from the bathtub to the bathtub via the micro-bubble generating unit, and a third flow path from the storage tank to the bathtub via the micro-bubble generating unit. The control unit is configured to execute a bathtub cleaning operation in which detergent is mixed with the hot water sent from the storage tank by the detergent mixing unit and the hot water mixed with the detergent is supplied to the bathtub to clean the bathtub by controlling the bath system so that hot water flows along the first flow path, a fine-bubble generating operation in which the hot water stored in the bathtub is circulated to the fine-bubble generating unit by controlling the bath system so that hot water flows along the second flow path, thereby generating fine bubbles in the hot water stored in the bathtub, and a fine-bubble generating unit cleaning operation in which the hot water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by controlling the bath system so that hot water flows along the third flow path.
[0008] Since the hot water stored in the bathtub may be contaminated with dirt (e.g., the user's sebum), the fine bubble generating operation may cause the dirt to enter the fine bubble generating unit. Therefore, in order to keep the fine bubble generating unit clean, it is preferable to wash the fine bubble generating unit with hot water supplied from the water supply source. From a hygienic point of view, it is necessary to prevent the hot water stored in the bathtub and the hot water mixed with detergent from flowing back to the water supply source. According to the above configuration, the hot water supplied from the water supply source is stored in a storage tank having a backflow prevention mechanism, and the hot water can be supplied from the storage tank to the detergent mixing unit and the fine bubble generating unit. For this reason, the storage tank having the backflow prevention mechanism is shared between the units. Therefore, a bath system capable of performing both the bathtub cleaning operation and the fine bubble generating operation while keeping the fine bubble generating unit clean can be manufactured at a relatively low cost.
[0009] In a second aspect of the present technology, in the first aspect, the bathtub may be provided with a cleaning nozzle through which hot and cold water flowing through the first flow path during the bathtub cleaning operation is discharged into the bathtub, an inlet through which hot and cold water in the bathtub flows into the second flow path during the fine-bubble generating operation, and an outlet through which hot and cold water flowing through the second flow path during the fine-bubble generating operation flows out into the bathtub. The bath circuit may include a bathtub cleaning path having one end connected to the storage tank and the other end connected to the cleaning nozzle, a circulation path having one end connected to the inlet and the other end connected to the outlet, a communication path having one end connected to the bathtub cleaning path and the other end connected to the circulation path, and a switching mechanism provided in the communication path and switching between a first state that prohibits the flow of hot and cold water through the communication path and a second state that allows the flow of hot and cold water through the communication path in response to an instruction from the control unit. The detergent mixing unit may be provided in a portion of the bathtub cleaning path from a point where the one end of the communicating path is connected to the other end of the bathtub cleaning path. The fine-bubble generating unit may be provided between a point where the other end of the communicating path is connected to the circulation path and the other end of the circulation path. When the switching mechanism is in the first state, the bathtub cleaning path may function as the first flow path, and the circulation path may function as the second flow path. When the switching mechanism is in the second state, a portion from the one end of the bathtub cleaning path to a point where the one end of the communicating path is connected to the bathtub cleaning path, the communicating path, and a portion of the circulation path from a point where the other end of the communicating path is connected to the other end of the circulation path may function as the third flow path.
[0010] According to the above configuration, a part of the first flow path and a part of the second flow path can function as a part of the third flow path, which makes it possible to simplify the configuration of the bath circuit.
[0011] In a third aspect of the present technology, in the second aspect, the one or more pumps may include a cleaning pump provided in the bathtub cleaning path and pumping hot and cold water flowing in the bathtub cleaning path from one end to the other end of the bathtub cleaning path, and a circulation pump provided in the circulation path and pumping hot and cold water flowing in the circulation path from the one end to the other end of the circulation path. The control unit may operate the cleaning pump with the switching mechanism in the first state during the bathtub cleaning operation, operate the circulation pump with the switching mechanism in the first state during the fine-bubble generating operation, and operate at least one of the cleaning pump and the circulation pump with the switching mechanism in the second state during the fine-bubble generating unit cleaning operation.
[0012] According to the above configuration, the fine-bubble generating unit cleaning operation can be performed using the cleaning pump operated during the bathtub cleaning operation (or the circulation pump operated during the fine-bubble generating operation). Therefore, there is no need to provide a separate pump for the fine-bubble generating unit cleaning operation. This allows the bath system to be manufactured at even lower cost.
[0013] In a fourth aspect of the present technology, in the third aspect, the one end of the communication passage may be connected to a portion of the bathtub cleaning passage downstream of the cleaning pump. The control unit may operate the cleaning pump after setting the switching mechanism to the second state during the fine-bubble generating unit cleaning operation.
[0014] For example, if the cleaning pump has superior durability compared to other pumps (such as the circulation pump), it is desirable to operate the cleaning pump proactively to reduce the burden on the other pumps. According to the above configuration, since the cleaning pump is operated when the fine-bubble generating unit cleaning operation is performed, there is no need to operate pumps other than the cleaning pump. Therefore, it is possible to reduce the burden on pumps other than the cleaning pump.
[0015] In a fifth aspect of the present technology, in the third aspect, the other end of the communication passage may be connected to a portion of the circulation path upstream of the circulation pump. The control unit may operate the circulation pump after setting the switching mechanism to the second state during the micro-bubble generating unit cleaning operation.
[0016] For example, if the circulation pump has superior durability compared to other pumps (such as a cleaning pump), it is desirable to operate the circulation pump proactively to reduce the burden on the other pumps. According to the above configuration, since the circulation pump is operated when the fine-bubble generating unit cleaning operation is performed, there is no need to operate pumps other than the circulation pump. Therefore, the burden on pumps other than the circulation pump can be reduced. Furthermore, according to the above configuration, clean hot water stored in the storage tank passes through the circulation pump while the fine-bubble generating unit cleaning operation is being performed. This removes dirt adhering to the circulation pump, allowing the circulation pump to be kept clean.
[0017] In a sixth aspect of the present technology, in the third aspect, the one end of the communication passage may be connected to a portion of the bathtub cleaning passage downstream of the cleaning pump, and the other end of the communication passage may be connected to a portion of the circulation passage upstream of the circulation pump.
[0018] According to the above configuration, the pump to be operated during the cleaning operation of the fine-bubble generating unit can be selected from the cleaning pump and the circulation pump. This makes it possible to switch the pump to be operated during the cleaning operation of the fine-bubble generating unit depending on the situation, for example.
[0019] In a seventh aspect of the present technology, in the sixth aspect described above, when performing the fine-bubble generating unit cleaning operation, the control unit may operate at least one of the cleaning pump and the circulation pump so that the operating time or number of operations is equalized between the cleaning pump and the circulation pump.
[0020] If only one of the cleaning pump and the circulation pump is operated during the fine-bubble generating unit cleaning operation, the load on the pump may be large. According to the above configuration, when the fine-bubble generating unit cleaning operation is performed, at least one of the cleaning pump and the circulation pump can be operated so that the operating time or the number of operations is equalized between the cleaning pump and the circulation pump. This makes it possible to prevent the load on the cleaning pump (or the circulation pump) from becoming too large. [Brief description of the drawings]
[0021] [Figure 1] 2 is a diagram showing a schematic diagram of the configuration of a first flow path F1 and a second flow path F2 in a bath system 2 according to Example 1. FIG. [Diagram 2] 1 is a diagram showing a schematic configuration of a bathtub adaptor 22 according to a first embodiment. [Diagram 3] 13 is a diagram showing a schematic diagram of the configuration of a third flow path F3 in the bath system 2 of Example 1. FIG. [Figure 4] 10 is a flowchart of a pump leveling process executed by the control unit 16 of the bath system 2 according to the first embodiment. [Diagram 5] A diagram showing a schematic diagram of how a first flow path F1 and a second flow path F2 are configured in a bath system 202 according to Example 2. [Figure 6] A diagram showing a schematic diagram of how a third flow path F3 is configured in a bath system 202 according to Example 2. [Figure 7] A diagram showing a schematic diagram of the configuration of a first flow path F1' in a bath system 302 according to Example 3. [Figure 8] A diagram showing a schematic diagram of how a second flow path F2' is configured in a bath system 302 according to Example 3. [Figure 9] A diagram showing a schematic diagram of how a third flow path F3' is configured in a bath system 302 according to Example 3. [Figure 10] FIG. 11 is a diagram showing a schematic configuration of a bath system 402 according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] (Example 1: Bath System 2) As shown in Fig. 1, the bath system 2 of this embodiment includes a bath circuit 4, a heat source unit 6, a storage tank 8, a washing pump 10A, a circulation pump 10B, a detergent mixing unit 12, a fine bubble generating unit 14, and a control unit 16. The bath system 2 can heat hot water supplied from a water supply source 18 (e.g., a water supply) and supply the hot water heated to a desired temperature to a faucet (not shown) installed in a kitchen or the like, or to a bathtub 20 installed in a bathroom. The bath system 2 can also reheat the hot water (also called bathtub water) stored in the bathtub 20, and generate fine bubbles in the bathtub water. The bath system 2 can also clean the bathtub 20.
[0023] The bathtub 20 is provided with a bathtub adapter 22, a cleaning nozzle 24, and a drain plug 26. The bathtub adapter 22 is attached to the side wall of the bathtub 20. The bathtub adapter 22 is a necessary tool for supplying hot and cold water to the bathtub 20 and for sucking hot and cold water out of the bathtub 20. The cleaning nozzle 24 is attached to the center of the bottom wall of the bathtub 20. The cleaning nozzle 24 is a tool configured to spray the supplied liquid toward the inner wall of the bathtub 20. The cleaning nozzle 24 is configured to spray the liquid radially when the bathtub 20 is viewed from above, for example. The drain plug 26 is attached to a drain port (not shown) formed in the bottom wall of the bathtub 20. The drain plug 26 opens and closes the drain port. When the drain plug 26 is closed, the drain port is closed, so hot and cold water can be stored in the bathtub 20. When the drain plug 26 is open, the drain port is opened, so hot and cold water stored in the bathtub 20 can be discharged from the drain port. An actuator 28 is attached to the drain plug 26 for opening and closing the drain plug 26. The drain plug 26 can also be opened and closed manually by a user.
[0024] (Bathroom Circuit 4) The bath circuit 4 includes a water supply passage 30, a hot water outlet passage 32, a bath outward passage 34, a bath return passage 36, a water supply passage 38, a water supply valve 40, a tank hot water outlet passage 42, a first three-way valve 44, a cleaning passage opening / closing valve 46, a communication passage 48, a second three-way valve 50, a first detergent mixing passage 52, a check valve 54, a second detergent mixing passage 56, a first circulation return passage 57, a second circulation return passage 58, and a circulation outward passage 60. In this embodiment, the tank hot water outlet passage 42, the first detergent mixing passage 52, and the second detergent mixing passage 56 are sometimes collectively referred to as the "bathtub cleaning passage A". Also, the second circulation return passage 58, the circulation outward passage 60, and the first circulation return passage 57 are sometimes collectively referred to as the "circulation passage B".
[0025] One end of the water supply passage 30 is connected to the water supply source 18. The other end of the water supply passage 30 is connected to the heat source unit 6. One end of the hot water outlet passage 32 is connected to the heat source unit 6. The other end of the hot water outlet passage 32 is connected to, for example, a faucet (not shown). One end of the bath outgoing passage 34 is connected to the heat source unit 6. The other end of the bath outgoing passage 34 is connected to the bathtub adapter 22. One end of the bath return passage 36 is connected to the bathtub adapter 22. The other end of the bath return passage 36 is connected to the heat source unit 6. One end of the water refill passage 38 is connected to the middle of the hot water outlet passage 32. The other end of the water refill passage 38 is connected to the top of the storage tank 8. A water refill valve 40 is provided in the water refill passage 38. One end of the tank hot water outlet passage 42 is connected to the bottom of the storage tank 8. The other end of the tank hot water outlet passage 42 is connected to a first three-way valve 44. The cleaning path opening / closing valve 46 is provided in the tank hot water outlet path 42. One end of the communication path 48 is connected to the first three-way valve 44. The other end of the communication path 48 is connected to the second three-way valve 50. One end of the first detergent mixing path 52 is connected to the first three-way valve 44. The other end of the first detergent mixing path 52 is connected to the detergent mixing unit 12. The check valve 54 is provided in the first detergent mixing path 52. One end of the second detergent mixing path 56 is connected to the detergent mixing unit 12. The other end of the second detergent mixing path 56 is connected to the cleaning nozzle 24. One end of the first circulation return path 57 is connected to the bathtub adapter 22. The other end of the first circulation return path 57 is connected to the second three-way valve 50. One end of the second circulation return path 58 is connected to the second three-way valve 50. The other end of the second circulation return path 58 is connected to the fine bubble generating unit 14. One end of the outward circulation path 60 is connected to the fine bubble generating unit 14. The other end of the outward circulation path 60 is connected to the bathtub adapter 22.
[0026] The make-up water valve 40 opens and closes the make-up water passage 38. The make-up water valve 40 is normally closed. The cleaning passage opening and closing valve 46 opens and closes the tank hot water outlet passage 42. The cleaning passage opening and closing valve 46 is normally closed. The first three-way valve 44 is switchable between a first communication state (see FIG. 1) in which the tank hot water outlet passage 42 and the first detergent mixing passage 52 are connected to each other and the tank hot water outlet passage 42 and the connecting passage 48 are not connected to each other, and a second communication state (see FIG. 3) in which the tank hot water outlet passage 42 and the first detergent mixing passage 52 are not connected to each other and the tank hot water outlet passage 42 and the connecting passage 48 are connected to each other. The second three-way valve 50 is switchable between a third communication state (see FIG. 1) in which the first circulation return path 57 and the second circulation return path 58 are communicated with each other and the second circulation return path 58 is not communicated with the communication passage 48, and a fourth communication state (see FIG. 3) in which the first circulation return path 57 and the second circulation return path 58 are not communicated with each other and the second circulation return path 58 is communicated with the communication passage 48. The check valve 54 allows the flow of hot water and cold water in the first detergent mixing path 52 from the first three-way valve 44 toward the detergent mixing unit 12 and prohibits the flow of hot water and cold water from the detergent mixing unit 12 toward the first three-way valve 44.
[0027] Cleaning pump 10A is provided in tank outlet passage 42, between storage tank 8 and cleaning passage on-off valve 46. Cleaning pump 10A pumps hot water flowing in tank outlet passage 42 in a direction from storage tank 8 toward first three-way valve 44. In addition, circulation pump 10B is provided in second circulation return passage 58. Circulation pump 10B pumps hot water flowing in second circulation return passage 58 in a direction from second three-way valve 50 toward fine bubble generating unit 14. Cleaning pump 10A and circulation pump 10B are installed, for example, between the outer wall of bathtub 20 and the bathtub apron (not shown).
[0028] (Configuration of heat source unit 6) The heat source unit 6 includes a first heat source unit 64, a second heat source unit 66, a heat source water supply passage 68, a heat source hot water outlet passage 70, a heat source bath return passage 72, a heat source bath outward passage 74, a bypass passage 76, a bypass servo 78, a hot water supply passage 80, a hot water filling valve 82, and a reheating pump 84. The heat source unit 6 is installed, for example, outdoors.
[0029] One end of the heat source water supply passage 68 is connected to the water supply passage 30. The other end of the heat source water supply passage 68 is connected to the first heat source unit 64. One end of the heat source hot water outlet passage 70 is connected to the first heat source unit 64. The other end of the heat source hot water outlet passage 70 is connected to the hot water outlet passage 32. The first heat source unit 64 heats hot water, for example, by burning gas. The first heat source unit 64 heats the water flowing in from the heat source water supply passage 68 and sends the heated hot water to the heat source hot water outlet passage 70.
[0030] One end of the bypass passage 76 is connected to the heat source water supply passage 68. The other end of the bypass passage 76 is connected to the heat source hot water outlet passage 70. The bypass servo 78 is provided at a point where the bypass passage 76 connects to the heat source water supply passage 68. The bypass servo 78 can adjust the ratio of the flow rate of hot water flowing from the heat source water supply passage 68 to the heat source hot water outlet passage 70 via the first heat source unit 64 and the flow rate of hot water flowing from the heat source water supply passage 68 to the heat source hot water outlet passage 70 via the bypass passage 76 by adjusting the opening degree of the built-in valve body. By adjusting the opening degree of the bypass servo 78, the high-temperature hot water flowing from the first heat source unit 64 and the low-temperature hot water flowing from the bypass passage 76 are mixed at a desired ratio in the heat source hot water outlet passage 70 downstream of the point where the bypass passage 76 is connected, and hot water adjusted to a desired temperature is supplied.
[0031] One end of the molten metal pouring path 80 is connected to the heat source molten metal outlet path 70 downstream of the point where the bypass path 76 connects to the heat source molten metal outlet path 70. The other end of the molten metal pouring path 80 is connected to the heat source bath return path 72. A molten metal filling valve 82 is provided in the molten metal pouring path 80 and opens and closes the molten metal pouring path 80. The molten metal filling valve 82 is normally closed.
[0032] One end of the heat source bath return path 72 is connected to the bath return path 36. The other end of the heat source bath return path 72 is connected to the second heat source unit 66. One end of the heat source bath outward path 74 is connected to the second heat source unit 66. The other end of the heat source bath outward path 74 is connected to the bath outward path 34. The second heat source unit 66 heats hot water, for example, by burning gas. The second heat source unit 66 heats the hot water flowing in from the heat source bath return path 72 and sends the heated hot water to the heat source bath outward path 74.
[0033] The reheating pump 84 is provided in the heat source bath return path 72 between the point where the hot water supply path 80 connects to the heat source bath return path 72 and the second heat source unit 66. The reheating pump 84 pumps the hot water flowing in the heat source bath return path 72 toward the second heat source unit 66.
[0034] (Configuration of storage tank 8) The storage tank 8 is installed, for example, between the outer wall of the bathtub 20 and the bathtub apron (not shown). The storage tank 8 is provided with an overflow path 86. One end of the overflow path 86 is connected to the storage tank 8. The other end of the overflow path 86 is connected to a predetermined drainage point (for example, a sewer). The point where one end of the overflow path 86 connects to the storage tank 8 is located at a lower position than the point where the other end of the water supply path 38 connects to the storage tank 8, and is located at a higher position than the point where one end of the tank hot water outlet path 42 connects to the storage tank 8. When the hot water stored in the storage tank 8 reaches the height of the point where one end of the overflow path 86 connects to the storage tank 8, the hot water is discharged to the drainage point via the overflow path 86. Therefore, the water level in the storage tank 8 is maintained below the height of the point where one end of the overflow path 86 connects to the storage tank 8. As a result, the hot and cold water stored in the storage tank 8 is prevented from flowing back toward the water supply passage 38 (i.e., the water supply source 18). In addition, the storage tank 8 is provided with a water level sensor (not shown) capable of detecting the water level in the storage tank 8.
[0035] (Configuration of detergent mixing unit 12) Detergent mixing unit 12 includes a detergent tank 88, a detergent inlet passage 90, a detergent valve 92, and a mixer 94. Detergent tank 88 stores liquid detergent for cleaning bathtub 20. Detergent mixing unit 12 is installed, for example, between the outer wall of bathtub 20 and a bathtub apron (not shown).
[0036] One end of the detergent introduction passage 90 is connected to the bottom of the detergent tank 88. The other end of the detergent introduction passage 90 is connected to a mixer 94. A detergent valve 92 is provided in the detergent introduction passage 90 and opens and closes the detergent introduction passage 90. The detergent valve 92 is normally closed. The mixer 94 is provided between the first detergent mixing passage 52 and the second detergent mixing passage 56. The mixer 94 has a venturi (not shown). When hot and cold water flows inside the mixer 94 with the detergent valve 92 open, negative pressure is generated inside the mixer 94. Due to this negative pressure, the detergent stored in the detergent tank 88 is sucked into the mixer 94 through the detergent introduction passage 90. Then, inside the mixer 94, hot and cold water mixed with the detergent (also called cleaning liquid) is generated.
[0037] (Configuration of the microbubble generating unit 14) The fine bubble generating unit 14 includes a pressurized tank 96, a tank inlet passage 98, a tank outlet passage 100, a pressurizing pump 102, a tank opening / closing valve 104, an air introduction passage 106, an air introduction valve 108, and an air introduction pump 110. The fine bubble generating unit 14 is installed, for example, between the outer wall of the bathtub 20 and a bathtub apron (not shown).
[0038] The pressurized tank 96 can store hot water therein. A low water level electrode 112 and a high water level electrode 114 for detecting the water level in the pressurized tank 96 are provided inside the pressurized tank 96. The low water level electrode 112 detects the water level by coming into contact with the surface of the hot water stored in the pressurized tank 96. The high water level electrode 114 detects the water level by coming into contact with the surface of the hot water stored in the pressurized tank 96. The water level detected by the low water level electrode 112 (hereinafter also referred to as the lower limit water level) is lower than the water level detected by the high water level electrode 114 (hereinafter also referred to as the upper limit water level). The pressurized tank 96 is used to pressurize and dissolve air in the hot water.
[0039] One end of the tank inlet passage 98 is connected to the second circulation return passage 58. The other end of the tank inlet passage 98 is connected to the upper part of the pressurized tank 96. The pressurized pump 102 is provided in the tank inlet passage 98. The pressurized pump 102 pressure-feeds the hot and cold water flowing in the tank inlet passage 98 toward the pressurized tank 96.
[0040] One end of the tank outflow path 100 is connected to the bottom of the pressurized tank 96. The other end of the tank outflow path 100 is connected to the outward circulation path 60. The tank on-off valve 104 is provided in the tank outflow path 100 and opens and closes the tank outflow path 100. The tank on-off valve 104 is normally closed.
[0041] One end of the air introduction path 106 is connected to the pressurized tank 96. An air introduction pump 110 is provided at the other end of the air introduction path 106. An air introduction valve 108 is provided midway through the air introduction path 106. The air introduction valve 108 opens and closes the air introduction path 106. The air introduction valve 108 is normally closed. The air introduction pump 110 takes in air from the atmosphere and sends the taken in air to the pressurized tank 96 via the air introduction path 106.
[0042] (Configuration of bathtub adapter 22) As shown in FIG. 2, the bathtub adapter 22 includes a first inlet 116, a first inlet 118, a second inlet 120, a second inlet 122, a first outlet 124, a first outlet 126, a second outlet 128, a second outlet 130, four check valves 132, 134, 136, 138, and a fine bubble generating nozzle 140. One end of the first inlet 116 is connected to the inside of the bathtub 20 via the first inlet 118. The other end of the first inlet 116 is connected to the first circulation return path 57. The check valve 132 is provided in the first inlet 116. The check valve 132 allows hot water to flow from the first inlet 118 to the first circulation return path 57 and prohibits hot water from flowing from the first circulation return path 57 to the first inlet 118. One end of the second inflow path 120 communicates with the inside of the bathtub 20 via the second inlet 122. The other end of the second inflow path 120 is connected to the bath return path 36. The check valve 134 is provided in the second inflow path 120. The check valve 134 allows hot water to flow from the second inlet 122 to the bath return path 36, and prohibits hot water from flowing from the bath return path 36 to the second inlet 122. One end of the first outflow path 124 communicates with the inside of the bathtub 20 via the first outlet 126. The other end of the first outflow path 124 is connected to the circulation outward path 60. The check valve 136 is provided in the first outflow path 124. The check valve 136 allows hot water to flow from the circulation outward path 60 to the first outlet 126, and prohibits hot water from flowing from the first outlet 126 to the circulation outward path 60. The fine bubble generating nozzle 140 is provided in the first outflow passage 124 between the check valve 136 and the first outlet 126. The fine bubble generating nozzle 140 is equipped with a venturi (not shown) and reduces the pressure of the hot water passing through the fine bubble generating nozzle 140. One end of the second outflow passage 128 communicates with the inside of the bathtub 20 via the second outlet 130. The other end of the second outflow passage 128 is connected to the bath outflow passage 34. The check valve 138 is provided in the second outflow passage 128. The check valve 138 allows the flow of hot water from the bath outflow passage 34 toward the second outlet 130 and prohibits the flow of hot water from the second outlet 130 toward the bath outflow passage 34.
[0043] (Configuration of control unit 16) The control unit 16 shown in FIG. 1 includes a CPU, a ROM, a RAM, and the like. The control unit 16 is configured to be able to execute various operations (bath water filling operation, reheating operation, bathtub cleaning operation, fine bubble generating operation, and fine bubble generating unit cleaning operation) described below by controlling the operation of each part of the bath system 2. The control unit 16 is also configured to be able to communicate with a remote control 160 that can be operated by a user. The user can instruct the start and end of various operations and change various settings via the remote control 160. The various settings here include, for example, the set temperature and set water volume for the bath water filling operation, and the set temperature for the reheating operation. The control unit 16 also stores in its memory the operating time of the cleaning pump 10A and the operating time of the circulation pump 10B for a predetermined period in the past (for example, the past seven days).
[0044] (Bath filling operation) The water filling operation is started, for example, when the user instructs the start of the water filling operation on the remote control 160. Alternatively, the water filling operation is started when the start time of the water filling operation set by the user on the remote control 160 arrives. When the water filling operation is started, the control unit 16 operates the actuator 28 to close the drain plug 26, except when the drain plug 26 is already closed. After that, the control unit 16 opens the water filling valve 82 and starts heating by the first heat source unit 64. As a result, hot water adjusted to the set temperature for the water filling operation flows from the heat source hot water outlet path 70 through the hot water supply path 80 into the heat source bath return path 72. Here, in the heat source bath return path 72, the flow from the point where the hot water supply path 80 is connected to the second heat source unit 66 is permitted, but the flow from the point where the hot water supply path 80 is connected to the bath return path 36 is prohibited by the check valve 134 of the bathtub adapter 22 (see FIG. 2). Therefore, the hot water flowing from the hot water supply passage 80 into the heat source bath return passage 72 flows into the bathtub 20 via the second heat source unit 66, the heat source bath outward passage 74, the bath outward passage 34, the second outlet passage 128 (see FIG. 2) and the second outlet port 130 (see FIG. 2) of the bathtub adapter 22. The control unit 16 waits until the accumulated water volume detected by a water volume sensor (not shown) provided in the hot water supply passage 80, for example, reaches the set water volume for the bath filling operation. The accumulated water volume here means the accumulated water volume detected by the water volume sensor after the bath filling operation has started. When the accumulated water volume reaches the set water volume, the control unit 16 closes the bath filling valve 82 and stops heating the hot water by the first heat source unit 64. The control unit 16 then stops the bath filling operation.
[0045] (Reheating operation) The reheating operation is started, for example, when the user instructs the start of the reheating operation on the remote control 160. When the reheating operation is started, the control unit 16 operates the reheating pump 84 and starts heating the hot water by the second heat source unit 66. As a result, the hot water in the bathtub 20 is sent to the second heat source unit 66 via the second inlet 122 (see FIG. 2) and second inlet passage 120 (see FIG. 2) of the bathtub adapter 22, the bath return passage 36, and the heat source bath return passage 72. The hot water heated by the second heat source unit 66 is returned to the bathtub 20 via the heat source bath outward passage 74, the bath outward passage 34, the second outward passage 128 (see FIG. 2) and second outflow port 130 (see FIG. 2) of the bathtub adapter 22. When the temperature detected by, for example, a temperature sensor (not shown) provided in the heat source bath return line 72 becomes equal to or higher than the set temperature for the reheating operation, the control unit 16 stops the reheating pump 84 and terminates the heating of hot water by the second heat source unit 66. After that, the control unit 16 terminates the reheating operation.
[0046] (Bathtub cleaning operation) The bathtub cleaning operation is started, for example, when the user issues an instruction to start the bathtub cleaning operation via the remote control 160. When the bathtub cleaning operation is started, the control unit 16 sets the first three-way valve 44 to the first communication state (see FIG. 1). In this state, a flow path is formed from the storage tank 8 through the tank outlet path 42, the first detergent mixing path 52, the detergent mixing unit 12, and the second detergent mixing path 56 to the cleaning nozzle 24. In this embodiment, this flow path is also referred to as the "first flow path F1." The first flow path F1 is opened when the cleaning path opening / closing valve 46 is opened, and is closed when the cleaning path opening / closing valve 46 is closed.
[0047] The bathtub cleaning operation includes a preparation step, a preliminary cleaning step, a cleaning liquid spraying step, and a rinsing step.
[0048] (preparation process) The preparation process is started when the bathtub cleaning operation starts. When the preparation process starts, the control unit 16 operates the actuator 28 to open the drain plug 26, except when the drain plug 26 is already open. The control unit 16 then waits until the bathtub 20 is empty (for example, waits for 10 minutes). When the bathtub 20 is empty, the control unit 16 closes the cleaning path opening / closing valve 46, except when the cleaning path opening / closing valve 46 is already closed. In addition, the control unit 16 opens the water refill valve 40 and starts heating by the first heat source unit 64. As a result, hot water adjusted to a predetermined temperature flows from the heat source hot water outlet path 70 through the water refill path 38 into the storage tank 8. At this time, hot water is stored in the storage tank 8, so the water level in the storage tank 8 rises. The control unit 16 waits until the water level detected by a water level sensor (not shown) provided in the storage tank 8 reaches a predetermined water level. When the water level detected by the water level sensor reaches a predetermined water level, the control unit 16 closes the water make-up valve 40 and terminates the heating of hot water by the first heat source unit 64. Thereafter, the control unit 16 terminates the preparation process.
[0049] (Pre-cleaning process) The control unit 16 starts the preliminary washing process in response to the completion of the preparation process. When the preliminary washing process starts, the control unit 16 opens the washing path opening / closing valve 46 and operates the washing pump 10A. This causes the hot and cold water stored in the storage tank 8 to be sent to the washing nozzle 24 via the first flow path F1. The hot and cold water sent to the washing nozzle 24 is sprayed from the washing nozzle 24. When the elapsed time from the start of the preliminary washing process reaches a predetermined time (e.g., 40 seconds), the control unit 16 stops the washing pump 10A and closes the washing path opening / closing valve 46. The control unit 16 then ends the preliminary washing process. In the preliminary washing process, dirt adhering to the inner wall of the bathtub 20 is simply washed away by the hot and cold water.
[0050] (Cleaning liquid injection process) When the time elapsed since the end of the preliminary washing process reaches a predetermined time (e.g., 30 seconds), the control unit 16 starts the washing liquid spraying process. When the washing liquid spraying process starts, the control unit 16 opens the washing path opening / closing valve 46 and the detergent valve 92 and operates the washing pump 10A. As a result, hot and cold water stored in the storage tank 8 is sent to the washing nozzle 24 via the first flow path F1. In the washing liquid spraying process, the detergent is mixed with the hot and cold water in the detergent mixing unit 12, so that the washing liquid is sprayed from the washing nozzle 24. When the time elapsed since the start of the washing liquid spraying process reaches a predetermined time (e.g., 3 seconds), the control unit 16 stops the washing pump 10A and closes the washing path opening / closing valve 46 and the detergent valve 92. Thereafter, the control unit 16 waits until a predetermined waiting time (e.g., 40 seconds) has passed. The control unit 16 repeats the spraying of the washing liquid from the washing nozzle 24 and the subsequent waiting a predetermined number of times, and then ends the washing liquid spraying process. In the cleaning liquid spraying step, the cleaning liquid is sprayed onto the inner wall of the bathtub 20. The reason why a waiting time is provided in the cleaning liquid spraying step is to allow the cleaning liquid to penetrate into the dirt adhering to the inner wall of the bathtub 20.
[0051] (Rinsing process) When the cleaning liquid spraying process is completed, the control unit 16 starts the rinsing process. When the rinsing process is completed, the control unit 16 opens the cleaning path opening / closing valve 46 and operates the cleaning pump 10A. This causes the hot and cold water stored in the storage tank 8 to be sent to the cleaning nozzle 24 via the first flow path F1. The hot and cold water sent to the cleaning nozzle 24 is sprayed from the cleaning nozzle 24. When the elapsed time from the start of the rinsing process reaches a predetermined time (e.g., 90 seconds), the control unit 16 stops the cleaning pump 10A and closes the cleaning path opening / closing valve 46. The control unit 16 then ends the rinsing process. In the rinsing process, dirt adhering to the inner wall of the bathtub 20 is washed away by the hot and cold water together with the cleaning liquid. When the rinsing process is completed, the bathtub cleaning operation also ends.
[0052] If the control unit 16 determines that there is a shortage of hot water in the storage tank 8 during the execution of the preliminary cleaning process, the cleaning liquid injection process, and the rinsing process, it may open the water replenishment valve 40 and start heating using the first heat source unit 64 to replenish hot water to the storage tank 8.
[0053] (Fine bubble generation operation) The microbubble generating operation is started when the user instructs the start of the microbubble generating operation on the remote control 160 while hot water is stored in the bathtub 20. Alternatively, the microbubble generating operation is started in response to the end of the bath water filling operation. When the microbubble generating operation is started, the control unit 16 sets the second three-way valve 50 to the third communication state (see FIG. 1). In this state, a flow path is formed that returns from the bathtub 20 to the bathtub 20 via the first inlet 118 (see FIG. 2) and the first inlet 116 (see FIG. 2) of the bathtub adapter 22, the first circulation return path 57, the second circulation return path 58, the tank inlet path 98, the pressurized tank 96, the tank outlet path 100, the circulation outward path 60, the first outlet path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22. In this embodiment, this flow path is also called the "second flow path F2". The second flow path F2 is opened when the tank on-off valve 104 is opened, and is closed when the tank on-off valve 104 is closed.
[0054] The fine bubble generating operation includes an air introduction step and a pressurized dissolution step.
[0055] (Air introduction process) The air introduction process is started at the start of the fine bubble generating operation and after the pressurized dissolution process is completed. When the air introduction process is started, the control unit 16 opens the tank opening / closing valve 104 and the air introduction valve 108 and operates the circulation pump 10B and the air introduction pump 110. As a result, the bath water is circulated between the bathtub 20 and the second flow path F2, and air is introduced into the pressurized tank 96. In the air introduction process, the amount of air introduced into the pressurized tank 96 is greater than the amount of air dissolved in the hot water in the pressurized tank 96, so the water level in the pressurized tank 96 drops. When the water level in the pressurized tank 96 falls below the lower limit water level, the control unit 16 closes the air introduction valve 108 and stops the air introduction pump 110. After that, the control unit 16 ends the air introduction process. When the air introduction process ends, the tank opening / closing valve 104 remains open, and the circulation pump 10B remains operating.
[0056] (Pressure dissolution process) The pressurized dissolving process is started after the air introduction process is completed. When the pressurized dissolving process is started, the control unit 16 operates the pressurized pump 102. This circulates the bath water between the bathtub 20 and the second flow path F2, and promotes the pressurized dissolution of air in the hot water in the pressurized tank 96. In the pressurized dissolving process, since air is not introduced into the pressurized tank 96, the amount of air in the pressurized tank 96 decreases as air dissolves in the hot water in the pressurized tank 96. This causes the water level in the pressurized tank 96 to rise. When the water level in the pressurized tank 96 reaches or exceeds the upper water level, the control unit 16 stops the pressurized pump 102 and ends the pressurized dissolving process. When the pressurized dissolving process is completed, the tank opening / closing valve 104 remains open, and the circulation pump 10B remains operating.
[0057] During the microbubble generating operation, the bath water is circulated between the bathtub 20 and the second flow path F2. In the process of circulating the bath water between the bathtub 20 and the second flow path F2 (particularly the pressurizing process), air is pressurized and dissolved in the water in the pressurized tank 96. The water in which the air is pressurized and dissolved passes through the microbubble generating nozzle 140 (see FIG. 2) provided in the bathtub adapter 22 and is then supplied to the bathtub 20. When the water in which the air is pressurized and dissolved passes through the microbubble generating nozzle 140, the water is depressurized to below atmospheric pressure, so that the air pressurized and dissolved in the water appears as microbubbles. Therefore, during the microbubble generating operation, the water containing microbubbles is supplied to the bathtub 20. The amount of microbubbles supplied to the bathtub 20 (i.e., the amount of microbubbles generated) is greater during the pressurized dissolution process than during the air introduction process. This is because the pressure on the hot water is higher during the pressurized dissolution process than during the air introduction process, and therefore the amount of air dissolved under pressure in the hot water is also greater.
[0058] When the number of times the air introduction process and the pressurized dissolution process are performed reaches a predetermined number of repetitions (for example, 5 times), the control unit 16 stops the circulation pump 10B, the pressure pump 102, and the air introduction pump 110, and closes the tank opening / closing valve 104 and the air introduction valve 108. Thereafter, the control unit 16 ends the fine bubble generating operation.
[0059] (Fine bubble generating unit cleaning operation) The fine-bubble generating unit cleaning operation is started in response to the end of the fine-bubble generating operation. Alternatively, the fine-bubble generating unit cleaning operation is started when the user instructs the start of the fine-bubble generating unit cleaning operation with the remote control 160. When the fine-bubble generating unit cleaning operation is started, the control unit 16 sets the first three-way valve 44 to the second communication state and the second three-way valve 50 to the fourth communication state (see FIG. 3). In this state, a flow path is formed from the storage tank 8 to the bathtub 20 via the tank outlet path 42, the communication path 48, the second circulation return path 58, the tank inlet path 98, the pressurized tank 96, the tank outlet path 100, the circulation forward path 60, the first outlet path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22. In this embodiment, this flow path is also called the "third flow path F3". The third flow path F3 is opened when the cleaning path opening / closing valve 46 and the tank opening / closing valve 104 are opened, and is closed when the cleaning path opening / closing valve 46 or the tank opening / closing valve 104 is closed.
[0060] The fine bubble generating unit cleaning operation includes a hot water storage process and a cleaning process.
[0061] (Hot water storage process) The hot water storage process is started when the microbubble generating unit cleaning operation starts. When the hot water storage process is started, the control unit 16 closes the cleaning path opening / closing valve 46, except when the cleaning path opening / closing valve 46 is already closed. The control unit 16 also opens the water make-up valve 40 and starts heating by the first heat source unit 64. As a result, hot water adjusted to a predetermined temperature flows from the heat source hot water outlet path 70 through the water make-up path 38 into the storage tank 8. At this time, hot water is stored in the storage tank 8, so the water level in the storage tank 8 rises. The control unit 16 waits until the water level detected by a water level sensor (not shown) provided in the storage tank 8 reaches a predetermined water level. When the water level detected by the water level sensor reaches the predetermined water level, the control unit 16 closes the water make-up valve 40 and ends the heating of hot water by the first heat source unit 64. After that, the control unit 16 ends the hot water storage process.
[0062] (Cleaning process) The control unit 16 starts the cleaning process in response to the end of the hot water storage process. When the cleaning process starts, the control unit 16 executes a pump leveling process (see FIG. 4) described later to select one of the cleaning pump 10A and the circulation pump 10B. After that, the control unit 16 opens the tank opening / closing valve 104 and the cleaning path opening / closing valve 46, and operates the pump selected according to the pump leveling process. As a result, the hot water stored in the storage tank 8 is sent to the bathtub 20 via the third flow path F3. In this process, the clean hot water stored in the storage tank 8 passes through the fine bubble generating unit 14 and is then discharged into the bathtub 20. As a result, dirt (e.g., the user's sebum) present on the fine bubble generating unit 14 is removed. When the time that has elapsed since the start of the cleaning process reaches a predetermined time (e.g., 30 seconds), the control unit 16 stops either the cleaning pump 10A or the circulating pump 10B that is in operation, and closes the cleaning path opening / closing valve 46 and the tank opening / closing valve 104. Thereafter, the control unit 16 ends the cleaning process. When the cleaning process ends, the micro-bubble generating unit cleaning operation also ends.
[0063] If the control unit 16 determines that hot water is running low in the storage tank 8 during the cleaning process, it may open the water replenishment valve 40 and start heating using the first heat source unit 64 to replenish hot water to the storage tank 8.
[0064] (Pump leveling) In step S2, which is executed at the start of the pump leveling process, the control unit 16 accesses the memory to obtain the operation time of the washing pump 10A in a predetermined past period (for example, the past 7 days). After step S2, the process proceeds to step S4.
[0065] In step S4, the control unit 16 accesses the memory to obtain the operation time of the circulation pump 10B in a predetermined period of time in the past (for example, the past seven days). After step S4, the process proceeds to step S6.
[0066] In step S6, the control unit 16 determines whether the operation time of the washing pump 10A acquired in step S2 is less than the operation time of the circulating pump 10B acquired in step S4. If the operation time of the washing pump 10A is less than the operation time of the circulating pump 10B (YES), the process proceeds to step S8.
[0067] In step S8, the control unit 16 selects the cleaning pump 10A as the pump to be operated during the fine-bubble generating unit cleaning operation. After step S8, the pump leveling process shown in FIG.
[0068] In step S6, if it is determined that the operation time of the cleaning pump 10A is equal to or longer than the operation time of the circulating pump 10B (NO), the process proceeds to step S10. In step S10, the control unit 16 selects the circulating pump 10B as the pump to be operated during the micro-bubble generating unit cleaning operation. After step S10, the pump leveling process shown in FIG. 4 ends.
[0069] (Example 2: Bath system 202) As shown in Fig. 5, the bath system 202 of this embodiment has a configuration substantially similar to that of the bath system 2 of the first embodiment (see Fig. 1). Components common to the bath system 202 and the bath system 2 are given the same reference numerals and their description will be omitted. Below, the bath system 202 will be described, focusing on the differences from the bath system 2.
[0070] Bath system 202 differs from bath system 2 in that it includes control unit 216 instead of control unit 16. Bath system 202 also differs from bath system 2 in that bath pump 10A and washing path opening / closing valve 46 are provided in first detergent mixing path 52 instead of tank outlet path 42.
[0071] The washing path opening / closing valve 46 is provided in the first detergent mixing path 52, between the first three-way valve 44 and the detergent mixing unit 12. The washing pump 10A is provided in the first detergent mixing path 52, between the first three-way valve 44 and the washing path opening / closing valve 46. The washing pump 10A pressure-feeds the hot and cold water flowing in the first detergent mixing path 52 in a direction from the first three-way valve 44 toward the detergent mixing unit 12.
[0072] The control unit 216, like the control unit 16 of the first embodiment, is configured to be able to execute a water filling operation, a re-heating operation, a bathtub cleaning operation, a fine bubble generating operation, and a fine bubble generating unit cleaning operation.
[0073] There are no differences in the components related to the bath filling operation and reheating operation between the bath system 202 and the bath system 2. Therefore, the control unit 216 controls each part of the bath system 202 in the bath filling operation and reheating operation in the same way as the control unit 16.
[0074] On the other hand, there are differences between bath system 202 and bath system 2 in the components involved in bathtub cleaning operation, fine-bubble generating operation, and fine-bubble unit cleaning operation. Specifically, there are differences in the arrangement of cleaning pump 10A and cleaning path opening / closing valve 46. However, for bathtub cleaning operation and fine-bubble generating operation, the control flow described in embodiment 1 can still be used despite these differences. For this reason, control unit 216 controls each part of bath system 202 in bathtub cleaning operation and fine-bubble generating operation in the same way as control unit 16 in embodiment 1.
[0075] Only during the fine bubble unit cleaning operation, the control unit 216 controls each part of the bath system 202 according to a control flow different from the control flow explained in the embodiment 1. The details will be explained below.
[0076] (Fine bubble generating unit cleaning operation) The fine-bubble generating unit cleaning operation is started in response to the end of the fine-bubble generating operation, or when the user issues an instruction to start the fine-bubble generating unit cleaning operation via the remote control 160.
[0077] The fine bubble generating unit cleaning operation includes a hot water storage process and a cleaning process.
[0078] (Hot water storage process) The hot water storage process is started when the micro-bubble generating unit cleaning operation starts. When the hot water storage process is started, the control unit 216, for example, sets the first three-way valve 44 to the first communication state (see FIG. 5). In this state, the tank hot water outlet passage 42 and the first detergent mixing passage 52 are communicated by the first three-way valve 44, but the first detergent mixing passage 52 is closed by the cleaning passage opening / closing valve 46. Therefore, hot water is prohibited from flowing from the storage tank 8 to the tank hot water outlet passage 42. Thereafter, the control unit 216 opens the water refill valve 40 and starts heating by the first heat source device 64. As a result, hot water adjusted to a predetermined temperature flows from the heat source hot water outlet passage 70 through the water refill passage 38 into the storage tank 8. At this time, hot water is stored in the storage tank 8, so the water level in the storage tank 8 rises. The control unit 216 waits until the water level detected by a water level sensor (not shown) provided in the storage tank 8 reaches a predetermined water level. When the water level detected by the water level sensor reaches the predetermined water level, the control unit 216 closes the water make-up valve 40 and ends the heating of hot water by the first heat source unit 64. Thereafter, the control unit 216 ends the hot water storage process.
[0079] (Cleaning process) The control unit 216 starts the cleaning process in response to the end of the hot water storage process. When the cleaning process starts, the control unit 216 sets the first three-way valve 44 to the second communication state and the second three-way valve 50 to the fourth communication state (see FIG. 6). In this state, the third flow path F3 described in the first embodiment is configured. The third flow path F3 in this embodiment is opened when the tank opening / closing valve 104 is opened, and is closed when the tank opening / closing valve 104 is closed. After configuring the third flow path F3, the control unit 216 operates the circulation pump 10B with the tank opening / closing valve 104 open. As a result, the hot water stored in the storage tank 8 is sent to the bathtub 20 via the third flow path F3. In this process, the clean hot water stored in the storage tank 8 passes through the fine bubble generating unit 14 and is then discharged into the bathtub 20. As a result, dirt (e.g., the user's sebum) present on the fine bubble generating unit 14 is removed. When the time elapsed since the start of the cleaning process reaches a predetermined time (e.g., 30 seconds), the control unit 216 stops the circulation pump 10B and closes the tank opening / closing valve 104. After that, the control unit 216 ends the cleaning process. When the cleaning process ends, the micro-bubble generation unit cleaning operation also ends.
[0080] If the control unit 216 determines that hot water is running low in the storage tank 8 during the cleaning process, it may open the water replenishment valve 40 and start heating using the first heat source unit 64 to replenish hot water to the storage tank 8.
[0081] (Example 3: Bath system 302) As shown in Figure 7, bath system 302 of this embodiment differs from bath system 2 of embodiment 1 (see Figure 1) in that it includes a bath circuit 304 instead of bath circuit 4, a shared pump 10C instead of cleaning pump 10A and circulating pump 10B, and a control unit 316 instead of control unit 16. The other components of bath system 302 are common to bath system 2, so they are given the same symbols as in embodiment 1 and their explanations are omitted.
[0082] The bath circuit 304 includes a water supply passage 330, a hot water outlet passage 332, a bath outgoing passage 334, a bath return passage 336, a water supply passage 338, a water supply valve 340, a tank outgoing passage 342, a first three-way valve 344, a pump passage 346, a pump passage opening / closing valve 348, a second three-way valve 350, a first detergent mixing passage 352, a check valve 354, a second detergent mixing passage 356, a first circulation return passage 357, a second circulation return passage 358, and a circulation outgoing passage 360. Note that the components 330, 332, 334, 336, 338, and 340 are the same as the components 30, 32, 34, 36, 38, and 40 described in the first embodiment, and therefore detailed description thereof will be omitted.
[0083] One end of the tank hot water outlet passage 342 is connected to the bottom of the storage tank 8. The other end of the tank hot water outlet passage 342 is connected to the first three-way valve 344. One end of the pump passage 346 is connected to the first three-way valve 344. The other end of the pump passage 346 is connected to the second three-way valve 350. The pump passage opening / closing valve 348 is provided in the pump passage 346. One end of the first detergent mixing passage 352 is connected to the second three-way valve 350. The other end of the first detergent mixing passage 352 is connected to the mixer 94 of the detergent mixing unit 12. The check valve 354 is provided in the first detergent mixing passage 352. One end of the second detergent mixing passage 356 is connected to the mixer 94 of the detergent mixing unit 12. The other end of the second detergent mixing passage 356 is connected to the washing nozzle 24. One end of the second circulation return passage 358 is connected to the second three-way valve 350. The other end of the second circulation return path 358 is connected to the tank inlet path 98 of the fine-bubble generating unit 14. One end of the circulation outward path 360 is connected to the tank outlet path 100 of the fine-bubble generating unit 14. The other end of the circulation outward path 360 is connected to the first outlet path 124 of the bathtub adapter 22 (see FIG. 2). One end of the first circulation return path 357 is connected to the first inlet path 116 of the bathtub adapter 22 (see FIG. 2). The other end of the first circulation return path 357 is connected to the first three-way valve 344.
[0084] The pump path on-off valve 348 opens and closes the pump path 346. The pump path on-off valve 348 is normally closed. The first three-way valve 344 is switchable between a fifth communication state (see FIGS. 7 and 9) in which the pump path 346 and the tank discharge path 342 are connected to each other and the pump path 346 and the first circulation return path 357 are not connected to each other, and a sixth communication state (see FIG. 8) in which the pump path 346 and the tank discharge path 342 are not connected to each other and the pump path 346 and the first circulation return path 357 are connected to each other. The second three-way valve 350 is switchable between a seventh communication state (see FIG. 7) in which the pump path 346 and the first detergent mixing path 352 are communicated with each other and the pump path 346 and the second circulation return path 358 are not communicated with each other, and an eighth communication state (see FIGS. 8 and 9) in which the pump path 346 and the first detergent mixing path 352 are not communicated with each other and the pump path 346 and the second circulation return path 358 are communicated with each other. The check valve 354 allows the flow of hot and cold water in the first detergent mixing path 352 from the second three-way valve 350 toward the detergent mixing unit 12 and prohibits the flow of hot and cold water from the detergent mixing unit 12 toward the second three-way valve 350.
[0085] The shared pump 10C is provided in the pump path 346. The shared pump 10C pumps the hot and cold water flowing in the pump path 346 in a direction from the first three-way valve 344 toward the second three-way valve 350. The shared pump 10C is installed, for example, between the outer wall of the bathtub 20 and a bathtub apron (not shown).
[0086] The control unit 316, like the control unit 16 of the first embodiment, is configured to be able to execute a water filling operation, a re-heating operation, a bathtub cleaning operation, a fine bubble generating operation, and a fine bubble generating unit cleaning operation.
[0087] There are no differences in the components related to the bath filling operation and reheating operation between bath system 302 and bath system 2. Therefore, control unit 316 controls each part of bath system 302 in the bath filling operation and reheating operation in the same way as control unit 16.
[0088] In the bathtub cleaning operation, the fine bubble generating operation, and the fine bubble unit cleaning operation, the bath system 302 controls each part of the bath system 302 according to a control flow different from the control flow described in the embodiment 1. The details are described below.
[0089] (Bathtub cleaning operation) The bathtub cleaning operation is started, for example, when the user issues an instruction to start the bathtub cleaning operation via the remote control 160. When the bathtub cleaning operation is started, the control unit 316 sets the first three-way valve 344 to the fifth communication state and the second three-way valve 350 to the seventh communication state (see FIG. 7). In this state, a flow path is formed from the storage tank 8 through the tank outlet path 342, the pump path 346, the first detergent mixing path 352, the detergent mixing unit 12, and the second detergent mixing path 356 to the cleaning nozzle 24. In this embodiment, this flow path is also referred to as the "first flow path F1'." The first flow path F1' is opened when the pump path opening / closing valve 348 is opened, and is closed when the pump path opening / closing valve 348 is closed.
[0090] The bathtub cleaning operation includes a preparation step, a preliminary cleaning step, a cleaning liquid spray step, and a rinsing step. In each step of the bathtub cleaning operation, the control unit 316 controls each part of the bath system 302 in the same way as the control unit 16 in the first embodiment. For example, the control unit 316 controls the shared pump 10C and the pump path opening / closing valve 348 in the same way that the control unit 16 controls the cleaning pump 10A and the cleaning path opening / closing valve 46. This causes the bathtub 20 to be cleaned.
[0091] (Fine bubble generation operation) The microbubble generating operation is started when the user instructs the start of the microbubble generating operation on the remote control 160 while hot water is stored in the bathtub 20. Alternatively, the microbubble generating operation is started in response to the end of the bath water filling operation. When the microbubble generating operation is started, the control unit 316 sets the first three-way valve 344 to the sixth communication state and the second three-way valve 350 to the eighth communication state (see FIG. 8). In this state, a flow path is formed that returns from the bathtub 20 to the bathtub 20 via the first inlet 118 (see FIG. 2) and the first inlet 116 (see FIG. 2) of the bathtub adapter 22, the first circulation return path 357, the pump path 346, the second circulation return path 358, the tank inlet path 98, the pressurized tank 96, the tank outlet path 100, the circulation forward path 360, the first outlet path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22. In this embodiment, this flow path is also referred to as the “second flow path F2′.” The second flow path F2′ is opened when the pump path on-off valve 348 and the tank on-off valve 104 are opened, and is closed when the pump path on-off valve 348 or the tank on-off valve 104 is closed.
[0092] The microbubble generating operation includes an air introduction process and a pressurized dissolution process. In each process of the microbubble generating operation, the control unit 316 controls each part of the bath system 302 in the same way as the control unit 16 in the first embodiment. For example, the control unit 316 controls the common pump 10C in the same way that the control unit 16 controls the circulation pump 10B. This allows hot water containing microbubbles to be supplied to the bathtub 20.
[0093] (Fine bubble generating unit cleaning operation) The fine-bubble generating unit cleaning operation is started in response to the end of the fine-bubble generating operation. Alternatively, the fine-bubble generating unit cleaning operation is started when the user instructs the start of the fine-bubble generating unit cleaning operation with the remote control 160. When the fine-bubble generating unit cleaning operation is started, the control unit 316 sets the first three-way valve 344 to the fifth communication state and the second three-way valve 350 to the eighth communication state (see FIG. 9). In this state, a flow path is formed from the storage tank 8 to the bathtub 20 via the tank outlet path 342, the pump path 346, the second circulation return path 358, the tank inlet path 98, the pressurized tank 96, the tank outlet path 100, the circulation forward path 360, the first outlet path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22. In this embodiment, this flow path is also called the "third flow path F3'". The third flow path F3' is opened when the pump path on-off valve 348 and the tank on-off valve 104 are opened, and is closed when the pump path on-off valve 348 or the tank on-off valve 104 is closed.
[0094] The fine-bubble generating unit cleaning operation includes a hot water storage process and a cleaning process. In each process of the fine-bubble generating unit cleaning operation, the control unit 316 controls each part of the bath system 302 in the same manner as the control unit 16 in the first embodiment. For example, the control unit 316 controls the common pump 10C and the pump path opening / closing valve 348 in the same manner that the control unit 16 controls the cleaning pump 10A (and / or the circulation pump 10B) and the cleaning path opening / closing valve 46. This causes the fine-bubble generating unit 14 to be cleaned.
[0095] (Example 4: Bath system 402) As shown in Fig. 10, bath system 402 of this embodiment has a configuration substantially similar to bath system 2 of embodiment 1 (see Fig. 1). Components common to bath system 402 and bath system 2 are given the same reference numerals and their description will be omitted. Below, bath system 402 will be described, focusing on the differences from bath system 2.
[0096] The bath system 402 differs from the bath system 2 in that it includes a control unit 416 instead of the control unit 16. The bath system 402 also differs from the bath system 2 in that the circulation pump 10B is provided in the first circulation return path 57 instead of the second circulation return path 58. The control unit 416 is configured to be able to perform the bath filling operation, the reheating operation, the bathtub cleaning operation, the fine bubble generating operation, and the fine bubble generating unit cleaning operation, just like the control unit 16 in the first embodiment. In the cleaning process of the fine bubble unit cleaning operation, the control unit 416 operates the cleaning pump 10A while stopping the circulation pump 10B, thereby generating a flow of hot water according to the third flow path F3. In other words, the control unit 416 is configured not to perform the pump leveling process (see FIG. 4) described in the first embodiment. The bath system 402 controls each part of the bath system 402 according to a control flow different from that of the control unit 16 in the first embodiment only in the above points.
[0097] (Modification) In the first, second, third and fourth embodiments, a gas other than air (for example, carbon dioxide, hydrogen, oxygen) may be introduced into the pressurized tank 96. This allows the gas other than air to be supplied to the bathtub 20 as fine bubbles.
[0098] In the first, second and fourth embodiments, the bath circuit 4 does not have to be equipped with the cleaning path opening / closing valve 46.
[0099] In the third embodiment, the bath circuit 304 does not have to be equipped with the pump path opening / closing valve 348.
[0100] In the first, second and fourth embodiments, the bath circuit 4 may be provided with a switching mechanism (e.g., an on-off valve provided in the communication passage 48) that switches between a first state in which hot and cold water is prohibited from flowing through the communication passage 48 and a second state in which hot and cold water is permitted to flow through the communication passage 48, instead of the first three-way valve 44 and the second three-way valve 50. In this configuration, when the switching mechanism is in the first state, the first flow path F1 and the second flow path F2 are formed. When the switching mechanism is in the second state, the third flow path F3 is formed. However, in this configuration, even if the switching mechanism is in the second state and hot and cold water is caused to flow according to the third flow path F3, some hot and cold water may flow into a location other than the third flow path F3 (e.g., the first detergent mixing path 52, the first circulation return path 57). Therefore, the bath circuit 4 may further be provided with a mechanism that prohibits hot and cold water from flowing into a location other than the third flow path F3 when the switching mechanism is in the second state. For example, the bath circuit 4 may further include an on-off valve provided in the first detergent mixing path 52 (or the first circulation return path 57). In this case, by closing the on-off valve provided in the first detergent mixing path 52 (or the first circulation return path 57), it is possible to prevent hot and cold water from flowing to a location other than the third path F3.
[0101] In the second embodiment, the bath circuit 4 may not have the tank hot water outlet passage 42. In this case, the first three-way valve 44 may be provided at the bottom of the storage tank 8. The first three-way valve 44 may be switchable between a state in which the storage tank 8 and the first detergent mixing passage 52 are connected to each other and the storage tank 8 and the communication passage 48 are not connected to each other, and a state in which the storage tank 8 and the first detergent mixing passage 52 are not connected to each other and the storage tank 8 and the communication passage 48 are connected to each other. In the above modified example, the first three-way valve 44 may be replaced by a switching mechanism having an equivalent function (for example, an on-off valve).
[0102] For example, when the bathtub cleaning operation starts, the bathtub 20 may already be empty and a sufficient amount of hot and cold water may be stored in the storage tank 8. In this case, the control unit 16, 216, 316 may execute the preliminary cleaning process without executing the preparation process when the bathtub cleaning operation starts. Alternatively, the control unit 16, 216, 316 may execute the cleaning liquid spraying process without executing the preparation process and the preliminary cleaning process when the bathtub cleaning operation starts.
[0103] For example, at the start of the fine-bubble generating unit cleaning operation, a sufficient amount of hot water may be stored in the storage tank 8. In this case, the control unit 16, 216, 316 may execute the cleaning process without executing the hot water storage process at the start of the fine-bubble generating unit cleaning operation.
[0104] In the first embodiment, the control unit 16 may store in a memory the number of times the cleaning pump 10A and the number of times the circulating pump 10B have been operated in a predetermined period in the past (for example, the past seven days). In the pump leveling process, the control unit 16 may select the pump with the fewer number of operations as the pump to be operated during the fine-bubble generating unit cleaning operation.
[0105] In the first embodiment, the control unit 16 may be configured to switch the pump to be operated in the fine-bubble generating unit cleaning operation between the cleaning pump 10A and the circulating pump 10B every predetermined period (for example, every day).
[0106] In the first, second and fourth embodiments, the location of the fine bubble generating unit 14 in the bath circuit 4 may be changed as appropriate. For example, the fine bubble generating unit 14 may be provided between the second three-way valve 50 and the circulation pump 10B in the second circulation return line 58. In this way, when the circulation pump 10B is provided downstream of the fine bubble generating unit 14, air in the atmosphere can be drawn into the pressurized tank 96 through the air introduction path 106 only by the operation of the circulation pump 10B in the air introduction step of the fine bubble generation operation, even if the air introduction pump 110 does not operate. That is, the air introduction pump 110 is not required. In the third embodiment, the fine bubble generating unit 14 can be provided upstream of the shared pump 10C to achieve the same effect as above.
[0107] In the first, second, third and fourth embodiments, the micro-bubble generating unit 14 is of a pressure dissolution type, in which gas is pressurized and dissolved in liquid, and the gas dissolved in liquid is precipitated as micro-bubbles. The micro-bubble generating unit 14 may be replaced with a unit that generates micro-bubbles by a method other than the pressure dissolution method. For example, the micro-bubble generating unit 14 may be replaced with a shear type unit that generates a swirling flow and breaks down the bubbles into fine bubbles by the swirling flow to generate micro-bubbles.
[0108] In Examples 1, 2, 3 and 4, the adapter for connecting the bath forward path 34 and the bath return path 36 to the bathtub 20 and the adapter for connecting the circulation forward path 60 and the first circulation return path 57 (or the circulation forward path 360 and the first circulation return path 357) to the bathtub 20 may be provided separately from each other.
[0109] (Features of each embodiment) As described above, the bath system 2, 202, 302, 402 comprises a storage tank 8 that stores hot water supplied from the water supply source 18 and has a backflow prevention mechanism 86 that prevents the stored hot water from flowing back toward the water supply source 18, one or more pumps 10A, 10B, 10C that pump the hot water, a detergent mixing unit 12 that mixes detergent into the hot water, a fine-bubble generating unit 14 that generates fine bubbles in the hot water, a bath circuit 4, 304 that is connected to the bathtub 20 and in which the storage tank 8, one or more pumps 10A, 10B, 10C, detergent mixing unit 12, and fine-bubble generating unit 14 are provided, and a control unit 16, 216, 316, 416. The bath circuit 4, 304 includes a first flow path F1, F1' leading from the storage tank 8 to the bathtub 20 via the detergent mixing unit 12, a second flow path F2, F2' leading from the bathtub 20 back to the bathtub 20 via the fine-bubble generating unit 14, and a third flow path F3, F3' leading from the storage tank 8 to the bathtub 20 via the fine-bubble generating unit 14. The control unit 16, 216, 316, 416 is configured to execute a bathtub cleaning operation in which hot and cold water sent from the storage tank 8 is mixed with detergent by the detergent mixing unit 12 and the hot and cold water mixed with the detergent is supplied to the bathtub 20 to clean the bathtub 20 by controlling the bath system 2, 202, 302, 402 so that hot and cold water flows along the first flow paths F1, F1'; a fine-bubble generating operation in which the hot and cold water stored in the bathtub 20 is circulated to the fine-bubble generating unit 14 to generate fine bubbles in the hot and cold water stored in the bathtub 20 by controlling the bath system 2, 202, 302, 402 so that hot and cold water flows along the second flow paths F2, F2'; and a fine-bubble generating unit cleaning operation in which the hot and cold water stored in the storage tank 8 is passed through the fine-bubble generating unit 14 to clean the fine-bubble generating unit 14 by controlling the bath system 2, 202, 302, 402 so that hot and cold water flows along the third flow paths F3, F3'.
[0110] Since the hot water stored in the bathtub 20 may be contaminated with dirt (e.g., the user's sebum), the dirt may enter the fine-bubble generating unit 14 when the fine-bubble generating operation is performed. Therefore, in order to keep the fine-bubble generating unit 14 clean, it is preferable to wash the fine-bubble generating unit 14 with hot water supplied from the water supply source 18. From a hygienic point of view, it is necessary to prevent the hot water stored in the bathtub 20 and the hot water mixed with detergent from flowing back to the water supply source 18. According to the above configuration, the hot water supplied from the water supply source 18 is stored in the storage tank 8 having the backflow prevention mechanism 86, and the hot water can be supplied from the storage tank 8 to the detergent mixing unit 12 and the fine-bubble generating unit 14. For this reason, the storage tank 8 having the backflow prevention mechanism 86 is shared between the detergent mixing unit 12 and the fine-bubble generating unit 14. Therefore, the bath system 2, 202, 302, 402 capable of performing both bathtub cleaning operation and fine bubble generating operation while keeping the fine bubble generating unit 14 clean can be manufactured at relatively low cost.
[0111] In the bath system 2, 202, 402, the bathtub 20 is provided with a cleaning nozzle 24 through which hot and cold water flowing through the first flow path F1 is discharged into the inside of the bathtub 20 during bathtub cleaning operation, an inlet 118 through which hot and cold water inside the bathtub 20 flows into the second flow path F2 during fine-bubble generating operation, and an outlet 126 through which hot and cold water flowing through the second flow path F2 flows out into the inside of the bathtub 20 during fine-bubble generating operation. The bath circuit 4 includes a bathtub cleaning path A, one end of which is connected to the storage tank 8 and the other end of which is connected to the cleaning nozzle 24, a circulation path B, one end of which is connected to the inlet 118 and the other end of which is connected to the outlet 126, a communication path 48, one end of which is connected to the middle of the bathtub cleaning path A and the other end of which is connected to the middle of the circulation path B, and a switching mechanism 44, 50, which is provided in the communication path 48 and switches between a first state in which the flow of hot and cold water is prohibited through the communication path 48 and a second state in which the flow of hot and cold water is permitted through the communication path 48 in response to an instruction from the control unit 16, 216, 416. The detergent mixing unit 12 is provided in the bathtub cleaning path A from the point where one end of the communication path 48 is connected to the other end of the bathtub cleaning path A. The fine bubble generating unit 14 is provided between the point where the other end of the communication path 48 is connected to the circulation path B and the other end of the circulation path B. When the switching mechanisms 44, 50 are in the first state, the bathtub cleaning path A functions as the first path F1, and the circulation path B functions as the second path F2. When the switching mechanisms 44, 50 are in the second state, the portion of the bathtub cleaning path A from one end to a point where one end of the communication path 48 is connected, the communication path 48, and the portion of the circulation path B from the point where the other end of the communication path 48 is connected to the other end of the circulation path B function as the third path F3.
[0112] According to the above configuration, a part of the first flow path F1 and a part of the second flow path F2 can function as a part of the third flow path F3, so that the configuration of the bath circuit 4 can be simplified.
[0113] In the bath system 2, 202, 402, the one or more pumps 10A, 10B include a cleaning pump 10A provided in a bathtub cleaning path A for pumping hot and cold water flowing in the bathtub cleaning path A from one end to the other end of the bathtub cleaning path A, and a circulation pump 10B provided in a circulation path B for pumping hot and cold water flowing in the circulation path B from one end to the other end of the circulation path B. The control unit 16, 216, 416 operates the cleaning pump 10A with the switching mechanisms 44, 50 in the first state during a bathtub cleaning operation, operates the circulation pump 10B with the switching mechanisms 44, 50 in the first state during a fine-bubble generating operation, and operates at least one of the cleaning pump 10A and the circulation pump 10B with the switching mechanisms 44, 50 in the second state during a fine-bubble generating unit cleaning operation.
[0114] According to the above configuration, the fine-bubble generating unit cleaning operation can be performed using the cleaning pump 10A operated during the bathtub cleaning operation (or the circulating pump 10B operated during the fine-bubble generating operation). Therefore, there is no need to provide a separate pump for the fine-bubble generating unit cleaning operation. Therefore, the bath system 2, 202, 402 can be manufactured at even lower cost.
[0115] In the bath system 2, 402, one end of the communication passage 48 is connected to a portion of the bathtub cleaning path A downstream of the cleaning pump 10A. The control unit 16, 416 operates the cleaning pump 10A after setting the switching mechanism 44, 50 to the second state during the fine-bubble generating unit cleaning operation.
[0116] For example, if the washing pump 10A has superior durability compared to other pumps (such as the circulation pump 10B), it is desirable to actively operate the washing pump 10A to reduce the burden on the other pumps. According to the above configuration, since the washing pump 10A is operated when performing the fine-bubble generating unit cleaning operation, there is no need to operate pumps other than the washing pump 10A. Therefore, it is possible to reduce the burden on pumps other than the washing pump 10A.
[0117] In the bath system 2, 202, the other end of the communication passage 48 is connected to a portion of the circulation path B upstream of the circulation pump 10B. During the fine-bubble generating unit cleaning operation, the control unit 16, 216 operates the circulation pump 10B after setting the switching mechanism 44, 50 to the second state.
[0118] For example, if the circulation pump 10B has superior durability compared to other pumps (such as the cleaning pump 10A), it is desirable to operate the circulation pump 10B proactively to reduce the burden on the other pumps. According to the above configuration, since the circulation pump 10B is operated when the fine-bubble generating unit cleaning operation is performed, there is no need to operate pumps other than the circulation pump 10B. Therefore, the burden on pumps other than the circulation pump 10B can be reduced. Furthermore, according to the above configuration, during the fine-bubble generating unit cleaning operation, clean hot water stored in the storage tank 8 passes through the circulation pump 10B. This removes dirt adhering to the circulation pump 10B, so that the circulation pump 10B can be kept clean.
[0119] In the bath system 2, one end of the communication passage 48 is connected to a portion of the bathtub cleaning passage A downstream of the cleaning pump 10A. The other end of the communication passage 48 is connected to a portion of the circulation passage B upstream of the circulation pump 10B.
[0120] According to the above configuration, the pump to be operated during the fine-bubble generating unit cleaning operation can be selected from the cleaning pump 10A and the circulation pump 10B. This makes it possible to switch the pump to be operated during the fine-bubble generating unit cleaning operation depending on the situation, for example.
[0121] In the bath system 2, when the control unit 16 performs the fine bubble generating unit cleaning operation, it operates at least one of the cleaning pump 10A and the circulation pump 10B so that the operating time or number of operations is equalized between the cleaning pump 10A and the circulation pump 10B.
[0122] If only one of the washing pump 10A and the circulation pump 10B were operated for the fine-bubble generating unit cleaning operation, the load on that pump would be large. According to the above configuration, when the fine-bubble generating unit cleaning operation is performed, at least one of the washing pump 10A and the circulation pump 10B can be operated so that the operating time or number of operations is equalized between the washing pump 10A and the circulation pump 10B. This makes it possible to prevent the load on the washing pump 10A (or the circulation pump 10B) from being large.
[0123] The technical elements described in this specification or drawings exert technical utility alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. In addition, the technologies illustrated in this specification or drawings can achieve multiple objectives simultaneously, and achieving one of those objectives is itself technically useful. [Explanation of symbols]
[0124] 2: bath system, 4: bath circuit, 6: heat source unit, 8: storage tank, 10A: cleaning pump, 10B: circulation pump, 10C: shared pump, 12: detergent mixing unit, 14: fine bubble generating unit, 16: control unit, 18: water supply source, 20: bathtub, 22: bathtub adapter, 24: cleaning nozzle, 26: drain plug, 28: actuator, 30: water supply path, 32: hot water outlet path, 34: bath forward path, 36: bath return path, 38: water refill path, 40: water refill valve, 42: tank hot water outlet path, 44: first three-way valve, 46: cleaning path opening / closing valve, 48: connecting path, 50: second three-way valve, 52: third 1 detergent mixing path, 54: check valve, 56: second detergent mixing path, 57: first circulation return path, 58: second circulation return path, 60: circulation forward path, 64: first heat source unit, 66: second heat source unit, 68: heat source water supply path, 70: heat source hot water outlet path, 72: heat source bath return path, 74: heat source bath forward path, 76: bypass path, 78: bypass servo, 80: hot water supply path, 82: hot water filling valve, 84: reheating pump, 86: overflow path, 88: detergent tank, 90: detergent introduction path, 92: detergent valve, 94: mixer, 96: pressurized tank, 98: tank inlet path, 100: tank outlet path, 102: pressurized pump, 104 : tank opening / closing valve, 106: air introduction passage, 108: air introduction valve, 110: air introduction pump, 112: low water level electrode, 114: high water level electrode, 116: first inlet, 118: first inlet, 120: second inlet, 122: second inlet, 124: first outlet, 126: first outlet, 128: second outlet, 130: second outlet, 132: check valve, 134: check valve, 136: check valve, 138: check valve, 140: fine bubble generating nozzle, 160: remote control, 202: bath system, 216: control unit, 302: bath system, 304: bath circuit, 316: control Control unit, 330: water supply passage, 332: hot water outlet passage, 334: bath outgoing passage, 336: bath return passage, 338: water supply passage, 340: water supply valve, 342: tank hot water outlet passage, 344: first three-way valve, 346: pump passage, 348: pump passage opening / closing valve, 350: second three-way valve, 352: first detergent mixing passage, 354: check valve, 356: second detergent mixing passage, 357: first circulation return passage, 358: second circulation return passage, 360: circulation outgoing passage, 402: bath system, 416: control unit, A: bathtub cleaning passage, B: circulation passage, F1, F1´: first flow passage, F2, F2´: second flow passage, F3, F3´: third flow passage
Claims
1. A storage tank that stores hot water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot water from flowing back toward the water supply source; One or more pumps for pumping hot and cold water; A detergent mixing unit that mixes detergent into hot water; A microbubble generating unit that generates microbubbles in hot water; a bath circuit connected to a bathtub, the bath circuit including the storage tank, the one or more pumps, the detergent mixing unit, and the microbubble generating unit; A bath system comprising: The bath circuit is a first flow path extending from the storage tank to the bathtub via the detergent mixing unit; A second flow path that runs from the bath to the bath via the fine bubble generating unit; A third flow path extending from the storage tank to the bathtub via the fine bubble generating unit, The control unit a bathtub cleaning operation in which the bath system is controlled so that hot and cold water flows along the first flow path, the detergent mixing unit mixes the hot and cold water sent from the storage tank with the detergent, and the hot and cold water mixed with the detergent is supplied to the bathtub to clean the bathtub; A micro-bubble generating operation in which the hot water stored in the bathtub is circulated to the micro-bubble generating unit by controlling the bath system so that the hot water flows along the second flow path, thereby generating micro-bubbles in the hot water stored in the bathtub; The bath system is configured to be capable of performing a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by controlling the bath system so that hot and cold water flows along the third flow path.
2. The bathtub is provided with a cleaning nozzle through which hot and cold water flowing through the first flow path is discharged into the bathtub during the bathtub cleaning operation, an inlet through which hot and cold water inside the bathtub flows into the second flow path during the fine-bubble generating operation, and an outlet through which hot and cold water flowing through the second flow path flows out into the bathtub during the fine-bubble generating operation, The bath circuit is A bathtub cleaning passage having one end connected to the storage tank and the other end connected to the cleaning nozzle; a circulation path having one end connected to the inlet and the other end connected to the outlet; A communication passage having one end connected to the middle of the bathtub cleaning passage and the other end connected to the middle of the circulation passage; a switching mechanism that is provided in the communication passage and that switches between a first state in which hot and cold water is prohibited from flowing through the communication passage and a second state in which hot and cold water is permitted to flow through the communication passage in response to an instruction from the control unit; the detergent mixing unit is provided in a portion of the bathtub cleaning passage from a point where the one end of the communication passage is connected to the other end of the bathtub cleaning passage, the micro-bubble generating unit is provided between a portion of the circulation path to which the other end of the communication passage is connected and the other end of the circulation path, When the switching mechanism is in the first state, the bathtub cleaning path functions as the first flow path and the circulation path functions as the second flow path, A bath system as claimed in claim 1, wherein when the switching mechanism is in the second state, the portion of the bathtub cleaning path from one end to the point where the one end of the connecting passage is connected, the connecting passage, and the portion of the circulation path from the point where the other end of the connecting passage is connected to the other end of the circulation path function as the third flow path.
3. The one or more pumps include: A cleaning pump is provided in the bathtub cleaning passage and pressure-feeds hot and cold water flowing through the bathtub cleaning passage from one end of the bathtub cleaning passage to the other end of the bathtub cleaning passage; A circulation pump is provided in the circulation path and pumps hot and cold water flowing through the circulation path from the one end to the other end of the circulation path. The control unit During the bathtub cleaning operation, the switching mechanism is set to the first state and the cleaning pump is operated; During the fine bubble generating operation, the switching mechanism is set to the first state and the circulation pump is operated; The bath system of claim 2 , wherein during the fine-bubble generating unit cleaning operation, the switching mechanism is set to the second state and at least one of the cleaning pump and the circulation pump is operated.
4. The one end of the communication passage is connected to a portion of the bathtub cleaning passage downstream of the cleaning pump, The bath system according to claim 3 , wherein the control unit operates the cleaning pump after setting the switching mechanism in the second state during the fine-bubble generating unit cleaning operation.
5. the other end of the communication passage is connected to a portion of the circulation path upstream of the circulation pump, The bath system according to claim 3 , wherein the control unit operates the circulation pump while the switching mechanism is in the second state during the fine-bubble generating unit cleaning operation.
6. The one end of the communication passage is connected to a portion of the bathtub cleaning passage downstream of the cleaning pump, The bath system of claim 3, wherein the other end of the communication passage is connected to a portion of the circulation path upstream of the circulation pump.
7. The bath system of claim 6, wherein when the control unit performs the fine bubble generating unit cleaning operation, it operates at least one of the cleaning pump and the circulation pump so that the operating time or number of operations is equalized between the cleaning pump and the circulation pump.
Citation Information
Patent Citations
Fine bubble generator, bathtub having the same, and additive liquid feed device for use therein
JP2017148717A
Bathtub washing device
JP2022082148A
