Operation planning system and operation planning method

The system optimizes railway operation plans by accurately detecting boarding and alighting times using train data, addressing inefficiencies and energy waste by adjusting train speeds and reducing delays.

JP2024168991APending Publication Date: 2024-12-05HITACHI LTD

Patent Information

Application Number
JP2023086150
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing railway operation plans do not finely adjust station stop times based on actual passenger boarding and alighting times, leading to potential delays and inefficiencies due to variations in passenger loading times, which can result in energy wastage and inconvenience.

Method used

A system that utilizes data from train parameters such as door states, passenger weights, and train speed to accurately detect boarding and alighting completion times, adjusting operation plans to reflect these variations and optimize energy efficiency and convenience.

Benefits of technology

The system enables precise calculation of boarding and alighting times, reducing delays, enhancing energy efficiency by adjusting train speeds, and creating stable operation plans that minimize energy consumption and improve passenger convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168991000001_ABST
    Figure 2024168991000001_ABST
Patent Text Reader

Abstract

To detect completion timing of boarding / exiting when boarding / exiting time is shorter than a predetermined station stop time, calculate the boarding / exiting time, and reflect it in an operation plan.SOLUTION: An operation planning system comprises a train boarding / exiting time estimation device having a data acquisition unit for acquiring time information, information on stations where trains stop, parameters related to passenger weight of the train, train speed, and door opening / closing state, a passenger weight calculation unit for calculating the passenger weight from the parameter, a reference weight calculation unit for calculating reference weight after boarding / exiting the train during a time period from the time when the door changes from opening state to closing state until the train speed becomes greater than zero, by using the train speed, the door opening / closing state, and the passenger weight, a boarding / exiting time estimation unit for estimating the boarding / exiting time by comparing the passenger weight and the reference weight after boarding / exiting the train during the time from the door opening state to the door closing state, by using the door opening / closing state, the passenger weight, and the reference weight after boarding / exiting the train, and an operation planning device for acquiring the boarding / exiting time at each station from the boarding / exiting time estimation device and creating an operation plan.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a railway vehicle operation plan creating system and an operation plan creating method. [Background technology]

[0002] Even in the railway industry, which is relatively energy efficient, further energy conservation is needed. Also, from the perspective of reducing operating costs and improving convenience in the railway business, there is a demand to develop operation plans that take into account passenger boarding and alighting times when trains stop at stations.

[0003] As background technology in this technical field, Patent Document 1 discloses a train operation support system that takes into account the time required for boarding and alighting at a station (hereinafter referred to as "boarding and alighting time") as well as the confirmation time as station stop time, and improves the accuracy of estimating the departure time of the preceding train from the station, thereby enabling stable energy-saving effects for the running of following trains between stations.

[0004] In this system, when trains run according to an operation plan that specifies predetermined station stop times, if it is predicted that the departure of the preceding train will be delayed due to congestion or other reasons, the arrival time of the following train at the station is adjusted to prevent external stops and unplanned braking. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2022-42138 Summary of the Invention [Problem to be solved by the invention]

[0006] However, in Patent Document 1, the station stop times in the current operation plan are adjusted separately for peak and off-peak times, and are not finely adjusted for each station or for each time period. Therefore, if it takes longer for passengers to board and disembark than the planned station stop time, delays will occur. Conversely, during off-peak times, depending on the station, passengers may finish boarding and disembarking in less time than the planned station stop time, and the train may have to wait until departure.

[0007] In operation planning, the leeway time (hereinafter referred to as "waiting time") when the boarding and alighting time is shorter than the planned station stop time can be shortened and the running time between stations can be extended by that amount, making it possible to reduce the train's maximum speed when traveling between stations and operate in a more energy-efficient manner. In addition, by adding the shortened waiting time to the time spent stopping at other stations where departure delays are frequent, disruptions to the schedule can be reduced and convenience can be improved.

[0008] Here, in order to calculate the boarding and alighting times, it is necessary to detect the start and end timings of boarding and alighting. The start timing of boarding and alighting can generally be considered to be the same as the timing when the doors open. However, the end timing of boarding and alighting can be considered to be the same as the timing when the train doors close when the train is crowded, but if there is a waiting time, it is likely to be earlier than the timing when the doors close.

[0009] Therefore, simply obtaining information from the train indicating the open / closed state of the doors may not accurately detect the boarding / alighting completion time and may not allow the boarding / alighting time to be calculated.

[0010] Therefore, the present invention aims to provide a technology that makes it possible to detect the timing of boarding and alighting completion when the boarding and alighting time is shorter than the station stop time specified in the operation plan, using data that can be obtained from the train. [Means for solving the problem]

[0011] In order to solve the above problems, a representative operation plan creation system of the present invention includes a boarding and alighting time estimation device having a data acquisition unit that acquires time information, station information at which the train stops, parameters related to the passenger weight of the train, the train speed, and the open / closed state of the train's doors, a passenger weight calculation unit that calculates the passenger weight from the parameters, a reference weight calculation unit that uses the train speed, the open / closed state of the doors, and the passenger weight to calculate a post-boarding and alighting reference weight from the time when the doors change from the open state to the closed state until the train speed becomes greater than 0, and a boarding and alighting time estimation unit that estimates boarding and alighting times by comparing the passenger weight and the post-boarding and alighting reference weight from the open / closed state of the doors, the passenger weight, and the post-boarding and alighting reference weight, and an operation plan creation device that acquires the boarding and alighting times at each station at which the train stops from the boarding and alighting time estimation device and creates an operation plan for the train. Effect of the Invention

[0012] According to the present invention, by detecting the timing at which boarding and alighting is completed when the boarding and alighting time is shorter than the station stop time specified in the operation plan, and calculating the boarding and alighting time, and creating an operation plan that reflects the boarding and alighting time, it is possible to achieve greater energy savings and improved convenience. Problems, configurations and effects other than those described above will become apparent from the description of the following embodiments. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a diagram illustrating an example of a block configuration of an operation plan creation system according to an embodiment. [Diagram 2] FIG. 13 is a diagram illustrating an example of a method for detecting an estimated boarding / alighting completion time. [Diagram 3] FIG. 11 is a diagram illustrating another example of a block configuration of the operation plan creation system according to the embodiment. [Figure 4] FIG. 2 is a diagram illustrating an example of a data configuration of an operation plan. [Diagram 5] FIG. 2 is a diagram illustrating an example of a data configuration of vehicle data. [Figure 6]FIG. 11 is a flowchart showing an example of a processing flow of a data input unit. [Figure 7] FIG. 2 is a diagram for explaining the definition of a running state. [Figure 8] FIG. 13 is a flowchart illustrating an example of a process flow of a passenger weight calculation unit. [Figure 9] FIG. 11 is a flowchart showing an example of a process flow of a reference weight calculation unit. [Figure 10] FIG. 13 is a flowchart illustrating an example of a process flow of a boarding / alighting time estimation unit. [Figure 11] FIG. 11 is a flowchart illustrating an example of a processing flow of a storage unit. [Figure 12] FIG. 13 is a flowchart illustrating an example of a processing flow of an operation plan creation unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals.

[0015] Hereinafter, with reference to Figs. 1 to 12, an embodiment will be described as a mode for carrying out the present invention. Note that the present invention is not limited to this embodiment. In addition, in the drawings, the same parts are denoted by the same reference numerals. In addition, in this embodiment, pressure information of the train's air spring device (hereinafter referred to as "AS pressure") is used as the passenger weight related parameter. EXAMPLES

[0016] First, in the operation plan creation system according to the present invention, even if passengers complete boarding and alighting within a time shorter than the station stop time specified in advance in the operation plan, it is possible to detect the boarding and alighting completion time. The concept behind this is explained using Fig. 2. Fig. 2 is a diagram showing an example of a method for detecting the estimated boarding and alighting completion time.

[0017] As shown in Figure 2, the time from when the train doors change from open to closed to when the train speed becomes greater than 0 is defined as T, and the post-boarding / alighting reference weight and the weight threshold for the post-boarding / alighting reference weight are calculated from the passenger weight at this time T. Next, the passenger weight is checked going back in time from when the train doors change from open to closed to when the train doors change from closed to open. In this way, the time when the passenger weight shows a value outside the weight threshold for the post-boarding / alighting reference weight is detected as the estimated boarding / alighting completion time.

[0018] In addition, the operation plan creation system of the embodiment is equipped with the functions described in (1) to (4) below, which makes it possible to detect the time when passengers complete boarding and alighting even if the boarding and alighting is completed in a time shorter than the station stop time specified in the operation plan.

[0019] (1) A function to acquire the pressure value of the air spring device from the train as a passenger weight-related parameter and calculate the passenger weight from the acquired pressure value.

[0020] (2) A function to calculate the post-boarding / alighting reference weight for determining the time when passengers board and alight from the passenger weight during the time T from when the doors transition to the closed state until the train speed becomes greater than 0 while the train is stopped at the station.

[0021] (3) A function to calculate a weight threshold from the fluctuation range of passenger weight when calculating the post-boarding reference weight to prevent false detection of boarding / alighting completion times even when the AS pressure changes due to vibration of the air spring device caused by passenger movement inside the vehicle, resulting in a change in passenger weight.

[0022] (4) A function to check the passenger weight retroactively from the time the door changes from an open state to a closed state to the time the door changes from a closed state to an open state, and to detect the time when the passenger weight deviates from the weight threshold value relative to the reference weight after boarding and alighting as the estimated boarding and alighting completion time in the case where boarding and alighting are completed before the door transitions from an open state to a closed state.

[0023] Furthermore, the operation plan creation system of the embodiment is equipped with the functions described in (5) to (8) below, thereby improving convenience by reducing delays and enabling the creation of operation plans that enable energy savings by reducing the maximum train speed through the extension of the running time between stations.

[0024] (5) A function that sets the time when the door changes from closed to open as the estimated boarding / alighting start time and calculates the estimated boarding / alighting time from the difference between that and the estimated boarding / alighting completion time.

[0025] (6) A function to select boarding and alighting time information to be used for updating operation plans based on date and time conditions

[0026] (7) A function to calculate expected boarding and alighting times by statistically processing the estimated boarding and alighting times from the selected boarding and alighting time information

[0027] (8) A function to update the planned arrival time or planned departure time in the operation plan using the estimated boarding and alighting times

[0028] Furthermore, because there is a limit to the shortest possible travel time between each station, when updating operation plans it is necessary to take into account these travel time limits and the risk of delays, and to ensure that the operation plan is stable overall.

[0029] Fig. 1 is a diagram illustrating an example of a block configuration of an operation plan creation system 100 according to an embodiment. The operation plan creation system 100 includes a boarding / alighting time estimating device 200 and an operation plan creation device 300. Here, the boarding / alighting time estimating device 200 and the operation plan creation device 300 may be implemented as separate devices, or may be implemented as separate functional units in the same device. Fig. 1 illustrates a case where the boarding / alighting time estimating device 200 and the operation plan creation device 300 are implemented as separate devices.

[0030] The boarding / alighting time estimation device 200 includes a data input unit 210, a passenger weight calculation unit 220, a reference weight calculation unit 230, and a boarding / alighting time estimation unit 240. The boarding / alighting time estimation device 200 also includes an internal storage area such as a memory, a hard disk, an SSD, etc., and includes a vehicle data storage area 211 for temporarily storing information acquired by the data input unit 210.

[0031] However, the configuration of the vehicle data storage area 211 is not limited to the configuration shown in Fig. 1, and when the boarding / alighting time estimation device 200 can be connected to a storage area constructed on an external server or a cloud environment via wired or wireless communication, the vehicle data storage area 211 may be provided in the storage area. For example, Fig. 3 is a diagram showing another example of a block configuration of the operation plan creation system 100 according to the embodiment, and is an example in which an external storage area is provided outside the operation plan creation system 100.

[0032] The operation plan creation device 300 includes a storage unit 310 and an operation plan creation unit 320. The operation plan creation device 300 also includes an internal storage area such as a memory, a hard disk, and an SSD, and includes an operation plan storage area 311 in the storage area for storing the operation plan acquired by the storage unit 310, boarding and alighting time information, and the like.

[0033] However, the configuration of the operation plan storage area 311 is not limited to the configuration shown in Fig. 1, and when the operation plan creation device 300 can be connected to a storage area constructed on an external server or a cloud environment via wired or wireless communication, the operation plan storage area 311 may be provided in the storage area. For example, as shown in Fig. 3, the operation plan storage area 311 may be provided in an external storage area.

[0034] The train 400 includes a vehicle information control device 410, a speed generator 420, a door device 430, an air spring device 440, and a data output unit 450. Here, Fig. 1 and Fig. 3 show an example of one train 400 that runs according to a certain operation plan among a plurality of trains that run on one line, but in actual application, a configuration will be used in which a plurality of trains on various lines exchange information with the boarding and alighting time estimation device 200 and the operation planning device 300.

[0035] Next, the input / output method between each device and the operation timing of each device will be described. Input / output and operations inside the train 400 are executed sequentially while the train 400 is traveling, and vehicle data is sequentially transmitted to the data input unit 210 of the boarding / alighting time estimation device 200 through the data output unit 450. In addition, the boarding / alighting time estimation device 200 sequentially processes the vehicle data acquired from the train 400, and outputs the calculated boarding / alighting time information to the storage unit 310 of the operation plan creation device 300.

[0036] The storage unit 310 of the operation plan creation device 300 executes sequential processing each time it acquires boarding and alighting time information or the operation plan creation unit 320 is started. This operation plan creation unit 320 is started at any timing by an operator (such as a railway operator) who creates an operation plan (not shown), and updates the operation plan using the boarding and alighting time information accumulated in the storage unit 310. Regarding the updated operation plan, the driver records this operation plan from the operation plan creation unit 320 to an information storage medium such as an IC card or a USB memory before the start of commercial operation of the train 400. Thereafter, when the driver gets on the train 400, a method of outputting the operation plan by connecting this information storage medium to the train information control device 410 of the train 400 can be considered.

[0037] However, the input / output modes and operation timings between the devices are not limited to those described as examples. For example, as shown in Fig. 3, if the train information control device 410 of the train 400 has a storage area such as a memory, a hard disk, or an SSD, and has an on-board storage area 411 for temporarily storing vehicle data generated in this storage area, the vehicle data is stored in the on-board storage area 411 while traveling. When the train returns to a depot or the like after the end of commercial operation, an information recording medium such as a hard disk or SSD is connected to the data output unit 450 to acquire the vehicle data stored in a lump. Next, the information recording medium may be connected to the data input unit 210 of the boarding / alighting time estimation device 200 to input the vehicle data.

[0038] 3, when the vehicle data storage area 211 exists in a recording area on an external server or a cloud, the boarding and alighting time estimation device 200 may calculate the boarding and alighting times by a railway operator activating the boarding and alighting time estimation device 200 at any timing and acquiring the vehicle data accumulated in the vehicle data storage area 211. The operation plan creation device 300 may be activated every time boarding and alighting time information is input from the boarding and alighting time estimation device 200 to the storage unit 310, and update the operation plan.

[0039] First, the input / output aspects of the components of the train 400 will be described. The vehicle information control device 410 acquires an operation plan from the operation plan creation device 300, and outputs the operation plan to a driver, or, in the case of a vehicle without a driver, such as a driverless train, to a device that controls train running.

[0040] Here, the data related to the operation plan is, for example, table data in which all stations from the starting station (Station A) to the terminal station (Station Z) and the planned arrival times and planned departure times for all these stations are described for at least each train number, as shown in Fig. 4. Here, Fig. 4 is a diagram showing an example of the data configuration of the operation plan.

[0041] The vehicle information control device 410 acquires train speed information from the speed generator 420, air spring pressure information (hereinafter referred to as "AS pressure" (air suspension pressure)) from the air spring device 440 as a passenger weight related parameter, and binary information indicating the door state, open or closed (hereinafter referred to as "door state"), from the door device 430. In addition to this information, the vehicle information control device 410 generates time-series vehicle data from date and time information held within the vehicle information control device 410 and station information acquired from the operation plan, as shown in Fig. 5, and outputs the data to the data output unit 450. Here, Fig. 5 is a diagram showing an example of the data configuration of the vehicle data.

[0042] The data output unit 450 acquires the above-mentioned vehicle data from the vehicle information control device 410 , and outputs it to the data input unit 210 of the boarding / alighting time estimation device 200 .

[0043] Next, input / output modes and operation modes of the components of the boarding / alighting time estimation device 200 will be described. The data input unit 210 inputs vehicle data from the data output unit 450 of the train 400, extracts only vehicle data during station stops, and stores the extracted vehicle data in the vehicle data storage area 211. The data input unit 210 also outputs the stored vehicle data to the passenger weight calculation unit 220, the reference weight calculation unit 230, and the boarding / alighting time estimation unit 240. Details of the operation of the data input unit 210 will be described later.

[0044] The passenger weight calculation unit 220 acquires vehicle data (time and AS pressure) from the data input unit 210. Using the acquired AS pressure, it calculates time-series data of passenger weight while the train is stopped at a station, and outputs the data to the reference weight calculation unit 230 and the boarding / alighting time estimation unit 240. Details of the operation of the passenger weight calculation unit 220 will be described later.

[0045] The reference weight calculation unit 230 acquires vehicle data (train speed and door status) from the data input unit 210 and passenger weight from the passenger weight calculation unit 220. From the acquired door status, train speed, and passenger weight, it calculates a post-boarding / alighting reference weight and a weight threshold value, and outputs these to the boarding / alighting time estimation unit 240. Details of the operation of the reference weight calculation unit 230 will be described later.

[0046] Here, as shown in Fig. 2, the post-boarding / alighting reference weight is an index representing the passenger weight in a state in which the doors transition from an open state to a closed state while the train is stopped at a station and the number of passengers inside the train 400 is confirmed. Also, as shown in Fig. 2, the weight threshold is an index representing how much the passenger weight must deviate from the post-boarding / alighting reference weight before the boarding / alighting time estimation unit 240 detects that boarding / alighting is complete.

[0047] The boarding and alighting time estimation unit 240 acquires vehicle data (time, current station, door status) from the data input unit 210, passenger weight from the passenger weight calculation unit 220, and post-boarding and alighting reference weight and weight threshold from the reference weight calculation unit 230. Using the acquired time, current station, door status, passenger weight, post-boarding and alighting reference weight, and weight threshold, it calculates an estimated boarding and alighting start time, stopping stations, and estimated boarding and alighting time to generate boarding and alighting time information. The generated boarding and alighting time information is output to the storage unit 310 of the operation plan creation device 300. Details of the operation mode of the boarding and alighting time estimation unit 240 will be described later.

[0048] 6 is a flowchart showing an example of a processing flow of the data input unit 210. The processing of the data input unit 210 is executed every time vehicle data is input. The data input unit 210 executes each of the following steps, but the description of the executing unit will be omitted below.

[0049] In step S1001, vehicle data (time, current station, train speed, AS pressure, and door state) is obtained from the data output unit 450 of the train 400 and stored in the vehicle data storage area 211, and the process proceeds to step S1002.

[0050] A series of processes from step S1002 to step S1012 below are looped as many times as the number of time steps of the vehicle data stored in step S1001.

[0051] In step S1002, the vehicle data stored in step S1001 for one step is read from the vehicle data storage area 211, and the process proceeds to step S1003.

[0052] In step S1003, it is determined whether the previous door state is closed and the current door state is open. If the result of the determination is Yes, the process proceeds to step S1004, and if the result is No, the process proceeds to step S1005.

[0053] In step S1004, the internal variable, running state, is changed from 0 to 1, and the process proceeds to step S1004. Here, the running state is a variable held inside the data input unit 210 for monitoring the running state in which the train 400 is. Fig. 7 is a diagram explaining the definition of the running state. As shown in the figure, 0 is the state in which the train is running, 1 is the state in which the train is stopped at the station and the doors are open, and 2 is the state in which the train is stopped at the station, the doors are closed, and the train is waiting until the departure time.

[0054] In step S1005, it is determined whether the previous value of the driving state is 1, the previous value of the door state is open, and the current value is closed. If the determination result is Yes, the process proceeds to step S1006, and if the determination result is No, the process proceeds to step S1007.

[0055] In step S1006, the running state is changed from 1 to 2, and the process proceeds to step S1007.

[0056] In step S1007, it is determined whether the previous value of the running state is 2 and the train speed is greater than 0. If the determination result is Yes, the process proceeds to step S1008, and if the determination result is No, the process proceeds to step S1011.

[0057] In step S1008, the transmission vehicle data stored in the vehicle data memory area 211 is obtained, and the obtained transmission vehicle data is output to the passenger weight calculation unit 220, the reference weight calculation unit 230, and the boarding / alighting time estimation unit 240, and the process proceeds to step S1009.

[0058] Here, the transmission vehicle data is data obtained by extracting only data with a driving state of 1 or 2 from the vehicle data acquired in step S1001, and is initially set as empty data, which is accumulated by additional storage in step S1012.

[0059] In step S1009, the transmission vehicle data in the vehicle data storage area 211 is deleted, and the process proceeds to step S1010.

[0060] In step S1010, the running state is changed from 2 to 0, and the process proceeds to step S1011.

[0061] In step S1011, it is determined whether the running state is greater than 0. If the determination result is Yes, the process proceeds to step S1012, and if the determination result is No, the process proceeds to the next step of the loop process. After executing the processes for the number of time steps of the vehicle data stored in step S1001, the loop process ends.

[0062] In step S1012, the vehicle data of the current step is added to the transmission vehicle data, and stored in the vehicle data storage area 211, and the process proceeds to the next step of the loop. After executing the processes for the number of time steps of the vehicle data stored in step S1001, the loop process ends.

[0063] 8 is a flowchart showing an example of a processing flow of the passenger weight calculation unit 220. The processing of the passenger weight calculation unit 220 is executed every time vehicle data is acquired from the data input unit. The execution subject of each of the following steps is the passenger weight calculation unit 220, but the description of the execution subject will be omitted below.

[0064] In step S2001, vehicle data (time, AS pressure) is acquired from data input unit 210, and the process proceeds to step S2002.

[0065] The processes in steps S2002 and S2003 are looped for the number of time steps of the vehicle data acquired in step S2001.

[0066] In step S2002, the passenger weight is calculated for each car of the train 400 using the following formula, and the process proceeds to step S2003. Passenger weight = (AS pressure - empty AS pressure) x surface area of ​​air spring ÷ gravitational acceleration Here, the unladen AS pressure is a value specific to each car of the train 400, and is set to a value measured in advance when the train 400 is manufactured or before it goes into service.

[0067] In addition, when multiple air spring devices are installed in each vehicle and multiple AS pressure data are available, an unladen AS pressure is set for each air spring device. Here, the passenger weight for each vehicle is calculated by averaging the passenger weights calculated for each air spring.

[0068] In the embodiment, a method for calculating passenger weight using AS pressure as a passenger weight-related parameter has been shown, but the means for calculating passenger weight is not limited to this method, and if there is another mechanism for detecting passenger weight on train 400, the measurement results may be used.

[0069] In step S2003, the time of the AS pressure when calculating the passenger weight and the calculated passenger weight of each vehicle are compiled into one time series data as passenger weight information, and the process proceeds to the next step in the loop. After executing the processing for the number of time steps of the input data, the loop process ends and the process proceeds to step S2004.

[0070] In step S2004, the passenger weight information is output to the reference weight calculation unit 230 and the boarding / alighting time estimation unit 240, and the process ends.

[0071] 9 is a flowchart showing an example of a processing flow of the reference weight calculation unit 230. The reference weight calculation unit 230 is executed every time passenger weight information is input from the passenger weight calculation unit 220. The execution subject of each of the following steps is the reference weight calculation unit 230, but the description of the execution subject will be omitted below.

[0072] In step S3001, vehicle data (train speed, door status) is obtained from data input unit 210, and passenger weight information is obtained from passenger weight calculation unit 220, and the process proceeds to step S3002.

[0073] The processing from step S3002 to step S3006 is executed the same number of times as the number of cars constituting the train 400. Moreover, the processing from step S3002 to step S3004 is looped the same number of times as the number of time steps of the input car data.

[0074] In step S3002, it is determined whether the door state has changed from open to closed. If the result of the determination is Yes, the process proceeds to step S3003, and if the result is No, the process proceeds to the next step in the loop process.

[0075] In step S3003, the passenger weight is added to the total weight, and 1 is added to the total weight data number, and the process proceeds to step S3004. Here, the total weight and the total weight data number are variables for calculating the average passenger weight, and both have an initial value of 0.

[0076] In step S3004, if the passenger weight is greater than the maximum weight, the maximum weight is updated to the passenger weight. If the passenger weight is less than the minimum weight, the minimum weight is updated to the passenger weight. Then, the process proceeds to the next step in the loop process.

[0077] After executing the processing for the number of time steps of the input vehicle data, the loop processing ends and the process proceeds to step S3005. Here, the maximum weight and the minimum weight are variables for calculating the maximum and minimum passenger weights referenced when calculating the post-boarding / disembarking reference weight, and both have an initial value of 0.

[0078] In step S3005, the post-boarding / alighting reference weight (average passenger weight) of the vehicle being processed is calculated using the following formula, and the process proceeds to step S3006. Post-boarding reference weight = total weight / total number of weight data

[0079] In step S3006, the greater of the absolute value of the difference between the post-boarding / disembarking reference weight and the maximum weight and the absolute value of the difference between the post-boarding / disembarking reference weight and the minimum weight is calculated as the weight threshold value for the vehicle being processed, and the process proceeds to the next loop processing step. After executing the process for the number of vehicles, the loop process ends and the process proceeds to step S3007.

[0080] Here, the weight threshold is an index indicating how much the passenger weight must deviate from the post-boarding / alighting reference weight in order for the boarding / alighting time estimation unit 240 to detect boarding / alighting as completed.

[0081] In the embodiment, the weight threshold is calculated based on the maximum and minimum values, but the weight threshold may also be calculated by calculating the standard deviation of passenger weight using the post-boarding / disembarking reference weight and passenger weight and setting the standard deviation as the threshold.

[0082] In step S3007, the post-boarding / alighting reference weight and the weight threshold value of each vehicle are output to the boarding / alighting time estimation unit 240, and the process ends.

[0083] 10 is a flowchart showing an example of a processing flow of the boarding / alighting time estimation unit 240. The processing of the boarding / alighting time estimation unit 240 is executed every time the post-boarding / alighting reference weight and the weight threshold value are acquired from the reference weight calculation unit 230. The boarding / alighting time estimation unit 240 executes each of the following steps, but the description of the execution unit will be omitted below.

[0084] In step S4001, vehicle data (date, time, door status, current station) is obtained from data input unit 210, passenger weight information is obtained from passenger weight calculation unit 220, and the post-boarding / alighting reference weight and weight threshold value are obtained from reference weight calculation unit 230, and the process proceeds to step S4002.

[0085] In step S4002, the time of the first data in the vehicle data is set as the estimated boarding / alighting start time, and the data of the current station at that time is set as the stop station, and the process proceeds to step S4003.

[0086] The processes from step S4003 to step S4005 are looped for the number of cars in the train 400. Moreover, the processes in step S4003 and step S4004 are looped for the number of time steps of the car data, going back in time from the point when the door state changed from open to closed to the beginning of the data.

[0087] In step S4003, it is determined whether the absolute value of the difference between the post-boarding / alighting reference weight and the passenger weight is equal to or less than the weight threshold (|post-boarding / alighting reference weight-passenger weight|≦weight threshold). If the determination result is Yes, the process proceeds to the next step of the loop process, and after the process is completed up to the first data, the loop process is terminated and the process proceeds to step S4005. If the determination result is No, the process proceeds to step S4004.

[0088] In step S4004, the time of the vehicle data in the current loop is set to the estimated boarding / alighting completion time, and the process proceeds to step S4005.

[0089] In step S4005, the estimated boarding and alighting time of the vehicle being processed is calculated using the following formula, and the process proceeds to the next step of the loop. After executing the processes for the number of vehicles, the loop ends and the process proceeds to step S4006. Estimated boarding / alighting time = Estimated boarding / alighting completion time - Estimated boarding / alighting start time

[0090] In step S4006, the maximum value among the estimated boarding and alighting times of each vehicle constituting the train 400 is calculated as the estimated boarding and alighting time at the stop station, and the process proceeds to step S4007.

[0091] In step S4007, boarding and alighting time information is generated from the date, stopping stations, estimated boarding and alighting start times, and estimated boarding and alighting times, and this boarding and alighting time information is output to the storage unit 310 of the operation plan creation device 300, and the process ends.

[0092] Next, input / output modes and operation modes of the components included in the operation plan creation device 300 will be described. The storage unit 310 acquires boarding and alighting time information from the boarding and alighting time estimation unit 240 of the boarding and alighting time estimation device 200 and stores it in the operation plan storage area 311.

[0093] Furthermore, the storage unit 310 acquires operation plan search conditions (train numbers) from the operation plan creation unit 320, acquires an operation plan that matches the operation plan search conditions from the operation plan storage area 311, and outputs boarding and alighting time information for each stop in the operation plan to the operation plan creation unit 320. Additionally, the storage unit 310 acquires an updated operation plan from the operation plan creation unit 320 and stores it in the operation plan storage area 311. Details of the operation mode of the storage unit 310 will be described later.

[0094] Here, the operation plan search conditions are arbitrarily set by the business operator (such as a railway business operator) that creates the operation plan according to the train number for which the operation plan is to be changed. For example, only train numbers that frequently experience delays due to commuting, etc. are selected, or if the operation plan for an entire line is to be updated, all train numbers for that line are selected. Note that a train number is a number used by railway businesses and is uniquely assigned to each route (from the starting station to the terminal station) to distinguish each train in the operation plan.

[0095] In addition, in the embodiment, the train number is used as a search condition, but the search condition is not limited to the train number, and may be information that can select a specific operation plan, such as a combination of a starting station and a planned departure time from the starting station.

[0096] The operation plan creation unit 320 outputs operation plan search conditions (train number) set by an operator who wishes to change an operation plan (not shown) to the storage unit 310, and acquires the operation plan and boarding and alighting time information from the storage unit 310. For example, boarding and alighting time selection conditions (date, time range) are set by an operator who wishes to change an operation plan (not shown), and boarding and alighting time information is acquired based on the boarding and alighting time selection conditions. The assumed boarding and alighting times are calculated by statistically processing the estimated boarding and alighting times of the boarding and alighting time information selected from the acquired boarding and alighting time information. Then, the operation plan is updated using the calculated assumed boarding and alighting times. The updated operation plan is output to the storage unit 310 and the train 400. Details of the operation mode of the operation plan creation unit 320 will be described later.

[0097] Here, the boarding / alighting time selection conditions are conditions for selecting boarding / alighting time information to be used in statistical processing for calculating expected boarding / alighting times, and are set arbitrarily by the business operator who creates the operation plan.

[0098] As the date condition, for example, only weekdays on which congestion is likely to occur due to commuting may be set, or a specific day of the week may be set. Also, if you want to update the operation plan of the target train number regardless of the date, you do not need to set it.

[0099] As for the time range condition, if you want to set a detailed operation plan for each train, you can set it to a value shorter than the train running interval, such as ±1 to 2 minutes, or if you want to set an operation plan for every few trains, you can set it to ±10 to 15 minutes, for example.

[0100] The expected boarding and alighting times are the boarding and alighting times expected for a certain date and time range at the station to be updated.

[0101] Statistical processing is performed on the estimated boarding and alighting times selected according to the boarding and alighting time selection conditions, and the results that satisfy the policy of updating the operation plan of the operator updating the operation plan are used. For example, if it is desired to update the operation plan to match the boarding and alighting times that occur on average, the average value may be used. Also, if it is desired to update the operation plan to match the boarding and alighting times that occur most frequently, the most frequent value may be used. On the other hand, if it is desired to update the operation plan so as to minimize delays, the maximum value or the like may be used. In the embodiment, the above-mentioned average value is used, as will be described later.

[0102] 11 is a flowchart showing an example of a processing flow of the storage unit 310. The storage unit 310 executes processing every time it acquires boarding / alighting time information from the boarding / alighting time estimation unit 240 of the boarding / alighting time estimation device 200 or acquires search conditions from the operation plan creation unit 320. The storage unit 310 executes each of the following steps, but the description of the execution unit will be omitted below.

[0103] In step S5001, boarding and alighting time information is obtained from the boarding and alighting time estimating unit 240 of the boarding and alighting time estimating device 200, and is stored in the operation plan storage area 311, and the process proceeds to step S5002.

[0104] In step S5002, it is determined whether or not an operation plan search condition (train number) has been acquired from the operation plan creation unit 320. If the determination result is Yes, the process proceeds to step S5003, and if the determination result is No, the process ends.

[0105] In step S5003, all boarding and alighting time information including the operation plan that matches the train number listed in the operation plan search conditions and the stop stations that match the stations listed in the operation plan are obtained from the operation plan memory area 311 and output to the operation plan creation unit 320, and the process proceeds to step S5004.

[0106] In step S5004, the updated operation plan is acquired from the operation plan creation unit 320, and the operation plan before the update in the operation plan storage area 311 is overwritten and saved, and the process ends.

[0107] 12 is a flowchart showing an example of the processing flow of the operation plan creation unit 320. The operation plan creation unit 320 executes processing when the operator who creates the operation plan sets the operation plan search conditions and the boarding / alighting time selection conditions. The operation plan creation unit 320 executes each of the following steps, but the description of the execution body is omitted below.

[0108] In step S6001, the operation plan search condition (train number) is output to the storage unit 310, and the process proceeds to step S6002.

[0109] In step S6002, the operation plan and boarding / alighting time information are obtained from the memory unit 310, and the process proceeds to step S6003.

[0110] The processing from step S6003 to step S6005 executes a loop process as many times as the number of train numbers specified in the operation plan search conditions, and furthermore, within this loop process, the processing is executed as many times as the number of stations listed in the operation plan being processed.

[0111] In step S6003, the date, stop stations, and estimated boarding / alighting start times of the boarding / alighting time information are referenced, and from among the stop stations that are the station being processed and whose dates match the dates of the boarding / alighting time selection conditions, a station whose estimated boarding / alighting start time is within the time range of the boarding / alighting time selection conditions with respect to the planned arrival time at the station being processed is selected, and the process proceeds to step S6004.

[0112] In step S6004, the average value of the estimated boarding and alighting times of the selected boarding and alighting time information is calculated and set as the assumed boarding and alighting time, and the process proceeds to step S6005.

[0113] In step S6005, the planned arrival time of the station being processed is updated using the following formula, and the process proceeds to the next step of the loop. If processing has been completed for all stations listed in the operation plan being processed, the loop ends and the process proceeds to the loop for the next train number. After processing has been completed for the operation plans for all train numbers, the loop ends and the process proceeds to step S6006. Updated planned arrival time = planned departure time - estimated boarding and alighting time

[0114] In step S6006, the updated operation plan is output to the memory unit 310 and the train 400, and the process ends.

[0115] Furthermore, the method of updating the operation plan is not limited to the processing method according to the flowchart shown in Figure 12, but may be any method that updates the previous operation plan by referring to the expected boarding and disembarking times estimated in the above-mentioned embodiment.

[0116] According to the above-described embodiment, at least the following technical aspects are included. <Technical aspect 1> The operation plan creation system includes a data acquisition unit that acquires time information, station information where the train stops, parameters related to the passenger weight of the train, the train speed, and the open / closed state of the train's doors, a passenger weight calculation unit that calculates the passenger weight from the above parameters, a reference weight calculation unit that uses the train speed, the open / closed state of the doors, and the passenger weight to calculate a post-boarding / alighting reference weight from the time when the doors change from the open state to the closed state until the train speed becomes greater than 0, and a boarding / alighting time estimation unit that estimates boarding / alighting times by comparing the passenger weight and the post-boarding / alighting reference weight from the open / closed state of the doors, the passenger weight, and the post-boarding / alighting reference weight, and an operation plan creation device that acquires boarding and alighting times for each station where the train stops from the boarding / alighting time estimation device and creates an operation plan for the train.

[0117] <Technical aspect 2> In the operation plan creation system described in Technical Aspect 1 above, the parameter is a pressure value of an air spring device installed in the train, and the passenger weight calculation unit calculates the passenger weight from the difference between the pressure value when the train is operating and the pressure value when the train is empty.

[0118] <Technical aspect 3> In the operation plan creation system described in the above technical aspect 1 or the above technical aspect 2, the reference weight calculation unit calculates the average passenger weight from the time when the door changes from an open state to a closed state to the time when the train speed becomes greater than 0 as the post-boarding and alighting reference weight.

[0119] <Technical aspect 4> In the operation plan creation system described in Technical Aspect 3 above, the reference weight calculation unit calculates the maximum value of the fluctuation range of passenger weight during the time from when the door changes from an open state to when the train speed becomes greater than 0 as a weight threshold value for the post-boarding and alighting reference weight.

[0120] <Technical aspect 5> In the operation plan creation system described in Technical Aspect 4 above, the boarding / disembarking time estimation unit extracts the point at which the passenger weight deviates from the post-boarding / disembarking reference weight by more than the weight threshold value by going back in time from the point at which the door changes from an open state to a closed state to the point at which the door changes from a closed state to an open state as the boarding / disembarking completion time.

[0121] <Technical Aspect 6> In the operation plan creation system described in Technical Aspect 5 above, when a train is composed of multiple cars, the boarding and alighting time estimation unit extracts the boarding and alighting completion time of the car with the latest extracted boarding and alighting completion time as the boarding and alighting completion time of the train.

[0122] <Technical Aspect 7> In the operation plan creation system described in Technical Aspect 5 or Technical Aspect 6 above, the boarding / alighting time estimation unit determines the time when the door changes from a closed state to an open state as the boarding / alighting start time, and estimates the boarding / alighting time as the difference between the boarding / alighting start time and the boarding / alighting completion time.

[0123] <Technical Aspect 8> An operation plan creation system according to any one of Technical Aspects 1 to 7 above, wherein the operation plan creation device creates an operation plan including a train number, information on all stations from the starting station to the terminal station, and information on the arrival time and departure time at each station.

[0124] <Technical Aspect 9> In the operation plan creation system described in Technical Aspect 8 above, the operation plan creation device has a memory unit that stores each piece of information about boarding and alighting times, the stations at which the boarding and alighting times were calculated, the date, the boarding and alighting start time, and the boarding and alighting completion time as boarding and alighting time information.

[0125] <Technical Aspect 10> In the operation plan creation system described in Technical Aspect 9 above, the operation plan creation device updates the operation plan by adjusting the station arrival time or station departure time for each station based on the result of statistical processing of the boarding and alighting times included in the set of boarding and alighting time information for the same station as the station related to the operation plan to be updated, from the boarding and alighting time information stored in the memory unit.

[0126] <Technical aspect 11> In the operation plan creation system described in Technical Aspect 10 above, when adjusting the station arrival time, the operation plan creation device limits the set of boarding and alighting time information to boarding and alighting time information whose boarding and alighting start time is included within a predetermined time range from the station arrival time.

[0127] <Technical aspect 12> In the operation plan creation system described in Technical Aspect 10 above, when adjusting the station arrival time, the operation plan creation device limits the set of boarding and alighting time information to boarding and alighting time information including a date that matches a date condition that specifies an arbitrary number of days.

[0128] <Technical aspect 13> An operation plan creation system according to any one of the above technical aspects 10 to 12, wherein the operation plan creation device defines, for a station related to the operation plan to be updated, an average value of the boarding and alighting times included in the set of boarding and alighting time information as the boarding and alighting time for that station, and adjusts the arrival time or departure time for that station based on the defined boarding and alighting time.

[0129] <Technical aspect 14> The method for creating an operation plan involves obtaining time information, station information where the train will stop, parameters related to the passenger weight of the train, the train speed and the open / closed state of the train's doors, calculating the passenger weight from the above parameters, using the train speed, the open / closed state of the doors and the passenger weight to calculate a post-boarding / alighting reference weight from the time the doors change from open to closed to the time the train speed becomes greater than 0, using the open / closed state of the doors, passenger weight and the post-boarding / alighting reference weight to estimate the boarding and alighting times by comparing the passenger weight from the time the doors change from open to closed to the post-boarding / alighting reference weight, and creating an operation plan for the train using the estimated boarding and alighting times for each station where the train stops.

[0130] <Technical aspect 15> An operation plan creation method as described in Technical Aspect 14 above, wherein the parameter is a pressure value of an air spring device installed on the train, and the passenger weight calculation unit calculates the passenger weight from the difference between the pressure value when the train is operating and the pressure value when the train is empty.

[0131] As described above, the operation plan creation system of the present invention makes it possible to detect the time when passengers have completed boarding and alighting even if the boarding and alighting is completed in less time than the station stop time specified in the operation plan, and furthermore, improves convenience by reducing delays, and saves energy by reducing the maximum train speed by extending the running time between stations.

[0132] However, because there is a limit to the shortest possible travel time between each station, when updating operation plans it is necessary to take into account these travel time limits and the risk of delays in order to create an overall stable operation plan.

[0133] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications are possible without departing from the gist of the present invention. [Explanation of symbols]

[0134] 100... operation plan creation system, 200... boarding / alighting time estimation device, 210... data input unit, 211: vehicle data storage area; 220: passenger weight calculation unit; 230: reference weight calculation unit; 240: boarding / alighting time estimation unit, 300: operation plan creation device, 310: storage unit, 311: operation plan storage area; 320: operation plan creation unit; 400: train; 410...vehicle information control device, 411...on-board memory area, 420...speed generator, 430: door device, 440: air spring device, 450: data output unit

Claims

1. a data acquisition unit that acquires time information, information on stations where the train stops, parameters related to the passenger weight of the train, the train speed of the train, and the open / closed state of the doors of the train; a passenger weight calculation unit for calculating the passenger weight from the parameters; a reference weight calculation unit that calculates a post-boarding / alighting reference weight during a period from a point in time when the door changes from an open state to a closed state until the train speed becomes greater than 0, using the train speed, the open / closed state of the door, and the passenger weight; a boarding / alighting time estimation unit that estimates a boarding / alighting time by using the open / closed state of the door, the passenger weight, and the post-boarding / alighting reference weight and comparing the passenger weight and the post-boarding / alighting reference weight during a period from when the door is opened to when it is closed; A boarding / alighting time estimation device having an operation plan creation device that acquires the boarding and alighting times of each station where the train stops from the boarding and alighting time estimation device and creates an operation plan for the train; An operation planning system equipped with the above.

2. The operation plan creation system according to claim 1, the parameter is a pressure value of an air spring device mounted on the train, The passenger weight calculation unit calculates the passenger weight from a difference between the pressure value when the train is in operation and the pressure value when the train is empty. An operation plan creation system comprising:

3. The operation plan creation system according to claim 1, The reference weight calculation unit calculates, as the post-boarding / alighting reference weight, an average value of the passenger weight during a period from when the door changes from an open state to a closed state until the train speed becomes greater than 0. An operation plan creation system comprising:

4. The operation plan creation system according to claim 3, The reference weight calculation unit calculates a maximum value of a fluctuation range of the passenger weight during a time period from when the door changes from an open state to a closed state until the train speed becomes greater than 0 as a weight threshold value for the post-boarding / alighting reference weight. An operation plan creation system comprising:

5. The operation plan creation system according to claim 4, The boarding / alighting time estimation unit extracts, as the boarding / alighting completion time, a time point at which the passenger weight deviates from the post-boarding / alighting reference weight by more than the weight threshold value by going back in time from a time point at which the door changes from an open state to a closed state to a time point at which the door changes from a closed state to an open state. An operation plan creation system comprising:

6. The operation plan creation system according to claim 5, When the train is composed of a plurality of cars, the boarding / alighting time estimation unit extracts the boarding / alighting completion time of the car having the latest extracted boarding / alighting completion time as the boarding / alighting completion time of the train. An operation plan creation system comprising:

7. The operation plan creation system according to claim 6, The boarding / alighting time estimation unit estimates a time when the door changes from a closed state to an open state as a boarding / alighting start time, and estimates a difference between the boarding / alighting start time and the boarding / alighting completion time as a boarding / alighting time. An operation plan creation system comprising:

8. An operation plan creation system according to any one of claims 1 to 7, The operation plan creation device creates an operation plan including train numbers, information on all stations from the starting station to the terminal station, and information on the arrival time and departure time of each station. An operation plan creation system comprising:

9. The operation plan creation system according to claim 8, The operation plan creation device has a storage unit that stores, as boarding / alighting time information, information on the boarding / alighting time, the stop station at which the boarding / alighting time was calculated, a date, the boarding / alighting start time, and the boarding / alighting completion time. An operation plan creation system comprising:

10. The operation plan creation system according to claim 9, The operation plan creation device updates the operation plan by adjusting the station arrival time or the station departure time for each station based on a result of statistical processing of the boarding and alighting times included in the set of boarding and alighting time information for the same station as a station related to the operation plan to be updated from the boarding and alighting time information stored in the storage unit. An operation plan creation system comprising:

11. The operation plan creation system according to claim 10, The operation plan creation system is characterized in that, when adjusting the station arrival time, the operation plan creation device limits the set of boarding and alighting time information to boarding and alighting time information whose boarding and alighting start time is included within a predetermined time range from the station arrival time.

12. The operation plan creation system according to claim 10, When adjusting the station arrival time, the operation plan creation device limits the set of boarding and alighting time information to boarding and alighting time information including a date that matches a date condition that specifies an arbitrary number of days. An operation plan creation system comprising:

13. The operation plan creation system according to claim 10, The operation plan creation device defines an average value of the boarding and alighting times included in the set of boarding and alighting time information as a boarding and alighting time for a station related to the operation plan to be updated, and adjusts the station arrival time or station departure time for the station based on the defined boarding and alighting time. An operation plan creation system comprising:

14. Acquire time information, station information at which the train stops, parameters related to the passenger weight of the train, the train speed of the train, and the open / closed state of the doors of the train; Calculating the passenger weight from the parameters; using the train speed, the open / closed state of the door, and the passenger weight, calculate a post-boarding / alighting reference weight during a period from when the door changes from the open state to the closed state until the train speed becomes greater than 0; using the door open / closed state, the passenger weight, and the post-boarding / off reference weight, estimating a boarding / off time by comparing the passenger weight and the post-boarding / off reference weight during a time period from when the door is opened to when it is closed; A train operation plan is created using the estimated boarding and alighting times for each station where the train stops. A method for creating an operation plan comprising the steps of:

15. The operation plan creation method according to claim 14, the parameter is a pressure value of an air spring device mounted on the train, The passenger weight is calculated from the difference between the pressure value when the train is in operation and the pressure value when the train is empty. A method for creating an operation plan comprising the steps of:

Citation Information

Patent Citations

  • Train control system, on-vehicle equipment, and ground equipment

    JP2010100182A

  • Monitoring system

    WO2021199173A1

  • Automatic train operation assistance device, automatic train operation assistance system, and automatic train operation assistance method

    WO2023084701A1

  • Train operation support system and method for the same

    JP2022042138A