Treatment liquid feeding device and washing machine

JP2024169073APending Publication Date: 2024-12-05QINGDAO HAIER WASHING MASCH CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023086261
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05

AI Technical Summary

Benefits of technology

【0013】 本開示によれば、液剤収容部内の液剤をより有効に活用できる処理液投入装置及び洗濯機を提供できる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024169073000001_ABST
    Figure 2024169073000001_ABST
Patent Text Reader

Abstract

To provide: a treatment liquid feeding device capable of more effectively using a liquid agent in a liquid agent accommodating part; and a washing machine having the treatment liquid feeding device.SOLUTION: A treatment liquid feeding device according to an embodiment includes: a liquid agent accommodating part; and a feeding mechanism to suck a liquid agent in the liquid agent accommodating part and feed the liquid agent together with water as a treatment liquid into a washing tank. The feeding mechanism comprises: a liquid agent extracting channel to extract the liquid agent from the liquid agent accommodating part; and a first check valve that is disposed in the liquid agent extracting channel, opens and closes communication between the liquid agent accommodating part and the liquid agent extracting channel, and allows the liquid agent to flow from the liquid agent accommodating part to the liquid agent extracting channel. The liquid agent accommodating part can be attached to or detached from the liquid agent extracting channel and comprises: a liquid agent guide channel to allow the liquid agent in the liquid agent accommodating part to flow into the liquid agent extracting channel; and a second check valve that is disposed in the liquid agent guide channel, opens and closes communication between the liquid agent accommodating part and the liquid agent extracting channel, and allows the liquid agent to flow from the liquid agent accommodating part into the liquid agent extracting channel. The first check valve and the second check valve are disposed along a same direction in a state where the liquid agent extracting channel and the liquid agent guide channel are connected.SELECTED DRAWING: Figure 25
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a treatment liquid dispenser and a washing machine. [Background technology]

[0002] In recent years, washing machines equipped with treatment liquid dispensers have been sold. An example of the treatment liquid dispenser is the device disclosed in Patent Document 1. In the device disclosed in Patent Document 1, detergent (liquid) stored in a liquid storage box is sucked up using a negative pressure pipe, mixed with water, and supplied to the washing tub as treatment liquid. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2020 / 113954 Summary of the Invention [Problem to be solved by the invention]

[0004] In the technology described in Patent Document 1, a check valve is provided in a flow path for extracting the liquid from a liquid storage box (hereinafter referred to as a "liquid extraction flow path"). The liquid storage box is provided with a flow path (hereinafter referred to as a "liquid guide flow path") for flowing the liquid in the liquid storage box to the liquid extraction flow path while the liquid storage box is connected to the liquid extraction flow path. For example, it is considered to provide a check valve in the liquid guide flow path as well so that the liquid does not leak from the liquid guide flow path in cases such as when the liquid storage box is removed from the housing in which it is installed.

[0005] In this case, when the step of extracting the liquid from the liquid storage box is carried out using the liquid guide flow path and the liquid extraction flow path, the two check valves are both open and the liquid flows between the two check valves. Therefore, the liquid is present between the two check valves. When the liquid guide flow path is detached from the liquid extraction flow path, the liquid between the two check valves drips onto the bottom wall of the housing that contains the liquid storage box and is not used for washing.

[0006] The present disclosure aims to provide a treatment liquid dispenser and a washing machine that can more effectively utilize the liquid in a liquid storage section. [Means for solving the problem]

[0007] A treatment liquid input device according to one aspect of the present disclosure includes a liquid agent storage unit, and a supply mechanism that sucks out the liquid agent in the liquid agent storage unit and supplies the liquid agent together with water to a washing tub as a treatment liquid, the supply mechanism including a liquid agent extraction flow path for extracting the liquid agent from the liquid agent storage unit, and a first check valve that is disposed in the liquid agent extraction flow path and opens and closes communication between the liquid agent storage unit and the liquid agent extraction flow path and allows the liquid agent to flow from the liquid agent storage unit to the liquid agent extraction flow path, the liquid agent extraction flow path is detachably attached to the liquid agent extraction flow path, and includes a liquid agent guide flow path for flowing the liquid agent in the liquid agent storage section to the liquid agent extraction flow path, and a second check valve arranged in the liquid agent guide flow path for opening and closing communication between the liquid agent storage section and the liquid agent extraction flow path, and for flowing the liquid agent from the liquid agent storage section to the liquid agent extraction flow path, and when the liquid agent extraction flow path and the liquid agent guide flow path are connected, the first check valve and the second check valve are arranged along the same direction.

[0008] In the above configuration, when the liquid agent extraction flow path and the liquid agent guide flow path are connected, the first check valve and the second check valve are arranged along the same direction. Therefore, since the first check valve and the second check valve can be easily arranged close to each other, the amount of liquid agent remaining between the first check valve and the second check valve can be reduced. Therefore, the configuration of the treatment liquid input device allows the liquid agent in the liquid agent storage unit to be effectively used.

[0009] The supply mechanism has a housing in which a storage space for accommodating the liquid agent storage unit is formed, the housing having a bottom wall, a top wall opposite the bottom wall, a rear wall connecting the bottom wall and the top wall, a first side wall connecting the bottom wall, the top wall and the rear wall, and a second side wall connecting the bottom wall, the top wall and the rear wall and facing the first side wall, the storage space being formed by the bottom wall, the top wall, the first side wall and the second side wall, the liquid agent extraction flow path protruding forward from the rear wall, and a connecting end of the liquid agent guide flow path connected to the liquid agent extraction flow path may be exposed from a wall of the liquid agent storage unit that faces the rear wall.

[0010] Since the front surface of the housing is open, the liquid agent storage unit can be installed in the housing by sliding the liquid agent storage unit backward. When the liquid agent extraction flow path protrudes forward from the rear wall, and the connecting end of the liquid agent guide flow path is exposed from a wall of the liquid agent storage unit facing the rear wall, the liquid agent guide flow path and the liquid agent extraction flow path can be easily connected to each other by sliding the liquid agent storage unit backward as described above.

[0011] A rod-shaped member may be provided at a front end of the liquid agent extraction flow path, extending forward from the front end, for maintaining an open state of the second check valve in a state in which the liquid agent guide flow path and the liquid agent extraction flow path are connected. In this case, the open state of the second check valve is maintained by the rod-shaped member in a state in which the liquid agent guide flow path and the liquid agent extraction flow path are connected, so that the liquid agent can be extracted by using the liquid agent guide flow path and the liquid agent extraction flow path.

[0012] A washing machine according to another aspect of the present disclosure includes a washing tub and the treatment liquid dispenser. The washing machine includes the treatment liquid dispenser. The treatment liquid dispenser can effectively utilize the liquid in the liquid agent storage unit, and therefore the liquid in the liquid agent storage unit can be effectively utilized in the washing machine. Effect of the Invention

[0013] According to the present disclosure, it is possible to provide a treatment liquid dispenser and a washing machine that can more effectively utilize the liquid in the liquid storage section. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a side view of a washing machine according to an embodiment. [Diagram 2] FIG. 2 is a perspective view of the washing machine shown in FIG. [Diagram 3] FIG. 3 is a diagram showing the washing machine shown in FIG. 2 in a state where the second liquid agent container is pulled out from the supply mechanism. [Figure 4] FIG. 4 is a diagram showing a schematic configuration of the treatment liquid supply device. [Diagram 5] FIG. 5 is a schematic diagram for explaining an example of one process in the case where water is supplied to a washing tub by a treatment liquid supplying device. [Figure 6] FIG. 6 is a schematic diagram for explaining an example of a process for taking out the first liquid from the first liquid storage unit by the treatment liquid supply device. [Figure 7] FIG. 7 is a schematic diagram for explaining an example of a step of introducing the first liquid agent taken out in the step shown in FIG. [Figure 8] FIG. 8 is a schematic diagram for explaining an example of a process for taking out the second liquid agent from the second liquid agent storage unit by the treatment liquid supply device. [Figure 9] FIG. 9 is a schematic diagram for explaining an example of a step of introducing the second liquid agent taken out in the step shown in FIG. [Figure 10] FIG. 10 is a perspective view of a treatment liquid supplying device according to an embodiment. [Figure 11] FIG. 11 is a perspective view of a first liquid agent container (liquid agent container) according to one embodiment. [Figure 12] FIG. 12 is a perspective view of a second liquid agent container (liquid agent container) according to one embodiment. [Figure 13] FIG. 13 is a perspective view of the liquid agent storage section with the cover member removed. [Figure 14]FIG. 14 is an exploded perspective view of the liquid agent storage section with the cover member removed. [Figure 15] 15 is a perspective view of a supply mechanism included in the liquid agent storage unit shown in FIG. [Figure 16] 16 is a perspective view of a water supply unit included in the supply mechanism shown in FIG. [Figure 17] FIG. 17 is a cross-sectional perspective view taken along line XVII-XVII in FIG. [Figure 18] 18 is a perspective view of a negative pressure generating unit included in the supply mechanism shown in FIG. [Figure 19] FIG. 19 is a cross-sectional view taken along line XIX-XIX in FIG. [Figure 20] FIG. 20 is a cross-sectional perspective view taken along the line XX-XX in FIG. [Figure 21] FIG. 21 is a cross-sectional view taken along line XXI-XXI in FIG. [Figure 22] 22 is a perspective view of a housing provided in the supply mechanism shown in FIG. [Figure 23] FIG. 23 is a perspective view of the housing with the top wall removed. [Figure 24] FIG. 24 is a diagram for explaining the configuration of the bottom wall. [Diagram 25] FIG. 25 is a diagram for explaining the positional relationship between a valve included in a first liquid agent storage unit and a valve provided in a first liquid agent outlet flow path connected to the first liquid agent storage unit in the housing. [Figure 26] FIG. 26 is an exploded perspective view of the housing shown in FIG. [Figure 27] FIG. 27 is a diagram for explaining a flow path formed on the upper surface of the top wall. [Figure 28] FIG. 28 is a diagram for explaining a flow path formed on the rear surface of the rear wall. [Figure 29] FIG. 29 is a perspective view of the top wall as viewed from below. [Diagram 30] FIG. 30 is a diagram for explaining the flow of liquid dropping from the top wall toward the bottom wall. [Diagram 31] FIG. 31 is a diagram for explaining a schematic configuration of a modified example of the treatment liquid supplying device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings. The same elements are given the same reference numerals, and duplicated explanations will be omitted. The dimensional ratios of the drawings do not necessarily match those in the description.

[0016] FIG. 1 is a side view of a washing machine according to one embodiment. FIG. 2 is a perspective view of the washing machine shown in FIG. 1. In the following, the mutually orthogonal X, Y and Z directions shown in FIG. 1 may be used to explain the washing machine 1. The X, Y and Z directions correspond to the front-rear direction, left-right direction and height direction (or the up-down direction or vertical direction) in the installation state of the washing machine 1 shown in FIG. 1. In the following explanation, terms indicating directions such as "front", "rear", "up", "down", "left" and "right" are terms based on the installation state of the washing machine 1 shown in FIG. 1 and FIG. 2.

[0017] The schematic configuration of the washing machine 1 will be described. The washing machine 1 shown in Figs. 1 and 2 is a vertical washing machine. The washing machine 1 has a housing 2. The housing 2 forms the outer shell of the washing machine 1. The housing 2 is made of metal, for example. The housing 2 has a hollow body 2a with an open top and bottom. The top of the body 2a is covered with a top plate 2b, and a footrest 2c is attached to the bottom of the body 2a. When viewed from the Z direction, the shape of the body 2a is quadrangular (rectangular or square).

[0018] A laundry insertion port is formed in top panel 2b. The insertion port is covered by top lid 3. Top lid 3 is attached to top panel 2b so as to be freely opened and closed. An operation panel unit 4 is provided in the front of top panel 2b. A plurality of buttons for operating washing machine 1 are arranged on operation panel unit 4. Operation panel unit 4 is provided in washing machine 1 and is electrically connected to a control unit that controls washing machine 1. The control unit controls washing machine 1 in accordance with user instructions input through operation panel unit 4.

[0019] As shown in FIG. 1, housing 2 accommodates outer tub 5a and inner tub (washing tub) 5b.

[0020] The outer tub 5a has a cylindrical shape with a bottom. The outer tub 5a is, for example, a resin tub. The outer tub 5a is elastically suspended from the housing 2 by a plurality of (for example, four) hanging rods having a vibration isolator. The outer tub 5a is configured so that a treatment liquid for washing is supplied to the outer tub 5a through a water supply channel provided in the housing 2, and the treatment liquid can be discharged from the outer tub 5a through a drain channel provided in the housing 2. In this specification, the "treatment liquid" means a liquid corresponding to each process such as a washing process and a rinsing process of laundry. Therefore, in the washing process, the treatment liquid may be a liquid containing a detergent, and in the rinsing process, the treatment liquid may be a liquid containing water or a fabric softener. In the following, for convenience of explanation, the liquid flowing through the flow path may be specifically referred to as a first liquid agent, a second liquid agent, and water, or may be collectively described as a treatment liquid.

[0021] The inner tub 5b has a cylindrical shape with a bottom. The inner tub 5b is smaller than the outer tub 5a and is arranged inside the outer tub 5a coaxially with the outer tub 5a. The inner tub 5b is arranged inside the outer tub 5a so as to be rotatable around a rotation axis extending in the Z direction. The inner tub 5b is, for example, a metal tub. The inner tub 5b is a tub for washing or spin-drying laundry placed in the inner tub 5b. A plurality of through holes are formed on the inner peripheral surface of the inner tub 5b. This allows the washing liquid to move between the outer tub 5a and the inner tub 5b. A rotor (pulsator) 6 is rotatably arranged at the bottom of the inner tub 5b.

[0022] A drive unit 7 is also housed in the housing 2 to drive and rotate the inner tub 5b and the rotor 6. The drive unit 7 is disposed under the outer tub 5a. The drive unit 7 generates power (torque) to drive the inner tub 5b and the rotor 6. The drive unit 7 rotates the inner tub 5b and the rotor 6 by the power. For example, in the washing step and rinsing step, the drive unit 7 transmits the power only to the rotor 6 to rotate only the rotor 6, and in the spin-drying step, the drive unit 7 transmits the power only to the rotor 6 and the inner tub 5b to rotate the rotor 6 and the inner tub 5b together.

[0023] The washing machine 1 is provided with a treatment liquid supplying device 10 for supplying a treatment liquid to the inner tub 5b.

[0024] The processing liquid supplying device 10 is incorporated in the upper rear portion of the housing 2 so that the front portion of the processing liquid supplying device 10 is exposed when the top lid 3 is open as shown in FIG. 2. The processing liquid supplying device 10 is disposed so that an inlet for supplying the liquid toward the inner tank 5b is positioned above the inner tank 5b. This allows the liquid to be supplied from the inlet to the inner tank 5b. The processing liquid supplying device 10 includes a first liquid storage section 20A, a second liquid storage section 20B, and a supply mechanism 30.

[0025] The first liquid storage unit 20A and the second liquid storage unit 20B store a liquid. Examples of the liquid include liquid detergent and fabric softener. The first liquid storage unit 20A and the second liquid storage unit 20B store different liquids. The liquid stored in the first liquid storage unit 20A is referred to as the first liquid, and the liquid stored in the second liquid storage unit 20B is referred to as the second liquid. Unless otherwise specified, the first liquid is a liquid detergent and the second liquid is a fabric softener.

[0026] The first liquid agent storage unit 20A and the second liquid agent storage unit 20B are contained in a housing (casing) 40 of the supply mechanism 30. The first liquid agent storage unit 20A and the second liquid agent storage unit 20B are slidable relative to the housing 40. In other words, the housing 40 has an accommodation space that slidably accommodates the first liquid agent storage unit 20A and the second liquid agent storage unit 20B.

[0027] As shown in Fig. 3, the second liquid agent can be replenished with the second liquid agent by pulling out the second liquid agent storage unit 20B from the housing 40. Fig. 3 is a diagram showing a state in which the second liquid agent storage unit 20B is pulled out from the supply mechanism 30 in the washing machine 1 shown in Fig. 2. Although the case of the second liquid agent storage unit 20B has been described using Fig. 3, the first liquid agent can be replenished with the first liquid agent by pulling out the first liquid agent storage unit 20A.

[0028] In the treatment liquid supplying device 10, it is also possible to detach the first liquid storage unit 20A and the second liquid storage unit 20B from the housing 40. That is, the first liquid storage unit 20A and the second liquid storage unit 20B are attached to the housing 40 in a detachable manner.

[0029] The schematic configuration of the treatment liquid supplying device 10 will be described with reference to Fig. 4. Fig. 4 is a diagram showing the schematic configuration of the treatment liquid supplying device 10. Fig. 4 is a diagram focusing on the flow path of the treatment liquid (water containing a first liquid agent or a second liquid agent, or water (water containing no liquid agent)) in the treatment liquid supplying device 10, and corresponds to a piping diagram of the treatment liquid supplying device 10.

[0030] The treatment liquid input device 10 has a water supply passage 11, a first main passage 12A, a second main passage 12B and an input passage 13.

[0031] The water inlet 11a of the water supply flow path 11 is connected to a hose attachment part of the washing machine 1 via a hose or the like. The hose attachment part is further connected to a water faucet via a hose or the like. Thus, water from the water faucet flows into the water inlet 11a, and water (treatment liquid) flows into the water supply flow path 11. The water that flows into the water supply flow path 11 from the water inlet 11a flows through the first main flow path 12A and the second main flow path 12B into the input flow path 13, and is then input from the input port 13a of the input flow path 13 into the inner tub 5b. In the following description, "upstream" and "downstream" are terms that refer to the flow direction of the treatment liquid from the water inlet 11a toward the input port 13a.

[0032] The treatment liquid input device 10 includes a water supply valve V1a and a water supply valve V1b for controlling the inflow of the treatment liquid from the water supply passage 11 into the first main passage 12A and the second main passage 12B.

[0033] When both the water supply valves V1a and V1b are open, water flows from the water supply flow passage 11 into both the first main flow passage 12A and the second main flow passage 12B. When the water supply valve V1a is open and the water supply valve V1b is closed, water flows from the water supply flow passage 11 into the first main flow passage 12A, while the inflow of water into the second main flow passage 12B is blocked. Conversely, when the water supply valve V1a is closed and the water supply valve V1b is open, water flows from the water supply flow passage 11 into the second main flow passage 12B, while the inflow of water into the first main flow passage 12A is blocked. When both the water supply valves V1a and V1b are closed, the inflow of water from the water supply flow passage 11 into both the first main flow passage 12A and the second main flow passage 12B is blocked. In this embodiment, the water supply valve (first valve) V1a and the water supply valve (second valve) V1b are solenoid valves. The water supply valves as the first valve and the second valve are not limited to solenoid valves.

[0034] The treatment liquid input device 10 includes a flow path switching unit U1 that switches the inflow of the treatment liquid flowing through the first main flow path 12A and the second main flow path 12B into the input flow path 13. The flow path switching unit U1 is a part for switching between a case where the treatment liquid is flowed from the first main flow path 12A into the input flow path 13, a case where the treatment liquid is flowed from the second main flow path 12B into the input flow path 13, and a case where the treatment liquid is flowed from both the first main flow path 12A and the second main flow path 12B into the input flow path 13.

[0035] As shown in FIG. 4, an example of the flow path switching unit U1 has a check valve (seventh valve) V2a provided in the first main flow path 12A and a check valve (eighth valve) V2b provided in the second main flow path 12B. When the water supply valve V1a is opened to cause a flow of the treatment liquid from the upstream to the downstream in the first main flow path 12A, the check valve V2a allows the treatment liquid to flow from the first main flow path 12A to the input flow path 13. When the water supply valve V1b is opened to cause a flow of the treatment liquid from the upstream to the downstream in the second main flow path 12B, the check valve V2b allows the treatment liquid to flow from the second main flow path 12B to the input flow path 13. Although check valves are exemplified as the seventh valve and the eighth valve, the seventh valve and the eighth valve are not limited in type as long as they can achieve the same function as the check valves.

[0036] A first liquid agent extraction flow path 14A is connected to the first main flow path 12A. When the first liquid agent storage unit 20A is attached to the housing 40, the first liquid agent storage unit 20A is connected to the first liquid agent extraction flow path 14A so that the first liquid agent can be extracted from the first liquid agent storage unit 20A. As a result, when the first liquid agent storage unit 20A is accommodated in the housing 40, the first liquid agent storage unit 20A is connected to the first main flow path 12A via the first liquid agent extraction flow path 14A.

[0037] A check valve (fifth valve) V3a is disposed in the first liquid agent extraction flow path 14A to prevent backflow of the treatment liquid, such as water, in the first main flow path 12A to the first liquid agent storage unit 20A, and to prevent leakage of the treatment liquid in the first main flow path 12A when the first liquid agent storage unit 20A is removed. Although a check valve is exemplified as the fifth valve, the type of the fifth valve is not limited as long as it can achieve the same function as the above-mentioned check valve.

[0038] A second liquid agent extraction flow path 14B is connected to the second main flow path 12B. When the second liquid agent storage unit 20B is attached to the housing 40, the second liquid agent storage unit 20B is connected to the second liquid agent extraction flow path 14B so that the second liquid agent can be extracted from the second liquid agent storage unit 20B. As a result, when the second liquid agent storage unit 20B is accommodated in the housing 40, the second liquid agent storage unit 20B is connected to the second main flow path 12B via the second liquid agent extraction flow path 14B.

[0039] A check valve (sixth valve) V3b is arranged in the second liquid agent extraction flow path 14B to prevent backflow of the treatment liquid, such as water, in the second main flow path 12B to the second liquid agent storage unit 20B, and to prevent leakage of the treatment liquid in the second main flow path 12B when the second liquid agent storage unit 20B is removed. Although a check valve is exemplified as the sixth valve, the sixth valve is not limited to a particular type as long as it can achieve the same function as the check valve.

[0040] The processing liquid supplying device 10 includes a negative pressure generating unit U2 for sucking out the liquid from each of the first liquid storage unit 20A and the second liquid storage unit 20B. In this embodiment, the negative pressure generating unit U2 has a first venturi section 15A provided in a part of the first main flow path 12A and a second venturi section 15B provided in a part of the second main flow path 12B. The first venturi section 15A and the second venturi section 15B generate negative pressure by the Venturi effect. The first venturi section 15A is disposed upstream of the connection between the first liquid extraction flow path 14A and the first main flow path 12A in the first main flow path 12A. The second venturi section 15B is disposed upstream of the connection between the second liquid extraction flow path 14B and the second main flow path 12B in the second main flow path 12B.

[0041] The first venturi portion 15A and the second venturi portion 15B are connected by a connecting flow path 16. A flow meter 17 is provided in the connecting flow path 16. The result of the flow meter 17 may be analyzed by a control unit that controls the washing machine 1.

[0042] In the treatment liquid introduction device 10, the first main flow path 12A and the second main flow path 12B are connected to the introduction flow path 13 by a bypass flow path 18 that bypasses the negative pressure generating unit U2. The upstream side of the bypass flow path 18 branches into two and is connected to the first main flow path 12A and the second main flow path 12B. The connection parts of the bypass flow path 18 with the first main flow path 12A and the second main flow path 12B are located upstream of the negative pressure generating unit U2. A relief valve (third valve) V4a that controls the flow of the treatment liquid from the first main flow path 12A to the bypass flow path 18 is disposed near the connection part between the first main flow path 12A and the bypass flow path 18 in the bypass flow path 18. A relief valve (fourth valve) V4b that controls the flow of the treatment liquid from the second main flow path 12B to the bypass flow path 18 is disposed near the connection part between the second main flow path 12B and the bypass flow path 18 in the bypass flow path 18. Although the relief valves have been exemplified as the third valve and the fourth valve, the third valve and the fourth valve are not limited to their types as long as they can achieve the same function as the above-mentioned relief valves.

[0043] Here, an outline of a liquid supplying method using the treatment liquid supplying device 10 will be described. The liquid supplying method will be described based on a state in which the first liquid supplying unit 20A and the second liquid supplying unit 20B are installed in the housing 40, the first liquid supplying unit 20A and the second liquid supplying unit 20B are connected to the first liquid supplying flow path 14A and the second liquid supplying flow path 14B, and water can flow from a water faucet into the water supply port 11a.

[0044] First, the water supply valves V1a and V1b are opened. As a result, as shown in FIG. 5, water (treatment liquid) flows into the first main flow path 12A and the second main flow path 12B. At this time, the water supply valves V1a and V1b are opened so that the pressure (water pressure) in the first main flow path 12A and the second main flow path 12B is substantially the same. The check valves V2a and V2b and the relief valves V4a and V4b are opened by the pressure of the water flowing through the first main flow path 12A and the second main flow path 12B. As a result, water flows into the input flow path 13 from both the first main flow path 12A and the second main flow path 12B through a path passing through the negative pressure generating unit U2 and the flow path switching unit U1, and water flows into the input flow path 13 through a path passing through the bypass flow path 18. The water that flows into the input flow path 13 in this way is supplied to the inner tank 5b (water passing process). FIG. 5 is a schematic diagram showing the flow of water in the water passing process. In FIG. 5, the flow of water is shown typically by arrows.

[0045] In the water passing step, water also flows into the connecting flow path 16. Therefore, the inside of the connecting flow path 16 is also filled with water. In the water passing step, the check valves V3a and V3b are maintained in a closed state. Therefore, water does not flow into the first liquid agent storage portion 20A and the second liquid agent storage portion 20B.

[0046] After a certain amount of water is supplied to the inner tank 5b as described above, the water supply valves V1a and V1b are closed, thereby maintaining the first main flow path 12A, the second main flow path 12B, and the connecting flow path 16 filled with water (filling step).

[0047] After carrying out the above-mentioned filling step, if a first liquid agent is to be added, a first liquid agent removal step and a first liquid agent introduction step are carried out, and if a second liquid agent is to be added, a second liquid agent removal step and a second liquid agent introduction step are carried out.

[0048] First, the case of feeding the first liquid will be described. Fig. 6 is a schematic diagram showing the flow of water and the first liquid in the first liquid extraction step. Fig. 7 is a schematic diagram showing the flow of water and the first liquid in the first liquid feeding step. In Figs. 6 and 7, the flow of water is indicated by a solid arrow, and the flow of the first liquid is indicated by a dashed arrow.

[0049] In the first liquid agent extraction step, only the water supply valve V1b is opened. In this case, as shown in FIG. 6, water flows from the water supply flow path 11 to the second main flow path 12B, but water does not flow from the water supply flow path 11 to the first main flow path 12A. In this water flow, the check valve V2b and the relief valve V4b are open, but the check valve V2a and the relief valve V4a are closed. As a result, water flows from the water supply flow path 11 to the input flow path 13 via the second main flow path 12B, and water flows from the water supply flow path 11 to the input flow path 13 via the second main flow path 12B and the bypass flow path 18.

[0050] The negative pressure generated in the second venturi portion 15B disposed in the second main flow path 12B causes the water in the first main flow path 12A and the connecting flow path 16 to flow into the second main flow path 12B through the connecting flow path 16 and the second venturi portion 15B. In this way, the flow of water from the first main flow path 12A to the second main flow path 12B causes pressure toward the first venturi portion 15A to act on the check valve V3a, thereby opening the check valve V3a. As a result, the first liquid agent in the first liquid agent storage portion 20A is sucked into the first liquid agent extraction flow path 14A, and the first liquid agent is extracted toward the first main flow path 12A. At this time, the first liquid agent is extracted in the first main flow path 12A so as to fill the first storage area that temporarily stores the extracted first liquid agent. The first liquid agent stored in the first storage area is the first liquid agent to be introduced into the inner tank 5b as described later.

[0051] In the first liquid agent extraction step, the amount of water flowing through the connecting flow path 16 is measured by a flow meter 17 provided in the connecting flow path 16, and when the measured value reaches a predetermined water amount, it is determined that the desired first liquid agent has been extracted. The predetermined water amount is the amount of water filled into the first main flow path 12A in the filling step, which corresponds to the amount of the first liquid agent to be sucked out (the amount to fill the first storage area). The amount of the first liquid agent to be sucked out is set so that the first liquid agent does not flow up to the flow meter 17.

[0052] At this stage, the first liquid agent supplying step is performed by opening the water supply valve V1a. By opening the water supply valve V1a, water flows into the first main flow path 12A and the second main flow path 12B in the same manner as in the water passing step. As a result, the first liquid agent in the first storage area is supplied together with water into the inner tank 5b, as shown by the solid and dashed arrows in FIG. 7. In the first liquid agent supplying step, water also flows into the supply flow path 13 via the bypass flow path 18, in the same manner as in the water passing step.

[0053] By continuing to flow a certain amount of water after the first liquid agent is introduced, the first liquid agent remaining in the first main flow path 12A and the like is also washed away and introduced into the inner tank 5b together with the water. In other words, the parts of the first main flow path 12A and the like through which water flows are washed in the same manner as in the water passing step (washing step). Here, for convenience of explanation, the first liquid agent introduction step and the washing step are explained separately, but the first liquid agent introduction step and the washing step may be one step.

[0054] The above-mentioned cleaning step prevents the first liquid from being mixed into the treatment liquid, for example, when the second liquid in the second liquid storage section 20B is added after the first liquid is added to the inner tank 5b. The above-mentioned cleaning step corresponds to the above-mentioned water passing step for the second liquid when the second liquid is added after the first liquid is added to the inner tank 5b.

[0055] Next, the case of feeding the second liquid will be described. Fig. 8 is a schematic diagram showing the flow of water and the second liquid in the second liquid extraction step. Fig. 9 is a schematic diagram showing the flow of water and the second liquid in the second liquid feeding step. In Figs. 8 and 9, the flow of water is indicated by a solid arrow, and the flow of the first liquid is indicated by a dashed arrow.

[0056] In the second liquid agent extraction process, only the water supply valve V1a is opened after the filling process. In this case, as shown in FIG. 8, water flows from the water supply flow path 11 to the second main flow path 12B, but water does not flow from the water supply flow path 11 to the first main flow path 12A. In this case, the check valve V2a and the relief valve V4a are opened, but the check valve V2b and the relief valve V4b are closed. As a result, a flow of the treatment liquid from the water supply flow path 11 to the input flow path 13 via the first main flow path 12A, and a flow of water from the water supply flow path 11 to the input flow path 13 via the first main flow path 12A and the bypass flow path 18 are generated.

[0057] In this case, the negative pressure generated in the first venturi portion 15A disposed in the first main flow path 12A causes the water in the second main flow path 12B and the connecting flow path 16 to flow through the connecting flow path 16 and the first venturi portion 15A to the first main flow path 12A. In this way, the water flows from the second main flow path 12B to the first main flow path 12A, and the pressure toward the second venturi portion 15B acts on the check valve V3b, so that the check valve V3b opens. As a result, the second liquid agent in the second liquid agent storage portion 20B is sucked into the second liquid agent extraction flow path 14B, and the second liquid agent is extracted toward the second main flow path 12B. At this time, the second liquid agent is extracted in the second main flow path 12B so as to fill the second storage area that temporarily stores the extracted second liquid agent. The second liquid agent stored in the second storage area is the second liquid agent to be introduced into the inner tank 5b as described later.

[0058] In the second liquid agent extraction step, the amount of water flowing through the connecting flow path 16 is measured by a flow meter 17 provided in the connecting flow path 16, and when the measured value reaches a predetermined water amount, it is determined that the desired second liquid agent has been extracted. The predetermined water amount is the amount of water filled into the second main flow path 12B in the filling step, which corresponds to the amount of the second liquid agent to be sucked out (the amount to fill the first storage area). The amount of the second liquid agent to be sucked out is set so that the second liquid agent does not flow up to the flow meter 17.

[0059] At this stage, the water supply valve V1b is opened. As a result, in the same manner as in the water passing step, water flows into the first main flow path 12A and the second main flow path 12B, and the second liquid agent that has accumulated between the second liquid agent extraction flow path 14B and the second venturi portion 15B is introduced into the inner tank 5b together with the water, as shown by the solid and dashed arrows in FIG.

[0060] By continuing to flow a certain amount of water after the second liquid agent is introduced, the second liquid agent remaining in the second main flow path 12B and the like is also washed away and introduced into the inner tank 5b together with the water. In other words, the parts of the second main flow path 12B and the like through which water flows are washed in the same manner as in the water passing step (washing step). Here, for the sake of convenience, the second liquid agent introduction step and the washing step have been described separately, but the second liquid agent introduction step and the washing step may be a single step.

[0061] The control of the supply mechanism 30 in the above-mentioned liquid agent supplying method may be performed by a control unit that controls the washing machine 1, or the supply mechanism 30 may have a control unit for controlling each device of the supply mechanism 30 (water supply valves V1a, V1b, etc.).

[0062] Next, an example of the configuration of the treatment liquid supplying device 10 will be specifically described. FIG. 10 is a perspective view of the treatment liquid supplying device 10. As shown in FIG. 10, the treatment liquid supplying device 10 includes two liquid storage units 20 and a supply mechanism 30. When the two liquid storage units 20 are to be described separately, one of the two liquid storage units 20 will be referred to as the "first liquid storage unit 20A" and the other as the "second liquid storage unit 20B" as described above. The first liquid storage unit 20A stores a first liquid, and the second liquid storage unit 20B stores a second liquid different from the first liquid.

[0063] [Liquid storage section] Fig. 11 is a perspective view of one of the two liquid agent storage units 20. Specifically, Fig. 11 is a perspective view of the first liquid agent storage unit 20A. Fig. 12 is a perspective view of the other of the two liquid agent storage units 20. Specifically, Fig. 12 is a perspective view of the second liquid agent storage unit 20B. Fig. 13 is a perspective view of the liquid agent storage unit 20 with the cover 22 removed. Fig. 14 is an exploded perspective view of the liquid agent storage unit 20 with the cover 22 removed. Figs. 13 and 14 are drawings of the case where the liquid agent storage unit 20 is the second liquid agent storage unit 20B.

[0064] The liquid storage section 20 has a liquid tank (liquid container) 21. The liquid tank 21 is a container for storing a liquid. The upper surface (or upper portion) of the liquid tank 21 is open. As shown in FIG. 13, the liquid tank 21 has a bottom wall 211, and a front wall 212, a left side wall 213, a right side wall 214, and a rear wall 215 provided so as to surround the periphery of the bottom wall 211. The front wall 212, the left side wall 213, the right side wall 214, and the rear wall 215 may rise vertically from the peripheral portion of the bottom wall 211 via a curved portion. An example of the material of the liquid tank 21 is a resin. Examples of the resin include polypropylene and polyethylene terephthalate. When the liquid tank 21 is a resin tank, the liquid tank 21 is, for example, integrally molded from a resin.

[0065] The liquid agent tank 21 configured as described above has a box shape with an open top. As shown in Figs. 11 and 12, the top of the liquid agent tank 21 is closed by a cover 22. In this embodiment, the cover 22 is detachable from the liquid agent tank 21. A liquid agent injection port for injecting the liquid agent into the liquid agent tank 21 is formed in the cover 22 near the front wall 212. In one embodiment, the liquid agent injection port is closed by a lid 23. The lid 23 may be attached to the cover 22 so that the liquid agent injection port can be opened and closed. A user can inject the liquid agent into the liquid agent tank 21 by opening the lid 23.

[0066] A front door 24 may be attached to the outer surface of the front wall 212. The front door 24 is provided with a liquid amount window 241 formed of, for example, a transparent member. A user can check the amount of liquid stored in the liquid tank 21 through the liquid amount window 241. In the embodiment shown in Figs. 12 to 14, the liquid amount window 241 is provided on the left side of the front door 24. Since Figs. 12 to 14 illustrate the second liquid agent storage unit 20B as the liquid agent storage unit 20, in the case of the first liquid agent storage unit 20A, the liquid amount window 241 is provided on the right side of the front door 24.

[0067] As for the form of the liquid medication containing section 20, the front door 24 may be omitted, and the front shape of the liquid medication containing section 20 may be formed by the front wall 212.

[0068] As shown in FIGS. 13 and 14, a liquid agent removal section 25 and a foreign matter removal section 26 are provided in the liquid agent tank 21.

[0069] The liquid agent outlet 25 has a liquid agent guide flow path 251 for flowing the liquid agent in the liquid agent tank 21 to the supply mechanism 30. The liquid agent outlet 25 is connected to the rear wall 215. When the liquid agent storage unit 20 is set in the supply mechanism 30, the liquid agent guide flow path 251 is connected to a liquid agent outlet flow path of the supply mechanism 30. A connection end 2511 (see FIG. 25) of the liquid agent guide flow path 251 with the liquid agent outlet flow path is exposed from the rear wall 215. The liquid agent outlet flow path to which the liquid agent guide flow path 251 of the first liquid agent storage unit 20A is connected is the first liquid agent outlet flow path 14A shown in FIG. 4, and the liquid agent outlet flow path to which the liquid agent guide flow path 251 of the second liquid agent storage unit 20B is connected is the second liquid agent outlet flow path 14B shown in FIG. 4.

[0070] The liquid agent guide flow path 251 has a first portion 251a extending forward from the rear wall 215, and a second portion 251b extending downward from a tip of the first portion 251a toward the bottom wall 211. The first portion 251a is aligned horizontally, for example, when the liquid agent storage unit 20 is set in the housing 40. The lower end of the second portion 251b is a liquid agent suction port. In this embodiment, the first portion 251a is provided with a check valve (second check valve) V5. This valve opens and closes communication between the liquid agent guide flow path 251 and the liquid agent extraction flow path. The check valve V5 prevents the liquid agent in the liquid agent storage unit 20 from leaking from the liquid agent guide flow path 251 when the liquid agent storage unit 20 is removed from the housing 40. The check valve V5 has a valve body and a spring (elastic member), and may be a spring-type valve in which the open state is achieved when the valve body is pushed, for example, by a rod-shaped member in the direction in which the spring contracts, and the closed state is achieved when the pressing force of the rod-shaped member is released.

[0071] The foreign matter removal section 26 is a section that removes foreign matter so that the liquid agent guide flow path 251 does not suck in the foreign matter. Examples of the foreign matter include lint and human hair. In this embodiment, the foreign matter removal section 26 is attached to the bottom wall 211 so as to surround the liquid agent outlet section 25. An example of the foreign matter removal section 26 will be described based on the form shown in Figs. 13 and 14 .

[0072] The foreign matter removal section 26 has a flat filter section 261 and a cover member 262. The filter section 261 is a section that removes foreign matter. In other words, the filter section 261 filters the liquid agent. The cover member 262 is provided integrally with the filter section 261. The cover member 262 covers the liquid agent extraction section 25. The cover member 262 has a semi-cylindrical shape, for example, as shown in FIG. 13 and FIG. 14. The foreign matter removal section 26 is fitted to the liquid agent extraction section 25 so that the cover member 262 covers the liquid agent extraction section 25. The foreign matter removal section 26 is fixed to the liquid agent tank 21 by attaching the filter section 261 to the bottom wall 211. In this configuration, the liquid agent from which foreign matter has been removed by the filter section 261 flows into the liquid agent guide flow path 251 in the liquid agent extraction section 25 arranged inside the foreign matter removal section 26.

[0073] [Supply mechanism] 15 is a perspective view of the supply mechanism 30. The supply mechanism 30 has a water supply unit 31, a negative pressure generating unit 32, and a housing 40. In this embodiment, the water supply unit 31 and the negative pressure generating unit 32 are connected by a connecting pipe 33. The negative pressure generating unit 32 is screwed to the housing 40.

[0074] [Water supply section] The water supply unit 31 is a part that supplies water from a water faucet to the negative pressure generating unit 32 and the housing 40. Fig. 16 is a perspective view of the water supply unit 31. Fig. 17 is a perspective cross-sectional view taken along line XVII-XVII in Fig. 16. In the water supply unit 31, the walls constituting each flow path are made of, for example, resin, and examples of resins are the same as those in the liquid agent tank 21.

[0075] The water supply section 31 has a water supply pipe section 311, a first pipe section 312, and a second pipe section 313. In the embodiment shown in Figs. 16 and 17, the water supply pipe section 311 extends in the X direction, and the first pipe section 312 and the second pipe section 313 extend in the Y direction. An internal space S1 that connects the water supply pipe section 311, the first pipe section 312, and the second pipe section 313 is formed in the water supply section 31. As a result, water flowing in the water supply pipe section 311 flows through the internal space S1 to the first pipe section 312 and the second pipe section 313. The internal space S1 also functions as a storage chamber that temporarily stores water.

[0076] The water supply section 31 is provided with a water supply valve V1a and a water supply valve V1b. This controls the inflow of water flowing through the water supply section 31 into the first pipe section 312 and the second pipe section 313. FIG. 17 shows a case where the water supply valve V1a and the water supply valve V1b are open and the water flowing through the water supply section 31 flows into both the first pipe section 312 and the second pipe section 313. When water is not flowing into the first pipe section 312, the water supply valve V1a closes the connection end of the first pipe section 312 with the internal space S1. Similarly, when water is not flowing into the second pipe section 313, the water supply valve V1b closes the connection end of the second pipe section 313 with the internal space S1.

[0077] The water supply pipe section 311 and the internal space S1 constitute the water supply flow path 11. An end 311a of the water supply pipe section 311 is the water supply port 11a. The first pipe section 312 constitutes a part of the first main flow path 12A, and the second pipe section 313 constitutes a part of the second main flow path 12B.

[0078] As shown in Fig. 15, the water supply unit 31 is connected to the negative pressure generating unit 32 by a connecting pipe 33. Specifically, the first pipe 312 is connected to a third pipe 321 (described later) by the connecting pipe 33, and the second pipe 313 is connected to a fourth pipe 322 (described later) by the connecting pipe 33. The connecting pipe 33 connecting the first pipe 312 and the negative pressure generating unit constitutes a part of the first main flow path 12A, and the connecting pipe 33 connecting the second pipe 313 and the negative pressure generating unit constitutes a part of the second main flow path 12B. The connecting pipe 33 is, for example, a rubber pipe. Since the connecting pipe 33 is a rubber pipe, it is easy to assemble it to the top plate 2b (see Fig. 1).

[0079] [Negative pressure generating part] The negative pressure generating unit 32 will be described with reference to Figs. 18 to 21. Fig. 18 is a perspective view of the negative pressure generating unit 32. Fig. 19 is a cross-sectional view taken along line XIX-XIX in Fig. 18. Fig. 20 is a cross-sectional perspective view taken along line XX-XX in Fig. 18. Fig. 21 is a cross-sectional view taken along line XXI-XXI in Fig. 18.

[0080] The negative pressure generating unit 32 is a part that causes the water flowing in from the water supply unit 31 to flow into the housing 40, and generates a negative pressure for sucking the first liquid agent from the first liquid agent storage unit 20A and a negative pressure for sucking the second liquid agent from the second liquid agent storage unit 20B. The negative pressure generating unit 32 has a third pipe portion 321, a fourth pipe portion 322, and a fifth pipe portion 323.

[0081] The third pipe section 321 is aligned along the Y direction. The third pipe section 321 is connected to the first pipe section 312 (see FIG. 16) by a connecting pipe 33. This allows water from the first pipe section 312 to flow through the third pipe section 321. The third pipe section 321 constitutes a part of the first main flow path 12A.

[0082] As shown in FIG. 19, the third pipe section 321 is provided with the first venturi section 15A. The first venturi section 15A has a narrowing section 151 in which the flow path is partially narrowed, and a branch passage 152 that intersects and connects to the narrowing section 151. The flow path cross-sectional area of ​​the narrowing section 151 is smaller than the flow path cross-sectional area upstream and downstream of the narrowing section 151 in the flow direction of water in the third pipe section 321. In the embodiment shown in FIG. 19, the narrowing section 151 is formed by reducing the diameter of the third pipe section 321, but the method of forming the narrowing section 151 is not limited as long as the flow path cross-sectional area is small. In the first venturi section 15A, negative pressure is generated in the branch passage 152 by water flowing through the narrowing section 151. The speed of the water flowing through the narrowing section 151 may be adjusted so that a desired negative pressure is generated by the Venturi effect. A part of the third pipe section 321 configured as above functions as a Venturi tube. The entire third tube portion 321 may be referred to as a Venturi tube.

[0083] The fourth pipe section 322 is aligned along the Y direction. The fourth pipe section 322 is connected to the second pipe section 313 (see FIG. 16) by the connecting pipe 33. As a result, water from the second pipe section 313 flows into the fourth pipe section 322. The fourth pipe section 322 constitutes a part of the second main flow path 12B. The fourth pipe section 322 is provided with a second venturi section 15B (not shown in FIG. 19). The second venturi section 15B also has a throttle section 151 and a branch passage 152, similar to the first venturi section 15A. Therefore, a part of the fourth pipe section 322 functions as a Venturi tube. The entire fourth pipe section 322 may be referred to as a Venturi tube.

[0084] The first venturi section 15A and the second venturi section 15B are connected by a connecting section 324 through which the treatment liquid can flow. As shown in FIG. 18 and FIG. 21, the connecting section 324 has a first portion 324a communicating with the branch passage 152 of the first venturi section 15A, a second portion 324b communicating with the branch passage 152 of the second venturi section 15B, and a third portion 324c extending along the X direction and connecting the first portion 324a and the second portion 324b. The third portion 324c connects the upper ends of the first portion 324a and the second portion 324b. The connecting section 324 functions as a connecting flow path 16.

[0085] A flow meter 17 is attached to the third portion 324c to measure the flow rate of water flowing through the connecting portion 324. The flow meter 17 may be installed in a storage portion 325 provided on the third portion 324c, as shown in Figs. 20 and 21 .

[0086] 19 and 20, an internal space S2 is formed in the negative pressure generating section 32. The internal space S2 is connected to the third pipe section 321 and the fourth pipe section 322. The internal space S2 is disposed below the third pipe section 321 and the fourth pipe section 322. The connection relationship between the third pipe section 321 and the internal space S2 will be described with reference to FIG. 19.

[0087] As shown in FIG. 19, the third pipe section 321 and the internal space S2 are connected by a hole 321a formed in the third pipe section 321. The hole 321a is formed in the third pipe section 321 upstream of the first venturi section 15A. A relief valve V4a for controlling the inflow of water from the hole 321a is disposed at the position of the hole 321a in the internal space S2. The relief valve V4a is disposed so that when the water supply valve V1a is open and water is flowing through the third pipe section 321, the relief valve V4a is also opened, and when the water supply valve V1a is closed and water is not flowing through the third pipe section 321, the relief valve V4a is also closed. When the relief valve V4a is open, the water flowing through the third pipe section 321 also flows into the internal space S2.

[0088] FIG. 19 illustrates the connection relationship between the third pipe section 321 and the internal space S2, but the connection relationship between the fourth pipe section 322 and the internal space S2 is the same. That is, the fourth pipe section 322 and the internal space S2 are connected by a hole formed in the fourth pipe section 322. The hole is formed in the fourth pipe section 322 upstream of the second venturi section 15B. In the internal space S2, a relief valve V4b is disposed at the position of a hole formed in the fourth pipe section 322 that leads to the internal space S2 to control the inflow of water from the hole. The relief valve 4b is disposed so that when the water supply valve V1b is opened and water is flowing in the fourth pipe section 322, the relief valve 4b is also opened, and when the water supply valve V1b is closed and water is not flowing in the fourth pipe section 322, the relief valve 4b is also closed. When the relief valve 4b is open, the water flowing in the fourth pipe section 322 also flows into the internal space S2.

[0089] As shown in FIG. 18, the fifth pipe section 323 is disposed near the downstream end of the third pipe section 321 (or the fourth pipe section 322). In this embodiment, the fifth pipe section 323 is disposed between the third pipe section 321 and the fourth pipe section 322. As shown in FIG. 20, the fifth pipe section 323 is connected to the internal space S2. Therefore, the water flowing into the internal space S2 from the third pipe section 321 and the fourth pipe section 322 flows into the fifth pipe section 323. The internal space S2 and the fifth pipe section 323 form a part of the bypass flow path 18. The internal space S2 also functions as a storage chamber that temporarily stores the water flowing in from the third pipe section 321 and the fourth pipe section 322.

[0090] [housing] An example of the housing 40 will be described with reference to Figs. 22 to 30. Fig. 22 is a perspective view of the housing 40. Fig. 23 is a perspective view of the housing 40 with the top wall 45 removed. Fig. 24 is a diagram for explaining the configuration of the bottom wall 41. Fig. 25 is a diagram for explaining the positional relationship between the check valve V5 of the first liquid agent storage section 20A and the check valve V3a provided in the sixth pipe section 46 (first liquid agent extraction flow path) of the housing 40. Fig. 26 is an exploded perspective view of the housing 40. Fig. 27 is a diagram for explaining the flow path formed on the upper surface 451 of the top wall 45. Fig. 28 is a diagram for explaining the flow path formed on the back surface 441 of the rear wall 44. Fig. 29 is a perspective view of the top wall 45 as viewed from the lower surface 452 side. Fig. 30 is a diagram for explaining the flow of the treatment liquid that has fallen from the top wall 45 toward the bottom wall 41.

[0091] The housing 40 accommodates the first liquid agent storage portion 20A and the second liquid agent storage portion 20B. The housing 40 is box-shaped with an open front. The housing 40 has a bottom wall 41, a left side wall 42, a right side wall 43, a rear wall 44, and a top wall 45. When one of the left side wall 42 and the right side wall 43 is referred to as a first side wall, the other can be referred to as a second side wall.

[0092] The top wall 45 faces the bottom wall 41 in the Z direction. The rear wall 44 connects the bottom wall 41 and the top wall 45. The left side wall 42 faces the right side wall 43 in the X direction. The left side wall 42 and the right side wall 43 connect the bottom wall 41, the rear wall 44, and the top wall 45. The bottom wall 41, the left side wall 42, the right side wall 43, the rear wall 44, and the top wall 45 form a storage space S3 that accommodates the first liquid agent storage portion 20A and the second liquid agent storage portion 20B.

[0093] The bottom wall 41 has a bottom wall main body 411 and a support plate 412. The rear wall 44, the left side wall 42, and the right side wall 43 rise continuously from the bottom wall main body 411 so as to surround the periphery of the bottom wall main body 411 except for the front edge portion. As shown in Figs. 22, 23, and 24, the support plate 412 is disposed on the front side of the bottom wall main body 411. The support plate 412 supports the front portions of the first liquid agent containing portion 20A and the second liquid agent containing portion 20B. The support plate 412 is connected to the bottom wall main body 411 at both ends of the support plate 412 in the X direction.

[0094] As shown in Fig. 24, an opening 413 is formed between the bottom wall main body 411 and a portion between both ends of the support plate 412. The opening 413 is an inlet 13a for introducing the treatment liquid into the inner tank 5b. The lower part of the support plate 412 may be inclined toward the rear. In this case, the treatment liquid is introduced toward the rear from the opening 413. The region where the opening 413 is formed may be supported by a plurality of connecting pieces 414 arranged discretely in the X direction.

[0095] The bottom wall body 411 slopes forward from the rear wall 44 so that the treatment liquid flows from the rear wall 44 toward the opening 413. In this embodiment, the bottom wall body 411 slopes forward from the rear wall 44 in a cascading manner in three stages.

[0096] Specifically, the bottom wall main body 411 has a first step 411a connected to the rear wall 44, a second step 411b lowered from the first step 411a, and a third step 411c further lowered from the second step 411b. A connection area between the second step 411b and the third step 411c faces a corner formed by the rear wall 215 and the bottom wall 211 of the liquid agent tank 21, as shown in FIG. 24. The third step 411c is located below the first liquid agent storage portion 20A and the second liquid agent storage portion 20B when the first liquid agent storage portion 20A and the second liquid agent storage portion 20B are accommodated in the housing 40.

[0097] 23, the bottom wall main body 411 may be formed with two flow path defining portions 415 that define an area through which the treatment liquid flows. One of the two flow path defining portions 415 is formed closer to the left side wall 42, and the other is formed closer to the right side wall 43. In one example, the flow path defining portion 415 is formed to make the treatment liquid flow toward the center of the opening 413. This prevents the treatment liquid from leaking out from anywhere other than the opening 413.

[0098] A platform portion 416 for supporting the liquid agent containing portion 20 may be formed on both edges in the Y direction of the bottom wall main body 411. In one example, the platform portion 416 also functions as a guide when the first liquid agent containing portion 20A and the second liquid agent containing portion 20B are contained in the housing 40.

[0099] 22 and 23, a guide portion 421 that guides the first liquid agent storage portion 20A when the first liquid agent storage portion 20A is stored in the housing 40 may be formed on the left side wall 42. The guide portion 421 also functions as a support portion that supports the first liquid agent storage portion 20A.

[0100] The right side wall 43 may be formed with a guide portion 431 for guiding the second liquid agent storage portion 20B when the second liquid agent storage portion 20B is stored in the housing 40. The guide portion 431 also functions as a support portion for supporting the second liquid agent storage portion 20B. FIG. 23 shows an embodiment in which the guide portion 421 and the guide portion 431 are steps formed on the left side wall 42 and the right side wall 43.

[0101] 23, a sixth tube 46 and a seventh tube 47 are arranged on the rear wall 44. The sixth tube 46 and the seventh tube 47 are connected to the first liquid agent storage portion 20A and the second liquid agent storage portion 20B when the first liquid agent storage portion 20A and the second liquid agent storage portion 20B are attached to the housing 40. The sixth tube 46 and the seventh tube 47 are aligned along the X direction. A front end (tip portion) 461 of the sixth tube 46 and a front end (tip portion) 471 of the seventh tube 47 are located within the housing 40.

[0102] The sixth pipe section 46 functions as the first liquid agent extraction flow path 14A. A check valve V3a is disposed in the sixth pipe section 46. The check valve V3a is a valve that opens and closes the communication between the liquid agent guide flow path 251 of the first liquid agent storage section 20A and the sixth pipe section 46 (first liquid agent extraction flow path 14A). The check valve V3a is disposed along the X direction. The seventh pipe section 47 functions as the second liquid agent extraction flow path 14B. A check valve V3b is disposed in the seventh pipe section 47. The check valve V3b is a valve that opens and closes the communication between the liquid agent guide flow path 251 of the second liquid agent storage section 20B and the seventh pipe section 47 (second liquid agent extraction flow path 14B). The check valve V3b is disposed along the X direction. The check valves V3a and V3b may be spring-type valves having a valve body and a spring (elastic member).

[0103] When the first liquid agent storage unit 20A is installed in the housing 40, the liquid agent guide flow path 251 of the first liquid agent storage unit 20A is connected to the sixth pipe section 46. A rod-shaped member 48 is attached to the sixth pipe section 46. When the liquid agent storage unit 20 is installed in the housing 40, the rod-shaped member 48 pushes forward the check valve V5 (see FIGS. 14 and 24) in the first portion 251a of the liquid agent guide flow path 251. This opens the check valve V5, and when the first liquid agent storage unit 20A is installed in the housing 40, a state in which the first liquid agent can flow from the first liquid agent storage unit 20A toward the sixth pipe section 46 is realized.

[0104] When the second liquid agent storage unit 20B is installed in the housing 40, the liquid agent guide flow path 251 of the second liquid agent storage unit 20B is connected to the seventh pipe portion 47. A rod-shaped member 48 is attached to the seventh pipe portion 47. When the second liquid agent storage unit 20B is installed in the housing 40, the rod-shaped member 48 pushes the check valve V5 forward. This opens the check valve V5, and when the second liquid agent storage unit 20B is installed in the housing 40, a state in which the second liquid agent can flow from the second liquid agent storage unit 20B toward the seventh pipe portion 47 is realized.

[0105] The positional relationship between the check valve V5 in the first liquid agent storage portion 20A and the check valve V3a in the sixth pipe portion 46 will be described with reference to Figure 25. In order to describe the positional relationship between the check valve V5 and the check valve V3a, Figure 25 shows components in the vicinity of the check valves V3a and V5 in a schematic manner.

[0106] In this embodiment, the check valve V3a and the check valve V5 are each arranged along the X direction. Therefore, the check valve V3a and the check valve V5 are arranged along one direction. In the installed state of the washing machine 1, the X direction corresponds to the horizontal direction. Therefore, the check valve V3a and the check valve V5 are arranged along the horizontal direction.

[0107] 25, the positional relationship between the check valve V5 in the first liquid agent storage portion 20A and the check valve V3a in the sixth pipe portion 46 has been explained, but the positional relationship between the check valve V5 in the second liquid agent storage portion 20B and the check valve V3b in the seventh pipe portion 47 is also similar. That is, the check valve V3b and the corresponding check valve V5 are arranged in one direction.

[0108] In the housing 40, a flow path is formed for allowing the treatment liquid from the negative pressure generating unit 32, the first liquid material storage unit 20A, and the second liquid material storage unit 20B to flow to the opening 413. This flow path will be described.

[0109] As shown in Figs. 22 and 26, an upper surface flow path section 50 is disposed on the top wall 45. The upper surface flow path section 50 is provided on a part of the upper surface 451 of the top wall 45. The upper surface flow path section 50 has a box shape. The upper surface flow path section 50 has a peripheral wall 51 that surrounds a predetermined area of ​​the upper surface 451 and a lid 52 attached to the peripheral wall 51. As shown in Figs. 26 and 27, the inside of the upper surface flow path section 50 is partitioned by a partition wall 53. As a result, a first upper surface flow path 501, a second upper surface flow path 502, a third upper surface flow path 503, and a fourth upper surface flow path 504 are formed in the upper surface flow path section 50.

[0110] The first upper surface flow path 501 corresponds to a first storage area that temporarily stores the first liquid agent when the first liquid agent is extracted from the first liquid agent storage section 20A in the first liquid agent extraction step described with reference to Fig. 6. Therefore, the upper surface flow path section 50 functions as a first liquid agent storage section.

[0111] As shown in Fig. 26, a rear flow path section 60 is disposed in the rear wall 44. The rear flow path section 60 is provided in a part of the rear surface 441 of the rear wall 44. The rear flow path section 60 has a box shape. The rear flow path section 60 has a peripheral wall 61 that surrounds a predetermined area of ​​the rear surface 441 and a lid 62 attached to the peripheral wall 61. As shown in Figs. 26 and 28, the inside of the rear flow path section 60 is partitioned by a partition wall 63 to form a first rear flow path 601 and a second rear flow path 602.

[0112] The second rear flow channel 602 corresponds to a second storage area that temporarily stores the second liquid agent when the second liquid agent is extracted from the second liquid agent storage section 20B in the second liquid agent extraction step described with reference to Fig. 8. Therefore, the rear flow channel section 60 functions as a second liquid agent storage section.

[0113] As shown in FIG. 23, a check valve accommodating portion 70 is disposed in the housing 40 near the left side wall 42. The check valve accommodating portion 70 has a first valve accommodating portion 71 and a second valve accommodating portion 72 along the Z direction. The first valve accommodating portion 71 is a hollow body having an upper opening, and a check valve V2a is disposed therein. The check valve V2a is disposed in the first valve accommodating portion 71 so as to allow the processing liquid to flow from the bottom to the top. The second valve accommodating portion 72 is a hollow body having an upper opening, and a check valve V2b is disposed therein. The check valve V2b is disposed in the second valve accommodating portion 72 so as to allow the processing liquid to flow from the bottom to the top. The check valves V2a and V2b may be, for example, float-type check valves.

[0114] The check valve accommodating portion 70 may have a connecting portion 73 that connects the first valve accommodating portion 71 and the second valve accommodating portion 72. The connecting portion 73 connects the first valve accommodating portion 71 and the second valve accommodating portion 72 above the portion where the check valves V2a, V2b are arranged. The lower end of the connecting portion 73 is closed. The upper end of the connecting portion 73 is open.

[0115] The first upper surface flow path 501 connects the third pipe section 321 (see FIG. 18) of the negative pressure generating section 32 and the first rear surface flow path 601. The first rear surface flow path 601 connects the first upper surface flow path 501, the sixth pipe section 46, and the first valve accommodating section 71. The first upper surface flow path 501, the first rear surface flow path 601, and the first valve accommodating section 71 configure a part of the first main flow path 12A. An example of the connection relationship between the third pipe section 321, the first upper surface flow path 501, the first rear surface flow path 601, the sixth pipe section 46, and the first valve accommodating section 71 will be described.

[0116] The first upper surface flow path 501 is connected to the third pipe portion 321 by a connecting pipe 54a (see FIGS. 26, 27, and 29). The connecting pipe 54a is provided near the right edge of the top wall 45. The connecting pipe 54a is connected to the third pipe portion 321 (see FIG. 18) in a state in which the negative pressure generating unit 32 is fixed to the housing 40. As shown in FIG. 27, a hole 501a connected to the connecting pipe 54a is formed in the first upper surface flow path 501 in the top wall 45. With the above configuration, the first upper surface flow path 501 communicates with the third pipe portion 321.

[0117] The first upper surface flow path 501 and the first rear surface flow path 601 are connected by a guide tube 55a (see FIG. 29) formed in the top wall 45 and a guide tube 64a (see FIG. 28) formed in the rear wall 44. The guide tube 55a extends downward from a hole 501b formed in the top wall 45 in the first upper surface flow path 501. As shown in FIG. 27, the hole 501b is formed in the top wall 45 near the rear edge. As shown in FIG. 28, the guide tube 64a is aligned along the Z direction. An upper portion of the guide tube 64a is connected to the guide tube 55a, and a lower portion of the guide tube 64a is connected to the first rear surface flow path 601. In the embodiment shown in FIG. 28, the lower portion of the guide tube 64a is located above the rear end 462 of the sixth pipe portion 46 protruding rearward from the rear surface 441 of the rear wall 44. In the first rear flow passage 601, a hole 601a is formed at the lower position of the guide tube 64a. This allows the first rear flow passage 601 and the guide tube 64a to communicate with each other. With the above configuration, the first upper surface flow passage 501 and the first rear flow passage 601 communicate with each other. Therefore, in this case, the guide tube 55a and the guide tube 64a also configure a part of the first main flow passage 12A.

[0118] The rear end 462 of the sixth pipe section 46 protrudes from the rear surface 441 into the first rear flow passage 601. At least one notch may be formed in the rear end 462 so that the first rear flow passage 601 and the sixth pipe section 46 communicate with each other. With this configuration, the sixth pipe section 46 communicates with the first rear flow passage 601. Here, a form in which the rear end 462 of the sixth pipe section 46 protrudes rearward from the rear surface 442 has been exemplified, but a hole connected to the rear end 462 may be formed in the rear wall 44.

[0119] A hole 601b is formed in the rear wall 44 at a position corresponding to the lower part of the first valve housing portion 71. The first rear flow path 601 and the first valve housing portion 71 communicate with each other through this hole 601b.

[0120] The second upper surface flow path 502 connects the seventh pipe section 47 and the second rear surface flow path 602. The second rear surface flow path 602 connects the second upper surface flow path 502, the seventh pipe section 47, and the second valve accommodating section 72. The second upper surface flow path 502, the second rear surface flow path 602, and the second valve accommodating section 72 configure a part of the second main flow path 12B.

[0121] The second upper surface flow path 502 is connected to the fourth pipe portion 322 (see FIG. 18) by a connecting pipe 54b (see FIGS. 26, 27, and 28). The connecting pipe 54b is provided near the right edge of the top wall 45. The connecting pipe 54b is disposed closer to the rear edge of the top wall 45 than the connecting pipe 54a. With the negative pressure generating unit 32 fixed to the housing 40, the connecting pipe 54b is connected to the fourth pipe portion 322. In the top wall 45, a hole 502b connected to the connecting pipe 54b is formed in the second upper surface flow path 502. With the above configuration, the second upper surface flow path 502 is in communication with the fourth pipe portion 322.

[0122] The second upper surface flow path 502 and the second back surface flow path 602 are connected by a guide tube 55b (see FIG. 29) formed in the top wall 45 and a guide tube 64b (see FIG. 23 and FIG. 28) formed in the rear wall 44. The guide tube 55b extends downward from a hole 502b (see FIG. 27) formed in the second upper surface flow path 502 in the top wall 45. The hole 502b is formed in the top wall 45 near a corner formed by the rear edge and the right edge. The guide tube 64b has an opening connected to the guide tube 55b, and the portion opposite the opening is closed. Therefore, the guide tube 64b has a bottomed cylindrical shape. Near the bottom of the guide tube 64b, a hole 602b (see FIG. 28) is formed in the rear wall 44. The hole 602b connects the guide tube 64b and the second back surface flow path 602. With the above configuration, the second upper surface flow path 502 and the second rear surface flow path 602 communicate with each other.

[0123] 28, the rear end 472 of the seventh pipe section 47 protrudes from the rear surface 442 into the second rear flow passage 602. At least one notch may be formed in the rear end 472 so that the second rear flow passage 602 and the seventh pipe section 47 communicate with each other. With this configuration, the seventh pipe section 47 communicates with the second rear flow passage 602. Here, a form in which the rear end 472 protrudes rearward from the rear surface 442 has been exemplified, but a hole connected to the rear end 472 may be formed in the rear wall 44.

[0124] A hole 602b is formed in the rear wall 44 at a position corresponding to the lower part of the second valve housing portion 72. The second rear flow path 602 and the second valve housing portion 72 communicate with each other through this hole 602b.

[0125] The third upper surface flow path 503 connects the fifth pipe portion 323 (see FIG. 18) and the accommodation space S3 in the housing 40. The third upper surface flow path 503 constitutes a part of the bypass flow path .

[0126] The third upper surface flow path 503 is connected to the fifth pipe portion 323 by a connecting pipe 54c (see Figs. 26, 27 and 29). The connecting pipe 54c is provided near the right edge of the top wall 45. The connecting pipe 54c is disposed between the connecting pipes 54a and 54b. The connecting pipe 54c is connected to the fifth pipe portion 323 in a state in which the negative pressure generating unit 32 is fixed to the housing 40. A hole 503a (see Fig. 27) connected to the connecting pipe 54c is formed in the third upper surface flow path 503 in the top wall 45. With the above configuration, the third upper surface flow path 503 is in communication with the fifth pipe portion 323.

[0127] As shown in FIG. 27, at least one hole 503b is formed in the third upper surface flow path 503 near the rear edge of the top wall 45. In the embodiment shown in FIG. 27, three holes 503b are formed in the top wall 45. The holes 503b are located on the first step 411a of the bottom wall 41. Since the third upper surface flow path 503 communicates with the storage space S3 in the housing 40 through the holes 503b, the treatment liquid flowing through the third upper surface flow path 503 flows into the housing 40 through the holes 503b. A guide tube 55c (see FIG. 29) may be formed at the bottom of the holes 503b. This makes it easier for the treatment liquid to fall straight down from the holes 503b.

[0128] The fourth upper surface flow path 504 is formed along the rear edge portion of the top wall 45. The fourth upper surface flow path 504 connects the check valve accommodating portion 70 and the accommodating space S3 within the housing 40. The fourth upper surface flow path 504 constitutes a part of the input flow path 13 (a second part of the input flow path 13).

[0129] As shown in FIG. 27, three holes 504a1, 504a2, 504a3 and a hole 504b are formed in the fourth upper surface flow path 504 in the top wall 45. The holes 504a1, 504a2, 504a3 are connected to the upper openings of the first valve accommodating portion 71, the connecting portion 73, and the second valve accommodating portion 72. This allows the fourth upper surface flow path 504 to communicate with the check valve accommodating portion 70. A guide tube 55d (see FIG. 29) may be formed in the lower portion of the holes 504a1, 504a2, 504a3. In this case, the guide tube 55d is connected to the upper openings of the first valve accommodating portion 71, the connecting portion 73, and the second valve accommodating portion 72, so that the holes 504a1, 504a2, 504a3 communicate with the first valve accommodating portion 71, the connecting portion 73, and the second valve accommodating portion 72. The hole 504b penetrates the top wall 45. Therefore, the fourth upper surface flow path 504 and the storage space S3 communicate with each other through the hole 504b, so that the treatment liquid flowing through the fourth upper surface flow path 504 falls into the housing 40 from the hole 504b. A guide tube 56 (see FIG. 29) may be formed at the bottom of the hole 504b. This makes it easier for the treatment liquid to fall straight down from the hole 504b.

[0130] As described above, the treatment liquid flows into the housing 40 from the hole 503b formed in the third upper surface flow path 503 and the hole 504b formed in the fourth upper surface flow path 504. The treatment liquid thus flowing in flows along the bottom wall 41 (specifically, the bottom wall main body 411) of the housing 40 as shown by the arrows in FIG. 30, and is then introduced into the inner tank 5b from the opening 413.

[0131] In a state in which the first liquid agent storage unit 20A and the second liquid agent storage unit 20B are accommodated in the housing 40, a space S3a is formed between the first liquid agent storage unit 20A and the second liquid agent storage unit 20B and the rear wall 44. The treatment liquid falls in the space S3a from the top wall 45 toward the bottom wall 41. Thus, the space S3a constitutes a part of the input flow path 13. Specifically, the space S3a (particularly, the area below the holes 503b and 504b) functions as a fall area in the input flow path 13, where the treatment liquid falls.

[0132] 30, the lower surface 211a of the first liquid agent storage unit 20A and the lower surface 211a of the second liquid agent storage unit 20B face the bottom wall 41, and a space S3b is generated between the lower surface 211a and the bottom wall 41. Therefore, the treatment liquid that has flowed into the storage space S3 from the top wall 45 flows through the space S3b toward the opening 413. Thus, the space S3b between the first liquid agent storage unit 20A and the second liquid agent storage unit 20B and the rear wall 44 and bottom wall 41 of the housing 40 functions as a part (first portion) of the input flow path of the treatment liquid. The lower surface 211a is the outer surface of the bottom wall 211 of the liquid agent tank 21.

[0133] 23, the first flow rectifying portion 81 and the second flow rectifying portion 82 are disposed on the first step portion 411a of the bottom wall main body 411. The first flow rectifying portion 81 is disposed below the hole portion 504b, and the second flow rectifying portion 82 is disposed below the hole portion 503b.

[0134] The first and second flow straightening sections 81 and 82 are sections for preventing the treatment liquid from bubbling due to, for example, the falling treatment liquid colliding with the first step section 411a and jumping up.

[0135] The first rectifying section 81 has a plurality of rectifying plates 811. The plurality of rectifying plates 811 are arranged in parallel in the Y direction. The second rectifying section 82 has a plurality of rectifying plates 821. The plurality of rectifying plates 821 are arranged in parallel in the Y direction. The interval between two adjacent rectifying plates 811 in the plurality of rectifying plates 811 is set to a distance that can suppress the splashing of the fallen processing liquid. Similarly, the interval between two adjacent rectifying plates 821 in the plurality of rectifying plates 821 is set to a distance that can suppress the splashing of the fallen processing liquid. Each rectifying plate 811 and each rectifying plate 821 are integrally formed with the bottom wall 41 and the rear wall 44. Each rectifying plate 811 and each rectifying plate 821 also function as a rib. An example of the material of each rectifying plate 811 and each rectifying plate 821 is resin.

[0136] The flows of water, the first liquid agent, and the second liquid agent in the treatment liquid supplying device 10 described with reference to FIGS. 10 to 30 will be described in relation to the respective steps described with reference to FIGS.

[0137] (Water supply process) In the water supply step, the water supply valves V1a and V1b are opened, so that water flows from the water supply pipe 311 to both the first pipe 312 and the second pipe 313.

[0138] The first pipe section 312 communicates with the third pipe section 321, and the second pipe section 313 communicates with the fourth pipe section 322. Therefore, the water that flows from the water supply pipe section 311 into the first pipe section 312 and the second pipe section 313 flows through the third pipe section 321 and the fourth pipe section 322.

[0139] The third pipe portion 321 communicates with the first upper surface flow path 501 via the connecting pipe 54a and the hole portion 501a (see FIG. 27). Therefore, the water that has flowed into the third pipe portion 321 flows into the first upper surface flow path 501.

[0140] The fourth pipe portion 322 communicates with the second upper surface flow path 502 via the connecting pipe 54b and the hole portion 502a (see FIG. 27). Therefore, the water that flows into the fourth pipe portion 322 flows into the second upper surface flow path 502.

[0141] When water flows through the third pipe section 321 and the fourth pipe section 322, the relief valves V4a and V4b are open. Therefore, part of the water flowing through the third pipe section 321 flows into the fifth pipe section 323 through the internal space S1. Similarly, part of the water flowing through the fourth pipe section 322 flows into the fifth pipe section 323 through the internal space S1. The fifth pipe section 323 is in communication with the third upper surface flow path 503 via the connecting pipe 54c and the hole section 503a (see FIG. 27). Therefore, the water that flows into the fifth pipe section 323 flows into the third upper surface flow path 503.

[0142] Water that flows from the third pipe portion 321 into the first upper surface flow path 501 flows from hole portion 501a toward hole portion 501b. Water that flows into hole portion 501b flows into the first rear surface flow path 601 through hole portion 501b. Water that flows into the first rear surface flow path 601 flows toward hole portion 601b. Hole portion 601b is connected to the first valve accommodating portion 71. Therefore, water that flows into hole portion 601b flows into the first valve accommodating portion 71.

[0143] When water flows through both the third pipe section 321 and the fourth pipe section 322, negative pressure for extracting the first liquid agent from the first liquid agent storage section 20A is not generated. Therefore, the check valve V3a (see FIG. 23) in the sixth pipe section 46 is closed. Therefore, even if the water that has flowed from the first upper surface flow path 501 to the first rear surface flow path 601 flows toward the hole section 601b as described above, the water is prevented from flowing into the first liquid agent storage section 20A through the sixth pipe section 46.

[0144] The water that flows from the fourth pipe portion 322 into the second upper surface flow path 502 flows from hole portion 502a toward hole portion 502b. The water that flows into hole portion 502b flows into the second rear surface flow path 602 through hole portion 502b. The water that flows into the second rear surface flow path 602 flows toward hole portion 602b. Hole portion 602b is connected to the second valve accommodating portion 72. Therefore, the water that flows into hole portion 602b flows into the second valve accommodating portion 72.

[0145] When water flows through both the third pipe section 321 and the fourth pipe section 322, negative pressure for extracting the second liquid agent from the second liquid agent storage section 20B is not generated. Therefore, the check valve V3b (see FIG. 23) in the seventh pipe section 47 is closed. Therefore, even if the water that has flowed from the second upper surface flow path 502 into the second rear surface flow path 602 flows toward the hole section 602b as described above, the water is prevented from flowing into the second liquid agent storage section 20B through the seventh pipe section 47.

[0146] The water that has flowed from the fifth pipe portion 323 into the third upper surface flow path 503 flows from the hole portion 503a toward the hole portion 503b, and then flows from the hole portion 503b into the accommodation space S3.

[0147] When water flows from the first rear flow passage 601 into the first valve housing 71, the check valve V2a opens due to water pressure. As a result, water flows from the bottom to the top of the first valve housing 71, and the water flows into the fourth upper surface flow passage 504 through the top opening and the hole 504a1 of the first valve housing 71. Similarly, when water flows from the second rear flow passage 602 into the second valve housing 72, the check valve V2b opens due to water pressure. As a result, water flows from the bottom to the top of the second valve housing 72, and the water flows into the fourth upper surface flow passage 504 through the top opening and the hole 504a2 of the second valve housing 72. In this embodiment, the first valve housing 71 and the second valve housing 72 are connected by the connecting portion 73. Therefore, when water flows from the bottom to the top in the first valve housing 71 and the second valve housing 72, the water also flows into the connecting portion 73. The water in the connecting portion 73 flows into the fourth upper surface flow path 504 through the holes 504a1, 504a2, and 504a3.

[0148] The water that has flowed into the fourth upper surface flow path 504 as described above flows into the accommodation space S3 through the hole 504b.

[0149] The water flowing into the storage space S3 from the hole 503b and the water flowing into the storage space S3 from the hole 504b flows toward the opening 413 through the space S3a between the bottom wall main body 411 and the first liquid agent storage portion 20A and the second liquid agent storage portion 20B as a flow path. As a result, the water is introduced from the opening 413 into the inner tank 5b.

[0150] (filling process) In the filling step, the water supply valves V1a and V1b are closed, so that the flow paths through which water flowed in the water supply step are maintained in a state filled with water.

[0151] (First liquid removal process) In the first liquid agent extraction process, only the water supply valve V1b is open, as described with reference to Fig. 6. Therefore, the water that has flowed into the water supply pipe section 311 flows only into the second pipe section 313, and then into the fourth pipe section 322. The water that has flowed into the fourth pipe section 322 flows to the opening 413 via the same route as in the water supply process, and is introduced into the inner tank 5b.

[0152] Since water flows only from the water supply pipe section 311 to the fourth pipe section 322, the negative pressure in the second venturi section 15B in the fourth pipe section 322 causes the water in the connecting section 324 to flow toward the fourth pipe section 322, and further from the fourth pipe section 322 to the second upper surface flow path 502. Since the above-mentioned water flow occurs in the connecting section 324, the water in the third pipe section 321, the first upper surface flow path 501, and the first back surface flow path 601 which configure the first main flow path 12A also flows into the fourth pipe section 322 through the connecting section 324.

[0153] In the first rear flow path 601, a flow of water is generated toward the first upper surface flow path 501, so that the check valve V3a opens. As a result, the first liquid agent in the first liquid agent storage section 20A flows into the first rear flow path 601 through the sixth tube section 46. The first liquid agent that has flowed into the first rear flow path 601 flows into the first upper surface flow path 501. As a result, the first upper surface flow path 501 is filled with the first liquid agent.

[0154] (First liquid injection process and cleaning process) As explained with reference to Fig. 7, in the first liquid agent supplying step and the cleaning step, both water supply valves V1a and V1b are opened. This allows water to flow in the same manner as in the water supplying step, so that the first liquid agent taken out in the first liquid agent unloading step is introduced into inner tank 5b from opening 413 together with water.

[0155] The first liquid agent introduced in the first liquid agent introduction step is the first liquid agent filled in the first upper surface flow path 501 in the first liquid agent extraction step. Therefore, the flow path of the first liquid agent from the sixth pipe portion 46 toward the first venturi portion 15A has a length sufficient to extract the first liquid agent to be introduced. For example, as shown in the figure, by forming the first upper surface flow path 501 that is folded back multiple times, it is possible to sufficiently extract the first liquid agent to be introduced.

[0156] (Second liquid removal process) In the second liquid agent extraction process, only the water supply valve V1a is open, as described with reference to Fig. 8. Therefore, the water that has flowed into the water supply pipe section 311 flows only into the first pipe section 312, and then into the third pipe section 321. The water that has flowed into the third pipe section 321 flows to the opening 413 via the same route as in the water supply process, and is introduced into the inner tank 5b.

[0157] Since water flows only from the water supply pipe section 311 to the third pipe section 321, the negative pressure in the first venturi section 15A in the third pipe section 321 causes the water in the connecting section 324 to flow toward the third pipe section 321, and from the third pipe section 321 to the first upper surface flow path 501. Since the above-mentioned water flow is generated in the connecting section 324, the water in the fourth pipe section 322, the second upper surface flow path 502, and the second back surface flow path 602 which constitute the second main flow path 12B also flows into the third pipe section 321 through the connecting section 324.

[0158] In the second rear flow path 602, a flow of water toward the second upper surface flow path 502 occurs, and therefore the check valve V3b opens. As a result, the second liquid agent in the second liquid agent storage section 20B flows into the second rear flow path 602 through the seventh tube section 47. As a result, the second rear flow path 602 is filled with the second liquid agent.

[0159] (Second liquid injection process and cleaning process) As explained with reference to Fig. 9, in the second liquid agent supplying step and the cleaning step, both water supply valves V1a and V1b are opened. This allows water to flow in the same manner as in the water supplying step, so that the second liquid agent taken out in the second liquid agent unloading step is introduced into inner tank 5b from opening 413 together with water.

[0160] The second liquid agent taken out in the second liquid agent supplying step is the second liquid agent stored in the second rear flow channel 602 in the second liquid agent taking out step. Therefore, the second rear flow channel 602 has a length sufficient to take out the second liquid agent to be put in. For example, as shown in Fig. 28, by forming the second rear flow channel 602 to be folded back multiple times, the amount of the second liquid agent to be put in can be secured.

[0161] In this embodiment, as shown in FIG. 25, the check valve V5 in the first liquid agent storage section 20A and the check valve V3a arranged in the sixth pipe section 46 (first liquid agent extraction flow path 14A) are arranged along the same direction. The check valve V5 and the check valve V3a may be arranged substantially on the same straight line. In such an arrangement, for example, the distance between the check valve V5 and the check valve V3a can be shorter than when the arrangement direction of the check valve V5 and the arrangement direction of the check valve V3a intersect. An example of a case where the arrangement direction of the check valve V5 and the arrangement direction of the check valve V3a intersect is when the check valve V5 is arranged along the X direction, while the check valve V3a is arranged along the Z direction.

[0162] When the first liquid agent is removed from the first liquid agent storage unit 20A, the first liquid agent remains in the area between the check valve V5 and the check valve V3a. This remaining first liquid agent is referred to as the first residual liquid agent. When the connection between the liquid agent guide passage 251 and the first liquid agent extraction passage 14A is released in order to remove the first liquid agent storage unit 20A from the housing 40, both the check valve V5 and the check valve V3a are in a closed state. Therefore, the first liquid agent is prevented from newly flowing out from the liquid agent guide passage 251 to the outside, and water is also prevented from newly flowing out from the first liquid agent extraction passage 14A. However, even if the check valve V5 and the check valve V3a are in a closed state, the first residual liquid agent leaks out to the bottom wall 41.

[0163] In a configuration in which the check valves V5 and V3a are arranged along the same direction, the amount of the first residual liquid leaking when the connection between the liquid guide flow path 251 and the first liquid extraction flow path 14A is released as described above can be reduced.

[0164] Although the explanation has been given based on the positional relationship between the check valve V5 and the check valve V3a in the first liquid agent storage portion 20A shown in Fig. 25, the same effect can be obtained by arranging the check valve V5 and the check valve V3b in the second liquid agent storage portion 20B along the same direction. That is, when the connection between the liquid agent guide flow path 251 in the second liquid agent storage portion 20B and the second liquid agent extraction flow path 14B is released, the amount of the second residual liquid agent between the check valve V5 and the check valve V3b provided in the second liquid agent storage portion 20B can be reduced. The second residual liquid agent is the second liquid agent remaining between the check valve V5 and the check valve V3b provided in the second liquid agent storage portion 20B.

[0165] The first and second residual liquid agents are not substantially used in washing the laundry. In this way, the amount of the first and second residual liquid agents that do not contribute to washing can be reduced, so that the treatment liquid dispenser 10 and the washing machine 1 equipped with the same can effectively utilize the first and second liquid agents. Since the first and second liquid agents can be effectively utilized, the operating costs of the washing machine 1, including the purchase costs of the first and second liquid agents, can also be reduced. Since the first and second residual liquid agents drip onto the bottom wall 41, if the amount of the first and second residual liquid agents is small, the maintenance work for the housing 40 can be reduced.

[0166] In a configuration in which the housing 40 has a bottom wall 41, a left side wall 42, a right side wall 43, a rear wall 44 and a top wall 45 and the front surface of the housing 40 is open, the first liquid agent storage section 20A and the second liquid agent storage section 20B can be accommodated in the storage space S3, for example, by sliding the first liquid agent storage section 20A and the second liquid agent storage section 20B from the front surface of the housing 40 toward the rear wall 44.

[0167] When the sixth pipe section 46 (first liquid agent extraction flow path 14A) protrudes forward from the rear wall 44 and the first liquid agent storage unit 20A is detachable from the sixth pipe section 46, for example, the first liquid agent storage unit 20A can be detached from the sixth pipe section 46 by a sliding operation of the first liquid agent storage unit 20A relative to the housing 40. Specifically, by sliding the first liquid agent storage unit 20A backward from the front surface of the housing 40, the liquid agent guide flow path 251 of the first liquid agent storage unit 20A can be connected to the sixth pipe section 46. Conversely, by sliding the first liquid agent storage unit 20A forward, the connection between the liquid agent guide flow path 251 of the first liquid agent storage unit 20A and the sixth pipe section 46 is released, and the first liquid agent storage unit 20A can be removed from the housing 40. Therefore, the first liquid agent storage portion 20A can be easily installed in the housing 40 and removed from the housing 40.

[0168] In one embodiment, a rod-shaped member 48 is provided at the front end 461 of the sixth pipe section 46 (first liquid agent extraction flow path 14A). In this case, by connecting the liquid agent guide flow path 251 of the first liquid agent storage unit 20A to the sixth pipe section 46, it is possible to switch the check valve V5 to an open state and maintain that state, and by releasing the connection between the liquid agent guide flow path 251 of the first liquid agent storage unit 20A and the sixth pipe section 46, it is possible to switch the check valve V5 to a closed state. That is, the rod-shaped member 48 provided on the sixth pipe section 46 can control the opening and closing of the check valve V5 of the first liquid agent storage unit 20A. As described above, when the first liquid agent storage unit 20A and the sixth pipe section 46 are attached and detached by the sliding movement of the first liquid agent storage unit 20A relative to the housing 40, the opening and closing of the check valve V5 can also be controlled by the rod-shaped member 48 by the sliding movement.

[0169] When the seventh pipe section 47 (second liquid agent extraction flow path 14B) protrudes forward from the rear wall 44 and the second liquid agent storage section 20B is detachable from the seventh pipe section 47, for example, the second liquid agent storage section 20B can be detached from the seventh pipe section 47 by a sliding action of the first liquid agent storage section 20A relative to the housing 40. Specifically, the second liquid agent storage section 20B can be connected to the seventh pipe section 47 by sliding the second liquid agent storage section 20B backward from the front surface of the housing 40. Conversely, the second liquid agent storage section 20B can be detached from the housing 40 by sliding the second liquid agent storage section 20B forward to release the connection between the second liquid agent storage section 20B and the seventh pipe section 47. Therefore, the first liquid agent storage section 20A can be easily installed in the housing 40 and the first liquid agent storage section 20A can be easily removed from the housing 40.

[0170] In one embodiment, a rod-shaped member 48 is provided at the front end 471 of the seventh pipe section 47 (the second liquid agent extraction flow path 14B). In this case, by connecting the liquid agent guide flow path 251 of the second liquid agent storage unit 20B to the seventh pipe section 47, it is possible to switch the check valve V5 to an open state and maintain that state, and by releasing the connection between the liquid agent guide flow path 251 of the second liquid agent storage unit 20B and the seventh pipe section 47, it is possible to switch the check valve V5 to a closed state. That is, the rod-shaped member 48 provided at the seventh pipe section 47 can control the opening and closing of the check valve V5 of the second liquid agent storage unit 20B. As described above, when the second liquid agent storage unit 20B and the seventh pipe section 47 are attached and detached by the sliding movement of the second liquid agent storage unit 20B relative to the housing 40, the opening and closing of the check valve V5 can also be controlled by the rod-shaped member 48 by the sliding movement.

[0171] In one embodiment, the gap between the bottom wall 41 and the lower surfaces 211a of the first liquid agent storage unit 20A and the second liquid agent storage unit 20B functions as a part (first portion) of the input flow passage 13. In this case, even if the first and second residual liquid agents drip onto the bottom wall 41, the first and second residual liquid agents dripping onto the bottom wall 41 are washed away after each wash. This reduces the maintenance work required for the housing 40.

[0172] The treatment liquid input device 10 includes a bypass flow path 18. This can suppress abnormal noise in the first venturi section 15A and the second venturi section 15B. This point will be described in comparison with a case where the bypass flow path 18 is not provided.

[0173] In the inner tub 5b, a certain amount of water (for example, 15 liters) is poured into the inner tub 5b to wash clothes, etc. The water poured into the inner tub 5b flows through the first main flow path 12A and the second main flow path 12B. The first venturi section 15A and the second venturi section 15B are arranged in the first main flow path 12A and the second main flow path 12B to extract the liquid agent. In the first venturi section 15A and the second venturi section 15B, the flow path is narrowed. In this case, if a large amount of water flows through the first venturi section 15A and the second venturi section 15B to pour the certain amount of water into the inner tub 5b, abnormal noise is generated in the first venturi section 15A and the second venturi section 15B. In particular, the first venturi section 15A and the second venturi section 15B generate negative pressure capable of sucking in the liquid agent in order to remove the liquid agent, and from the standpoint of shortening the time it takes for water to be stored in the inner tank 5b, if the amount of water flowing through the first venturi section 15A and the second venturi section 15B is increased, abnormal noise is likely to increase.

[0174] In response to this, the treatment liquid introduction device 10 includes a bypass flow path 18. The bypass flow path 18 branches off from the upstream portion of the first venturi portion 15A and the second venturi portion 15B in the first main flow path 12A and the second main flow path 12B and is connected to the introduction flow path 13. Therefore, a part of the water flowing through the first main flow path 12A and the second main flow path 12B bypasses the first venturi portion 15A and the second venturi portion 15B (in other words, the negative pressure generating unit U2 shown in FIG. 4) and flows into the introduction flow path 13, and is then introduced into the inner tank 5b. In this case, the amount of water flowing through the first venturi portion 15A and the second venturi portion 15B can be reduced while ensuring the amount of water to be introduced into the inner tank 5b. Since the amount of water flowing through the first venturi portion 15A and the second venturi portion 15B can be reduced, the generation of abnormal noise in the first venturi portion 15A and the second venturi portion 15B can be suppressed.

[0175] The treatment liquid dispenser 10 can increase the amount of water flowing from the water supply passage 11 to the first main passage 12A and the second main passage 12B while suppressing the generation of abnormal noise. Therefore, the time required for storing water in the inner tub 5b can be shortened, and the time required for washing can be shortened.

[0176] In the embodiment including the water supply valves V1a and V1b, the flow of water to the first main flow path 12A and the second main flow path 12B can be controlled by controlling the water supply valves V1a and V1b. As a result, the generation of negative pressure in the first venturi portion 15A and the second venturi portion 15B can be controlled, so that it is possible to switch between the case where the first liquid agent is dispensed and the case where the second liquid agent is dispensed, as illustrated.

[0177] In a configuration in which the relief valves V4a, V4b are provided in the bypass passage 18, the flow of water from the first main passage 12A and the second main passage 12B to the bypass passage 18 can be controlled.

[0178] In a configuration in which a check valve V3a is provided in the first liquid agent extraction flow path 14A and a check valve V3b is provided in the second liquid agent extraction flow path 14B, the first liquid agent can be extracted from the first liquid agent storage section 20A and the second liquid agent can be extracted from the second liquid agent storage section 20B while preventing water from flowing from the first liquid agent extraction flow path 14A into the first liquid agent storage section 20A and water from the second liquid agent extraction flow path 14B into the second liquid agent storage section 20B.

[0179] In a configuration including the flow path switching unit U1, i.e., in a configuration including the check valves V2a, V2b, it is possible to switch between flowing the first liquid agent in the first main flow path 12A into the input flow path 13 and flowing the second liquid agent in the second main flow path 12B into the input flow path 13. As a result, it is possible to control the input of the first liquid agent and the input of the second liquid agent into the inner tank 5b.

[0180] In the first liquid agent removal process described with reference to Fig. 6, the first liquid agent is removed from the first liquid agent storage section 20A into the first main flow path 12A. In the second liquid agent removal process described with reference to Fig. 8, the second liquid agent is removed from the second liquid agent storage section 20B into the second main flow path 12B. For this reason, the first main flow path 12A and the second main flow path 12B need to be long enough to remove the first liquid agent and the second liquid agent in the amounts required for washing and to temporarily store them therein.

[0181] In this embodiment, the first upper surface flow path 501 formed on the upper surface 451 of the top wall 45 is a first storage area for temporarily storing the first liquid agent taken out from the first liquid agent storage unit 20A, and the second rear surface flow path 602 formed on the rear surface 441 of the rear wall 44 is a second storage area for temporarily storing the second liquid agent taken out from the second liquid agent storage unit 20B. That is, in the processing liquid supply device 10 of this embodiment, the first storage area for the taken out first liquid agent and the second storage area for the taken out second liquid agent are arranged on two different surfaces among the multiple surfaces of the housing 40. In one example of this embodiment, the angle between the surface on which the first storage area is arranged and the surface on which the second storage area is arranged is 90°.

[0182] Therefore, the size of the housing 40 can be made smaller than when the first storage area and the second storage area are disposed together on the same surface (for example, the upper surface 451 of the top wall 45). As a result, a small-sized processing liquid supply device 10 can be realized.

[0183] The rear surface 441 is usually considered to be a dead space. Therefore, in a configuration in which one of the first storage area and the second storage area is disposed on the rear surface 441, the dead space can be effectively utilized to reduce the size of the housing 40.

[0184] In the treatment liquid supplying device 10 according to the embodiment, the lower surfaces 211a of the first liquid agent storage unit 20A and the second liquid agent storage unit 20B face the bottom wall main body 411. In one example of the treatment liquid supplying device 10, a gap between the lower surfaces 211a of the first liquid agent storage unit 20A and the second liquid agent storage unit 20B and the bottom wall 41 functions as a part (first portion) of the supply flow path 13. Therefore, even if the first liquid agent remaining between the check valve V5 in the first liquid agent storage unit 20A and the check valve V3a in the sixth pipe portion 46 drips onto the bottom wall 41 when the first liquid agent storage unit 20A is removed from the housing 40, the first liquid agent adhering to the bottom wall 41 is washed away when water is supplied into the inner tank 5b. Similarly, when the second liquid agent containing portion 20B is removed from the housing 40, even if the second liquid agent remaining between the check valve V5 in the second liquid agent containing portion 20B and the check valve V3b in the seventh pipe portion 47 drips onto the bottom wall 41, the second liquid agent adhering to the bottom wall 41 is washed away when water is poured into the inner tank 5b. Therefore, the first liquid agent and the second liquid agent remain on the bottom wall 41 and are prevented from solidifying. This makes it easy to perform maintenance on the housing 40.

[0185] When either the first or second liquid agent is a detergent, if the detergent remains attached to the bottom wall 41 of the housing 40, it can cause the growth of bacteria, mold, and unpleasant odors. In a configuration in which the gaps between the bottom wall 41 and the lower surfaces of the first liquid agent storage section 20A and the second liquid agent storage section 20B function as a part (first portion) of the input flow passage 13, the detergent attached to the bottom wall 41 is washed away with each wash. This makes it possible to suppress the growth of bacteria, mold, and unpleasant odors.

[0186] In the treatment liquid supplying device 10 according to an embodiment, the fourth upper surface flow path 504 in the top wall 45 is a part (second part) of the input flow path 13, and the treatment liquid also flows on the bottom wall 41, so that the fourth upper surface flow path 504 is a part (first part) of the input flow path 13. The treatment liquid falls from the fourth upper surface flow path 504 on the top wall 45 toward the bottom wall 41. In an embodiment, when the treatment liquid flows on the bottom wall 41, the space between the first liquid agent storage unit 20A and the second liquid agent storage unit 20B and the bottom wall 41 functions as the input flow path 13 through which the treatment liquid flows. When the bottom wall 41 is inclined downward toward the front in order to cause the treatment liquid to flow toward the opening 413, as shown in FIG. 30, the input flow path 13 is once narrowed between the corners of the lower rear of the first liquid agent storage unit 20A and the second liquid agent storage unit 20B and the bottom wall main body 411. Therefore, the treatment liquid that has fallen as described above flows toward the opening 413 once through an area with a small flow path cross-sectional area.

[0187] When the first straightening section 81 is provided at the place where the treatment liquid falls, the treatment liquid falls between the plurality of straightening plates 811 constituting the first straightening section 81. In this case, the treatment liquid is less likely to foam after falling because the splash caused by the treatment liquid colliding with the bottom wall 41 is suppressed. Therefore, even if there is a place on the downstream side where the flow path is narrowed, the treatment liquid is less likely to stagnate. The falling treatment liquid is straightened by the plurality of straightening plates 811. In this respect, it is possible to suppress the stagnation of the treatment liquid caused by the place on the downstream side where the flow path is narrowed. As a result, it is possible to prevent problems such as the treatment liquid leaking from unexpected places in the treatment liquid input device 10.

[0188] In particular, when the treatment liquid falls from the top wall 45 to the bottom wall 41 as described above, such falling occurs in the storage space S3. The first liquid agent storage portion 20A and the second liquid agent storage portion 20B are stored in the storage space S3. By suppressing the retention of the treatment liquid in the storage space S3, it is possible to prevent, for example, the treatment liquid (e.g., water) from mixing into the first liquid agent storage portion 20A and the second liquid agent storage portion 20B.

[0189] In one embodiment, the support plate 412 constituting a part of the bottom wall 41 forms an opening 413. As shown in FIG. 24, in a configuration in which the lower part of the support plate 412 is inclined backward, the treatment liquid is poured backward into the inner tub 5b from the opening 413 (the inlet 13b). In this case, the treatment liquid is poured onto the inner circumferential surface side of the inner tub 5b. Depending on the laundry, it may be better to supply the treatment liquid containing the liquid agent directly to the laundry. When the treatment liquid is poured backward from the opening 413 as described above, the treatment liquid is easily applied to the laundry near the periphery of the inner tub 5b.

[0190] (Modification) The number of liquid containers included in the treatment liquid supplying device may be one. A treatment liquid supplying device having one liquid container will be described as a modified example. Fig. 31 is a diagram showing a schematic configuration of a treatment liquid supplying device 10A according to the modified example.

[0191] As shown in FIG. 31, the treatment liquid input device 10A has one liquid agent storage section 20. The treatment liquid input device 10A has a supply mechanism that extracts the liquid agent from the liquid agent storage section 20 and supplies it to the inner tank 5b together with water as a treatment liquid. The supply mechanism has a housing that contains the liquid agent storage section 20. The supply mechanism and the housing in the modified example are also referred to as the supply mechanism 30 and the housing 40. Furthermore, in the respective elements of the supply mechanism 30 and the housing 40 in the modified example, the same elements as those in the above embodiment are denoted by the same reference numerals, and duplicated explanations will be omitted.

[0192] The supply mechanism 30 of the treatment liquid input device 10A includes a water supply passage 11, a main passage (intermediate passage) 12, and an input passage 13. The main passage 12 connects the water supply passage 11 and the input passage 13. The supply mechanism 30 includes a water supply valve V1 that controls the flow of water from the water supply passage 11 to the main passage 12. The main passage 12 is provided with a venturi section 15. The supply mechanism 30 includes a liquid agent extraction passage 14 that is connected to the liquid agent storage section 20 and is used to extract the liquid agent from the liquid agent storage section 20. The liquid agent extraction passage 14 is provided with a check valve V3 that functions similarly to the check valve V3a (or check valve V3b). The liquid agent extraction passage 14 is connected to the venturi section 15. A flow meter 17 may be provided in the connecting passage 19. Figure 31 shows an example in which the liquid agent extraction flow path 14 and the venturi portion 15 are connected via a connecting flow path 19, but the connecting flow path 19 shown in Figure 31 may also be a part of the liquid agent extraction flow path 14.

[0193] In the treatment liquid input device 10A, the main flow path 12 and the input flow path 13 are also connected by a bypass flow path 18, bypassing the venturi section 15. The bypass flow path 18 is connected to the main flow path 12 upstream of the venturi section 15 in the main flow path 12. A relief valve V4 that controls the flow of water from the main flow path 12 is provided in the bypass flow path 18.

[0194] In the treatment liquid input device 10A, when the water supply valve V1 is opened to allow water to flow from the water supply passage 11 to the main passage 12, a negative pressure is generated in the venturi portion 15. This negative pressure opens the check valve V3, and the liquid in the liquid storage portion 20 is sucked into the liquid extraction passage 14. The liquid sucked into the liquid extraction passage 14 flows into the main passage 12 through the connecting passage 19 and the venturi portion 15, and is input together with water into the inner tank 5b through the input port 13a of the input passage 13.

[0195] The treatment liquid input device 10A is provided with a bypass flow path 18. When water flows from the water supply flow path 11 to the main flow path 12, the relief valve V4 opens. Therefore, a part of the water that has flowed from the water supply flow path 11 to the main flow path 12 flows into the input flow path 13 by bypassing the venturi section 15 through the bypass flow path 18.

[0196] The configuration of the liquid storage unit 20 of the treatment liquid supplying device 10A is the same as that of the first liquid storage unit 20A or the second liquid storage unit 20B. Therefore, the liquid storage unit 20 has a liquid guide flow path 251 in which a check valve V5 is arranged and which is connected to the liquid extraction flow path 14. In the treatment liquid supplying device 10A, the check valve V5 and the check valve V3 are also arranged along the same direction in a state in which the liquid guide flow path 251 and the liquid extraction flow path 14 are connected. As a result, as in the case of the above embodiment, the amount of liquid remaining in the check valve V5 and the check valve V3 can be reduced, so that the liquid in the liquid storage unit 20 can be effectively utilized.

[0197] In the treatment liquid input device 10A, as described above, a portion of the water that has flowed from the water supply passage 11 into the main passage 12 flows into the input passage 13, bypassing the venturi section 15 through the bypass passage 18. This makes it possible to reduce the amount of water flowing through the venturi section 15 while ensuring the amount of water to be input into the inner tank 5b. Because the amount of water flowing through the venturi section 15 can be reduced, the generation of abnormal noise in the venturi section can be suppressed.

[0198] The embodiments of the present invention have been described above. However, the present invention is not limited to the exemplified embodiments, and is intended to include the scope indicated by the claims, and is intended to include all modifications within the meaning and scope equivalent to the claims.

[0199] The supply mechanism may not have a bypass flow path. An example of the supply mechanism may have a water supply flow path having a water supply port through which water is supplied and for flowing the water supplied through the water supply port, a liquid agent extraction flow path for extracting the liquid agent in the liquid agent storage unit, an input flow path having an input port for inputting a treatment liquid into the washing tub, and an intermediate flow path for flowing the treatment liquid containing the water flowing through the water supply flow path and the liquid agent extracted by the liquid agent extraction flow path toward the input flow path.

[0200] In a configuration in which the supply mechanism has two liquid agent storage units, one of the two liquid agent storage units is a first liquid agent storage unit that stores a first liquid agent and the other is a second liquid agent storage unit that stores a second liquid agent, an example of the supply mechanism may have two of the intermediate flow paths and two of the liquid agent extraction flow paths. In this case, one of the two liquid agent extraction flow paths may be a first liquid agent extraction flow path for extracting the first liquid agent, and the other may be a second liquid agent extraction flow path for extracting the second liquid agent, and one of the two intermediate flow paths may be a first intermediate flow path that flows the water flowing in the water supply flow path and the first liquid agent extracted at the first liquid agent extraction flow path toward the input flow path, and the other may be a second intermediate flow path that flows the water flowing in the water supply flow path and the second liquid agent extracted at the second liquid agent extraction flow path toward the input flow path.

[0201] In the embodiment having the first and second intermediate flow paths as described above, the supply mechanism may include a water supply valve that controls the flow of water from the water supply flow path to the first and second intermediate flow paths. In the embodiment having the first and second intermediate flow paths as described above, the supply mechanism may include a flow path switching unit that can switch the flow of treatment liquid from the first and second intermediate flow paths to the input flow path.

[0202] For example, the number of liquid agent containing sections may be three or more. Elements functioning as a water supply section and a negative pressure generating section may be integrally provided on the housing.

[0203] The various embodiments described above may be combined as appropriate without departing from the spirit of the present invention.

[0204] The gist of the present disclosure is as follows: [1] to [4] [1] A liquid agent storage portion; A supply mechanism that sucks out the liquid agent in the liquid agent storage unit and supplies the liquid agent together with water as a treatment liquid to the washing tub; having The supply mechanism includes: a liquid agent extraction flow path for extracting the liquid agent from the liquid agent storage portion; a first check valve disposed in the liquid agent outlet flow path for opening and closing communication between the liquid agent storage unit and the liquid agent outlet flow path and for allowing the liquid agent to flow from the liquid agent storage unit to the liquid agent outlet flow path; having The liquid agent storage section includes: a liquid agent guide flow path that is detachably attached to the liquid agent extraction flow path and that causes the liquid agent in the liquid agent storage unit to flow into the liquid agent extraction flow path; a second check valve disposed in the liquid guide flow path, opening and closing communication between the liquid storage unit and the liquid extraction flow path, and allowing the liquid to flow from the liquid storage unit to the liquid extraction flow path; having When the liquid agent extraction flow path and the liquid agent guide flow path are connected to each other, the first check valve and the second check valve are arranged along the same direction. Processing liquid injection device. [2] The supply mechanism has a housing having an accommodation space for accommodating the liquid agent accommodation portion, The housing includes: The bottom wall and A top wall facing the bottom wall; a rear wall connecting the bottom wall and the top wall; a first side wall connecting the bottom wall, the top wall, and the rear wall; a second side wall connecting the bottom wall, the top wall, and the rear wall and facing the first side wall; having The storage space is formed by the bottom wall, the top wall, the first side wall, and the second side wall, the liquid agent extraction channel protrudes forward from the rear wall, a connecting end of the liquid agent guide flow path connected to the liquid agent take-out flow path is exposed from a wall of the liquid agent storage unit facing the rear wall; The processing liquid supply device according to [1]. [3] A rod-shaped member is provided at a front end of the liquid agent extraction flow path, the rod-shaped member extending forward from the front end, and the rod-shaped member is configured to maintain an open state of the second check valve in a state in which the liquid agent guide flow path and the liquid agent extraction flow path are connected to each other. The processing liquid supply device according to [2]. [4] A washing tub; A processing liquid supplying device according to any one of [1] to [3], Equipped with a washing machine. [Explanation of symbols]

[0205] 1...washing machine, 5b...inner tub (washing tub), 10...treatment liquid dispenser, 14...liquid agent extraction flow path, 14A...first liquid agent extraction flow path, 14B...second liquid agent extraction flow path, 20A...first liquid agent storage section, 20B...second liquid agent storage section, 41...bottom wall, 42...left side wall (first side wall or second side wall), 43...right side wall (second side wall or first side wall), 44...rear wall, 45...top wall, 46...sixth pipe section (first liquid agent extraction flow path), 47...seventh pipe section (second liquid agent extraction flow path), 48...rod-shaped member, 215...rear wall (wall facing the rear wall of the housing), 251...liquid agent guide flow path, 461...front end, 471...front end, 2511...connecting end. V3a...check valve (first check valve), V3b...check valve (second check valve), V5...check valve (second check valve).

Claims

1. A liquid agent storage section; A supply mechanism that sucks out the liquid agent in the liquid agent storage unit and supplies the liquid agent together with water as a treatment liquid to the washing tub; having The supply mechanism includes: a liquid agent extraction flow path for extracting the liquid agent from the liquid agent storage portion; a first check valve disposed in the liquid agent outlet flow path, for opening and closing communication between the liquid agent storage unit and the liquid agent outlet flow path and for allowing the liquid agent to flow from the liquid agent storage unit to the liquid agent outlet flow path; having The liquid agent storage section includes: a liquid agent guide flow path that is detachably attached to the liquid agent extraction flow path and that causes the liquid agent in the liquid agent storage unit to flow into the liquid agent extraction flow path; a second check valve disposed in the liquid guide flow path, opening and closing communication between the liquid storage unit and the liquid extraction flow path, and allowing the liquid to flow from the liquid storage unit to the liquid extraction flow path; having When the liquid agent extraction flow path and the liquid agent guide flow path are connected to each other, the first check valve and the second check valve are arranged along the same direction. Processing liquid injection device.

2. the supply mechanism has a housing in which an accommodation space for accommodating the liquid agent accommodation portion is formed, The housing includes: The bottom wall and A top wall facing the bottom wall; a rear wall connecting the bottom wall and the top wall; a first side wall connecting the bottom wall, the top wall, and the rear wall; a second side wall connecting the bottom wall, the top wall, and the rear wall and facing the first side wall; having The storage space is formed by the bottom wall, the top wall, the first side wall, and the second side wall, the liquid agent extraction channel protrudes forward from the rear wall, a connecting end of the liquid agent guide flow path connected to the liquid agent take-out flow path is exposed from a wall of the liquid agent storage unit facing the rear wall; The treatment liquid supplying device according to claim 1 .

3. a rod-shaped member is provided at a front end of the liquid agent extraction flow path, the rod-shaped member extending forward from the front end, for maintaining an open state of the second check valve in a state in which the liquid agent guide flow path and the liquid agent extraction flow path are connected to each other; The treatment liquid supplying device according to claim 2 .

4. A washing tub and A processing liquid supplying device according to any one of claims 1 to 3, Equipped with a washing machine.

Citation Information

Patent Citations

  • Detergent dispensing system

    WO2020113954A1