Pouring space measuring device and measuring method

The pouring space measuring device with a two-dimensional scanner and encoder system addresses inaccuracies in tunnel construction volume measurement, enhancing precision and reducing residual concrete and emissions.

JP2024170243APending Publication Date: 2024-12-06TAISEI CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023087292
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing methods for measuring pouring space in tunnel construction are inaccurate due to construction errors in formwork and require complex 3D modeling, leading to volume discrepancies and residual concrete generation.

Method used

A pouring space measuring device using a rail-mounted two-dimensional scanner and encoder system to calculate the volume of the space between formwork and tunnel surfaces, integrating a traction mechanism and control unit for precise measurement.

Benefits of technology

Accurately measures pouring space volume, reducing residual concrete and associated costs, improving productivity, and minimizing CO2 emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024170243000001_ABST
    Figure 2024170243000001_ABST
Patent Text Reader

Abstract

To propose a pouring space measuring device and a measuring method capable of accurately measuring the volume of a pouring space at a top end of a tunnel and effectively suppressing the generation of residual concrete.SOLUTION: A pouring space measuring device 1 measures the volume of a pouring space S1 of lining concrete C at a top end of a tunnel T. The device is equipped with a rail 2 that is installed on an outer surface of a top 14a1 of a formwork 14 and extends in the axial direction of the tunnel T, a two-dimensional scanner 3 that runs along the rail 2 and measures the shape of the pouring space S1 in a plane whose normal direction is the axial direction of the tunnel T, a traction mechanism 4 that pulls the two-dimensional scanner 3, an encoder 5 that measures the position of the two-dimensional scanner 3, and a control unit 6 that calculates the volume of the pouring space S1 based on the measurement results measured by the two-dimensional scanner 3 and the encoder 5.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pouring space measuring device and a measuring method for tunnel construction. [Background technology]

[0002] Conventionally, the techniques disclosed in Patent Documents 1 and 2 are known as techniques for measuring the casting space in tunnel construction. Patent Document 1 relates to a wrapping space measurement method used for confirming the wrapping space for casting lining concrete and grasping the casting volume of the lining concrete in the wrapping space. In the technique of Patent Document 1, before installing a center in the tunnel, the completed shape of the inner wall surface of the tunnel is measured with a three-dimensional scanner to obtain the coordinates of the inner wall surface of the tunnel, and after installing the center in the tunnel, the three-dimensional coordinates of multiple prisms installed in the center are measured with a total station to obtain the coordinates of the formwork surface of the center. In the technique of Patent Document 1, the wrapping space before casting the lining concrete and the casting volume of the lining concrete in the wrapping space are measured from the difference between the coordinates of the inner wall surface of the tunnel and the coordinates of the formwork surface of the center. Patent Document 2 relates to a concrete pouring management system. The technology of Patent Document 2 includes a final top position identification process that identifies the final top position of concrete based on a three-dimensional model of the pouring space, a point cloud information acquisition process that acquires point cloud information of the pouring site during pouring based on imaging information captured by an imaging device of the pouring site during pouring, a top position identification process that identifies the top position of the concrete being poured based on the three-dimensional model and the cloud information, and a required amount calculation process that calculates the required amount required to pour concrete up to the final top position based on the three-dimensional model, the point cloud information, the top position, and the final top position. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-61417 A [Patent Document 2] JP 2022-174364 A Summary of the Invention [Problem to be solved by the invention]

[0004] The lining space measurement method of Patent Document 1 is suitable for space measurement of construction projects where formwork is assembled according to design, such as for the main body. On the other hand, in space measurement of tunnel lining, the finished shape of the support finish surface (such as the surface of sprayed concrete), which is part of the formwork, may have a construction error of about several centimeters from the construction target, so even if the remaining volume is calculated from the design 3D model based on the measurement method of Patent Document 1, the volume that can be adjusted in the batch mixer (0.25 m3) may be exceeded. 3 ) Therefore, it is not very applicable to spatial measurements of tunnel linings. In addition, since Patent Document 2 is based on a design 3D model based on metal forms, there are problems when applying it to the section where box punching is performed. Since a tunnel is a linear structure, a design 3D model is often created by extending the same cross section based on the tunnel linearity (plan and longitudinal section). However, since the box punching section has cross-sectional changes in the longitudinal and transverse directions, it is difficult to reflect them in detail in the design 3D model, and if the method of Patent Document 2 is to be applied to the box punching section, an advanced 3D model is required, and creating the 3D model requires advanced technology and effort. In addition, the box punching section is generally constructed by attaching a wooden box punching formwork to the center, but since these are attached manually by workers, the center set error and the construction error of the box punching formwork are also integrated. In addition, if the planned quantity for one span calculated before pouring is, for example, 100 m 3 If so, 4m 3This involves transporting the equivalent of 25 ready-mix concrete trucks, but in reality it is not possible to confirm the exact volume of each ready-mix concrete truck (for example, the control standard value for air volume: ±2.5%, the accuracy of the measuring equipment at the manufacturing plant: water ±1%, cement ±1%, aggregate ±3%). Also, when the concrete is unloaded from the ready-mix concrete truck, some of the concrete adheres to the inside of the drum and remains inside. As a result, the amount of concrete at the time of shipment does not match the actual amount of concrete poured into the structure. For this reason, when pouring involves transporting a large number of loads, these errors are accumulated, and the final error is limited to a capacity (0.25 m) that can be adjusted in the batch mixer. 3 ) and therefore it is presumed that the amount of remaining concrete will not be reduced. The present invention aims to solve the above-mentioned problems and to propose a pouring space measuring device and a measuring method that can accurately measure the volume of the pouring space during pouring work at the top end of a tunnel and effectively suppress the generation of residual concrete. [Means for solving the problem]

[0005] The pouring space measuring device of the present invention for solving the above problem measures the volume of the pouring space of the lining concrete formed between the outer surface of the formwork of the center and the inner surface of the tunnel at the top end of the tunnel. The pouring space measuring device includes a rail installed on the outer surface of the top of the formwork and extending in the axial direction of the tunnel, a two-dimensional scanner that travels along the rail and measures the shape of the pouring space in a plane normal to the axial direction of the tunnel, a towing mechanism that tows the two-dimensional scanner, an encoder that measures the position of the two-dimensional scanner, and a control unit that calculates the volume of the pouring space based on the measurement results measured by the two-dimensional scanner and the encoder. In the present invention, the remaining required amount of lining concrete can be measured accurately in the final stage of the tunnel top casting work, so the influence of calculation errors related to ordering and transporting ready-mix concrete is small, and the generation of leftover concrete can be effectively suppressed. This contributes to reducing the disposal cost of concrete debris and reducing the CO2 emissions associated with concrete production. In addition, the volume can be calculated using the measurement results from the 2D scanner and encoder and simple calculation processing, so the remaining required amount of lining concrete can be determined accurately in a short time. Furthermore, the number of ready-mixed concrete trucks can be adjusted based on the calculated volume, so waiting time for ready-mixed concrete trucks can be reduced, improving productivity. It is preferable that the encoder is provided integrally with the traction mechanism. In this configuration, since there is no need to attach or adjust the encoder to the traction mechanism, the remaining required amount of lining concrete can be measured smoothly and accurately. In addition, the device can be easily installed at the top end of the tunnel and removed after measurement. In addition, the rail is preferably fixed to the outer surface of the top of the formwork by a magnet. This configuration makes it easy to install the rail on the outer surface of the top of the formwork and to remove it after measurement.

[0006] The measurement method of the present invention for solving the above problems is a method for measuring the volume of the concrete pouring space at the top end of a tunnel. A traction mechanism and an encoder are installed on the bottom side of the formwork of the center, and a two-dimensional scanner is arranged on the lap side of the formwork, the two-dimensional scanner is pulled from the lap side to the bottom side by the traction mechanism, and the volume of the concrete pouring space is calculated based on the measurement results obtained by the two-dimensional scanner and the encoder. In the present invention, the 2D scanner is pulled from the lap side to the bottom side for measurement, so the volume of the pouring space adjacent to the poured lining concrete can be measured. This reduces the effect of calculation errors related to the ordering and transportation of ready-mix concrete, and effectively suppresses the generation of residual concrete. Effect of the Invention

[0007] According to the pouring space measurement device and measurement method of the present invention, the volume of the pouring space can be measured with high accuracy during pouring work at the top end of a tunnel, and the generation of residual concrete can be effectively suppressed. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a schematic cross-sectional view showing a tunnel to which a pouring space measuring device according to a first embodiment of the present invention is applied. [Diagram 2] FIG. 2 is an enlarged cross-sectional view showing the vicinity of the top end of a tunnel in which the pouring space measuring device according to the first embodiment of the present invention is installed. [Diagram 3] FIG. 1 is a diagram showing a pouring space measurement device according to a first embodiment of the present invention, where (a) is a side view showing the overall configuration, and (b) is an enlarged side view showing a main part. [Figure 4] FIG. 2 is an enlarged side view showing a two-dimensional scanner of the pouring space measuring device according to the first embodiment of the present invention. [Diagram 5] 1 is an enlarged view showing the two-dimensional scanner of the pouring space measuring device according to the first embodiment of the present invention as viewed from the bottom side. FIG. [Figure 6] FIG. 2 is an enlarged view showing a traction device and an encoder of the concrete pouring space measuring device according to the first embodiment of the present invention. [Figure 7] FIG. 1 is a block diagram showing a volume calculation system of a pouring space measuring device according to a first embodiment of the present invention. [Figure 8] 1A and 1B are diagrams for explaining the procedure for calculating volume by the control unit of the pouring space measuring device of the first embodiment of the present invention, where (a) is an explanatory diagram for calculating the cross-sectional area of ​​a tunnel using a two-dimensional scanner, and (b) is an explanatory diagram for calculating the volume of the pouring space based on the measurement results of the two-dimensional scanner and encoder. [Figure 9] FIG. 11 is an enlarged side view showing a two-dimensional scanner of a pouring space measuring device according to a second embodiment of the present invention. [Figure 10] 13 is an enlarged view showing the two-dimensional scanner of the pouring space measuring device according to the second embodiment of the present invention as viewed from the bottom side. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The concrete pouring space measurement device and the measurement method of the present invention will be described in detail below with reference to the appropriate drawings. In the following description, when referring to the concrete pouring space measurement device and the measurement method, "front and back," "left and right," and "up and down" are mentioned, the directions shown in Figures 1 and 2 are used as references, but this is not intended to limit the method of use (installation direction) of the concrete pouring space measurement device. In addition, common parts in each embodiment are given common reference symbols, and duplicated explanations will be omitted.

[0010] (First embodiment) FIG. 1 is a schematic cross-sectional view showing a tunnel T to which a pouring space measuring device 1 according to the first embodiment is applied. As shown in Fig. 1, a center (slide center) 10 is installed in the tunnel of a tunnel T to which the concrete pouring space measurement device 1 is applied. The center 10 is movable along a moving rail 11c laid in the axial direction of the tunnel T. The center 10 includes a gantry 11 and a formwork 14 supported by the gantry 11. The tunnel T has a hole wall T1, which is constructed in the natural ground G by blasting, mechanical excavation, etc. and has a horseshoe shape or a circle shape as shown in the figure. A pouring space S into which lining concrete C is poured is formed between the hole wall T1 and a formwork 14. When sprayed concrete is applied to the inner peripheral surface of the hole wall T1, a pouring space S is formed between the formwork 14 and the shotcrete. The gantry 11 is a framework member formed into a gate shape by appropriately combining shaped steel and the like. The gantry 11 is provided with a pair of left and right support legs 11a, 11a, and a beam member 11b installed on the upper ends of the support legs 11a, 11a. The lower ends of the support legs 11a, 11a are provided with wheels (not shown) for running on a moving rail 11c. The gantry 11 also has a work scaffold 13 that functions as a scaffold for workers during concrete pouring and as a temporary storage area for materials and equipment. Concrete pouring pipes 15a to 15d are arranged inside the center 10.

[0011] The formwork 14 is formed of multiple forms lined up in the circumferential and axial directions of the tunnel T, and has an arch shape. The multiple forms are supported by multiple support members 12 extending vertically, horizontally, diagonally upwards, and diagonally downwards from the gantry 11. The multiple forms include a top form 14a located at the top end of the center 10, side forms 14b, 14b located on both sides of the top form 14a, and invert forms 14c, 14c located below the side forms 14b, 14b. A box-out section 14e is formed in the casting space S on the side of the side form 14b. The box-out section 14e is surrounded by a frame material so as not to be buried in the lining concrete C, and after removal from the form, it functions as a place for installing equipment and ventilation piping, for example. When constructing the center 10, the gantry 11 is assembled on the ground of the tunnel T, and then the top form 14a, side form 14b, and invert form 14c are assembled in that order via support members 12 and various intermediate members.

[0012] Next, the concrete pouring space measuring device 1 will be described. Fig. 2 is an enlarged cross-sectional view showing the vicinity of the top end of the tunnel where the concrete pouring space measuring device 1 is installed, Fig. 3 is a diagram showing the concrete pouring space measuring device 1, (a) is a side view showing the overall configuration, and (b) is a side view showing an enlarged view of the main parts. Fig. 4 is an enlarged side view showing the two-dimensional scanner 3, Fig. 5 is an enlarged view of the two-dimensional scanner 3 seen from the bottom part TU side, and Fig. 6 is an enlarged view showing the traction device 20 and the encoder 30 of the concrete pouring space measuring device 1. Fig. 7 is a block diagram showing the volume calculation system. The pouring space measuring device 1 measures the volume of the pouring space S1 (the area marked with a dark dot pattern in Figure 2) of the lining concrete C formed at the top end of the tunnel T between the outer surface of the formwork 14 of the center 10 and the hole wall T1 (inner surface) of the tunnel T. 3(a)(b), the concrete pouring space measuring device 1 includes a rail 2, a two-dimensional scanner 3 that runs on the rail 2, a traction mechanism 4 that traction the two-dimensional scanner 3, and an encoder 5. As shown in FIG. 7, the concrete pouring space measuring device 1 includes a control unit 6 that calculates the volume of the concrete pouring space S1 at the top end from the data acquired by the two-dimensional scanner 3 and the encoder 5, as well as a communication control unit 7 and a terminal device 8 for operation. As shown in Fig. 3(a)(b), the rail 2 is fixed to the outer surface of the top of the top form 14a by a magnet 2a, and extends in the axial direction of the tunnel T. As shown in Fig. 5, the rail 2 is a straight rail with a substantially V-shaped groove 2b formed at the upper and lower parts. A guide member 2c for running the two-dimensional scanner 3 along the rail 2 is inserted into the upper groove 2b. Meanwhile, a fastener 2d for the magnet 2a is inserted into the lower groove 2b. A plurality of magnets 2a (a total of four in this embodiment) are arranged at a predetermined interval. The number of magnets 2a can be set appropriately.

[0013] The two-dimensional scanner 3 runs on the rail 2 and measures the shape of the casting space S1 at the top end in a plane normal to the axial direction of the tunnel T while moving along the rail 2. The two-dimensional scanner 3 is operated by power supplied from a power source (not shown), and emits a laser pulse beam toward the hole wall T1 of the tunnel T and detects the return beam with an optical sensor to accurately measure the distance L to the hole wall T1. The specifications of the two-dimensional scanner 3 can be, for example, an opening angle of 360 degrees, a scan count of 25 times / second, and an angle resolution of 0.04 degrees, and 9000 pieces of distance data can be measured every 0.04 degrees in one 360-degree measurement. When measuring while moving the two-dimensional scanner 3, the beams output in one measurement do not strictly exist on the same plane, but when calculating the volume of the casting space S1, they are measured on the same plane. The two-dimensional scanner 3 is attached to a bracket 31. The bracket 31 has a flat base 32, an attachment portion 33 rising from an end of the base 32, and a reinforcing portion 34 connecting the base 32 and the attachment portion 33. A plate-shaped support member 35 that supports the guide members 2c, 2c is attached to the lower surface of the base 32.

[0014] The traction mechanism 4 is a handle winch, and as shown in Fig. 6, includes a base 41, a pair of left and right side plates 42, 42, a rotating drum 43, a speed reducer 44, and an operation handle 45. An encoder 5 is integrally attached to the output shaft 43a of the traction mechanism 4 (rotating drum 43) via a connecting member 46. As shown in FIG. 3(b), the base 41 is fixed to the end 14a2 of the bottom side TU of the top 14a1 of the top form 14a by a bolt or the like. As shown in FIG. 6, a pair of left and right side plates 42, 42 and a support plate 51 for supporting the encoder 5 are attached to the base 41. The rotating drum 43 is rotatably supported between the side plates 42, 42. A wire 48 (see FIGS. 3(a) and (b)) for pulling the two-dimensional scanner 3 is wound around the rotating drum 43 (not shown in FIG. 6). The rotating drum 43 is rotated via a reduction gear unit 44 driven by the rotation operation of an operating handle 45. The reduction gear unit 44 is provided on the left side of the left side plate 42. The operating handle 45 is attached to an input shaft 44a of the reduction gear unit 44.

[0015] The encoder 5 measures the moving distance (position) of the two-dimensional scanner 3 based on the rotation of the output shaft 43a of the traction mechanism 4 (rotating drum 43). The encoder 5 is a rotary encoder, which generates, for example, 1000 pulses per rotation and counts the distance per pulse. The encoder 5 is connected to the two-dimensional scanner 3 via a cable (not shown) and communicates with the two-dimensional scanner 3. The measurement results by the encoder 5 are sent to the two-dimensional scanner 3 and then sent to the control unit 6 together with the measurement results by the two-dimensional scanner 3 (see FIG. 7). Data is sent to the control unit 6 via the communication control unit 7. The communication control unit 7 has a router function. As shown in FIG. 7, the two-dimensional scanner 3, the control unit 6, and the terminal device 8 are connected to the communication control unit 7 via a network, for example, an Ethernet cable. The network may also be the Internet or a telephone communication network.

[0016] The control unit 6 calculates the volume of the casting space S1 based on the measurement results from the two-dimensional scanner 3 and the encoder 5 input via the communication control unit 7. Figure 8 is a diagram for explaining the volume calculation procedure by the control unit 6, where (a) is an explanatory diagram for calculating the cross-sectional area of ​​the tunnel T using a two-dimensional scanner 3, and (b) is an explanatory diagram for calculating the volume of the pouring space S1 based on the measurement results of the two-dimensional scanner 3 and the encoder 5. 8(a), the two-dimensional scanner 3 measures the distance L and the angle θ from the two-dimensional scanner 3 to the hole wall T1 of the tunnel T, and transmits the measurement result to the control unit 6. The angle θ can be set arbitrarily. The control unit 6 regards each of the triangles as a triangle according to the interval of the angle θ, and calculates the areas A1 to A n Calculate the area of ​​each triangle A1~A n is (L 2 / 2)tanθ. Then, the control unit 6 calculates the area of ​​each triangle A1 to A n and calculate the cross-sectional area A. Next, the control unit 6 calculates the amount of movement of the two-dimensional scanner 3 from the measurement value of the encoder 5, and multiplies the cross-sectional area A for each predetermined amount of movement M to obtain the section volumes V1 to V for each amount of movement M. n Then, the control unit 6 calculates the section volumes V1 to V n Add up the volumes V1 to V n The volume of the rail 2 in the above step is subtracted to calculate the volume of the casting space S1. The volume of the rail 2 may be calculated from the amount of movement of the two-dimensional scanner 3, or may be calculated in advance and stored in the control unit 6. The control unit 6 calculates the amount of lining concrete to be poured based on the volume of the pouring space S1.

[0017] The terminal device 8 is a terminal used by an operator, and is, for example, a smartphone, a tablet, a notebook type personal computer, or the like. The terminal device 8 allows input of various settings for the two-dimensional scanner 3 and the encoder 5. The display screen of the terminal device 8 also displays the measurement results of the two-dimensional scanner 3 and the encoder 5, the cross-sectional area A calculated by the control unit 6, and the section volumes V1 to V for each movement amount M. n It is possible to display various data such as the volume of the pouring space S1, the amount of poured lining concrete, etc. The terminal device 8 is not necessarily required, and the control unit 6 may be configured to automatically measure by a program or the like preset in the control unit 6.

[0018] Next, a measurement method using the concrete pouring space measurement device 1 will be described. The timing for installing the pouring space measurement device 1 is preferably after the center 10 is set and before the lining concrete C is poured. When installing the pouring space measurement device 1, first, the rail 2 is installed from the bottom TU side of the center 10, and the traction mechanism 4 is installed on the end 14a2 of the top 14a1 of the top form 14a by a bolt or the like. Then, the two-dimensional scanner 3 is installed on the rail 2 on the lap part LA side. Then, the wire 48 is drawn out from the rotating drum 43 of the traction mechanism 4, and the tip of the wire 48 is connected to the bracket 31 of the two-dimensional scanner 3. The two-dimensional scanner 3 and the encoder 5 are connected by a communication cable, and the two-dimensional scanner 3, the control unit 6, and the terminal device 8 are connected to the communication control unit 7 via an Ethernet cable. Thereafter, as shown in FIG. 1, the lining concrete C is supplied through the concrete pouring pipe 15a, and the lining concrete C is poured into the pouring space S on the sides of the invert form 14c and the side form 14b. At this time, the lining concrete C also flows around the box removal section 14e. Thereafter, the concrete pouring pipe 15a is switched to the concrete pouring pipe 15b, and then to the concrete pouring pipe 15c for blowing up, and the lining concrete C is poured up to a pouring height H shown in FIG. 2, for example, a height at which the left and right ends of the top form 14a are covered with the lining concrete C. The pouring height H is set to a height at which the pouring space S1 measurable by the 2D scanner 3 remains at the top end. In other words, the laser pulse beam of the two-dimensional scanner 3 is not blocked by the outer shape of the top form 14a or the poured lining concrete C, and the lining concrete C is poured through the blow-up concrete pouring pipe 15c to a height where it can reach the entire pouring surface (top surface) of the poured lining concrete C.

[0019] Thereafter, the two-dimensional scanner 3 and the encoder 5 are set to a state in which measurement can be started, and the operating handle 45 of the traction mechanism 4 is rotated to wind the wire 48 onto the rotating drum 43. This causes the two-dimensional scanner 3 to travel on the rail 2 from the lap portion LA side to the bottom portion TU side, and the measurement results by the two-dimensional scanner 3 and the encoder 5 are sent to the control unit 6. The control unit 6 acquires 9000 measurement results per process from the two-dimensional scanner 3, performs high-speed calculations, and calculates the cross-sectional area A. The control unit 6 also acquires the measurement results of the encoder 5, and calculates the section volumes V1 to V from the cross-sectional area A. n and calculate the volume of the casting space S1. The worker places an order for ready-mixed concrete based on the calculated volume of the pouring space S1.

[0020] After that, the two-dimensional scanner 3, the towing mechanism 4, the rail 2, etc. are collected from the bottom part TU side, and the pouring space measuring device 1 is removed from above the top form 14a. Then, the lining concrete C is poured into the pouring space S1 through the concrete pouring pipe 15d for blowing up.

[0021] According to the pouring space measurement device 1 of the present embodiment described above, the remaining required amount of lining concrete C can be accurately measured in the pouring work at the top end of the tunnel T, which is the final stage of the pouring work, so the influence of calculation errors related to ordering and transporting ready-mixed concrete is small, and the generation of residual concrete can be effectively suppressed. This contributes to reducing the disposal cost of concrete debris and reducing CO2 emissions associated with concrete production. Furthermore, since the volume can be calculated using the measurement results from the two-dimensional scanner 3 and the encoder 5 and simple arithmetic processing, it is possible to grasp the remaining required amount of lining concrete C accurately in a short time. Furthermore, since the number of ready-mixed concrete trucks can be adjusted based on the calculated volume, it is possible to reduce the waiting time for ready-mixed concrete trucks and improve productivity. In addition, because the encoder 5 is provided integrally with the traction mechanism 4, there is no need to attach or adjust the encoder 5 to the traction mechanism 4, and the remaining required amount of lining concrete C can be measured smoothly and accurately. In addition, the traction mechanism 4 and the encoder 5 can be easily installed at the top end of the tunnel T and removed after measurement. Furthermore, since the rail 2 is fixed to the outer surface of the top portion 14a1 of the top form 14a by the magnets 2a, it is easy to install the rail 2 on the outer surface of the top portion 14a1 and to remove it after measurement. In addition, since the remaining required amount of lining concrete C is measured after pouring in the box pull-out section 14e is completed, it is not affected by the pouring work related to the box pull-out section 14e, and the remaining required amount of lining concrete C can be measured accurately.

[0022] Furthermore, in the measurement method of this embodiment, the 2D scanner 3 is pulled from the lap portion LA side toward the bottom portion TU side for measurement, so that it is possible to measure the volume of the pouring space S1 adjacent to the poured lining concrete at the top end (the remaining required amount of lining concrete C). This reduces the effect of calculation errors related to the ordering and transportation of ready-mixed concrete, and effectively suppresses the generation of residual concrete.

[0023] Second embodiment Next, a pouring space measurement device according to a second embodiment will be described with reference to Figures 9 and 10. This embodiment differs from the first embodiment in that a two-dimensional scanner 3 is disposed on the side of a rail 2. Figure 9 is an enlarged side view showing the two-dimensional scanner 3 of the concrete pouring space measuring device 1 of the second embodiment, and Figure 10 is an enlarged view showing the two-dimensional scanner 3 of the concrete pouring space measuring device 1 of the second embodiment as viewed from the bottom part TU side. As shown in Figures 9 and 10, the two-dimensional scanner 3 is attached to a bracket 31A and is disposed to the side of the rail 2 by the bracket 31A. As shown in Figure 10, the bracket 31A has a side portion 36 extending upward from a base portion 32, and an upper portion 37 that is continuous with the side portion 36 and is disposed on the rail 2. The base portion 32, the side portion 36 and the upper portion 37 are integrally formed, and are generally crank-shaped when viewed from the bottom portion TU (see Figure 3(b)) side. A flat sliding plate 39 is attached to the underside of the base 32. The sliding plate 39 is slidable against the outer surface of the top 14a1 of the top form 14a. The sliding plate 39 is preferably made of a material with low sliding resistance, such as a resin molded product. The side portion 36 rises from the side edge of the base 32 along the side surface of the rail 2. The upper portion 37 is formed continuously with the upper end of the side portion 36 and extends onto the upper surface of the rail 2. A plate-shaped support member 35 that supports the guide members 2c, 2c is attached to the underside of the upper portion 37.

[0024] In this embodiment, the same effects as those described in the first embodiment can be obtained. In addition, since the bracket 31A places the two-dimensional scanner 3 on the side of the rail 2, the amount of protrusion of the two-dimensional scanner 3 from the outer surface of the top form 14a can be reduced compared to the case where the two-dimensional scanner 3 is placed on the upper side of the rail 2. As a result, even in a tunnel T in which the volume of the pouring space S1 at the top end is relatively small, the distance L between the two-dimensional scanner 3 and the hole wall T1 can be secured, and the volume of the pouring space S1 can be suitably measured.

[0025] Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and each of the above-described components can be appropriately modified without departing from the spirit of the present invention. For example, in the first and second embodiments, the traction mechanism 4 has been described as a handle winch, but the present invention is not limited to this, and may be configured to be driven by an electric motor or the like as a drive source. In addition, in the first and second embodiments, the encoder 5 is integrally provided with the traction mechanism 4, but this is not limited to this, and the encoder 5 may be provided separately from the traction mechanism 4 and attached to the traction mechanism 4. In addition, in the first and second embodiments, the rail 2 is fixed to the outer surface of the top 14a1 of the top form 14a by a magnet 2a, but this is not limited to this and the rail 2 may be fixed to the outer surface of the top 14a1 using various other fixing devices or fixing mechanisms. [Explanation of symbols]

[0026] 1. Pouring space measurement device 2 Rail 2a magnet 3. 2D Scanner 4 Traction mechanism 5 Encoders 6. Control Unit 10. Centre 14 Formwork T-Tunnel 14a1 Top C Lining concrete S1 Pouring space T-Tunnel T1 Hole wall (inner surface)

Claims

1. A pouring space measuring device that measures the volume of the pouring space of the lining concrete formed between the outer surface of the center formwork and the inner surface of the tunnel at the top end of the tunnel, A rail installed on the outer surface of the top of the formwork and extending in the axial direction of the tunnel; A two-dimensional scanner that travels along the rail and measures the shape of the casting space in a plane normal to the axial direction of the tunnel; a traction mechanism for traction the two-dimensional scanner; an encoder for measuring a position of the two-dimensional scanner; A pouring space measuring device characterized by comprising a control unit that calculates the volume of the pouring space based on the measurement results measured by the two-dimensional scanner and the encoder.

2. The pouring space measuring device according to claim 1, characterized in that the encoder is integrally provided in the traction mechanism.

3. The pouring space measurement device according to claim 1, characterized in that the rail is fixed to the outer surface of the top of the formwork by a magnet.

4. A method for measuring the volume of a pouring space at the top end of a tunnel, comprising: A measurement method characterized by installing a traction mechanism and encoder on the bottom side of a center formwork, and arranging a two-dimensional scanner on the lap side of the formwork, using the traction mechanism to traction the two-dimensional scanner from the lap side toward the bottom side, and calculating the volume of the pouring space based on the measurement results measured by the two-dimensional scanner and encoder.

Citation Information

Patent Citations

  • Lining space measuring method for tunnel construction

    JP2022061417A

  • Placing management system and placing management method

    JP2022174364A