Method of working inside nuclear reactor containment vessel
By employing multiple through-holes in reactor containment vessels for coordinated device entry, the method addresses inefficiencies in equipment size limitations and operational complexity, enhancing work efficiency and flexibility.
Patent Information
- Application Number
- JP2023090121
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-26
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-06
AI Technical Summary
The small-sized through-holes in reactor containment vessels limit the size of equipment that can be carried in, necessitating multiple loadings and unloadings of specialized equipment, which is inefficient and complicates operations.
A method utilizing multiple through-holes in the reactor containment vessel to introduce and coordinate multiple devices for cooperative work, allowing for efficient distribution of equipment roles and functions.
This approach enhances work efficiency by enabling simultaneous use of multiple devices through different access points, reducing the need for repeated equipment insertion and improving operational flexibility.
Smart Images

Figure 2024170264000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for working inside a nuclear reactor containment vessel using multiple small penetrations. [Background technology]
[0002] In investigations into the reactor containment vessel following the Fukushima Daiichi Nuclear Power Plant accident, accessible penetrations were selected from the many penetrations present in the reactor containment vessel, and specialized equipment suited to the purpose of the investigation was used to conduct the investigation.
[0003] There are penetration holes that provide the shortest linear access into the reactor containment vessel, but the dimensions of the penetration holes are small. Depending on the role of the device to be inserted, the device itself may become large if it is to have multiple functions, and the functions of the device may be limited due to the dimensional constraints of the penetration hole to be inserted.
[0004] When work is performed through one penetration hole, it is necessary to divide the equipment into different roles and perform the work in multiple steps, which results in poor work efficiency and a long work period. Or, by making the equipment have multiple roles, the equipment becomes complicated and difficult to operate. On the other hand, the containment vessel has multiple penetration holes, and by inserting multiple pieces of equipment through these penetration holes and combining the equipment inside the containment vessel, it is possible to work inside the containment vessel without having to frequently take the equipment in and out, and without dividing the work steps.
[0005] In this regard, Patent Document 1 proposes, for the purpose of providing a method for observing the inside of a reactor containment vessel that enables a preliminary investigation inside the vessel with minimal access, that "in a method for observing the inside of a reactor containment vessel, an observation probe 50 is inserted through a penetration 13 that is provided so as to penetrate the inside and outside of the reactor containment vessel 12, and the inside of the vessel is observed." [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2013-104817 A Summary of the Invention [Problem to be solved by the invention]
[0007] According to an investigation of the inside of the reactor containment vessel through the penetration hole, the size of the equipment that can be brought into the reactor containment vessel is limited by the small penetration hole. Also, when working through one penetration hole, it is necessary to prepare dedicated equipment for the purpose and to carry the dedicated equipment in and out multiple times, which is not efficient.
[0008] More specifically, the through hole that provides the shortest access to the inside of the pedestal is located in a straight line with the inside of the pedestal, making it difficult to easily enter the inside of the pedestal. Also, the through hole is small, which limits the size of the equipment that can be brought in.
[0009] Furthermore, the installation of cameras inside the pedestal and work inside the reactor containment vessel will be carried out with the use of equipment. Since there is not just one device, when working with one small through-hole, the device must be moved in and out multiple times, which is inefficient.
[0010] In view of the above, an object of the present invention is to provide a method for working inside a reactor containment vessel that is expected to improve work efficiency. [Means for solving the problem]
[0011] In view of the above, the present invention provides "a method for work inside a reactor containment vessel in a boiling water nuclear power plant, characterized in that a plurality of devices or materials are carried into the reactor containment vessel by using a plurality of penetration holes existing in the reactor containment vessel."
[0012] Furthermore, according to the present invention, "a method of working inside a reactor containment vessel in a nuclear power plant, comprising the steps of: carrying in a first work device through a first penetration hole present in the reactor containment vessel; carrying in a second work device through a second penetration hole present in the reactor containment vessel; and causing a plurality of work devices to carry out coordinated work inside the reactor containment vessel in response to control signals from a control device that remotely operates the first work device and the second work device." Effect of the Invention
[0013] According to the present invention, it is possible to provide a method for working inside a reactor containment vessel that is expected to improve work efficiency.
[0014] Specifically, as is clear from the description of the examples, by using multiple penetration holes to access the reactor containment vessel, it is possible to expand the loading equipment and distribute the roles of the equipment's use, thereby increasing the number of work applications. It becomes possible to do things that were not possible with just one penetration hole, which is expected to improve work efficiency.
[0015] In addition, by dividing the roles of use, it is possible to miniaturize the equipment, and the restrictions imposed by the through-hole dimensions are alleviated, making it possible to use smaller through-holes, and the options for usable through-holes are increased, allowing for the creation of optimal work procedures. Increasing the number of usable through-holes makes it possible to bring in multiple pieces of equipment, and the alleviation of restrictions on through-holes also makes it easier to design the equipment.
[0016] Furthermore, even if one penetration hole is occupied by the delivery of equipment, it is possible to carry in the equipment through other penetration holes, making it possible to continue work inside the reactor containment vessel, which is expected to improve work efficiency and shorten construction time. [Brief description of the drawings]
[0017] [Figure 1] A diagram showing the exterior and cross-sections of the reactor containment vessel of a boiling water reactor. [Figure 2A]FIG. 13 is a cross-sectional view showing a state in which a work robot or the like has entered inside the reactor containment vessel. [Figure 2B] An enlarged partial view showing a work robot and other equipment entering inside the reactor containment vessel. [Figure 3A] FIG. 13 is a cross-sectional view showing a state in which a work robot or the like has entered the reactor containment vessel. [Figure 3B] An enlarged partial view showing work robots and other equipment descending to the bottom of the reactor containment vessel and working there. [Figure 4A] FIG. 13 is a cross-sectional view showing a state in which a work robot or the like has entered the reactor containment vessel. [Figure 4B] An enlarged view of a portion of the reactor containment vessel showing the cameras placed in various locations. [Diagram 5] An enlarged partial view showing the work status of checking the inside of the vent pipe. [Figure 6] An enlarged partial view showing the sampling of deposits inside the vent pipe. [Figure 7] An enlarged partial view showing the work status of checking the inside of the vent pipe. [Figure 8] An enlarged partial view showing the work being done to check the condition of the pedestal. [Figure 9] An enlarged partial view showing the work being done to check the condition of the pedestal. [Figure 10A] FIG. 13 is a cross-sectional view showing a state in which a work robot or the like has entered the reactor containment vessel. [Figure 10B] An enlarged partial view showing the pedestal reinforcement work status. [Figure 11] An enlarged partial view showing the pedestal reinforcement work status. [Figure 12] FIG. [Figure 13A] A diagram showing the work robot, cutting tool, and camera deployed inside the reactor containment vessel. [Figure 13B] A diagram showing the state in which the work robot has received the cutting tool and camera inside the reactor containment vessel. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. EXAMPLES
[0019] Figure 1 shows the exterior and cross-sections of the reactor containment vessel of a boiling water reactor. As shown on the left in Figure 1, the reactor containment vessel 1 has multiple penetration holes 2 of different sizes that allow entry into the vessel for investigation and work.
[0020] 1 shows an example of the layout of the exterior of the reactor containment vessel 1 in cross section BB (longitudinal cross section), the lower left shows an example of the layout of the exterior of cross section AA (transverse cross section), and the lower right shows an enlarged view (partially enlarged view) of the portion of the longitudinal cross section leading to the suppression chamber 3. In the embodiments of the present invention described below, the sequential progress of work content will be described using any of these configurations.
[0021] In the first embodiment, as the first stage, a state in which a working robot or the like has entered inside the reactor containment vessel 1 through the through hole 2 is shown. This state will be described with reference to Figs. 2A and 2B.
[0022] FIG. 2A shows a state in which devices such as a work robot 6a, a cutting tool 6b, and a camera 6c are inserted into the reactor containment vessel 1 through the penetration holes 2 from different penetration holes 2a, 2b, and 2c, respectively. FIG. 2B shows a state in which these devices are seated on a grating 9 inside the reactor containment vessel 1. Note that equipment and other materials are also carried in through the penetration hole 2. The equipment includes sandbags, reinforcing materials such as dry mortar or geopolymer, hoses, and the like.
[0023] 2A and 2B, a work robot 6a is carried into the reactor containment vessel 1 through one of the through holes 2a in the reactor containment vessel 1, and a cutting tool 2b is inserted through a through hole 2b other than the through hole 2a through which the work robot 6a was carried in. Furthermore, a camera 6c is inserted through a through hole 2c other than the through hole 2c for the work robot 6a and the cutting tool 6b to check the work status.
[0024] A work robot 6a and a cutting tool 6b carried into the reactor containment vessel 1 can cut the grating 9 inside the reactor containment vessel 1 to construct an opening 10 that serves as an access route to the basement floor. EXAMPLES
[0025] In the second embodiment, the next step is a descent operation in which a work robot or the like is advanced into the lower part of the containment vessel 1. This state will be described with reference to Figs. 3A and 3B.
[0026] Fig. 3A shows a state in which a work robot 6d and a lifting equipment 6e are inserted into the reactor containment vessel 1 from different through-holes 2d and 2e, respectively. Fig. 3B shows a state in which a work robot 6a and a camera 6c are lowered down from a grating 9 inside the reactor containment vessel 1 using the lifting equipment 6e.
[0027] 3A and 3B, a working robot 6d is brought into the reactor containment vessel 1 through a penetration hole 2d different from the device brought into the reactor containment vessel 1 in Example 1, and performs auxiliary work and collaborative work for the working robot 6a brought in in Example 1. For example, a lifting device 6e is inserted through yet another penetration hole 2e, and the working robot 6a is lowered to the basement floor using this lifting device 6e through the access route 10 constructed in Example 1.
[0028] When the working robot 6a is lowered, the working robot 6d can assist in connecting the working robot 6a to the lifting equipment 6e and in handling the cables. In addition, when the lifting equipment 6e is larger in shape than the through-hole into which it is inserted to support the lifting mechanism or load, the parts of the lifting equipment 6e can be carried in through the through-hole 2 and assembled and used inside the reactor containment vessel 1 by the joint work of the working robot 6a and the working robot 6d.
[0029] At this time, by suspending a camera 6c, the hoisting and lowering work can be monitored from outside the containment vessel 1.
[0030] It is also possible to replace the equipment inserted with the equipment previously inserted, without increasing the number of through-holes to be used. For example, after using the cutting tool 6b inserted in the first embodiment, it is also possible to retrieve the cutting tool 6b and insert the lifting equipment 6e from the through-hole 2b into which the cutting tool 6b was inserted, or to retrieve the camera 6c and insert the work robot 6d from the through-hole 2c. EXAMPLES
[0031] In the third embodiment, as the next stage, the working robot 6a1 that has been lowered to the bottom of the reactor containment vessel 1 is performing an investigation operation, as shown in FIGS. 3A and 3B.
[0032] Furthermore, in the work of FIGS. 3A and 3B, the working robot 6a1 that descended to the basement floor of the reactor containment vessel 1 in the second embodiment can be made to move on its own to inspect the inside and outside of the pedestal 15. EXAMPLES
[0033] In the fourth embodiment, as the next stage, the working robot 6a1 that has been lowered to the bottom of the reactor containment vessel 1 starts actual work after the investigation, as shown in Figs. 3A and 3B.
[0034] 3A and 3B, it is also possible to self-propel the work robot 6a1 that descended to the basement floor of the reactor containment vessel 1 in Example 2 and sample deposits inside and outside the pedestal 15 and attachments to structures that have fallen into the pedestal. The sampled deposits and attachments to the structures are placed in a container, and by removing only the container, it is also possible to reduce the number of times the device is carried in and out. EXAMPLES
[0035] In the fifth embodiment, as the next stage, when full-scale work begins inside the reactor containment vessel 1, a state in which cameras for confirmation are placed at various locations is shown in Figs. 4A and 4B.
[0036] In the case of Fig. 4A, the type of equipment introduced into the reactor containment vessel 1 may be the same as that in Fig. 3A, but here it is described that a new camera 6cn has been introduced through the penetration hole 2n. As a result, as shown in Fig. 4B, it is shown that multiple cameras 6c have been introduced into various places inside the reactor containment vessel 1. Note that the penetration hole 2 for introducing multiple cameras may use a different location for each camera 6, or may be a common location.
[0037] In the fifth embodiment, a camera 6cn or a camera-mounted robot 6an is carried into the reactor containment vessel 1 through a penetration hole 2n of the reactor containment vessel 1 that is not used in the first to fourth embodiments. As specific installation locations of the carried-in camera 6cn or the camera-mounted robot 6an, for example, it is preferable to install a camera 6c2 near the CRD carry-in / out entrance 18 of the pedestal, a camera 6c1 near the worker opening 19 on the basement floor, and a camera 6c3 near the CRD removal / insertion piping opening 20. By installing the camera at all or any of these openings, it is possible to check the inside of the pedestal 18.
[0038] It is also possible to replace the device inserted with the device inserted earlier, without increasing the number of through-holes to be used. For example, it is also possible to retrieve the cutting tool 6b and the camera 6c inserted in the first embodiment, and insert the camera 6cn or the camera-mounted robot 6an from the through-holes 2b and 2c from which the cutting tool 6b and the camera 6c have been retrieved. EXAMPLES
[0039] In the sixth embodiment, checking the vicinity of the vent pipe 24 will be described with reference to the partially enlarged views of Figs.
[0040] 5, when checking the inside of the vent pipe 24, the grating 9 above the jet differential 21 into which the deposits are thought to have flowed is cut in the same manner as in Example 1, and an opening 10 is opened. It is also possible to insert a camera 6c through the penetration hole 2 of an unused reactor containment vessel 1, and use a work robot 6a that has already been delivered or will be newly delivered to insert the camera 6c into the jet differential 21 from above the grating 9, and investigate the inside of the vent pipe 24.
[0041] In addition, in FIG. 6 which shows the same vent pipe 24 as in FIG. 5, if a sampling device 25 is inserted instead of the camera 6c, it is possible to sample the deposits inside the vent pipe 24.
[0042] Furthermore, in FIG. 7, which shows the same vent pipe 24 as in FIG. 5 and FIG. 6, if a new inspection robot 6a is inserted from an unused through hole, the inside of the vent pipe 24 can be confirmed to the very back. It is also possible to check whether sediments are flowing into Recess Chamber 3. EXAMPLES
[0043] In the seventh embodiment, confirmation of the state of the pedestal on the assumption that cooling water is pooled in the lower part of the containment vessel 1 will be described with reference to FIG.
[0044] As shown in Fig. 8, in this scene, a boat-type robot 29 equipped with a UT (ultrasonic) probe can be brought in through the penetration hole 2 of the reactor containment vessel 1 to check the condition of the pedestal 18. By bringing in a camera and lighting through a penetration hole other than the penetration hole 2 through which the boat-type robot 29 was brought in, it is possible to obtain an overview of the work situation. EXAMPLES
[0045] In the eighth embodiment, confirmation of the state of the pedestal on the assumption that cooling water is pooled in the lower part of the containment vessel 1 will also be described with reference to FIG.
[0046] 9, instead of the UT (ultrasonic) probe of the seventh embodiment, a boat-type robot 30 equipped with a core boring tool is introduced through the penetration hole 2 of the containment vessel 1, thereby making it possible to perform core sampling of the pedestal. Also, by introducing a camera and lighting through a penetration hole different from the penetration hole through which the boat-type robot equipped with a core boring tool is introduced, it is possible to obtain an overview of the working situation. EXAMPLES
[0047] In the ninth embodiment, the reinforcement when necessary will be described with reference to Figs. 10A and 10B.
[0048] Fig. 10A shows that sandbags 31, hoses 34, and work robots 6 have been carried into the containment vessel 1 through different penetration holes 2 for reinforcing various locations. Fig. 10B shows the state of the reinforcement work.
[0049] In this scene, sandbags 31 are brought into the reactor containment vessel 1 through a penetration hole 2 of the reactor containment vessel 1. The brought-in sandbags 31 are transported into the pedestal by a work robot 6 brought in through another penetration hole 2, and are then piled up in front of the pedestal 18 that needs reinforcement by the work robot 6 to create a dam 33.
[0050] It is also possible to carry a hose 34 for reinforcing material 35 such as dry mortar or geopolymer into the reactor containment vessel 1 through the penetration hole 2 of an unused reactor containment vessel 1, and inject the reinforcing material 35 such as dry mortar or geopolymer into a dam 33 made by piling up sandbags 31, thereby reinforcing the pedestal 18. EXAMPLES
[0051] Example 10 also relates to reinforcement when reinforcement is required. It shows a reinforcement method different from that of Example 9. In this case, as shown in FIG. 11, a dam 36 is made with sandbags at the worker opening 19 of the pedestal 18 in the same procedure as in Example 9, and a hose for a reinforcing material 35 such as dry mortar or geopolymer brought in through an unused through hole is brought into the pedestal 18, and the reinforcing material 35 such as dry mortar or geopolymer is injected into the pedestal 18 to reinforce the pedestal 18. The reinforcing material 35 such as dry mortar or geopolymer injected into the pedestal 18 is collected together with the deposits. EXAMPLES
[0052] In Example 11, the use of a common through hole will be described with reference to Fig. 12. In Examples 1 to 10, when a single through hole can have a plurality of openings, for example, when a single through hole 2 is drilled with a plurality of holes, guide pipes 37 are attached to the drilled holes, and equipment can be inserted through the guide pipes 37, it is also possible to use a combination of a plurality of guide pipes and a plurality of through holes for work.
[0053] When carrying devices or materials into the reactor containment vessel, it is advisable to divide the functions and carry in devices or materials according to the size of the penetration hole.
[0054] In addition, since multiple devices are carried in through multiple penetration holes, more complicated work can be performed by these cooperative operations. As an example, a first working device is carried in through a first penetration hole present in the reactor containment vessel, a second working device is carried in through a second penetration hole present in the reactor containment vessel, and the multiple working devices carry out cooperative work inside the reactor containment vessel by control signals from a control device that remotely operates the first working device and the second working device. Furthermore, if there is a third penetration hole, the third working device may be carried in, and if there are further multiple penetration holes, multiple working devices may be carried in. The control device may be provided at any location outside the reactor containment vessel. EXAMPLES
[0055] In Example 12, a grating cutting operation using a work robot will be described as a specific example of Example 1 with reference to Figures 2A, 2B, 13A, and 13B.
[0056] In Example 1, the first step is shown in which a work robot or the like enters the reactor containment vessel 1 through the penetration hole 2 and cuts the grating inside the reactor containment vessel to construct an opening that serves as an access route to the basement floor.
[0057] FIG. 2A shows a state in which devices such as a work robot 6a, a cutting tool 6b, and a camera 6c are inserted into the reactor containment vessel 1 through the penetration holes 2 from different penetration holes 2a, 2b, and 2c, respectively.
[0058] FIG. 2B shows the operation of cutting the grating 9 inside the reactor containment vessel 1 using a work robot 6a and a cutting tool 6b that have been brought into the reactor containment vessel 1 to create an opening 10 that serves as an access route to the basement floor.
[0059] Fig. 13A shows an example of the working robot 6a, cutting tool 6b, and camera 6c that have been inserted into the reactor containment vessel 1 in Fig. 2A, with the cutting tool 6b shown in plan and side views, and the camera 6c shown in front and side views. The working robot 6a is a hydraulically driven robot having four legs 38 and two arms 39. The legs and arms of the robot can be controlled to any position by driving multiple cylinders with supplied hydraulic pressure.
[0060] 13B shows the state where the work robot 6a has received the cutting tool 6b and camera 6c inside the reactor containment vessel 1. The work robot 6a uses its four legs 38 to move inside the reactor containment vessel 1, receives the cutting tool 6b and camera 6c that have been inserted into the reactor containment vessel 1 with its two arms 39, and moves to a predetermined location. After arriving at the predetermined location, the work robot 6a can use the cutting tool 6b that has been inserted into the reactor containment vessel 1 to cut the grating 9 and create an opening 10 that serves as an access route to the basement floor.
[0061] The above shows an example of a multi-legged robot as a means of movement within the reactor containment vessel, but the means of movement may be other than multi-legged, such as a crawler robot. Also, the above shows an example of a robot equipped with two arms carrying tools for work at the destination, but even if the robot has short arms, it is possible to perform work by switching the arms to hold the work tool. Furthermore, the above shows an example of a working robot that is hydraulically driven, but it may be an electric robot or other robot that is not hydraulically driven.
[0062] As shown in the above-described embodiment, in the present invention, the through hole for accessing the inside of the reactor containment vessel is In this case, multiple access openings to the reactor containment vessel are used. By using this, it is possible to expand the equipment that can be brought in and distribute the roles of the equipment. In addition, by dividing the roles of the device, it is possible to miniaturize the device. By inserting the , it becomes possible to combine the devices inside the reactor containment vessel. Even if a hole is occupied, work can be continued by inserting equipment and materials through other penetration holes. do. [Explanation of symbols]
[0063] 1: Nuclear containment vessel 2:Through hole 3: Suppression chamber 6: Equipment 9: Grating 10: Opening 15: Pedestal 18:CRD loading / unloading entrance 19: Worker opening 20: CRD pull-out and insertion pipe opening 24: Vent pipe 25: Sampling device
Claims
1. A method for working inside a reactor containment vessel in a nuclear power plant, comprising: Using multiple penetration holes in the reactor containment vessel, multiple devices or equipment can be inserted into the reactor 2. A method for working inside a nuclear reactor containment vessel, comprising: carrying a workpiece into the containment vessel.
2. 2. The method for working inside a nuclear reactor containment vessel according to claim 1, The reactor containment vessel is constructed by using the plurality of devices or equipment carried in through the plurality of penetration holes. Inspection of the reactor containment vessel, confirmation of the status of each part inside the reactor containment vessel, and sample of materials inside the reactor containment vessel Sampling, reinforcement of structures within the reactor containment vessel, removal of obstacles within the reactor containment vessel 2. A method for working inside a nuclear reactor containment vessel, comprising:
3. 2. The method for working inside a nuclear reactor containment vessel according to claim 1, The functions of the device to be carried into the reactor containment vessel are shared, depending on the size of the through hole. and carrying in an apparatus that has been installed in the reactor containment vessel.
4. 2. The method for working inside a nuclear reactor containment vessel according to claim 1, The fact that a plurality of the devices can cooperate in their operations within the reactor containment vessel A method for working inside a nuclear reactor containment vessel.
5. 3. The method for working inside a nuclear reactor containment vessel according to claim 2, An opening is formed in the grating by the device carried into the reactor containment vessel, and the front Lowering the device and inspecting the lower part of the reactor containment vessel and the suppression chamber; Confirmation of the conditions inside the suppression chamber, sampling of materials inside the reactor containment vessel , reinforcement of structures in the reactor containment vessel, removal of obstacles in the reactor containment vessel, 2. A method for working inside a nuclear reactor containment vessel, comprising the steps of:
6. A method for working inside a reactor containment vessel in a nuclear power plant, comprising: A first working device is carried in through a first penetration hole present in the reactor containment vessel; A second working device is carried in through a second penetration hole present in the reactor containment vessel; The first working device and the second working device are operated by a control signal from a control device that remotely operates the first working device and the second working device. The present invention is characterized in that a plurality of the work devices perform cooperative work inside the reactor containment vessel. Method of working inside the reactor containment vessel.
Citation Information
Patent Citations
Reactor containment vessel interior observation method
JP2013104817A