Air conditioning unit test equipment
The air conditioning unit testing device addresses inefficiencies in existing methods by simulating real-world conditions and accurately measuring performance, enhancing precision and reducing costs through a comprehensive simulation and measurement system.
Patent Information
- Application Number
- JP2024525105
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-04
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-12-31
AI Technical Summary
Existing air conditioning unit testing methods for railway vehicles are time-consuming, costly, and labor-intensive, with inaccurate results due to ideal analysis under limiting conditions, leading to inefficiencies and resource wastage.
An air conditioning unit testing device comprising an evaporation chamber cycle simulation system, condensation chamber cycle simulation system, and measurement control system, featuring adjustable components and sensors to simulate real-world conditions and accurately measure performance parameters.
The device enables precise calibration and verification of design parameters, reducing development cycles and resource waste by providing accurate test data and minimizing reworks.
Smart Images

Figure 2024538255000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of rail vehicle air conditioning unit test equipment technology, and in particular to an air conditioning unit test equipment. [Background technology]
[0002] At present, railway systems are developing very rapidly, and air conditioning units are basically installed in the interiors of railway passenger cars, including high-speed trains, super-fast trains, subways, high-speed intercity trains, etc. The installed air conditioning units differ according to the type of train, and the requirements for cooling capacity, evaporation, condensation air volume, etc. of the air conditioning units vary according to the type of car. However, all the air conditioning units installed in various types of railway passenger cars need to be performance tested in an air conditioning performance test room before design and installation, and during the test, the air inlet and outlet of the air conditioning unit are connected to the air duct of the test room to simulate the temperature, humidity, and power supply environments when the air conditioning unit operates on a train, so as to test whether each performance parameter of the air conditioning unit meets the design requirements.
[0003] In related technologies, after the design of an air conditioning unit is completed, only theoretical calculations and simulation analysis can be performed, but when determining the heat exchange effect and loss situation inside the air conditioning unit under relative conditions according to the limiting conditions set as an analytical model, only ideal analysis can be performed on the local conditions inside the air conditioning unit.
[0004] Therefore, it is necessary to design a test device to be set up for each different air conditioning unit, and only an ideal analysis can be made of the internal local conditions of the air conditioning unit, which is time-consuming, costly, labor-intensive, and causes a waste of resources; at the same time, there are large errors in the test results obtained, making it impossible to accurately calculate the heat exchange effect. Summary of the Invention [Problem to be solved by the invention]
[0005] SUMMARY OF THE PRESENT EMBODIMENT The present invention provides an air conditioning unit testing apparatus that can effectively solve the above and other potential technical problems. [Means for solving the problem]
[0006] The air conditioning unit test device provided by the present invention includes an evaporation chamber cycle simulation system, a condensation chamber cycle simulation system, and a measurement control system. The condensation chamber cycle simulation system includes a condensation chamber axial fan, an adjustable condensation tank, an adjustable condenser, and a compressor, the axial fan has an outlet communicating with the air inlet of the adjustable condensation tank through a first air supply line, the adjustable condensation tank has an outlet connected to the first air supply line, and the adjustable condenser is installed in the adjustable condensation tank, the evaporation chamber cycle simulation system includes an evaporation chamber axial fan, an adjustable evaporation tank, and an adjustable evaporator, the evaporation chamber axial fan has an outlet communicating with the air inlet of the adjustable evaporation tank through a second air supply line, the adjustable evaporation tank has an outlet connected to the second air supply line, and the adjustable evaporator is The condensation chamber cycle simulation system is provided in an adjustable evaporation tank, the compressor having a high pressure end communicating with an adjustable condenser, the compressor having a low pressure end communicating with an adjustable evaporator, the adjustable condenser communicating with the adjustable evaporator via a capillary refrigerant tube to cycle refrigerant between the adjustable condenser and the adjustable evaporator, and the measurement and control system includes a first measurement device and a second measurement device, the first measurement device is connected in the condensation chamber cycle simulation system and used to measure parameters of the condensation chamber cycle simulation system, and the second measurement device is connected in the evaporation chamber cycle simulation system and used to measure parameters of the evaporation chamber cycle simulation system.
[0007] In an optional embodiment, the first measuring device includes a first pitot tube air volume measuring device, a second pitot tube air volume measuring device, and a first temperature and humidity measuring device, the first temperature and humidity measuring device is provided in an adjustable condensation tank and arranged at upwind and downwind positions of the adjustable condenser, the first pitot tube air volume test device is provided in a first air supply pipe, and the second pitot tube air volume test device is provided in a first outlet pipe, the second measuring device includes a third pitot tube air volume measuring device, a fourth pitot tube air volume measuring device, and a second temperature and humidity measuring device, the second temperature and humidity measuring device is provided in an adjustable evaporation tank and arranged at upwind and downwind positions of the adjustable evaporator, the third pitot tube air volume test device is provided in a second air supply pipe, and the fourth pitot tube air volume test device is provided in a second outlet pipe. The first pitot tube airflow measuring device and the second pitot tube airflow measuring device are provided in the first intake duct and the first blow-out duct, respectively, to measure the air pressure in the first intake duct and the first blow-out duct, and calculate the airflow value according to the air pressure. At the same time, the first temperature and humidity measuring device is provided in the adjustable condensation tank and arranged at the windward and leeward positions of the adjustable condenser, to measure the temperature and humidity values in front and behind the adjustable condenser, and calculate the difference between the temperature and humidity values for use in calculating the cooling amount of the test device. The third pitot tube airflow measuring device and the fourth pitot tube airflow measuring device are provided in the second intake duct and the second blow-out duct, respectively, to measure the air pressure in the second intake duct and the second blow-out duct, and calculate the airflow value according to the air pressure. At the same time, a second temperature and humidity measuring device is provided in the adjustable evaporation tank and arranged at the windward and downwind positions of the adjustable evaporator to measure the temperature and humidity values in front of and behind the adjustable evaporator, and the difference between the temperature values and the difference between the humidity values are calculated for use in calculating the cooling amount of the test device.
[0008] In an optional embodiment, the condensation chamber cycle simulation system further includes a first straightening grid, the first straightening grid is provided in the first intake pipe and is used to make the airflow in the first intake pipe uniform by passing through the first straightening grid, and the evaporation chamber cycle simulation system further includes a second straightening grid, the second straightening grid is provided in the second intake pipe and is used to make the airflow in the second intake pipe uniform by passing through the second straightening grid. Note that the first straightening grid is provided in the first intake pipe, and based on the characteristics of the grid-like structure of the grid, the airflow entering the first intake pipe is made uniform, that is, the air can be diverted by the grid-like first straightening grid, thereby achieving the effect of making the airflow uniform. The second straightening grid is installed in the second air supply pipe, and based on the characteristics of the grid-like structure of the grid, the wind entering the second air supply pipe can be made uniform in airflow, that is, the wind can be diverted by the grid-like second straightening grid, thereby achieving the effect of making the airflow uniform.
[0009] In an optional embodiment, the condensation chamber cycle simulation system further includes a first straightening wire mesh, which is provided in the first air intake pipe and located at a downwind position of the first straightening grid, and is used to make the air flowing through the first straightening wire mesh uniform by passing through the first straightening wire mesh, and the evaporation chamber cycle simulation system further includes a second straightening wire mesh, which is provided in the second air intake pipe and located at a downwind position of the second straightening grid, and is used to make the air flowing through the second straightening wire mesh uniform by passing through the second straightening wire mesh. By providing the first straightening wire mesh at a downwind position of the first straightening grid, it is possible to easily achieve further uniformity of the air flow of the air entering the first air intake pipe. By providing a second straightening wire mesh at a position downwind of the second straightening grid, it is possible to easily achieve further uniformity of the airflow entering the second air supply duct.
[0010] In an alternative embodiment, the first pitot tube airflow test device is provided in the first air intake pipe and is located at the downwind position of the first straightening wire mesh, and the third pitot tube airflow test device is provided in the second air intake pipe and is located at the downwind position of the second straightening wire mesh. By providing the first pitot tube airflow test device in the first air intake pipe and located at the downwind position of the first straightening wire mesh, and the third pitot tube airflow test device in the second air intake pipe and located at the downwind position of the second straightening wire mesh, it becomes easier for the first pitot tube airflow test device and the third pitot tube airflow test device to collect uniform airflow, thereby collecting more accurate data.
[0011] In an alternative embodiment, a first diameter-changing connecting pipe is provided at the connecting position between the first intake duct and the outlet of the condensing chamber axial fan, and the first intake duct is connected to the first diameter-changing connecting pipe through a first flexible pipe, and a second diameter-changing connecting pipe is provided at the connecting position between the second intake duct and the outlet of the evaporating chamber axial fan, and the second intake duct is connected to the second diameter-changing connecting pipe through a second flexible pipe. The first diameter-changing connecting pipe is provided to connect the outlet of the condensing chamber axial fan and the first intake duct, which have different diameters, so that the diameters are the same. By providing the first flexible pipe, it is possible to easily realize the deviation and buffering to a certain extent, and it is more excellent in adjustability than the case of a hard pipe. The second diameter-changing connecting pipe is provided to connect the outlet of the evaporation chamber axial fan having a different diameter to the second air intake pipe so as to match the diameter. By providing the second soft pipe, it is possible to easily realize the misalignment and buffering to a certain extent, and it is more excellent in adjustability than the case of the hard pipe.
[0012] In an optional embodiment, the condensation chamber axial fan is provided with a first frequency converter for changing the frequency of the condensation chamber axial fan, and the evaporation chamber axial fan is provided with a second frequency converter for changing the frequency of the evaporation chamber axial fan. When the first frequency converter is provided, the frequency of the condensation chamber axial fan can be directly changed by the first frequency converter to adjust the airflow rate of the condensation chamber cycle simulation system. When the second frequency converter is provided, the frequency of the evaporation chamber axial fan can be directly changed by the second frequency converter to adjust the airflow rate of the evaporation chamber cycle simulation system.
[0013] In an optional embodiment, both ends of the adjustable condensation tank are provided with a third diameter change connecting pipe and a third flexible pipe, and both ends of the adjustable condensation tank are connected to the first air supply line and the first blow-off line through the third diameter change connecting pipe and the third flexible pipe in sequence; both ends of the adjustable evaporation tank are provided with a fourth diameter change connecting pipe and a fourth flexible pipe, and both ends of the adjustable evaporation tank are connected to the second air supply line and the second blow-off line through the fourth diameter change connecting pipe and the fourth flexible pipe in sequence. and / or the condensation chamber cycle simulation system further comprises a first air flow rate adjustment plate provided at the outlet of the first outlet duct, and the evaporation chamber cycle simulation system further comprises a second air flow rate adjustment plate provided at the outlet of the second outlet duct, and / or the condensation chamber cycle simulation system further comprises a first wheeled plate and a second wheeled plate, the condensation chamber axial fan is connected to the first wheeled plate via a first fan support seat, and the first the air intake pipe is connected to the first wheeled plate via a first air intake pipe holder, the adjustable condensation tank is connected to the second wheeled plate via a first base, and the first outlet pipe is connected to the second wheeled plate via a first outlet pipe holder; the evaporation chamber cycle simulation system further comprises a third wheeled plate, a fourth wheeled plate, a second air intake pipe holder, and a second outlet pipe holder; the evaporation chamber axial fan is connected to the third wheeled plate via a second fan support base, the adjustable evaporation tank is connected to the fourth wheeled plate via a second base, the second air intake pipe holder is used to support the second air intake pipe line, and the second outlet pipe holder is used to support the second outlet pipe line; and / or the air conditioning unit test apparatus further comprises a power supply system for powering the condensation chamber cycle simulation system, the evaporation chamber cycle simulation system, and the measurement and control system. In addition, a third diameter-changing connecting pipe is provided for connecting the first air supply line and the first air discharge line, which have different diameters, to the adjustable condensation tank.The provision of the third soft pipe allows for easy realization of flexible connection, and allows for easy realization of misalignment and buffering to a certain degree, which is more excellent in adjustability than the case of the hard pipe. The fourth diameter-changing connecting pipe is provided to connect the second air supply pipe and the second blow-out pipe of different diameters to the adjustable evaporation tank. The provision of the fourth soft pipe allows for easy realization of flexible connection, and allows for easy realization of misalignment and buffering to a certain degree, which is more excellent in adjustability than the case of the hard pipe. The first air volume adjustment plate is provided to adjust the air volume in the condensation chamber cycle simulation system by limiting the blow-out volume by blocking the blow-out port to different degrees, and to play the role of air volume adjustment. The first air volume adjustment plate is used in combination with the first frequency converter to better adjust the air volume in the condensation chamber cycle simulation system to reach the desired air volume. The second airflow adjustment plate is provided to adjust the airflow in the evaporation chamber cycle simulation system by restricting the airflow by shielding the air outlet to different degrees, and to play the role of airflow adjustment. When the second airflow adjustment plate is used in combination with the second frequency converter, the airflow in the evaporation chamber cycle simulation system can be better adjusted to reach the desired airflow. In addition, the first wheeled plate and the second wheeled plate are provided for moving the condensation chamber cycle simulation system into a preset test room that can be adjusted to the temperature and humidity values of the outdoor environment to perform testing. The third wheeled plate and the fourth wheeled plate are provided for moving the evaporation chamber axial fan and the adjustable evaporation tank into a preset test room that can be adjusted to the temperature and humidity values of the indoor environment to perform testing. The power supply system is provided for powering the condensation chamber cycle simulation system, the evaporation chamber cycle simulation system, and the measurement and control system.
[0014] In an optional embodiment, the adjustable condenser includes a plurality of groups of condensing assemblies arranged in an array along the radial direction of the inner cavity of the adjustable condensing tank, and each group of condensing assemblies is provided with an independent switch, and the adjustable evaporator includes a plurality of groups of evaporating assemblies arranged in an array along the radial direction of the inner cavity of the adjustable condensing tank, and each group of evaporating assemblies is provided with an independent switch. By making the adjustable condenser include a plurality of groups of condensing assemblies arranged in an array along the radial direction of the inner cavity of the adjustable condensing tank, i.e., along the cross-sectional direction of the wind, it is easy to realize a better heat exchange of the air volume. At the same time, each group of condensing assemblies is provided with an independent switch, and the coolant passing area in the condenser is controlled by adjusting the independent switch, i.e., the heat exchange area is adjusted. By making the adjustable evaporator include a plurality of groups of evaporating assemblies arranged in an array along the radial direction of the inner cavity of the adjustable evaporating tank, i.e., along the cross-sectional direction of the wind, it is easy to realize a better heat exchange of the air volume. At the same time, each group of evaporating assemblies is provided with an independent switch, and the coolant passing area in the evaporator is controlled by adjusting the independent switch, i.e., the heat exchange area is adjusted.
[0015] In an optional embodiment, the adjustable condenser further comprises a first shielding plate for shielding the condensing assembly, the first shielding plate being removably connected to the condensing assembly and used to shield the closed condensing assembly, and the adjustable evaporator further comprises a second shielding plate for shielding the evaporating assembly, the second shielding plate being removably connected to the evaporating assembly and used to shield the closed condensing assembly, the first shielding plate being removably connected to the condensing assembly and used to shield the closed condensing assembly, i.e., the first shielding plate is removably connected to the evaporating assembly and used to cover the closed condensing assembly, i.e., the first shielding plate is covered by the condensing assembly that is not passing refrigerant, thereby reducing the dead pass area, and the second shielding plate is removably connected to the evaporating assembly and used to shield the closed evaporating assembly, i.e., the second shielding plate is covered by the evaporating assembly that is not passing refrigerant, thereby reducing the dead pass area. Effect of the Invention
[0016] An air conditioning unit test device provided by an embodiment of the present disclosure includes an evaporation chamber cycle simulation system, a condensation chamber cycle simulation system, and a measurement and control system, the condensation chamber cycle simulation system includes a condensation chamber axial fan, an adjustable condensation tank, an adjustable condenser, and a compressor, the evaporation chamber cycle simulation system includes an evaporation chamber axial fan, an adjustable evaporation tank, and an adjustable evaporator, the compressor has a high pressure end communicating with the adjustable condenser, the compressor has a low pressure end communicating with the adjustable evaporator, the adjustable condenser communicates with the adjustable evaporator through a capillary refrigerant tube to cycle refrigerant between the adjustable condenser and the adjustable evaporator, and the measurement and control system includes a first measurement device connected in the condensation chamber cycle simulation system and a second measurement device connected in the evaporation chamber cycle simulation system. During the test, the evaporation chamber cycle simulation system is used to simulate the indoor unit of the air conditioner, the condensation chamber cycle simulation system is used to simulate the outdoor unit of the air conditioner, and the first measuring device is connected in the condensation chamber cycle simulation system, and the second measuring device is connected in the evaporation chamber cycle simulation system, the evaporation chamber cycle simulation system is arranged in a first test room that can simulate the train indoor environment, and the condensation chamber cycle simulation system is arranged in a second test room that can simulate the train outdoor environment, and the condensation chamber axial fan, the adjustable condenser, the evaporation chamber axial fan, the adjustable evaporator, and the compressor are adjusted according to the parameters to be verified, and the first measuring device and the second measuring device are used to measure the difference between the wind pressure value and the temperature value and the difference between the humidity value, thereby calculating the air volume value and the cooling amount value, thereby achieving the purpose of calibrating and checking the design parameters, verifying the design idea, providing test data, reducing the risk of changes and rework after the prototype is prototyped, and reducing losses. At the same time, the simulation test verification can be carried out at any time according to the needs of the design, shortening the development cycle and obtaining test data early.
[0017] Advantages of additional aspects of the invention will be set forth in part in the description which follows and in part will be obvious from the description, or may be learned by practice of the invention. [Brief description of the drawings]
[0018] These and other objects, features and advantages of embodiments of the present invention will be more readily understood by reference to the following detailed description of the drawings in which several embodiments of the present invention are illustrated, by way of example and not limitation, in which: [Figure 1] FIG. 2 is a structural schematic diagram of a condensation chamber cycle simulation system of an air-conditioning unit testing apparatus provided by an embodiment of the present disclosure; [Diagram 2] FIG. 2 is a structural schematic diagram of an evaporation chamber cycle simulation system of an air-conditioning unit testing apparatus provided by an embodiment of the present disclosure; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, the embodiments of the present invention will be described in detail. Examples according to the embodiments are shown in the drawings, and the same or similar reference numerals throughout indicate the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the drawings are illustrative and intended to explain the present invention, and are not to be construed as limiting the present invention.
[0020] In describing the present invention, it should be understood that orientations or positional relationships indicated by terms such as "length", "width", "thickness", "upper", "lower", "front", "rear", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like are based on orientations or positional relationships shown in the drawings, and are merely for ease and simplification of description of the present invention, and are not to be understood as limiting the present invention, as they do not expressly or imply that the devices or elements shown are required to have, be configured, or operate in a particular orientation.
[0021] Additionally, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as expressing or implying a relative importance or number of technical features being presented. Thus, a feature defined by "first" or "second" can explicitly or implicitly include at least one of the feature. In the description of the present invention, "plurality" means at least two, e.g., two, three, etc., unless otherwise limited.
[0022] In the present invention, the terms "attached", "coupled", "connected", "fixed" and the like should be understood in a broad sense unless otherwise clearly defined and limited, and may mean, for example, fixedly connected, detachably connected, or integrated, mechanically connected, directly connected, indirectly connected via an intermediate medium, internal communication between two elements, or an interactive relationship between two elements. A person skilled in the art can understand the specific meaning of the above terms in the present invention according to the situation.
[0023] In the present description, a statement referring to terms such as "one embodiment," "some embodiments," "examples," "specific examples," or "some examples" means that a particular feature, structure, material, or characteristic described with reference to the embodiment or example is included in at least one embodiment or example of the present invention. In this specification, general expressions of the above terms do not necessarily refer to the same embodiment or example. In addition, a particular feature, structure, material, or characteristic described may be incorporated in any one or more embodiments or examples in an appropriate manner. Furthermore, a person skilled in the art may combine and combine the various embodiments or examples described herein and the features of the various embodiments or examples without mutual inconsistency.
[0024] In the related art, after the design of an air conditioning unit is completed, only theoretical calculation and simulation analysis can be performed, but when determining the heat exchange effect and loss situation inside the air conditioning unit under relative conditions according to the limiting conditions set as an analysis model, only ideal analysis can be performed on the local state inside the air conditioning unit, so it is necessary to design a test device set with different air conditioning units, and only ideal analysis can be performed on the local state inside the air conditioning unit, which is time-consuming, costly, labor-intensive, and causes a waste of resources, and at the same time, there is a large error in the obtained test results, making it impossible to accurately calculate the heat exchange effect.
[0025] In view of this, the air conditioning unit testing device provided in the embodiments of the present application is equipped with a condensation chamber cycle simulation system and an evaporation chamber cycle simulation system, which respectively simulate the outdoor unit and indoor unit of an air conditioner, and measures the parameters of the indoor unit and the outdoor unit through a measurement and control system to achieve the purpose of calibrating and checking the design parameters.
[0026] Specifically, the air conditioning unit test device provided by the embodiment of the present disclosure includes an evaporation chamber cycle simulation system, a condensation chamber cycle simulation system, and a measurement control system. The condensation chamber cycle simulation system includes a condensation chamber axial fan, an adjustable condensation tank, an adjustable condenser, and a compressor, the evaporation chamber cycle simulation system includes an evaporation chamber axial fan, an adjustable evaporation tank, and an adjustable evaporator, the compressor communicates with the adjustable condenser at a high pressure end, the compressor communicates with the adjustable evaporator at a low pressure end, the adjustable condenser communicates with the adjustable evaporator through a capillary refrigerant tube to cycle the refrigerant between the adjustable condenser and the adjustable evaporator, and the measurement control system includes a first measurement device connected in the condensation chamber cycle simulation system and a second measurement device connected in the evaporation chamber cycle simulation system. During the test, the evaporation chamber cycle simulation system is used to simulate the indoor unit of the air conditioner, and the condensation chamber cycle simulation system is used to simulate the outdoor unit of the air conditioner, and the first measuring device is connected in the condensation chamber cycle simulation system, and the second measuring device is connected in the evaporation chamber cycle simulation system, the evaporation chamber cycle simulation system is arranged in a first test room that can simulate the environment inside the train cabin, and the condensation chamber cycle simulation system is arranged in a second test room that can simulate the environment outside the train cabin, and the condensation chamber axial fan, the adjustable condenser, the evaporation chamber axial fan, the adjustable evaporator, and the compressor are adjusted according to the parameters to be verified, and the first measuring device and the second measuring device are used to measure the difference between the wind pressure value and the temperature value and the difference between the humidity value, thereby calculating the wind volume value and the cooling amount value, thereby achieving the purpose of calibrating and checking the design parameters, verifying the design idea, providing test data, reducing the risk of changes and rework after the prototype is prototyped, and reducing losses. At the same time, the simulation test verification can be carried out at any time according to the needs of the design, shortening the development cycle and obtaining test data early.
[0027] Please refer to Figures 1 and 2. The air conditioning unit test device provided by the embodiment of the present application includes a condensation chamber cycle simulation system 11, an evaporation chamber cycle simulation system 13, and a measurement and control system, the condensation chamber cycle simulation system 11 includes a condensation chamber axial fan 111, an adjustable condensation tank 112, an adjustable condenser 113, and a compressor, the axial fan has an outlet connected to the intake port of the adjustable condensation tank 112 through a first intake pipe 114, the adjustable condensation tank 112 has an outlet connected to a first outlet pipe 115, and the adjustable condensation tank 112 has an outlet connected to a second outlet pipe 116. The adjustable condenser 113 is provided in the adjustable condensing tank 112, and the evaporation chamber cycle simulation system 13 includes an evaporation chamber axial fan 131, an adjustable evaporation tank 132, and an adjustable evaporator 133, and the evaporation chamber axial fan 131 has an outlet connected to the air intake port of the adjustable evaporation tank 132 via a second air intake pipe 134, the adjustable evaporation tank 132 has an outlet connected to the second air intake pipe 135, and the adjustable evaporator 133 is provided in the adjustable evaporation tank 132.
[0028] The compressor has a high pressure end communicating with an adjustable condenser 113, and a low pressure end communicating with an adjustable evaporator 133, the adjustable condenser 113 communicating with the adjustable evaporator 133 via a capillary refrigerant tube for cycling refrigerant between the adjustable condenser 113 and the adjustable evaporator 133, and the measurement and control system includes a first measurement device and a second measurement device, the first measurement device being connected in the condensation chamber cycle simulation system 11 and used to measure parameters of the condensation chamber cycle simulation system 11, and the second measurement device being connected in the evaporation chamber cycle simulation system 13 and used to measure parameters of the evaporation chamber cycle simulation system 13.
[0029] The present disclosure provides an air conditioning unit test device including a condensation chamber cycle simulation system 11, the condensation chamber cycle simulation system 11 including a condensation chamber axial fan 111, an adjustable condensation tank 112, an adjustable condenser 113, and a compressor, the axial fan has an outlet communicating with an air inlet of the adjustable condensation tank 112 through a first air inlet line 114, the adjustable condensation tank 112 has an outlet connecting with a first air outlet line 115, and the adjustable condenser 113 is disposed in the adjustable condensation tank 112. The compressor has a high pressure end communicating with the adjustable condenser 113, the compressor has a low pressure end communicating with an adjustable evaporator 133, and the adjustable condenser 113 communicates with the adjustable evaporator 133 through a capillary refrigerant tube to cycle the refrigerant between the adjustable condenser 113 and the adjustable evaporator 133. The condensation chamber cycle simulation system 11 is used to simulate the outdoor unit of an air conditioner, and the condensation chamber axial fan 111 sends a desired amount of air into the condensation chamber cycle simulation system 11, and the air passes through an adjustable condenser 113 in an adjustable condensing tank 112 to complete heat exchange, and is finally discharged via a first outlet pipe 115. The test parameters are verified using a first measuring device by adjusting the condensation chamber axial fan 111 and the adjustable condenser 113 to match the test parameters.
[0030] For example, the condensation chamber axial fan 111 is provided with a first frequency converter for changing the frequency of the condensation chamber axial fan 111. When the first frequency converter is provided, the frequency of the condensation chamber axial fan 111 can be directly changed by the first frequency converter when adjusting the airflow rate, thereby realizing adjustment of the airflow rate of the condensation chamber cycle simulation system 11.
[0031] For example, the condensation chamber axial fan 111 is provided with a push button switch, an electromagnetic contactor, and an overcurrent relay. The push button switch is electrically connected to the electromagnetic contactor, and the push button switch controls the attraction or disconnection of the electromagnetic contactor to realize the opening and closing of the condensation chamber axial fan 111. The overcurrent relay is electrically connected to the condensation chamber axial fan 111 and is used to prevent damage to products and equipment caused by overcurrent failure.
[0032] For example, the condensation chamber cycle simulation system 11 further includes a first air flow rate adjustment plate 116 provided at the outlet of the first outlet pipe 115. The first air flow rate adjustment plate 116 is provided to adjust the air flow rate in the condensation chamber cycle simulation system 11 by restricting the air flow rate by blocking the outlet to different degrees. When the first air flow rate adjustment plate 116 is used in combination with the first frequency converter, the air flow rate in the condensation chamber cycle simulation system 11 can be better adjusted to reach a desired air flow rate.
[0033] For example, the adjustable condenser 113 includes a plurality of groups of condensing assemblies arranged in an array along the radial direction of the inner cavity of the adjustable condensing tank 112, and each group of condensing assemblies is provided with an independent switch. The adjustable condenser 113 includes a plurality of groups of condensing assemblies arranged in an array along the radial direction of the inner cavity of the adjustable condensing tank 112, i.e., along the cross-sectional direction of the wind, so that it is easy to better realize the heat exchange of the air volume. At the same time, each group of condensing assemblies is provided with an independent switch, and the coolant passing area in the condenser is controlled by adjusting the independent switch, i.e., the heat exchange area is adjusted.
[0034] Exemplarily, the adjustable condenser 113 further includes a first shielding plate for shielding the condensing assembly, the first shielding plate being removably connected to the condensing assembly and used to shield the closed condensing assembly, i.e., the first shielding plate covers the condensing assembly that is not passing the refrigerant therethrough, thereby reducing the dead pass area.
[0035] Illustratively, the adjustable condenser 113 includes 10 groups of condensation assemblies arranged in an array, and during testing, adaptively closes a predetermined number of groups of condensation assemblies as needed, and covers and shields the closed condensation assemblies with a first shielding plate, illustratively achieving covering and shielding the condensation assemblies by bolting the first shielding plate to the closed condensation assemblies.
[0036] The condensation chamber cycle simulation system 11 provided by the present disclosure includes a compressor, the high pressure end of which communicates with an adjustable condenser 113, the low pressure end of which communicates with an adjustable evaporator 133, and the adjustable condenser 113 communicates with the adjustable evaporator 133 through a capillary refrigerant tube to cycle a refrigerant between the adjustable condenser 113 and the adjustable evaporator 133. In addition, the heat exchange is realized by providing a compressor for driving the refrigerant to cycle between the adjustable condenser 113 and the adjustable evaporator 133 to cycle the refrigerant between the adjustable condenser 113 and the adjustable evaporator 133.
[0037] For example, the compressor is provided with a push button switch, an electromagnetic contactor, and an overcurrent relay, the push button switch is electrically connected to the electromagnetic contactor, and the push button switch controls the attraction or disconnection of the electromagnetic contactor to realize opening and closing of the compressor, and the overcurrent relay is electrically connected to the compressor and is used to prevent damage to products and equipment caused by overcurrent faults.
[0038] Exemplarily, the compressor is further provided with a frequency converter, and the operating frequency of the compressor is set by the frequency converter to cause the compressor to output different powers, thereby controlling the flow rate of the refrigerant in the pipes.
[0039] The first air intake pipe 114 provided by the present disclosure is used to convey the air to the condensation tank 112, which can adjust the air volume of the condensation chamber axial flow fan 111. Exemplarily, a first diameter change connecting pipe 1141 is provided at the connecting position between the first air intake pipe 114 and the outlet of the condensation chamber axial flow fan 111, and the first air intake pipe 114 is connected to the first diameter change connecting pipe 1141 by a first soft pipe 1142. The first diameter change connecting pipe 1141 is provided to connect the outlet of the condensation chamber axial flow fan 111, which has a different diameter, to the first air intake pipe 114 so that the diameters match. By providing the first soft pipe 1142, it is possible to easily realize the misalignment and buffering to a certain extent, and the adjustability is superior to the case of a hard pipe.
[0040] For example, the condensation chamber cycle simulation system 11 further includes a first straightening grid 1143, which is provided in the first air intake pipe 114 and is used to make the airflow uniform by passing through the first straightening grid 1143 when the airflow flows through the first air intake pipe 114. The first straightening grid 1143 is provided in the first air intake pipe 114 and, based on the characteristics of the grid-like structure of the grid, makes the airflow uniform when the airflow enters the first air intake pipe 114, i.e., the airflow can be diverted by the grid-like first straightening grid 1143, thereby achieving the effect of making the airflow uniform.
[0041] For example, the condensation chamber cycle simulation system 11 further includes a first straightening wire mesh 1144, which is provided in the first air supply pipe 114 and located at a downwind position of the first straightening grid 1143, and is used to make the air flowing through the first straightening wire mesh 1144 uniform by passing through the first straightening wire mesh 1144. Note that, by providing the first straightening wire mesh 1144 at a downwind position of the first straightening grid 1143, it is possible to easily realize further uniformity of the air flow of the air entering the first air supply pipe 114.
[0042] Illustratively, the adjustable condensation tank 112 may be a cylindrical structure that is open at both ends. Illustratively, the present specification is not limited to a particular structure or shape of the adjustable condensation tank 112. In other specific embodiments, depending on the needs of a user, the adjustable condensation tank 112 may be of other suitable shapes, as long as the adjustable condensation tank 112 can accommodate the adjustable condenser 113 and complete the heat exchange within the adjustable condensation tank 112.
[0043] For example, both ends of the adjustable condensation tank 112 are provided with a third diameter-changing connecting pipe 1121 and a third soft pipe 1122, and both ends of the adjustable condensation tank 112 are connected to the first air intake pipe 114 and the first air intake pipe 114 through the third diameter-changing connecting pipe 1121 and the third soft pipe 1122 in sequence. The third diameter-changing connecting pipe 1121 is provided to connect the first air intake pipe 114 and the first blowing pipe 115 of different diameters to the adjustable condensation tank 112. By providing the third soft pipe 1122, a flexible connection can be easily realized, and deviation and buffering can be easily realized to a certain extent, and the adjustability is better than that of a hard pipe.
[0044] Exemplarily, the condensing chamber cycle simulation system 11 further includes a first wheeled plate 117 and a second wheeled plate 118, in which the condensing chamber axial flow fan 111 is connected to the first wheeled plate 117 via a first fan support seat 1171, the first air intake pipe 114 is connected to the first wheeled plate 117 via a first air intake pipe holder 1173, the adjustable condensing tank 112 is connected to the second wheeled plate 118 via a first base 1181, and the first blow-off pipe 115 is connected to the second wheeled plate 118 via a first blow-off pipe holder 1183. The first wheeled plate 117 and the second wheeled plate 118 are provided to move the condensing chamber cycle simulation system 11 into a preset test room that can be adjusted to an outdoor environment for testing.
[0045] The present disclosure provides an air conditioning unit testing apparatus including an evaporation chamber cycle simulation system 13, the evaporation chamber cycle simulation system 13 including an evaporation chamber axial fan 131, an adjustable evaporation tank 132, and an adjustable evaporator 133, the evaporation chamber axial fan 131 having an outlet connected to the air intake port of the adjustable evaporation tank 132 via a second air intake line 134, the adjustable evaporation tank 132 having an outlet connected to the second air intake line 135, and the adjustable evaporator 133 being provided within the adjustable evaporation tank 132. The evaporation chamber cycle simulation system 13 is used to simulate an indoor unit of an air conditioner, and the evaporation chamber axial fan 131 sends a desired amount of air into the evaporation chamber cycle simulation system 13, and the air passes through an adjustable evaporator 133 in an adjustable evaporation tank 132 to complete heat exchange, and is finally discharged via a second outlet pipe 135. The evaporation chamber axial fan 131 and the adjustable evaporator 133 are adjusted to match the test parameters, and the test parameters are verified using a second measuring device.
[0046] For example, the evaporation chamber axial fan 131 is provided with a second frequency converter for changing the frequency of the evaporation chamber axial fan 131. When the second frequency converter is provided, the frequency of the evaporation chamber axial fan 131 can be directly changed by the second frequency converter when adjusting the airflow rate, thereby realizing adjustment of the airflow rate of the evaporation chamber cycle simulation system 13.
[0047] For example, the evaporation chamber axial fan 131 is provided with a push button switch, an electromagnetic contactor, and an overcurrent relay. The push button switch is electrically connected to the electromagnetic contactor, and the push button switch controls the attraction or disconnection of the electromagnetic contactor to realize the opening and closing of the evaporation chamber axial fan 131. The overcurrent relay is electrically connected to the evaporation chamber axial fan 131 and is used to prevent damage to products and equipment caused by overcurrent failure.
[0048] For example, the evaporation chamber cycle simulation system 13 further includes a second air flow rate adjustment plate 136 provided at the outlet of the second outlet pipe 135. The second air flow rate adjustment plate 136 is provided to adjust the air flow rate in the evaporation chamber cycle simulation system 13 by restricting the air flow rate by blocking the outlet to different degrees. When the second air flow rate adjustment plate 136 is used in combination with the second frequency converter, the air flow rate in the evaporation chamber cycle simulation system 13 can be better adjusted to reach a desired air flow rate.
[0049] For example, the adjustable evaporator 133 includes a plurality of groups of evaporative assemblies arranged in an array along the radial direction of the inner cavity of the adjustable evaporative tank 132, and each group of evaporative assemblies is provided with an independent switch. The adjustable evaporator 133 includes a plurality of groups of evaporative assemblies arranged in an array along the radial direction of the inner cavity of the adjustable evaporative tank 132, i.e., along the cross-sectional direction of the wind, so that it is easy to better realize the heat exchange of the air volume. At the same time, each group of evaporative assemblies is provided with an independent switch, and the refrigerant passing area in the evaporator is controlled by adjusting the independent switch, i.e., the heat exchange area is adjusted.
[0050] Exemplarily, the adjustable evaporator 133 further includes a second shielding plate for shielding the evaporating assembly, which is removably connected to the evaporating assembly and used to shield the closed evaporating assembly, i.e., the second shielding plate covers the evaporating assembly that is not passing the refrigerant with the second shielding plate, thereby reducing the dead passage area.
[0051] Exemplarily, the adjustable evaporator 133 includes 10 groups of evaporation assemblies arranged in an array, and during testing, a predetermined number of groups of evaporation assemblies are adaptively closed as needed, and the closed cold evaporation assemblies are covered and shielded with a second shielding plate, exemplarily, the covering and shielding of the evaporation assemblies can be achieved by bolting the second shielding plate to the closed evaporation assemblies.
[0052] The second air intake pipe 134 provided by the present disclosure is used to convey the air from the evaporation chamber axial flow fan 131 to the evaporation tank 132, which can adjust the air volume. Exemplarily, a second diameter change connecting pipe 1341 is provided at the connecting position between the second air intake pipe 134 and the outlet of the evaporation chamber axial flow fan 131, and the second air intake pipe 134 is connected to the second diameter change connecting pipe 1341 by a second soft pipe 1342. The second diameter change connecting pipe 1341 is provided to connect the outlet of the evaporation chamber axial flow fan 131, which has a different diameter, to the second air intake pipe 134 so that the diameters match. By providing the second soft pipe 1342, it is possible to easily realize the misalignment and buffering to a certain extent, and the adjustability is superior to the case of a hard pipe.
[0053] For example, the evaporation chamber cycle simulation system 13 further includes a second straightening grid 1343, which is provided in the second air intake pipe 134 and is used to make the airflow uniform by passing through the second straightening grid 1343 when the airflow flows through the second air intake pipe 134. The second straightening grid 1343 is provided in the second air intake pipe 134 and, based on the characteristics of the grid-like structure of the grid, makes the airflow uniform when the airflow enters the second air intake pipe 134, that is, the airflow can be diverted by the grid-like second straightening grid 1343, thereby achieving the effect of making the airflow uniform.
[0054] For example, the evaporation chamber cycle simulation system 13 further includes a second straightening wire mesh 1344, which is provided in the second air supply pipe 134 and located at a downwind position of the second straightening grid 1343, and is used to make the air flowing through the second straightening wire mesh 1344 uniform by passing through the second straightening wire mesh 1344. By providing the second straightening wire mesh 1344 at a downwind position of the second straightening grid 1343, it is possible to easily realize further uniformization of the air flow of the air entering the second air supply pipe 134.
[0055] Illustratively, the adjustable evaporative tank 132 may be a cylindrical structure with both ends open. Illustratively, the present specification does not limit the specific structure or shape of the adjustable evaporative tank 132. In other specific embodiments, according to the needs of a user, the adjustable evaporative tank 132 may be in other suitable shapes, as long as the adjustable evaporative tank 132 can accommodate the adjustable evaporator 133 and achieve the completion of heat exchange within the adjustable evaporative tank 132.
[0056] For example, both ends of the adjustable evaporation tank 132 are provided with a fourth diameter change connecting pipe 1321 and a fourth soft pipe 1322, and both ends of the adjustable evaporation tank 132 are connected to the second air supply pipe 134 and the second blowing pipe 135 through the fourth diameter change connecting pipe 1321 and the fourth soft pipe 1322 in sequence. The fourth diameter change connecting pipe 1321 is provided to connect the second air supply pipe 134 and the second blowing pipe 135 of different diameters to the adjustable evaporation tank 132, and the fourth soft pipe 1322 can easily realize a flexible connection, and can easily realize deviation and buffering to a certain extent, and is more excellent in adjustability than the case of a hard pipe.
[0057] The evaporation chamber cycle simulation system 13 further includes a third wheeled plate 137, a fourth wheeled plate 138, a second air intake pipe holder 1371, and a second blow-off pipe holder 1373, the evaporation chamber axial flow fan 131 is connected to the third wheeled plate 137 through a second fan support seat 1372, the adjustable evaporation tank 132 is connected to the fourth wheeled plate 138 through a second base 1381, the second air intake pipe holder 1371 is used to support the second air intake pipe line, and the second blow-off pipe holder 1373 is used to support the second blow-off pipe line 135. The third wheeled plate 137 and the fourth wheeled plate 138 are used to move the evaporation chamber axial flow fan 131 and the adjustable evaporation tank 132.
[0058] The measurement and control system provided by the present disclosure includes a first measurement device and a second measurement device, the first measurement device is connected into the condensation chamber cycle simulation system 11 and used to measure parameters of the condensation chamber cycle simulation system 11, and the second measurement device is connected into the evaporation chamber cycle simulation system 13 and used to measure parameters of the evaporation chamber cycle simulation system 13. During the test, the temperature value difference, the humidity value difference and the wind pressure value are measured by the first measurement device and the second measurement device, thereby calculating the blowing amount value and the cooling amount value, thereby achieving the purpose of calibrating and checking the design parameters and verifying the accuracy of the design idea.
[0059] For example, the first measuring device includes a first pitot tube airflow measuring device 151, a second pitot tube airflow measuring device 153, and a first temperature and humidity measuring device 153, the first temperature and humidity measuring device 153 is provided in the adjustable condensation tank 112 and arranged at the windward position and the downwind position of the adjustable condenser 113, the first pitot tube airflow test device is provided in the first intake pipe 114, and the second pitot tube airflow test device is provided in the first blowout pipe 115. The first pitot tube airflow measuring device 151 and the second pitot tube airflow measuring device 153 are provided in the first intake pipe 114 and the first blowout pipe 115, respectively, to measure the wind pressure in the first intake pipe 114 and the first blowout pipe 115, and calculate the airflow value according to the wind pressure. At the same time, the first temperature and humidity measuring device 153 is installed in the adjustable condensation tank 112 and arranged at the windward and downwind positions of the adjustable condenser 113, thereby measuring the temperature and humidity values in front of and behind the adjustable condenser 113, and calculating the difference between the temperature values and the difference between the humidity values for use in calculating the cooling amount of the test apparatus.
[0060] For example, the second measuring device includes a third pitot tube airflow measuring device 161, a fourth pitot tube airflow measuring device 162, and a second temperature and humidity measuring device 163, the second temperature and humidity measuring device 163 is provided in the adjustable evaporation tank 132 and arranged at the windward position and the downwind position of the adjustable evaporator 133, the third pitot tube airflow test device is provided in the second intake duct 134, and the fourth pitot tube airflow test device is provided in the second blowout duct 135. The third pitot tube airflow measuring device 161 and the fourth pitot tube airflow measuring device 162 are provided in the second intake duct 134 and the second blowout duct 135, respectively, to measure the wind pressure in the second intake duct 134 and the second blowout duct 135, and calculate the airflow value according to the wind pressure. At the same time, the second temperature and humidity measuring device 163 is installed in the adjustable evaporation tank 132 and arranged at the windward and downwind positions of the adjustable evaporator 133, thereby measuring the temperature and humidity values in front of and behind the adjustable evaporator 133, and calculating the difference between the temperature values and the difference between the humidity values for use in calculating the cooling amount of the test apparatus.
[0061] Specifically, in this embodiment, the first pitot tube air volume measuring device 151, the second pitot tube air volume measuring device 153, the third pitot tube air volume measuring device 161, and the fourth pitot tube air volume measuring device 162 are respectively equipped with a dynamic pressure differential pressure transmitter, a static pressure differential pressure transmitter, and a wind pressure measuring instrument, and the dynamic pressure differential pressure transmitter and the static pressure differential pressure transmitter transmit pressure values to the wind pressure measuring instrument, and the wind pressure measuring instrument transmits a pressure signal to the processing module, and the processing module calculates the air volume values in the first outlet pipe 115 and the second outlet pipe 135, and adjusts the first frequency converter and the second frequency converter according to the air volume values, thereby adjusting the air volume values in the first air supply pipe 114 and the second air supply pipe 134, and at the same time, the air volume values can be used for calculating the cooling amount in the design and development of the test equipment, and the measurement and calculation results are recorded.
[0062] Specifically, in this embodiment, the first temperature and humidity measuring device 153 and the second temperature and humidity measuring device 163 each include a sampling fan, a sampling box, a dry-bulb temperature measuring probe, and a wet-bulb temperature measuring probe. During the test, the sampling fan samples the constant airflow in the adjustable condensation tank 112 and the adjustable evaporation tank 132 into the sampling box, and the temperature and humidity values are collected by the dry-bulb temperature measuring probe and the wet-bulb temperature measuring probe, respectively, and transmitted to the processing module for real-time monitoring and recording. At the same time, according to the different temperatures and humidity required, the cooler, the hotter, and the humidifier in the test room are adjusted to meet the desired conditions for the test, and the output power of the compressor is adjusted to meet the desired conditions for the test. According to the data such as the temperature value, the humidity value, the dynamic pressure value, the static pressure value, etc. collected by the first measuring device and the second measuring device, the cooling amount during the current operation of the air conditioning unit test device is calculated, and the purpose of calibrating and checking the design parameters is achieved.
[0063] For example, the first pitot tube airflow test device is provided in the first air intake duct 114 and located at the downwind position of the first straightening wire mesh 1144, and the third pitot tube airflow test device is provided in the second air intake duct 134 and located at the downwind position of the second straightening wire mesh 1344. If the first pitot tube airflow test device is provided in the first air intake duct 114 and located at the downwind position of the first straightening wire mesh 1144, and the third pitot tube airflow test device is provided in the second air intake duct 134 and located at the downwind position of the second straightening wire mesh 1344, it becomes easier for the first pitot tube airflow test device and the third pitot tube airflow test device to collect wind with uniform airflow, and thus more accurate data can be collected.
[0064] In an alternative exemplary embodiment, the air conditioning unit test apparatus further comprises a power supply system for powering the condensation chamber cycle simulation system 11, the evaporation chamber cycle simulation system 13, and the measurement and control system. The power supply system is provided to power the condensation chamber cycle simulation system 11, the evaporation chamber cycle simulation system 13, and the measurement and control system.
[0065] Specifically, in this embodiment, the power supply system may include a main circuit power supply and a control circuit power supply, and the main circuit power supply includes a compressor power supply, a condensation chamber axial flow fan 111 power supply, and an evaporation chamber axial flow fan 131 power supply. As the above power supply, a variable voltage power supply of three-phase AC voltage 0V to 500V can be adopted, which supplies power to the inverter after passing through a circuit breaker and a contactor, supplies power to the compressor and the fan after inverter rectification by the inverter, adjusts the output frequency of the inverter according to design needs, and controls the compressor and the fan to reach the required output frequency. Exemplarily, the control circuit power supply is used to supply power to the first measuring device and the second measuring device, and a DC 100V power supply, an AC 100V power supply, or a DC 24V power supply can be adopted as the input power supply.
[0066] Finally, it should be noted that the above embodiments are for describing the technical solutions of the present invention, but are not limiting thereof. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or make equivalent substitutions for some or all of the technical features thereof, and such modifications or substitutions should be understood as not departing from the essence of the corresponding technical solutions and the scope of the technical solutions according to the embodiments of the present invention.
[0067] It should be noted that each specific technical feature described in the above specific embodiments can be combined in any suitable manner unless contradictory, and in order to avoid unnecessary duplication, the present invention will not provide additional descriptions of various possible combination forms.
[0068] This application claims priority to a Chinese patent application filed with the China National Intellectual Property Office on November 4, 2021, bearing application number 202111300389.8 and titled "Air-conditioning Unit Testing Apparatus," the entire contents of which are incorporated herein by reference. [Explanation of symbols]
[0069] 11. Condensation chamber cycle simulation system 111 Condensation chamber axial flow fan 112 Adjustable Condensation Tank 1121 Third diameter change connecting pipe 1122 Third soft tube 113 Adjustable Condenser 114 First air supply line 1141 First diameter change connecting pipe 1142 First soft tube 1143 First Rectification Grid 1144 First Straightening Wire Mesh 115 First blow-off pipe 116 First air flow adjustment plate 117 First Wheel Plate 1171 First Fan Support Seat 1173 First Air Intake Pipe Holder 118 Second Wheel Plate 1181 First Pedestal 1183 First blowpipe holder 13 Evaporation chamber cycle simulation system 131 Evaporation chamber axial flow fan 132 Adjustable Evaporation Tank 1321 Fourth diameter change connecting pipe 1322 4th soft tube 133 Adjustable Evaporator 134 Second air supply line 1341 Second diameter change connecting pipe 1342 Second soft tube 1343 Second Rectification Grid 1344 Second Straightening Wire Mesh 135 Second blow-off pipe 136 Second air flow adjustment plate 137 3rd Wheel Plate 1371 Second Air Intake Pipe Holder 1372 Second Fan Support Seat 1373 Second blowpipe holder 138 4th Wheel Plate 1381 Second Pedestal 151 First Pitot Tube Air Flow Measuring Device 152 Second Pitot Tube Air Flow Measuring Device 153 First temperature and humidity measuring device 161 Third Pitot Tube Air Flow Measuring Device 162 Fourth Pitot Tube Air Flow Measuring Device 163 Second temperature and humidity measuring device
Claims
1. An air conditioning unit test device comprising a condensation chamber cycle simulation system, an evaporation chamber cycle simulation system, and a measurement and control system, The condensation chamber cycle simulation system includes a condensation chamber axial fan, an adjustable condensation tank, an adjustable condenser, and a compressor, the outlet of the condensation chamber axial fan communicates with the air inlet of the adjustable condensation tank through a first air supply line, the outlet of the adjustable condensation tank is connected to a first air supply line, and the adjustable condenser is provided in the adjustable condensation tank; The evaporation chamber cycle simulation system includes an evaporation chamber axial fan, an adjustable evaporation tank, and an adjustable evaporator, the outlet of the evaporation chamber axial fan communicates with the air inlet of the adjustable evaporation tank through a second air supply pipe, the outlet of the adjustable evaporation tank is connected to a second air supply pipe, and the adjustable evaporator is provided in the adjustable evaporation tank; a high pressure end of the compressor in communication with the adjustable condenser and a low pressure end of the compressor in communication with the adjustable evaporator, the adjustable condenser in communication with the adjustable evaporator via a capillary refrigerant tube for cycling refrigerant between the adjustable condenser and the adjustable evaporator; The air conditioning unit testing apparatus, characterized in that the measurement control system includes a first measuring device and a second measuring device, the first measuring device being connected to the condensation chamber cycle simulation system and used to measure parameters of the condensation chamber cycle simulation system, and the second measuring device being connected to the evaporation chamber cycle simulation system and used to measure parameters of the evaporation chamber cycle simulation system.
2. the first measuring device includes a first pitot tube airflow measuring device, a second pitot tube airflow measuring device, and a first temperature and humidity measuring device, the first temperature and humidity measuring device is provided in the adjustable condensation tank and arranged at an upwind position and a downwind position of the adjustable condenser, the first pitot tube airflow test device is provided in the first air supply duct, and the second pitot tube airflow test device is provided in the first blow-out duct; The air conditioning unit testing device of claim 1, characterized in that the second measuring device includes a third Pitot tube air volume measuring device, a fourth Pitot tube air volume measuring device, and a second temperature and humidity measuring device, the second temperature and humidity measuring device is provided in the adjustable evaporation tank and arranged at an upwind position and a downwind position of the adjustable evaporator, the third Pitot tube air volume testing device is provided in the second air supply duct, and the fourth Pitot tube air volume testing device is provided in the second discharge duct.
3. 3. The air conditioning unit testing device of claim 2, wherein the condensation chamber cycle simulation system further comprises a first straightening grid, the first straightening grid being provided in the first air supply line and used to make the airflow uniform by passing through the first straightening grid, and the evaporation chamber cycle simulation system further comprises a second straightening grid, the second straightening grid being provided in the second air supply line and used to make the airflow uniform by passing through the second straightening grid.
4. the condensation chamber cycle simulation system further comprises a first straightening wire mesh, the first straightening wire mesh being provided in the first air supply pipeline and disposed at a downwind position of the first straightening grid, and being used to make the air flowing through the first straightening wire mesh uniform by passing through the first straightening wire mesh; 4. The air conditioning unit testing device of claim 3, wherein the evaporation chamber cycle simulation system further comprises a second straightening wire mesh, the second straightening wire mesh being provided in the second air supply pipeline and positioned downwind of the second straightening grid, and the air flowing through the second straightening wire mesh is used to pass through the second straightening wire mesh and make the airflow uniform.
5. 5. The air conditioning unit testing device of claim 4, wherein the first Pitot tube air volume test device is provided in the first air supply pipe and positioned downwind of the first straightening wire mesh, and the third Pitot tube air volume test device is provided in the second air supply pipe and positioned downwind of the second straightening wire mesh.
6. a first diameter change connecting pipe is provided at a connecting position between the first intake pipe and the outlet of the condensing chamber axial flow fan, and the first intake pipe is connected to the first diameter change connecting pipe through a first soft pipe; The air conditioning unit testing device according to any one of claims 1 to 5, characterized in that a second diameter change connecting pipe is provided at the connection position between the second air intake duct and the outlet of the evaporation chamber axial fan, and the second air intake duct is connected to the second diameter change connecting pipe by a second soft pipe.
7. The condensation chamber axial flow fan is provided with a first frequency converter for changing a frequency of the condensation chamber axial flow fan; The air conditioning unit testing device according to any one of claims 1 to 5, characterized in that the evaporation chamber axial flow fan is provided with a second frequency converter for changing the frequency of the evaporation chamber axial flow fan.
8. Both ends of the adjustable condensation tank are provided with a third diameter change connecting pipe and a third soft pipe, and both ends of the adjustable condensation tank are connected to the first air supply pipe and the first blow-out pipe through the third diameter change connecting pipe and the third soft pipe in order; Both ends of the adjustable evaporation tank are provided with a fourth diameter change connecting pipe and a fourth soft pipe, and both ends of the adjustable evaporation tank are connected to the second air supply pipe and the second air discharge pipe through the fourth diameter change connecting pipe and the fourth soft pipe in order, and / or The condensation chamber cycle simulation system further includes a first air flow rate adjustment plate provided at an outlet of the first outlet duct, and the evaporation chamber cycle simulation system further includes a second air flow rate adjustment plate provided at an outlet of the second outlet duct, and / or the condensation chamber cycle simulation system further comprises a first wheeled plate and a second wheeled plate, the condensation chamber axial fan is connected to the first wheeled plate through a first fan support seat, the first air intake line is connected to the first wheeled plate through a first air intake pipe holder, the adjustable condensation tank is connected to the second wheeled plate through a first base, and the first blow-off pipe is connected to the second wheeled plate through a first blow-off pipe holder; The evaporation chamber cycle simulation system further comprises a third wheeled plate, a fourth wheeled plate, a second air inlet pipe holder, and a second outlet pipe holder, the evaporation chamber axial fan is connected to the third wheeled plate via a second fan support seat, the adjustable evaporation tank is connected to the fourth wheeled plate via a second base, the second air inlet pipe holder is used to support the second air inlet pipe line, and the second outlet pipe holder is used to support the second outlet pipe line; and / or The air conditioning unit testing apparatus according to any one of claims 1 to 5, further comprising a power supply system for supplying power to the condensation chamber cycle simulation system, the evaporation chamber cycle simulation system, and the measurement and control system.
9. the adjustable condenser includes a plurality of groups of condensing assemblies arranged in an array disposed radially along an interior cavity of the adjustable condensing tank, each group of condensing assemblies being provided with an independent switch; The adjustable evaporator includes a plurality of groups of evaporative assemblies arranged in an array along the radial direction of the internal cavity of the adjustable evaporative tank, and each group of the evaporative assemblies is provided with an independent switch. The air conditioning unit testing device according to any one of claims 1 to 5, characterized in that:
10. 10. The air conditioning unit testing apparatus of claim 9, wherein the adjustable condenser further comprises a first shielding plate for shielding the condensation assembly, the first shielding plate being removably connected to the condensation assembly and used to shield the closed condensation assembly, and the adjustable evaporator further comprises a second shielding plate for shielding the evaporation assembly, the second shielding plate being removably connected to the evaporation assembly and used to shield the closed evaporation assembly.
Citation Information
Patent Citations
Low temperature forced air cooling heat exchanger performance test bench
CN207623033U
Duct type air conditioner
JP1994257840A
Flow straightening unit
JP2004093169A
Testing device of air conditioner
JP2006078132A
Wind tunnel test method and wind tunnel test device used therefor
JP2015090334A
