Data transmission method and device, storage medium, and program product
The data transmission method for NR-DC addresses deployment scenario complexities by controlling media processing modules based on identification information, reducing implementation and maintenance costs while enhancing performance and user experience.
Patent Information
- Application Number
- JP2024531493
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-12-09
- Filing Date
- 2022-11-08
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2042-11-08
AI Technical Summary
Existing NR-DC architectures face complexity in hardware deployment and high maintenance costs due to differences in control signaling and media data communication across various deployment scenarios, leading to increased development workload and inefficiencies.
A data transmission method that determines the deployment form between NR base stations based on identification information, generates control signaling, and controls media processing modules to transmit data accordingly, allowing interaction across different deployment scenarios without requiring redevelopment.
This method reduces implementation complexity for equipment manufacturers and carrier maintenance costs by enabling flexible data transmission across varying NR-DC scenarios, improving performance and user perception.
Smart Images

Figure 2024540667000001_ABST
Abstract
Description
[Technical field]
[0001] This application is filed based on a Chinese patent application bearing application number 202111498509.X and filing date December 9, 2021, and claims priority to the Chinese patent application, the entire contents of which are incorporated herein by reference.
[0002] The present application relates to dual connections in the field of communications, and in particular to a data transmission method and an apparatus, storage medium, and program product thereof. [Background technology]
[0003] New Radio-Dual Connectivity (NR-DC) is dual connectivity that includes low frequency and low frequency from the frequency band, that is, one physical NR station is a low frequency cell and the other physical NR station is also a low frequency cell. NR-DC also includes low frequency and high frequency dual connectivity from the frequency band, that is, one physical NR station is a low frequency cell and the other physical NR station is also a high frequency cell. Different manufacturers have different deployment forms of low frequency and high frequency under the two NR-DC architectures, so equipment manufacturers need multiple solutions for implementation.
[0004] In related technologies, there are three main ways to integrate the two architectures of NR-DC. For example, dual connections, including low and high frequencies from the frequency band, have three scenarios: non-common frame between NR-DC stations, common frame and common logic station in NR-DC station, and common frame and non-common logic station in NR-DC station. For the above three scenarios, equipment manufacturers need to be aware of the differences in NR-DC in the three deployment scenarios to achieve implementation. For example, differences in control signaling and media data communication make hardware deployment complex, and the operation processing (OP) module has high development workload, high software version maintenance costs, poor performance, and low efficiency in the three deployment scenarios. Summary of the Invention [Problem to be solved by the invention]
[0005] The following is a summary of subject matter described in detail herein that is not intended to limit the scope of the claims.
[0006] The embodiments of the present application provide a data transmission method, an apparatus therefor, a storage medium, and a program product. [Means for solving the problem]
[0007] In a first aspect, the present embodiment comprises: A data transmission method applied to a first new radio base station in which a first operation processing module is arranged, comprising: controlling the first operation processing module such that the first operation processing module creates a first media processing module; Obtaining second identification information of a second new radio base station where a second operation processing module is located, and determining a deployment mode between the first new radio base station and the second new radio base station according to the second identification information; generating target identification information according to the deployment form, generating control signaling according to the target identification information, and sending the control signaling to the second new radio base station so that the second operation processing module creates a second media processing module according to the control signaling; controlling the first media processing module such that the first media processing module transmits data to the second media processing module according to the deployment configuration.
[0008] In a second aspect, the present embodiment comprises: A data transmission method applied to a second new radio base station, comprising: receiving a control signaling sent by a first new radio base station, the control signaling including target identification information generated by the first new radio base station according to a deployment mode between the first new radio base station and the second new radio base station; creating a second media processing module according to the control signaling; determining a deployment mode between the second new radio base station and the first new radio base station based on the target identification information; and controlling the second media processing module to perform data offload processing according to the deployment form.
[0009] In a third aspect, the present embodiment also provides a method for producing a composition comprising the steps of: There is provided a data transmission device including a memory, a processor, and a computer program stored in the memory and operable by the processor, the processor implementing the above data transmission method when it executes the computer program.
[0010] In a fourth aspect, the present embodiment also provides a method for producing a composition comprising: A computer-readable storage medium is provided having stored thereon computer-executable instructions for carrying out the above data transmission method.
[0011] In a fifth aspect, the present embodiment also provides a method for producing a composition comprising: A computer program product is provided, the computer program product including a computer program or computer instructions, the computer program or computer instructions being stored in a computer-readable storage medium, a processor of the computer device reading the computer program or computer instructions from the computer-readable storage medium, and the processor executing the computer program or computer instructions to cause the computer device to perform the above-mentioned data transmission method.
[0012] Other features and advantages of the present application will be set forth in the following specification, and in part will be obvious from the specification, or may be learned by the practice of the present application. The objectives and other advantages of the present application will be realized and obtained by the structure particularly pointed out in the written description, claims and drawings. The drawings are used to provide a further understanding of the technical solution of the present application, constitute a part of the specification, and are used to interpret the technical solution of the present application together with the embodiments of the present application, and are not intended to limit the technical solution of the present application. [Brief description of the drawings]
[0013] [Figure 1] A schematic diagram of an NR-DC architecture for performing a data transmission method according to one embodiment of the present application. [Diagram 2] A schematic diagram of an NR-DC architecture for performing a data transmission method according to another embodiment of the present application. [Diagram 3] FIG. 2 is a schematic diagram of a dual connection structure between a low frequency new radio base station and a high frequency new radio base station, the deployment form of which is inter-station non-common frame deployment according to an embodiment of the present application; [Figure 4]A schematic diagram of a dual connection structure between a low frequency new radio base station and a high frequency new radio base station, with common frame-common logic station deployment as the deployment form according to an example of the present application. [Diagram 5] A schematic diagram of a dual connection structure between a low frequency new radio base station and a high frequency new radio base station, with common frame non-common logic station deployment as the deployment mode according to an example of the present application. [Figure 6] 4 is a flowchart of a data transmission method applied to a first new radio base station according to an embodiment of the present application. [Figure 7] 7 is a flowchart of a specific method of step S120 of FIG. 6. [Figure 8] 8 is a flowchart of a specific method of step S220 of FIG. 7; [Figure 9] 8 is a flowchart of another specific method of step S220 of FIG. 7; [Figure 10] 7 is a flowchart of a first specific method of step S140 of FIG. 6. [Figure 11] 7 is a flowchart of a second specific method of step S140 of FIG. 6; [Figure 12] 7 is a flowchart of another specific method of step S120 of FIG. 6. [Figure 13] 7 is a flowchart of a third specific method of step S140 of FIG. 6; [Figure 14] 4 is a flowchart of a data transmission method applied to a second new radio base station according to an embodiment of the present application. [Figure 15] 15 is a flowchart of a first specific method of step S930 of FIG. 14. [Figure 16] 15 is a flowchart of a second specific method of step S930 of FIG. 14. [Figure 17] 15 is a flowchart showing a third specific method of step S930 of FIG. 14. [Figure 18] 15 is a flowchart of a first specific method of step S940 of FIG. 14. [Figure 19] 15 is a flowchart of a second specific method of step S940 of FIG. 14. [Figure 20] 15 is a flowchart of a third specific method of step S940 of FIG. 14. [Figure 21] A schematic diagram of the application of dual connections of low frequency new radio base stations and high frequency new radio base stations configured to perform a data transmission method according to an example of the present application to a common frame deployment scenario. [Figure 22] A schematic diagram of dual connection of a low frequency new radio base station and a high frequency new radio base station configured to perform a data transmission method according to an example of the present application applied to a non-common frame deployment scenario. [Figure 23] 1 is a structural schematic diagram of a data transmission device according to an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be described in more detail below with reference to the drawings and examples. The specific examples described in this specification are only used to interpret the present application and are not used to limit the present application.
[0015] It should be noted that although a logical order is shown in the flow chart, in some cases the steps shown or described may be performed in a different order than that shown in the flow chart. In the description of the specification and claims and the above-mentioned attached drawings, plural (or plural) means two or more, and terms such as "greater than," "less than," "exceeding," etc. are understood to be exclusive of the number, and terms such as "greater than," "less than," "within," etc. are understood to be inclusive of the number. Descriptions such as "first," "second," etc. are provided merely for the purpose of distinguishing technical features and should not be understood to indicate or imply relative importance, or to imply the number of technical features depicted, or to imply the context of the technical features depicted.
[0016] The present application provides a data transmission method and its device, storage medium, and program product, which includes: determining a deployment mode between a first new radio base station and a second new radio base station based on the second identification information; then generating target identification information according to the deployment mode; generating control signaling based on the target identification information; sending the control signaling including the target identification information to the second new radio base station, so that the second operation processing module of the second new radio base station creates a second media processing module based on the target identification information in the control signaling; and finally controlling the first media processing module to transmit data to the second media processing module according to the deployment mode. That is, in the embodiment of the present application, the first operation processing module and the second operation processing module can interact with each other in any deployment mode, and the first media processing module and the second media processing module can also interact with each other by creating the first media processing module by the first operation processing module of the first new radio base station and creating the second media processing module by the second operation processing module of the second new radio base station. Therefore, data transmission can be achieved without regard for differences in implementation and transmission between different deployment scenarios NR-DC, thereby reducing the implementation complexity of equipment manufacturers and the complexity of carrier version upgrades.
[0017] Hereinafter, the embodiments of the present application will be further described with reference to the drawings.
[0018] As shown in FIG. 1, FIG. 1 is a schematic diagram of an NR-DC architecture configured to perform a data transmission method according to an embodiment of the present application. In the example of FIG. 1, user equipment (UE) (not shown) is respectively connected to two NRs, one of which serves as a first new radio base station 200 and the other NR serves as a second new radio base station 300. The first new radio base station 200 is connected to a 5GC100 (5th Generation Core Network, 5G core network) via an NG-C (user plane interface between a next generation radio access network (NG-RAN) and a 5GC100) interface and an NG-U interface (control plane interface between the NG-RAN and the 5GC100), and the SN is connected to the 5GC100 via the NG-U interface.
[0019] It should be noted that, in addition to the NR-DC architecture shown in Fig. 1, the NR-DC also has another protocol architecture. As shown in Fig. 2, in the example of Fig. 2, a UE (not shown) is connected to only one NR, which functions as a third new radio base station 400 including two distributed units (DUs), one DU functions as an MCG 420 (Master Cell group), and the other DU functions as an SCG 430 (Secondary Cell group). The SCG 430 is connected to a CU 410 (Centralized Unit) via an F1-C (Control Plane) interface and an F1-U (User Plane) interface, and the SCG 430 is connected to the CU 410 via an F1-C interface and an F1-U interface, and the CU 410 is connected to the 5GC 100 via an NG-C interface and an NG-U interface.
[0020] In addition, one NR may include one CU and multiple DUs, one CU may be divided into a control plane unit (CU-CP) and a user plane unit (CU-UP), and one CU may include one CU-CP and multiple CU-UPs. Here, the CU-CP is connected to the DU via an F1-C interface, and the CU-UP is connected to the DU via an F1-U interface.
[0021] In addition, the F1-C (control plane) interface and the F1-U (user plane) interface belong to the F1 interface, which supports signaling exchange and data transmission between the CU and the DU. The F1 interface separates the radio network layer and the transport network layer and can exchange user terminal-related information, non-user terminal-related information, etc.
[0022] In addition, multiple DUs can be centrally controlled by one CU, and theoretically, there is no limit to the maximum number of DUs that can be connected to one CU, and the number is subject to only practical limitations in specific implementation. The 3GPP (registered trademark) 3rd Generation Partnership Project standard specifies that one DU is connected to only one CU, but does not exclude connecting multiple CUs to the same DU to increase fault tolerance in actual operation.
[0023] The CU and DU may be divided according to the protocol layer of the wireless network, and for example, the functions of the packet data convergence protocol layer (PDCP) and higher protocol layers (e.g., radio resource control (RRC)) may be set in the CU. The functions of protocol layers below PDCP, such as radio link control (RLC), medium access control (MAC), and physical layer (PHY), are set in the DU.
[0024] In addition, NR-DC may include dual connection of low-frequency new radio base station and low-frequency new radio base station in the frequency band, that is, one NR is a low-frequency new radio base station and another NR is also a low-frequency new radio base station. Alternatively, NR-DC may include dual connection of low-frequency new radio base station and high-frequency new radio base station, that is, one NR is a low-frequency new radio base station and another NR is a high-frequency new radio base station. There are mainly three deployment scenarios for the integration of the two types of architectures of NR-DC, which are shown in Figures 3 to 5 using the dual connection of low-frequency new radio base station and high-frequency new radio base station as an example.
[0025] In the example of Figure 3, the deployment form of the low frequency new radio base station 500 and the high frequency new radio base station 600 is inter-station non-common frame deployment, that is, the low frequency new radio base station 500 and the high frequency new radio base station 600 become two stations in terms of hardware and two stations in terms of logic. The first centralized unit 520 of the low frequency new radio base station 500 and the second centralized unit 620 of the high frequency new radio base station 600 are independent of each other, the first distributed unit 510 of the low frequency new radio base station 500 and the second distributed unit 610 of the high frequency new radio base station 600 are independent of each other, the Public Land Mobile Network (PLMN) and Generation Node Base Identity document (gNBID) of the low frequency new radio base station 500 and the PLMN and gNBID of the high frequency new radio base station 600 are independent of each other, and the Internet Protocol (IP) addresses, NG interfaces, and XN interfaces of the low frequency new radio base station 500 and the high frequency new radio base station 600 are also independent of each other. Here, the NG interface includes an NG-C interface and an NG-U interface, and the XN interface is a network interface between NG-RAN nodes. The low frequency new radio base station 500 is connected to the 5GC 100 via an NG-C interface and an NG-U interface, and the high frequency new radio base station 600 is connected to the 5GC 100 via an NG-U interface. Note that in the NR-DC scenario, the low frequency new radio base station 500 and the high frequency new radio base station 600 need to transmit control signaling via the XN interface to perform media data communication.
[0026] In the example of FIG. 4, the deployment form of the low frequency new radio base station 500 and the high frequency new radio base station 600 is a common frame-common logic station deployment, that is, the low frequency new radio base station 500 and the high frequency new radio base station 600 become one station in terms of hardware and one station in terms of logic. The low frequency new radio base station 500 and the high frequency new radio base station 600 share the first centralized unit 520, the first distributed unit 510 of the low frequency new radio base station 500 and the second distributed unit 610 of the high frequency new radio base station 600 are independent of each other, and the low frequency new radio base station 500 and the high frequency new radio base station 600 share the PLMN, gNBID, IP address, and NG interface. Here, the NG interface includes an NG-C interface and an NG-U interface. The low frequency new radio base station 500 and the high frequency new radio base station 600 are both connected to the 5GC 100 via an NG-C interface and an NG-U interface. In addition, the first centralized unit 520 has a common protocol layer RRC (Radio Resource Control), a General Packet Radio Service Tunnelling Protocol user plane (GTPU), and a Service Data Adaptation Protocol (SDAP), and the low frequency new radio base station 500 and the high frequency new radio base station 600 transmit control signaling through a custom logical interface in a frame to perform media data communication in an NR-DC scenario.
[0027] In the example of Figure 5, the deployment form of the low frequency new radio base station 500 and the high frequency new radio base station 600 is a common frame non-common logic station deployment, that is, the low frequency new radio base station 500 and the high frequency new radio base station 600 become one station in terms of hardware, and two stations in terms of logic. The first centralized unit 520 of the low frequency new radio base station 500 and the second centralized unit 620 of the high frequency new radio base station 600 are independent of each other, the first distributed unit 510 of the low frequency new radio base station 500 and the second distributed unit 610 of the high frequency new radio base station 600 are independent of each other, and the PLMN and gNBID of the low frequency new radio base station 500 and the PLMN, gNBID, IP, address, and NG interface of the high frequency new radio base station 600 are also independent of each other. Here, the NG interface includes an NG-C interface and an NG-U interface. The low frequency new radio base station 500 and the high frequency new radio base station 600 are both connected to the 5GC 100 via an NG-C interface and an NG-U interface. In an NR-DC scenario, the low frequency new radio base station 500 and the high frequency new radio base station 600 transmit control signaling via a logical XN interface to perform media data communication.
[0028] In addition, the frequency range corresponding to the low frequency new radio base station 500 may be 450 MHZ to 6000 MHZ, and the frequency range corresponding to the high frequency new radio base station 600 may be 24250 MHZ to 52600 MHZ, and is not particularly limited here.
[0029] In addition, the principle of the dual connection of the low frequency new radio base station 500 and the low frequency new radio base station 500 is consistent with the principle of the dual connection of the low frequency new radio base station 500 and the high frequency new radio base station 600.
[0030] The NR-DC architecture and application scenarios described in the embodiments of the present application are intended to more clearly explain the technical solutions of the embodiments of the present application, and are not intended to limit the technical solutions of the embodiments of the present application. With the evolution of the NR-DC architecture and the emergence of new application scenarios, the technical solutions of the embodiments of the present application can be equally applied to similar technical problems.
[0031] The NR-DC architectures shown in Figures 1 and 2, and the NR-DC deployment scenarios shown in Figures 3-5 are not intended to limit the embodiments of the present application, which may include more or fewer components than those shown, may combine some components, or may have different deployments of components.
[0032] Based on the above NR-DC architecture, various embodiments of data transmission methods are proposed below.
[0033] As shown in Figure 6, Figure 6 is a flowchart of a data transmission method according to an embodiment of the present application, which can be applied to a first new radio base station, such as the first new radio base station in the NR-DC architecture shown in Figure 1. A first operation processing module is disposed in the first new radio base station, and the data transmission method may include, but is not limited to, steps S110, S120, S130, and S140.
[0034] Step S110: The first operation processing module is controlled so that the first operation processing module creates a first media processing module.
[0035] In addition, when the first new radio base station receives a detection report of a UE, the first operation processing module controls the first operation processing module to create a first media processing module, but this embodiment is not particularly limited to this.
[0036] In addition, the first new radio base station may be a low-frequency new radio base station or a high-frequency new radio base station, and the frequency range corresponding to the low-frequency new radio base station 500 may be 450 MHZ to 6000 MHZ, and the frequency range corresponding to the high-frequency new radio base station 600 may be 24250 MHZ to 52600 MHZ, and there are no particular limitations here.
[0037] Step S120: Obtain second identification information of the second new radio base station, and determine a deployment mode between the first new radio base station and the second new radio base station according to the second identification information.
[0038] In this step, there are many ways for the first new radio base station to obtain the second identification information of the second new radio base station. For example, the first new radio base station may obtain the second identification information of the second new radio base station based on the operations, administration and maintenance (OAM) of the first new radio base station, or may obtain it in other ways, but this is not particularly limited here.
[0039] In addition, the second new radio base station is provided with a second operation processing module. The second new radio base station can be a low frequency new radio base station or a high frequency new radio base station, the frequency range corresponding to the low frequency new radio base station 500 can be 450MHZ-6000MHZ, and the frequency range corresponding to the high frequency new radio base station 600 can be 24250MHZ-52600MHZ, and is not particularly limited here.
[0040] In addition, the second identification information may include a gNBID and a PLMN, but this embodiment is not particularly limited thereto.
[0041] Step S130: Generate target identification information according to a deployment mode, generate control signaling based on the target identification information, and send the control signaling to a second new radio base station for a second operation processing module to generate a second media processing module according to the control signaling.
[0042] In this step, since the deployment configurations of the first new radio base station and the second new radio base station are determined in step S120, generate target identification information according to the deployment configurations, then generate control signaling based on the target identification information, and then send the control signaling by the first operation processing module to the second operation processing module of the second new radio base station, so that the second operation processing module of the second new radio base station creates the second media processing module according to the control signaling, thereby facilitating the first media processing module to control the first media processing module to transmit data to the second media processing module according to the deployment configuration in the next step.
[0043] Step S140: According to a deployment mode, control the first media processing module so that the first media processing module transmits data to the second media processing module.
[0044] In this step, since the deployment configuration of the first new radio base station and the second new radio base station has been determined in step S120 and the second media processing module has been created in step S130, the first media processing module can be controlled to transmit data to the second media processing module according to the deployment configuration.
[0045] This data transmission may be data reverse transmission or another transmission method, but is not particularly limited here.
[0046] In this embodiment, by adopting the data transmission method including the above steps S110 to S140, the first new radio base station controls the first operation processing module, so that the first operation processing module creates a first media processing module, then obtains the second identification information of the second new radio base station, determines a deployment mode between the first new radio base station and the second new radio base station based on the second identification information, generates target identification information according to the deployment mode, then generates control signaling based on the target identification information, then sends the control signaling by the first operation processing module to the second operation processing module of the second new radio base station, so that the second operation processing module of the second new radio base station creates the second media processing module according to the control signaling, and finally controls the first media processing module, so that the first media processing module transmits data to the second media processing module according to the deployment mode. That is, in the embodiment of the present application, the first media processing module is created by the first operation processing module of the first new radio base station, and the second media processing module is created by the second operation processing module of the second new radio base station, so that the first operation processing module and the second operation processing module can interact with each other in any deployment form, and the first media processing module and the second media processing module can also interact with each other. Therefore, data transmission can be realized ignoring the implementation differences and transmission differences of different deployment scenarios NR-DC, and the implementation complexity of device manufacturers and the complexity of carrier version upgrades can be reduced.
[0047] In addition, the first new radio base station may be a low frequency new radio base station or a high frequency new radio base station, but is not particularly limited here. Similarly, the second new radio base station may be a low frequency new radio base station or a high frequency new radio base station, but is not particularly limited here. In addition, the frequency range corresponding to the low frequency new radio base station 500 may be 450MHZ to 6000MHZ, and the frequency range corresponding to the high frequency new radio base station 600 may be 24250MHZ to 52600MHZ, but is not particularly limited here.
[0048] In one embodiment, as shown in FIG. 7, step S120 will be described, and step S120 may include, but is not limited to, step S210 and step S220.
[0049] Step S210: Obtain a configuration list, and determine whether the second identification information exists in the configuration list.
[0050] In this step, the first new radio base station obtains its own configuration list, and checks whether the second identification information exists in the configuration list.
[0051] Step S220: If the second identification information exists in the configuration list, obtain the first identification information of the first new radio base station, compare the first identification information with the second identification information, and determine the deployment mode between the first new radio base station and the second new radio base station according to the result of the comparison.
[0052] In this step, in step S210, it is checked whether the second identification information exists in the configuration list. If the second identification information exists in the configuration list, the first identification information of the first new radio base station is obtained, and the first identification information and the second identification information are compared, and the deployment form between the first new radio base station and the second new radio base station is determined according to the result of the comparison process.
[0053] In addition, the first identification information may include the gNBID and PLMN of the first new radio base station, or may be other information. Similarly, the second identification information may include the gNBID and PLMN of the second new radio base station, or other information, and is not particularly limited here.
[0054] In this embodiment, by adopting the data transmission method of the above steps S210 and S220, the first new radio base station obtains its own configuration list, determines whether the second identification information exists in the configuration list, and if the second identification information exists in the configuration list, obtains the first identification information of the first new radio base station, compares the first identification information with the second identification information, and determines the deployment mode between the first new radio base station and the second new radio base station according to the result of the comparison.
[0055] In one embodiment, the first new radio base station obtains its own configuration list, and if the gNBID and PLMN of the second new radio base station are present in the configuration list, it indicates that the first new radio base station and the second new radio base station are common frames, and if not, it indicates that the first new radio base station and the second new radio base station are separate frames, but this embodiment is not particularly limited thereto.
[0056] In one embodiment, as shown in FIG. 8, step S220 will be described, and step S220 may include, but is not limited to, step S310.
[0057] Step S310: If the first identification information and the second identification information are consistent, determine the deployment mode between the first new radio base station and the second new radio base station as common frame-common logic station deployment.
[0058] In this embodiment, in step S220, it is determined that the second identification information exists in the configuration list of the first new radio base station, so the first new radio base station acquires its own first identification information, compares the first identification information with the second identification information, and if the first identification information and the second identification information match, determines the deployment mode between the first new radio base station and the second new radio base station to be common frame-common logic station deployment.
[0059] In one embodiment, it is assumed that the first identification information includes the gNBID and PLMN of the first new radio base station, and the second identification information includes the gNBID and PLMN of the second new radio base station. If the gNBID of the first new radio base station and the gNBID of the second new radio base station match, and the PLMN of the first new radio base station and the PLMN of the second new radio base station match, the first identification information and the second identification information match, and the deployment mode between the first new radio base station and the second new radio base station is determined to be common frame-common logic station deployment; otherwise, it is determined that the first identification information and the second identification information do not match, but this embodiment is not particularly limited thereto.
[0060] In another embodiment, as shown in FIG. 9, step S220 is described, which may include, but is not limited to, step S410.
[0061] Step S410: If the first identification information and the second identification information do not match, determine the deployment mode between the first new radio base station and the second new radio base station as common frame non-common logic station deployment.
[0062] In this embodiment, in step S220, it is determined that the second identification information exists in the configuration list of the first new radio base station, so the first new radio base station acquires its own first identification information and compares the first identification information with the second identification information. If the first identification information and the second identification information do not match, it determines the deployment mode of the first new radio base station and the second new radio base station as common frame / non-common logic station deployment.
[0063] It should be noted that the embodiment shown in FIG. 9 is a parallel embodiment to the embodiment shown in FIG. 8, and each corresponds to a different deployment form.
[0064] In one embodiment, it is assumed that the first identification information includes the gNBID and PLMN of the first new radio base station, and the second identification information includes the gNBID and PLMN of the second new radio base station, if the gNBID of the first new radio base station and the gNBID of the second new radio base station match, and the PLMN of the first new radio base station and the PLMN of the second new radio base station do not match, it indicates that the first identification information and the second identification information do not match, and the deployment type between the first new radio base station and the second new radio base station is determined as common frame non-shared logical station deployment. Alternatively, if the gNBID of the first new radio base station and the gNBID of the second new radio base station do not match, and the PLMN of the first new radio base station and the PLMN of the second new radio base station match, it indicates that the first identification information and the second identification information do not match, and the deployment type between the first new radio base station and the second new radio base station is determined as common frame non-shared logical station deployment. Alternatively, if the gNBID of the first new radio base station and the gNBID of the second new radio base station do not match, and the PLMN of the first new radio base station and the PLMN of the second new radio base station do not match, it indicates that the first identification information and the second identification information do not match, and the deployment mode between the first new radio base station and the second new radio base station is determined to be common frame / non-common logic station deployment, but this embodiment is not particularly limited to this.
[0065] In one embodiment, step S140 will be described as shown in FIG. 10. When the deployment type between the first new radio base station and the second new radio base station is determined as a common frame-common logical station deployment, step S140 may include, but is not limited to, steps S510 and S520.
[0066] Step S510: The IP address and MAC address of the second media processing module are set in the first media processing module.
[0067] In this step, if the deployment mode between the first new radio base station and the second new radio base station is determined as common frame-common logic station deployment, the first operation processing module sets an IP address and a MAC address of the second media processing module, and sends the IP address and the MAC address of the second media processing module to the first media processing module in order to control the first media processing module to transmit data to the second media processing module according to the IP address and the MAC address of the second media processing module in the next step.
[0068] Step S520: Control the first media processing module so that the first media processing module transmits data to the second media processing module according to the IP address and the MAC address of the second media processing module.
[0069] This data transmission may be data reverse transmission or another transmission method, but is not particularly limited here.
[0070] In this step, since the IP address and MAC address of the second media processing module are obtained in step S510, the first new radio base station can control the first media processing module so that the first media processing module transmits data to the second media processing module according to the IP address and MAC address of the second media processing module.
[0071] In this embodiment, by adopting a data transmission method including the above steps S510 to S520, when the deployment mode between the first new radio base station and the second new radio base station is determined as a common frame-common logic station deployment, the first operation processing module sets an IP address and a MAC address of the second media processing module, sends the IP address and the MAC address of the second media processing module to the first media processing module, and controls the first media processing module to transmit data to the second media processing module according to the IP address and the MAC address of the second media processing module.
[0072] A media access control address (MAC address), also called a LAN address, Ethernet (registered trademark) address, or physical address, is an address that can identify the location of a device on a network. For example, the MAC address of the second media processing module can determine the physical address of the second media processing module.
[0073] In one embodiment, step S140 will be described as shown in FIG. 11. Step S140 may include, but is not limited to, steps S610 and S620 when the deployment type between the first new radio base station and the second new radio base station is determined as common frame / non-common logical station deployment.
[0074] Step S610: Control the first operation processing module so that the first operation processing module creates a first transmission platform.
[0075] In this step, if the deployment form between the first new radio base station and the second new radio base station is determined as common frame-non-common logic station deployment, the first new radio base station can control the first operation processing module to create a first transmission platform so that in the next step, the first media processing module transmits data to the second media processing module via an intranet port of the first transmission platform.
[0076] Step S620: Control the first media processing module to transmit data to the second media processing module through an intranet port of the first transmission platform.
[0077] In this step, since the first transmitting platform is created in step S610, the first media processing module is controlled so that the first media processing module transmits data to the second media processing module via an intranet port of the first transmitting platform.
[0078] This data transmission may be data reverse transmission or another transmission method, but is not particularly limited here.
[0079] In this embodiment, by adopting the data transmission method including the above steps S610 to S620, when the deployment mode between the first new radio base station and the second new radio base station is determined as common frame / non-common logic station deployment, the first new radio base station controls the first operation processing module so that the first operation processing module creates a first transmission platform, and then the first media processing module can transmit data to the second media processing module through the intranet port of the first transmission platform.
[0080] In one embodiment, as shown in FIG. 12, step S120 will be described, and step S120 may include, but is not limited to, step S710.
[0081] Step S710: If the second identification information does not exist in the configuration list, determine the deployment mode between the first new radio base station and the second new radio base station as inter-station non-common frame deployment.
[0082] In this embodiment, the first new radio base station obtains its own configuration list, and checks whether the configuration list includes the second identification information. If the second identification information does not exist in the configuration list, the deployment mode between the first new radio base station and the second new radio base station is determined to be inter-station non-common frame deployment, but this embodiment is not particularly limited thereto.
[0083] In addition, the second identification information may include the gNBID and PLMN of the second new radio base station, or may include other information, but is not particularly limited here.
[0084] The embodiment shown in FIG. 12 belongs to a parallel embodiment to the embodiment shown in FIG. 9 and the embodiment shown in FIG. 8, and corresponds to different deployment forms.
[0085] In one embodiment, step S140 will be described as shown in FIG. 13. When the deployment mode between the first new radio base station and the second new radio base station is determined as inter-station non-common frame deployment, step S140 may include, but is not limited to, steps S810 and S820.
[0086] Step S810: Control the first operation processing module so that the first operation processing module creates a first transmission platform.
[0087] In this step, if the deployment mode between the first new radio base station and the second new radio base station is determined as inter-station non-common frame deployment, the first new radio base station can control the first operation processing module so that in the next step, the first media processing module transmits data to the second transmission platform of the second new radio base station via the external network port of the first transmission platform, and the first operation processing module creates a first transmission platform for transmitting data to the second media processing module via the second transmission platform.
[0088] Step S820: Control the first media processing module so that the first media processing module transmits data to the second transmission platform of the second new radio base station through the external network port of the first transmission platform, so that the first media processing module transmits data to the second transmission platform of the second new radio base station through the external network port of the first transmission platform.
[0089] In this step, since the first transmission platform has been created in step S810, the first media processing module controls the first media processing module to transmit data to the second transmission platform of the second new radio base station through the external network port of the first transmission platform, so that the first media processing module transmits data to the second media processing module through the second transmission platform.
[0090] This data transmission may be data reverse transmission or another transmission method, but is not particularly limited here.
[0091] In this embodiment, by adopting the data transmission method including the above steps S810 to S820, when the deployment mode between the first new radio base station and the second new radio base station is determined as inter-station non-common frame deployment, the first new radio base station controls the first operation processing module so that the first operation processing module creates a first transmission platform, and then the first media processing module can transmit data to the second transmission platform of the second new radio base station through the external network port of the first transmission platform, so as to transmit data to the second media processing module via the second transmission platform.
[0092] As shown in FIG. 14, FIG. 14 is a flowchart of a data transmission method according to another embodiment of the present application, which may be applied to a second new radio base station, such as the second new radio base station in the NR-DC architecture shown in FIG. 1, and which may include, but is not limited to, steps S910, S920, S930, and S940.
[0093] Step S910: Receive control signaling sent by a first new radio base station, where the control signaling includes target identification information generated by the first new radio base station according to a deployment mode between the first new radio base station and the second new radio base station.
[0094] The target identification information may be the ID of the first operation processing module of the first new radio base station, a message related to the virtual Stream Control Transmission Protocol (SCTP), a message related to SCTP, or other message, but is not limited thereto here.
[0095] In addition, the second new radio base station can receive the control command via the XN interface, the logical XN interface, or the internal interface, but is not particularly limited here.
[0096] Step S920: Create a second media processing module according to the control signaling.
[0097] In this step, since the control signaling sent by the first new radio base station is received in step S910, upon receiving the control signaling, the second new radio base station creates a second media processing module according to the control signaling, so as to utilize the second media processing module to perform data offloading in the next step.
[0098] It should be noted that the second media processing module is generated after the second operation processing module of the second new radio base station receives the control signaling, but is not particularly limited here.
[0099] Step S930: Determine a deployment mode between the second new radio base station and the first new radio base station according to the target identification information.
[0100] Step S940: Control the second media processing module so that the second media processing module performs data offload processing according to the deployment mode.
[0101] The data offload process is related to a bearer type that is related to a traffic type, and the bearer type is classified into a split bearer and a radio bearer.
[0102] The target of the data streaming process by the second media processing module may be the first new radio base station or the second new radio base station, but is not particularly limited here. For example, the core network first transmits data to the second media processing module, and the second media processing module transmits a part of the data to the first media processing module after receiving the data, and performs data offload processing on the other part of the data in the second new radio base station, but this embodiment is not particularly limited thereto.
[0103] In this embodiment, by adopting a data transmission method including steps S910 to S940, the second new radio base station receives control signaling sent by the first new radio base station, where the control signaling includes target identification information generated by the first new radio base station according to a deployment mode between the first new radio base station and the second new radio base station, determines a deployment mode between the second new radio base station and the first new radio base station based on the target identification information, creates a second media processing module according to the control signaling, and finally, controls the second media processing module to perform data offloading processing according to the deployment mode.
[0104] The first new radio base station may be a low frequency new radio base station or a high frequency new radio base station, but is not limited here. Similarly, the second new radio base station may be a low frequency new radio base station or a high frequency new radio base station, but is not limited here.
[0105] In one embodiment, as shown in FIG. 15, step S930 will be described, and step S930 may include, but is not limited to, step S1010.
[0106] Step S1010: If the target identification information is a stream control transport protocol, determine the deployment manner between the second new radio base station and the first new radio base station as an inter-station non-common frame deployment.
[0107] In one embodiment, when the second new radio base station receives the control command sent by the first new radio base station, the second new radio base station creates a second media processing module according to the control command, and the control command includes a stream control transport protocol, so the second new radio base station determines the deployment mode between the second new radio base station and the first new radio base station as inter-station non-common frame deployment according to the stream control transport protocol, but this embodiment is not particularly limited thereto.
[0108] In one embodiment, as shown in FIG. 16, step S930 will be described, and step S930 may include, but is not limited to, step S1110.
[0109] Step S1110: If the target identification information is a virtual stream control transport protocol, determine a deployment mode between the second new radio base station and the first new radio base station as a common frame non-common logical station deployment.
[0110] In one embodiment, when the second new radio base station receives the control command sent by the first new radio base station, the second new radio base station creates a second media processing module according to the control command. In addition, since the control command includes a virtual stream control transport protocol, the second new radio base station determines the deployment mode between the second new radio base station and the first new radio base station as a common frame non-common logical station deployment according to the virtual stream control transport protocol, but this embodiment is not particularly limited thereto.
[0111] In one embodiment, as shown in FIG. 17, step S930 will be described, and step S930 may include, but is not limited to, step S1210.
[0112] Step S1210: If the target identification information is the identification information of the first operation processing module of the first new radio base station, determine the deployment mode between the second new radio base station and the first new radio base station as common frame-common logic station deployment.
[0113] In addition, the identification information of the first operation processing module of the first new radio base station may be the ID of the first operation processing module or may be other information, but is not particularly limited here.
[0114] In one embodiment, when the second new radio base station receives the control command sent by the first new radio base station, the second new radio base station creates a second media processing module according to the control command. Also, since the control command includes the ID of the first operation processing module, the second new radio base station determines the deployment form between the second new radio base station and the first new radio base station as a common frame-common logic station deployment according to the ID of the first operation processing module, but this embodiment is not particularly limited thereto.
[0115] The embodiment shown in FIG. 15 belongs to a parallel embodiment to the embodiment shown in FIG. 16 and the embodiment shown in FIG. 17, and each corresponds to a different deployment form.
[0116] In one embodiment, as shown in FIG. 18, step S940 will be described. This step S940 may further include, but is not limited to, steps S1310 and S1320 when the deployment form is inter-station non-common frame deployment.
[0117] Step S1310: Control the second operation processing module so that the second operation processing module creates a second transmission platform.
[0118] Step S1320: Control the second media processing module so that the second media processing module performs data offload processing via an external network port of the second transmission platform.
[0119] In this embodiment, when the deployment mode of the first new radio base station and the second new radio base station is inter-station non-common frame deployment, the second new radio base station controls the second operation processing module so that the second operation processing module creates a second transmission platform, and the second media processing module performs data offload processing through an external network port of the second transmission platform.
[0120] In one embodiment, as shown in FIG. 19, step S940 will be described. This step S940 may further include, but is not limited to, steps S1410 and S1420 when the deployment form is a common frame-common logical station deployment.
[0121] Step S1410: A destination IP address and a destination MAC address for data offloading are set in the second media processing module.
[0122] In addition, this destination IP address and destination MAC address may be those of the first media processing module of the first new radio base station, or those of the equipment of the second new radio base station, but this embodiment does not particularly limit this.
[0123] Step S1420: The second media processing module is controlled so as to perform data offload processing according to the destination IP address and the destination MAC address.
[0124] In this embodiment, when the deployment form of the first new radio base station and the second new radio base station is common frame-common logic station deployment, the second new radio base station controls the second operation processing module so that the second operation processing module sets a destination IP address and a destination MAC address for performing data offload processing, and controls the second media processing module so that the second media processing module performs data offload processing according to the destination IP address and the destination MAC address.
[0125] In one embodiment, when the deployment form of the first new radio base station and the second new radio base station is common frame-common logic station deployment, the second operation processing module sets a destination IP address and a destination MAC address for data offloading, writes the destination IP address and the destination MAC address in the data header of the target for data offloading, and controls the second media processing module to perform data offloading processing according to the destination IP address and the destination MAC address, but this embodiment is not particularly limited to this.
[0126] In one embodiment, step S940 will be described as shown in FIG. 20. This step S940 may further include step S1510 if the deployment type is common frame non-common logical station deployment, but is not limited thereto.
[0127] Step S1510: Control the second media processing module so that the second media processing module performs data offload processing via an intranet port of the first transmission platform of the first new radio base station.
[0128] In this embodiment, when the deployment form of the first new radio base station and the second new radio base station is common frame non-common logic station deployment, the second new radio base station controls the second operation processing module so that the second operation processing module performs data offload processing through the intranet port of the first transmission platform of the first new radio base station.
[0129] The embodiment shown in FIG. 18 belongs to a parallel embodiment to the embodiment shown in FIG. 19 and the embodiment shown in FIG. 20, and each corresponds to a different deployment form.
[0130] The data transmission method according to the above embodiment will now be described in detail using a specific example. Example 1
[0131] 21, it is assumed that the first new radio base station is a low frequency new radio base station 500, the second new radio base station is a high frequency new radio base station 600, the low frequency new radio base station 500 includes a first distributed unit 510 and a first centralized unit 520, the high frequency new radio base station 600 includes a second distributed unit 610 and a second centralized unit 620, the first distributed unit 510 and the first centralized unit 520 are communicatively connected, and the second distributed unit 610 and the second centralized unit 620 are communicatively connected. When the low frequency new radio base station 500 receives a measurement report from the UE, it performs a dual connection addition with the high frequency new radio base station 600. First, the low frequency new radio base station 500 creates a first operation processing module 521 in the first collection unit 520, and the first operation processing module 521 obtains the configuration list of the low frequency new radio base station 500 according to the low frequency OAM, judges whether the gNBID and PLMN of the high frequency new radio base station 600 exist in the configuration list, if it exists, judges whether the gNBID of the low frequency new radio base station 500 and the gNBID of the high frequency new radio base station 600 match, and whether the PLMN of the low frequency new radio base station 500 and the PLMN of the high frequency new radio base station 600 match, and if both the gNBID of the low frequency new radio base station 500 and the gNBID of the high frequency new radio base station 600, and the PLMN of the low frequency new radio base station 500 and the PLMN of the high frequency new radio base station 600 match, determines the low frequency new radio base station 500 and the high frequency new radio base station 600 as a common frame common logic station deployment. Then, the first operation processing module 521 configures the first transmission platform 530 and creates a first media processing module in the first centralization unit 520. The first operation processing module 521 sends an SN Addition Request request message to the second operation processing module 621 of the high frequency new radio base station 600 through the first transmission platform 530, and the control signaling including the ID information of the first operation processing module 521 is added to the SN Addition Request request message.When the second operation processing module 621 receives the request, it creates a second media processing module 622 in the second centralized unit 620 and returns an SN Addition Request Response message to the first operation processing module 521, and the second operation processing module 521 obtains the ID information of the first operation processing module 521 from the control signaling. The second operation processing module 521 may directly send a message including the ID information of the second operation processing module 521 to the first operation processing module 521 based on the ID information of the first operation processing module 521. When the first operation processing module 521 receives a message including the ID information of the second operation processing module 621, it can obtain the ID information of the second operation processing module 621. After that, the first operation processing module 521 and the second operation processing module 621 can communicate through each other's ID information. When the first media processing module 522 receives the notification of data backtransmission, the first operation processing module 521 sets the IP address and MAC address of the second media processing module 622 in the first media processing module 522, and then the first media processing module 522 directly writes the IP address and MAC address in the data header of the backtransmitted data, and sends it to the second media processing module 622 via the first transmission platform 530. In this example, from the user's perspective, a dual-master, dual-instance approach is adopted, and different transmission methods are adopted according to different deployment scenarios, thereby reducing the delay in the process of NR-DC and data transmission and improving the user's perception.
[0132] Both the first operation processing module 521 and the second operation processing module 621 transmit messages via the XN interface, and the messages undergo ASN.1 (Abstract Syntax Notation Number one) encoding. Example 2
[0133] This example and the above example are based on the same structural diagram. Referring to Figure 21, assume that the first new radio base station is a low frequency new radio base station 500, the second new radio base station is a high frequency new radio base station 600, the low frequency new radio base station 500 includes a first distributed unit 510 and a first centralized unit 520, the high frequency new radio base station 600 includes a second distributed unit 610 and a second centralized unit 620, the first distributed unit 510 and the first centralized unit 520 are communicatively connected, and the second distributed unit 610 and the second centralized unit 620 are communicatively connected. When the low frequency new radio base station 500 receives a measurement report from the UE, it performs a dual connection addition with the high frequency new radio base station 600. First, the low frequency new radio base station 500 creates a first operation processing module 521 in the first collection unit 520, and the first operation processing module 521 obtains the configuration list of the low frequency new radio base station 500 according to the low frequency OAM, and judges whether the gNBID and PLMN of the high frequency new radio base station 600 exist in the configuration list, and if so, judges whether the gNBID of the low frequency new radio base station 500 and the gNBID of the high frequency new radio base station 600 match, and whether the PLMN of the low frequency new radio base station 500 and the PLMN of the high frequency new radio base station 600 match. However, if the gNBID of the low frequency new radio base station 500 and the gNBID of the high frequency new radio base station 600 do not match, or the PLMN of the low frequency new radio base station 500 and the PLMN of the high frequency new radio base station 600 do not match, or both the gNBID of the low frequency new radio base station 500 and the gNBID of the high frequency new radio base station 600, and the PLMN of the frequency new radio base station 500 and the PLMN of the high frequency new radio base station 600 do not match, the low frequency new radio base station 500 and the high frequency new radio base station 600 are determined as common frame non-common logical station deployment. Then, the first operation processing module 521 configures the first transmission platform 530 and creates a first media processing module 522 in the first centralization unit 520.The first media processing module 522 sends an SN Addition Request request message to the second operation processing module 621 of the high frequency new radio base station 600 through the intranet port of the first transmission platform 530, and a control signaling including a virtual stream control transport protocol is added to the SN Addition Request request message. The control signaling is sent to the logical XN interface, and then sent to the second operation processing module 621 of the high frequency new radio base station 600 through the logical XN interface. Upon receiving the control signaling, the second operation processing module 621 creates a second media processing module 622 in the second centralization unit 620, and returns an SN Addition Request Response message to the first operation processing module 521. The second operation processing module 621 can obtain the virtual stream control transport protocol from the control signaling, and determine from the virtual stream control transport protocol that the high frequency new radio base station 600 and the low frequency new radio base station 500 are in a common frame-non-common logical station deployment. Then, the first operation processing module 521 and the second operation processing module 621 can communicate through the virtual stream control transport protocol. When the first media processing module 522 receives the notification of data backhaul, the first operation processing module 521 sets the IP address of the second media processing module 622 to the first media processing module 522, and then the first media processing module 522 directly writes the IP address in the data header of the backhauled data and sends it to the second media processing module 622 through the intranet port of the first transmission platform 530. In this example, from the viewpoint of the carrier, it saves the carrier's physical resources, reduces the transmission resources and the SCTP link between the IP resources and the 5GC by half, greatly reduces the maintenance cost of the carrier, and also improves the performance of the base station.From the user's perspective, adopting dual-master and dual-instance aspects and adopting different transmission methods according to deployment scenarios reduces the delay in NR-DC processes and data transmission, improving user perception.
[0134] Both the first operation processing module 521 and the second operation processing module 621 transmit messages via the XN interface, and the messages undergo ASN.1 (Abstract Syntax Notation Number one) encoding. Example 3
[0135] 22, it is assumed that the first new radio base station is a low frequency new radio base station 500, the second new radio base station is a high frequency new radio base station 600, the low frequency new radio base station 500 includes a first distributed unit 510 and a first centralized unit 520, the high frequency new radio base station 600 includes a second distributed unit 610 and a second centralized unit 620, the first distributed unit 510 and the first centralized unit 520 are communicatively connected, and the second distributed unit 610 and the second centralized unit 620 are communicatively connected. When the low frequency new radio base station 500 receives a measurement report from the UE, it performs a dual connection addition with the high frequency new radio base station 600. First, the low frequency new radio base station 500 creates a first operation processing module 521 in the first collection unit 520, and the first operation processing module 521 obtains the configuration list of the low frequency new radio base station 500 according to the low frequency OAM, and judges whether the gNBID and PLMN of the high frequency new radio base station 600 exist in the configuration list; if not, determines the low frequency new radio base station 500 and the high frequency new radio base station 600 as inter-station non-common frame deployment. Then, the first operation processing module 521 configures the first transmission platform 530, creates a first media processing module 522 in the first centralization unit 520, and sends an SN Addition Request request message to the second operation processing module 621 of the high frequency new radio base station 600 through the external network port of the first transmission platform 530. The SN Addition Request request message is added with control signaling including a stream control transport protocol. The control signaling is transmitted to the XN interface and then transmitted via the XN interface to the second transmission platform 630 of the high frequency new radio base station 600. The second transmission platform 630 transmits the control signaling including the stream control transport protocol to the second operation processing module 621.When the second operation processing module 621 receives the control signaling, it creates a second media processing module 622 in the second centralization unit 620 and returns an SN Addition Request Response message to the first operation processing module 521. The second operation processing module 621 can obtain a stream control transport protocol from the control signaling, and determine that the high frequency new radio base station 600 and the low frequency new radio base station 500 are in inter-station non-common frame deployment according to the stream control transport protocol. Then, the first operation processing module 521 and the second operation processing module 621 can communicate through the stream control transport protocol. When the first media processing module 522 receives the notification of data backtransmission, the first operation processing module 521 sets the IP address of the second media processing module 622 to the first media processing module 522, and then the first media processing module 522 directly writes the IP address in the data header of the backtransmitted data, sends it to the second transmission platform 630 through the external network port of the first transmission platform 530, and sends it to the second media processing module 622 through the second transmission platform 630. In this example, from the viewpoint of the carrier, it saves the carrier's physical resources, reduces the SCTP link between the transmission resource and IP resource and the 5GC by half, greatly reduces the maintenance cost of the carrier, and also improves the performance of the base station. From the viewpoint of the user, the dual master, dual instance aspect is adopted, and different transmission methods are adopted according to the deployment scenario, thereby reducing the delay of the process and data transmission of NR-DC and improving the user's perception.
[0136] Both the first operation processing module 521 and the second operation processing module 621 transmit messages via the XN interface, and the messages undergo ASN.1 (Abstract Syntax Notation Number one) encoding.
[0137] There are various encoding formats for ASN.1, such as Basic Encoding Rules (BER), Canonical Encoding Rules (CER), and Distinguished Encoding Rules (DER), of which BER, CER, and DER are the three most common encoding formats for ASN.1.
[0138] In the above three examples, that is, Example 1 and Example 2 shown in FIG. 21, and Example 3 shown in FIG. 22, from the viewpoint of the device manufacturer, in the NR-DC, different operation processing modules, for example, the first operation processing module 521 and the second operation processing module 621, are installed on the CU side (first centralized unit or second centralized unit), and for example, the first operation processing module 521 and the second operation processing module 621 are directly portable in three deployment scenarios, namely inter-station non-common frame deployment, common frame-common logical station deployment, and common frame-non-common logical station deployment, eliminating the need for redevelopment, and the media plane adopts an independent media plane instance method, eliminating the need for redevelopment in the three deployment scenarios and allowing direct porting. This greatly reduces the complexity of implementation, and allows the same software version to flexibly adapt to the three deployment scenarios, thereby saving labor and maintenance costs.
[0139] In the above three examples, i.e., Example 1 and Example 2 shown in FIG. 21, and Example 3 shown in FIG. 22, the frequency range corresponding to the low-frequency new radio base station 500 may be 450 MHZ to 6000 MHZ, and the frequency range corresponding to the high-frequency new radio base station 600 may be 24250 MHZ to 52600 MHZ, but is not particularly limited here.
[0140] The present embodiment also provides, as shown in FIG. A memory 702 configured to store a program; A data transmission device 700 is provided, including, but not limited to, a processor 701 configured to execute a program stored in a memory 702, the processor 701 being configured to execute the program stored in the memory 702 to perform the above-mentioned data transmission method.
[0141] The processor 701 and the memory 702 may be connected via a bus or in other ways.
[0142] The memory 702 as a non-transitory computer-readable storage medium may be configured to store non-transitory software programs and non-transitory computer-executable programs, such as the data transmission method described in the embodiments of the present application. When the processor 701 executes the non-transitory software programs and instructions stored in the memory 702, the above data transmission method is realized.
[0143] The memory 702 may include a program storage area that may store an operating system and / or applications necessary for at least one function, and a data storage area that may store and execute the data transmission methods described above. Additionally, the memory 702 may include high-speed random access memory and may include non-transient memory, such as at least one disk memory device, flash memory device, or other non-transient solid-state memory device. In some embodiments, the memory 702 may include memory 702 located remotely relative to the processor 701 that may be connected to the processor 701 via a network. Examples of the aforementioned networks include, but are not limited to, the Internet, a corporate intranet, a local area network, a mobile communication network, and combinations thereof.
[0144] Non-transitory software programs and instructions necessary to realize the above data transmission methods are stored in memory 702 and, when executed by one or more processors 701, realize the above data transmission methods, e.g. steps S110 to S140 of the method in FIG. 6, steps S210 and S220 of the method in FIG. 7, step S310 of the method in FIG. 8, step S410 of the method in FIG. 9, steps S510 to S520 of the method in FIG. 10, step S510 of the method in FIG. 11, and steps S520 of the method in FIG. 12, step S810 and step S820 of the method in FIG. 13, steps S910 to S940 of the method in FIG. 14, step S1010 of the method in FIG. 15, step S1110 of the method in FIG. 16, step S1210 of the method in FIG. 17, steps S1310 and S1320 of the method in FIG. 18, steps S1410 and S1420 of the method in FIG. 19, and step S1510 of the method in FIG. 20.
[0145] The above device or system embodiments are merely schematic, and the units shown as separate components may or may not be physically separated, i.e., located in one place or distributed among multiple network units. Some or all of these modules may be selected to achieve the objectives of the embodiments according to actual needs.
[0146] An embodiment of the present application also relates to, when executed by a processor or controller, such as the processor in the above-described apparatus embodiments, steps S110 to S140 of the method in FIG. 6, steps S210 and S220 of the method in FIG. 7, step S310 of the method in FIG. 8, step S410 of the method in FIG. 9, steps S510 to S520 of the method in FIG. 10, steps S610 and S620 of the method in FIG. 11, step S710 of the method in FIG. 12, step S710 of the method in FIG. 13, and the like. A computer-readable storage medium is provided having stored thereon computer-executable instructions for causing the above-mentioned processor to execute steps S810 and S820, steps S910 to S940 of the method in FIG. 14, step S1010 of the method in FIG. 15, step S1110 of the method in FIG. 16, step S1210 of the method in FIG. 17, steps S1310 and S1320 of the method in FIG. 18, steps S1410 and S1420 of the method in FIG. 19, and step S1510 of the method in FIG. 20.
[0147] Further, an embodiment of the present application includes a computer program or computer instructions stored in a computer-readable storage medium, and a processor of a computing device reads the computer program or computer instructions from the computer-readable storage medium and executes the computer program or computer instructions to perform the data transmission method in the above embodiment, for example, steps S110 to S140 of the method in FIG. 6, steps S210 and S220 of the method in FIG. 7, step S310 of the method in FIG. 8, step S410 of the method in FIG. 9, and steps S510 to S520 of the method in FIG. 10. 12, step S810 and step S820 of the method in FIG. 13, steps S910 to S940 of the method in FIG. 14, step S1010 of the method in FIG. 15, step S1110 of the method in FIG. 16, step S1210 of the method in FIG. 17, step S1310 and step S1320 of the method in FIG. 18, step S1410 and step S1420 of the method in FIG. 19, and step S1510 of the method in FIG. 20.
[0148] An embodiment of the present application includes controlling the first operation processing module so that the first operation processing module creates a first media processing module, obtaining second identification information of the second new radio base station in which the second operation processing module is located, determining a deployment mode between the first new radio base station and the second new radio base station based on the second identification information, generating target identification information according to the deployment mode, generating control signaling based on the target identification information, sending the control signaling to the second new radio base station so that the second operation processing module creates the second media processing module according to the control signaling, and controlling the first media processing module so that the first media processing module transmits data to the second media processing module according to the deployment mode. According to an aspect of the embodiment of the present application, a deployment mode between the first new radio base station and the second new radio base station is determined based on the second identification information, then a target identification information is generated according to the deployment mode, a control signaling is generated based on the target identification information, the control signaling including the target identification information is sent to the second new radio base station to make the second operation processing module of the second new radio base station create a second media processing module based on the target identification information in the control signaling, and finally, the first media processing module is controlled to transmit data to the second media processing module according to the deployment mode. That is, in the aspect of the embodiment of the present application, the first operation processing module and the second operation processing module can interact with each other in any deployment mode, and the first media processing module and the second media processing module can also interact with each other by creating the first media processing module by the first operation processing module of the first new radio base station and creating the second media processing module by the second operation processing module of the second new radio base station.Therefore, data transmission can be achieved without regard for differences in implementation and transmission between different deployment scenarios NR-DC, thereby reducing the implementation complexity of equipment manufacturers and the complexity of carrier version upgrades.
[0149] All or part of the steps in the methods and systems disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. Some or all of the physical components may be implemented as software executed by a processor, such as a central processor, digital signal processor, microprocessor, or as hardware, or as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on a computer readable medium, which may include computer storage media (or non-transitory media) and communication media (or transitory media). As known to those skilled in the art, the term computer storage media includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (e.g., computer readable instructions, data structures, program modules, or other data). Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cartridge, magnetic tape, magnetic disk storage or other magnetic storage device, or any other medium that can be used to store the desired information and that can be accessed by a computer. Additionally, communication media typically includes computer readable instructions, data structures, program modules or other data in a modulated data signal, such as a carrier wave or other transmission mechanism, and may include any information delivery media as known to those skilled in the art.
[0150] Although several examples of the present application have been described above, the present application is not limited to the above embodiments, and a person skilled in the art may make various equivalent modifications or substitutions without departing from the spirit of the present application, and all of these equivalent modifications or substitutions are intended to be included in the scope defined by the claims of the present application.
Claims
1. A data transmission method applied to a first new radio base station in which a first operation processing module is arranged, comprising: controlling the first operation processing module such that the first operation processing module creates a first media processing module; Obtaining second identification information of a second new radio base station where a second operation processing module is located, and determining a deployment mode between the first new radio base station and the second new radio base station according to the second identification information; generating target identification information according to the deployment form, generating control signaling according to the target identification information, and sending the control signaling to the second new radio base station for the second operation processing module to create a second media processing module according to the control signaling; controlling the first media processing module such that the first media processing module transmits data to the second media processing module in response to the deployment configuration.
2. The step of determining a deployment configuration between the first new radio base station and the second new radio base station based on the second identification information includes: obtaining a configuration list and determining whether the second identification information is present in the configuration list; 2. The data transmission method according to claim 1, further comprising: if the second identification information exists in the configuration list, acquiring the first identification information of the first new radio base station, comparing the first identification information with the second identification information, and determining a deployment form between the first new radio base station and the second new radio base station according to a result of the comparison.
3. The step of determining a deployment mode between the first new radio base station and the second new radio base station according to a result of the comparison process includes: If the first identification information and the second identification information match, determining a deployment mode between the first new radio base station and the second new radio base station as a common frame / common logic station deployment; Or, 3. The data transmission method according to claim 2, further comprising the step of determining a deployment mode between the first new radio base station and the second new radio base station as a common frame / non-common logical station deployment when the first identification information and the second identification information do not match.
4. When the deployment mode between the first new radio base station and the second new radio base station is determined as a common frame / common logic station deployment, the step of controlling the first media processing module so that the first media processing module transmits data to the second media processing module according to the deployment mode includes: setting an IP address and a MAC address of the second media processing module in the first media processing module; and controlling the first media processing module so that the first media processing module transmits data to the second media processing module according to an IP address and a MAC address of the second media processing module.
5. When the deployment mode between the first new radio base station and the second new radio base station is determined as a common frame / non-common logical station deployment, the step of controlling the first media processing module so that the first media processing module transmits data to the second media processing module according to the deployment mode includes: controlling the first operation processing module such that the first operation processing module creates a first transmission platform; and controlling the first media processing module so that the first media processing module transmits data to the second media processing module via an intranet port of the first transmission platform.
6. The step of determining a deployment configuration between the first new radio base station and the second new radio base station based on the second identification information includes:
3. The data transmission method according to claim 2, further comprising the step of determining a deployment mode between the first new radio base station and the second new radio base station as an inter-station non-common frame deployment when the second identification information does not exist in the configuration list.
7. When the deployment mode between the first new radio base station and the second new radio base station is determined as an inter-station non-common frame deployment, the step of controlling the first media processing module so that the first media processing module transmits data to the second media processing module according to the deployment mode includes: controlling the first operation processing module such that the first operation processing module creates a first transmission platform; 7. The data transmission method according to claim 6, further comprising the step of controlling the first media processing module so that the first media processing module transmits data to the second transmission platform of the second new radio base station via an external network port of the first transmission platform, so that the first media processing module transmits data to the second transmission platform of the second new radio base station via a second transmission platform.
8. A data transmission method applied to a second new radio base station, comprising: receiving a control signaling sent by a first new radio base station, the control signaling including target identification information generated by the first new radio base station according to a deployment configuration between the first new radio base station and the second new radio base station; creating a second media processing module according to the control signaling; determining a deployment mode between the second new radio base station and the first new radio base station based on the target identification information; and controlling the second media processing module to perform data offload processing in accordance with the deployment form.
9. The target identification information includes a stream control transport protocol, a virtual stream control transport protocol, or an identification information of a first operation processing module of the first new radio base station, and the step of determining a deployment mode between the second new radio base station and the first new radio base station based on the target identification information includes: If the target identification information is a stream control transport protocol, determining a deployment mode between the second new radio base station and the first new radio base station as an inter-station non-common frame deployment; or If the target identification information is a virtual stream control transport protocol, determining a deployment mode between the second new radio base station and the first new radio base station as a common frame non-common logical station deployment; or The data transmission method according to claim 8, further comprising at least one of the steps of: determining a deployment mode between the second new radio base station and the first new radio base station as a common frame / common logic station deployment when the target identification information is the identification information of the first operation processing module of the first new radio base station.
10. When the deployment form is an inter-station non-common frame deployment, the step of controlling the second media processing module to perform data offload processing in accordance with the deployment form includes: controlling the second operation processing module so that the second operation processing module creates a second transmission platform; and controlling the second media processing module so that the second media processing module performs data offload processing via an external network port of the second transmission platform.
11. When the deployment form is a common frame / common logical point deployment, the step of controlling the second media processing module so that the second media processing module performs data offload processing according to the deployment form includes: setting a destination IP address and a destination MAC address for data offloading to the second media processing module; and controlling the second media processing module so that the second media processing module performs data offload processing in response to the destination IP address and the destination MAC address.
12. When the deployment form is a common frame non-common logical point deployment, the step of controlling the second media processing module so that the second media processing module performs data offload processing according to the deployment form includes: The data transmission method according to claim 9, further comprising: controlling the second media processing module so that the second media processing module performs data offload processing via an intranet port of a first transmission platform of the first new radio base station.
13. A data transmission device comprising a memory, a processor, and a computer program stored in the memory and operable by the processor, the processor implementing the data transmission method according to any one of claims 1 to 12 when it executes the computer program.
14. A computer-readable storage medium storing computer-executable instructions for carrying out the data transmission method according to any one of claims 1 to 12.
15. A computer program product comprising a computer program or computer instructions, the computer program or computer instructions being stored in a computer-readable storage medium, a processor of a computing device reading the computer program or computer instructions from the computer-readable storage medium, and the processor executing the computer program or computer instructions to cause the computing device to perform the data transmission method according to any one of claims 1 to 12.
Citation Information
Patent Citations
System and method for exchanging configuration information between two nodes in a wireless network
JP2020523808A
Tunnel setup for split bearers in Multi-RAT Dual Connectivity (MR-DC) and NR-NR Dual Connectivity (NR-DC)
JP2021533600A
Resource isolation in wireless communications systems
US20210266870A1
