Method, device, electronic device, and storage medium for determining a project stream
The method enhances project stream personalization and customization by updating pending execution streams based on preset operations and controls, ensuring a better match with actual projects and improving reusability.
Patent Information
- Application Number
- JP2024531280
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-26
- Filing Date
- 2022-11-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-11-03
AI Technical Summary
Existing project streams lack personalization and customization, leading to a mismatch between digitized project streams and real projects, making them non-reusable and inadequate for effective project management.
A method and apparatus for determining a project stream that involves obtaining a pending execution project stream, updating it based on preset operations on process nodes, and setting it as a target execution project stream upon triggering a control, thereby enhancing personalization and customization.
The method improves the match between the final project stream and actual projects, providing reusability and meeting specific project management needs.
Smart Images

Figure 2024542568000001_ABST
Abstract
Description
[Technical field]
[0001] TECHNICAL FIELD The present disclosure relates to the field of computer technology, for example, to a method, an apparatus, an electronic device, and a storage medium for determining a project stream.
[0002] This application claims priority to a Chinese patent application bearing application number 202111424198.2, filed with the State Intellectual Property Office of the People's Republic of China on November 26, 2021, the entire contents of which are incorporated herein by reference. [Background technology]
[0003] When a company develops a product or expands its business in response to market and user needs, it first plans a corresponding project based on the content of the current work, and then organizes and plans the specific processes within the project so that the work will be carried out in multiple stages after the project is launched.
[0004] However, actual projects are usually relatively complex, and the digitized project stream obtained by the conventional method may not match the actual project. In addition, it is difficult for related users to personalize the project stream, so the existing project stream does not have reusability and cannot meet the management needs of the actual project. Summary of the Invention [Problem to be solved by the invention]
[0005] The embodiments of the present disclosure provide a method, apparatus, electronic device, and storage medium for determining a project stream, which realizes personalized customization of a project stream and improves the consistency between the finally determined project stream and an actual project. [Means for solving the problem]
[0006] In aspect 1, an embodiment of the present disclosure comprises: Obtaining a ready-to-use execution project stream including a plurality of ready-to-use process nodes; updating the queued execution project stream in response to detecting that the operation on the at least one queued process node is a preset operation; and in response to detecting that the target control has been triggered, setting the updated ready-to-use execution project stream as the target execution project stream. Provides a method for determining project streams.
[0007] In aspect 2, an embodiment of the present disclosure comprises: a use-ready execution project stream acquisition module configured to acquire a use-ready execution project stream including a plurality of use-ready process nodes; a use-waiting execution project stream update module configured to update the use-waiting execution project stream in response to detecting that an operation on the at least one use-waiting process node is a preset operation; a target execution project stream determination module configured to determine the updated ready-to-use execution project stream as a target execution project stream in response to detecting that the target control has been triggered; A project stream determiner is also provided.
[0008] In a third aspect, an embodiment of the present disclosure comprises: one or more processors; a storage device configured to store one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors perform any of the project stream determination methods described in the embodiments of the present disclosure. An electronic device is further provided.
[0009] In aspect 4, an embodiment of the present disclosure comprises: The method includes computer-executable instructions configured to, when executed by a computer processor, perform any of the project stream determination methods described in the embodiments of the present disclosure. A storage medium is also provided. [Brief description of the drawings]
[0010] Throughout the drawings, the same or similar reference numbers represent the same or similar elements. It should be understood that the drawings are schematic and that the drawings and elements are not necessarily drawn to scale. [Figure 1] 1 is a flowchart of a method for determining a project stream according to one embodiment of the present disclosure. [Diagram 2] 13 is a flowchart of a method for determining a project stream according to another embodiment of the present disclosure. [Diagram 3] 1 illustrates one waiting-to-be-used execution project stream according to one embodiment of the present disclosure. [Figure 4] 13 is an illustration of a node-related casting edit page according to one embodiment of the present disclosure. [Diagram 5] 13 is an illustration of an edit visible node information page according to one embodiment of the present disclosure. [Figure 6] 13 illustrates an updated waiting-to-use execution project stream according to one embodiment of the present disclosure. [Figure 7] FIG. 2 is a structural block diagram of a project stream determination device according to an embodiment of the present disclosure. [Figure 8] FIG. 1 is a structural schematic diagram of an electronic device according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] It should be understood that steps described in method embodiments of the present disclosure may be performed in different orders and / or in parallel. Also, method embodiments may include additional steps and / or steps that are shown omitted from the execution. The scope of the present disclosure is not limited in this respect.
[0012] As used herein, the term "comprising" and variations thereof are open inclusive, i.e., "including, but not limited to." The term "based on" means "based at least in part on." The term "one embodiment" refers to "at least one embodiment." The term "another embodiment" refers to "at least one other embodiment." The term "some embodiments" refers to "at least some embodiments." Relevant definitions of other terms are provided below.
[0013] It should be noted that the concepts of "first", "second", etc. referred to in this disclosure are merely intended to distinguish different devices, modules, or units, and are not intended to limit the order or interdependence of functions performed by these devices, modules, or units.
[0014] It should be understood that the modifications "one" and "multiple" referred to in the present disclosure are exemplary and not limiting, and that those of skill in the art should understand them as "one or more" unless the context clearly indicates otherwise.
[0015] 1 is a flowchart of a method for determining a project stream according to an embodiment of the present disclosure. This embodiment is applied to processing a project stream in the related art to obtain a project stream that matches an actual project, and the method can be performed by a project stream determination device, which can be realized in the form of software and / or hardware, and the hardware can be an electronic device such as a mobile terminal, a PC terminal, or a server, etc.
[0016] Before introducing the technical solution, the application scenario can be illustrated. The technical solution can be applied to any scenario of determining a project stream with high matching degree for an actual project based on the project stream in the related technology. For example, an enterprise creates a project according to the needs of the market and users, and wants to quickly build a project stream with high matching degree for the project based on the project stream in the related technology. In this case, the execution project stream in the related technology can be obtained based on the technical solution, and then the project stream in the related technology can be updated based on the preset operation to obtain a target execution project stream with high matching degree with the actual project.
[0017] As shown in FIG. 1, the method of this embodiment includes the following steps:
[0018] In S110, a waiting-to-be-used execution project stream is obtained.
[0019] For a project planned by an enterprise for a certain product or business, the relevant staff needs to establish a corresponding project process for the actual work content of the project, so as to grasp and control multiple links in the project after it is deployed. For example, an enterprise can create a corresponding project process for an Internet product, which includes multiple stages such as project startup, development testing, and online, and each stage is associated with specific work content.
[0020] On this basis, in this embodiment, the execution project stream is a digitalized carrier of the project process, which can at least reflect multiple work stages in the project process and the associated relationships between the multiple work stages, and the execution project stream can be stored and represented in a document, a flowchart, or other specific form, and project participants can monitor and manage the entire project and the work of multiple stages based on the execution project stream corresponding to the project.
[0021] In the actual application process, there are multiple ways to generate a project stream. For example, after a project person determines a target project, he or she can manually edit the execution project stream in text format based on experience, and then name and store the project stream; or, according to the process management needs of the actual project, generate a project stream in a specific platform or system. For example, through the platform or system for generating a project stream, the relevant staff can divide the overall scheme of the project into multiple stages according to certain division rules, and generate a project stream in the form of a flow chart. For example, the generated project stream can be stored in a specific storage space for recalling when the project stream is shown on a specific page.
[0022] In this embodiment, the generated and stored execution project stream is a waiting-to-use execution project stream. It can be understood that the number of waiting-to-use execution project streams may be one or more. In addition, one waiting-to-use execution project stream can correspond to at least a certain type of project. For example, a waiting-to-use execution project stream with an identifier A stored in the repository can correspond to a development project of a big data-related product.
[0023] For example, the waiting-to-use execution project stream further includes a plurality of waiting-to-use process nodes. Those skilled in the art should understand that the plurality of stages of an actual project can all be associated with a theme idea corresponding to a specific performer and the execution content of the stage. In the waiting-to-use execution project stream, the carrier of the related information of the plurality of stages is the waiting-to-use process node, and in each waiting-to-use execution project stream, the process node may be multiple, and the specific number is determined according to the actual work content and project management needs of the project. Meanwhile, one process node may correspond to a certain stage in the project, or a certain step in a single stage of the project. For example, the process nodes of the waiting-to-set goal project include an evaluation start node, a score node, a needs analysis node, a development node, a test node, and a publication node. Here, the evaluation start node, the score node, and the needs analysis node correspond to the start-up stage of the project, the development node and the test node correspond to the development and test stage of the project, and the publication node corresponds to the online stage of the project.
[0024] In this embodiment, when multiple execution project streams are stored in the repository, the execution project streams waiting to be used can be acquired in multiple ways. For example, all project streams are displayed on a specific page of a platform or system, and a user can manually select one or more of them as the execution project streams waiting to be used. In addition, in response to a project stream acquisition command issued by a user, the tag information carried in the command can be analyzed and extracted, and a project stream related to the tag from the multiple execution project streams can be selected as the execution project streams waiting to be used based on the tag information and provided to the user. It should be understood by those skilled in the art that the specific manner of acquiring the execution project streams waiting to be used can be selected according to the actual situation, and the embodiment of the present disclosure does not specifically limit this. It should be understood that acquiring the execution project streams waiting to be used and acquiring multiple process nodes waiting to be used contained in the project streams can be determined as a project flowchart corresponding to a certain project.
[0025] In S120, if it is detected that the operation for at least one waiting-to-be-used process node is a preset operation, the waiting-to-be-used execution project stream is updated.
[0026] In this embodiment, after obtaining an execution project stream waiting to be used, an operation on the project stream is detected, and if a preset operation on at least one process node waiting to be used is detected, the project stream waiting to be used can also be updated.
[0027] For example, after loading the waiting-to-use execution project stream into the platform or system for determining the project stream, the user can operate multiple waiting-to-use process nodes by clicking, dragging, and other methods. Meanwhile, the platform or system pre-stores a set of instructions reflecting various operations on the process nodes. For example, a click operation instruction and a drag instruction for the process node. It can be understood that the operations corresponding to the above instructions are pre-set operations. Meanwhile, for the waiting-to-use process nodes, different operation instructions correspond to different processing methods and trigger different effects. For example, the user can modify the name of the process node after clicking the process node and inputting text information into the setting page related to the process node. When the user double-clicks the process node, the node can be deleted, which indicates that the current project does not need to execute the task corresponding to the process node, and when the user drags the process node, the execution order of multiple stage tasks of the project can be changed. It should be noted that, in the actual application process, the pre-set operations and operation instructions can be set according to the requirements of the platform or system for determining the project stream, and the embodiment of the present disclosure is not specifically limited thereto.
[0028] For example, a preset operation is detected, and the corresponding waiting-to-use process node is processed according to the operation, thereby realizing the update of the waiting-to-use execution project stream. It may be understood that a new project stream is determined based on the original project stream, and the updated project stream is more consistent with the actual project. Illustratively, when a platform or system for determining a project stream shows a waiting-to-use execution project stream to a user on a specific page, the project stream includes an evaluation start node, a score node, a needs analysis node, a development node, a test node, and a publication node, but there is no need to perform a needs analysis task for the project that needs to be implemented this time, and in this case, the project person in charge can delete the waiting-to-use process node by double-clicking the needs analysis node.
[0029] By detecting preset operations for waiting-to-be-used process nodes, not only is it possible to realize modification of the process nodes, but it is also possible to avoid destruction of the execution project stream in the related art caused by operations other than the preset operations.
[0030] In S130, when it is detected that the target control has been triggered, the updated waiting-for-use execution project stream is set as the target execution project stream.
[0031] In this embodiment, after processing the waiting-to-use process nodes according to the detected preset operation, the new project stream obtained based on the original waiting-to-use execution project stream is the target execution project stream. It can be seen that the matching degree between the target execution project stream and the actual project is higher. In the above example, after the project manager deletes the needs analysis node from the waiting-to-use execution project stream in the platform or system, the obtained new execution project stream only includes the evaluation start node, score node, development node, test node and issue node, which is the target execution project stream corresponding to the actual project.
[0032] In this embodiment, the operation of determining the target execution project stream can be triggered by a target control. For example, in a platform or system for determining a project stream, the target control can be a visualization control specially developed for determining the target execution project stream. For example, a "project stream determination" control is developed, and the updated execution project stream can be the target execution project stream by detecting a click operation on the control.
[0033] In the actual application process, the target control may be a package of data and methods and have certain attributes and methods. For example, a number of node edit controls related to a node can be the target control. It can be understood that the node edit control is a control that detects and responds to the operation preset for the node, and after the user confirms the operation content in the control, the platform or system can trigger the confirmation operation of the target execution project stream.
[0034] In addition, in this embodiment, after determining the target execution project stream based on the waiting execution project stream, the newly generated project stream may be stored as a template in a specific storage space of the platform or system, and a tag representing a project type is attached to the template, so that when it is necessary to determine a project stream for other subsequent projects of the same or similar type based on this, the target execution project stream related to the tag can be used as a waiting execution project stream, which can be directly used by other project personnel, or the project personnel can perform the individualization customization operation in the above aspect of this embodiment on the project stream.
[0035] The technical solution of this embodiment first obtains a waiting-to-use execution project stream, that is, obtains a project work program template in the related art. If it is detected that the operation of at least one waiting-to-use process node is a preset operation, the waiting-to-use execution project stream is updated, and if it is detected that the target control is triggered, the updated waiting-to-use execution project stream is the target execution project stream, so as to provide the project stream in the related art with reusability, and provide users with a route for updating the project stream in the related art according to the demands of actual project management, so as to realize the personalized customization of the project stream, and improve the matching degree between the finalized project stream and the actual project.
[0036] FIG. 2 is a flow chart of a method for determining a project stream according to another embodiment of the present disclosure. Based on the above embodiment, a waiting-to-use execution project stream is determined according to a configuration field. That is, a project work program template that is closest to an actual project is determined, and for example, according to a trigger operation on a waiting-to-use process node, the process node and the node associated with the node are deleted, so as to realize trimming of the waiting-to-use execution project stream, and to meet the user's demand for personalization of the project stream. The exemplary embodiment may refer to the technical solution of this embodiment. Here, the same or corresponding technical terms as those in the above embodiment are omitted here.
[0037] As shown in FIG. 2, the method includes the following steps.
[0038] In S210, a use-waiting execution project stream is determined from a plurality of selection-waiting execution project streams according to a preset configuration field.
[0039] In this embodiment, a plurality of execution project streams may be stored in the storage space of the platform or system for determining the project stream. It can be understood that these project streams can reflect at least the project processes of a plurality of projects as project work program templates corresponding to a plurality of types of projects. To meet the actual project management needs of the project personnel, the final target execution project stream can be obtained by updating one of the project streams. Therefore, the plurality of project streams pre-stored in the platform or system can be the execution project streams waiting to be selected.
[0040] In this embodiment, the waiting-to-use execution project stream is selected and determined from the multiple waiting-to-select execution project streams based on a preset configuration field. Here, the configuration field may be a preset project type or an important field. Exemplarily, the tag information carried in the waiting-to-select execution project stream may represent a project type such as "mobile product development project stream", "big data product development project stream", etc. The important field may be a field that matches a keyword in the name of the multiple waiting-to-select execution project streams, such as iOS, Data, etc. It can be understood that the project type or important field that can be the configuration field may be a summary and embodiment of the substantial work content of the project.
[0041] It can be understood that in the actual application process, the configuration field may be carried in an instruction to determine a target execution project stream sent to a platform or system, and the platform or system can determine the configuration field carried in the instruction by analyzing and extracting the instruction.
[0042] For example, based on the determined placement field, a waiting-to-use execution project stream can be selected from a plurality of waiting-to-select execution project streams in a manner that matches the field. For example, if it is determined that the project type is the "mobile product development project stream" in the above example, the waiting-to-use execution project stream can be determined by matching the field with the names of the plurality of project streams. Furthermore, it is also possible to traverse and match a plurality of waiting-to-use process nodes in each waiting-to-select execution project stream in a manner that matches the field, and, according to the matching result, to set the project stream corresponding to the process node in the result as the target execution project stream. For example, if it is determined that the important field is Data, a plurality of process nodes in each waiting-to-select execution project stream can be traversed to determine three waiting-to-use process nodes, namely, "Data score period", "Data development", and "Data test". For example, a project stream including the above three waiting-to-use process nodes is set as a waiting-to-use execution project stream.
[0043] In S220, if it is detected that the operation for at least one waiting-to-be-used process node is a preset operation, the waiting-to-be-used execution project stream is updated.
[0044] In the actual application process, there are various cases for updating the waiting execution project stream according to the detected preset operation, and the various cases will be described in detail below.
[0045] For example, when it is detected that the trigger operation for the current waiting process node is a delete operation, the current waiting process node is deleted and the waiting execution project stream is updated. Hereinafter, this process will be specifically described with reference to FIG.
[0046] Referring to FIG. 3, when the platform or system for determining a project stream shows the waiting-for-use execution project stream shown in FIG. 3 on a certain page, the user can perform trigger operations such as clicking, dragging, etc. on the waiting-for-use process nodes therein. When the “Data Development” node is clicked, the platform or system displays a menu corresponding to the waiting-for-use process node, and the menu includes multiple options such as “Add Node”, “Connect”, and “Delete Node”. It can be understood that the multiple options are related to actual operation instructions. For example, when the user clicks the “Delete Node” option, a delete operation on the waiting-for-use process node can be triggered, in which case the platform or system deletes the “Data Development” node from the waiting-for-use execution project stream to realize the update of the waiting-for-use execution project stream.
[0047] In addition, in the actual application process, a waiting-to-use process node may be related to multiple other process nodes in the waiting-to-use execution project stream. That is, according to the actual project needs, if a certain stage task does not need to be executed, multiple tasks that have dependencies on the stage task also do not need to be executed. Therefore, when deleting these process nodes, the system also adaptively deletes other process nodes that have dependencies on the deleted node, such as the "Data score period" node and the "Data test" node in FIG. 3.
[0048] For example, when it is detected that the currently waiting process node is triggered, the node attribute information corresponding to the currently waiting process node is displayed. When it is detected that the related casting information or the visible node information in the node attribute information is modified, the process node waiting to be deleted related to the currently waiting process node is determined, and the waiting to be deleted execution project stream is updated according to the process node waiting to be deleted. Hereinafter, the process will be described in detail with reference to FIG. 4 and FIG. 5.
[0049] 4, a node information editing page can be pre-prepared in a platform or system for determining a project stream. For example, after displaying a waiting-to-use execution project stream on a specific page, if it is detected that a user selects a waiting-to-use process node in the project stream, the display of the corresponding node information editing page can be triggered. It can be seen that the node attribute information of the waiting-to-use node is displayed on the node information editing page, and an editing function for the node attribute information is provided.
[0050] In this embodiment, the node attribute information may be information reflecting the staff and work contents of multiple stages of the project, and may include at least one of the following: node identifier, node name, node linkage user, node authority information, node execution time, node operation type, node circulation type, node restriction type, previous node identifier, and node event. Here, the information that can affect the deletion of the process node is related casting information and visible node information.
[0051] Referring to Fig. 4, in the node information editing page, if the waiting process node selected by the user has an attribute of "can be deleted", the "related casting" information of the node can be modified. In this embodiment, the "related casting" can at least determine the deletion operation of the related node, and can be understood as the person in charge or the executor of the project task corresponding to the node. When the related casting of the waiting process node is modified, it can be determined that a number of process nodes corresponding to the modified casting need to be deleted. These nodes that need to be deleted can be understood as waiting-to-delete nodes, and it can be understood that the tasks / events related to the modified person in charge or the executor do not need to be executed according to the actual project.
[0052] Referring to Fig. 5, the visibility condition of the node can also be set in the node information editing page. It can be seen that the attribute information can also determine whether the process node needs to be deleted in the current project stream. Illustratively, after the user adds the "Data Development" field in "Add Visibility Condition" as a condition for whether to delete the process node and confirms it, all fields related to Data Development in the current waiting-to-use execution project stream are waiting-to-delete process nodes.
[0053] In this embodiment, according to the above two methods, the process nodes waiting to be used can determine the process nodes waiting to be deleted, and further update the execution project stream waiting to be used.
[0054] For example, when it is detected that related casting information in the node attribute information has been deleted, a process node awaiting deletion related to the current process node awaiting use is determined, or when it is detected that content corresponding to visible node information in the node attribute information has been deleted, a process node awaiting deletion related to the current process node awaiting use is determined.
[0055] Continuing to refer to FIG. 4, in the node information editing page, the project personnel can select "Data Engineer" as the related casting of the "Data Development" node from multiple types of castings provided by the preset set of related castings. For example, when the platform or system deletes the casting, the "Data Development" node (and multiple nodes related to the subsequent big data tasks) corresponding to the casting are determined as process nodes waiting to be deleted. Those skilled in the art can understand that the platform or system can further provide a recovery function of the related casting and its related nodes. That is, after recovering the "Data Engineer" in the above example, the nodes related to the casting are also removed from the set of process nodes waiting to be deleted.
[0056] Continuing to refer to FIG. 5, it can be determined that in the node information editing page, the visible node information may include “Data Development”. Therefore, if it is detected that the content related to big data development in the project is deleted, it can be determined that the node related to “Data Development” is a process node waiting to be deleted.
[0057] For example, the current process node waiting to be used is set as the master node, and process nodes waiting to be used that depend on the master node are searched for on the downstream link, and the process nodes waiting to be used are set as process nodes waiting to be deleted.
[0058] Here, the waiting process nodes can be divided into master nodes and slave nodes. For multiple process nodes corresponding to the executing process, the master process node and the slave process node are one relative concept, and by setting the concept of master / slave in the process node, it is possible to reflect at least the execution order of multiple nodes and the association relationship between the nodes.
[0059] In this embodiment, after a user determines the process nodes waiting to be deleted in the waiting-to-use execution project stream, these nodes can be set as master nodes, indicating that the actual project tasks / events corresponding to the nodes do not need to be executed. Meanwhile, other tasks / events related to the project tasks / events do not need to be executed as well. On this basis, it may be understood that the platform or system for determining the project stream can automatically search for waiting-to-use process nodes that depend on the master node in the downstream link, and automatically determine one or more nodes that have a dependency relationship with the node. For example, the node determined by the platform or system is also determined as a waiting-to-delete node.
[0060] Taking Figure 3 as an example, when the "Data score period" node is determined as a process node waiting to be deleted, it indicates that the project personnel has deleted the relevant casting information of the node or deleted the content corresponding to the visible node information of the node, that is, the actual project does not need to execute the task / event related to big data. In this case, the platform or system for determining the project stream takes the "Data score period" as the master node, performs a search operation in the downlink based on the node, determines the "Data development" node and the "Data test" node that have a dependency relationship with the node, and further, the two determined nodes are similarly determined as process nodes waiting to be deleted.
[0061] For example, if it is determined that the “Data Score Period” node, the “Data Development” node, and the “Data Test” node in FIG. 3 are process nodes waiting to be deleted, the platform or system can delete these nodes and realize the update of the execution project stream waiting to be used to obtain the updated execution project stream waiting to be used shown in FIG. 6.
[0062] In S230, when it is detected that the target control is triggered, the updated waiting-for-use execution project stream is set as the target execution project stream.
[0063] The technical solution of this embodiment determines a waiting execution project stream according to the configuration field, that is, determines a project work program template that is closest to an actual project, for example, based on a trigger operation on a waiting process node, deletes the waiting process node and the nodes related to the waiting process node, thereby realizing the trimming of the waiting execution project stream, and meeting the user's demand for personalization of the project stream.
[0064] 7 is a structural block diagram of a project stream determination device according to an embodiment of the present disclosure, which can execute the project stream determination method according to any embodiment of the present disclosure, and has corresponding functional modules and beneficial effects. As shown in FIG. 7, the device includes: a waiting-to-use execution project stream acquisition module 310, a waiting-to-use execution project stream update module 320, and a target execution project stream determination module 330.
[0065] The obtain use-ready execution project stream module 310 is configured to obtain a use-ready execution project stream that includes a plurality of use-ready process nodes.
[0066] The use-waiting execution project stream update module 320 is configured to update the use-waiting execution project stream when detecting that an operation on the at least one use-waiting process node is a preset operation.
[0067] The target execution project stream determination module 330 is configured to set the updated waiting-to-be-used execution project stream as the target execution project stream when it detects that the target control has been triggered.
[0068] For example, the waiting-to-be-used execution project stream acquisition module 310 is further configured to determine the waiting-to-be-used execution project stream from the plurality of waiting-to-be-selected execution project streams according to a preset configuration field.
[0069] For example, the waiting-for-use execution project stream update module 320 is further configured to, when it detects that the trigger operation for a current waiting-for-use process node is a delete operation, delete the current waiting-for-use process node and update the waiting-for-use execution project stream.
[0070] Based on the above technical solutions, the waiting-to-be-used running project stream updating module 320 includes a node attribute information display unit, a waiting-to-be-deleted process node determining unit, and a waiting-to-be-used running project stream updating unit.
[0071] The node attribute information display unit is configured to, when detecting that a currently waiting process node has been triggered, display preset node attribute information corresponding to the currently waiting process node.
[0072] The process node waiting to be deleted determination unit is configured to determine a process node waiting to be deleted related to the currently waiting-to-be-used process node when it detects that related casting information or visible node information in the node attribute information has been modified.
[0073] A usage waiting execution project stream updating unit is configured to update the usage waiting execution project stream based on the deletion waiting process nodes.
[0074] For example, the process node waiting to be deleted determination unit is further configured to determine a process node waiting to be deleted related to the current process node waiting to be used when it detects that related casting information in the node attribute information has been deleted, or to determine a process node waiting to be deleted related to the current process node waiting to be used when it detects that content corresponding to visible node information in the node attribute information has been deleted.
[0075] For example, the process node waiting to be deleted determination unit is further configured to set the current process node waiting to be used as a master node, search for process nodes waiting to be used that depend on the master node on a downstream link, and set the process node waiting to be used as the process node waiting to be deleted.
[0076] The technical solution of this embodiment first obtains a waiting-to-use execution project stream, that is, obtains a project work program template in the related art. If it is detected that the operation of at least one waiting-to-use process node is a preset operation, the waiting-to-use execution project stream is updated, and if it is detected that the target control is triggered, the updated waiting-to-use execution project stream is the target execution project stream, so as to provide the project stream in the related art with reusability, and provide a route for users to update the project stream in the related art according to the demands of actual project management, so as to realize the personalized customization of the project stream, and improve the matching degree between the finalized project stream and the actual project.
[0077] The project stream determination device according to an embodiment of the present disclosure can execute the project stream determination method according to any embodiment of the present disclosure, and has functional modules corresponding to the execution of the method and beneficial effects.
[0078] The multiple units and modules of the above device are merely divided according to functional logic, and are not limited to the above division, as long as they can realize the corresponding functions. Furthermore, the specific names of the multiple functional units are merely for easy distinction from each other, and do not limit the scope of protection of the embodiments of the present disclosure.
[0079] FIG. 8 is a structural schematic diagram of an electronic device according to an embodiment of the present disclosure. Hereinafter, referring to FIG. 8, a structural schematic diagram of an electronic device (for example, a terminal device or a server in FIG. 8) 400 suitable for implementing an embodiment of the present disclosure is shown. The terminal device in the embodiment of the present disclosure may include, but is not limited to, mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (for example, in-vehicle navigation terminals), and fixed terminals such as digital TVs, desktop computers, and the like. The electronic device shown in FIG. 8 is merely an example and does not impose any limitations on the functions and scope of use of the embodiment of the present disclosure.
[0080] As shown in Fig. 8, the electronic device 400 may include a processing unit (e.g., a central processor, a graphic processor, etc.) 401, and the electronic device can perform various appropriate operations and processes based on a program stored in a read-only memory (ROM) 402 or loaded from a storage device 408 into a random access memory (RAM) 403. The RAM 403 further stores various programs and data necessary for the operation of the electronic device 400. The processing unit 401, the ROM 402, and the RAM 403 are connected to each other via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.
[0081] Typically, input devices 406 including, for example, a touch panel, touch pad, keyboard, mouse, camera, microphone, accelerometer, gyroscope, etc., output devices 407 including, for example, a liquid crystal display (LCD), speaker, vibrator, etc., storage devices 408 including, for example, a magnetic tape, hard disk, etc., and communication devices 409 can be connected to the I / O interface 405. The communication devices 409 enable the electronic device 400 to communicate wirelessly or via wires with other devices to exchange data. Although FIG. 8 illustrates the electronic device 400 with various devices, it should be understood that it is not necessary to implement or include all of the illustrated devices. Instead, more or fewer devices may be implemented or included.
[0082] According to an embodiment of the present disclosure, the process described with reference to the flowchart above may be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product including a computer program carried on a non-transitory computer-readable medium, the computer program including program code for performing the method illustrated in the flowchart. In such an embodiment, the computer program may be downloaded and installed from a network by the communication device 409, or may be installed from the storage device 408, or may be installed from the ROM 402. When the computer program is executed by the processing device 401, it performs the above-mentioned functions defined in the method of the embodiment of the present disclosure.
[0083] The names of messages or information exchanged between multiple devices in the embodiments of the present disclosure are for illustrative purposes only and are not intended to limit the scope of these messages or information.
[0084] The electronic device according to the embodiment of the present disclosure belongs to the same idea as the method for determining a project stream according to the above embodiment, and the technical details not described in detail in this embodiment may be referred to the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.
[0085] An embodiment of the present disclosure provides a computer storage medium having a computer program stored thereon, the computer storage medium implementing the method for determining a project stream according to the above embodiment when the program is executed by a processor.
[0086] It should be noted that the computer readable medium described in this disclosure may be a computer readable signal medium, a computer readable storage medium, or any combination of the above. The computer readable storage medium may be, for example, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. Further specific examples of the computer readable storage medium may include, but are not limited to, an electrical connection having one or more leads, a portable computer disk, a hard disk, a random access memory (RAM), a read only memory (ROM), an erasable programmable read only memory (EPROM or flash memory), an optical fiber, a portable compact disk read only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this disclosure, the computer readable storage medium may be any tangible medium that contains or stores a program that can be used in or in conjunction with an instruction execution system, apparatus, or device. In this disclosure, a computer-readable signal medium may include a propagated data signal, either in baseband or as part of a carrier wave, in which computer-readable program code is carried. Such a propagated data signal may take a variety of forms, including, but not limited to, an electromagnetic signal, an optical signal, or any suitable combination of the above. A computer-readable signal medium may be any computer-readable medium other than a computer-readable storage medium, which may transmit, propagate, or transmit a program for use in or in conjunction with an instruction execution system, apparatus, or device. The program code contained in the computer-readable medium may be transmitted by any suitable medium, including, but not limited to, electrical wire, optical cable, radio frequency (RF), etc., or any suitable combination of the above.
[0087] In some embodiments, clients and servers may communicate using any now known or later developed network protocol, such as HTTP (Hyper Text Transfer Protocol), and may interconnect with any form or medium of digital data communication (e.g., a communications network). Examples of communications networks include a local area network ("LAN"), a wide area network ("WAN"), a network of networks (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any now known or later developed network.
[0088] The computer readable medium may be included in the electronic device, or may exist separately and not attached to the electronic device.
[0089] The computer-readable medium carries one or more programs, and when the one or more programs are executed by the electronic device, the electronic device Get a pending execution project stream that contains multiple pending process nodes, updating the waiting-for-use execution project stream when detecting that the operation on the at least one waiting-for-use process node is a preset operation; When it is detected that the target control has been triggered, the updated waiting-for-use execution project stream is set as the target execution project stream.
[0090] Computer program code for carrying out the operations of the present disclosure can be written in one or more programming languages or combinations thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and even conventional procedural programming languages such as "C" or similar. The program code may be executed entirely on the user's computer, partially on the user's computer, as a single, separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or business server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., connected via the Internet using an Internet Service Provider).
[0091] The flowcharts and block diagrams in the drawings illustrate possible architectures, functions, and operations of the methods and computer program products according to various embodiments of the present disclosure. In this regard, each block in the flowcharts or block diagrams may represent a module, program, or part of code, which includes one or more executable instructions for implementing a certain logical function. It should be noted that in some alternative implementations, the functions described in the blocks may occur in a different order from the order described in the drawings. For example, two blocks shown as connected may actually be executed substantially in parallel or in reverse order depending on the related functions. It should be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts may be implemented in a system based on dedicated hardware that executes a certain function or operation, or may be implemented in a combination of dedicated hardware and computer instructions. The modules or units according to the embodiments of the present disclosure may be implemented in the form of software or hardware.
[0092] The units according to the embodiments of the present disclosure may be implemented in a software manner or a hardware manner, where the names of the units do not limit the units themselves, for example, the first acquiring unit may be described as "a unit for acquiring at least two Internet Protocol addresses".
[0093] The functionality of the present invention may be performed, at least in part, by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard parts (ASSPs), systems on a chip (SOCs), complex programmable logic devices (CPLDs), etc.
[0094] In the present specification, a machine-readable medium may be a tangible medium that can contain or store a program used in or in conjunction with an instruction execution system, apparatus, or device. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the above. Further specific examples of machine-readable storage media include an electrical connection by one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only disk (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0095] According to one or more embodiments of the present disclosure, [Example 1] is Obtaining a ready-to-use execution project stream including a plurality of ready-to-use process nodes; updating the waiting-for-use execution project stream when detecting that the operation on the at least one waiting-for-use process node is a preset operation; When it is detected that the target control is triggered, the updated waiting-for-use execution project stream is set as the target execution project stream. Provides a method for determining project streams.
[0096] According to one or more embodiments of the present disclosure, [Example 2] is For example, the method further includes determining the use-ready execution project stream from a plurality of selection-ready execution project streams based on a preset placement field. Provides a method for determining project streams.
[0097] According to one or more embodiments of the present disclosure, [Example 3] is For example, when detecting that a trigger operation for a current waiting-to-be-used process node is a delete operation, deleting the current waiting-to-be-used process node and updating the waiting-to-be-used execution project stream; For a plurality of master process nodes, when it is detected that a current master process node has been triggered, adding a slave process node corresponding to the current master process node, and when it is detected that the slave process node has been triggered, setting the slave process node as a current master process node. Provides a method for determining project streams.
[0098] According to one or more embodiments of the present disclosure, [Example 4] is For example, when detecting that a currently waiting process node is triggered, displaying preset node attribute information corresponding to the currently waiting process node; determining a process node waiting to be deleted that is related to the currently waiting-to-be-used process node when detecting that the related casting information or the visible node information in the node attribute information has been modified; and updating the waiting-to-be-used execution project stream based on the waiting-to-be-deleted process nodes. Provides a method for determining project streams.
[0099] According to one or more embodiments of the present disclosure, [Example 5] is For example, when detecting that the related casting information in the node attribute information is deleted, determining a process node waiting to be deleted that is related to the currently waiting-to-be-used process node; or determining a process node waiting to be deleted related to the currently waiting-to-be-used process node when detecting that the content corresponding to the visible node information in the node attribute information has been deleted; Provides a method for determining project streams.
[0100] According to one or more embodiments of the present disclosure, [Example 6] is For example, the method further includes: determining the current process node waiting for use as a master node, searching for a process node waiting for use that depends on the master node on a downlink, and determining the process node waiting for use as the process node waiting for deletion. Provides a method for determining project streams.
[0101] According to one or more embodiments of the present disclosure, [Example 7] is a use-ready execution project stream acquisition module configured to acquire a use-ready execution project stream including a plurality of use-ready process nodes; a use-waiting execution project stream update module configured to update the use-waiting execution project stream when detecting that an operation on the at least one use-waiting process node is a preset operation; and a target execution project stream determination module configured to determine the updated waiting-for-use execution project stream as a target execution project stream when it is detected that the target control has been triggered. Provides a determinant of the project stream.
[0102] Also, although various operations have been described in a particular order, it should not be understood that these operations must be performed in the particular order shown, or in a forward order. In certain circumstances, multitasking and parallel processing may be advantageous. Similarly, the above discussion includes a number of specific implementation details, which should not be understood as limiting the scope of the disclosure. Some features described in the description of a single embodiment may be implemented in combination in a single embodiment. Conversely, various features described in the description of a single embodiment may be implemented in multiple embodiments, either alone or in any suitable subcombination.
Claims
1. A method for determining a project stream, comprising the steps of: Obtaining a ready-to-use execution project stream including a plurality of ready-to-use process nodes; updating the wait-for-use execution project stream in response to detecting that an operation on at least one wait-for-use process node is a preset operation; in response to detecting that the target control has been triggered, setting the updated ready-to-use execution project stream as a target execution project stream; Including, method.
2. obtaining the waiting-to-be-used execution project stream, determining the waiting-to-use execution project stream from a plurality of waiting-to-select execution project streams according to a preset placement field; The method of claim 1 , comprising:
3. updating the wait-for-use execution project stream in response to detecting that the operation on the at least one wait-for-use process node is a preset operation; in response to detecting that the trigger operation for a current pending process node is a delete operation, deleting the current pending process node and updating the pending execution project stream; The method of claim 1 , comprising:
4. updating the wait-for-use execution project stream in response to detecting that the operation on the at least one wait-for-use process node is a preset operation; In response to detecting that a currently reserved process node has been triggered, displaying preset node attribute information corresponding to the currently reserved process node; determining a pending deletion process node associated with the current pending use process node in response to detecting that associated casting information or visible node information in the node attribute information has been modified; updating the waiting-to-be-used execution project stream based on the waiting-to-be-deleted process nodes; The method of claim 1 , comprising:
5. determining a pending deletion process node associated with the currently pending use process node in response to detecting that associated casting information or visible node information in the node attribute information has been modified, determining a process node waiting to be deleted that is associated with the currently waiting-to-be-used process node in response to detecting that associated casting information in the node attribute information has been deleted; or determining a process node waiting to be deleted that is associated with the current process node waiting to be used in response to detecting that content corresponding to visible node information in the node attribute information has been deleted; The method of claim 4 , comprising:
6. Determining a process node waiting to be deleted that is associated with the current process node waiting to be used includes: setting the current process node waiting for use as a master node, searching for a process node waiting for use that depends on the master node via a downlink, and setting the process node waiting for use as the process node waiting for deletion; The method of claim 4 , comprising:
7. A project stream determiner, comprising: a use-ready execution project stream acquisition module configured to acquire a use-ready execution project stream including a plurality of use-ready process nodes; a use-waiting execution project stream update module configured to update the use-waiting execution project stream in response to detecting that an operation on at least one use-waiting process node is a preset operation; a target execution project stream determination module configured to determine the updated ready-to-use execution project stream as a target execution project stream in response to detecting that the target control has been triggered; An apparatus comprising:
8. The waiting execution project stream acquisition module includes: and determining the waiting-to-use execution project stream from a plurality of waiting-to-select execution project streams based on a preset placement field; 8. The apparatus of claim 7.
9. An electronic device, one or more processors; a storage device configured to store a computer program including one or more instructions; A computer program comprising said one or more instructions, when executed by said one or more processors, causes said one or more processors to perform a method according to any one of claims 1 to 6. electronic equipment.
10. Comprising computer executable instructions configured to, when executed by a computer processor, perform the method of any one of claims 1 to 6, storage medium.
Citation Information
Patent Citations
Support device, support method and support program
JP2004213447A
Project management program and project management system
JP2005338968A
Progress management platform
US20100138268A1
Application with embedded workflow designer
US20170315782A1