Building Energy Management Systems

The system addresses the need for efficient building energy management by collecting and analyzing data from building devices to optimize energy usage and control, enhancing energy efficiency through intelligent policies.

JP2024543914AInactive Publication Date: 2024-11-26NX CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2024531314
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-15
Filing Date
2021-12-15
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There is a need for a comprehensive building energy management system that efficiently manages energy consumption and control using IoT and machine learning technologies.

Method used

A building energy management system that collects and analyzes energy and control information from devices within a building, generating pattern data to optimize energy usage and control policies through a server that includes a control unit, communication unit, storage unit, and analysis unit, utilizing machine learning models to analyze device operation and generate control commands.

Benefits of technology

The system effectively manages energy consumption by optimizing device operation based on real-time data analysis, reducing energy waste and improving efficiency through intelligent control policies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024543914000001_ABST
    Figure 2024543914000001_ABST
Patent Text Reader

Abstract

The building energy management system of the present invention includes a first module connected to a first device and generating first pattern data including information related to energy and control of the first device, and a server receiving the first pattern data from the first module and controlling the first device through the first module based on the first pattern data, wherein the first module receives from the first device a plurality of time information and a plurality of energy information and a plurality of control information each corresponding to the plurality of time information, classifies the plurality of control information according to a control entity, a control location and a control item for operation of the first device, and generates the first pattern data based on the plurality of energy information and the classified plurality of control information including information related to power of the first device.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a building energy management system, and more particularly to a building energy management system that collects energy information and control information from devices installed in a building and creates a comprehensive energy policy. [Background technology]

[0002] Recently, many measures have been taken to control carbon emissions. In relation to carbon emissions, the need to efficiently consume and manage the energy of devices installed in buildings has become more prominent. A building energy management system is needed to comprehensively manage the energy of a building by applying efficient IoT technology and machine learning technology to devices installed in the building. Summary of the Invention [Problem to be solved by the invention]

[0003] An object of the present invention is to provide a building energy management system that generates pattern data including energy information and control information to enable energy management of a building. Effect of the Invention

[0004] According to one embodiment of the present invention, a building energy management system may be provided that generates pattern data including energy information and control information to enable energy management of a building. [Brief description of the drawings]

[0005] [Figure 1] 1 is a diagram for explaining devices and modules arranged in a building. [Diagram 2] FIG. 1 illustrates an environmental diagram of a building energy management system according to one embodiment. [Diagram 3] 4 is a diagram illustrating pattern data according to an embodiment; [Figure 4]1 is a diagram illustrating an example of pattern data according to an embodiment; [Diagram 5] 1 is a diagram illustrating control data and delay measurement according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0006] According to one embodiment, a building energy management system is a building energy management system that manages the energy of a building by collecting information of modules connected to devices installed in a building, and includes: a first module connected to a first device and generating first pattern data including information related to energy and control of the first device; and a server that receives the first pattern data from the first module and controls the first device through the first module based on the first pattern data, wherein the first module receives from the first device a plurality of time information and a plurality of energy information and a plurality of control information each corresponding to the plurality of time information, classifies the plurality of control information according to a control entity, control location, and control item for operation of the first device, and generates the first pattern data based on the plurality of energy information and the classified plurality of control information including information related to the power of the first device.

[0007] Here, the control entity may include at least one of a person, an application, an external device, and an internal device of the first device.

[0008] Here, when the control entity is a device, the control location may be set based on sensing information of a GPS sensor included in the device.

[0009] Here, the plurality of time information may be determined by internal time information of the first module, and the internal time information of the first module may be synchronized periodically or aperiodically by the server.

[0010] Here, the control items may include at least one of power, illuminance, temperature, and humidity of the first device.

[0011] Here, the plurality of energy information includes the plurality of time information and a plurality of power data and arc data each corresponding to the plurality of time information, the plurality of power data includes at least one of voltage, current, power amount, and power factor information of the first device, and the arc data includes whether an arc occurs in the first device and an arc current.

[0012] Here, the server acquires energy information at a first time point, control information at the first time point, and energy information at a second time point, and control information at the second time point from the data included in the first pattern data, and the server inputs the energy information and control information for each time point included in the first pattern data into a machine learning model, and analyzes the reason for control of the first device for each time point based on the machine learning model.

[0013] According to one embodiment, an energy management module is an energy management module that is connected to devices installed in a building to control the devices, collects information about the devices, and transmits the collected information to an external device. The energy management module includes a control unit that is connected to the devices and changes a power state of the devices or adjusts a voltage or current, a storage unit that stores energy information, which is information related to the energy of the devices, and control information for the operation of the devices, and a communication unit that transmits data including the energy information and the control information to the external device or receives control command data for the devices from the external device, where the energy information includes at least one of voltage, current, power, and power factor information of the devices, and the control information includes a control entity, control location, and control item for the operation of the devices.

[0014] The embodiments described in this specification are intended to clearly explain the concept of the present invention to those having ordinary skill in the art to which the present invention pertains, and therefore the present invention is not limited to the embodiments described in this specification, and the scope of the present invention should be interpreted as including modifications or variations that do not deviate from the concept of the present invention.

[0015] The terms used in this specification are currently widely used and general terms that are possible in consideration of the functions of the present invention, but these may change depending on the intentions of those skilled in the art to which the present invention belongs, precedents, the emergence of new technology, etc. However, when a specific term is defined and used with a different meaning, the meaning of the term will be described separately. Therefore, the terms used in this specification should be defined based on the substantial meaning of the term and the overall content of this specification, rather than simply the name of the term.

[0016] The drawings attached to this specification are intended to easily explain the present invention, and the shapes illustrated in the drawings are exaggerated as necessary to facilitate understanding of the present invention, and therefore the present invention is not limited by the drawings.

[0017] In this specification, if it is determined that a detailed description of a known structure or function related to the present invention may obscure the gist of the present invention, the detailed description thereof will be omitted as necessary.

[0018] Figure 1 is a diagram for explaining the equipment and modules arranged in a building. Figure 1(a) is a diagram for explaining the equipment arranged in the building, and Figure 1(b) is a diagram for explaining the module connected to the equipment.

[0019] 1(a), a plurality of devices are illustrated in a building. In general, a building has a plurality of devices, including an entrance / exit device, a lighting device, a heating / cooling device, a circulation device, and a power supply device, disposed inside and outside the building.

[0020] The entrance and exit devices installed in the building may include door locks, entrance and exit lock devices, automatic entrance and exit devices, automatic revolving doors, security authentication devices, etc. The lighting devices included in the building may include devices that output light such as light bulbs, LED lights, emergency lights, etc., some of which may have adjustable illuminance.

[0021] The heating and cooling equipment installed in the building may include devices for adjusting the temperature inside the building, such as air conditioners, heaters, heaters, radiators, etc., some of which may also adjust the humidity inside the building. The circulation equipment installed in the building may include devices that can circulate the air inside the building, such as circulators and ventilation fans. The power supply equipment installed in the building may include power supplies, outlets, etc.

[0022] 1(b), a module connected to a wall socket arranged in a building is illustrated. In FIG. 1(b), the example of the device is a wall socket, but the device that can be connected to the module can be each device included in the entrance / exit device, lighting device, heating / cooling device, circulation device, and power supply device.

[0023] The module is connected to the device to collect information related to the energy of the device and control the device. Specifically, the module is connected to an electric wire or circuit inside the device to collect data and transmit the collected data to a server. A detailed description of the module is provided in FIG. 2.

[0024] FIG. 2 is an environmental diagram of a building energy management system according to one embodiment.

[0025] Referring to FIG. 2, a building energy management system according to one embodiment may include a server 1000, one or more modules, and one or more devices.

[0026] The modules 100 and 200 may be connected to an apparatus as shown in Fig. 1(b) to collect data of the apparatus, specifically, the modules may collect information related to the energy of the apparatus.

[0027] According to one embodiment, the module may collect information on the voltage, current, power, or power factor of the device. The module may collect the parameters in real time, or may collect them periodically or aperiodically according to a control command of the server 1000. The module may also collect information on whether an arc occurs in the device and, when an arc occurs, on the arc current.

[0028] According to another embodiment, the module may collect information regarding the control of the device. Specifically, the module may collect information regarding who controlled the device, where, for which item, and for what content.

[0029] For example, for a lighting device in a room, the module can collect information about the lighting device being turned off by a person inside the room at a time point, and for example, for an air conditioner, the module can collect information about the air conditioner being turned off by a schedule function of the air conditioner at a time point.

[0030] For example, for a room heater, the module can collect information that the heater's set temperature has been reduced by a user terminal outside the room at one point in time. For example, for a room outlet, the module can collect information that the outlet has been turned off by an external device at one point in time.

[0031] The server 1000 is a central component of the building energy management system and can act as an overall control unit of the building energy system.

[0032] The server 1000 may be connected to the first module 100 and the second module 200. The server 1000 may also be connected to the first module 100 and the second module 200 to transmit and receive communication signals.

[0033] Alternatively, if the device has a communication function, the server 1000 can directly transmit and receive communication signals to and from each device without going through a module. However, since it is rare for a device to have a communication function, the present specification will mainly describe an example in which the server 1000 collects device information through a module.

[0034] 1, there may be a device between the server 1000 and the first module 100 and the second module 200 that relays these communications. For example, there may be another module between the server 1000 and the first module 100, and the other module may transmit communication signals between the server 1000 and the first module 100.

[0035] Also, for example, a sub-server or edge computing may exist between the server 1000 and the first module 100 to transmit communication signals between the server 1000 and the first module 100. That is, the server 1000 and each module may communicate with each other without any distance limitations.

[0036] According to one embodiment, the server 1000 may include a control unit 1100 , a communication unit 1200 , a storage unit 1300 , and an analysis unit 1400 .

[0037] 1 illustrates four components included in server 1000, the components illustrated are not required and server 1000 may include more or fewer components. Additionally, each component of server 1000 may be physically included in one server, or each component may be a distributed server that is distributed according to its respective function.

[0038] The control unit 1100 can control the operation of the server 1000. Specifically, the control unit 1100 can transmit control commands to the communication unit 1200, the storage unit 1300, and the analysis unit 1400 to execute the operation of each unit.

[0039] Unless otherwise specified below, it can be understood that the operation of the server 1000 is performed under the control of the control unit 1100.

[0040] The communication unit 1200 may connect the server 1000 to an external device to communicate with the server 1000. That is, the communication unit 1200 may transmit / receive data to / from the external device. For example, the communication unit 1200 may transmit / receive data to / from the first module 100 or the second module 200.

[0041] According to an embodiment, the communication unit 1200 may receive energy information of a device connected to the module from the module. For example, the communication unit 1200 may receive energy information of a first device from the first module 100. This will be described in detail below with reference to FIG.

[0042] The communication unit 1200 may be a communication module that supports at least one of a wired communication method and a wireless communication method, for example, the communication unit may acquire data from an external device through a communication method such as WiFi, Bluetooth, ZigBee, BLE (Bluetooth Low Energy), and RFID.

[0043] The storage unit 1300 may store various data and programs necessary for the operation of the server 1000. The storage unit 1300 may store information acquired by the server 1000.

[0044] For example, the storage unit 1300 may store information regarding the energy of the device received through a module by the communication unit 1200. In addition, the storage unit 1300 may store information regarding the control of each device.

[0045] The storage unit 1300 may store data temporarily or semi-permanently. Examples of the storage unit 1300 include a hard disk drive (HDD), a solid state drive (SSD), a flash memory, a read-only memory (ROM), a random access memory (RAM), a cloud storage, etc. However, the storage unit 1300 is not limited thereto and may be embodied as various modules for storing data.

[0046] The storage unit 1300 may be provided in a form that is built into the wearable device 1000 or in a form that is detachable.

[0047] The analysis unit 1400 can analyze data acquired through the communication unit 1200, classify the data, and generate new data. At this time, the analysis unit 1400 can input data to a trained machine learning model to analyze data related to the device. The analysis unit 1400 can analyze the control reason for the device at each point in time through the machine learning model. The analysis unit 1400 can continuously train the machine learning model through the data input to the machine learning model.

[0048] According to an embodiment, the analysis unit 1400 may analyze or classify data regarding the device acquired through the communication unit 1200. Specifically, the analysis unit 1400 may analyze or classify information related to the energy of the device.

[0049] For example, the analysis unit 1400 may analyze the power status of the device by analyzing the voltage, current, power, etc. of the device. In addition, the analysis unit 1400 may analyze the arc occurrence status of the device by analyzing whether an arc occurs in the device and the arc current.

[0050] In addition, the analysis unit 1400 may analyze or classify information related to the control of the device. For example, the analysis unit 1400 may analyze data regarding who and how a specific item of the device was controlled at a certain point in time. The analysis unit 1400 may classify data regarding the control according to six principles.

[0051] As a specific example, the analysis unit 1400 can classify device control into control entity, control location, control item, and control content, and generate control information according to the classification.

[0052] The analysis unit 1400 may generate pattern data including information related to the energy of the device and control information according to the classification. Also, the analysis unit 1400 may set a control policy for the device based on the pattern data. The pattern data generated by the analysis unit will be described in detail below with reference to FIG. 3.

[0053] 3 is a diagram illustrating pattern data generated by a server according to an embodiment, and FIG 4 is a diagram illustrating an example of pattern data according to an embodiment.

[0054] Referring to FIG. 3, the pattern data may include energy information and control information.

[0055] The energy information included in the pattern data may include power data and / or arc data as information related to the energy of the device.

[0056] The power data may include the voltage, current, power, and / or power factor information of the device, as shown in Fig. 4. The voltage, current, power, and power factor of the device vary over time, and the device transmits the time-varying information to the module. The device may transmit the information to the module in real time, periodically, only when there is a change, or non-periodically at the request of the module.

[0057] Arc data, as shown in FIG. 4, can include information on whether an arc occurs in the device and, if an arc occurs, the arc current. Arcs can occur in the device due to external impacts and internal circuit problems. The device continuously monitors arc occurrence and can detect the arc current if an arc occurs. The device can transmit information related to arcs to the module in real time, periodically, only when there is a change, or non-periodically at the request of the module.

[0058] The control information included in the pattern data may include information related to the control of the device, such as a control subject, a control location, a control item, and / or control content.

[0059] As shown in Fig. 4, the control entity that controls the device may be a person, an app, an internal device, or an external device. Specifically, the device may be controlled by a person operating a switch, by an app on a user terminal, by a reservation system within the device, or by an operation by an external device.

[0060] In addition, the location where the device is controlled may be the location where the controller is located depending on the controller. Specifically, if the controller is a person, the control location may be the location where the switch is located, and if the controller is an app, the control location may be determined based on GPS sensing information of the user terminal. In addition, if the controller is an internal device, the control location may be the location where the device is located, and if the controller is an external device, the control location may be the location where the external device is located.

[0061] In addition, the control items and contents of the device may vary depending on the type of device. For example, if the device is a heating / cooling device, the control items may be power, temperature, and humidity, and the control contents may be on, off, increase, and decrease. For example, if the device is a lighting device, the control items may be power and illuminance, and the control contents may be on, off, increase, and decrease.

[0062] 4, the server 1000 can generate pattern data according to time. The pattern data in FIG 4 is generated by the server 1000 for the lighting device.

[0063] For example, the server 1000 may generate pattern data including device control information and energy information according to a first time point (01:00). At this time, the control information at the first time point may include information that a person in room 1 has turned on the lighting device. Also, at this time, the energy information at the first time point may include information that the lighting device has a voltage a, a current b, a power amount c, and a power factor d, and that no arc has occurred at the first time point.

[0064] Also, the pattern data may include device control information and energy information according to the second time point (02:00). At this time, the control information at the second time point may include information that the illuminance of the lighting device has been increased by the user terminal in room 1. Also, at this time, the energy information at the second time point may include information that the lighting device has e voltage, f current, g power, h power factor, and no arc has occurred at the second time point.

[0065] The server 1000 can analyze the pattern data and set up a policy for future building energy. Specifically, the server 1000 can analyze the energy information of the device according to the control information and set up a policy for the device to be controlled at a specific time. Also, the server 1000 can analyze the energy information of the device according to the control information and set up a policy for the device to be controlled according to a specific control entity.

[0066] For example, if the server 1000 determines based on information contained in the pattern data that a lighting device is turned on by a person at 9:00 a.m., the server 1000 can set control over the lighting device so that the lighting device is automatically turned on every 9:00 a.m.

[0067] In addition, for example, if the server 1000 determines based on information included in the pattern data that the air conditioner is to repeatedly perform a set temperature reduction control after the indoor temperature reaches or exceeds 25°C, the server 1000 can adjust the set temperature so that the indoor temperature does not reach or exceed 25°C.

[0068] In addition, the server 1000 can set up a policy and then transmit a control command to each device through a module according to the policy.

[0069] For example, the server 1000 may transmit a control command to each module to turn off the power of the lighting device and the power of the air conditioner at 6 p.m. according to the clock-out policy, and each module may control the power of the device connected to each module to be turned off based on the received control command.

[0070] Also, for example, the server 1000 may transmit a control command to each module to set the set temperature of a heater to 24° C. for a certain period of time according to a winter holiday policy. At this time, each module may control the set temperature of a heater connected to each module to 24° C. based on the received control command.

[0071] When the server 1000 transmits control data including a control command to each module according to a policy, the time during which the control of the device is performed may vary depending on the communication method of each module. Specifically, the first module 100 may communicate with the server 1000 via a first communication method, and the second module 200 may communicate with the server 1000 via a second communication method that is different from the first communication method.

[0072] The communication methods of the modules are different because of the devices connected to the modules. Alternatively, the communication method may be different depending on the location where each device is installed. For example, a module connected to an outlet may communicate with the server 1000 via WiFi or Bluetooth, and a module connected to a lighting device may communicate with the server 1000 via ZigBee. In this case, the ZigBee communication method may be slower than the WiFi or Bluetooth communication method.

[0073] Even if the server 1000 transmits the same control command to the modules, the control performed by the control command may differ for each device due to differences in communication methods.

[0074] For example, the server 1000 may transmit the same control data to a first module connected to a first lighting device and a second module connected to a second lighting device so that the power of the first lighting device and the second lighting device are turned on.

[0075] In this case, a first module communicating with the server 1000 via a first communication method can turn on the power of a first lighting device at a first time point based on the received control data, whereas a second module communicating with the server 1000 via a second communication method can turn on the power of a second lighting device at a second time point that is later than the first time point based on the received control data.

[0076] From the outside, it can be seen that the lighting devices are not turned on simultaneously but are turned on separately even though the server 1000 has transmitted control data at the same time, which can be considered as an error in the building energy management system including the server 1000.

[0077] Also, internally, the server 1000 needs to process data related to each module with the same time stamp. If the server 1000 processes data related to each module that is not uniform due to differences in communication speed at the time, the server 1000 cannot process the data collectively, so it needs to manage the data with one time stamp.

[0078] Therefore, a building energy management system that can take into account the speed difference between communication methods is needed. The speed difference between communication methods can be solved by including a delay in the control data.

[0079] 5 is a diagram illustrating control data and delay measurement according to an embodiment, in which (a) of FIG is a diagram illustrating control data, and (b) of FIG is a diagram illustrating an example of measuring a delay.

[0080] 5(a), the control data transmitted by the server 1000 to each module may include a delay (D) and a control command (M, information). For example, if the control data is 255 bits, the server 1000 may assign a delay to 2 bits and a control command to the remaining bits.

[0081] When control data including a delay is transmitted to a module, the module can operate in a buffer state for a time corresponding to the delay. That is, the module does not process data during the time corresponding to the delay, but can process the data after the time has elapsed. In this case, processing data means transmitting a control command to a device to control the device.

[0082] 5(b), an example of a method for setting a delay included in the control data is shown. The server 1000 can send a signal to the first module and the second module in advance, know the time when the signal is received by the module, and set a delay based on the difference in the reception time.

[0083] For example, the server 1000 may transmit a first reference signal R1 to a first module in a first communication method and a second reference signal R2 to a second module in a second communication method. In this case, the reference signal may be a basic communication signal that does not include a control command. Also, the first reference signal R1 may be the same as the second reference signal R2.

[0084] At this time, as shown in Fig. 5(b), the server 1000 can simultaneously transmit the first reference signal R1 and the second reference signal R2 at the reference time t0. However, the present invention is not limited to this, and the server 1000 can grasp the speed difference of the communication method of each module in another manner without simultaneously transmitting the first reference signal R1 and the second reference signal R2.

[0085] For example, a first reference signal R1 may be transmitted at a first time point and a response to the first reference signal R1 may be received at a second time point, and the speed of the first communication method may be determined based on the first and second time points. Also, a second reference signal R2 may be transmitted at a third time point and a response to the second reference signal R2 may be received at a fourth time point, and the speed of the second communication method may be determined based on the third and fourth time points.

[0086] The first module that receives the first reference signal R1 can again transmit a first response signal Rp1, which is a response to the first reference signal R1, to the server 1000. At this time, the first response signal Rp1 can be a simple ACK signal. The server 1000 can receive the first response signal Rp1 at a first time point t1.

[0087] The second module that receives the second reference signal R2 can again transmit a second response signal Rp2, which is a response to the second reference signal R2, to the server 1000. At this time, the second response signal Rp2 can be a simple ACK signal. The server 1000 can receive the second response signal Rp2 at a second time point t2.

[0088] The server 1000 can calculate a difference between the first time point t1 and the second time point t2. At this time, the difference means a difference in speed between the first communication method and the second communication method. The server 1000 can set a delay included in the control data based on the difference.

[0089] Furthermore, when the delay is set based on the difference, it is possible to reflect not only the difference in communication speed but also the difference in data processing speed for each module.

[0090] When the server 1000 transmits control data to a first module and a second module simultaneously, it can transmit first control data including a delay set based on the difference to the first module, and transmit second data without a delay to the second module.

[0091] Alternatively, when the server 1000 controls the first and second devices simultaneously but does not transmit control data to each module simultaneously, it may transmit to the first module first control data including a first delay set based on the difference, and transmit to the second module second control data including a second delay set based on the time of transmitting the first control data, the first delay, and the time of transmitting data to the second module. That is, when the server 1000 does not transmit control data to each module simultaneously, it may transmit to each module including a delay calculated for each control data to be transmitted to each module.

[0092] The method according to the embodiment may be embodied in the form of program instructions that can be executed by various computer means and recorded on a computer readable medium. The computer readable recording medium may include program instructions, data files, data structures, and the like, alone or in combination. The program instructions recorded on the computer readable recording medium may be specially designed and configured for the embodiment, or may be known and available to those skilled in the art of computer software. Examples of computer readable recording media include magnetic media such as hard disks, floppy disks, and magnetic tapes, optical recording media such as CD-ROMs and DVDs, magneto-optical media such as floppy disks, and hardware devices specially configured to store and execute program instructions, such as ROMs, RAMs, flash memories, and the like. Examples of program instructions include not only machine language codes such as those produced by a compiler, but also high-level language codes that can be executed by a computer using an interpreter, and the like. The hardware devices may be configured to operate as one or more software modules to perform operations of the embodiment, or vice versa.

[0093] Although the embodiments have been described above with reference to limited embodiments and drawings, those skilled in the art may make various modifications and variations from the above description. For example, the described techniques may be performed in a different order than described, and / or the components of the described systems, structures, devices, circuits, etc. may be combined or combined in a different manner than described, or may be replaced or substituted by other components or equivalents, and still achieve suitable results.

[0094] Accordingly, other implementations, other embodiments, and equivalents of the claims are within the scope of the following claims.

Claims

1. A building energy management system that collects information from devices and modules connected to the building and manages the energy of the building, a first module coupled to a first device and configured to generate first pattern data including information related to energy and control of the first device; a server that receives the first pattern data from the first module and controls the first device through the first module based on the first pattern data; The first module is receiving a plurality of pieces of time information, and a plurality of pieces of energy information and a plurality of pieces of control information, each corresponding to the plurality of pieces of time information, from the first device; classifying the plurality of pieces of control information according to a control subject, a control location, and a control item for the operation of the first device; generating the first pattern data based on the plurality of energy information including information related to power of the first device and the plurality of classified control information; Building Energy Management Systems.

2. The control entity includes at least one of a person, an application, an external device, and an internal device of the first device. The building energy management system of claim 1 .

3. When the control entity is a device, the control location is set based on sensing information of a GPS sensor included in the device. The building energy management system of claim 1 .

4. the plurality of pieces of time information are determined by internal time information of the first module; The internal time information of the first module is periodically or aperiodically synchronized by the server. The building energy management system of claim 1 .

5. The control items include at least one of power, illuminance, temperature, and humidity of the first device. The building energy management system of claim 1 .

6. The plurality of energy information includes the plurality of time information and a plurality of power data and arc data respectively corresponding to the plurality of time information, The plurality of power data include at least one of voltage, current, power amount, and power factor information of the first device; The arc data includes whether an arc occurs in the first device and an arc current. The building energy management system of claim 1 .

7. The server acquires energy information at a first time point and control information at the first time point and energy information at a second time point and control information at the second time point from data included in the first pattern data, The server inputs energy information and control information for each time point included in the first pattern data into a machine learning model, and analyzes a reason for control of the first device for each time point based on the machine learning model. The building energy management system of claim 1 .

8. An energy management module that is connected to devices installed in a building, controls the devices, collects information about the devices, and transmits the collected information to an external device, A control unit coupled to the device to change a power state of the device or adjust a voltage or current of the device; a storage unit for storing energy information, which is information related to the energy of the device, and control information for the operation of the device; a communication unit for transmitting data including the energy information and the control information to the external device or receiving control command data for the device from the external device, The energy information includes at least one of voltage, current, power, and power factor information of the device; The control information includes a control subject, a control location, and a control item for the operation of the device. Energy management module.

Citation Information

Patent Citations

  • Building equipment control device and building with the same

    JP2012145992A

  • Determination of electrical load

    JP2017060384A

  • Control system, control method, and program

    JP2020167474A

  • System and method for smart space

    JP2020184345A

  • Abnormality detection system, distribution board system, abnormality detection method and program

    JP2021081399A