Construction site information provision system
The construction site information providing system addresses the lack of information and safety management in existing systems by transmitting relevant data to personnel and managing entry/exit, enhancing safety and operational efficiency.
Patent Information
- Application Number
- JP2023216617
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2025-07-03
AI Technical Summary
Existing construction site security systems do not provide various construction site information, such as location, weather, current situation, disaster presence, and safety, to construction-related personnel, and lack effective management of personnel entry and exit.
A construction site information providing system with a management node and communication nodes that transmit and output location, image, weather, and safety information to construction-related personnel, and manage entry and exit through a network of tablets, smartphones, and personal computers.
Ensures construction-related personnel are informed of site details, enhances safety by determining feasible work conditions, and manages personnel entry and exit efficiently, preventing accidents and ensuring safe operations.
Smart Images

Figure 2025099726000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a construction site information providing system that outputs various construction site information of a plurality of construction sites.
Background Art
[0002] There is disclosed a construction site security system for monitoring and controlling a construction site, which includes monitoring devices installed at the construction site, control devices installed at the construction site, a monitoring and control unit that reads monitoring data of the monitoring devices installed at the construction site and controls the control devices based on a control command, a field mobile terminal having a communication function installed at the construction site, and a monitoring mobile terminal carried by the monitoring side and having a communication function (see Patent Document 1).
[0003] In this construction site security system, the field mobile terminal captures monitoring data from the monitoring devices via the monitoring and control unit, sends the monitoring data to the monitoring mobile terminal for communication, and when the monitoring mobile terminal receives the monitoring data and makes a monitoring judgment and determines that an abnormality has occurred or there is a risk thereof, a corresponding control command is generated and sent to the field mobile terminal by communication, and the field mobile terminal receives the control command and controls the corresponding control devices via the monitoring and control unit according to the control command.
Prior Art Documents
Patent Documents
[0004]
Patent Document 1
Summary of the Invention
Problems to be Solved by the Invention
[0005] The construction site security system disclosed in Patent Document 1 can ensure the security of the construction site and continue to provide security even after the building is handed over to the owner. However, the construction site security system of Patent Document 1 does not output various construction site information of each construction site to each construction-related person who plans to work at each construction site, and does not inform these construction-related persons of the location, weather, current situation, presence or absence of disasters, and safety of each construction site. As a result, these construction-related persons cannot know the location, weather, current situation, presence or absence of disasters, and safety of each construction site where they plan to work. In addition, this construction site security system cannot manage the entry and exit of construction-related persons working at the construction site.
[0006] An object of the present invention is to provide a construction site information providing system that can inform each construction-related person working at each construction site of the location, current situation, scale, structure, weather, presence or absence of disasters, and safety of that construction site, so that these construction-related persons can know the location, current situation, scale, structure, weather, presence or absence of disasters, and safety of each construction site where they work. Another object of the present invention is to provide a construction site information providing system that can manage the entry and exit of construction-related persons working at the construction site.
Means for Solving the Problems
[0007] A premise of the present invention for solving the above problems is a construction site information providing system that provides various construction site information of a plurality of construction sites.
[0008] The features of the present invention under the above premise are that the construction site information providing system is formed by a management node that manages various construction site information at the construction site, and a plurality of communication nodes that are held by each construction-related person working at the construction site and form a network with the management node and output various construction site information at the construction site. The management node has a position information storage means for storing the position information of a plurality of construction sites, and a position information transmission means for transmitting the position information of a predetermined construction site where the construction-related person works among the position information of the construction sites stored by the position information storage means to the communication node held by the construction-related person. The communication node has a position information receiving means for receiving the position information of a predetermined construction site where the construction-related person works transmitted from the management node by the position information transmission means, and a position information output means for outputting the position information of the predetermined construction site received by the position information receiving means.
[0009] As an example of the present invention, the position information is address information of a predetermined construction site where the construction-related person works, map information for outputting the position of a predetermined construction site where the construction-related person works on a map, and route information indicating a route from the current location where the construction-related person is located to a predetermined construction site where the construction-related person works.
[0010] As another example of the present invention, the construction site information providing system includes a plurality of Web cameras of different manufacturers installed at each construction site for photographing construction site images of those construction sites. The management node has a construction site image receiving means for receiving the construction site images of each construction site photographed by those Web cameras, and a construction site image transmission means for transmitting the construction site image of a predetermined construction site where the construction-related person works among the construction site images of each construction site received by the construction site image receiving means to the communication node held by the construction-related person. The communication node includes a construction site image receiving means for receiving the construction site image of a predetermined construction site where the construction-related person works transmitted from the management node by the construction site image transmission means, and a construction site image output means for outputting the construction site image of the predetermined construction site received by the construction site image receiving means.
[0011] As another example of the present invention, a management node includes weather information acquisition means for acquiring weather information of a plurality of work sites for each construction site, and weather information transmission means for transmitting, to a communication node possessed by a construction worker, the weather information of a predetermined construction site where the construction worker works among the weather information acquired by the weather information acquisition means. The communication node includes weather information reception means for receiving the weather information of a predetermined construction site where the construction worker works transmitted from the management node by the weather information transmission means, and weather information output means for outputting the weather information of the predetermined construction site received by the weather information reception means.
[0012] As another example of the present invention, the weather information is the current weather in the vicinity including the construction site, the weather forecast in the vicinity including the construction site, and the rain cloud radar information in the vicinity including the construction site.
[0013] As another example of the present invention, a management node includes first construction work feasibility determination means for determining the feasibility of construction work at each construction site based on the weather information of each construction site acquired by the weather information acquisition means, and first construction work feasibility transmission means for transmitting the feasibility of construction work at each construction site determined by the first construction work feasibility determination means to a communication node possessed by a construction worker. The communication node includes first construction work feasibility reception means for receiving the feasibility of construction work at each construction site transmitted from the management node by the first construction work feasibility transmission means, and first construction work feasibility output means for outputting the feasibility of construction work at each construction site received by the first construction work feasibility reception means.
[0014] As another example of the present invention, a management node includes safety confirmation information transmission means for transmitting safety confirmation information to a communication node possessed by a construction worker working at a disaster-occurring construction site when a disaster at or above a set level occurs at a predetermined construction site. The communication node includes safety reply information transmission means for transmitting, to the management node, safety reply information of a construction worker possessing the communication node when the communication node receives the safety confirmation information transmitted from the management node by the safety confirmation information transmission means. The management node includes safety confirmation information output means for outputting the safety confirmation information of the construction worker when the management node receives the safety reply information of the construction worker from the communication node by the safety reply information transmission means.
[0015] As another example of the present invention, a web camera captures an image of a construction site at the time of a disaster at the construction site where the disaster occurs, and a management node serves as a first disaster-occurrence site image receiving means for receiving the disaster-occurrence site image of the construction site at the time of the disaster from the web camera, and a disaster-occurrence site image transmitting means for transmitting, to a communication node possessed by a construction-related person, the disaster-occurrence site image of a predetermined disaster-occurrence construction site where the construction-related person works among the disaster-occurrence site images of each construction site received by the first disaster-occurrence site image receiving means. The communication node includes a second disaster-occurrence site image receiving means for receiving the disaster-occurrence site image of the disaster-occurrence construction site where the construction-related person works transmitted from the management node by the disaster-occurrence site image transmitting means, and a disaster-occurrence site image output means for outputting the disaster-occurrence site image of the predetermined disaster-occurrence construction site received by the second disaster-occurrence site image receiving means.
[0016] As another example of the present invention, a management node includes a second construction work feasibility determination means for determining the feasibility of construction work at the construction site based on the disaster-occurrence site image of the construction site received by the disaster-occurrence site image receiving means, and a second construction work feasibility transmission means for transmitting the feasibility of construction work at each construction site determined by the second construction work feasibility determination means to a communication node possessed by a construction-related person. The communication node includes a second construction work feasibility receiving means for receiving the feasibility of construction work at each construction site transmitted from the management node by the second construction work feasibility transmission means, and a second construction work feasibility output means for outputting the feasibility of construction work at each construction site received by the second construction work feasibility receiving means.
[0017] As another example of the present invention, a construction site information providing system includes a vibration sensor installed at each construction site to detect vibrations at those construction sites and transmit the detected vibrations to a management node, and a microphone installed at each construction site to detect sounds at those construction sites and transmit the detected sounds to the management node. When vibrations equal to or higher than a set level occur among the vibrations transmitted from the vibration sensor, the management node includes vibration information transmitting means for transmitting vibration information equal to or higher than the set level to a communication node possessed by a construction worker working at the construction site where the vibrations equal to or higher than the set level occurred. When sounds equal to or higher than a set level occur among the sounds transmitted from the microphone, the management node includes sound information transmitting means for transmitting sound information equal to or higher than the set level to a communication node possessed by a construction worker working at the construction site where the sounds equal to or higher than the set level occurred. The communication node includes vibration information receiving means for receiving vibration image information of the construction site where the construction worker works, which is transmitted from the management node by the vibration information transmitting means, vibration information output means for outputting vibration information of a predetermined construction site received by the vibration information receiving means, sound information receiving means for receiving sound information of the construction site where the construction worker works, which is transmitted from the management node by the sound information transmitting means, and sound information output means for outputting sound information of a predetermined construction site received by the sound information receiving means.
[0018] As another example of the present invention, the communication node includes entry information transmitting means for transmitting entry information of a construction worker to the management node when the construction worker enters the construction site where the construction worker works, and construction worker entry information transmitting means for transmitting construction worker information of the entering construction worker to the management node. The management node includes construction worker entry information storage means for storing the construction worker entry information transmitted from the communication node by the construction worker entry information transmitting means for each construction site, entry number aggregating means for aggregating the number of entering construction workers for each construction site based on the entry information transmitted from the communication node by the entry information transmitting means, entry number output means for outputting the aggregated number of entering construction workers for each construction site in a classified state, and construction worker entry information output means for outputting the construction worker entry information stored by the construction worker entry information storage means for each construction site in a classified state.
[0019] As another example of the present invention, when a construction worker leaves a construction site where the communication node is located and works, the communication node includes an exit information transmission means for transmitting the construction worker's exit information to the management node, and a construction worker exit information transmission means for transmitting the construction worker information of the construction worker who is leaving to the management node. The management node includes a construction worker exit information storage means for storing the construction worker exit information transmitted from the communication node by the construction worker exit information transmission means for each construction site, an exit number aggregation means for aggregating the number of construction workers leaving each construction site based on the exit information transmitted from the communication node by the exit information transmission means, an exit number output means for outputting the number of construction workers aggregated by the exit number aggregation means for each construction site, and a construction worker exit information output means for outputting the construction worker exit information stored by the construction worker exit information storage means in a state where it is classified for each construction site.
[0020] As another example of the present invention, in a construction site information providing system, a plurality of various gadgets can be output at the management node and the communication node, and existing gadgets can be changed to other gadgets at the management node and the communication node.
[0021] As another example of the present invention, in a construction site information providing system, a plurality of information display blocks can be output on one screen of the communication node, and at least two of the position information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the permission information of the construction work at each construction site, and the disaster occurrence site image of the construction site are separately output to each information display block output on one screen.
[0022] As another example of the present invention, in a construction site information providing system, the management node and the communication nodes form a network via a predetermined blockchain.
Effects of the Invention
[0023] According to the construction site information providing system of the present invention, a management node stores the location information of a plurality of construction sites, and transmits the location information of a predetermined construction site where construction-related personnel work among the stored location information of the construction sites to a communication node held by the construction-related personnel. The communication node receives the location information of the predetermined construction site where the construction-related personnel work transmitted from the management node, and outputs the received location information of the predetermined construction site. Therefore, each construction-related personnel working or planning to work at each construction site can be notified of the location information of that construction site from the management node, and by the communication node outputting the location information of the construction site, the location of each construction site where those construction-related personnel work or plan to work can be known.
[0024] In a construction site information providing system where the location information is address information of a predetermined construction site where construction-related personnel work, map information for outputting the location of the predetermined construction site where construction-related personnel work on a map, and route information indicating a route from the current location where the construction-related personnel are located to the predetermined construction site where the construction-related personnel work, each construction-related personnel working or planning to work at each construction site can be notified of the address, map information, and route of that construction site from the management node, and by the communication node outputting the address, map information, and route of the construction site, the address, map information, and route of each construction site where those construction-related personnel work or plan to work can be known. Even if a construction-related person is in charge of a large number of construction sites, the construction site information providing system can accurately recognize the location of the construction site by looking at the address, map information, and route, and can reach those construction sites without getting lost.
[0025] The management node receives the construction site images of each construction site captured by those web cameras, and transmits the construction site images of a predetermined construction site where construction-related personnel work among the received construction site images of each construction site to the communication node held by the construction-related personnel. The communication node receives the construction site images of the predetermined construction site where construction-related personnel work transmitted from the management node, and outputs the received construction site images of the predetermined construction site. The construction site information providing system can inform each construction-related personnel working at the construction site of the current situation, scale, and structure of the construction site by the management node transmitting the construction site images of the construction site where the construction-related personnel work to the communication node and the communication node outputting the construction site images, enabling each construction-related personnel to know the current situation, scale, and structure of each construction site.
[0026] The management node acquires the weather information of multiple work sites for each construction site, and transmits the weather information of a predetermined construction site where construction-related personnel work among the acquired weather information to the communication node held by the construction-related personnel. The communication node receives the weather information of the predetermined construction site where construction-related personnel work transmitted from the management node, and outputs the received weather information of the predetermined construction site. The construction site information providing system can inform each construction-related personnel working at the construction site of the weather information of the construction site by the management node transmitting the weather information of the construction site where the construction-related personnel work to the communication node and the communication node outputting the weather information received from the management node, enabling each construction-related personnel to know the weather information of each construction site where they plan to work.
[0027] The construction site information providing system, where the weather information is the current weather of the vicinity including the construction site, the weather forecast of the vicinity including the construction site, and the rain cloud radar information of the vicinity including the construction site, can inform each construction-related personnel working at each construction site of the current weather, weather forecast, and rain cloud radar information of the vicinity including the construction site from the management node, and by the communication node outputting the current weather, weather forecast, and rain cloud radar information of the vicinity including the construction site, those construction-related personnel can know the current weather, weather forecast, and rain cloud radar information of the vicinity including each construction site where they plan to work.
[0028] Based on the weather information of each construction site obtained by the management node, it determines the feasibility of construction work at each construction site, and transmits the determined feasibility of construction work at each construction site to the communication nodes held by the construction-related personnel. The communication node receives the feasibility of construction work at each construction site transmitted from the management node and outputs the received feasibility of construction work at each construction site. The construction site information providing system can avoid the risk of construction work carried out in bad weather and ensure the safety of the construction site by the management node determining the feasibility of construction work at each construction site based on the weather information of each construction site and the communication node outputting the received feasibility of construction work at each construction site. The construction site information providing system can prevent the occurrence of danger to the construction-related personnel and enable the construction-related personnel to carry out construction work safely.
[0029] When a disaster of a certain level or above occurs at a predetermined construction site by the management node, it transmits safety confirmation information to the communication node held by the construction-related personnel working at the disaster-occurring construction site. When the communication node receives the safety confirmation information transmitted from the management node, it transmits the safety reply information of the construction-related personnel holding the communication node to the management node. When the management node receives the safety reply information of the construction-related personnel from the communication node by the safety reply information transmission means, the construction site information providing system that outputs the safety reply information of the construction-related personnel can quickly confirm the safety of the construction-related personnel working at the disaster-occurring construction site and can carry out appropriate life-saving assistance in case of a disaster by the management node transmitting safety confirmation information to the communication node and the communication node transmitting safety reply information to the management node. When the construction site information providing system receives the safety reply information of the construction-related personnel from the communication node, since the management node outputs the safety confirmation information of the construction-related personnel, the managers, on-site responsible persons, on-site supervisors, etc. among the construction-related personnel can know the safety of the construction-related personnel for each disaster-occurring construction site, and the managers, on-site responsible persons, on-site supervisors, etc. can accurately grasp the safety of the construction-related personnel for each disaster-occurring construction site.
[0030] The management node receives the disaster occurrence site images of the construction site during a disaster from a web camera, and transmits the disaster occurrence site images of a predetermined disaster occurrence construction site where construction-related personnel work among the received disaster occurrence site images of each construction site to the communication node held by the construction-related personnel. The communication node receives the disaster occurrence site images of the disaster occurrence construction site where construction-related personnel work transmitted from the management node, and outputs the received disaster occurrence site images of the predetermined disaster occurrence construction site. In the construction site information providing system, the management node transmits the disaster occurrence site images of the construction site received from the web camera to the communication node, and the communication node outputs the disaster occurrence site images, so that it is possible to notify construction-related personnel of the presence or absence of a disaster, and construction-related personnel can know the damage situation and safety of the construction site due to the disaster, and construction-related personnel can evacuate safely and quickly from the disaster occurrence site, ensuring the safety of construction-related personnel at the disaster occurrence site.
[0031] Based on the disaster occurrence construction site images of the construction site received by the management node, the management node determines the feasibility of construction work at that construction site, and transmits the determined feasibility of construction work at each construction site to the communication node held by the construction-related personnel. The communication node receives the feasibility of construction work at each construction site transmitted from the management node, and outputs the received feasibility of construction work at each construction site. In the construction site information providing system, since the feasibility of work at the construction site after a disaster is determined based on the determination of the management node on the feasibility of construction work, it is possible to avoid the risk of determining the feasibility of work based on the judgment of individual construction-related personnel, and ensure the safety of the work of construction-related personnel at the disaster occurrence site.
[0032] When vibrations equal to or above the set level among the vibrations transmitted from the vibration sensor by the management node occur, the vibration information is transmitted to the communication node held by the construction worker working at the construction site where the vibrations equal to or above the set level have occurred. Also, when sounds equal to or above the set level among the sounds transmitted from the microphone occur, the sound information is transmitted to the communication node held by the construction worker working at the construction site where the sounds equal to or above the set level have occurred. The construction site information providing system that receives the vibration image information of the construction site where the construction worker works transmitted from the management node by the communication node, outputs the received vibration information of the predetermined construction site, receives the sound information of the construction site where the construction worker works transmitted from the management node, and outputs the received sound information of the predetermined construction site. When abnormal vibrations equal to or above the set level occur at the construction site, since the communication node outputs the vibration information of the construction site where the construction worker works, the construction worker working at the predetermined construction site can know the abnormality caused by the vibrations at the construction site from the vibration information, and the construction worker who has detected the danger can safely and quickly evacuate from the construction site, and the safety of the construction worker can be ensured. When abnormal sounds equal to or above the set level occur at the construction site, since the communication node outputs the sound information of the construction site where the construction worker works, the construction worker working at the predetermined construction site can know the abnormality caused by the noise at the construction site from the sound information, and the construction worker who has detected the danger can safely and quickly evacuate from the construction site, and the safety of the construction worker can be ensured.
[0033] When a construction worker enters a construction site where the communication node is located and the construction workers who own it are working, the construction worker entry information is sent to the management node, and the construction worker information of the entering construction worker is sent to the management node. The management node stores the construction worker entry information sent from the communication node for each construction site, aggregates the number of entering construction workers for each construction site based on the entry information sent from the communication node, outputs the aggregated number of entering workers in a state classified for each construction site, and outputs the stored construction worker entry information in a state classified for each construction site. In the construction site information providing system, since the management node aggregates the number of entering construction workers for each construction site and outputs the aggregated number of entering workers for each construction site, managers, site supervisors, on-site supervisors, etc. among the construction workers can know the number of entering workers for each construction site, and managers, site supervisors, on-site supervisors, etc. can accurately grasp the number of entering workers for each construction site. The construction site information providing system enables managers, on-site supervisors, etc. among the construction workers to know various information about the construction workers who have entered each construction site and accurately grasp the construction workers who have entered each construction site by the management node outputting the construction worker entry information of the construction workers who have entered each construction site in a state classified for each construction site.
[0034] When a construction worker leaves the construction site where the communication node is located and is possessed by the construction-related person, the communication node transmits the departure information of the construction worker to the management node, and transmits the construction-related person information of the departing construction worker to the management node. The management node stores the construction worker departure information transmitted from the communication node for each construction site, aggregates the number of departing construction workers for each construction site based on the departure information transmitted from the communication node, outputs the aggregated number of departing workers for each construction site, and outputs the stored construction worker departure information in a state divided for each construction site. Since the management node of the construction site information providing system aggregates the number of departing construction workers for each construction site and outputs the aggregated number of departing workers for each construction site, managers and site supervisors among the construction workers can know the number of departing workers for each construction site, and managers and site supervisors can accurately grasp the number of departing workers for each construction site. The construction site information providing system outputs the construction worker departure information of the construction workers who have left each construction site in a state divided for each construction site, so that managers and site supervisors among the construction workers can know various information of the construction workers who have left each construction site, and managers and site supervisors can accurately grasp the construction workers who have left each construction site.
[0035] The construction site information providing system capable of outputting a plurality of various gadgets in the management node and the communication node and capable of changing an existing gadget to another gadget in the management node and the communication node can open a plurality of various sites by using the plurality of various gadgets output to the management node and the communication node, and construction-related persons can use the site to purchase items, conduct various searches, various investigations, and the like. Since the construction site information providing system can change an existing gadget to another gadget in the management node and the communication node, it is possible to select a gadget useful for construction-related persons and open a site necessary for construction work.
[0036] A plurality of information display blocks can be output to one screen of a communication node, and at least two of the location information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the information on the feasibility of construction work at each construction site, and the disaster occurrence site image of the construction site are separately output to each information display block output to one screen. In the construction site information providing system, various information and images are output to the plurality of information display blocks output to one screen, so that construction-related personnel can view a plurality of information on one screen and can know a plurality of information at once on one screen.
[0037] In a construction site information providing system in which a management node and those communication nodes form a network via a predetermined blockchain, the management node and those communication nodes form a network via the blockchain, and the location information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the information on the feasibility of construction work at each construction site, and the disaster occurrence site image of the construction site are stored in the management node as transaction data. Therefore, while preventing the falsification of the location information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the information on the feasibility of construction work at each construction site, and the disaster occurrence site image of the construction site, it is possible to save an accurate history of the location information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the information on the feasibility of construction work at each construction site, and the disaster occurrence site image of the construction site.
Brief Description of the Drawings
[0038]
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Figure 12
Figure 13
Figure 14
Embodiments for Carrying Out the Invention
[0039] Referring to the accompanying drawings, the details of the construction site information providing system 10 according to the present invention will be described as follows. Note that FIG. 1 is a configuration diagram of the construction site information providing system 10 shown as an example, and FIG. 2 is a diagram showing an example of the first to third construction sites 17a to 17c.
[0040] In FIG. 1, two tablets 11a, 11b (communication nodes), two smartphones 12a, 12b (communication nodes), and three personal computers 13a to 13c (communication nodes) are illustrated. However, in reality, a plurality (specific number) of various first to nth tablets, a plurality (specific number) of various first to nth personal computers, and a plurality (specific number) of various first to nth smartphones, more than those shown in the figure, form the construction site information providing system 10. As communication nodes, in addition to the tablets 11a, 11b, smartphones 12a, 12b, and personal computers 13a to 13c, digital signage is included, and nodes such as a plurality of various high-functional portable communication terminals connectable to the Internet to be developed in the future are included. Further, in FIG. 2, the first to third construction sites 17a to 17c are illustrated. However, in reality, there are a plurality (first to nth) of construction sites more than those shown in the figure.
[0041] The construction site information providing system 10 provides various construction site information of the first to third construction sites 17a to 17c (a plurality of construction sites) to construction-related persons. Construction-related persons include those engaged in on-site work at the construction site, such as formwork carpenters, jumpers, steel bar workers, carpenters, plasterers, pipe workers, electricians, etc., as well as construction managers, on-site supervisors, and employees of the construction company headquarters.
[0042] The construction site information providing system 10 includes a plurality (specific number) of various tablets 11a, 11b (first to nth communication nodes) possessed by a specific number of construction-related persons working at each of the first to third construction sites 17a to 17c (each construction site), a plurality (specific number) of various smartphones 12a, 12b (first to nth communication nodes) possessed by those construction-related persons, the first to third personal computers 13a to 13c (first to nth communication nodes) installed at the construction sites 17a to 17c, a management server 14 (management node) that transmits (distributes) predetermined data to those tablets 11a, 11b, those smartphones 12a, 12b, and those personal computers 13a to 13c, a plurality of various Web cameras 15 of different manufacturers installed at each of the construction sites 17a to 17c, and vibration sensors (not shown) and microphones 16 of different manufacturers installed at each of the construction sites 17a to 17c.
[0043] The tablets 11a and 11b, the smartphones 12a and 12b, the personal computers 13a to 13c, and the management server 14 form a network via a blockchain. Note that the construction site information providing system 10 may be a client-server model.
[0044] The tablets 11a and 11b and the personal computers 13a to 13c are physical computers equipped with a central processing unit (CPU or MPU) and a memory (main memory and cache memory), and have a built-in large-capacity storage area (or large-capacity hard disk). Note that among the first to third personal computers 13a to 13c (the first to n communication terminal devices) (entry / exit management nodes), the first personal computer 13a is installed in the site office or temporary prefabricated office of the first construction site 17a, and the second personal computer 13b is installed in the site office or temporary prefabricated office of the second construction site 17b, and the third personal computer 13c is installed in the site office or temporary prefabricated office of the third construction site 17c.
[0045] Alternatively, instead of or together with the first personal computer 13a, the first digital signage may be installed in the site office or temporary prefabricated office of the first construction site 17a, instead of or together with the second personal computer 13b, the second digital signage may be installed in the site office or temporary prefabricated office of the second construction site 17b, and instead of or together with the third personal computer 13c, the third digital signage may be installed in the site office or temporary prefabricated office of the third construction site 17c.
[0046] The memories of the tablets 11a and 11b and the personal computers 13a to 13c store (hold) communication node identification information (communication node identification identifier) that identifies each of the tablets 11a and 11b and each of the personal computers 13a to 13c and also identifies each construction-related person, and the URL of the management server 14. As the communication node identification information (communication node identification identifier), in addition to using the IP addresses, MAC addresses, URLs, email addresses, cookie information, and solid identification numbers of the tablets 11a and 11b and the personal computers 13a to 13c, the management server 14 can independently generate a unique identifier for identifying the tablets 11a and 11b and the personal computers 13a to 13c, and use the generated identifier as the communication node identification information.
[0047] The tablets 11a and 11b and the personal computers 13a to 13b have a DNS server function, a database server function, a web server function, a mail server function, and a document server function. The tablets 11a and 11b and the personal computers 13a to 13b can use the URL of the management server 14 to access and log in to the management server 14, and can access any other server, tablet, or personal computer without access restrictions via a plurality of various DNS servers and the like connected to the Internet (network). The tablets 11a and 11b and the personal computers 13a to 13b can use the Internet to transmit various information (character data and image data) to a plurality of other servers including the management server 14, tablets, personal computers, and smartphones, and can use the Internet to receive various information from a plurality of other servers including the management server 14, tablets, personal computers, and smartphones.
[0048] The main memories of the tablets 11a and 11b, the main memories of the smartphones 12a and 12b, and the main memories of the personal computers 13a to 13b store a construction site information providing application for executing each means of the construction site information providing system 10. The central processing units of the tablets 11a and 11b, the central processing units of the smartphones 12a and 12b, and the central processing units of the personal computers 13a to 13b start the construction site information providing application stored in the memory based on the control by the operating system (OS), and implement each means described below according to the application. Note that each means implemented by the tablets 11a and 11b and the smartphones 12a and 12b is the same.
[0049] The construction site information providing application directly accesses the management server 14, or accesses the management server 14 from another server via a link, and then downloads (installs) from the management server 14. Alternatively, after reading a barcode (QR code) (registered trademark) to access the management server 14, it downloads (installs) from the management server 14. When downloading the construction site information providing application to the tablets 11a and 11b and the smartphones 12a and 12b, construction-related person information (password, ID number, name of the construction-related person, address of the construction-related person, telephone number and FAX number of the construction-related person, age of the construction-related person, gender of the construction-related person, email address, face photo of the construction-related person, communication node identification information and URL of the tablets 11a and 11b and the smartphones 12a and 12b possessed by the construction-related person) is transmitted and stored (registered) in the management server 14 as personal information of each construction-related person who owns the tablet and the smartphone (construction-related person information storage means). When the construction site information providing application is downloaded to the tablets 11a and 11b and the smartphones 12a and 12b, a construction-related person registration number (construction-related person identifier) for identifying the construction-related person who holds the tablets 11a and 11b and the smartphones 12a and 12b is assigned from the management server 14.
[0050] In the first to third personal computers 13a to 13b, construction site information (including each planned construction site), location information of each construction site 17a to 17c (including each planned construction site 17a to 17c), and a plurality of construction site images of each construction site 17a to 17c (including each planned construction site 17a to 17c) are input, and these information and images are stored (stored) in a large-capacity storage area (or a large-capacity hard disk) in a state associated with the communication node identification information (communication node identification identifier) of the personal computers 13a to 13c. The first to third personal computers 13a to 13b store location information and a plurality of construction site images (image data) in a large-capacity storage area (or a large-capacity hard disk) (block) together with a predetermined hash value indicating the content of the previous data.
[0051] The construction site images of those construction sites 17a to 17c are taken by the web camera 15 in time series (continuously, at intervals of one day, one week, ten days, one month, etc.) and transmitted from the web camera 15 to the first to third personal computers 13a to 13b. The central processing unit of the first to third personal computers 13a to 13b transmits the construction site information, the location information of each construction site 17a to 17c, and the construction site images of each construction site 17a to 17c taken by the web camera 15 to the management server 14 together with the communication node identification information and the hash value.
[0052] The vibrations (vibration data) of those construction sites 17a to 17c are measured by the vibration sensor in time series (continuously, at intervals of 30 minutes, one hour, two hours, etc.) and transmitted from the vibration sensor to the first to third personal computers 13a to 13b. The central processing unit of the first to third personal computers 13a to 13b transmits the construction site information, the location information of each construction site 17a to 17c, and the vibrations of each construction site 17a to 17c measured by the vibration sensor to the management server 14 together with the communication node identification information and the hash value.
[0053] The sounds (sound data) of those construction sites 17a to 17c are measured (collected) by the microphone 16 in a time series (continuously, at intervals of 15 minutes, 30 minutes, 1 hour, etc.) and transmitted from the microphone 16 to the first to third personal computers 13a to 13b. The central processing units of the first to third personal computers 13a to 13b transmit the construction site information, the location information of each of the construction sites 17a to 17c, and the sounds of each of the construction sites 17a to 17c measured by the microphone to the management server 14 together with the communication node identification information and the hash value.
[0054] The construction site information includes the names f of each of the construction sites 17a to 17c and each of the planned construction sites 17a to 17c, the addresses of the construction sites 17a to 17c and the planned construction sites 17a to 17c, the telephone numbers and email addresses of the construction sites 17a to 17c and the planned construction sites 17a to 17c, the construction periods of the construction sites 17a to 17c and the planned construction sites 17a to 17c, the construction site identification information (construction site identification identifier) for identifying the construction sites 17a to 17c and the planned construction sites 17a to 17c, the names of the persons in charge of the construction sites 17a to 17c, and so on. The location information includes the addresses of the predetermined construction sites 17a to 17c and the predetermined planned construction sites 17a to 17c where the construction-related persons work, the map information for outputting the locations of the predetermined construction sites 17a to 17c and the predetermined planned construction sites 17a to 17c where the construction-related persons work on the map, and the route information indicating the routes from the current locations where the construction-related persons are located to the predetermined construction sites 17a to 17c and the predetermined planned construction sites 17a to 17c where the construction-related persons work.
[0055] Smartphones 12a and 12b incorporate a physical computer that has a central processing unit (CPU or MPU) and memory (main memory and cache memory) and operates under an independent operating system (OS), and implement a large-capacity hard disk. Smartphones 12a and 12b can be connected to the Internet using a web browser, access and log in to an unspecified number of other servers (physical servers or virtual servers) using the Internet, and can use various search engines on the Internet. Smartphones 12a and 12b can access and log in to server 14 using the URL of management server 14, and can transmit various information (character data and image data) to a plurality of other servers including management server 14, tablets, personal computers, and smartphones using the Internet, and can receive various information from a plurality of other servers including management server 14, tablets, personal computers, and smartphones using the Internet.
[0056] The hard disks of smartphones 12a and 12b store communication node identification information (communication node identification identifier) that identifies each smartphone 12a and 12b and each construction-related person, and the URL of management server 14. As the communication node identification information (communication node identification identifier), the IP address, MAC address, URL, email address, Cookie information, solid identification number, etc. of those smartphones 12a and 12b can be used. In addition, management server 14 can independently generate a unique identifier that identifies those smartphones 12a and 12b, and use the generated identifier as the communication node identification information.
[0057] On the hard disks of tablets 11a and 11b and smartphones 12a and 12b, construction-related personnel information of construction-related personnel who have the right to use (possess) them is stored (kept) in a state associated with communication node identification information. Examples of construction-related personnel information include passwords, ID numbers, the names of construction-related personnel, the addresses of construction-related personnel, the telephone numbers and fax numbers of construction-related personnel, the ages of construction-related personnel, the genders of construction-related personnel, email addresses, the face photos of construction-related personnel, the communication node identification information of tablets 11a and 11b and smartphones 12a and 12b possessed by construction-related personnel, and URLs, etc. On the hard disks of tablets 11a and 11b and smartphones 12a and 12b, a plurality of construction site names and a plurality of construction site addresses are stored (kept) in a state associated with construction site identification information (construction site identifier).
[0058] On the touch panels 18 of tablets 11a and 11b and smartphones 12a and 12b, a plurality of various gadgets (not shown) are output (displayed). With tablets 11a and 11b and smartphones 12a and 12b, the existing various gadgets output (displayed) on the touch panel 18 can be changed to other gadgets. Construction-related personnel who possess tablets 11a and 11b or smartphones 12a and 12b access various sites using those gadgets.
[0059] The construction site information providing system 10 can open a plurality of various sites by using the plurality of various gadgets output (displayed) on the touch panels 18 of tablets 11a and 11b and smartphones 12a and 12b (communication nodes), and construction-related personnel can use those sites to purchase items, conduct various searches, various investigations, etc. Since the construction site information providing system 10 can change existing gadgets to other gadgets on the touch panels 18 of tablets 11a and 11b and smartphones 12a and 12b (communication nodes), it is possible to select gadgets useful for construction-related personnel and open sites necessary for construction work.
[0060] On the touch panels 18 of the tablets 11a, 11b and the smartphones 12a, 12b, a plurality of information display blocks (not shown) are output (displayed) on one screen. For each information display block output on one screen of the touch panels 18 of the tablets 11a, 11b and the smartphones 12a, 12b, at least two of the location information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the permission information of the construction work at each construction site, and the disaster occurrence site image of the construction site described later are output separately. The construction site information providing system outputs various information and images to a plurality of information display blocks output on one screen of the touch panels 18 of the tablets 11a, 11b and the smartphones 12a, 12b (communication nodes), so that construction-related personnel can view a plurality of information on one screen and know a plurality of information at once on one screen.
[0061] The management server 14 (management node) is constructed in the cloud (cloud computing). The management server 14 is a virtual server having a virtual CPU or a virtual MPU (central processing unit), a virtual main memory, and a virtual cache memory (memory) and operating by an independent operating system (virtual OS), and a large-capacity virtual storage area is formed. As the cloud, Infrastructure as a Service (IaaS), Platform as a Service (PaaS), or Software as a Service (SaaS) can be used. Incidentally, the management server 14 may be a physical server installed in a data center contracted by an administrator (management company) who manages and provides the construction site information providing system 10. The physical management server 14 is a physical computer equipped with a central processing unit (CPU or MPU) and a memory (main memory and cache memory), and incorporates a large-capacity storage area (or a large-capacity hard disk). Although not shown, an input device such as a keyboard and a mouse, and an output device such as a display and a printer are connected to the management server 14 via an interface.
[0062] The management server 14 (virtual server) has a DNS server function, a database server function, a web server function, a mail server function, and a document server function, and is software-divided according to each server function. The management server 14 can access any other server without access restriction via the Internet while passing through a plurality of various DNS servers etc. connected to the Internet (network). The management server 14 forms a network via the Internet with other servers in a data center established anywhere in the world.
[0063] A plurality of various gadgets (not shown) are output (displayed) on the display 19 of the management server 14. In the management server 14, the existing various gadgets output (displayed) on the display 19 can be changed to other gadgets. The construction-related personnel who manage the management server 14 access various sites using those gadgets.
[0064] The construction site information providing system 10 can open a plurality of various sites using the plurality of various gadgets output (displayed) on the display 19 of the management server 14 (management node), and the construction-related personnel who manage the management server 14 can use the site to purchase items, conduct various searches, various investigations, etc. Since the construction site information providing system 10 can change the existing gadgets to other gadgets in the management server 14 (management node), the construction-related personnel who manage the management server 14 can select the gadgets useful for them and open the sites necessary for the construction work.
[0065] In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, management node identification information (management node identification identifier) for identifying the server 14, the URLs and email addresses of the tablets 11a and 11b, communication node identification information of the tablets 11a and 11b, the URLs and email addresses of the smartphones 12a and 12b, communication node identification information of the smartphones 11a and 11b, the URLs and email addresses of the first to third personal computers 13a to 13b, communication node identification information of the personal computers 13a to 13b, and the personal information of the registered construction-related persons are stored. As the management node identification information (management node identification identifier), in addition to being able to use the IP address, MAC address, URL, email address, Cookie information, and solid identification number of the management server 14, the management server 14 can independently generate a unique identifier for identifying it and use the generated identifier as the management node identification information.
[0066] In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, the setting levels (disaster levels) when determining the feasibility of construction work according to the weather, the setting levels (disaster levels) when determining the transmission of safety confirmation information, and the setting levels (disaster levels) when determining the feasibility of construction work due to disasters are stored (stored) in a state associated with the construction site identification information (construction site identification identifier) for identifying each construction site 17a to 17c. In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, the setting levels (alarm levels) of vibration (vibration data) and sound (sound data) are stored (stored) in a state associated with the construction site identification information (construction site identification identifier) for identifying each construction site 17a to 17c. These setting levels can be changed at any time using the input device.
[0067] In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, construction site information (including each construction planned site information) transmitted from the first to third personal computers 13a to 13b is stored (stored) in a state associated with communication node identification information, transmission date and time, and construction site identification information (construction site specific identifier) (construction site information storage means). The construction site information can also be directly input into the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 via an input device. In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, the location information of each construction site 17a to 17c (including each construction planned site 17a to 17c) transmitted from the first to third personal computers 13a to 13b is stored (stored) in a state associated with communication node identification information, transmission date and time, and construction site identification information (construction site specific identifier) (location information storage means). The location information can also be directly input into the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 via an input device.
[0068] In the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)) of the management server 14, the construction-related person information of the registered construction-related persons, the construction sites 17a to 17c where the registered construction-related persons work or the construction sites 17a to 17c where the registered construction-related persons plan to work, and the work site identification information for specifying them (the names of the construction sites 17a to 17c and the construction planned sites 17a to 17c, the addresses of the construction sites 17a to 17c and the construction planned sites 17a to 17c, the telephone numbers and email addresses of the construction sites 17a to 17c and the construction planned sites 17a to 17c, the construction periods of the construction sites 17a to 17c and the construction planned sites 17a to 17c, the construction site specific numbers (construction site specific identifiers) for specifying the construction sites 17a to 17c and the construction planned sites 17a to 17c, the names of the persons in charge of the construction sites, etc.) are stored (stored) in a state associated with the construction-related person registration numbers (construction-related person identifiers).
[0069] The management server 14 receives construction site images of each construction site 17a - 17c (including each planned construction site 17a - 17c) taken by the web camera 15 and transmitted in time series from the first to third personal computers 13a - 13b (construction site image receiving means). In the large - capacity virtual storage area (large - capacity storage area (or large - capacity hard disk)) of the management server 14, the construction site images of each construction site 17a - 17c (including each planned construction site 17a - 17c) transmitted in time series from the first to third personal computers 13a - 13b are stored (stored) in a state associated with hash values, communication node identification information, transmission date and time, and construction site identification information (construction site identifier) (construction site image storage means).
[0070] In addition, the latest construction site information is transmitted (input) to the management server 14, and the latest construction site information is updated at any time. Also, the latest position information is transmitted (input) to the management server 14, and the latest position information is updated at any time. Further, construction site images are transmitted (input) to the management server 14 at any time, and the construction site images transmitted in time series are stored. The management server 14 stores position information (position data) and a plurality of construction site images (image data) in a large - capacity virtual storage area (large - capacity storage area (or large - capacity hard disk)) (block) together with a predetermined hash value indicating the content of the previous data. Since the position information (position data) and a plurality of construction site images (image data) are stored in the large - capacity virtual storage area (block) of the management server 14 as transaction data, an accurate history of the position information (position data) and the construction site images (image data) is preserved.
[0071] Those web cameras 15 are installed at predetermined positions on each construction floor (each floor) of each construction site 17a - 17c. Those web cameras 15 take construction site images of each construction floor (each floor) of each construction site 17a - 17c in time series (at intervals of one day, one week, ten days, one month, etc.), and transmit the taken construction site images to the first to third personal computers 13a - 13b. Note that the shooting interval of the web camera 15 can be arbitrarily set and changed.
[0072] Those vibration sensors are installed at predetermined positions on each construction floor (each story) of each construction site 17a to 17c. Those vibration sensors measure the vibrations of each construction floor (each story) of each construction site 17a to 17c in time series (continuously, at intervals of 30 minutes, 1 hour, 2 hours, etc.), and transmit the measured vibrations to the first to third personal computers 13a to 13b. Note that the measurement interval of the vibration sensors can be arbitrarily set and changed.
[0073] Those microphones 16 are installed at predetermined positions on each construction floor (each story) of each construction site 17a to 17c. Those microphones 16 measure (collect sound) the sounds of each construction floor (each story) of each construction site 17a to 17c in time series (continuously, at intervals of 15 minutes, 30 minutes, 1 hour, etc.), and transmit the measured sounds (sound data) to the first to third personal computers 13a to 13b. Note that the measurement interval of the microphones 16 can be arbitrarily set and changed.
[0074] FIG. 3 is a diagram showing an example of a multi-window menu screen 20 (initial screen) output (displayed) on the touch panel 15 of the tablet 11a, and FIG. 4 is a diagram showing an example of a position information output screen 21 output (displayed) on the touch panel 15 of the tablet 11a. Note that in FIG. 4, the display of each data output to each output area is omitted. Hereinafter, the construction site information providing system 10 will be described by taking as an example the case where a construction-related person having the tablet 11a works at the first construction site 17a. However, the same screens as the touch panel 15 of the tablet 11a are also output (displayed) on the touch panels of the tablet 11b and the smartphones 12a and 12b.
[0075] To use the construction site information providing system 10, a construction-related person registered in the construction site information providing system 10 taps (clicks) an icon (not shown) indicating the construction site information providing system 10 output (displayed) on the touch panel 15 of the tablet 11a. When the icon indicating the construction site information providing system 10 is tapped, the construction site information providing application is launched, and a multi-window menu screen 20 (initial screen) is output (displayed) on the touch panel 15 of the tablet 11a.
[0076] On the multi-window menu screen 20, a location information window 20a, a construction site image window button 20b, a weather information window button 20c, and an end button 20d are output (displayed). When the end button 20d is tapped, the construction site information providing application ends (the same applies to the following end buttons). To view the location information of the first construction site 17a where construction-related personnel are working or planning to work, tap the location information window 20a on the multi-window menu screen 20.
[0077] When the location information window 20a is tapped, although not shown in the figure, a construction site selection screen is output (displayed) on the touch panel 15 of the tablet 11a. On the construction site selection screen, a construction-related personnel registration number output area that outputs (displays) the construction-related personnel registration number, a name output area that outputs (displays) the name of the construction-related personnel, a face photo output area that outputs (displays) the face photo of the construction-related personnel, a construction site selection area for selecting a construction site, a construction site determination button, a clear button, a back button, and an end button are output (displayed). In the construction site selection area, a construction site input area for inputting the name and address of the construction site and a construction site name pull-down list in which the names of a plurality of construction sites are output (displayed) are output (displayed). When the clear button is clicked, the data input in the input area is cleared (the same applies to the following clear buttons). When the back button is tapped, it returns to the previous screen (the same applies to the following back buttons).
[0078] After confirming the construction-related person registration number, name, and face photo, the construction-related person who will work at or plans to work at Construction Site 17a in the construction site input area of the construction site selection area enters the name and address of Construction Site 17a where they will work or plan to work, or selects the name of Construction Site 17a where they will work or plan to work from the construction site name pull-down list, and then taps the construction site determination button. When the construction site determination button is tapped, the central processing unit of the tablet 11a uses the URL of the management server 14 to access and log in to the management server 14 via the Internet, and sends the construction site specific information (construction site specific identifier) corresponding to the construction site name and construction site address entered in the construction site input area, or the construction site specific information (construction site specific identifier) corresponding to the construction site name selected from the construction site name pull-down list, together with the position information transmission request signal and the communication node specific information (communication node specific identifier) to the management server 14.
[0079] The management server 14 that has received the construction site specific information, communication node specific information, and position information transmission request signal from the tablet 11a extracts the construction site information corresponding to the construction site specific information and the position information of Construction Site 17a from the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), and transmits the extracted construction site information and the position information of Construction Site 17a to the tablet 11a via the Internet (position information transmission means). The central processing unit of the tablet 11a receives the construction site information and the position information of Construction Site 17a transmitted from the management server 14 by the position information transmission means (position information receiving means).
[0080] The central processing unit of the tablet 11a that has received the construction site information and the location information of the construction site 17a from the management server 14 outputs (displays) the location information output screen 21 shown in FIG. 4 on the touch panel 15 (location information output means). On the location information output screen 21 shown in FIG. 4, there are a construction site information output area 21a that outputs (displays) construction site information (name of the construction site, address of the construction site, telephone number and email address of the construction site, construction period of the construction site, name of the person in charge of the construction site, etc.), a construction site image output area 21b that outputs (displays) an image of the construction site, a location information output area 21c that outputs (displays) the location information of the construction site, a menu screen button 21d, and an end button 21e. When the menu screen button 21d is tapped, the multi-window menu screen 20 of FIG. 3 is output (displayed) on the touch panel 15 (the same applies to the following menu screen buttons).
[0081] In the location information output area 21c, a map information output area 21f that outputs (displays) the location of a predetermined construction site 17a (or a planned construction site 17a) where construction-related personnel work on the map, and a route information output area 21g that shows the route from the current location where the construction-related personnel are located to a predetermined construction site 17a (or a planned construction site 17a) where the construction-related personnel work are output (displayed).
[0082] In the construction site information providing system 10, the management server 14 (management node) transmits the location information (address, map information, route) of a predetermined construction site 17a where construction-related personnel work among the location information of the construction site to the tablet 11a (communication node) held by the construction-related personnel, and the tablet 11a outputs the location information of the predetermined construction site 17a received from the management server 14. Therefore, each construction-related personnel working (including work plans) at each construction site can be notified from the management server 14 of the location information of that construction site, and by the tablet 11a outputting the location information of the construction site, the locations of each construction site where those construction-related personnel work can be known. Even if a construction-related person is in charge of a large number of construction sites, the construction site information providing system 10 can accurately recognize the location of the construction site by looking at the location information (address, map information, route), and can reach those construction sites without getting lost.
[0083] FIG. 5 is a diagram showing an example of a construction site image output screen 22 output (displayed) on the touch panel 15 of the tablet 11a. Note that in FIG. 5, the display of each data output to each output area is omitted. To view a construction site image of the construction site 17a where a construction-related person works or plans to work, tap the construction site image window 20b on the menu screen 20. When the construction site image window 20b is tapped, a construction site selection screen (not shown) described above is output (displayed) on the touch panel 15 of the tablet 11a.
[0084] Enter the name and address of the construction site where you work or plan to work in the construction site input area of the construction site selection area, or select the name of the construction site where you work or plan to work from the construction site name pull-down menu, and then tap the construction site determination button. When the construction site determination button is tapped, the central processing unit of the tablet 11a uses the URL of the management server 14 to access and log in to the management server 14 via the Internet, and the construction site identification information (construction site specific identifier) corresponding to the construction site name and construction site address entered in the construction site input area, or the construction site identification information (construction site specific identifier) corresponding to the construction site name selected from the construction site name pull-down menu, and a construction site image transmission request signal are transmitted to the management server 14 together with the communication node identification information (communication node specific identifier).
[0085] The management server 14 that has received the construction site identification information, communication node identification information, and construction site image transmission request signal from the tablet 11a extracts the construction site information corresponding to the construction site identification information and the construction site image of the construction site 17a from a large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), and transmits the extracted construction site information and the construction site image of the construction site 17a to the tablet 11a via the Internet (construction site image transmission means). The central processing unit of the tablet 11a receives the construction site information and the construction site image of the construction site 17a transmitted from the management server 14 by the construction site image transmission means (construction site image reception means).
[0086] The central processing unit of the tablet 11a that has received the construction site information and the construction site image of the construction site 17a from the management server 14 outputs (displays) the construction site image output screen 22 shown in FIG. 5 on the touch panel 15 (construction site image output means). On the construction site image output screen 22 of FIG. 5, a construction site information output area 22a that outputs (displays) construction site information (name of the construction site, address of the construction site, telephone number and email address of the construction site, construction period of the construction site, name of the person in charge of the construction site, etc.), a construction site image output area 22b that outputs (displays) the current construction site image of the construction site 17a, a menu screen button 22c, and an end button 22d are output (displayed). In the construction site image output screen 22 of FIG. 5, one construction site image is illustrated, but a plurality of construction site images of the construction site 17a taken by each Web camera 15 are output (displayed) in the construction site image output area 22d.
[0087] In the construction site information providing system 10, the management server 14 (management node) transmits the current construction site image of a predetermined construction site 17a where construction-related personnel work among the construction site images of each construction site taken by those Web cameras 15 to the tablet 11a (communication node), and the tablet 11a outputs (displays) the current construction site image of the predetermined construction site 17a received from the management server 14. Therefore, each construction-related person working at each construction site can be informed of the current status, scale, and structure of the current construction site, and each construction-related person can know the current status, scale, and structure of each construction site.
[0088] FIG. 6 is a diagram showing an example of the weather information output screen 23 output (displayed) on the touch panel 15 of the tablet 11a. In FIG. 6, the display of each data output to each output area is omitted. To view the weather information of the construction site 17a where construction-related personnel are working or planning to work, tap the weather information window 20c on the menu screen 20. When the weather information window 20c is tapped, a previously described construction site selection screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a.
[0089] In the construction site input area of the construction site selection area, enter the name and address of the construction site 17a where you are working or the construction site 17a where you plan to work, or select the name of the construction site where you are working or plan to work from the construction site name pull-down menu, and then tap the construction site determination button. When the construction site determination button is tapped, the central processing unit of the tablet 11a uses the URL of the management server 14 to access and log in to the management server 14 via the Internet, and the construction site specific information (construction site specific identifier) corresponding to the construction site name and construction site address entered in the construction site input area, or the construction site specific information (construction site specific identifier) corresponding to the construction site name selected from the construction site name pull-down menu, and a weather information transmission request signal are transmitted to the management server 14 together with the communication node specific information (communication node specific identifier).
[0090] The management server 14 that has received the construction site specific information, communication node specific information, and weather information image transmission request signal from the tablet 11a accesses the regional weather observation system (AMeDAS) of the Japan Meteorological Agency, rainfall information services, weather information sites, etc., and acquires the weather information in the vicinity including the construction site 17a (weather information acquisition means). The management server 14 transmits the acquired weather information in the vicinity including the construction site 17a, the construction site information, and the construction site image of the current construction site 17a to the tablet 11a via the Internet (weather information transmission means). The weather information includes the current weather in the vicinity including the construction site 17a, the weather forecast in the vicinity including the construction site 17a, and the rain cloud radar information in the vicinity including the construction site 17a.
[0091] Next, the management server 14 refers to the warning level of the Japan Meteorological Agency, which is the meteorological information of the construction site 17a (each construction site) obtained by the meteorological information acquisition means, and determines the feasibility of construction work at each construction site based on the warning level (first construction work feasibility determination means). For example, when the warning level is 5 (heavy rain special warning, flood occurrence information), warning level 4 (landslide disaster warning information, flood danger information, high wave special warning), or warning level 3 (heavy rain warning, flood warning, flood warning information), it is determined that construction work at the construction site is not feasible. When the warning level is 2 (heavy rain advisory, flood advisory, flood advisory) or warning level 1 (early advisory), it is determined that construction work at the construction site is feasible. The management server 14 transmits the feasibility of construction work at each construction site determined by the first construction work feasibility determination means to the tablet 11a via the Internet (first construction work feasibility transmission means).
[0092] The management server 14 stores (stores) in a mass storage area (or a mass hard disk) (block) in a state where the meteorological information, construction site information, and construction site image of the current construction site 17a around the obtained construction site 17a are associated with the acquisition date and time and construction site specific information (construction site specific identifier) together with a predetermined hash value (meteorological information storage means). At the same time, the meteorological information around the construction site 17a including the construction site 17a, the construction site image of the current construction site 17a, and the feasibility of construction work at the construction site 17a determined by the first construction work feasibility determination means are stored (stored) in a mass storage area (or a mass hard disk) (block) in a state where they are associated with the determination date and time and construction site specific information (construction site specific identifier) together with a predetermined hash value (first construction work feasibility storage means).
[0093] The central processing unit of the tablet 11a receives the weather information, construction site information, and the construction site image of the current construction site 17a in the vicinity of the construction site 17a including the construction site 17a transmitted from the management server 14 by the weather information transmission means (weather information receiving means), and receives the permission or non - permission of the construction work at the construction site 17a transmitted from the management server 14 by the construction work permission first transmission means (construction work permission first receiving means). The central processing unit of the tablet 11a outputs the weather information of a predetermined construction site 17a received from the management server 14 by the weather information receiving means (weather information output means), and outputs the permission or non - permission of the construction work at the construction site 17a received from the management server 14 by the construction work permission first receiving means (construction work permission first output means). Sunny On the weather information output screen 23 shown in FIG. 6, there are output (displayed): a construction site information output area 23a that outputs (displays) construction site information (name of the construction site, address of the construction site, telephone number and email address of the construction site, construction period of the construction site, name of the person in charge of the construction site, etc.); a construction site image output area 23b that outputs (displays) the construction site image of the current construction site; a weather information output area 23c that outputs (displays) weather information; a construction work permission output area 23d that outputs (displays) the permission or non - permission of the construction work; a menu screen button 23e; and an end button 23f. The construction site image output in the construction site image output area 23b is the construction site image of the current construction site 17a taken by the web camera 15 at the time when the weather information was acquired. In the weather information output area 23c, there are output (displayed): a current weather output area 23g that outputs (displays) the current weather in the vicinity including the construction site; a weather forecast output area 23h that outputs (displays) the weather forecast in the vicinity including the construction site; and a rain cloud radar information output area 23i that outputs (displays) the rain cloud radar information in the vicinity including the construction site. In the construction work permission output area 23g, either "construction work possible" or "construction work impossible" at the current construction site 17a is output (displayed).
[0094] The construction site information providing system 10 enables the management server 14 (management node) to transmit the weather information of a predetermined construction site where construction-related personnel are working or planning to work to the tablet 11a (communication node), and the tablet 11a outputs the weather information received from the management server 14, so that each construction-related personnel working or planning to work at each construction site can be informed of the weather information of that construction site (the current weather, weather forecast, rain cloud radar information in the vicinity including the construction site), and each construction-related personnel working or planning to work at each construction site can know the weather information of that construction site (the current weather, weather forecast, rain cloud radar information in the vicinity including the construction site).
[0095] The construction site information providing system 10 enables the management server 14 (management node) to refer to the warning level of the Meteorological Agency, which is the weather information of each construction site, judge the feasibility of construction work at each construction site based on the warning level, and the tablet 11a (communication node) outputs the feasibility of construction work at each construction site received, so that the risk of construction work carried out in bad weather can be avoided, and the safety of the construction site can be ensured. The construction site information providing system 10 can prevent the occurrence of danger to construction-related personnel and enable construction-related personnel to carry out construction work safely.
[0096] FIG. 7 is a diagram showing an example of the safety confirmation transmission screen 24 output (displayed) on the touch panel 15 of the tablet 11, and FIG. 8 is a diagram showing an example of the safety confirmation screen 25 output (displayed) on the display 19 of the management server 14. In FIGS. 7 and 8, the display of each data output to each output area is omitted. The management server 14 accesses the earthquake observation system installed in the prefecture, the aforementioned regional weather observation system (AMeDAS), rainfall information service, weather information site, etc., and monitors whether disasters such as earthquakes, storms, and landslides have occurred in the vicinity including a predetermined construction site. When a disaster occurs in the vicinity including a predetermined construction site, the management server 14 acquires the disaster information (seismic intensity, weather, warning level, etc.) in the vicinity including the construction site where the disaster occurred from the above-mentioned systems and sites (disaster information acquisition means).
[0097] When a disaster occurs in the vicinity including the construction site 17a and the disaster is at or above the set level, the central processing unit of the management server 14 transmits, via the Internet, for example to the first personal computer 13a, a disaster-occurrence construction-site shooting signal for shooting an image of the disaster-occurrence construction site 17a at the time of or immediately after the disaster by the web camera 15 installed at the disaster-occurrence site 17a. The central processing unit of the first personal computer 13a that has received the disaster-occurrence construction-site shooting signal from the management server 14 causes the web camera 15 to shoot an image of the disaster-occurrence construction site 17a. The image of the disaster-occurrence construction site 17a shot by the web camera 15 is transmitted from the first personal computer 13a to the management server 14 via the Internet, and the management server 14 receives the image of the disaster-occurrence site 17a (disaster-occurrence site image first reception means).
[0098] Next, the central processing unit of the management server 14 determines the feasibility of construction work at the disaster-occurrence construction site 17a based on the disaster information (warning level) of the disaster-occurrence construction site 17a obtained by the disaster information acquisition means and the image of the disaster-occurrence site 17a obtained by the disaster-occurrence site image first reception means (construction work feasibility second determination means). For example, when the disaster level in the disaster information is warning level 5 (urgent safety assurance) or warning level 4 (evacuation instruction), it is determined that construction work at the disaster-occurrence construction site 17a is not feasible. Also, even if the disaster level in the disaster information is warning level 3 (evacuation of the elderly, etc., evacuation preparation), warning level 2 (confirmation of evacuation behavior), or warning level 1 (early warning information), if it is determined from the image of the disaster-occurrence site 17a that damage such as damage or collapse has occurred at the disaster-occurrence construction site 17a, it is determined that construction work at the disaster-occurrence construction site 17a is not feasible. Further, when the disaster level in the disaster information is warning level 3 (evacuation of the elderly, etc., evacuation preparation), warning level 2 (confirmation of evacuation behavior), or warning level 1 (early warning information), and it is determined from the image of the disaster-occurrence site 17a that no damage such as damage or collapse has occurred at the disaster-occurrence construction site 17a, it is determined that construction work at the disaster-occurrence construction site 17a is feasible.
[0099] When the disaster at the disaster-stricken site 17a is at or above the set level, the management server 14 transmits safety confirmation information to the tablet 11a held by the construction workers working at the disaster-stricken construction site 17a via the Internet (safety confirmation information transmission means). For example, when the disaster level in the disaster information is warning level 5 (urgent safety assurance) or warning level 4 (evacuation instruction), it is determined that a disaster at or above the set level has occurred, and safety confirmation information is transmitted to the tablet 11a. Further, the management server 14 transmits the disaster occurrence site image of the disaster-stricken construction site 17a received by the disaster occurrence site image first receiving means (the disaster occurrence site image of the predetermined disaster-stricken construction site 17a where the construction workers are working) to the tablet 11a via the Internet (disaster occurrence site image transmission means), and transmits the feasibility of construction work at the disaster-stricken construction site 17a determined by the second construction work feasibility determination means (construction work not feasible, construction work feasible) to the tablet 11a via the Internet (second construction work feasibility transmission means).
[0100] The tablet 11a receives the safety confirmation information and the disaster occurrence site image transmitted from the management server 14 by the safety confirmation information transmission means and the disaster occurrence site image transmission means (safety confirmation information receiving means, second disaster occurrence site image receiving means), and receives the feasibility of construction work at the disaster-stricken construction site 17a transmitted from the management server 14 by the second construction work feasibility transmission means (construction work not feasible, construction work feasible) (second construction work feasibility receiving means). When the central processing unit of the tablet 11a receives the safety confirmation information, the disaster occurrence site image, and the feasibility of construction work transmitted from the management server 14 by the safety confirmation information transmission means, the disaster occurrence site image transmission means, and the second construction work feasibility transmission means, it outputs (displays) the safety confirmation transmission screen 24 shown in FIG. 7 on the touch panel 15 (safety confirmation information output means, disaster occurrence site image output means, second construction work feasibility output means).
[0101] On the safety confirmation transmission screen 24 in Fig. 7, there are output (displayed) a construction-related person information output area 24a with the registered construction-related person's construction-related person information (name of the construction-related person, face photo of the construction-related person), a disaster-occurred construction site information output area 24b with the disaster-occurred construction site information where a disaster has occurred (name of the construction site and the planned construction site, address of the construction site and the planned construction site, seismic intensity and weather in the vicinity including the disaster-occurred construction site), a disaster-occurred site image output area 24c with the disaster-occurred site image of the disaster-occurred construction site, a construction work feasibility output area 24d with the feasibility of construction work at the disaster-occurred construction site (construction work not possible, construction work possible) output (displayed), a safety transmission button 24e, a menu screen button 24f, and an end button 24g. When the construction-related person is safe, they tap the safety transmission button 24f on the safety confirmation screen. In addition, by looking at the feasibility of the construction work output (displayed) in the construction work feasibility output area 24d, the construction-related person can know whether the construction work at the disaster-occurred construction site 17a is not possible or possible.
[0102] When the safety transmission button 24e is tapped, the central processing unit of the tablet 11a transmits the safety (safe) reply information of the construction-related person to the management server 14 together with the communication node identification information, transmission date and time, construction-related person identification information (construction-related person identifier), and disaster-occurred construction site identification information (disaster-occurred construction site identifier) (safety reply information transmission means). The management server 14 receives the safety (safe) reply information transmitted from the tablet 11a (safety reply information receiving means). The management server 14 stores (stores) the received safety reply information (including the transmission date and time) in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) in a state associated with the communication node identification information, construction-related person identification information (construction-related person identifier), and disaster-occurred construction site identification information (disaster-occurred construction site identifier) (safety reply information storage means).
[0103] When the management server 14 that has received the safety reply information outputs (displays) the safety confirmation information screen 25 shown in FIG. 8 on the display 19 (safety confirmation information output means). On the safety confirmation information screen 25 in FIG. 8, there are a disaster-occurred construction site information output area 25a that outputs (displays) disaster-occurred construction site information (name of the construction site, address of the construction site, telephone number and email address of the construction site), a disaster-occurred construction site image output area 25b that outputs (displays) an image of the disaster-occurred construction site, a safety confirmed construction-related person number output area 25c that outputs (displays) the number of each construction-related person who has received the safety reply information, and a safety confirmed construction-related person information output area 25d that outputs (displays) the construction-related person identification information (name of the construction-related person, telephone number of the construction-related person, age of the construction-related person, gender of the construction-related person, email address, face photo of the construction-related person) of each construction-related person who has received the safety reply information.
[0104] When a disaster of a set level or higher occurs at a predetermined construction site 17a by the management server 14 (management node) in the construction site information providing system 10, the management server 14 transmits safety confirmation information to the tablet 11a (communication node) held by the construction-related person working at the disaster-occurred construction site 17a. When the tablet 11a receives the safety confirmation information transmitted from the management server 14, the tablet 11a transmits the safety (security) reply information of the construction-related person holding the tablet 11a to the tablet 11a. When the management server 14 receives the safety reply information of the construction-related person from the tablet 11a by the safety reply information transmission means, the management server 14 outputs the safety reply information of the construction-related person. Therefore, it is possible to quickly confirm the safety of the construction-related persons working at the disaster-occurred construction site 17a, and appropriate life rescue can be carried out in the event of a disaster.
[0105] When the management server 14 (management node) in the construction site information providing system 10 receives the safety reply information of the construction-related person from the tablet 11a (communication node), the management server 14 outputs the safety confirmation information of the construction-related person. Therefore, managers, site supervisors, on-site supervisors, etc. among the construction-related persons can know the safety of the construction-related persons at each disaster-occurred construction site, and managers, site supervisors, on-site supervisors, etc. can accurately grasp the safety of the construction-related persons at each disaster-occurred construction site.
[0106] In the construction site information providing system 10, when a disaster occurs or immediately after a disaster occurs, the management server 14 (management node) receives a disaster occurrence site image of the construction site from the web camera 15, and among the received disaster occurrence site images of each construction site, the disaster occurrence site image of a predetermined disaster occurrence construction site 17a where construction-related personnel work is transmitted to a tablet 11a (communication node) held by the construction-related personnel. The tablet 11a receives the disaster occurrence site image of the disaster occurrence construction site 17a where the construction-related personnel work, which is transmitted from the management server 14, and outputs the received disaster occurrence site image of the predetermined disaster occurrence construction site 17a. Therefore, it is possible to notify the construction-related personnel of the presence or absence of a disaster, the construction-related personnel can know the damage situation and safety of the construction site 17a due to the disaster, the construction-related personnel can evacuate safely and quickly from the disaster occurrence site 17a, and the safety of the construction-related personnel at the disaster occurrence site 17a can be ensured.
[0107] Based on the disaster information (warning level) received by the management server 14 (management node) and the disaster occurrence construction site image of the construction site 17a, the construction site information providing system 10 determines whether construction work can be carried out at the construction site 17a. The determination result of whether construction work can be carried out at the construction site 17a is transmitted to a tablet 11a (communication node) held by the construction-related personnel. The tablet 11a receives the determination result of whether construction work can be carried out at the construction site 17a, which is transmitted from the management server 14, and outputs the received determination result of whether construction work can be carried out at the construction site 17a. Therefore, based on the determination of whether construction work can be carried out by the management server 14, it is possible to decide whether work can be carried out at the construction site 17a after a disaster occurs, avoid the risk of determining whether work can be carried out based on the personal judgment of the construction-related personnel, and ensure the safety of the construction-related personnel's work at the disaster occurrence site 17a.
[0108] FIG. 9 is a diagram showing an example of a vibration information output screen 26 output (displayed) on the touch panel 15 of the tablet 11. In FIG. 9, the display of each data output to each output area is omitted. Hereinafter, it is assumed that vibrations equal to or higher than the set level (alarm level) occur at the first construction site 17a. The vibration information (vibration value) of those construction sites measured by the vibration sensor is transmitted from the first to third personal computers 13a to 13b to the management server 14. The management server 14 that has received the vibration information compares the set level (alarm level) of the vibration information stored in advance with the received vibration information, and determines whether the received vibration information is equal to or higher than the set level (alarm level) of the stored vibration information (vibration information comparison means). For example, when the set level (alarm level) of the vibration information (vibration value) is seismic intensity 3 (75 decibels) or seismic intensity 4 (85 decibels) or weak seismic intensity 5 (95 decibels), and the received vibration information (vibration value) is equal to or higher than that set level (alarm level), it is determined that vibrations at the alarm level have occurred.
[0109] When the management server 14 determines, as a result of comparing the set level (alarm level) of the vibration information (vibration value) stored by the vibration information comparison means with the received vibration information (vibration value), that the received vibration information is equal to or higher than the set level (alarm level) of the stored vibration information (when vibrations equal to or higher than the set level (alarm level) occur), the management server 14 transmits, via the Internet, a photographing instruction signal for the construction site image at the time of vibration occurrence at the first construction site 17a where vibrations equal to or higher than the set level (alarm level) have occurred to the first personal computer 13a (the personal computer 13a installed at the construction site 17a where vibrations have occurred among the first to third personal computers 13a to 13b) (construction site photographing instruction means).
[0110] Upon receiving a shooting instruction signal, the central processing unit of the first personal computer 13a takes a picture of the construction site image of the first construction site 17a when vibration equal to or higher than the set level (warning level or higher) occurs, and stores the construction site image (image data) taken by the web camera 15 together with a predetermined hash value in a large-capacity storage area (or large-capacity hard disk) (block). The central processing unit of the first personal computer 13a transmits the construction site image (image data) when vibration equal to or higher than the set level (warning level or higher) occurs, together with a predetermined hash value, to the management server 14 via the Internet.
[0111] The management server 14 receives the construction site image (image data) when vibration equal to or higher than the set level (warning level or higher) is transmitted from the first personal computer 13a, and stores (stores) the vibration value (decibel) equal to or higher than the set level (warning level or higher), the construction site image (image data) when vibration equal to or higher than the set level (warning level or higher) occurs, and the transmission date and time in a large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) in a state associated with the construction site specific information (construction site specific identifier) together with the hash value (vibration information storage means equal to or higher than the set level).
[0112] Since the vibration value (decibel) equal to or higher than the set level (warning level or higher) and the construction site image (image data) when vibration equal to or higher than the set level (warning level or higher) occurs are stored in the large-capacity virtual storage area (block) of the management server 14 as transaction data, an accurate history of the vibration value (decibel) equal to or higher than the set level (warning level or higher) and the construction site image (image data) when vibration equal to or higher than the set level (warning level or higher) occurs is saved.
[0113] The management server 14 transmits, via the Internet, vibration information at or above the set level (vibration value (decibel) at or above the set level (warning level or above), construction site image (image data) at the time of vibration occurrence at or above the set level (warning level or above)) that occurred at the first construction site 17a where construction workers working at the first construction site 17a where vibrations at or above the set level occurred hold the tablet 11a (vibration information transmission means). The central processing unit of the tablet 11a receives the vibration information at or above the set level of the first construction site 17a transmitted from the management server 14 by the vibration information transmission means (vibration information reception means). The central processing unit of the tablet 11a outputs the vibration information of a predetermined construction site 17a received by the vibration information reception means (vibration information output means).
[0114] On the touch panel 15 of the tablet 11a, a vibration information output screen 26 shown in FIG. 9 is output (displayed) (vibration information output means). On the vibration information output screen 26 of FIG. 9, a construction site information output area 26a that outputs (displays) construction site information (name of the construction site, address of the construction site, vibration occurrence date and time), a vibration value output area 26b that outputs (displays) a vibration value (decibel) at or above the set level (warning level or above), a construction site image output area 26c that outputs (displays) a construction site image (image data) of the first construction site 17a at the time of vibration occurrence at or above the set level (warning level or above), a warning message output area 26d that outputs (displays) a warning message (vibration warning information) indicating that the vibration has exceeded the set level (warning level), a menu screen button 26e, and an end button 26f are output (displayed).
[0115] When the vibration level (alarm level) of the vibration transmitted from the vibration sensor exceeds the set level in the construction site information providing system 10, the management server 14 (management node) transmits the vibration information (vibration value (decibel) above the set level (above the alarm level), construction site image (image data) at the time of vibration occurrence above the set level (above the alarm level)) to the tablet 11a (communication node) held by the construction worker working at the first construction site 17a where the vibration above the set level has occurred. The tablet 11a receives the vibration information of the construction site 17a where the construction worker is working transmitted from the management server 14, and outputs the received vibration information of the construction site 17a (vibration value (decibel) above the set level (above the alarm level), construction site image (image data) at the time of vibration occurrence above the set level (above the alarm level)) and the alarm message (vibration alarm information). Therefore, the construction worker working at a predetermined construction site 17a can know the abnormality due to the vibration of the construction site 17a based on the vibration information, and the construction worker who has detected the danger can safely and quickly evacuate from the construction site 17a, and the safety of the construction worker can be ensured.
[0116] FIG. 10 is a diagram showing an example of a sound (noise) information output screen 27 output (displayed) on the touch panel 15 of the tablet 11. In FIG. 10, the display of each data output to each output area is omitted. Hereinafter, it is assumed that a sound above the set level (noise level) has occurred at the first construction site 17a. The sound information (noise value) of those construction sites measured by the microphone 16 is transmitted from the first to third personal computers 13a to 13b to the management server 14. The management server 14 that has received the sound information compares the set level (noise level) of the sound information stored in advance with the received sound information, and determines whether the received sound information is equal to or higher than the set level (noise level) of the stored sound information (sound information comparison means). For example, when the set level (noise level) of the sound information (noise value) is 70 decibels or 80 decibels or 90 decibels, and the received sound information (noise value) is equal to or higher than the set level (noise level), it is determined that a sound at the noise level has occurred.
[0117] When the management server 14 compares the set level (alarm level) of the sound information (noise value) stored by the sound information comparison means with the received sound information (noise value) and determines that the received sound information is equal to or higher than the set level (alarm level) of the stored sound information (when sound (noise) equal to or higher than the set level (alarm level) occurs), the management server 14 transmits, via the Internet, a shooting instruction signal for a construction site image at the time of sound (noise) generation at the first construction site 17a where sound equal to or higher than the set level (alarm level) has occurred, to the first personal computer 13a (the personal computer 13a installed at the construction site 17a where sound (noise) has occurred among the first to third personal computers 13a to 13b) (construction site shooting instruction means).
[0118] The central processing unit of the first personal computer 13a that has received the shooting instruction signal takes a picture of the construction site image of the first construction site 17a at the time of sound (noise) generation where sound equal to or higher than the set level (alarm level) has occurred by the web camera 15, and stores the construction site image (image data) taken by the web camera 15 in a large-capacity storage area (or large-capacity hard disk) (block) together with a predetermined hash value. The central processing unit of the first personal computer 13a transmits, via the Internet, the construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (alarm level) to the management server 14 together with a predetermined hash value.
[0119] The management server 14 receives the construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (alarm level) transmitted from the first personal computer 13a, and stores (stores) in a large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) in a state where the sound value (decibel) equal to or higher than the set level (alarm level), the construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (alarm level), and the transmission date and time are associated with the construction site specific information (construction site specific identifier) together with the hash value (sound information storage means equal to or higher than the set level).
[0120] Since the sound value (decibel) equal to or higher than the set level (warning level) and the construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (warning level) are stored as transaction data in the large-capacity virtual storage area (block) of the management server 14, an accurate history of the sound value (decibel) equal to or higher than the set level (warning level) and the construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (warning level) is preserved.
[0121] The management server 14 transmits (sound information transmission means) the sound (noise) information (sound value (decibel) equal to or higher than the set level (warning level), construction site image (image data) at the time of sound (noise) generation equal to or higher than the set level (warning level)) at the first construction site 17a where the sound (noise) equal to or higher than the set level has occurred to the tablet 11a held by the construction-related person working at the first construction site 17a via the Internet. The central processing unit of the tablet 11a receives (sound information receiving means) the sound (noise) information equal to or higher than the set level at the first construction site 17a (sound information equal to or higher than the set level (warning level) at the construction site 17a where the construction-related person works) transmitted from the management server 14 by the sound information transmission means. The central processing unit of the tablet 11a outputs (sound information output means) the sound (noise) information of a predetermined construction site 17a received by the sound information receiving means.
[0122] On the touch panel 15 of the tablet 11a, a sound (noise) information output screen 27 shown in FIG. 10 is output (displayed) (sound information output means). On the sound (noise) information output screen of FIG. 10, a construction site information output area 27a that outputs (displays) construction site information (name of the construction site 17a, address of the construction site 17a, sound (noise) generation date and time), a sound value output area 27b that outputs (displays) the sound value (decibel) equal to or higher than the set level (warning level), a construction site image output area 27c that outputs (displays) the construction site image (image data) of the first construction site 17a at the time of sound (noise) generation equal to or higher than the set level (warning level), a warning message output area 27d that outputs (displays) a warning message (sound warning information) indicating that the sound (noise) has exceeded the set level (warning level), a menu screen button 27e, and an end button 27f are output (displayed).
[0123] When the construction site information providing system 19 detects that a sound (noise) equal to or above a set level (alarm level) among the sounds transmitted from the microphone 16 is generated by the management server 14 (management node), the system transmits the sound (noise) information (sound value (decibel) equal to or above the set level (alarm level), construction site image (image data) at the time of the sound (noise) equal to or above the set level (alarm level) occurring) to the tablet 11a (communication node) held by the construction worker working at the first construction site 17a where the sound (noise) equal to or above the set level has occurred. The tablet 11a receives the sound (noise) information of the construction site 17a where the construction worker is working, which is transmitted from the management server 14, and outputs the received sound (noise) information of the first construction site 17a (sound value (decibel) equal to or above the set level (alarm level), construction site image (image data) at the time of the sound (noise) equal to or above the set level (alarm level) occurring) and the alarm message (sound alarm information). Therefore, the construction worker working at the predetermined construction site 17a can know the abnormality caused by the sound (noise) at the construction site 17a based on the sound (noise) information, and the construction worker who has detected the danger can safely and quickly evacuate from the construction site 17a, and the safety of the construction worker can be ensured.
[0124] FIG. 11 is a diagram showing an example of the aggregated number of entrants output screen 28 output (displayed) on the display 19 of the management server 14, and FIG. 12 is a diagram showing another example of the aggregated number of entrants output screen 29 that follows FIG. 11 and is output (displayed) on the display of the management server 14. In FIGS. 11 and 12, the display of each data output to each output area is omitted. Hereinafter, the case where a construction worker holding the tablet 11a enters the first construction site 17a will be described as an example.
[0125] When a construction-related person works at the first construction site 17a or enters the construction site 17a where the construction-related person plans to work, click the entry button (not shown) output (displayed) on the display of the first personal computer 13a (entry / exit management node) installed at the construction site 17a. When the entry button is clicked, an entry screen (not shown) is output (displayed) on the display of the first personal computer 13a. The entry screen includes a construction site information output area that outputs (displays) the construction site information of the first construction site 17a (name of the construction site 17a, address of the construction site 17a, telephone number and email address of the construction site 17a, construction period of the construction site 17a, name of the person in charge of the construction site 17a, etc.), a construction site image output area that outputs (displays) an image of the construction site 17a, a barcode (QR code) to be read when entering the construction site 17a, and a cancel button are output (displayed).
[0126] When a construction-related person entering the first construction site 17a causes the barcode (QR code) output (displayed) on the display of the first personal computer 13a to be read into the tablet 11a, a data transmission screen (not shown) that outputs (displays) a data transmission button and a cancel button is output (displayed) on the touch panel 15 of the tablet 11a. When the construction-related person taps the data transmission button, an entry approval signal for the construction-related person holding the tablet 11a to enter the construction site 17a is transmitted from the tablet 11a to the first personal computer 13a, and at the same time, the construction-related person information of the construction-related person holding the tablet 11a (password, ID number, name of the construction-related person, address of the construction-related person, telephone number and FAX number of the construction-related person, age of the construction-related person, gender of the construction-related person, email address, face photo of the construction-related person, communication node identification information and URL of the tablet 11a held by the construction-related person) is transmitted from the tablet 11a to the first personal computer 13a (entry information transmission means, construction-related person entry information transmission means).
[0127] The central processing unit of the first personal computer 13a that has received the entry approval signal and construction-related personnel information transmits the received construction-related personnel information to the management server 14 via the Internet (entry information transmission means, construction-related personnel entry information transmission means). The central processing unit of the management server 14 that has received the entry approval signal and construction-related personnel information from the first personal computer 13a compares the construction-related personnel information received from the first personal computer 13a with the construction-related personnel information stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), and also compares the construction site specific number (construction site specific identifier) of the work site where the first personal computer 13a is installed with the construction site specific number (construction site specific identifier) of the work site where the construction-related personnel work (including work plans).
[0128] When the construction-related personnel information received from the first personal computer 13a by the central processing unit of the management server 14 matches the construction-related personnel information stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), and the construction site 17a where the first personal computer 13a is installed matches the construction site where the construction-related personnel work (including work plans), the central processing unit of the management server 14 transmits the face authentication screen output signal of the face authentication screen at the time of entry to the first personal computer 13a. The central processing unit of the first personal computer 13a outputs (displays) the face authentication screen (not shown) at the time of entry on the display according to the face authentication screen output signal received from the management server 14. In addition, when the construction-related personnel information does not match, an entry screen together with a mismatch message is output (displayed) on the display of the first personal computer 13a.
[0129] On the face authentication screen at the time of entry, a face authentication frame for authenticating the face image, a construction-related personnel name output area where the name of the construction-related personnel is output (displayed), a construction site name output area where the name of the first construction site 17a is output (displayed), a construction site address output area where the address of the construction site 17a is output (displayed), and a cancel button are output (displayed). The construction-related personnel puts their face into the face authentication frame or brings the face photo output (displayed) on the touch panel 15 of the tablet 11a close to the face authentication frame. The central processing unit of the first personal computer 13a transmits the face image (face image data) of the construction-related personnel reflected in the face authentication frame to the management server 14.
[0130] The central processing unit of the management server 14 compares the face image (face image data) of the construction-related person received from the first personal computer 13a with the face image (face image data) of the construction-related person stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)). When the face image (face image data) received from the first personal computer 13a matches the face image (face image data) stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), it permits the entry of the construction-related person of that face image into the first construction site 17a (entry face authentication means). After outputting (displaying) an entry permission message on the display of the first personal computer 13a, it outputs (displays) the entry screen again.
[0131] The central processing unit of the management server 14 stores (stores) the construction-related person information of the construction-related person whose entry has been permitted in the large-capacity storage area (or large-capacity hard disk) (block) for each construction site in a state associated with the entry permission date and time and the construction site identification information (construction site identifier) together with a predetermined hash value (construction-related person entry information storage means). The central processing unit of the management server 14 aggregates the number of entrants of the construction-related person whose entry has been permitted for each construction site (entrant number aggregation means), and stores (stores) the aggregated number of entrants of the construction-related person aggregated by the entrant number aggregation means in the large-capacity storage area (or large-capacity hard disk) (block) for each construction site in a state associated with the aggregation date and time and the construction site identification information (construction site identifier) together with a hash function (entrant number storage means).
[0132] By clicking the aggregation result output button (not shown) output (displayed) on the display 19 of the management server 14, the visitor number aggregation result output screen 28 shown in FIG. 11 is output (displayed) on the display 19 (visitor number output means). On the visitor number aggregation result output screen 28 of FIG. 11, a construction site name output pull-down list 28a that outputs (displays) a plurality of construction site names, a visitor number output area 28b that outputs (displays) the number of visitors for each of those construction sites, a construction site name input area 28c for inputting a construction site name, a date / time input area 28d for outputting the number of visitors at a predetermined date and time, a visitor number output button 28e, a date / time visitor number output button 28f, and an output date / time output area 28g that outputs (displays) the output date and time of the visitor number are output (displayed). When a predetermined date and time is input to the date / time input area 28d and the date / time visitor number output button 28f is clicked, a visitor number aggregation result output screen (not shown) at the specified date and time is output (displayed) on the display 19.
[0133] When a predetermined construction site name among the plurality of construction site names output (displayed) in the construction site name output pull-down list 28a is double-clicked, or when a predetermined construction site name is input to the construction site name input area 28c and the visitor number output button 28e is clicked, the visitor number aggregation result output screen 29 for each construction site shown in FIG. 12 that outputs (displays) the number of visitors and the like at the specified (selected) construction site is output (displayed) on the display 19 (visitor number output means).
[0134] On the visitor number aggregation result output screen 29 of FIG. 12, a construction site name output area 29a that outputs (displays) the specified (selected) construction site name, a visitor number output area 29b that outputs (displays) the number of visitors at that construction site, a visitor name output pull-down list 29c that outputs (displays) the names of construction-related persons who are visitors, a date / time input area 29d for outputting the number of visitors at a predetermined date and time, a date / time visitor number output button 29e, and an output date / time output area 29f that outputs (displays) the output date and time of the visitor number are output (displayed). When a predetermined date and time is input to the date / time input area 29d and the date / time visitor number output button 29e is clicked, a visitor number aggregation result output screen (not shown) at the specified date and time for the predetermined construction site is output (displayed) on the display 19.
[0135] When a predetermined name among the names of construction-related personnel who are the entrants output (displayed) in the entrant name output pull-down list 29c is clicked, a construction-related personnel entry information output screen (not shown) that outputs (displays) the construction-related personnel entry information of the construction-related personnel with the clicked (designated) name is output (displayed) on the display 19 (construction-related personnel entry information output means). On the construction-related personnel entry information output screen, there are a name output area that outputs (displays) the name of the designated construction-related personnel, a face photo output area that outputs (displays) the face photo of that construction-related personnel, a construction site name output area that outputs (displays) the name of the construction work site where that construction-related personnel works (including work plans), an entry date and time output area that outputs (displays) the entry date and time of that construction-related personnel to the construction site, and a work planned days output area that outputs (displays) the number of days of work planned by that construction-related personnel at the construction work site.
[0136] When a construction-related person enters a construction site 17a to 17c where the construction-related person who owns the tablet 11a (communication node) works, the construction site information providing system 10 transmits the entry information of the construction-related person to the management server 14 (management node). The management server 14 aggregates the number of entrants of construction-related personnel for each construction site 17a to 17c based on the entry information transmitted from the tablet 11a, and outputs (displays) the aggregated number of entrants in a state divided for each construction site 17a to 17c. Therefore, by looking at the entrant number aggregation result output screens in FIGS. 11 and 12, managers, site supervisors, on-site supervisors, etc. among the construction-related personnel can know the number of entrants for each construction site 17a to 17c, and managers, site supervisors, on-site supervisors, etc. can accurately grasp the number of entrants for each construction site 17a to 17c.
[0137] When a construction worker who possesses the tablet 11a (communication node) enters a construction site 17a - 17c where construction workers are working, the construction site information providing system 10 transmits the construction worker entry information of the entering construction worker to the management server 14 (management node). The management server 14 stores the construction worker entry information transmitted from the tablet 11a for each construction site 17a - 17c, and outputs (displays) the stored construction worker entry information in a state where it is classified for each construction site 17a - 17c. Therefore, administrators, site supervisors, etc. among the construction workers can know various information about the construction workers who have entered each construction site 17a - 17c, and administrators, site supervisors, etc. can accurately grasp the construction workers who have entered each construction site 17a - 17c.
[0138] FIG. 13 is a diagram showing an example of an exit number aggregation result output screen 30 output (displayed) on the display 19 of the management server 14, and FIG. 14 is a diagram showing another example of an exit number aggregation result output screen 31 that continues from FIG. 13 and is output (displayed) on the display 19 of the management server 14. In FIGS. 13 and 14, the display of each data output to each output area is omitted. Hereinafter, the case where a construction worker who possesses the tablet 11a exits from the first construction site 17a will be described as an example.
[0139] When a construction worker exits from the first construction site 17a where the work has been completed, the worker clicks the exit button output (displayed) on the display of the first personal computer 13a installed at the construction site 17a. When the exit button is clicked, an exit screen (not shown) is output (displayed) on the display of the first personal computer 13a. The exit screen outputs (displays) a construction site information output area that outputs (displays) the construction site information of the first construction site 17a (name of the construction site 17a, address of the construction site 17a, telephone number and email address of the construction site 17a, construction period of the construction site 17a, name of the person in charge of the construction site 17a, etc.), a construction site image output area that outputs (displays) an image of the construction site 17a, a barcode (QR code) to be read when exiting the construction site 17a, and a cancel button.
[0140] When a construction worker leaving the first construction site 17a causes a barcode (QR code) output (displayed) on the display 19 of the first personal computer 13a to be read into the tablet 11a, a data transmission screen (not shown) that outputs (displays) a data transmission button and a cancel button is output (displayed) on the touch panel 15 of the tablet 11a. When the construction worker taps the data transmission button, an exit authorization signal for the construction site 17a of the construction worker holding the tablet 11a is transmitted from the tablet 11a to the first personal computer 13a, and the construction worker information of the construction worker holding the tablet 11a (password, ID number, name of the construction worker, address of the construction worker, telephone number and FAX number of the construction worker, age of the construction worker, gender of the construction worker, email address, face photo of the construction worker, communication node identification information and URL of the tablet 11a held by the construction worker) is transmitted from the tablet 11a to the first personal computer 13a (exit information transmission means, construction worker exit information transmission means).
[0141] The central processing unit of the first personal computer 13a that has received the exit authorization signal and the construction worker information transmits the received construction worker information to the management server 14 via the Internet (exit information transmission means, construction worker exit information transmission means). The central processing unit of the management server 14 that has received the exit authorization signal and the construction worker information from the first personal computer 13a compares the construction worker information received from the first personal computer 13a with the construction worker information stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), and compares the construction site identification number (construction site identification identifier) of the work site where the first personal computer 13a is installed with the construction site identification number (construction site identification identifier) of the work site where the construction worker described in the construction worker information works (including the work schedule).
[0142] When the central processing unit of the management server 14 determines that the construction-related person information received from the first personal computer 13a matches the construction-related person information stored in the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)), and the construction site 17a where the first personal computer 13a is installed matches the construction site where the construction-related person works (including the work schedule), it transmits the face authentication screen output signal of the departure face authentication screen to the first personal computer 13a. The central processing unit of the first personal computer 13a outputs (displays) the departure face authentication screen (not shown) on the display according to the face authentication screen output signal received from the management server 14. In the case where the construction-related person information does not match, the departure screen is output (displayed) on the display of the first personal computer 13a together with a mismatch message.
[0143] On the departure face authentication screen, there are output (displayed) a face authentication frame for authenticating the face image, a construction-related person name output area where the name of the construction-related person is output (displayed), a construction-related person name output area where the name of the first construction site 17a is output (displayed), a construction-related person name output area where the address of the construction site 17a is output (displayed), and a cancel button. The construction-related person puts their face into the face authentication frame or brings the face photo output (displayed) on the touch panel 15 of the tablet 11a close to the face authentication frame. The central processing unit of the first personal computer 13a transmits the face image (face image data) of the construction-related person reflected in the face authentication frame to the management server 14.
[0144] The central processing unit of the management server 14 compares the face image (face image data) of the construction-related person received from the first personal computer 13a with the face image (face image data) of the construction-related person stored in the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)). When the face image (face image data) received from the first personal computer 13a matches the face image (face image data) stored in the large-capacity virtual memory area (large-capacity storage area (or large-capacity hard disk)), it permits the departure of the construction-related person of that face image from the first construction site 17a (departure face authentication means), outputs (displays) a departure permission message on the display of the first personal computer 13a, and then outputs (displays) the departure screen again.
[0145] The central processing unit of the management server 14 stores (stores in a large-capacity storage area (or large-capacity hard disk) (block) for each construction site) the construction-related person information of the construction-related persons who have been permitted to leave, together with a predetermined hash value, in a state associated with the departure permission date and time and the construction site identification information (construction site identifier) (construction-related person departure information storage means). The central processing unit of the management server 14 aggregates the number of departing persons of the construction-related persons who have been permitted to leave for each construction site (departing person number aggregation means), and stores (stores in a large-capacity storage area (or large-capacity hard disk) (block) for each construction site) the number of departing persons of the construction-related persons aggregated by the departing person number aggregation means, together with a hash function, in a state associated with the aggregation date and time and the construction site identification information (construction site identifier) (departing person number storage means).
[0146] By clicking on an aggregation result output button (not shown) output (displayed) on the display 19 of the management server 14, a departing person number aggregation result output screen 30 shown in FIG. 13 is output (displayed) on the display 19 (departing person number output means). On the departing person number aggregation result output screen 30 of FIG. 13, a construction site name output area 30a (pull-down list) that outputs (displays) a plurality of construction site names, a departing person number output area 30b (pull-down list) that outputs (displays) the number of departing persons for each of those construction sites, a construction site name input area 30c for inputting a construction site name, a date and time input area 30d for outputting the number of departing persons at a predetermined date and time, a departing person number output button 30e, a date and time departing person number output button 30f, and an output date and time output area 30g that outputs (displays) the output date and time of the number of departing persons are output (displayed). When a predetermined date and time is input in the date and time input area 30d and the date and time departing person number output button 30f is clicked, a departing person number aggregation result output screen (not shown) at the specified date and time is output (displayed) on the display 19.
[0147] When a predetermined construction site name is double-clicked from the pull-down list of a plurality of construction site names output (displayed) in the construction site name output area 30a, or when a predetermined construction site name is entered in the construction site name input area 30c and the number of people leaving the site output button 30e is clicked, a departure number aggregation result output screen 31 for each construction site as shown in FIG. 14, which outputs (displays) the number of people leaving the site, etc. at the designated (selected) construction site, is output (displayed) on the display 19 (number of people leaving the site output means).
[0148] On the departure number aggregation result output screen 31 of FIG. 14, there are a construction site name output area 31a that outputs (displays) the designated (selected) construction site name, a departure number output area 31b that outputs (displays) the number of people leaving the site at that construction site, a departure person name output pull-down list 31c that outputs (displays) the names of the construction-related persons who are the people leaving the site, a date and time input area 31d for outputting the number of people leaving the site at a predetermined date and time, a date and time departure number output button 31e, and an output date and time output area 31f that outputs (displays) the output date and time of the number of people leaving the site. When a predetermined date and time is entered in the date and time input area 31d and the date and time departure number output button 31e is clicked, a departure number aggregation result output screen (not shown) for a predetermined construction site at the designated date and time is output (displayed) on the display 19.
[0149] When a predetermined name is clicked from the names of the construction-related persons who are the people leaving the site output (displayed) in the departure person name output pull-down list 31c, a construction-related person departure information output screen (not shown) that outputs (displays) the construction-related person departure information of the construction-related person with the clicked (designated) name is output (displayed) on the display 19 (construction-related person departure information output means). On the construction-related person departure information output screen, there are a name output area that outputs (displays) the name of the designated construction-related person, a face photo output area that outputs (displays) the face photo of that construction-related person, a construction site name output area that outputs (displays) the name of the construction work site where that construction-related person worked, a departure date and time output area that outputs (displays) the departure date and time of that construction-related person from the construction site, and a work completion days output area that outputs (displays) the number of days of work completed by that construction-related person at the construction work site.
[0150] When a construction worker who holds the tablet 11a (communication node) leaves the construction sites 17a to 17c where the construction worker works, the construction site information providing system 10 transmits the departure information of the construction worker to the management server 14 (management node). Based on the departure information transmitted from the tablet 11a, the management server 14 totals the number of departing construction workers for each of the construction sites 17a to 17c, and outputs (displays) the totaled number of departing workers in a state classified for each of the construction sites 17a to 17c. Therefore, by looking at the departure number totaling result output screens in FIGS. 13 and 14, managers, site supervisors, and on-site supervisors among the construction workers can know the number of departing workers for each of the construction sites 17a to 17c, and managers, site supervisors, and on-site supervisors can accurately grasp the number of departing workers for each of the construction sites 17a to 17c.
[0151] When a construction worker leaves the construction sites 17a to 17c where the construction worker who holds the tablet 11a (communication node) works, the construction site information providing system 10 transmits the construction worker departure information of the departing construction worker to the management server 14 (management node). The management server 14 stores the construction worker departure information transmitted from the tablet 11a for each of the construction sites 17a to 17c, and outputs (displays) the stored construction worker departure information in a state classified for each of the construction sites 17a to 17c. Therefore, managers, on-site supervisors, and the like among the construction workers can know various information about the construction workers who have left the construction sites 17a to 17c, and managers, on-site supervisors, and the like can accurately grasp the construction workers who have left the construction sites 17a to 17c.
[0152] The construction site information providing system 10 forms a network via a blockchain with a management server 14 (management node), tablets 11a, 11b (communication nodes), and smartphones 12a, 12b (communication nodes). The location information of construction sites 17a to 17c, the current construction site images of construction sites 17a to 17c, the weather information of construction sites 17a to 17c, the permission information of construction work at each construction site 17a to 17c, and the disaster occurrence site images of construction sites 17a to 17c are stored in the management server 14 as transaction data. Therefore, while preventing the falsification of the location information of construction sites 17a to 17c, the current construction site images of construction sites 17a to 17c, the weather information of construction sites 17a to 17c, the permission information of construction work at each construction site 17a to 17c, and the disaster occurrence site images of construction sites 17a to 17c, it is possible to save an accurate history of the location information of construction sites 17a to 17c, the current construction site images of construction sites 17a to 17c, the weather information of construction sites 17a to 17c, the permission information of construction work at each construction site 17a to 17c, and the disaster occurrence site images of construction sites 17a to 17c.
Explanation of Signs
[0153] 10 Construction site information providing system 11a,11b Tablet (communication node) 12a,12b Smartphone (communication node) 13a~13c 1st~3rd personal computers (1st~n communication terminal devices) 14 Management server (management node) 15 Web camera 16 Microphone 17a~17c 1st~3rd construction sites 18 Touch panel 19 Display 20 Multi-window menu screen (initial screen) 21 Location information output screen 22 Construction site image output screen 23 Weather information output screen 24 Safety confirmation transmission screen 25 Safety confirmation screen 26 Vibration information output screen 27 Sound (Noise) Information Output Screen 28 Entrant Aggregate Result Output Screen 29 Entrant Aggregate Result Output Screen 30 Number of Departing Persons Aggregate Result Output Screen 31 Number of Departing Persons Aggregate Result Output Screen
Claims
1. In a construction site information providing system that provides various construction site information of a plurality of construction sites, the construction site information providing system is formed from a management node that manages various construction site information of the construction site, and a plurality of communication nodes that are held by each construction-related person working at the construction site and form a network with the management node and output various construction site information of the construction site, the management node has position information storage means for storing the position information of the plurality of construction sites, and position information transmission means for transmitting the position information of a predetermined construction site where the construction-related person works among the position information of the construction sites stored by the position information storage means to the communication node held by the construction-related person, the communication node has position information receiving means for receiving the position information of a predetermined construction site where the construction-related person works transmitted from the management node by the position information transmission means, and position information output means for outputting the position information of the predetermined construction site received by the position information receiving means. A construction site information providing system characterized by this.
2. The construction site information providing system according to claim 1, wherein the position information is address information of a predetermined construction site where the construction-related person works, map information for outputting the position of a predetermined construction site where the construction-related person works on a map, and route information indicating a route from the current location where the construction-related person is located to a predetermined construction site where the construction-related person works.
3. The construction site information providing system includes a plurality of Web cameras of different manufacturers installed for each construction site and photographing construction site images of those construction sites, the management node has construction site image receiving means for receiving the construction site images of each construction site photographed by those Web cameras, and construction site image transmission means for transmitting the construction site image of a predetermined construction site where the construction-related person works among the construction site images of each construction site received by the construction site image receiving means to the communication node held by the construction-related person, the communication node includes construction site image receiving means for receiving the construction site image of a predetermined construction site where the construction-related person works transmitted from the management node by the construction site image transmission means, and construction site image output means for outputting the construction site image of the predetermined construction site received by the construction site image receiving means. The construction site information providing system according to claim 1 or claim 2.
4. The management node includes weather information acquisition means for acquiring weather information of the plurality of work sites for each construction site, and weather information transmission means for transmitting weather information of a predetermined construction site where the construction-related personnel work among the weather information acquired by the weather information acquisition means to a communication node possessed by the construction-related personnel. The communication node includes weather information reception means for receiving the weather information of a predetermined construction site where the construction-related personnel work transmitted from the management node by the weather information transmission means, and weather information output means for outputting the weather information of the predetermined construction site received by the weather information reception means. The construction site information providing system according to claim 3.
5. The construction site information providing system according to claim 4, wherein the weather information is current weather in the vicinity including the construction site, weather forecast in the vicinity including the construction site, and rain cloud radar information in the vicinity including the construction site.
6. The management node includes first construction work feasibility determination means for determining the feasibility of construction work at each construction site based on the weather information of each construction site acquired by the weather information acquisition means, and first construction work feasibility transmission means for transmitting the feasibility of construction work at each construction site determined by the first construction work feasibility determination means to a communication node possessed by the construction-related personnel. The communication node includes first construction work feasibility reception means for receiving the feasibility of construction work at each construction site transmitted from the management node by the first construction work feasibility transmission means, and first construction work feasibility output means for outputting the feasibility of construction work at each construction site received by the first construction work feasibility reception means. The construction site information providing system according to claim 5.
7. The management node includes safety confirmation information transmission means for transmitting safety confirmation information to a communication node possessed by a construction-related person working at a disaster-occurred construction site when a disaster of a set level or higher occurs at a predetermined construction site. The communication node includes safety reply information transmission means for transmitting safety reply information of the construction-related person possessing the communication node to the management node when the safety confirmation information transmitted from the management node by the safety confirmation information transmission means is received. The management node includes safety confirmation information output means for outputting the safety confirmation information of the construction-related person when the safety reply information of the construction-related person is received from the communication node by the safety reply information transmission means. The construction site information providing system according to claim 6.
8. The web camera captures an image of the construction site at the time of the disaster at the construction site where the disaster occurs, and the management node includes a disaster occurrence site image first receiving means for receiving the disaster occurrence site image of the construction site at the time of the disaster from the web camera, and among the disaster occurrence site images of each construction site received by the disaster occurrence site image first receiving means, a disaster occurrence site image transmission means for transmitting the disaster occurrence site image of a predetermined disaster occurrence construction site where the construction-related person works to the communication node held by the construction-related person. The communication node includes a disaster occurrence site image second receiving means for receiving the disaster occurrence site image of the disaster occurrence construction site where the construction-related person works transmitted from the management node by the disaster occurrence site image transmission means, and a disaster occurrence site image output means for outputting the disaster occurrence site image of the predetermined disaster occurrence construction site received by the disaster occurrence site image second receiving means. The construction site information providing system according to claim 7.
9. The management node includes a construction work feasibility second determination means for determining the feasibility of construction work at the construction site based on the disaster occurrence site image of the construction site received by the disaster occurrence site image receiving means, and a construction work feasibility second transmission means for transmitting the feasibility of construction work at each construction site determined by the construction work feasibility second determination means to the communication node held by the construction-related person. The communication node includes a construction work feasibility second receiving means for receiving the feasibility of construction work at each construction site transmitted from the management node by the construction work feasibility second transmission means, and a construction work feasibility second output means for outputting the feasibility of construction work at each construction site received by the construction work feasibility second receiving means. The construction site information providing system according to claim 8.
10. The construction site information providing system includes a vibration sensor installed for each construction site to detect vibrations at those construction sites and transmit the detected vibrations to the management node, and a microphone installed for each construction site to detect sounds at those construction sites and transmit the detected sounds to the management node. When vibrations equal to or higher than a set level occur among the vibrations transmitted from the vibration sensor, the management node includes vibration information transmitting means for transmitting vibration information at or above the set level to a communication node possessed by the construction-related person working at the construction site where the vibrations at or above the set level occurred. When sounds equal to or higher than a set level occur among the sounds transmitted from the microphone, the management node includes sound information transmitting means for transmitting sound information at or above the set level to a communication node possessed by the construction-related person working at the construction site where the sounds at or above the set level occurred. The communication node includes vibration information receiving means for receiving vibration image information of the construction site where the construction-related person works, transmitted from the management node by the vibration information transmitting means, vibration information output means for outputting vibration information of a predetermined construction site received by the vibration information receiving means, sound information receiving means for receiving sound information of the construction site where the construction-related person works, transmitted from the management node by the sound information transmitting means, and sound information output means for outputting sound information of a predetermined construction site received by the sound information receiving means. The construction site information providing system according to claim 9.
11. entry information transmitting means for transmitting, when a construction worker who possesses the communication node enters a construction site where the construction worker works, the entry information of the construction worker to the management node; and construction worker entry information transmitting means for transmitting the construction worker information of the entering construction worker to the management node; the management node including construction worker entry information storage means for storing, for each construction site, the construction worker entry information transmitted from the communication node by the construction worker entry information transmitting means; entry number aggregating means for aggregating, based on the entry information transmitted from the communication node by the entry information transmitting means, the number of entering construction workers for each construction site; entry number output means for outputting, in a state where the number of entering construction workers aggregated by the entry number aggregating means is classified for each construction site; and construction worker entry information output means for outputting, in a state where the construction worker entry information stored by the construction worker entry information storage means is classified for each construction site, the construction site information providing system according to claim 10.
12. exit information transmitting means for transmitting, when a construction worker who possesses the communication node exits a construction site where the construction worker works, the exit information of the construction worker to the management node; and construction worker exit information transmitting means for transmitting the construction worker information of the exiting construction worker to the management node; the management node including construction worker exit information storage means for storing, for each construction site, the construction worker exit information transmitted from the communication node by the construction worker exit information transmitting means; exit number aggregating means for aggregating, based on the exit information transmitted from the communication node by the exit information transmitting means, the number of exiting construction workers for each construction site; exit number output means for outputting, for each construction site, the number of exiting construction workers aggregated by the exit number aggregating means; and construction worker exit information output means for outputting, in a state where the construction worker exit information stored by the construction worker exit information storage means is classified for each construction site, the construction site information providing system according to claim 11.
13. In the construction site information providing system, a plurality of various gadgets can be output in the management node and the communication node, and existing gadgets can be changed to other gadgets in the management node and the communication node, the construction site information providing system according to any one of claims 1 to 12.
14. In the construction site information providing system, a plurality of information display blocks can be output on one screen of the communication node, and at least two of the position information of the construction site, the current construction site image of the construction site, the weather information of the construction site, the permission information of the construction work at each construction site, and the disaster occurrence site image of the construction site are separately output to each information display block output on the one screen. The construction site information providing system according to claim 13.
15. In the construction site information providing system, the management node and the communication nodes form a network via a predetermined blockchain. The construction site information providing system according to claim 16.
Citation Information
Patent Citations
Monitoring and control method for construction site, its security system, and on-site security device
JP2006058940A