System, method, and program
The power management system optimizes fuel cell output distribution and integrates multiple power sources to address inefficiencies and degradation in fuel cell power systems, achieving efficient and cost-effective power supply.
Patent Information
- Application Number
- JP2024224279
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-12-27
- Filing Date
- 2024-12-19
- Publication Date
- 2025-07-09
AI Technical Summary
Existing power management systems for fuel cells struggle to optimize power generation efficiency and minimize degradation based on fluctuating power demands, leading to inefficiencies and increased wear on the fuel cells.
A power management system that includes a determination unit to optimize the output distribution of a first fuel cell and an additional power source, adjusting their output power based on predicted power demands, and utilizing a combination of fuel cells and storage batteries to manage power fluctuations, with an orchestration controller to coordinate the entire supply chain from fuel production to consumption.
The system enhances power generation efficiency and reduces fuel cell degradation by optimizing output power distribution, ensuring efficient power supply to consumers while minimizing equipment wear and reducing operational costs.
Smart Images

Figure 2025104301000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a system, a method, and a program.
Background Art
[0002] Patent Document 1 describes a system for receiving inexpensive nighttime power from commercial grid power and operating by switching to self-generation for a self-generation facility. [Prior Art Document] [Patent Document] Patent Document 1 Patent No. 4636404
Summary of the Invention
[0003] (1) In a first aspect of the present disclosure, at least one of the power generation efficiency or deterioration of the first fuel cell is optimized according to the power demand for the output power of a power management system that controls the output power of the first fuel cell and an additional power source, and a determination unit that determines the output distribution of the first fuel cell and the additional power source is provided, and an adjustment unit that is connected to the first fuel cell and the additional power source and adjusts the output power of the first fuel cell and the additional power source according to the output distribution. An output control device is provided.
[0004] (2) In the device of (1) above, the determination unit may determine target values of a plurality of control parameters for each of the first fuel cell and the additional power source according to the output distribution.
[0005] (3) In the device of (1) or (2) above, the determination unit determines a fuel transport instruction for the first fuel cell according to the output distribution, and the output control device may further include a communication unit that outputs the determined transport instruction.
[0006] (4) In any of the devices of (1) to (3) above, the determination unit determines the output distribution of the first fuel cell and a storage battery connected to the first fuel cell, and the adjustment unit may adjust the output power of the first fuel cell and the storage battery according to the output distribution.
[0007] (5) In any one of the devices (1) to (4) above, the determination unit inputs, into a degradation model that outputs the degree of degradation of the first fuel cell in response to the input of the control parameter of the first fuel cell, a control parameter within the range of the control parameter that satisfies the power demand and for which the power generation efficiency is equal to or greater than a predetermined threshold value, and determines the control parameter for which the degree of degradation output from the degradation model becomes the smallest, and the adjustment unit may adjust the output power of the first fuel cell and the additional power source in accordance with the determined control parameter.
[0008] (6) In any one of the devices (1) to (5) above, the determination unit may acquire at least one of the time-series power demand for the output power of the power management system or a predicted value of the power demand.
[0009] (7) In the device of (6) above, the determination unit may acquire a predicted value of the power demand for the output power of the power management system in accordance with the type of load device to which power is supplied by the power management system.
[0010] (8) In the device of (6) above, the determination unit may acquire a predicted value of the power demand for the output power of the power management system in accordance with at least one of the operation plan of the load device supplied with power by the first fuel cell, environmental data related to the load device, or past power demand for the output power of the power management system.
[0011] (9) In any one of the devices (1) to (8) above, the additional power source has a second fuel cell, and the determination unit may determine the ratio of the output power of the first fuel cell and the second fuel cell.
[0012] (10) In the device of (9) above, the determination unit may perform frequency analysis on the time-series variation of the power demand, and determine the output distribution of the first fuel cell and the second fuel cell based on the frequency analysis.
[0013] (11) In the device of (9) above, the start-up period of the first fuel cell may be different from the start-up period of the second fuel cell until a predetermined output power is reached.
[0014] (12) In the device of (11) above, the start-up period of the first fuel cell may be 5 to 50 times as long as the start-up period of the second fuel cell.
[0015] (13) In the device of (9) above, the load capacity of the first fuel cell may be different from the load capacity of the second fuel cell.
[0016] (14) In the device of (13) above, the load capacity of the first fuel cell may be 10 to 20 times the load capacity of the second fuel cell.
[0017] (15) In any of the devices of (1) to (14) above, the determination unit may determine the output distribution of the first fuel cell and the additional power source so that the fluctuation of the output power of the first fuel cell is within a range not exceeding a preset maximum operating frequency with respect to degradation, based on the frequency of the time-series fluctuation of the power demand.
[0018] (16) In the device of (15) above, the additional power source has a second fuel cell, and the preset maximum operating frequency for the first fuel cell may be different from the preset maximum operating frequency for the second fuel cell.
[0019] (17) In the device of (16) above, the preset maximum operating frequency for the first fuel cell may be 2 to 20 times the preset maximum operating frequency for the second fuel cell.
[0020] (18) In any of the devices of (1) to (17) above, the determination unit may determine the output distribution of the first fuel cell and the additional power source so as to adjust the output power of the first fuel cell within a range of 20% to 80% of the load capacity of the first fuel cell.
[0021] (19) In a second aspect of the present disclosure, there is provided a power management system including a first fuel cell, an additional power source, and an output control device according to any one of (1) to (18) above that controls the output power of the first fuel cell and the additional power source.
[0022] (20) In a third aspect of the present disclosure, there is provided a method including determining an output distribution of the first fuel cell and the additional power source that optimizes at least one of the power generation efficiency or degradation of the first fuel cell according to the power demand for the output power of a power management system that controls the output power of the first fuel cell and the additional power source, and adjusting the output power of the first fuel cell and the additional power source according to the output distribution, the method being connected to the first fuel cell and the additional power source.
[0023] (21) In a fourth aspect of the present disclosure, there is provided a program that causes a processor to determine an output distribution of the first fuel cell and the additional power source that optimizes at least one of the power generation efficiency or degradation of the first fuel cell according to the power demand for the output power of a power management system that controls the output power of the first fuel cell and the additional power source, and to adjust the output power of the first fuel cell and the additional power source according to the output distribution, the method being connected to the first fuel cell and the additional power source.
[0024] (22) In a fifth aspect of the present disclosure, there is provided a system for controlling the output power of a first fuel cell and an additional power source, the system including a receiving unit that receives information regarding the power demand for the output power, an orchestration controller that provides information for optimizing the output distribution of the first fuel cell and the additional power source to match the power demand, and an output control device that is connected to the first fuel cell and the additional power source and adjusts the output power of at least one of the first fuel cell or the additional power source according to the information for optimization.
[0025] (23) In the system of (22) above, the additional power source may have at least one of a storage battery or a second fuel cell.
[0026] (24) In the system of (23) above, the start-up period of the first fuel cell until it reaches a predetermined output power may be different from the start-up period of the second fuel cell.
[0027] (25) In the system of (24) above, the start-up period of the first fuel cell may be 5 to 50 times as long as the start-up period of the second fuel cell.
[0028] (26) In the system of (23) above, the load capacity of the first fuel cell may be different from the load capacity of the second fuel cell.
[0029] (27) In the system of (26) above, the load capacity of the first fuel cell may be 10 to 20 times the load capacity of the second fuel cell.
[0030] (28) In any of the systems from (22) to (27) above, at least one of the orchestration controller or the output control device may optimize the output distribution of the first fuel cell and the additional power source so as to adjust the output power of the first fuel cell within the range of 20% to 80% of the load capacity for the first fuel cell.
[0031] (29) In any of the systems from (22) to (28) above, at least one of the orchestration controller or the output control device may perform frequency analysis on the time-series variation of the power demand and generate information for optimizing the output distribution of the first fuel cell and the additional power source based on the frequency analysis.
[0032] (30) In any of the systems (22) to (29) above, at least one of the orchestration controller or the output control device may generate information for optimizing the output distribution of the first fuel cell and the additional power source so that the fluctuation of the output power of the first fuel cell is within a range not exceeding a preset maximum operating frequency with respect to deterioration, based on the frequency of the time-series variation of the power demand.
[0033] (31) In the system (30) above, the additional power source has a second fuel cell, and the preset maximum operating frequency for the first fuel cell may be different from the preset maximum operating frequency for the second fuel cell.
[0034] (32) In the system (31) above, the preset maximum operating frequency for the first fuel cell may be 2 to 20 times the preset maximum operating frequency for the second fuel cell.
[0035] (33) In any of the systems (22) to (32) above, the orchestration controller may predict the power demand for the output power based on the information received by the receiving unit.
[0036] (34) In the system (33) above, the output control device generates a plurality of supply plans for planning the output distribution of the first fuel cell and the additional power source in a predetermined period based on the prediction of the power demand for the output power, and the orchestration controller selects an optimal supply plan that optimizes at least one of the power generation efficiency, equipment cost, and deterioration regarding the first fuel cell and the additional power source from among the plurality of supply plans and provides the selection result to the output control device.
[0037] (35) In the system of (34) above, the orchestration controller may select the optimal supply plan based on results of simulating control and state changes of the first fuel cell and the additional power source according to each of the multiple supply plans.
[0038] (36) In any of the systems (22) to (35) above, the receiving unit may receive information regarding the electricity demand from at least one of a truck roll management system, a ship management system, a pipeline management system, a fuel tank management system, or a carbon credit system.
[0039] (37) In any of the systems (22) to (36) above, the output control device may optimize the output distribution of the first fuel cell and the additional power source so as to stop output of the first fuel cell during a startup period preset for the first fuel cell.
[0040] (38) In any of the systems (22) to (37) above, the output control device may optimize the output distribution of the first fuel cell and the additional power source using an evaluation function based on a weighted evaluation of power generation efficiency, equipment cost, and deterioration of the first fuel cell and the additional power source.
[0041] (39) In any of the systems (22) to (38) above, the first fuel cell, the additional power source, and the output control device may be installed in a plant, and the orchestration controller may provide information to the output control device of each of the multiple plants for optimizing the output distribution for the corresponding plant.
[0042] (40) In a sixth aspect of the present disclosure, there is provided a method executed by a system for controlling output power of a first fuel cell and an additional power source, the method comprising receiving information regarding power demand for the output power, providing information for optimizing output distribution of the first fuel cell and the additional power source to match the power demand, and adjusting output power of at least one of the first fuel cell or the additional power source in connection with the first fuel cell and the additional power source according to the information for optimization.
[0043] (41) In a seventh aspect of the present disclosure, there is provided a program for causing one or more processors to receive information regarding power demand for output power of a first fuel cell and an additional power source, provide information for optimizing output distribution of the first fuel cell and the additional power source to match the power demand, and adjust output power of at least one of the first fuel cell or the additional power source in connection with the first fuel cell and the additional power source according to the information for optimization.
[0044] Note that the above summary of the invention does not enumerate all the necessary features of the present invention. Also, sub - combinations of these feature groups can also be inventions.
Brief Description of Drawings
[0045]
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Figure 12
Mode for Carrying Out the Invention
[0046] Hereinafter, the present invention will be described through embodiments of the invention. However, the following embodiments do not limit the invention according to the claims. Also, not all combinations of features described in the embodiments are essential for the solution means of the invention.
[0047] FIG. 1 shows a configuration example of an orchestration system 10 according to the present embodiment. The orchestration system 10 optimizes the power supply to one or more consumers 120 across the entire supply chain. Here, "optimization" means bringing the target value closer to the optimal value using a predetermined method (optimization method). Therefore, "optimization" is not limited to making the target value the optimal value (for example, the maximum value or the minimum value), but includes making the target value a local optimal value (for example, the maximum value or the minimum value), and changing the target value to a better value than the current value.
[0048] The orchestration system 10 includes one or more tenants 20, an external system 30, and an orchestration controller 40.
[0049] Each of the one or more tenants 20 may be a supply chain from fuel production to power supply to consumers 120. Each tenant 20 includes a fuel production management system 100, a transportation management system 105, a fuel tank management system 110, a power management system 115, and a consumer 120. The multiple tenants 20 may share at least one of the fuel production management system 100, the transportation management system 105, the fuel tank management system 110, the power management system 115, and the consumer 120. The multiple tenants 20 may share the fuel production management system 100, as an example.
[0050] The fuel production management system 100 is connected to the transportation management system 105 and the orchestration controller 40. The fuel production management system 100 manages fuel production of the fuel cell. The fuel production management system 100 may instruct the production of hydrogen, which is fuel for the fuel cell, and ethanol, methane, or ammonia for hydrogen generation. As an example, the fuel production management system 100 manages a fuel production device that produces hydrogen by electrolysis using renewable energy. The fuel production management system 100 may include one or more processors that acquire information about fuel production from the orchestration controller 40 or fuel production equipment, and output the information about fuel production to the orchestration controller 40. The information about fuel production may include at least one of the operation rate of the fuel production device, the amount of fuel produced per unit time, or a fuel production plan. The fuel production management system 100 may adjust the start time of fuel production, the amount of production, etc., according to the production plan from the orchestration controller 40.
[0051] The transportation management system 105 is connected to the fuel tank management system 110 and the orchestration controller 40. The transportation management system 105 manages the transportation of the fuel produced by the fuel production management system 100. The transportation management system 105 may transmit transportation instructions to trucks, ships, pipelines, and the like that transport the fuel. The transportation management system 105 may include one or more processors that acquire information about the transportation of the fuel from the orchestration controller 40, the truck roll management system 130, the ship management system 135, or the pipeline management system 140, and output information about the transportation to the orchestration controller 40. The information about the transportation of the fuel may include at least one of a transportation plan for the fuel, past transportation information, transportation cost, energy consumption for transportation, transportation route, transportation amount, or transportation time. The transportation management system 105 may adjust the transportation start time, transportation route, transportation amount, and the like of the fuel according to the transportation plan from the orchestration controller 40.
[0052] The fuel tank management system 110 is connected to the power management system 115 and the orchestration controller 40. The fuel tank management system 110 manages a fuel tank that stores transported fuel. The fuel tank management system 110 may include one or more processors that obtain information about the fuel tank from the orchestration controller 40 or the tank control device 145 and output the information about the fuel tank to the orchestration controller 40. The information about the fuel tank may include at least one of the current amount of fuel remaining in the fuel tank, a change in the past amount of fuel remaining over time, or a maximum storage amount.
[0053] The power management system 115 is connected to the customer 120 and the orchestration controller 40. The power management system 115 manages the power supplied to the customer 120. The power management system 115 controls the output power of the first fuel cell 250 and the additional power source 255 to supply power to the customer 120. The power management system 115 may include one or more processors that obtain information regarding power demand from the orchestration controller 40 or the customer 120 and output at least one of the information regarding power demand or the power supply plan to the orchestration controller 40. The information regarding power demand may include at least one of the operation plan of the customer 120, environmental data, past power consumption, or power demand for a predetermined future period.
[0054] The customer 120 is connected to the orchestration controller 40. The customer 120 consumes the power supplied from the power management system 115. The customer 120 may be a plant. Examples of the plant include, in addition to industrial plants such as chemical plants, plants that manage and control wells and their surroundings such as gas fields and oil fields, plants that manage and control power generation such as hydraulic, thermal, and nuclear power plants, plants that manage and control environmental power generation such as solar power and wind power, and plants that manage and control water supply and sewerage and dams. Further, the customer 120 may be a ship, and the energy for generating the propulsion force for advancing the ship may be supplied by the power management system 115. The customer 120 may include one or more processors that obtain information regarding power demand from the orchestration controller 40 or sensors installed in the customer 120 and output the information regarding power demand to the orchestration controller 40 or the power management system 115.
[0055] The external system 30 is connected to the tenant 20A. The external system 30 executes operations according to instructions from the tenant 20A. The external system 30 may be located at a location separated from the tenant 20A. For example, it may be located in a country different from the customer 120. The external system 30 includes a truck roll management system 130, a ship management system 135, a pipeline management system 140, a tank control device 145, and a carbon credit system 150. The tenants 20B and 20C may be connected to a similar external system 30.
[0056] The truck roll management system 130 is connected to the transportation management system 105. The truck roll management system 130 may manage trucks that transport fuel according to transportation instructions from the transportation management system 105. The truck roll management system 130 may include one or more processors that acquire information regarding transportation by trucks and output information or instructions regarding transportation by trucks. The information regarding transportation may include at least one of a transportation plan for fuel by trucks, the transportation volume of each truck, or the transportation route.
[0057] The ship management system 135 is connected to the transportation management system 105. The ship management system 135 may manage ships that transport fuel according to transportation instructions from the transportation management system 105. The ship management system 135 may include one or more processors that acquire information regarding transportation by ships and output information or instructions regarding transportation by ships. The information regarding transportation by ships may include at least one of a transportation plan for fuel by ships, the transportation volume, the transportation time, or the transportation route.
[0058] The pipeline management system 140 is connected to the transportation management system 105. The pipeline management system 140 may manage a pipeline that transports fuel in response to a transportation instruction from the transportation management system 105. The pipeline management system 140 may include one or more processors that acquire information related to the transportation through the pipeline and output information or instructions related to the transportation through the pipeline. The information related to the transportation through the pipeline may include at least one of a transportation plan, a transportation amount, or a transportation time of the fuel through the pipeline.
[0059] The tank control device 145 is connected to the fuel tank management system 110. The tank control device 145 may manage a fuel tank that stores fuel. The tank control device 145 may include one or more processors that acquire information about the fuel tank from a sensor or the like installed in the fuel tank and output information or instructions about the fuel tank. The information about the fuel tank may include at least one of the current amount of fuel remaining in the fuel tank, the maximum storage amount of the fuel tank, or a fluctuation history of the storage amount of the fuel tank.
[0060] The carbon credit system 150 is connected to the power management system 115. The carbon credit system 150 may manage carbon credits related to greenhouse gas emissions of the power management system 115. The carbon credit system 150 may include one or more processors that acquire information about carbon credits from the power management system 115 or a carbon credit trading system, etc., and output information about carbon credits or trading instructions. The information about carbon credits may indicate the current buying and selling prices of carbon credits, etc.
[0061] The cracking management system 155 is connected to the power management system 115. The cracking management system 155 manages a device that extracts hydrogen, which is a fuel for a fuel cell, from ammonia or the like. The cracking management system 155 may include one or more processors that acquire information related to cracking from the power management system 115 or a cracking device and output information or instructions related to cracking. The information related to cracking may include at least one of the efficiency of cracking or the amount of hydrogen generated by cracking.
[0062] More than 50% of these external systems 30 may be distributed remotely from the customer 120 and the power management system 115 to control each process. By controlling each process in a distributed manner, optimization can be achieved without requiring real-time communication, and the orchestration system 10 is useful for optimizing the entire supply chain.
[0063] Each system in the orchestration system 10 may be a computer such as a PC, a tablet computer, a smartphone, a workstation, a server computer, or a general-purpose computer, or may be a computer system to which a plurality of computers are connected. Such a computer system is also a computer in a broad sense. Further, each system may be implemented by one or more executable virtual computer environments within the computer.
[0064] The orchestration controller 40 is connected to a plurality of tenants 20 respectively. The orchestration controller 40 may be connected to a plurality of systems of each tenant 20, and may further be connected to an external system 30. The orchestration controller 40 optimizes the power supply in the orchestration system 10. The orchestration controller 40 provides information for optimizing the output distribution (e.g., ratio or output power amount) of the output power of the fuel cell and the additional power source so as to match the power demand for the output power of the fuel cell and the additional power source to the power management system 115 of each tenant 20.
[0065] The orchestration controller 40 may be a computer such as a PC (personal computer), a tablet computer, a smartphone, a workstation, a server computer, or a general-purpose computer, or may be a computer system to which a plurality of computers are connected. Such a computer system is also a computer in a broad sense. Further, the orchestration controller 40 may be implemented by one or more executable virtual computer environments in the computer. Instead of this, the orchestration controller 40 may be a dedicated computer designed for optimizing power supply, or may be dedicated hardware realized by a dedicated circuit.
[0066] The orchestration controller 40 includes a first receiving unit 160A, a second receiving unit 160B, a third receiving unit 160C, a first planning unit 170A, a second planning unit 170B, a third planning unit 170C, and an energy demand prediction unit 180. The orchestration controller 40 may include one or more processors for executing at least part of the operations of the first receiving unit 160A, the second receiving unit 160B, the third receiving unit 160C, the first planning unit 170A, the second planning unit 170B, the third planning unit 170C, or the energy demand prediction unit 180. Note that the receiving unit and the planning unit of the orchestration controller 40 are not limited to three, and may be changed according to the number of tenants 20.
[0067] The first receiving unit 160A is connected to the tenant 20A. The first receiving unit 160A receives information on the power demand for the output power of the fuel cell and the additional power source in the tenant 20A from at least one of the fuel production management system 100, the transportation management system 105, the fuel tank management system 110, the power management system 115, the truck roll management system 130, the ship management system 135, the pipeline management system 140, the carbon credit system 150, the cracking management system 155, or the consumer 120 in the tenant 20A.
[0068] The information on the power demand includes, for example, at least one of the operation plan of the consumer 120, environmental data, past power demand (power consumption), or power demand for a predetermined future period. The operation plan may indicate at least one of a plan of the operation rate or operation period of the load device of the consumer 120 for a future period. The environmental data may indicate at least one of temperature, air pressure, weather, etc. detected by a sensor or the like installed in the consumer 120. The past power consumption may indicate at least one of the total power consumption in the consumer 120 for a predetermined past period or the power consumption in a time series. The power demand for a predetermined future period may indicate the required power amount calculated by the consumer 120 for the future period.
[0069] The second receiving unit 160B is connected to the tenant 20B. The second receiving unit 160B receives information regarding power demand from at least one of the multiple systems or consumers 120 in the tenant 20B. The third receiving unit 160C is connected to the tenant 20C. The third receiving unit 160C receives information regarding power demand from at least one of the multiple systems or consumers 120 in the tenant 20C. The information regarding power demand received by the second receiving unit 160B and the third receiving unit 160C may be the same type of information as the information regarding power demand received by the first receiving unit 160A.
[0070] The first planning unit 170A is connected to the first receiving unit 160A. The first planning unit 170A generates a power supply plan from the power management system 115 to the consumer 120 in the tenant 20A according to the information received by the first receiving unit 160A. The second planning unit 170B is connected to the second receiving unit 160B. The second planning unit 170B generates a power supply plan from the power management system 115 to the consumer 120 in the tenant 20B according to the information received by the second receiving unit 160B. The third planning unit 170C is connected to the third receiving unit 160C. The third planning unit 170C generates a power supply plan from the power management system 115 to the consumer 120 in the tenant 20C according to the information received by the third receiving unit 160C.
[0071] The energy demand prediction unit 180 is connected to the first planning unit 170A, the second planning unit 170B, and the third planning unit 170C. The energy demand prediction unit 180 performs energy demand prediction according to the supply plans generated by the first planning unit 170A, the second planning unit 170B, and the third planning unit 170C. The energy demand prediction unit 180 may predict the production amount of fuel required for the power supply amount in a plurality of tenants 20, etc. The orchestration controller 40 may transmit at least one of a power supply plan or an energy supply instruction according to the energy demand prediction to each tenant 20.
[0072] FIG. 2 shows a configuration example of a part of the orchestration system 10. FIG. 2 shows, as an example, the power management system 115 in the tenant 20A in more detail. The power management system 115 has an output control device 200 and a power supply device 210. Note that the power management system 115 in the tenant 20B or 20C may have the same configuration as that in FIG. 2.
[0073] The output control device 200 controls the power supplied to the customer 120 by the power management system 115. The output control device 200 may be installed at the customer 120 (for example, inside a plant). The output control device 200 may include one or more processors for generating, acquiring, and outputting information for power control. The output control device 200 has an acquisition unit 220, a communication unit 225, a simulation unit 230, a determination unit 235, and an adjustment unit 240.
[0074] The acquisition unit 220 is connected to the customer 120. The acquisition unit 220 acquires information regarding the customer 120. The acquisition unit 220 may acquire information regarding the power demand from the customer 120. As an example, the acquisition unit 220 may acquire at least one of the operation plan of the customer 120, environmental data, past power consumption, or the power demand for a predetermined future period. The operation plan may indicate at least one of the operation rate, operation time, or operation period of the load device of the customer 120 in a future period. The environmental data may indicate at least one of the temperature, atmospheric pressure, or weather of the environment where the customer 120 is installed. The past power consumption may indicate at least one of the total power consumption for a predetermined past period or the time-series power consumption at the customer 120. The power demand for a predetermined future period may indicate the required power amount determined by the customer 120 in a future period.
[0075] The communication unit 225 is connected to at least one other system in the orchestration system 10 and performs data transmission and reception with the at least one system. The communication unit 225 is connected to the orchestration controller 40 and performs data transmission and reception with the orchestration controller 40. The communication unit 225 may receive information from the orchestration controller 40 for optimizing the output distribution of the output power of the fuel cell and the additional power source so as to match the power demand.
[0076] The determination unit 235 is connected to the acquisition unit 220 and the communication unit 225. The determination unit 235 determines the output distribution of the first fuel cell 250 and the additional power source 255 that optimizes at least one of the power generation efficiency or degradation of the first fuel cell 250 according to the power demand for the output power by the power management system 115. The determination unit 235 may determine the output distribution of the first fuel cell 250 and the additional power source 255 according to the information received by the acquisition unit 220 and the communication unit 225.
[0077] The simulation unit 230 is connected to the determination unit 235. The simulation unit 230 performs a simulation regarding at least one of the consumer 120 or the power supply device 210 using a digital twin. The digital twin may include one or more models that simulate state changes, etc. of at least one of the consumer 120 or the power supply device 210. For example, the digital twin for the tenant 20A may be a model generated by machine learning using at least one of the information received from each system in the tenant 20A or the information received from the consumer 120 of the tenant 20A (past power demand, environmental data, etc.). The model may include a model that outputs at least one of the degradation degree or power generation efficiency of the first fuel cell 250, the predicted value of the power demand of the consumer 120, or the power supply plan according to inputs such as the power consumption, operation plan, and environmental data received from the consumer 120. The simulation unit 230 may supply the simulation result to the determination unit 235.
[0078] The adjustment unit 240 is connected to the determination unit 235, the first fuel cell 250, and the additional power source 255. The adjustment unit 240 adjusts the output power of the first fuel cell 250 and the additional power source 255 according to the output distribution determined by the determination unit 235. The adjustment unit 240 may output data indicating the output distribution of the first fuel cell 250 and the additional power source 255 to the power supply device 210. The adjustment unit 240 may also control the power supply by the power grid 275.
[0079] The power supply device 210 includes a first fuel cell 250, an additional power source 255, and an output unit 280. The additional power source 255 may output power. Further, the additional power source 255 may generate thermal energy, kinetic energy, or other types of energy other than electrical energy. The additional power source 255 may include at least one of a second fuel cell 260, a power supply device 265, or a storage battery 270. At least a part of the power supply device 210 may be installed within the consumer 120. For example, the first fuel cell 250 and the additional power source 255 may be installed in the consumer 120 (e.g., within a plant).
[0080] The first fuel cell 250 and the second fuel cell 260 are each connected to the adjustment unit 240. The first fuel cell 250 and the second fuel cell 260 each generate electricity using a chemical reaction between hydrogen and oxygen. The first fuel cell 250 and the second fuel cell 260 generate electricity according to an instruction from the adjustment unit 240 using the fuel produced and transported within the orchestration system 10. The first fuel cell 250 and the second fuel cell 260 may be different types of fuel cells. The load capacity of the first fuel cell 250 may be different from the load capacity of the second fuel cell 260. The load capacity of the first fuel cell 250 may be 10 to 20 times the load capacity of the second fuel cell 260. The first fuel cell 250 and the second fuel cell 260 may each be a proton exchange membrane fuel cell (PEMFC), a phosphoric acid fuel cell (PAFC), a molten carbonate fuel cell (MCFC), or a solid oxide fuel cell (SOFC).
[0081] The power supply device 265 is connected to the adjustment unit 240 and at least one of the first fuel cell 250, the second fuel cell 260, or the power supply device 265. The power supply device 265 is not particularly limited as long as it is a device that serves as a power source. As an example, it is a micro gas turbine or a fuel cell. The micro gas turbine may generate electricity using the exhaust heat of at least one of the first fuel cell 250 or the second fuel cell 260.
[0082] The storage battery 270 is connected to the adjustment unit 240 and at least one of the first fuel cell 250, the second fuel cell 260, or the power supply device 265. The storage battery 270 charges or discharges in response to an instruction from the adjustment unit 240. The storage battery 270 is charged by the output power of at least one of the first fuel cell 250, the second fuel cell 260, and the power supply device 265.
[0083] The output unit 280 is connected to the first fuel cell 250, the second fuel cell 260, the power supply device 265, the storage battery 270, and the power grid 275. The output unit 280 supplies the output power from the first fuel cell 250, the second fuel cell 260, the power supply device 265, the storage battery 270, and the power grid 275 to the consumer 120. The output unit 280 may include the output terminal of the power supply device 210 electrically connected to the load device of the consumer 120.
[0084] Figure 3 shows a first operation example of power supply optimization in the orchestration system 10. In the orchestration system 10, the orchestration controller 40 and the output control device 200 distributively execute the collection of information from multiple layers and the optimization of output power. In the first operation example, the output control device 200 controls the power supply device 210 according to the power supply plan generated by the orchestration controller 40. Note that, as an example, Figure 3 mainly shows the optimization operation of power supply in tenant 20A, but the orchestration system 10 may similarly execute optimization for tenants 20B and 20C.
[0085] In step S300, the orchestration controller 40 acquires the first power demand of the consumer 120 of tenant 20A. The first planning unit 170A of the orchestration controller 40 predicts the first power demand for the output power of the power management system 115 based on the information received by the first reception unit 160A. The first planning unit 170A may acquire the required power amount for the power management system 115 calculated by the consumer 120 of tenant 20A as the first power demand.
[0086] Further, the first planning unit 170A may predict the first power demand in a predetermined first period in the future through simulation using the digital twin for the tenant 20A. The first planning unit 170A may predict the time-series first power demand or the total of the first power demands for each time period in the first period.
[0087] The model used by the first planning unit 170A may include one or more models that simulate state changes of at least a part of the consumers 120 or the orchestration system 10. For example, the model for the tenant 20A may be generated by machine learning using at least one of the information received from each system related to the tenant 20A or the information received from the consumer 120 of the tenant 20A (past power demand, environmental data, operation plan, etc.). The model may output at least one of the first power demand of the consumer 120 or the supply plan of the power supply in response to the input of the information received from each system and the information received from the consumer 120. The model may simulate the state change of at least one system of the tenant A in response to the information received from each system related to the tenant 20A. As an example, the first planning unit 170A may perform simulation using the information indicating the operation plan and environmental data of the consumer 120 and obtain a simulation result including the first power demand. The model may be generated by a machine learning algorithm including a neural network or the like.
[0088] In step S310, the first planning unit 170A of the orchestration controller 40 determines a first power supply plan for supplying power to the customer 120 of the tenant 20A. The first planning unit 170A may determine a first supply plan that satisfies the first power demand during a future first period. The first planning unit 170A may determine a first supply plan indicating when to output which power source with what distribution. The first planning unit 170A may generate a first supply plan including at least one target value of the output power ratio or control parameter of the first fuel cell 250 and the additional power source 255. The control parameter may include at least one of the output power amount, fuel temperature, fuel pressure, or cooling water temperature of at least one of the first fuel cell 250 or the additional power source 255.
[0089] The first planning unit 170A may determine a first supply plan that optimizes the output distribution of the first fuel cell 250 and the additional power source 255 so as to adjust the output power of the first fuel cell 250 within the range of 20% to 80% of the load capacity (the maximum output power of the first fuel cell 250). The first planning unit 170A may determine a first supply plan so as to maintain the output power of the first fuel cell 250 within the range of 20% to 80% of the load capacity over the first period. If it is within the range of 20% to 80% of the load capacity, deterioration of the first fuel cell 250 can be suppressed. The first planning unit 170A may also determine a first supply plan that restricts the output power of the second fuel cell 260, which is the additional power source 255, within the range of 20% to 80% of the load capacity.
[0090] The first planning unit 170A may perform frequency analysis on the time-series variation of the first power demand, and generate information (supply plan) for optimizing the output distribution of the first fuel cell 250 and the additional power source 255 based on the frequency analysis. For example, the first planning unit 170A may, based on the frequency of the time-series variation of the power demand, generate information (supply plan) for optimizing the output distribution of the first fuel cell 250 and the additional power source 255 such that the variation in the output power of the first fuel cell 250 is within a range not exceeding a preset maximum operating frequency with respect to degradation. Similarly for the second fuel cell 260, the first planning unit 170A may generate a first supply plan for optimizing the ratio of the output powers of the first fuel cell 250 and the additional power source 255 such that it is within a range not exceeding a preset maximum operating frequency for the second fuel cell 260. The first fuel cell 250 and the second fuel cell 260 may be of different types, and may each have a preset maximum operating frequency different from each other. The preset maximum operating frequency for the first fuel cell 250 may be 2 to 20 times the preset maximum operating frequency for the second fuel cell 260.
[0091] As an example, the first planning unit 170A may perform frequency analysis by performing Fourier transform on the time-series variation of the first power demand, and may combine the output powers of the first fuel cell 250 and the second fuel cell 260 according to each frequency component of the first power demand such that they are within a range not exceeding the preset maximum operating frequency. For frequency components of the first power demand that are higher than the maximum operating frequency, the first planning unit 170A may determine the first supply plan such that the storage battery 270 is charged or discharged during time periods exceeding or falling short of the first power demand. The first planning unit 170A may further determine the first supply plan for supplying power from the power grid 275 during time periods when the first power demand is not satisfied. Since the degradation of a fuel cell increases as the rate of change of its output power increases, the maximum operating frequency may be the frequency of the variation in the output power for each of the first fuel cell 250 and the second fuel cell 260 where the degradation is less than a preset threshold. The maximum operating frequency may be set based on the results of examining the degradation degree of each fuel cell through experiments or simulations in advance.
[0092] The first planning unit 170A may optimize the output distribution of the first fuel cell 250 and the additional power source 255 so as to stop the output of the corresponding fuel cell during a preset startup period for at least one of the first fuel cell 250 and the second fuel cell 260. The startup period may be a period from the startup of the fuel cell (generated power = 0) until the deterioration of the fuel cell becomes equal to or less than a predetermined threshold value. The startup period may be a rising period until the fuel cell can output the maximum rated output power during steady operation. The startup period may be set from the results of examining the deterioration of each fuel cell by experiments or simulations in advance. The first fuel cell 250 and the second fuel cell 260 may have different startup periods. The startup period of the first fuel cell 250 may be 5 to 50 times as long as the startup period of the second fuel cell 260. Since the deterioration of the fuel cell increases when it outputs power during the startup period, the first planning unit 170A may determine a first supply plan for suppressing the deterioration by stopping the output of the fuel cell during the startup period. The first planning unit 170A may determine a first supply plan for supplementing the output power with an additional power source 255 other than the first fuel cell 250 during the startup period.
[0093] The first planning unit 170A may optimize the output distribution of the first fuel cell 250 and the additional power source 255 using an evaluation function based on a weighted evaluation of the power generation efficiency, equipment cost, and degradation of the first fuel cell 250 and the additional power source 255. As the power generation efficiency of the first fuel cell 250, the first planning unit 170A may use a value obtained by dividing the fuel cost (the cost from fuel production to power generation using the fuel) by the amount of power of the output power (that is, the unit price of power considering the entire supply chain). The power generation efficiency of the second fuel cell 260 may be the same. As the equipment cost, the first planning unit 170A may use the installation cost of each of the first fuel cell 250 and the second fuel cell 260 (for example, the price of the fuel cell). As the degradation of each of the first fuel cell 250 and the second fuel cell 260, the first planning unit 170A may use a degradation degree indicating a reduction rate or change amount with respect to the initial value such as the maximum output power. The first planning unit 170A calculates the sum of multiplying the values indicating the power generation efficiency, equipment cost, and degradation by preset weights, respectively, and determines the ratio of the output power of the first fuel cell 250 and the additional power source 255 for which the sum is equal to or greater than (or maximizes) a preset threshold as the first supply plan.
[0094] The first planning unit 170A may determine the first supply plan according to information of other systems. For example, the first planning unit 170A may calculate the amount of fuel that can be supplied to the fuel cell from information received from at least one of the fuel production management system 100, the transportation management system 105, or the fuel tank management system 110, and optimize the output distribution of the first fuel cell 250 and the additional power source 255 according to the amount of fuel that can be supplied. The first planning unit 170A may generate a first supply plan that reduces the output distribution of the first fuel cell 250 and the second fuel cell 260 when the amount of fuel supply is smaller, and increases the output distribution of the first fuel cell 250 and the second fuel cell 260 when the amount of fuel supply is larger. The first planning unit 170A may also determine the first supply plan according to information on carbon credits. The first planning unit 170A may generate a first supply plan that increases the power distribution of the first fuel cell 250 and the second fuel cell 260 during periods when the price of carbon credits is higher, and decreases the power distribution of the first fuel cell 250 and the second fuel cell 260 during periods when the price of carbon credits is lower.
[0095] The second planning unit 170B and the third planning unit 170C may determine the first supply plan for the tenants 20B and 20C, respectively, in the same manner as in steps S300 and S310. The orchestration controller 40 may provide, to each of the output control devices 200 of the multiple tenants 20, information for optimizing output allocation for the corresponding consumers 120 (e.g., at least one of the first power demand or the first supply plan of the corresponding tenant 20).
[0096] Further, the energy demand prediction unit 180 of the orchestration controller 40 may create at least one of a fuel supply plan, a transportation plan, and a production plan from a plurality of first supply plans determined by the first planning unit 170A, the second planning unit 170B, and the third planning unit 170C. The energy demand prediction unit 180 may calculate the total amount of fuel (hydrogen, etc.) required for the first fuel cell 250 and the second fuel cell 260 when the first supply plan is executed and the supply timing of the required fuel as a fuel supply plan. The energy demand prediction unit 180 may calculate the storage amount and storage timing for storing the fuel in the fuel tank from the total amount of fuel required and the supply timing of the required fuel. The energy demand prediction unit 180 may calculate the transportation amount and transportation timing for transporting the fuel as a transportation plan from the storage amount and storage timing. The energy demand prediction unit 180 may calculate the production amount and production timing of the fuel as a production plan from the transportation amount and transportation timing. The energy demand prediction unit 180 may simulate state changes of the fuel production management system 100, the transportation management system 105, or the fuel tank management system 110 using a digital twin, and perform the above calculation operation using the simulation results. In addition, the fuel supply plan, transportation plan, and production plan may be optimized using their respective objective functions. In this way, the energy demand prediction unit 180 can calculate the energy demand prediction according to the constraint conditions from the downstream side to the upstream side, and determine each plan.
[0097] The orchestration controller 40 may transmit instructions to each system according to a fuel supply plan, a transportation plan, or a production plan. For example, the orchestration controller 40 may transmit an instruction to the fuel production management system 100 of the corresponding tenant 20 to produce the calculated amount of fuel by the production timing. When the tenants 20A, 20B, and 20C have a common fuel production management system 100, the orchestration controller 40 can efficiently perform fuel production by instructing the tenants 20A, 20B, and 20C to produce the total amount of fuel.
[0098] The orchestration controller 40 may also transmit an instruction to the transportation management system 105 of the corresponding tenant 20 to transport the calculated transportation amount of fuel to the fuel tank by the transportation timing. In response to an instruction from the orchestration controller 40, the transportation management system 105 may transmit an instruction to the truck roll management system 130, the ship management system 135, and the pipeline management system 140 to transport fuel at the transportation amount and transportation timing corresponding to each. The orchestration controller 40 may transmit an instruction to the fuel tank management system 110 of the corresponding tenant 20 to store the calculated storage amount of fuel in the fuel tank by the storage timing. In response to an instruction from the orchestration controller 40, the fuel tank management system 110 may transmit an instruction to the tank control device 145 to store the calculated storage amount of fuel in the fuel tank by the storage timing.
[0099] In step S320, the output control device 200 acquires a second power demand for the output power of the first fuel cell 250 and the additional power source 255 in a predetermined future second period. The determination unit 235 of the output control device 200 may acquire at least one of a time-series power demand or a predicted value of the power demand for the output power of the power management system 115. The determination unit 235 may predict the time-series second power demand in the second period or the total of the second power demand for each time slot. The determination unit 235 may acquire the amount of power requested of the power management system 115, calculated by the consumer 120, as the second power demand.
[0100] Further, the determination unit 235 may predict the second power demand in a future second period according to the simulation result by the digital twin. The digital twin used by the simulation unit 230 may include one or more models that simulate at least one of the state change of the consumer 120 or the state change of the power supply device 210 (e.g., the first fuel cell 250 as an example). The digital twin may include a model generated by machine learning using information of the power supply device 210 (type, characteristics, etc. of the power source) and information received from the consumer 120 (past power consumption, environmental data, operation plan, etc.). The determination unit 235 may obtain a predicted value of the second power demand output from the model according to at least one input of the current state (power consumption, temperature, operation rate, etc.) of the consumer 120 or the future operation plan. The model may be generated by a machine learning algorithm including a neural network or the like.
[0101] The determination unit 235 may obtain a predicted value of the power demand with respect to the output power of the power management system 115 according to the type of the load device of the consumer 120 supplied with power by the power management system 115. The determination unit 235 may calculate the power demand pattern for each type of load device from the past power demand and obtain the predicted value using the power demand pattern. As an example, when the load device is an air conditioner, the determination unit 235 may use a power demand pattern in which there is more power demand during a period when the temperature is equal to or higher than a predetermined threshold.
[0102] Further, the determination unit 235 may obtain a predicted value of the power demand for the output power of the power management system 115 according to at least one of the operation plan of the load device of the consumer 120 powered by the first fuel cell 250, the environmental data related to the load device, or the past power demand for the output power of the power management system 115. The determination unit 235 may obtain the operation plan (time-series operation rate or operation rate in each of a plurality of periods) of each of the plurality of load devices from the consumer 120, and calculate the total power required according to the operation plan as the second power demand. The determination unit 235 may obtain the second power demand from the result of simulation according to at least one of the operation plan or environmental data of the consumer 120 using the digital twin. The determination unit 235 may use the past power demand as the predicted value of the future power demand. The determination unit 235 may use the past power demand in the corresponding period as the predicted value of the future power demand. As an example, the determination unit 235 may use the past power demand in February of last year as the predicted value of the power demand in February of this year. The determination unit 235 may also change the past power demand according to the operation plan of the consumer 120 or the load device and use it as the predicted value of the future power demand. The determination unit 235 may change the past power demand such that it increases in a period when the operation rate of the operation plan is higher than the past and decreases in a period when the operation rate is lower than the past, and use it as the second power demand.
[0103] The determination unit 235 may predict the power demand in the same manner as the first planning unit 170A of the orchestration controller 40, but the second period may be shorter than the first period. Accordingly, the determination unit 235 may predict the power demand at a shorter cycle than the first planning unit 170A of the orchestration controller 40. Further, the determination unit 235 may predict the second power demand using only the information obtained from the consumer 120. Further, the determination unit 235 may predict the second power demand using the information obtained after the prediction of the first power demand by the first planning unit 170A. Thus, the determination unit 235 can perform a demand prediction with higher accuracy than the orchestration controller 40.
[0104] In step S330, the output control device 200 determines a second power supply plan for supplying power to the consumer 120. The determination unit 235 may determine a second supply plan that satisfies the second power demand in a future second period. The determination unit 235 may determine a second supply plan indicating which power source to output and in what distribution at what time. The determination unit 235 may determine the second supply plan by changing the first supply plan according to the second power demand. For the output power planned in the first supply plan, the determination unit 235 may supply power from the storage battery 270 or the power grid 275 to the consumer 120 during a period when the second power demand is insufficient, and generate a second supply plan to charge the storage battery 270 or sell power via the power grid 275 during a period when the second power demand is exceeded.
[0105] Also, similar to the first planning unit 170A in step S310, the determination unit 235 may determine, as the second supply plan, the ratio or control parameter of the output power of the first fuel cell 250 and the additional power source 255. The determination unit 235 may determine a second supply plan that satisfies the second power demand and may determine either the first supply plan or the second supply plan as the optimal supply plan.
[0106] For example, similar to the first planning unit 170A in step S310, the determination unit 235 may perform frequency analysis on the time-series variation of the second power demand, and based on the frequency analysis, determine the output distribution of the first fuel cell 250 and the additional power source 255 as the second supply plan. Also, the determination unit 235 may determine a second supply plan including target values of a plurality of control parameters for each of the first fuel cell 250 and the additional power source 255 according to the output distribution of the first fuel cell 250 and the additional power source 255. The determination unit 235 may determine the target value of the output power of the first fuel cell 250, the target value of the output power of the second fuel cell 260, the target value of the output power of the power supply device 265, and the target value of the output power of the storage battery 270 so as to satisfy the second power demand according to the determined output distribution.
[0107] Further, the determination unit 235 inputs, into a degradation model that outputs the degradation degree of the first fuel cell 250 in response to the input of the control parameter of the first fuel cell 250, a control parameter within the range of control parameters that satisfies the second power demand and has a power generation efficiency equal to or higher than a predetermined threshold value, and determines a second supply plan including the control parameter for which the degradation degree output from the degradation model becomes the smallest. The determination unit 235 may previously store a function indicating the correlation between the control parameter regarding the first fuel cell 250 and the power generation efficiency, and determine a set of control parameters having a power generation efficiency equal to or higher than a predetermined threshold value using the function. Further, the determination unit 235 may receive the simulation result of the digital twin obtained by inputting the parameter regarding the first fuel cell 250 and the information regarding the consumer, and determine a set of control parameters having a power generation efficiency equal to or higher than a predetermined threshold value using the simulation result. The determination unit 235 may input a plurality of sets of control parameters having a power generation efficiency equal to or higher than a predetermined threshold value into the degradation model respectively, and determine the set of control parameters with the smallest degradation degree output as the second supply plan. The determination unit 235 may similarly determine a second supply plan that minimizes the degradation degree for the second fuel cell 260 as well.
[0108] Here, the degradation model may be a function showing the correlation between the control parameters and the degree of degradation of the first fuel cell 250, and may be a machine learning model. The degradation model may be a model generated by various machine learning algorithms including random forest, gradient boosting, logistic regression, neural network, and support vector machine (SVM). The degradation model is a model generated using, as learning data, at least one control parameter among the output power amount, fuel temperature, fuel pressure, environmental data (temperature, humidity, etc.), output power fluctuation (frequency), startup period, or cooling water temperature regarding the first fuel cell 250, which is obtained in advance by experiments or the like, and the degree of degradation of the first fuel cell 250 at the time of the control parameter. The degradation model may be a model that is theoretically correct regarding the degree of degradation of the fuel cell, or may be a function of the local degree of degradation obtained by changing the control parameter in a range where the degree of degradation is equal to or higher than a predetermined threshold. Note that the degree of degradation may indicate a change from the initial value of the maximum output power, current-voltage characteristics, or electrochemically active surface area (ECSA) of the fuel cell.
[0109] The determination unit 235 may perform a simulation on at least one of the power generation efficiency or degradation of the first fuel cell 250 when controlled by each of the determined second supply plan and the first supply plan. The determination unit 235 may determine, according to the simulation result, a supply plan in which at least one of the power generation efficiency or degradation is optimal (for example, the power generation efficiency is maximum and the degree of degradation is minimum) among the first supply plan and the second supply plan as the optimal supply plan.
[0110] The determination unit 235 may determine a fuel transportation instruction for the first fuel cell 250 and the second fuel cell 260 according to the output distribution of the optimal supply plan. For example, when the determination unit 235 determines an optimal supply plan different from the first supply plan, it may determine a transportation instruction to supplement the insufficient fuel or a transportation instruction to reduce the excessive fuel. The transportation instruction may include at least one of the transportation timing to the fuel tank, the transportation route, the transportation means, or the transportation volume. The communication unit 225 may output the transportation instruction to the transportation management system 105. Also, the determination unit 235 may determine the cracking amount and the cracking timing of the fuel required according to the optimal supply plan. The communication unit 225 may send an instruction to the cracking management system 155 to perform cracking with the determined cracking amount at the determined timing. Further, the determination unit 235 may calculate the predicted amount of greenhouse gas emissions reduced for each of a plurality of periods according to the optimal supply plan. The determination unit 235 may instruct the carbon credit system 150 to conduct the buying and selling of carbon credits according to the predicted amount of greenhouse gas emissions reduced and the period.
[0111] In step S340, the adjustment unit 240 controls the output power of the power supply device 210. The adjustment unit 240 adjusts the output powers of the first fuel cell 250 and the additional power source 255 according to the control parameters determined by the determination unit 235. The adjustment unit 240 may supply data indicating the time-series output power determined by the determination unit 235 to the power supply device 210 to set the output power. The first fuel cell 250, the second fuel cell 260, the power supply device 265, and the storage battery 270 may output power according to the data supplied from the adjustment unit 240 and supply the power to the consumer 120 via the output unit 280.
[0112] After step S340, the orchestration system 10 may execute optimization of power supply to the consumer 120 while repeating steps S300 to S340. The orchestration controller 40 or the output control device 200 may perform additional learning on a model or the like used for predicting power demand from the difference between the predicted value of power demand and the actual power demand. Further, the orchestration controller 40 or the output control device 200 may optimize the model that outputs the power supply plan so as to reduce the error between the actually performed power supply (output distribution) and the optimal power supply for the actual power demand calculated afterwards.
[0113] In the orchestration system 10 of the present embodiment, since the entire supply chain from fuel production to power supply to the consumer 120 can be optimized by the orchestration controller 40, costs can be efficiently reduced for a plurality of tenants 20. Further, the orchestration system 10 can reduce the possibility of fuel supply interruption in a supply chain that performs fuel production and transportation that takes a period of several weeks to several months by performing highly accurate simulation using a digital twin for power demand prediction and supply plan generation.
[0114] FIG. 4 shows a second operation example of power supply optimization in the orchestration system 10. In the second operation example, the orchestration system 10 may operate in the same manner as in the first operation example, except that one of the plurality of supply plans generated by the output control device 200 is selected by the orchestration controller 40, and power supply is performed according to the selected supply plan.
[0115] In step S400, the orchestration controller 40 acquires the predicted value of the first power demand of the consumer 120 of the tenant 20A. The first planning unit 170A may predict the first power demand in the same manner as in step S300. The orchestration controller 40 transmits data indicating the first power demand to the output control device 200.
[0116] In step S410, the output control device 200 generates a plurality of second supply plans that plan the output distribution (such as ratio) of the first fuel cell 250 and the additional power source 255 in a predetermined second period based on the prediction of the first power demand for the output power of the first fuel cell 250 and the additional power source 255. The determination unit 235 may generate a plurality of second supply plans while changing the constraint conditions. For example, the determination unit 235 may generate a second supply plan that is optimal for the power generation efficiency of the first fuel cell 250, a second supply plan that is optimal for the degradation of the first fuel cell 250, a second supply plan that is optimal for the power generation efficiency and degradation of the first fuel cell 250, a second supply plan that is optimal for the power generation efficiency of each of the first fuel cell 250 and the second fuel cell 260, and a second supply plan that is optimal for the degradation of each of the first fuel cell 250 and the second fuel cell 260. The determination unit 235 may generate a second supply plan in the same manner as in step S330 using the first power demand. The communication unit 225 transmits data indicating the plurality of second supply plans to the orchestration controller 40.
[0117] In step S420, the orchestration controller 40 may select an optimal supply plan that optimizes at least one of the power generation efficiency, equipment cost, and degradation related to the first fuel cell 250 and the additional power source 255 from among the plurality of second supply plans and provide the selection result to the output control device 200. The first planning unit 170A may select a supply plan with the maximum power generation efficiency related to the first fuel cell 250 and the additional power source 255 as the optimal supply plan. Also, the first planning unit 170A may select a supply plan with the maximum ratio of the total output power to the equipment cost related to the first fuel cell 250 and the additional power source 255 as the optimal supply plan. Also, the first planning unit 170A may select a supply plan with the minimum degradation related to the first fuel cell 250 and the additional power source 255 as the optimal supply plan.
[0118] The first planning unit 170A may select an optimal supply plan based on a result of simulating the control and state change of the first fuel cell 250 and the additional power source 255 according to each of the multiple second supply plans. The first planning unit 170A may simulate, in a digital twin, state changes (for example, at least one change in the output power amount, the fuel consumption amount, or the deterioration degree) regarding the first fuel cell 250 and the additional power source 255 due to the control according to each of the second supply plans, and calculate at least one of the power generation efficiency, the equipment cost, and the deterioration from the simulation result. The first planning unit 170A may select the second supply plan for which the calculation result is optimal as the optimal supply plan. The orchestration controller 40 transmits data indicating the selected optimal supply plan to the output control device 200.
[0119] The first planning unit 170A may select the optimal supply plan according to information of other systems. For example, the first planning unit 170A may calculate the amount of fuel that can be supplied to the first fuel cell 250 and the second fuel cell 260 from information received from at least one of the fuel production management system 100, the transportation management system 105, and the fuel tank management system 110, and select a second supply plan according to the amount of fuel that can be supplied. The first planning unit 170A may calculate the amount of power that can be output with the amount of fuel that can be supplied, and select a second supply plan in which the output power amount of the first fuel cell 250 and the second fuel cell 260 is equal to or less than the amount of power that can be output and the output power amount is maximum as the optimal supply plan. Furthermore, the first planning unit 170A may select a second supply plan in which the output distribution of the first fuel cell 250 and the second fuel cell 260 is smaller when the amount of fuel that can be supplied is smaller, and in which the output distribution of the first fuel cell 250 and the second fuel cell 260 is larger when the amount of fuel that can be supplied is larger, as the optimal supply plan.
[0120] In step S430, the adjustment unit 240 controls the power supply device 210 in accordance with the optimal supply plan, similarly to step S340.
[0121] According to this embodiment, power demand prediction and supply plan generation can be executed distributively between the orchestration controller 40 and the output control device 200, and the efficiency of power supply can be improved.
[0122] Note that the output control device 200 of this embodiment may be arranged separately from the orchestration controller 40, or at least a part of the configuration of the orchestration controller 40 may be included in the output control device 200.
[0123] FIG. 5 shows power consumption data of three different plants in the same period. FIGS. 5(a), 5(b), and 5(c) respectively show the time transitions of power consumption of different plants. In FIG. 5, the vertical axis represents the power consumption amount, and the horizontal axis represents time. FIG. 5(d) shows a partial enlarged view of the power consumption data of FIGS. 5(a), 5(b), and 5(c). The power consumption data in FIG. 5 shows repeated major trends such as three "gaps" that appear at approximately the same timing and at similar intervals. Also, as shown in FIG. 5(d), there is an overall similarity in that each plant exhibits the behavior of a high-frequency demand component (f1 in FIG. 5) and a low-frequency demand component (f2 in FIG. 5) over the entire period.
[0124] Optimization of power supply for plants, residential areas, industrial zones, etc. is much more complex than that for electric vehicles (EVs) or the like. Also, as shown in FIG. 5, the power consumption of large-scale areas such as plants and residential areas is much higher, in terms of capacity, than the power required for EVs by about 100 to 10,000 times. To supply power to plants, residential areas, etc., a plurality of fuel cells with different capacities and frequency characteristics are preferable. By combining and using fuel cells with various capacities and frequency characteristics, the power supply using fuel cells becomes efficient.
[0125] For the use of fuel cells, it is desirable to consider (1) excellent cost efficiency of power generation, (2) start-up time requirements (able to operate without losing efficiency), (3) the possibility of a sudden increase in power demand in a short period, (4) a power generation efficiency of 90% or more due to cost and other issues, and (5) the life of the electrodes, etc. It is preferable to optimize each fuel cell in the range of 20% to 80% of the output capacity level by an advanced optimization system such as a digital twin to meet the power demand and ensure cost and power conversion efficiency. Therefore, when selecting a combination of multiple fuel cells to conform to the power demand while optimizing both cost and power generation efficiency, it is preferable to meet the following conditions.
[0126] (a) The optimal frequencies (maximum operating frequencies) of the selected fuel cells are preferably significantly different. For example, the maximum operating frequency of the first fuel cell 250 is preferably 2 to 20 times the maximum operating frequency of the second fuel cell 260. (b) The start-up periods of the fuel cells are preferably significantly different from each other. For example, the start-up period of the first fuel cell 250 is preferably 5 to 50 times the start-up period of the second fuel cell 260. (c) The load capacities (maximum output powers) of the fuel cells are preferably significantly different. For example, the load capacity of the first fuel cell 250 is preferably 10 to 20 times the load capacity of the second fuel cell 260.
[0127] Figure 6 shows the characteristics of multiple power sources. In Figure 6, "Type" indicates the type of power source, "Variation Characteristics" indicates the time-series variation of the output when the degradation is less than a predetermined threshold, "Efficiency" indicates the power generation efficiency, "Maximum Power" indicates the maximum output power, "Start-up Time" indicates the period from start-up until the degradation is less than a predetermined threshold, and "Frequency" indicates the maximum frequency of the output variation when the degradation is less than a predetermined threshold.
[0128] The solid oxide fuel cell (SOFC) has a low maximum frequency related to degradation of 2 Hz and a long start-up period of 24 hours, but a large maximum output power of 200 kW and a high power generation efficiency of 75%. The polymer electrolyte fuel cell (PEMFC) has a relatively low maximum frequency related to degradation of 5 Hz, a start-up period of 3 hours, a relatively large maximum output power of 100 kW, and a relatively low power generation efficiency of 45%. The micro gas turbine (MGT) has a maximum frequency related to degradation of 50 Hz, a start-up period of 15 minutes, a small maximum output power of 10 kW, and a relatively low power generation efficiency of 40%. The storage battery has a large maximum frequency related to degradation of 1 kHz, a start-up period of 0 minutes and can be started instantaneously, a maximum output power of 50 kW, and a relatively high power generation efficiency of 85%.
[0129] The orchestration system 10 may apply the output power of the SOFC and PEMFC to the power demand for frequency components below 2 Hz, the output power of the PEMFC to the power demand for frequency components of 2 - 5 Hz, the output power of the MGT to the power demand for frequency components of 5 - 50 Hz, and the output power of the storage battery to the remaining power demand, for example, in the fluctuations of power demand. In this case, most of the power demand can be satisfied by fuel cells with large maximum power. By combining power sources with different characteristics as shown in FIG. 6, power can be efficiently supplied to a large power demand.
[0130] FIG. 7 shows the transition of the degradation rate of the fuel cell from start-up. In FIG. 7, the vertical axis represents the degradation rate and the horizontal axis represents time. For fuel cell A, since the degradation rate is large until 15 minutes have elapsed from start-up (time = 0), it is preferable not to output power. For fuel cell B, since the degradation rate is large until 3 hours have elapsed from start-up (time = 0), it is preferable not to output power. Thus, since the fuel cell has a long start-up period and the start-up period varies depending on the type, the orchestration system 10 preferably uses a combination of fuel cells with different start-up periods.
[0131] FIG. 8 shows an example of the characteristics of a fuel cell. In FIG. 8(a), the vertical axis represents the degradation rate (degree of degradation) of the fuel cell, and the horizontal axis represents the frequency of the output power fluctuation of the fuel cell. In (b), the vertical axis represents the degradation rate of the fuel cell, and the horizontal axis represents the load factor (ratio of the output power to the maximum output power) of the fuel cell. In (c), the vertical axis represents the power generation efficiency of the fuel cell, and the horizontal axis represents the load factor (ratio of the output power to the load capacity) of the fuel cell. As shown in (a), the fuel cell deteriorates significantly when the frequency of the output power fluctuation exceeds a specific frequency f0. Therefore, it is preferable to calculate the frequency f0 in advance by experiments or the like and set it in advance as the maximum operating frequency for each fuel cell. Also, as shown in (b), the fuel cell deteriorates significantly when operating outside the range of 20 to 80% of the load factor, and as shown in (c), the power generation efficiency also decreases. Therefore, it is preferable that the fuel cell maintains the output power within the range of 20% to 80% of the load capacity.
[0132] FIG. 9 is an explanatory diagram of the combination of output power with respect to the time-series variation of power demand. (a) of FIG. 9 shows the time-series variation of power demand, (b) shows the time-series variation of the output power of the first fuel cell 250 and the time-series variation of the output power of the storage battery 270 (negative indicates charging and positive indicates discharging), and (c) shows the time-series variation of the total output power of the first fuel cell 250 and the storage battery 270. The orchestration controller 40 or the output control device 200 decomposes the time-series variation of the power demand in (a) into components of a plurality of frequency bands by Fourier transform or the like. The orchestration controller 40 or the output control device 200 may generate a supply plan such that, among the plurality of frequency bands, the components below the maximum operating frequency of the first fuel cell 250 are supplied by the output power of the first fuel cell 250, and the components exceeding the maximum operating frequency are supplied by the output power of the storage battery 270. The orchestration controller 40 or the output control device 200 may generate a supply plan to supply the power demand in the frequency band where a peak occurs among the decomposed plurality of frequency bands within the range below the maximum operating frequency, by the output power of the first fuel cell 250 within the range of 20% to 80% of the load capacity. In this case, the power demand in other frequency bands may be supplied by the output power of the storage battery 270. By combining the output power of the first fuel cell 250 and the output power of the storage battery 270, it is possible to supply output power having a waveform that matches the power demand as shown in (c).
[0133] FIG. 10 is a diagram showing the power generation efficiency of the first fuel cell 250 at a certain moment. FIG. 10 shows the relationship between the parameter a on the x-axis, the parameter b on the y-axis, and the power generation efficiency E on the z-axis. The parameters a and b may be different from each other, and for example, may be observable and controllable parameters such as the amount of output power, fuel temperature, fuel pressure, cooling water temperature, etc., or observable but uncontrollable parameters such as power demand, degree of degradation, elapsed time since startup, purity of fuel, etc. The following formula 1 shows the power generation efficiency E calculated from the output power W (kWh) of the first fuel cell 250 and the input hydrogen amount V (Kg) to the first fuel cell 250.
[0134]
Equation
[0135] The first fuel cell 250 has its power generation efficiency E changing dynamically according to a plurality of parameters a, b, c, d, e, ···. FIG. 10 shows an efficiency surface (Eop surface) simplified two-dimensionally with respect to parameters a and b. In this case, the Eop surface at a certain moment shown in FIG. 10 becomes the control target space. Each of the parameters a, b, c, d, e, ··· has appropriate physical and logical constraints for various reasons. Considering these, if the first fuel cell 250 can be controlled in the peak region exceeding the Econ plane with the Econ plane set as a target value with the Eop surface, it is an optimal control. The orchestration controller 40 or the determination unit 235 can generate a supply plan with parameters in the peak region of the Eop surface (that is, the range where the power generation efficiency is equal to or higher than a predetermined threshold) as control parameters. By the optimization control of such an orchestration system 10, the operating point can be kept within the peak region of the Eop surface, and high-efficiency operation can be achieved. As a result, the cost of the generated electric power (that is, the required input hydrogen amount) can be minimized.
[0136] The following formula 2 is a degradation model showing the degradation degree dE of the power generation efficiency calculated from a plurality of parameters a, b, c, d, e, ···. The degradation degree dE of the first fuel cell 250 shown in formula 2 is dynamically determined by a function -g("p," "q," "r," "s," "t," ···) of a plurality of parameters p, q, r, s, t, ···, and the decay of the power generation efficiency progresses moment by moment. Note that the parameters p, q, r, s, t, ··· used for calculating the degradation degree dE may include at least one of the frequency or the change amount of the output fluctuation of the fuel cell. In this case, the parameter may be the amplitude of one or more predetermined frequencies in the frequency spectrum of the output fluctuation, or the ratio of the output power at each timing of 1 second ago, 0.9 seconds ago, ···, 0 seconds ago to the current output power.
[0137]
Equation
[0138] The orchestration controller 40 or the determination unit 235 calculates E op ' in Equation 3 in consideration of the cumulative deterioration from the initial value E0 of the power generation efficiency, thereby obtaining an optimal solution that conforms to the actual behavior considering deterioration. The orchestration controller 40 or the determination unit 235 may optimize the output power, etc. of the first fuel cell 250 within the peak region where it is equal to or greater than a predetermined threshold value for E op ' and generate a supply plan. The orchestration controller 40 or the determination unit 235 may similarly determine control parameters such as output power for the second fuel cell 260. Note that a predetermined threshold value for the power generation efficiency for determining the control parameters may be set to a value corresponding to the cumulative deterioration.
[0139] FIG. 11 shows the time-series variation of the output power of the fuel cell. In FIG. 11, the vertical axis represents the ratio of the output power to the load capacity, and the horizontal axis represents time. Since the orchestration system 10 of the present embodiment performs optimization by combining a plurality of power sources, after optimization, the fuel cell can be operated within a range with little deterioration (for example, the upper limit is 80% of the load capacity and the lower limit is 20% of the load capacity) to satisfy the power demand. On the other hand, before optimization, since it is necessary to change the output power of the fuel cell according to the power demand, it is necessary to operate the fuel cell even in a range with large deterioration.
[0140] Various embodiments of the present invention may be described with reference to flowcharts and block diagrams, where the blocks may represent (1) stages of a process in which operations are performed or (2) sections of a device having a role of performing operations. Specific stages and sections may be implemented by a dedicated circuit, a programmable circuit supplied with computer-readable instructions stored on a computer-readable medium, and / or a processor supplied with computer-readable instructions stored on a computer-readable medium. The dedicated circuit may include digital and / or analog hardware circuits, and may include an integrated circuit (IC) and / or discrete circuits. The programmable circuit may include a reconfigurable hardware circuit including memory elements such as logical AND, logical OR, logical XOR, logical NAND, logical NOR, and other logical operations, flip-flops, registers, a field programmable gate array (FPGA), a programmable logic array (PLA), etc.
[0141] The computer-readable medium may include any tangible device capable of storing instructions executable by an appropriate device, and as a result, a computer-readable medium having instructions stored therein will comprise a product including instructions executable to create means for performing the operations specified in the flowchart or block diagram. Examples of the computer-readable medium may include electronic storage media, magnetic storage media, optical storage media, electromagnetic storage media, semiconductor storage media, etc. More specific examples of the computer-readable medium may include floppy (registered trademark) disks, diskettes, hard disks, random access memory (RAM), read only memory (ROM), erasable programmable read only memory (EPROM or flash memory), electrically erasable programmable read only memory (EEPROM), static random access memory (SRAM), compact disc read only memory (CD-ROM), digital versatile disc (DVD), Blu-ray (registered trademark) disc, memory stick, integrated circuit card, etc.
[0142] Computer-readable instructions may include any combination of one or more programming languages, including assembler instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state-setting data, or source code or object code written in an object-oriented programming language such as Smalltalk®, JAVA®, C++, and a conventional procedural programming language such as the "C" programming language or a similar programming language.
[0143] Computer-readable instructions may be executed to create means for causing a processor or programmable circuit of a programmable data processing apparatus, such as a general-purpose computer, a special-purpose computer, or other computer, to perform the operations specified in a flowchart or block diagram, locally or via a wide area network (WAN) such as a local area network (LAN), the Internet, etc. Examples of processors include computer processors, processing units, microprocessors, digital signal processors, controllers, microcontrollers, etc.
[0144] FIG. 12 shows an example of a computer 2200 in which multiple aspects of the present invention may be embodied, in whole or in part. Programs installed on the computer 2200 can cause the computer 2200 to function as an operation associated with the apparatus according to an embodiment of the present invention or as one or more sections of the apparatus, or to execute the operation or the one or more sections, and / or cause the computer 2200 to execute a process according to an embodiment of the present invention or a stage of the process. Such a program may be executed by the CPU 2212 to cause the computer 2200 to perform certain operations associated with some or all of the blocks of the flowcharts and block diagrams described herein.
[0145] The computer 2200 according to this embodiment includes a CPU 2212, a RAM 2214, a graphic controller 2216, and a display device 2218, which are interconnected by a host controller 2210. The computer 2200 also includes an input / output unit such as a communication interface 2222, a hard disk drive 2224, a DVD-ROM drive 2226, and an IC card drive, which are connected to the host controller 2210 via an input / output controller 2220. The computer also includes legacy input / output units such as a ROM 2230 and a keyboard 2242, which are connected to the input / output controller 2220 via an input / output chip 2240.
[0146] The CPU 2212 operates according to programs stored in the ROM 2230 and the RAM 2214, thereby controlling each unit. The graphic controller 2216 acquires image data generated by the CPU 2212 in a frame buffer or the like provided in the RAM 2214 or in itself, and causes the image data to be displayed on the display device 2218.
[0147] The communication interface 2222 communicates with other electronic devices via a network. The hard disk drive 2224 stores programs and data used by the CPU 2212 in the computer 2200. The DVD-ROM drive 2226 reads a program or data from the DVD-ROM 2201 and provides the program or data to the hard disk drive 2224 via the RAM 2214. The IC card drive reads programs and data from an IC card and / or writes programs and data to the IC card.
[0148] ROM 2230 stores therein a boot program or the like executed by computer 2200 upon activation and / or a program dependent on the hardware of computer 2200. Input / output chip 2240 may also be connected to input / output controller 2220 via various input / output units through a parallel port, a serial port, a keyboard port, a mouse port, or the like.
[0149] The program is provided by a computer-readable medium such as DVD-ROM 2201 or an IC card. The program is read from the computer-readable medium, installed in hard disk drive 2224, RAM 2214, or ROM 2230, which are also examples of computer-readable media, and executed by CPU 2212. The information processing described in these programs is read by computer 2200, resulting in cooperation between the programs and the various types of hardware resources described above. The apparatus or method may be configured by realizing the operation or processing of information in accordance with the use of computer 2200.
[0150] For example, when communication is executed between computer 2200 and an external device, CPU 2212 may execute a communication program loaded in RAM 2214 and instruct communication interface 2222 to perform communication processing based on the processing described in the communication program. Communication interface 2222 reads transmission data stored in a transmission buffer processing area provided in a recording medium such as RAM 2214, hard disk drive 2224, DVD-ROM 2201, or an IC card under the control of CPU 2212, transmits the read transmission data to the network, or writes the received data received from the network to a reception buffer processing area or the like provided on the recording medium.
[0151] Further, the CPU 2212 may cause all or necessary parts of files or databases stored in external recording media such as a hard disk drive 2224, a DVD-ROM drive 2226 (DVD-ROM 2201), and an IC card to be read into the RAM 2214, and may execute various types of processing on the data on the RAM 2214. The CPU 2212 then writes back the processed data to the external recording media.
[0152] Various types of information such as various types of programs, data, tables, and databases may be stored in a recording medium and may undergo information processing. The CPU 2212 may perform various types of processing on the data read from the RAM 2214, including various types of operations, information processing, conditional judgment, conditional branching, unconditional branching, information search / replacement, etc. described throughout this disclosure and specified by the instruction sequence of the program, and write back the results to the RAM 2214. Further, the CPU 2212 may search for information in files, databases, etc. within the recording medium. For example, when a plurality of entries each having an attribute value of a first attribute associated with an attribute value of a second attribute are stored in the recording medium, the CPU 2212 searches for an entry that matches the condition where the attribute value of the first attribute is specified from among the plurality of entries, reads the attribute value of the second attribute stored in the entry, and thereby may obtain the attribute value of the second attribute associated with the first attribute that satisfies a predetermined condition.
[0153] The programs or software modules described above may be stored on a computer-readable medium on or near the computer 2200. Also, a recording medium such as a hard disk or RAM provided within a server system connected to a dedicated communication network or the Internet can be used as a computer-readable medium, thereby providing the program to the computer 2200 via the network.
[0154] As described above, the present invention has been described using embodiments, but the technical scope of the present invention is not limited to the scope described in the above embodiments. It is obvious to those skilled in the art that various changes or improvements can be made to the above embodiments. It is clear from the description of the claims that forms with such changes or improvements can also be included in the technical scope of the present invention.
[0155] In the claims, the specification, and the drawings, the execution order of each process such as operations, procedures, steps, and stages in the apparatus, system, program, and method shown is not explicitly stated as "earlier" or "preceding" etc., and it should be noted that, unless the output of the previous process is used in the subsequent process, it can be realized in any order. Regarding the operation flows in the claims, the specification, and the drawings, even if "first," "next," etc. are used for convenience in the description, it does not mean that it is essential to implement in this order.
[0156] As described above, the present invention has been described using embodiments, but the technical scope of the present invention is not limited to the scope described in the above embodiments. It is obvious to those skilled in the art that various changes or improvements can be made to the above embodiments. It is clear from the description of the claims that forms with such changes or improvements can also be included in the technical scope of the present invention.
[0157] In the claims, the specification, and the drawings, the execution order of each process such as operations, procedures, steps, and stages in the apparatus, system, program, and method shown is not explicitly stated as "earlier" or "preceding" etc., and it should be noted that, unless the output of the previous process is used in the subsequent process, it can be realized in any order. Regarding the operation flows in the claims, the specification, and the drawings, even if "first," "next," etc. are used for convenience in the description, it does not mean that it is essential to implement in this order.
Explanation of Reference Numerals
[0158] 10 Orchestration System 20 Tenants 30 External Systems 40 Orchestration Controller 100 Fuel Production Management System 105 Transport Management System 110 Fuel Tank Management System 115 Power Management System 120 Consumer 130 Truck Roll Management System 135 Ship Management System 140 Pipeline Management System 145 Tank Control Device 150 Carbon Credit System 155 Cracking Management System 160 First Receiving Unit 170 1st Planning Department 180 Energy Demand Forecasting Department 200 Output control device 210 Power supply equipment 220 Acquisition Department 225 Communications Department 230 Simulation Department 235 Decision Section 240 Adjustment section 250 1st fuel cell 255 Additional power sources 260 2nd fuel cell 265 Power Supply 270 Battery 275 Power grid 280 Output section 2200 Computer 2201 DVD-ROM 2210 Host Controller 2212 CPU 2214 RAM 2216 Graphics Controller 2218 Display Device 2220 Input / Output Controller 2222 Communication Interface 2224 Hard Disk Drive 2226 DVD-ROM Drive 2230 ROM 2240 Input / Output Chip 2242 Keyboard
Claims
1. A system for controlling the output power of a first fuel cell and an additional power source, comprising: a receiving unit configured to receive information regarding the power demand for the output power; an orchestration controller configured to provide information for optimizing the output distribution of the first fuel cell and the additional power source so as to match the power demand; and an output control device connected to the first fuel cell and the additional power source and configured to adjust the output power of at least one of the first fuel cell and the additional power source according to the information for optimization. The system.
2. The system according to Claim 1, wherein the additional power source includes at least one of a storage battery and a second fuel cell. The system according to Claim 1.
3. The system according to Claim 2, wherein a start-up period of the first fuel cell until it reaches a predetermined output power is different from a start-up period of the second fuel cell. The system according to Claim 2.
4. The system according to Claim 3, wherein the start-up period of the first fuel cell is 5 to 50 times as long as the start-up period of the second fuel cell. The system according to Claim 3.
5. The system according to Claim 2, wherein a load capacity of the first fuel cell is different from a load capacity of the second fuel cell. The system according to Claim 2.
6. The system according to Claim 5, wherein the load capacity of the first fuel cell is 10 to 20 times the load capacity of the second fuel cell. The system according to Claim 5.
7. The system according to Claim 1, wherein at least one of the orchestration controller and the output control device optimizes the output distribution of the first fuel cell and the additional power source such that the output power of the first fuel cell is adjusted within a range of 20% to 80% of the load capacity of the first fuel cell. The system according to Claim 1.
8. The system according to Claim 1, wherein at least one of the orchestration controller and the output control device performs frequency analysis on the time-series variation of the power demand and generates information for optimizing the output distribution of the first fuel cell and the additional power source based on the frequency analysis. The system according to Claim 1.
9. The system according to Claim 1, wherein at least one of the orchestration controller and the output control device generates information for optimizing the output distribution of the first fuel cell and the additional power source such that the variation in the output power of the first fuel cell is within a range not exceeding a preset maximum operating frequency with respect to degradation based on the frequency of the time-series variation of the power demand. The system according to Claim 1.
10. The additional power source includes a second fuel cell. The maximum operating frequency preset for the first fuel cell is different from the maximum operating frequency preset for the second fuel cell. The system of claim 9.
11. The maximum operating frequency preset for the first fuel cell is 2 to 20 times the maximum operating frequency preset for the second fuel cell. The system of claim 10.
12. The orchestration controller predicts a power demand for the output power based on the information received by the receiving unit. The system of claim 1 .
13. the output control device generates a plurality of supply plans that plan the output distribution of the first fuel cell and the additional power source for a predetermined period based on the prediction of the power demand for the output power; The orchestration controller selects an optimal supply plan that optimizes at least one of power generation efficiency, equipment cost, and deterioration of the first fuel cell and the additional power source from the plurality of supply plans, and provides the selection result to the output control device. The system of claim 12.
14. The orchestration controller selects the optimal supply plan based on a result of simulating control and state changes of the first fuel cell and the additional power source according to each of the plurality of supply plans. The system of claim 13.
15. The receiving unit receives information about the power demand from at least one of a truck roll management system, a ship management system, a pipeline management system, a fuel tank management system, or a carbon credit system. The system of claim 1 .
16. The output control device optimizes output distribution between the first fuel cell and the additional power source so as to stop output of the first fuel cell during a startup period that is preset for the first fuel cell. The system of claim 1 .
17. The output control device optimizes the output distribution of the first fuel cell and the additional power source using an evaluation function based on a weighted evaluation of power generation efficiency, equipment cost, and deterioration of the first fuel cell and the additional power source. The system of claim 1 .
18. the first fuel cell, the additional power source, and the output control device are installed in a plant; The orchestration controller provides information for optimizing the output distribution for each corresponding plant to each of the output control devices of the plurality of plants. The system according to claim 1.
19. A method implemented by a system for controlling the output power of a first fuel cell and an additional power source, comprising: receiving information regarding power demand for the output power; providing information for optimizing the output distribution of the first fuel cell and the additional power source to match the power demand; connecting to the first fuel cell and the additional power source and adjusting the output power of at least one of the first fuel cell or the additional power source according to the information for optimization. Method.
20. On one or more processors, receiving information regarding power demand for the output power of a first fuel cell and an additional power source; providing information for optimizing the output distribution of the first fuel cell and the additional power source to match the power demand; causing to be executed, connected to the first fuel cell and the additional power source, adjusting the output power of at least one of the first fuel cell or the additional power source according to the information for optimization. Program.