Control device for large-scale distributed energy models for smart grids
The modular control device for smart grids addresses the limitations of current energy management by integrating diverse energy equipment, enhancing efficiency and scalability, and facilitating smart grid adjustments and maintenance.
Patent Information
- Application Number
- JP2024002468U
- Authority / Receiving Office
- JP · JP
- Patent Type
- Utility models
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-09-25
- Estimated Expiration
- 2034-07-24
AI Technical Summary
Current distributed energy control methods in smart grids are limited to a single type of energy equipment, leading to difficulties in comprehensive management and smart coordination, inefficient power grid load determination, and energy waste, reducing operational efficiency.
A modular control device with a main switchboard and sub-switchboards, featuring classification, division, and overall control modules, along with child control modules for diverse energy equipment, enabling integrated management and smart coordination, and facilitating expansion and maintenance.
Enhances energy use efficiency, reduces operating costs, and improves scalability and flexibility through unified management and smart grid adjustments based on demand, with data security and cost-effective expansion capabilities.
Smart Images

Figure 0003248429000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of smart grid technology, and in particular to a control device for a distributed energy large-scale model for smart grids. [Background technology]
[0002] Distributed energy, as an important component of smart grid, its management and control are essential to improve the operation efficiency and energy utilization efficiency of smart grid. However, current distributed energy control methods are often limited to a single type of energy equipment, making it difficult to realize comprehensive management and smart coordination of diverse energy equipment. At the same time, existing control technologies are crude in judging the load and distribution demand of the power grid, and cannot meet the needs of the refined management of smart grid, leading to energy waste and reduced operation efficiency. Therefore, developing a control device that can realize the coordinated control of diverse energy equipment and smartly adjust based on the demand of the power grid has important practical significance and application value. Summary of the Invention
[0003] To overcome the shortcomings of the prior art, this utility model provides a control device for distributed energy large-scale models for smart grids, which realizes the integrated management and smart coordination of distributed energy large-scale models in smart grids through modular design, and has improved energy utilization efficiency, reduced operating costs, and certain scalability.
[0004] To achieve the above objectives, this utility model adopts the following technical solutions: A control device for a large-scale distributed energy model for a smart grid includes a main distribution board and multiple sub-distribution boards, each of which is provided with multiple distribution boards, a classification module, a division module, and an overall control module provided in the main distribution board, an induction module provided in the sub-distribution board, and multiple child control modules for controlling energy equipment provided in the distribution board, the child control modules in the same distribution board are of the same type and are used to control energy equipment of the same type, the classification module and the division module are electrically connected to the overall control module, the induction module is connected to the overall control module by an electrical signal, and the child control modules are electrically connected to the induction module.
[0005] In the above technical solution, the child control module has multiple types, the energy equipment has multiple different types, and the different types of child control modules are used to control different types of energy equipment. The energy equipment includes power generation equipment, power storage equipment, and hybrid equipment. The main distribution board and the sub-distribution board are respectively installed with different modules, and the module in the main distribution board is mainly responsible for the integrated management and energy distribution of the entire smart grid, and the module in the sub-distribution board is mainly responsible for the control and distribution of the energy equipment in a specific regional location, and the two operate in cooperation with each other. In many cases, a large number of sub-distribution boards are required for a specific region. Therefore, the sub-distribution boards are separated from the main distribution board so that they can be arranged as needed, and the sub-distribution boards can be added as the region increases, making it easy to expand the entire smart grid. Each sub-distribution board is provided with multiple distribution boards corresponding to it, and the child control modules in the same distribution board are of the same type and are used to control the same type of energy equipment, so that the energy equipment controlled by each distribution board can be unified, which makes subsequent maintenance and expansion easier and centralized management easier.
[0006] Preferably, the main switchboard is installed in a smart grid control center, and the sub-switchboard and the distribution board are installed near the energy equipment.
[0007] In the above technical solution, the modules in the main switchboard are mainly responsible for the integrated management and energy distribution of the entire smart grid, and are installed in the smart grid control center, which facilitates management, inspection and repair. The smart grid control center is the command and procurement center for the distributed energy large-scale model, and is the main place where the manager works. The sub-switchboard and distribution board are installed near the energy equipment, which facilitates inspection and management by the manager at the installation site of the energy equipment, and also facilitates expansion.
[0008] Preferably, a wireless signal transmission module is provided in the sub-distribution board, and the induction module in the sub-distribution board is electrically connected to the overall control module in the main distribution board via a wireless signal.
[0009] In the above technical solution, the main distribution board and the sub-distribution board are installed in different locations, so they can be connected by electrical signals via a wireless signal transmission module, which can reduce costs.
[0010] Preferably, energy facilities of the same type that are geographically close to each other are electrically connected to child control modules in the same distribution board.
[0011] With the above technical solution, geographically close energy equipment is electrically connected to child control modules in the same distribution board, making it easy for inspection and management personnel to inspect and manage energy equipment in the same location.
[0012] Preferably, child control modules in a plurality of distribution boards that are geographically close to each other are electrically connected to induction modules in the same sub-distribution board.
[0013] In the above technical solution, different distribution boards can control different types of energy equipment. After classifying different types of energy equipment that are geographically close to each other, they can be coordinated by the induction module in the same sub-distribution board, which facilitates energy procurement.
[0014] Preferably, the distribution board is provided with a plurality of mounting positions for mounting child control modules, the mounting positions are provided with connection seats, the child control modules are plugged into the connection seats to connect, and the distribution board is provided with a series connection interface for connecting in series with other distribution boards.
[0015] In the above technical solution, the serial connection interface is for connecting two distribution boards in series to increase the expansion capacity of the distribution board, and the connection base is for quickly inserting and connecting the child control module to the installation position.
[0016] Preferably, a main storage medium is provided in the main switchboard, and a sub storage medium is provided in the sub switchboard.
[0017] In the above technical solution, the primary storage medium is used to store computer programs, distribution data, load data, and energy equipment information in the smart grid. The secondary storage medium is used to store information, distribution data, and load data of energy equipment controlled by the corresponding secondary switchboard. By storing data in both the primary storage medium and the secondary storage medium, dual backup of information is realized, and data security is improved. In addition, the secondary storage medium does not require a large storage capacity because it only stores the corresponding information.
[0018] Preferably, the induction module includes one overall induction module and a plurality of partial induction modules, each of which is electrically connected to the overall induction module, and child control modules in the same distribution board are electrically connected to the same partial induction module.
[0019] In the above technical solution, by using a full induction module and multiple partial induction modules, different types of energy equipment can be more appropriately procured and the expansion capacity can be increased. When expansion is required, only a partial induction module needs to be added.
[0020] The control device of this utility model can realize efficient and coordinated control of a large-scale distributed energy model in a smart grid, improve energy utilization efficiency, and promote the sustainable development of the smart grid.
[0021] The advantages of this utility model are as follows: (1) The modular design makes it easy to install, maintain, and upgrade the equipment, and improves the scalability and flexibility of the system. (2) It realizes coordinated control of various energy equipment, improving energy utilization efficiency and reducing operation costs. (3) It realizes smart energy allocation based on the distribution demand and load data of the power grid, meeting the needs of sophisticated management of smart grids. (4) By installing the main distribution board in the smart grid control center, centralized management and inspection are facilitated, and by installing the sub-distribution board and distribution board near the energy equipment, on-site inspection and management are facilitated. (5) The main distribution board and the sub-distribution board are provided with main and sub storage media, respectively, and data is double-backed up, thereby enhancing data safety. [Brief description of the drawings]
[0022] [Figure 1] 1 is a schematic diagram of the structure of the present utility model. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0024] As shown in FIG. 1, the control device for a large-scale distributed energy model for a smart grid includes a main distribution board 1 and multiple sub-distribution boards 2, each of which is provided with multiple distribution boards 3, a classification module 4, a division module 5, and an overall control module 6 are provided in the main distribution board 1, an induction module 7 is provided in the sub-distribution board 2, and multiple child control modules 8 for controlling energy equipment 9 are provided in the distribution board 3, the child control modules 8 in the same distribution board 3 are of the same type and are used to control the same type of energy equipment 9, the classification module 4 and the division module 5 are electrically connected to the overall control module 6, the induction module 7 is connected to the overall control module 6 by an electrical signal, and the child control modules 8 are electrically connected to the induction module 7.
[0025] Specifically, the child control module 8 has multiple types, the energy equipment 9 has multiple different types, and the different types of child control modules 8 are used to control the different types of energy equipment 9. The energy equipment 9 includes a power generation equipment 91, a power storage equipment 92, and a hybrid equipment 93, and the power generation equipment 91 has only a power generation function and does not have a power storage function. The power storage equipment 92 has only a function of storing electricity and discharging the stored electricity to the power grid and does not have a power generation function. The hybrid equipment 93 has both a power generation function and a function of storing electricity and discharging the stored electricity to the power grid. The classification module 4 is used to obtain the energy type and energy data of the corresponding distributed energy in the distributed energy large-scale model, and to classify the distributed energy in multiple stages based on the energy type and energy data, thereby obtaining the corresponding power generation equipment, power storage equipment, and hybrid equipment. The division module 5 is used to perform analysis processing based on the distribution data and load data in the smart grid, obtain the distribution demand of the power grid, and divide the smart grid into different division areas based on the distribution demand of the power grid. The overall control module 6 is used to determine the corresponding power generation equipment, storage equipment, or hybrid equipment based on the distribution demand of the power grid and the division area, and adjust and control the corresponding power generation equipment, storage equipment, or hybrid equipment. When the induction module 7 determines that the storage equipment, power generation equipment, or hybrid equipment has a multi-factorial adjustment method, it is used to induce the multi-factorial subject to participate in the adjustment of the smart grid by adding different multi-factorial pricing policies to the storage equipment, power generation equipment, or hybrid equipment in different division areas based on the multi-factorial adjustment method. The child control module 8 is used to control the storage or power supply at the appropriate output of the corresponding energy equipment 9.
[0026] In the above technical solution, different modules are installed in the main switchboard 1 and the sub-switchboard 2. The modules in the main switchboard 1 are mainly responsible for the integrated management and energy distribution of the entire smart grid, and the modules in the sub-switchboard 2 are mainly responsible for the control and distribution of energy equipment 9 in a specific area, and the two work together. In many cases, a large number of sub-switchboards 2 are required for a specific area. Therefore, they are separated from the main switchboard 1 so that they can be arranged as needed, and as the area increases, sub-switchboards 2 are added, which makes it easy to expand the entire smart grid and facilitates subsequent expansion and management. Each sub-switchboard 2 is provided with a corresponding number of distribution boards 3, and the child control modules 8 in the same distribution board 3 are of the same type and are used to control the same type of energy equipment 9, so that the energy equipment 9 controlled by each distribution board 3 can be unified, which makes it easy to perform subsequent maintenance and expansion, and also makes it easy to centralize management. The symbols A, B, C, and D in Figure 1 represent different geographical areas.
[0027] Preferably, a main storage medium is provided in the main switchboard 1, and a sub storage medium is provided in the sub switchboard 2.
[0028] In the above technical solution, the primary storage medium is used to store computer programs, power distribution data, load data, and energy equipment 9 information in the smart grid. The secondary storage medium is used to store information, power distribution data, and load data of energy equipment 9 controlled by the corresponding secondary switchboard 2. By storing data in both the primary storage medium and the secondary storage medium, dual backup of information is realized, and data security is improved. In addition, the secondary storage medium does not require a large storage capacity because it only stores the corresponding information.
[0029] Specifically, the induction module 7 includes one overall induction module 71 and a plurality of partial induction modules 72, and the plurality of partial induction modules 72 are each electrically connected to the overall induction module 71, and the child control modules 8 in the same distribution board 3 are electrically connected to the same partial induction module 72. In the above technical solution, by using the overall induction module 71 and the plurality of partial induction modules 72, different types of energy equipment 9 can be more appropriately procured and the expansion capacity can be increased, and when expansion is required, only the partial induction module 72 needs to be added.
[0030] Preferably, the main switchboard 1 is installed in a smart grid control center, and the sub-switchboards 2 and 3 are installed near energy equipment 9. Energy equipment 9 of the same type that is geographically close is electrically connected to child control modules 8 in the same distribution board 3. Child control modules 8 in multiple distribution boards 3 that are geographically close are electrically connected to induction modules 7 in the same sub-distribution board 2.
[0031] In the above technical solution, the module in the main switchboard 1 is mainly responsible for the integrated management and energy distribution of the entire smart grid, and is installed in the smart grid control center, which facilitates management, inspection, and repair. The smart grid control center is a command and procurement center for a distributed energy large-scale model, and is mainly the place where the manager works. The sub-switchboard 2 and the distribution board 3 are installed near the energy equipment 9, which facilitates inspection and management by the inspection and management personnel at the installation site of the energy equipment 9, and also facilitates expansion. According to the above technical solution, the energy equipment 9 that is geographically close is electrically connected to the child control module 8 in the same distribution board 3, so that the inspection and management personnel can easily inspect and manage the energy equipment 9 in the same place. In addition, different distribution boards 3 can control different types of energy equipment 9. After classifying the different types of energy equipment 9 that are geographically close, they can be adjusted by the induction module 7 in the same sub-switchboard 2, which facilitates energy procurement.
[0032] Preferably, a wireless signal transmission module 10 is provided in the sub-distribution board 2, and the induction module 7 in the sub-distribution board 2 is electrically connected to the overall control module 6 in the main distribution board 1 by wireless signals. In the above technical solution, the main distribution board 1 and the sub-distribution board 2 are installed in different locations, so that the costs can be reduced by connecting them by electrical signals via the wireless signal transmission module 10. In another example, the induction module 7 in the sub-distribution board 2 and the overall control module 6 in the main distribution board 1 can also be electrically connected by a wired network.
[0033] Preferably, a plurality of mounting positions for mounting the child control modules 8 are provided within the distribution board 3, connection seats are provided at the mounting positions, the child control modules 8 are inserted into the connection seats to connect, and a series connection interface is provided on the distribution board 3 for connecting in series with other distribution boards 3.
[0034] In the above technical solution, the serial connection interface is for connecting two distribution boards 3 in series to increase the expansion capacity of the distribution board 3. The connection base is for quickly inserting and connecting the child control module 8 to the mounting position.
Claims
1. A control device for a distributed energy large-scale model for a smart grid, comprising: The system includes a main switchboard and a plurality of sub-switchboards, Each sub-board is provided with a plurality of sub-boards corresponding to the plurality of sub-boards, The main panel includes a classification module, a division module, and an integrated control module; The sub-board includes an induction module; The sub-board includes a plurality of sub-control modules for controlling energy equipment, The sub-control modules in the same sub-board are of the same type to control the same type of energy equipment, The classification module and the division module are electrically connected to the overall control module; The induction module is electrically connected to the general control module; The sub-control module is electrically connected to the guidance module. This is a control device for large-scale distributed energy models for smart grids, characterized by the following:
2. The control device for a distributed energy large-scale model for smart grids as described in claim 1, characterized in that the main switchboard is installed in a smart grid control center, and the sub-switchboard and the child switchboard are installed near energy equipment.
3. The control device for a distributed energy large-scale model for smart grids as described in claim 2, characterized in that the sub-panel is equipped with a wireless signal transmission module, and the induction module in the sub-panel is connected to the overall control module in the main panel via a wireless signal.
4. The control device for a large-scale distributed energy model for smart grids according to claim 1, characterized in that energy equipment of the same type that is geographically close is electrically connected to a sub-control module in the same child panel.
5. The control device for a distributed energy large-scale model for smart grids as described in claim 4, characterized in that sub-control modules in multiple sub-boards that are geographically close are electrically connected to the induction module in the same sub-board.
6. A control device for a large-scale distributed energy model for smart grids as described in any one of claims 1 to 5, characterized in that the sub-board has a plurality of mounting positions for mounting sub-control modules, a connection base is provided at the mounting positions, the sub-control modules are inserted into the connection base, and the sub-board has a series connection interface for connecting other sub-boards in series.
7. The control device for a large-scale distributed energy model for a smart grid according to any one of claims 1 to 5, characterized in that the main switchboard includes a main storage medium, and the secondary switchboard includes a secondary storage medium.
8. 6. The control device for a distributed energy large-scale model for smart grids according to claim 1, wherein the induction module includes a general induction module and a plurality of sub-induction modules, the plurality of sub-induction modules being electrically connected to the general induction module, and sub-control modules in the same sub-board being electrically connected to the same sub-induction module.
