【0018】 本発明によれば、ジャッキボルトやガイドレールの変形が大きくならないことは勿論、ガイドレールの最下端とレール最下端支持部材が接触してレール圧縮力が生じてもレール最下端支持部材の取り外し作業が容易に行える。
Smart Images

Figure 0007554583000008 
Figure 0007554583000003 
Figure 0007554583000002
Abstract
Description
[Technical field]
[0001] The present invention relates to a support structure for an elevator guide rail and a method for removing a rail bottom end support member, and in particular to a support structure for an elevator guide rail and a method for removing a rail bottom end support member that are suitable for fixing the guide rail of an elevator with a long ascent and descent stroke to a building. [Background technology]
[0002] Generally, buildings shrink over time due to shrinkage of concrete and the weight of furniture or the building itself.
[0003] In the elevator shaft of such a building, the rail bracket that fixes the elevator guide rail undergoes a relative displacement between the height of the fixed point on the building side and the fixed point on the guide rail side due to the contraction of the building, and therefore expands by the amount of the relative displacement. The elastic force of the rail bracket corresponding to this expansion acts on the guide rail as a vertical load.
[0004] Furthermore, if the elastic force of the rail bracket exceeds the rail clip holding force, which is the fixing force between the guide rail and the rail bracket, slippage occurs between the guide rail and the rail bracket, and the elongation of the rail bracket decreases so that the elastic force of the rail bracket falls below the rail clip holding force.
[0005] However, the vertical load on the guide rail caused by the shrinkage of the building is accumulated by the number of rail clips attached to the entire length of the guide rail, so when the bottom end of the guide rail is supported in contact with the pit at the bottom of the elevator shaft, a large compressive load is generated at the bottom of the guide rail.
[0006] Therefore, in long-travel elevators that use a large number of rail clips, measures are taken such as designing the holding force of the rail clips to be just right or providing a gap between the bottom end of the guide rail and the pit.
[0007] If the holding force of the rail clip is not excessive or insufficient, in the standard state, it will still have the function of holding the guide rail, but when the building shrinks, slippage will occur at a stage when the relative displacement is small, thereby suppressing the vertical load on the guide rail.Furthermore, if a gap is provided between the bottom end of the guide rail and the pit, when the building shrinks, the guide rail can also displace downward by the amount of that gap, so no relative displacement will occur between the building and the guide rail and the generation of vertical load will be suppressed.
[0008] When providing a gap between the bottom end of the guide rail and the pit, it is desirable to maintain a small constant gap so that the guide rail does not displace excessively downward when the rail clip slips due to causes other than the shrinkage of the building, such as when the emergency stop device is activated or during an earthquake.
[0009] Therefore, in the event of slippage due to the operation of the emergency stop device or an earthquake, a jack bolt is used to support the rail bottom end support member so that the height position of the rail bottom end support member that supports the bottom end of the guide rail can be adjusted during maintenance work, etc., to maintain a constant gap with the bottom end of the guide rail.
[0010] When using a jack bolt to support the bottom end of a guide rail, if the downward displacement of the guide rail due to shrinkage of the building exceeds the length of the threaded portion of the jack bolt, it becomes impossible to adjust the gap, and if the shrinkage of the building continues in this state, a large compressive load on the rail will be generated.
[0011] Therefore, in anticipation of the possibility that adjustment may become impossible with the jack bolt, a method has been proposed in which the guide rail is cut on-site to ensure adjustment space (see Patent Document 1), or a method in which an easily removable compression force transmission member is installed between the bottom end of the guide rail and the jack bolt, and the adjustment space is ensured by removing the compression force transmission member (Patent Document 2). [Prior art documents] [Patent documents]
[0012] [Patent Document 1] Patent No. 4675094 [Patent Document 2] Patent No. 5556595 Summary of the Invention [Problem to be solved by the invention]
[0013] However, while the structures described in Patent Documents 1 and 2 mentioned above are effective as a method for increasing the adjustment allowance when the adjustment allowance of the jack bolt remains, in a situation where a compressive load is generated in the guide rail, for example, when regular gap adjustment work cannot be performed, the work of removing the bottom guide rail or the compressive force transmission member becomes difficult.
[0014] In addition, in the case of a structure in which the head of the jack bolt comes into contact with the bottom end of the guide rail and is subjected to the compressive load of the guide rail, there is concern that the jack bolt may deform. Furthermore, because the contact area of the head of the jack bolt is small, the compressive load acting from the guide rail to the head of the jack bolt may cause localized deformation of the contact area between the bottom end of the guide rail and the head of the jack bolt, so that the bottom end of the guide rail and the head of the jack bolt will no longer be in contact perpendicular to the vertical direction (they will come into contact at an angle), and there is a concern that when the axial compressive load of the guide rail increases, deformation of the jack bolt and guide rail will become greater.
[0015] The present invention has been made in consideration of the above-mentioned points, and its object is to provide a support structure for an elevator guide rail and a method for removing a rail bottom end support member which not only prevents significant deformation of the jack bolt and guide rail, but also enables the easy removal of the rail bottom end support member even when the bottom end of the guide rail comes into contact with the rail bottom end support member, generating rail compressive force. [Means for solving the problem]
[0016] In order to achieve the above object, the support structure for an elevator guide rail of the present invention is a support structure for an elevator guide rail having a rail bottom end support member that is disposed below, via a gap, the bottom end of a guide rail that is erected in an elevator hoistway and guides an elevator body. And The rail bottom end support member is supported by a base portion installed at the bottom of the pit of the elevator via a height-adjusting jack bolt, and a support member removal means is provided for removing the rail bottom end support member when the rail comes into contact with the guide rail and a compressive load is applied. Step Preparation The support member removal means comprises a notch formed in the corner of the back side of the rail to fit a tool for removing the rail bottom end support member, and by applying a load to the tool fitted in the notch, the rail bottom end support member is removed by a pushing force utilizing the principle of leverage with the vertical frame of the base portion as a fulcrum, or Alternatively, the support member removing means has a screw hole penetrating from the top side of the rail to the back side of the rail. It is characterized by:
[0017] In order to achieve the above object, the method of removing a rail bottom end support member of the present invention comprises supporting a rail bottom end with a rail bottom end support member when a guide rail that is erected in an elevator hoistway and guides a lifting body is displaced downward by more than a certain amount, and the rail bottom end support member is a support structure for an elevator guide rail that is supported by a base portion that is installed at the bottom of a pit in the hoistway via a height-adjusting jack bolt, and when removing the rail bottom end support member while the bottom end of the guide rail is in contact with the rail bottom end support member and applying a compressive load thereto, A tool is fitted into a notch formed in a corner of the back surface of the rail of the rail bottom end support member, and a load is applied to the tool fitted into the notch, thereby removing the rail bottom end support member by a pushing force utilizing the principle of leverage with the vertical frame of the base portion as a fulcrum, or Alternatively, the rail bottom end support member is removed by continuing to tighten a bolt that is passed through a screw hole that penetrates the side surface of the rail bottom end support member from the rail top side to the rail back side, in a manner that jacks up the rail bottom end support member against the vertical frame of the base part. Alternatively, when the bottom end of the rail and the bottom end support member come into contact with each other, a rail jack bolt is passed through a screw hole formed in the base portion, and the tip of the rail jack bolt penetrates a notch formed in a corner portion on the back side of the rail of the bottom end support member to directly jack up the bottom end of the rail, thereby removing the bottom end of the rail support member while supporting the bottom end of the rail. Effect of the Invention
[0018] According to the present invention, not only is there no significant deformation of the jack bolt or guide rail, but also the rail bottom end support member can be easily removed even if the bottom end of the guide rail comes into contact with the rail bottom end support member and rail compression force is generated. [Brief description of the drawings]
[0019] [Figure 1] 1 is a side view showing a first embodiment of the support structure for an elevator guide rail of the present invention. FIG. [Diagram 2] FIG. 2 is a top view of FIG. [Diagram 3] FIG. 2 is a top view of a rail bottom end support member used in the first embodiment of the elevator guide rail support structure of the present invention. [Figure 4] FIG. 6 is a side view showing a second embodiment of the support structure for an elevator guide rail of the present invention. [Diagram 5] FIG. 5 is a top view of FIG. [Figure 6] 11 is a top view of a rail bottom end support member used in embodiment 2 of the elevator guide rail support structure of the present invention. FIG. [Figure 7] FIG. 11 is a side view showing a third embodiment of the support structure for an elevator guide rail of the present invention. [Figure 8] FIG. 8 is a top view of FIG. [Figure 9] FIG. 11 is a top view of a rail bottom end support member used in embodiment 3 of the elevator guide rail support structure of the present invention. [Figure 10]FIG. 11 is a side view showing a fourth embodiment of the support structure for an elevator guide rail of the present invention. [Figure 11] FIG. 11 is a top view of FIG. [Figure 12] 11 is a top view of a rail bottom end support member used in embodiment 4 of the elevator guide rail support structure of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] The supporting structure for an elevator guide rail and the method for removing the rail bottom end supporting member of the present invention will be described below based on the illustrated embodiments. Note that the same reference numerals are used for the same components in each embodiment. EXAMPLES
[0021] 1, 2 and 3 show a first embodiment of a support structure for an elevator guide rail according to the present invention.
[0022] In Figures 1 and 2, 1 is a guide rail that is installed in the elevator shaft to guide ascending and descending bodies such as the car and counterweight, and 2 is a base portion installed at the bottom of the shaft pit and is composed of a base portion vertical frame 2a, a base portion horizontal frame 2b extending horizontally from this base portion vertical frame 2a, and a base portion rib 2c provided to partially reinforce this base portion horizontal frame 2b.
[0023] As shown in Figure 2, the guide rail 1 is formed in a roughly T-shape, with the bottom surface of the T-shape defined as the rail back side 1b and the tip of the protruding part of the T-shape defined as the rail top side 1a. The rail back side 1b is installed on the base vertical frame 2a, and both ends of the rail back side 1b are fixed to the base vertical frame 2a by rail clips 5.
[0024] That is, the rail clip 5 is formed in a stepped shape, and the end of the guide rail 1 is clamped between one end of the stepped shape and the base vertical frame 2a, and the other end of the rail clip 5 is fixed by a clip bolt 6 and a nut 7 with washers 8, 9 and a spring washer 10 interposed between them.
[0025] Meanwhile, below the bottom end of the guide rail 1, there is provided a rail bottom end support member 3 which supports the bottom end of the guide rail 1 in the event of slippage due to emergency stop operation or an earthquake, and a number of jack bolts 4a, 4b (two approximately parallel in this embodiment) which support the rail bottom end support member 3 are provided to periodically adjust the height position of this rail bottom end support member 3 during maintenance work, etc., to keep the gap with the bottom end of the guide rail 1 constant.
[0026] As described above, for example, when the bottom end of the guide rail 1 and the rail bottom end support member 3 come into contact and a compressive load is generated due to failure to perform regular gap adjustment work, it becomes difficult to remove the rail bottom end support member 3, which is the first step to ensure the gap again, so a structure that allows easy removal of the rail bottom end support member 3 is desired. Also, in the unlikely event that the bottom end of the guide rail 1 comes into contact with the rail bottom end support member 3, it is desirable that the surface of the rail bottom end support member 3 with which the bottom end of the guide rail 1 comes into contact is approximately flat so that a bending moment does not act on the guide rail if the compressive load continues to increase due to continued shrinkage of the building.
[0027] Therefore, in this embodiment, as a support member removal means for removing the rail bottom end support member 3, a notch 3a is provided at the corner of the rail back side 1b of the rail bottom end support member 3, into which a tool (not shown) for removing the rail bottom end support member 3 is inserted.By inserting the tool into this notch 3a and applying a load to the tool inserted into notch 3a, the rail bottom end support member 3 is removed by a pushing force utilizing the principle of a lever with the base vertical frame 2a as a fulcrum.
[0028] According to this embodiment, even if the bottom end of the guide rail 1 comes into contact with the rail bottom end support member 3 and rail compression force is generated, not only will the deformation of the guide rail 1 not be significant, but the rail bottom end support member 3 can be easily removed. EXAMPLES
[0029] 4, 5 and 6 show a second embodiment of the support structure for an elevator guide rail of the present invention.
[0030] In the above-mentioned embodiment 1, the two jack bolts 4a, 4b supporting the rail bottom end support member 3 are installed substantially parallel to each other, but in this embodiment shown in Figures 4, 5 and 6, the three jack bolts 4a, 4b and 4c are installed to form a substantially triangular shape. The other configurations are the same as those of the embodiment 1.
[0031] Even in this embodiment, the effects are the same as those of the first embodiment. EXAMPLES
[0032] 7, 8 and 9 show a third embodiment of the support structure for an elevator guide rail according to the present invention.
[0033] In this embodiment shown in the drawing, screw holes 3b, 3c penetrating from the rail top side 1a to the rail back side 1b are provided on the side surface of the rail bottom end support member 3 as a support member removal means for removing the rail bottom end support member 3. Fastening bolts 11a, 11b are passed through the screw holes 3b, 3c. The other configurations are the same as those of the first embodiment.
[0034] In this embodiment, the fastening bolts 11a, 11b passed through the screw holes 3b, 3c that penetrate from the rail top side 1a of the rail bottom end support member 3 toward the rail back side 1b are continuously tightened, so that the rail bottom end support member 3 can be removed in a manner similar to jacking up the base vertical frame 2a.
[0035] Even in this embodiment, the effects are the same as those of the first embodiment. EXAMPLES
[0036] 10, 11 and 12 show a fourth embodiment of the support structure for an elevator guide rail according to the present invention.
[0037] The present embodiment shown in the figure provides a rail bottom end support means other than the rail bottom end support member 3 that can bear the rail compressive load by supporting the bottom end of the guide rail 1 when a rail compressive load is applied to the rail bottom end support member 3, and this rail bottom end support means is composed of a notch 3d formed in the corner of the rail back side 1b of the rail bottom end support member 3, a screw hole 2d formed in the base horizontal frame 2b, and rail jack bolts 12a, 12b that are passed through this screw hole 2d from below and have their tips positioned in the notch 3d to support the bottom end of the guide rail 1.
[0038] The configuration is the same as in Example 1, except that the rail back side 1b is installed on the base vertical frame 2a via a spacer 13 and both ends of the rail back side 1b are fixed to the base vertical frame 2a by rail clips 5.
[0039] In this embodiment, when the bottom end of the guide rail 1 comes into contact with the rail bottom end support member 3, the rail jack bolts 12a, 12b are passed through the screw holes 2d formed in the base horizontal frame 2b from below, and the tips of the rail jack bolts 12a, 12b pass through the notches 3d formed in the corners of the rail back side 1b of the rail bottom end support member 3 to support the bottom end of the guide rail 1, and the rail bottom end support member 3 is removed while the bottom end of the guide rail 1 is being supported by the rail jack bolts 12a, 12b.
[0040] In addition, in this embodiment, the screw hole 2d and the rail jack bolts 12a, 12b are formed to be the same size as or larger than the jack bolts 4a, 4b supporting the rail bottom end support member 3, and are configured to be provided in two or more locations.
[0041] Even in this embodiment, the effects are the same as those of the first embodiment.
[0042] The present invention is not limited to the above-described embodiments, and includes various modified examples. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]
[0043] DESCRIPTION OF THE REFERENCE NUMERALS 1...guide rail, 1a...rail top side, 1b...rail back side, 2...base, 2a...base vertical frame, 2b...base horizontal frame, 2c...base rib, 2d...screw hole formed in base horizontal frame, 3...rail bottom end support member, 3a, 3d...notch, 3b, 3c...screw hole, 4a, 4b, 4c...jack bolt, 5...rail clip, 6...clip bolt, 7...nut, 8, 9...washer, 10...spring washer, 11a, 11b...tightening bolt, 12a, 12b...rail jack bolt, 13...spacer.
Claims
1. A support structure for an elevator guide rail having a rail bottom end support member disposed below a rail bottom end of a guide rail that is installed in an elevator shaft and guides an elevator body, the support structure comprising: the rail bottom end support member is supported by a base portion installed at the bottom of the pit of the elevator shaft via a height-adjusting jack bolt, and is provided with a support member removal means for removing the rail bottom end support member when the rail comes into contact with the guide rail and a compressive load is applied thereto; the support member removal means is composed of a notch formed in a corner on the back side of the rail for fitting a tool for removing the rail bottom end support member, A support structure for an elevator guide rail, characterized in that by applying a load to the tool fitted into the notch, the rail bottom end support member is removed by a pushing force utilizing the principle of a lever with the vertical frame of the base portion as a fulcrum.
2. A support structure for an elevator guide rail having a rail bottom end support member disposed below the rail bottom end of a guide rail that is erected in an elevator shaft and guides an elevator body, the support structure comprising: the rail bottom end support member is supported by a base portion installed at the bottom of the pit of the elevator shaft via a height-adjusting jack bolt, and is provided with a support member removal means for removing the rail bottom end support member when the rail comes into contact with the guide rail and a compressive load is applied thereto; 13. An elevator guide rail support structure, comprising: a support member removal means for removing the support member from the top of the rail; a screw hole extending through the support member from the top of the rail to the back of the rail;
3. The support structure for an elevator guide rail according to claim 2, A support structure for an elevator guide rail, characterized in that the support structure can be removed by continuing to tighten the bolt passed through the screw hole.
4. A support structure for an elevator guide rail having a rail bottom end support member disposed through a gap below the bottom end of a guide rail that is erected in an elevator shaft and guides an elevator body, the rail bottom end support member is supported by a base portion installed on a bottom of the pit of the elevator shaft via a height-adjusting jack bolt, and includes a rail bottom end support means for supporting the rail bottom end when the rail comes into contact with the guide rail and a compressive load is applied; the rail bottom end support means has a notch formed in a corner portion on the back surface side of the rail, the base portion has a screw hole and a rail jack bolt that is passed through the screw hole from below and has a tip that passes through the notch of the rail bottom end support member to support the bottom end of the rail, a rail bottom end support member for supporting the rail by inserting a rail jack bolt through a threaded hole formed in the base portion and supporting the rail bottom end by the rail jack bolt so that the rail bottom end support member can be removed while the rail jack bolt is supporting the rail bottom end.
5. The support structure for an elevator guide rail according to any one of claims 1 to 4, 1 is a perspective view of an elevator guide rail support structure according to an embodiment of the present invention;
6. The support structure for an elevator guide rail according to any one of claims 1 to 5, A support structure for an elevator guide rail, characterized in that the guide rail is fixed to the vertical frame of the base portion via a rail clip.
7. When removing a rail bottom end support member that is disposed below the bottom end of a guide rail that is installed in an elevator shaft to guide a lifting body with a gap therebetween and that is supported by a base portion that is installed at the bottom of a pit in the elevator shaft via a height adjustment jack bolt, while the guide rail and the rail bottom end support member are in contact with each other and a compressive load is applied, A tool is fitted into a notch formed in a corner of the back surface of the rail of the rail bottom end support member, and a load is applied to the tool fitted into the notch, thereby removing the rail bottom end support member by a pushing force utilizing the principle of leverage with the vertical frame of the base portion as a fulcrum, or Alternatively, the rail bottom end support member is removed by continuing to tighten a bolt that is inserted into a screw hole that penetrates the rail bottom end support member from the rail top side to the rail back side, or Alternatively, a method for removing a rail bottom end support member is provided, comprising supporting the bottom end of the rail by passing a rail jack bolt through a threaded hole formed in the base portion from below, and removing the rail bottom end support member while the rail jack bolt is supporting the bottom end of the rail.
Citation Information
Patent Citations
Air heater
JP1980056595A
Apparatus for adjusting lowermost end of guide rail
JP2012096874A
Bottom receiving device of elevator rail and elevator device having the same
JP2015205768A
Governor adjustment jig
JP2019055857A
Elevator rail bottom support device
JP4675094B2