Lifting tool and method for installing the same

The lifting jig addresses the safety and efficiency challenges of trolley installation by using guide and under rollers to securely attach to steel beams, enabling stable, one-person operations that eliminate the need for leaning over temporary scaffolding or aerial vehicles.

JP7554701B2Active Publication Date: 2024-09-20SANKYU INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021067736
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-13
Publication Date
2024-09-20
Estimated Expiration
2041-04-13

AI Technical Summary

Technical Problem

Conventional trolley lifting jigs require manual installation, which is labor-intensive and poses safety risks due to the need for workers to lean over temporary scaffolding or aerial work vehicles, making installation and removal operations unstable and necessitating safety measures.

Method used

A lifting jig with a design that allows for stable installation and removal by sandwiching the steel beam flange between guide rollers and under rollers, enabling workers to install and remove the jig without leaning over temporary scaffolding or aerial work vehicles, using a pulley system to lift trolley segments with reduced effort.

Benefits of technology

The design improves safety and efficiency by allowing stable, one-person installation and removal of trolleys, even at high places, reducing the need for forceful operations in unstable positions and minimizing the risk of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007554701000017
    Figure 0007554701000017
  • Figure 0007554701000012
    Figure 0007554701000012
  • Figure 0007554701000001
    Figure 0007554701000001
Patent Text Reader

Abstract

To provide a trolley lifting fixture and a lifting fixture installing method capable of improving safety of installation and removal work.SOLUTION: The lifting fixture comprises: a first guide roller supported on a first support for supporting a first support arm for lifting a first split body of a trolley on one side of a beam steel member and guided to an upper corner of an upper flange of one side by a groove; a first under roller vertically pinching the first guide roller and the upper flange of one side; a second guide roller supported on a second support for supporting a second support arm for lifting a second split body of the trolley on the other side of the beam steel member and guided to an upper corner of an upper flange of the other side by a groove; and a second under roller vertically pinching the second guide roller and the upper flange of the other side. The lifting fixture is provided so as to be movable in the longitudinal direction of the beam steel material in the beam steel material.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a lifting jig for a trolley and a method for installing the lifting jig. [Background technology]

[0002] Trolleys are used to lift and move heavy objects. Trolleys are installed on steel beams at high altitudes, but because they are very heavy, installing them manually is hard work. Therefore, the applicant developed a lifting jig for trolleys (Patent Document 1). Hereinafter, the lifting jig may be abbreviated to "jig" in some cases.

[0003] The jig is installed on a steel beam located at a high altitude in a factory, and a rope is looped around a fixed pulley held by the jig and hung to the ground. The trolley segments are attached to the rope on the ground side via a movable pulley. The trolley segments are then lifted up to the steel beam located at a high altitude and connected together, allowing the trolley to be installed on the beam. The jig is lighter than the trolley and therefore easier to install, and the use of pulleys allows workers to lift the trolley segments with little force, improving the workability of installing the trolley. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-83487 A Summary of the Invention [Problem to be solved by the invention]

[0005] In some cases, temporary scaffolding that is set up to the height of the steel beam is used to install and remove the jig. The jig needs to be installed at a position offset from the steel beam so that the rope does not get caught on the scaffolding when the trolley is hoisted or lowered. Therefore, workers on the scaffolding had to lean out from the scaffolding to install and remove the jig. Conventional jigs are fixed to the steel beam by workers tightening bolts and clamping the upper flange of the steel beam from both sides. When removing the jig, the bolts are loosened and the clamps are released. Conventionally, these installation and removal tasks, which require force, had to be performed by workers leaning out from the scaffolding in an unstable position, and safety measures were necessary.

[0006] The installation and removal of the trolley using the jig must be performed at the jig's installation position, and the beam steel must be in a position offset from the temporary scaffolding. The installation of the trolley involves lifting the trolley's divided bodies and connecting the divided bodies, while the removal of the trolley involves disassembling the trolley and hanging the divided bodies. The connecting of the divided bodies and disassembling the trolley require particular strength from the workers. Therefore, the installation and removal of the trolley, which requires the workers' strength, must be performed in an unstable position with the workers leaning out of the temporary scaffolding, and safety measures were required.

[0007] The installation and removal of the jig can also be performed by a worker riding on the bucket of the aerial work platform. In this case, too, the conventional jig needs to be fixed on the steel beam outside the bucket so that the rope does not get caught in the bucket. Therefore, the worker needs to lean out of the bucket to install and remove the jig, and safety measures are required. When installing the jig, it is also possible to install the jig on the steel beam directly above the bucket, and then move the bucket to a position where the rope does not get caught in the bucket. However, even in this case, when moving the bucket with a worker on board, safety measures such as unlocking the aerial work platform, moving the bucket while checking for safety, and relocking the aerial work platform are required. In addition, when installing and removing the trolley by a worker riding on the bucket of the aerial work platform, the worker needs to lean out of the bucket, and safety measures are required.

[0008] The object of the present invention is to provide a trolley lifting jig and an installation method for the lifting jig that can improve the safety of installation and removal operations, and also improves the safety of installation and removal operations of a trolley using the jig. [Means for solving the problem]

[0009] For reference, the following description will be given with the same reference symbols as in the embodiment. (1) In order to solve the above problems, the lifting jig (1) of the present invention is a lifting jig for attaching the trolley to a lower flange (81) on both sides of a beam steel material (8) that is an I-beam or H-beam steel that is spanned at a height, by connecting a first division body (91) and a second division body (92) of a trolley (9), each of which has one of a pair of wheels (911, 921), with the pair of wheels placed on the lower flange, a first support arm (2) for supporting a first fixed pulley (29) above and on one side of the beam steel material and for hoisting a first movable pulley (93) from which the first divided body is suspended, to one side of the beam steel material using the first fixed pulley; A first support portion (4) that supports the first support arm; A first guide roller (71) supported by the first support portion and guided to an upper corner of the upper flange on one side of the beam steel by a V-shaped groove (713) formed along an outer circumferential surface; a first under roller (73) that contacts the lower surface of the upper flange on one side and vertically sandwiches the first guide roller and the upper flange on one side; a second support arm (3) for supporting a second fixed pulley (39) above and on the other side of the beam steel and for hoisting a second movable pulley (94) from which the second divided body is suspended, to the other side of the beam steel by using the second fixed pulley; A second support portion (5) that supports the second support arm; A second guide roller (72) supported by the second support portion and guided to the upper corner of the upper flange on the other side of the beam steel by a V-shaped groove (723) formed along the outer circumferential surface, and sandwiching the first guide roller and the upper flange from both sides; a second under roller (74) that contacts the lower surface of the upper flange on the other side and vertically sandwiches the second guide roller and the upper flange on the other side; The beam steel is characterized in that it is arranged to be movable in the longitudinal direction of the beam steel.

[0010] The lifting jig of the present invention (hereinafter, sometimes referred to as the jig) is installed on a beam steel material by clamping the upper flange of the beam steel material from both sides with the first and second guide rollers, and by clamping the upper flanges on both sides from above and below with the first and second guide rollers and the first and second under rollers. Therefore, the jig can handle the load applied when the first and second divisions of the trolley are lifted using the first and second support arms. In addition, the jig can be moved stably on the beam steel material by a worker pushing the jig by hand, etc., and can be used in the moved position. This allows a worker to install the jig on the beam steel material directly above on a temporary scaffold or on the bucket of an aerial work vehicle, and then install the jig outside the temporary scaffold or outside the bucket on the beam steel material simply by pushing the jig. When removing the jig, a worker can pull the jig installed outside the temporary scaffolding or outside the bucket to the steel beam directly above while on the temporary scaffolding or on the bucket of the aerial work vehicle, and can remove the jig from the steel beam while on the temporary scaffolding or on the bucket. Therefore, with the present invention, when installing or removing the jig, it is no longer necessary to perform work that requires strength while leaning out from the temporary scaffolding or the bucket of the aerial work vehicle, and the safety of the installation and removal work of the jig can be improved. In the present invention, when installing the trolley, a worker on the temporary scaffold or on the bucket of the aerial work vehicle and a worker on the ground use a jig installed outside the temporary scaffold or on the bucket to hoist the first and second division bodies of the trolley. Then, a worker on the temporary scaffold or on the bucket of the aerial work vehicle can pull the jig with the first and second division bodies hoisted up to the beam steel directly above the temporary scaffold or the bucket of the aerial work vehicle. Then, the worker connects the first and second division bodies to install the trolley on the beam steel. When removing the trolley, a worker on the temporary scaffold or on the bucket of the aerial work vehicle moves the jig to the beam steel directly above the temporary scaffold or the bucket. Next, the worker moves the trolley directly below the jig and connects the first and second division bodies of the trolley in the connected state to the jig directly above the trolley. Next, the worker separates the trolley into the first and second halves, and places the first and second halves in a state of being suspended from a jig directly above. The worker pushes the jig with the first and second halves of the trolley suspended, and places the jig outside the temporary scaffolding or bucket on the steel beam. Then, the worker on the temporary scaffolding or the bucket of the aerial work platform and the worker on the ground can use the jig to suspend the first and second halves to the ground. Therefore, by using the jig of the present invention when setting up or removing a trolley, it is possible to eliminate the need to perform work that requires strength in an unstable position by leaning over a temporary scaffold or bucket, which also leads to improved safety when setting up and removing the trolley. This effect is particularly noticeable when the trolley is large and the first and second divisions are heavy.

[0011] (2) In the above-mentioned configuration (1), the lifting jig (1) includes a connecting portion (6) that connects the first and second support portions so that the first and second support portions can approach and move apart in the width direction of the lifting jig, The connecting portion is a threaded shaft (61) extending in the width direction, on one side in the width direction, a first threaded portion (611) that screws into the first support portion, and on the other side in the width direction, a second threaded portion (612) that screws into the second support portion and has a reverse thread relationship with the first threaded portion; The screw shaft may be rotated to move the first and second support parts to a first position (FIG. 18(A)) where the first and second guide rollers and the first and second under rollers are spaced apart by a width greater than that of the upper flange, and to a second position (FIG. 18(D)) where the first and second guide rollers sandwich the upper flange from both sides and the first and second guide rollers and the first and second under rollers sandwich each of the upper flanges from above and below.

[0012] In the present invention, the first and second support parts that support the first and second support arms are connected by a screw shaft so that they can approach and move apart in the width direction of the lifting jig. In the present invention, when the first and second divided bodies are lifted, the tensile force in the width direction applied to the first and second support parts that support the first and second support arms can be countered by the force of the screw shaft that pulls the first and second support parts inward in the width direction. When lifting one side of the jig, a force is applied to the support part (first support part or second support part) on the other side of the jig, tending to lift the support part. In the present invention, the under-roller (first under-roller or second under-roller) of the support part on the other side presses down the underside of the upper flange on the other side, preventing the support part on the other side from lifting up. In the present invention, the first and second guide rollers and the first and second under-rollers can be moved closer to and farther apart in the width direction of the jig via the first and second support parts by rotating the screw shaft with the operating part. The moving direction of the conventional V-shaped clamp members that clamp the beam steel material from both sides is the circumferential direction around the axis. On the other hand, in the present invention, the moving direction of the first and second support parts that support the first and second guide rollers and the first and second under-rollers is the width direction of the jig, so that the moving range can be made wider, and the range of widths of the upper flanges of the beam steel material on which the jig can be installed can be made wider.

[0013] (3) In the above configuration (2), the first support portion includes a first roller shaft (711) that is inclined downward and outward in the width direction and on which the first guide roller is axially movable, and a first elastic member (712) that biases upward the first guide roller that moves downward with respect to the first roller shaft from a state in which the first guide roller is located above the first roller shaft, the second support portion includes a second roller shaft (721) that is inclined downward and outward in the width direction and on which the second guide roller is movably provided in the axial direction, and a second elastic member (722) that biases upward the second guide roller that moves downward with respect to the second roller shaft from a state in which the second guide roller is located at an upper portion of the second roller shaft, the first and second support portions are moved from a third position (FIG. 18(B)) in which the corners of the upper flanges on both sides abut against the V-shaped grooves of the first and second guide rollers with the first and second under-rollers positioned below the upper flanges, to the second position (FIG. 18(D)) by the connecting portion; As the first and second support portions move from the third position to the second position, they may move upward due to an upward reaction force received from the first and second guide rollers, causing the first and second under-rollers to abut against the lower surface of the upper flange.

[0014] In the present invention, by simply moving the first and second support parts closer to each other using the connecting parts from a state in which the upper corners of the upper flange abut in the grooves of the first and second guide rollers, the first and second under-rollers can be moved upward to abut against the undersides of the upper flanges on both sides, and the jig can be installed on the beam steel material. In the present invention, the first and second guide rollers can move up and down relative to the first and second roller shafts, so the first and second under-rollers can be moved upward to abut against the underside of the upper flange depending on the thickness of the upper flange of the beam steel material. Therefore, in the present invention, the range of thicknesses of the upper flange of the beam steel material on which the jig can be installed can be widened.

[0015] (4) In the above configuration (3), the first support portion includes a first guide surface (4221) located on the inside in the width direction of the first guide roller when the first guide roller is located on the upper part of the first roller shaft, and the first guide surface is capable of contacting an upper surface of the upper flange on one side together with the first guide roller when the first guide roller is located on the upper part of the first roller shaft, the second support portion includes a second guide surface (5221) located on the inner side in the width direction of the second guide roller when the second guide roller is located on the upper part of the second roller shaft, and the second guide surface is capable of contacting an upper surface of the upper flange on the other side together with the second guide roller when the second guide roller is located on the upper part of the second roller shaft, When the lifting jig, with the first and second support parts positioned at the first position (Figure 18(A)), is placed on the beam steel by abutting the first and second guide surfaces against the upper surface of the upper flange, the first and second guide surfaces may constantly contact the upper surface of the upper flange while the first and second support parts move from the first position to the third position by the connecting part.

[0016] In the present invention, the first and second guide surfaces of the jig are placed on the beam steel material when the first and second guide rollers and the first and second under-rollers are spaced apart by a distance greater than the width of the upper flange. In this state of the jig, the first and second support parts are brought closer to each other by the connecting parts, so that the first and second guide rollers come closer to each other with the first and second guide surfaces always in contact with the upper surface of the upper flange, and the upper corners of the upper flanges on both sides can come into contact with the grooves of the first and second guide rollers. By further bringing the first and second support parts closer to each other from this state by the connecting parts, the first and second under-rollers can come into contact with the lower surfaces of the upper flanges on both sides, as described above, and the jig can be installed on the beam steel material. Thus, in the present invention, with the jig placed on the beam steel with the first and second guide surfaces abutting against the top surface of the upper flange, the jig can be fixed in the left-right and up-down directions to the beam steel with just one action of operating the operating part of the connecting part. Therefore, the present invention makes it easy to install the jig and also shortens the time required for the jig installation work. In the present invention, since the operating part can be operated with the jig placed on the beam steel by the first and second guide surfaces, stable installation work of the jig can be performed by one person even at high places.

[0017] (5) In any one of the configurations (1) to (4) above, the first guide roller is provided in two rollers spaced apart from each other in the longitudinal direction, and the first under roller is provided between the two first guide rollers in the longitudinal direction, The second guide rollers may be provided in two positions spaced apart from each other in the longitudinal direction, and the second under roller may be provided between the two second guide rollers in the longitudinal direction.

[0018] In the present invention, the upper corner of the upper flange on one side is held down by two first guide rollers spaced apart in the length direction of the beam steel, and the upper corner of the upper flange on the other side is held down by two second guide rollers spaced apart in the length direction of the beam steel. Therefore, in the present invention, the first and second support parts can sufficiently resist the force that twists in the width direction of the jig. In the present invention, the first and second under-rollers are provided between the two first and second guide rollers in the length direction of the beam steel, respectively, so that the jig can be made smaller.

[0019] (6) In any one of the configurations (1) to (4) above, the first guide rollers are provided in pairs spaced apart in the length direction, and the second guide rollers are provided in pairs spaced apart in the length direction, The first support arm includes a pair of first support angles (21A, 21B) that are L-shaped in a plan view and have a base end (211) bent outward in the length direction along the width direction and support the first fixed pulley, The first support portion is a first body plate (41) along the longitudinal direction and having a pair of first openings (412) aligned in the longitudinal direction; a pair of first support frames (42A, 42B) that are formed in a U-shape that opens downward and inward in the width direction, support both ends of the first roller shaft with both arm portions (421A, 421B), pass through the first opening, and have upper ends located inside the first body plate and lower ends located outside the first body plate; Each of the first support frames is provided at the same position in the length direction as the corresponding base end, and an upper end is fixed to the first body plate by a fixing member (411) together with a lower part of the base end that overlaps with the upper end in the height direction, The second support arm includes a pair of second support angles (31A, 32B) that are L-shaped in a plan view and have a base end (311) bent outward in the length direction along the width direction and support the second fixed pulley, The second support portion is a second body plate (51) along the longitudinal direction and having a pair of second openings (512) aligned in the longitudinal direction; a pair of second support frames (52A, 52B) that are formed in a U-shape that opens downward and inward in the width direction, support both ends of the second roller shaft with both arm portions (521A, 521B), pass through the second opening, and have upper ends located inside the second body plate and lower ends located outside the second body plate; Each of the second support frames may be provided at the same position in the longitudinal direction as the corresponding base end, and the upper end may be fixed to the second main plate together with the lower part of the base end that overlaps with it in the height direction by a fixing member (511).

[0020] In the present invention, the lifting jig can be made into a strong structure with a simple configuration, and it is possible to reduce the weight by reducing the plate thickness.

[0021] (7) In any one of the configurations (1) to (6) above, the lifting jig (1) is a first brake (28) that can be switched between a brake fixed state in which a first stopper (282) is pressed against the rope (99) wound around the first fixed pulley to fix the lifting position of the first divided body and a brake released state in which the first stopper is released from the rope by operating a first handle (281) installed on the outer side portion of the lifting jig in the width direction of the first support arm (2); The second support arm (3) may be provided with a second brake (38) that can be switched between a brake fixed state in which a second stopper (382) is pressed against the rope looped around the second fixed pulley to fix the lifting position of the second divided body, and a brake released state in which the second stopper is released from the rope, by operating a second handle (381) installed on the outer side portion of the second support arm (3) in the width direction.

[0022] In the present invention, the first and second sections of the trolley can be lifted and lowered separately on both sides of the beam steel using a single rope and jig, and the lifting and lowering positions can be fixed with the first and second brakes.In the present invention, the first and second handles are located on the outer side portions of the lifting jig in the width direction of the first and second support arms, and the first and second handles are located at low positions, making it easy to operate the first and second handles.

[0023] (8) A method for installing a lifting jig according to the present invention is a method for installing a lifting jig, comprising the steps of: connecting a first division (91) and a second division (92) of a trolley (9), each of which has one of a pair of wheels (911, 921), so that the pair of wheels are placed on lower flanges (81) on both sides of a beam steel material (8) which is an I-beam or H-beam steel that is spanned at a height; and installing a lifting jig (1) for attaching the trolley to the lower flanges on the beam steel material so as to be movable in the longitudinal direction of the beam steel material, The lifting jig is a first support arm (2) for hoisting the first divided body to one side of the beam steel material using a first fixed pulley (29); a first support part (4) for supporting the first support arm; a first guide roller (71) supported by the first support part and having a V-shaped groove (713) formed along its outer circumferential surface; and a first under roller (73) supported by the first support part. a second support arm (3) for hoisting the second divided body to the other side of the beam steel material using a second fixed pulley (39); a second support part (5) for supporting the second support arm; a second guide roller (72) supported by the second support part and having a V-shaped groove (723) formed along its outer circumferential surface; and a second under roller (74) supported by the second support part. A connecting portion (6) that connects the first and second support portions so that they can approach and move away from each other in the width direction of the lifting jig. the first support portion includes a first roller shaft (711) that is inclined downward and outward in the width direction and on which the first guide roller is movably mounted in the axial direction, and a first elastic member (712) that biases upward the first guide roller that moves downward from a state in which it is positioned above the first roller shaft; the second support portion includes a second roller shaft (722) that is inclined downward and outward in the width direction and on which the second guide roller is movably mounted in the axial direction, and a second elastic member (722) that biases upward the second guide roller that moves downward from a state in which the second roller shaft is located at the top of the second roller shaft; The installation method includes: a first step (FIG. 18(B)) of abutting upper corners of both upper flanges against the V-shaped grooves of the first and second guide rollers while the first and second under-rollers are positioned below the upper flanges; a second step (FIGS. 18(C) and 18(D)) of using the connecting parts to move the first and second support parts inward in the width direction relative to the first step, thereby sandwiching the upper flange from both sides with the first and second guide rollers, and vertically sandwiching each of the upper flanges on both sides with the first and second guide rollers and the first and second under-rollers; In the second step, as the first and second support portions move inward in the width direction, they move upward due to the upward reaction force received from the first and second guide rollers, causing the first and second under-rollers to abut against the underside of the upper flange.

[0024] In the present invention, the first and second support parts are moved inward in the width direction of the jig by the connecting parts from a state in which the upper corners of the upper flanges on both sides are in contact with the V-shaped grooves of the first and second guide rollers. This allows the first and second under-rollers located below the upper flange to be moved upward and in contact with the lower surface of the upper flange, and the jig can be installed on the beam steel material. As described above, the jig installed on the beam steel material can handle the load applied when the first and second divided bodies of the trolley are lifted, and can be moved stably on the beam steel material by a worker pushing it by hand, etc. Therefore, a worker can install one end of the jig on the beam steel material directly above on a temporary scaffold or on the bucket of an aerial work vehicle using the method of the present invention, and then push the jig to install the jig on the beam steel material outside the temporary scaffold or outside the bucket. When removing the jig, a worker on the temporary scaffolding or on the bucket of the aerial work vehicle can pull the jig up to the steel beam directly above and remove the jig from the steel beam while on the temporary scaffolding or on the bucket. Therefore, by using the method of the present invention, it is possible to eliminate the need to perform force-intensive work in an unstable position by leaning out from the temporary scaffolding or the bucket when installing or removing the jig, and the safety of the installation and removal work of the jig can be improved. Similarly, when setting up and removing the trolley, by using a jig attached to the beam steel by the method of the present invention as described above, it is possible to eliminate the need to perform strenuous work in an unstable position leaning over a temporary scaffold or bucket, which also improves the safety of the work of setting up and removing the trolley.

[0025] (9) In the above configuration (8), the first support portion includes a first guide surface located on the inside in the width direction of the first guide roller when the first support portion is located on the upper part of the first roller shaft, and the first guide surface is capable of contacting an upper surface of the upper flange on one side together with the first guide roller when the first support portion is located on the upper part of the first roller shaft, the second support portion includes a second guide surface located more inward in the width direction than the second guide roller when the second support portion is located at an upper portion of the second roller shaft, and the second guide surface is capable of contacting an upper surface of the upper flange on the other side together with the second guide roller when the second support portion is located at an upper portion of the second roller shaft, In the first step, the lifting jig, in which the first and second guide rollers and the first and second under rollers are spaced apart by a distance greater than the width of the upper flange, is placed on the beam steel by abutting the first and second guide surfaces against the upper surface of the upper flange, and then, while constantly keeping the first and second guide surfaces in contact with the upper surface of the upper flange, the first and second support parts are moved inward in the width direction by the connecting parts, thereby abutting the upper corners of the upper flanges on both sides against the V-shaped grooves of the first and second guide rollers.

[0026] As described above, in the present invention, with the jig placed on the beam steel material by the first and second guide surfaces, the jig can be fixed in the left-right and up-down directions relative to the beam steel material with just one action of operating the operating part of the connecting part, and the jig can be released from the beam steel material with just one action. Therefore, in the present invention, the installation and removal of the jig can be made easier, and the time required for the installation and removal of the jig can be reduced. In the present invention, since the operating part can be operated with the jig placed on the beam steel material by the first and second guide surfaces, stable installation and removal of the jig can be performed by one person even at high places. [Brief description of the drawings]

[0027] [Figure 1] A diagram showing a lifting jig installed on a beam steel material. [Diagram 2] 13 is a flowchart of a jig installation operation. [Diagram 3] FIG. [Figure 4] 13A to 13C are diagrams showing the lowering operation of the first and second movable pulleys. [Diagram 5] FIG. [Figure 6] FIG. 13 is a diagram showing the lifting operation of the first divided body on the lighter side. [Figure 7] FIG. 13 is a diagram showing the lifting operation of the second divided body on the heavier side. [Figure 8] 11A to 11C are diagrams showing a connecting operation of the first and second divided bodies. [Figure 9] FIG. [Figure 10] FIG. 10 is a plan view of the jig in FIG. [Figure 11] FIG. 10 is a left side view of the jig in FIG. [Figure 12] 4 is a diagram showing the first fixed pulley and the first brake as viewed from the lower side of the first support arm. FIG. [Figure 13] 13 is a view showing the second fixed pulley and the second brake as viewed from the lower side of the second support arm. FIG. [Figure 14] FIG. 4 is a schematic diagram showing a configuration related to a first guide roller. [Figure 15] FIG. 4 is a schematic diagram showing a first guide surface of the first temporary receiving arm. [Figure 16] FIG. 13 is a perspective view showing a jig temporarily placed on a beam steel material. [Figure 17] 13 is a diagram showing a state in which the first and second support parts are brought close to each other until the opposing arm parts come into contact with each other. FIG. [Figure 18] 13 is a schematic diagram for explaining a fixed state of the jig by operating the adjustment handle. FIG. [Figure 19] FIG. 13 is a reference diagram showing the jig in an installed state as viewed obliquely from above. [Figure 20] 13 is an enlarged reference view showing the second under-roller and upper flange in an installed state, viewed from below. FIG. [Figure 21] 13 is a schematic diagram showing the state in which the jig is pulled to the ground while the first and second halves of the trolley are lifted. FIG. [Figure 22] FIG. 13 is a schematic diagram showing how the jig is installed outside the bucket. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] (Outline of the configuration of the lifting jig 1) FIG. 1 is a diagram showing a lifting jig 1 installed on a beam steel material 8. As shown in FIG. The lifting jig 1 (hereinafter, simply referred to as the jig 1) is installed on a steel beam 8 that is suspended at a high place. The steel beam 8 may be an I-beam or H-beam. The jig 1 can be used to lift the first and second divisions 91, 92 of the trolley 9 on both sides of the steel beam 8. The trolley 9 can be divided into first and second divisions 91, 92, each of which has one of a pair of wheels 911, 921. The first division 91 is lighter than the second division 92. As described above, in this specification, multiple elements with different numbers at the beginning, such as "for example, the first division 91 and the second division 92," may be collectively described as "the first and second divisions 91, 92."

[0029] The second division body 92 has a connecting shaft 922 arranged below the lower flange 81 of the beam steel material 8. The connecting shaft 922 has a hook 923 for connecting a heavy load. The first division body 91 has a tubular portion 912 into which the connecting shaft 922 is inserted. The second division body 92 can be connected to the first division body 91 by, for example, inserting the connecting shaft 922 of the second division body 92 into the tubular portion 912 of the first division body 91.

[0030] The trolley 9 moves on the lower flange 81 of the beam steel material 8 by wheels 911, 921 installed on the lower flange 81 on both sides of the beam steel material 8, and moves a heavy load suspended by the hook 923 along the beam steel material 8. In this embodiment, the trolley 9 is a geared trolley in which a circular hand chain 924 is rotatably suspended from the second divided body 92. When a worker pulls down the hand chain 924 to rotate it, the gear in the second divided body 92 rotates to rotate the wheels 911, 921, and the trolley 9 moves along the beam steel material 8. A chain block may be hung on the hook 923. The chain block includes a chain to which a heavy load is connected, and a brake that manually or electrically winds up or down the chain and stops the chain at that position. The trolley 9 may be a plain trolley that moves along the beam steel material 8 by being pushed by a worker. The trolley 9 may be an electric trolley that incorporates a motor for rotating the wheels 911, 921 and moves on the beam steel material 8 by pressing a button.

[0031] By connecting the first and second halves 91, 92 of the trolley 9 suspended on both sides of the beam steel 8, workers can attach the trolley 9 to the lower flange 81 with a pair of wheels 911, 921 resting on the lower flange 81 on both sides of the beam steel 8.

[0032] The jig 1 includes a first support arm 2 extending to one side in the width direction (the left side in Fig. 1), and a second support arm 3 extending to the other side in the width direction (the right side in Fig. 1). The width direction of the jig 1 refers to a direction parallel to the width direction of the beam steel material 8 when the jig 1 is installed on the beam steel material 8 (the left-right direction in Fig. 1).

[0033] The first support arm 2 supports a first fixed pulley 29 above and on one side (left side in FIG. 1) of the beam steel material 8, and is for hoisting the first movable pulley 93, from which the first divided body 91 is suspended, to one side of the beam steel material 8 using the first fixed pulley 29. The first fixed pulley 29 has, for example, two sheaves 292 (FIG. 12(A)) with a groove on the outer periphery for guiding the rope 99, and a rope 99, one end of which is fixed to the first support arm 2, is wound around it twice. The first movable pulley 93 has, for example, two sheaves, and is attached to the rope 99 by winding the rope 99 through the first fixed pulley 29 twice. A shackle is hung on the first movable pulley 93, and the first divided body 91 is hung via this shackle. As described above, one end of the rope 99 is fixed to the first support arm 2 , and is wound twice around the first fixed pulley 29 and the first fixed pulley 93 in that order, and then wound around the second fixed pulley 29 .

[0034] The second support arm 3 supports a second fixed pulley 39 above and on the other side (right side in FIG. 1) of the beam steel material 8, and is for hoisting the second movable pulley 94, from which the second divided body 92 is suspended, to the other side of the beam steel material 8 using the second fixed pulley 39. The second fixed pulley 39 has, for example, three sheaves 391 (FIG. 13(A)), and the rope 99 from the first fixed pulley 29 is wound around it twice. The second movable pulley 94 has, for example, two sheaves, and is attached to the rope 99 by winding the rope 99 through the second fixed pulley 39 twice. The second divided body 92 is hung from the second movable pulley 94 via a shackle. As described above, the rope 99 is wound around the second fixed pulley 39 and the second fixed pulley 94 twice, and then wound around the second fixed pulley 39 and hung to the ground.

[0035] The jig 1 is provided with first and second brakes 28 and 38. The first brake 28 can be switched by operating a first handle 281 between a brake fixed state in which a first stopper 282 (FIG. 12(A)) described later is pressed against the rope 99 looped around the first fixed pulley 29 to fix the lifting position of the first divided body 91, and a brake released state in which the first stopper 282 is released from the rope 99. The second brake 38 can be switched by operating a second handle 381 between a brake fixed state in which a second stopper 382 (FIG. 13(A)) is pressed against the rope 99 looped around the second fixed pulley 39 to fix the lifting position of the second divided body 92, and a brake released state in which the second stopper 382 is released from the rope 99.

[0036] The jig 1, which will be described in detail later, is equipped with first and second guide rollers 71, 72 and first and second under rollers 73, 74. As a result, after the jig 1 is installed on the beam steel material 8, a worker can push it manually, for example, to stably move it over the beam steel material 8, and it can be used as is in the moved position.

[0037] (Installation of trolley 9) Fig. 2 is a flow chart of the installation work of the jig 1. Fig. 3 is a diagram showing the installation work of the jig 1 in a schematic manner. First, an operator of the aerial work platform installs the jig 1 on the beam steel material 8 (steps 1 to 4 described later). A rope 99 is wound around the jig 1 installed on the beam steel material 8, and first and second movable pulleys 93 and 94 are attached to the rope 99. The end of the rope 99 is hung on the ground side and wound up on a reel 94. As will be described in steps 1 to 4 described later, after the jig 1 is once installed on the beam steel material 8 directly above the aerial work platform (step 3), it is installed at a position offset from the bucket in the length direction of the beam steel material 8 (perpendicular to the plane of FIG. 3), for example, at a position offset toward the front of the plane of FIG. 3, so that the rope 99 does not get caught in the bucket of the aerial work platform (step 4: see also FIG. 22).

[0038] 4 is a diagram showing the operation of lowering the first and second movable pulleys 93, 94. In the following, for ease of viewing, illustrations of a worker on the bucket of the aerial work platform are omitted. A worker on the bucket of the aerial work vehicle sets the first and second brakes 28, 38 to the brake fixed state and hangs the All-Right Rope 95 on the first and second movable pulleys 93, 94, and then operates the first and second handles 281, 381 to switch the first and second brakes 28, 38 to the brake released state. A worker on the ground pulls the All-Right Rope 95 to pull the first and second movable pulleys 93, 94 down to the ground (Step 5).

[0039] FIG. 5 is a diagram showing a slinging operation. A worker on the ground slings the first divided body 91, which is the lighter side, onto the first movable pulley 93, and slings the second divided body 92, which is the heavier side, onto the second movable pulley 94 (Step 6). Slinging refers to connecting an object to a movable pulley via a shackle or the like. As a result, the first and second divided bodies 91, 92, which have different weights, are connected to the rope 99 via the first and second movable pulleys 93, 94, and are lowered to the ground. The first and second divided bodies 91, 92 may be placed directly on the ground, or may be placed on the bed of a truck or a dolly.

[0040] FIG. 6 is a diagram showing the lifting operation of the first divided body 91 on the lighter side. In this state, when a worker on the ground pulls the rope 99 that has been lowered to the ground, the rope 99 slides on the second movable pulley 94 to which the second divided body 92 on the heavier side is connected, and on the second fixed pulley 39, and the first divided body 91 on the lighter side is lifted up. The worker on the ground pulls the rope 99 and hoists the first divided body 91 on the lighter side up to one side of the beam steel material 8 (the left side in FIG. 6). The worker on the bucket of the aerial work platform operates the first handle 281 to switch the first brake 28 to the brake fixed state, and fixes the lifting position of the first divided body 91 to one side of the beam steel material 8 (the left side in FIG. 6) (Step 7).

[0041] Here, the first movable pulley 93, to which the lighter first divided body 91 is connected, has the rope 99 wound around it twice and is supported by four ropes 99. Therefore, if the rope 99 is pulled with a force equal to or greater than a quarter of the weight of the first divided body 91, the first divided body 91 can be lifted. For example, the weight of a trolley 9 with a lifting load of 10 t is 100 kg, and the lighter first divided body 91 weighs 40 kg. In this case, if the rope 99 is pulled with a force equal to or greater than 10 kgf (98 N), which is a quarter of 40 kgf, the first divided body 91 can be lifted.

[0042] FIG. 7 is a diagram showing the lifting operation of the second divided body 92, which is the heavier side. With first brake 28 in the brake fixed state, when the worker on the ground pulls rope 99, this time the second divided body 92 on the heavier side is lifted up. The worker on the ground pulls rope 99 and hoists the second divided body 92 on the heavier side up to the other side of the beam steel material 8 (the right side in FIG. 7). The worker on the bucket of the aerial work platform operates second handle 381 to switch second brake 38 to the brake fixed state, and fixes the lifting position of the second divided body 92 to the other side of the beam steel material 8 (the right side in FIG. 7) (Step 8).

[0043] Here, the second movable pulley 94, to which the second divided body 92 on the heavier side is connected, has the rope 99 wound around it twice and is supported by four ropes 99. Therefore, if the rope 99 is pulled with a force equal to or greater than one-quarter of the weight of the second divided body 92, the second divided body 92 can be lifted. For example, the weight of a trolley 9 with a lifting load of 10 t is 100 kg, and the second divided body 92 on the heavier side is 60 kg. In this case, if the rope 99 is pulled with a force equal to or greater than 15 kgf (147 N), which is one-quarter of 60 kgf, the second divided body 92 can be lifted.

[0044] FIG. 21 is a schematic diagram showing how the jig 1 is pulled to the ground while the first and second division bodies 91, 92 of the trolley 9 are suspended. As described above, the jig 1 can be moved stably on the beam steel material 8 by pushing or pulling it. The worker on the bucket of the aerial work vehicle pulls the jig 1, with the first and second divided bodies 91, 92 hoisted, to just above the bucket on the beam steel material 8 (step 9). This enables the worker to perform the next step 10 of connecting the first and second divided bodies 91, 92 in a stable position on the bucket.

[0045] FIG. 8 is a diagram showing the operation of connecting the first and second divided bodies 91, 92. As shown in FIG. A worker on the bucket of the aerial work platform connects the first and second halves 91, 92 that are hoisted on both sides of the beam steel material 8 directly above the bucket, and removes the sling from the trolley 9 from the first and second movable pulleys 94 of the jig 1. This allows the trolley 9 to be attached to the lower flange 81 of the beam steel material 8 with the pair of wheels 911, 921 of the trolley 9 resting on the lower flange 81 on both sides of the beam steel material 8 (step 10).

[0046] FIG. 22 is a schematic diagram showing how the jig 1 is installed outside the bucket. As described above, jig 1 can be stably moved over steel beam 8, and can be used as is in the position where it was moved. The worker on the bucket of the aerial work platform pushes jig 1 over steel beam 8 to the outside of the bucket so that rope 99 does not get caught in the bucket, and reinstalls jig 1 (step 11).

[0047] A worker on the bucket of the aerial work platform hooks the OLY ROPE 95 to the second movable pulley 94 for the heavy side and switches the second brake 38 to the brake release state by operating the second handle 381. A worker on the ground pulls the OLY ROPE 95 to pull the second movable pulley 94 for the heavy side to the ground (Step 12).

[0048] A worker on the ground slings a chain block (not shown) onto the second movable pulley 94 for the heavy side (step 13).

[0049] The worker on the ground hoists the chain block with the rope 99 until the height of the chain block hook and the height of the hook 923 of the trolley 9 are approximately equal. The worker on the bucket of the aerial work vehicle operates the second handle 381 to switch the second brake 38 to the brake fixed state, and fixes the hoisting position of the chain block to a position where the height of the chain block hook and the height of the hook 923 of the trolley 9 are approximately equal (step 14). Since the chain block is supported by the four ropes 99 via the second movable pulley 94 and hoisted, it can be hoisted by pulling the rope 99 with a force of at least one-quarter of the weight.

[0050] The worker on the bucket of the aerial work platform pulls the jig 1 with the chain block hoisted up to just above the bucket on the steel beam 8 (step 15). This enables the worker to perform the next step 16 of connecting the chain block to the trolley 9 in a stable position on the bucket.

[0051] The worker on the aerial work platform connects the hook of the chain block to the hook 923 of the trolley 9, and removes the chain block from the first and second movable pulleys 94 of the jig 1 (step 16). By performing the above steps 1 to 16 in reverse order, the jig 1, trolley 9, and chain block can be removed from the beam steel material 8 and lowered to the ground.

[0052] In this manner, in this embodiment, the load of the lifting work of the trolley 9 can be reduced by hoisting the first and second division bodies 91, 92 of the trolley 9 and using the first and second fixed pulleys 29, 39 and the first and second movable pulleys 93, 94. When hoisting the trolley up to the beam steel material 8, conventionally, two workers and the trolley were placed on the aerial work platform, and there was a risk that the safety device of the aerial work platform would be activated due to their weight. In this embodiment, it is only necessary to place one worker and the jig 1 on the aerial work platform, and furthermore, the jig 1 can be made significantly lighter than the trolley 9, so that the activation of the safety device due to the weight limit of the aerial work platform can be prevented. In this embodiment, the first and second divided bodies 91, 92 can be easily lifted in sequence simply by pulling the rope 99 and switching the first and second brakes 28, 38.In addition, the amount of lifting work for the trolley 9 and the first and second divided bodies 91, 92 can be reduced, so that installation work for the trolley 9 can be carried out safely.

[0053] By simply pushing the jig 1 out of the bucket on the beam steel material 8, the jig 1 can be installed in a position where the rope 99 is not hung. In addition, the jig 1 with the first and second divided bodies 91, 92 lifted can be stably pulled to just above the bucket. Therefore, in this embodiment, it is not necessary to lean out of the bucket when installing the jig 1 and connecting the first and second divided bodies 91, 92, so the safety of these operations can be improved. The same effect as above can be achieved when removing the trolley 9. As with the installation and removal of the trolley 1, the load of the lifting and suspending operations can be reduced, the safety device of the aerial work vehicle can be prevented from operating, and the safety of the installation and removal operations can be improved.

[0054] (Modification of installation work of trolley 9) The rope 99 may be wound around the first fixed pulley 29 and the first movable pulley 93 only once, or may be wound around three or more times. The rope 99 may be wound around the second fixed pulley 39 and the second movable pulley 94 only once, or may be wound around three or more times, and then lowered to the ground via the second fixed pulley 39. Separate ropes may be hung on the first and second support arms 2 and 3, and the first divided body 91 or the second divided body 92 may be suspended from each rope via a movable pulley. Then, only the first support arm 2 may be used to hoist one of the first and second divided bodies 91 and 92, and only the second support arm 3 may be used to hoist the other of the first and second divided bodies 91 and 92. Even in this case, the first and second fixed pulleys 29 and 39 and the movable pulley are used to hoist the first and second divided bodies 91 and 92, so that the force required for hoisting can be reduced.

[0055] (Specific configuration of jig 1) FIG. 9 is a front view of the jig 1. FIG. The jig 1 is configured such that a first unit 100 including a first support arm 2, a first brake 28, a first support portion 4, a first guide roller 71, and a first under roller 73, and a second unit 200 including a second support arm 3, a second brake 38, a second support portion 5, a second guide roller 72, and a second under roller 74 are arranged facing each other in the width direction of the jig 1 and are connected by a connecting portion 6. In the jig 1, main elements such as the first and second support arms 2, 3, the first and second brakes 28, 38, and the first and second support portions 4, 5 may be made of aluminum alloy (duralumin) to reduce weight.

[0056] Below, each element of the first unit 100 will be described. Since each element of the second unit 200 has the same configuration as the corresponding element of the first unit 100, the description will be omitted, and differences will be described as appropriate if there are any. Directions such as up, down, left, right, and horizontal directions in the description of the jig 1 refer to the directions when the jig 1 is attached to the beam steel material 8.

[0057] (Configuration of first support arm 2) FIG. 10 is a plan view of the jig 1 of FIG. The first support arm 2 includes a pair of similarly configured first support angles 21A, 21B facing each other in the longitudinal direction of the beam steel material 8. The first support angles 21A, 21B are L-shaped in plan view, and support a first fixed pulley 29 along the width direction of the jig 1. Base ends 211 of the first support angles 21A, 21B are bent outward in the longitudinal direction of the beam steel material 8 (upper and lower sides in FIG. 10). On the base end 211 of the first support angle 21A on the lower side in FIG. 10, there is a rope stopper 299 to which an end of the rope 99 is connected. The rope stopper 299 is provided with a swivel for removing twists in the rope.

[0058] FIG. 11 is a left side view of the jig 1 of FIG. In the first support arm 2, a side portion on the outer side in the width direction of the jig 1 includes a support plate 212 provided across the sides of the first support angles 21A and 21B. In the support plate 212, a first handle 281 of the first brake 28 is installed in an area below the center of the sheave 292.

[0059] (Configuration of first fixed pulley 29 and first brake 28) FIG. 12(A) is a diagram showing the first fixed pulley 29 and the first brake 28 in the brake-released state as viewed from the lower side of the first support arm 2. FIG. The first fixed pulley 29 has, for example, two sheaves 292, which are rotatably mounted on a shaft 291 supported by the first support arm 2. In the brake released state, the first stopper 282 is located below the center of the sheaves 292 (the front side of the paper in FIG. 12(A)) and on the outer side in the width direction of the jig 1 (the left side in FIG. 12(A)). The first handle 281 is installed along the length direction of the beam steel material 8. The first handle 281 can be operated along a horizontal plane, and can be rotated 180 degrees toward the outer side in the width direction of the jig 1.

[0060] FIG. 12B is a diagram showing the first brake 28 in the brake fixed state as viewed from below the first support arm 2. As shown in FIG. The first handle 281 (FIG. 12(A)), which is in the brake release state position, is rotated 180 degrees to the brake fixed state position (FIG. 12(B)). Then, the link mechanism 283 between the first handle 281 and the first stopper 282 converts the rotational motion of the first handle 281 into a linear motion toward the inside of the width direction of the jig 1 and transmits it to the first stopper 282. The link mechanism 283 maintains the position of the first handle 281 in the brake fixed state, for example, by the action of a cam, even if the operator releases his / her hand from the first handle 281. As a result, by the first handle 281 being positioned in the brake fixed state, the first stopper 282 is fixed in a state where it is pressed against the rope 99 wound around the sheave 292, that is, the first brake 28 is maintained in the brake fixed state. As shown in Figures 13(A) and 13(B), the position of the second handle 381 of the second brake 38 in the brake released state and brake fixed state is on the opposite side to the position of the first handle 281 in the longitudinal direction of the beam steel 8, but it may be on the same side.

[0061] (Configuration of first support part 4) Returning to FIG. 9, the first support portion 4 includes a first body plate 41 and a pair of first support frames 42A, 42B (see FIG. 10 for 42B).

[0062] The first main body plate 41 is plate-shaped and extends along the length of the beam steel material 8, supporting the first support arm 2 at its upper part. The base ends 211 of the first support angles 21A and 21B are screwed to the first main body plate 41 at two points, top and bottom. The lower screw is given the reference number 411 for later explanation. The first main body plate 41 has a hole 413 (see also FIG. 11) for passing the rope 99 to the second main body plate 51 side.

[0063] A flange portion of a screw holder 416 is fixed by a plurality of screws 417 (see also FIG. 11) to the upper portion of the widthwise inner surface of the jig 1 in the first main body plate 41 and to the center portion in the longitudinal direction of the beam steel material 8. The end portion of the screw holder 416 is fitted into a hole 414 in the first main body plate 41. As a result, a female thread portion 415 inside the screw holder 416 is provided on the upper portion of the first main body plate 41. The lower portion of the first main body plate 41 has a pair of first openings 412 (see also FIG. 11) aligned in the longitudinal direction of the beam steel material 8.

[0064] The first support frames 42A and 42B have the same configuration, so only the first support frame 42A will be described. The first support frame 42A is formed in a U-shape that opens downward and inward in the width direction of the jig 1, and supports both ends of a first roller shaft 711 (described below) with both arms 421A and 421B. The upper arm is labeled 421A, and the lower arm is labeled 421B. The first support frame 42A passes through the first opening 412, with its upper end positioned inside the first main plate 41 and its lower end positioned outside the first main plate 41.

[0065] The first support frame 42A is fixed to the first main body plate 41 at two positions, upper and lower, across the first opening 412 with screws. The first support frame 42A is provided at the same position in the length direction of the beam steel material 8 as the corresponding base end 211 (FIG. 11), and the upper end is fixed to the first main body plate 41 together with the lower part of the base end 211 that overlaps in the height direction by the screw 411. The screw 411 is screwed into the first support frame 42A from the base end 211 side through the first main body plate 41. Although the screw 411 is exemplified as a fixing member for fixing the first support frame 42A, an appropriate member such as a pin may be used. The lower end of the first support frame 42A is screwed into the screw from the inside in the width direction of the jig 1. By fixing the first support angles 21A, 21B and the first support frames 42A, 42B to the first main body plate 41 as described above, the strength of the first main body plate 41 can be sufficiently ensured even if the first main body plate 41 is made of, for example, an aluminum alloy to reduce weight.

[0066] (Configuration Related to First Guide Roller 71) Two first guide rollers 71 are provided at a distance from each other in the length direction of the beam steel material 8, and are supported by the first support frames 42A and 42B of the first support portion 4. The central axis of the first guide roller 71 is inclined downward and outward in the width direction. The central axis of the first guide roller 71 is inclined 45 degrees with respect to the horizontal direction. A V-shaped groove 713 is formed along the outer circumferential surface of the first guide roller 71. The first guide roller 71 is guided by this groove 713 to the upper corner of the upper flange 82 on one side of the beam steel material 8, as shown in FIG. 14. The V-shaped groove 713 has a first inclined surface 7131 and a second inclined surface 7132, as shown in FIG. 14. The first inclined surface 7131 is tapered downward in the axial direction of the first guide roller 71. The second inclined surface 7132 is located below the first inclined surface 7131 in the axial direction of the first guide roller 71, and is tapered upward. The angle between the first and second inclined surfaces 7131, 7132 in a side view is, for example, 90°. The first inclined surface 7131 contacts an upper surface of an upper corner of the upper flange 82 on one side (the left side in FIG. 14), and the second inclined surface 7132 contacts a side surface of the corner.

[0067] The second guide roller 72 supported by the second support portion 5 has the same configuration as the first guide roller 71, and is guided to the upper corner of the upper flange 82 on the other side of the beam steel material 8 by a V-shaped groove 723 formed along the outer circumferential surface. The second guide roller 72 sandwiches the first guide roller 71 and the upper flange 82 from both sides. The V-shaped groove 723 has a first inclined surface 7231 and a second inclined surface 7232. The first inclined surface 7231 is tapered downward in the axial direction of the second guide roller 71. The second inclined surface 7232 is located below the first inclined surface 7231 in the axial direction of the second guide roller 72, and is tapered upward. The angle between the first and second inclined surfaces 7231 and 7232 in a side view is, for example, 90°. The first inclined surface 7231 comes into contact with the upper surface of the upper corner of the upper flange 82 on the other side (the right side in FIG. 14), and the second inclined surface 7232 comes into contact with the side surface of the corner.

[0068] Returning to Fig. 9, the first support portion 4 includes a pair of first roller shafts 711 installed at a distance in the longitudinal direction of the beam steel material 8. The first roller shafts 711 are inclined downward and outward in the width direction of the jig 1, and a first guide roller 713 is provided so as to be movable in the axial direction. In this embodiment, the first roller shaft 711 is inclined at 45 degrees with respect to the horizontal direction. A spring 712 (first elastic member) that urges the first guide roller 71 upward is fitted to the first roller shaft 711.

[0069] Before the jig 1 is installed, the first guide roller 71 is biased upward by the spring 712 and is positioned above the first roller shaft 711 by abutting against the upper arm portions 421A of the first support frames 42A and 42B.

[0070] At the inner bottom of the U-shaped first support frame 42A, there is a stopper 423 on the lower side. The position of the first guide roller 71 when it hits the stopper 423 becomes the lowest part of the movable range of the first guide roller 71. The stopper 423 restricts the downward movement of the first guide roller 71 to prevent over-compression of the spring 712. When the first guide roller 71 hits the stopper 423, the upper flange 82 of the beam steel material 8 does not hit the first main body plate 41.

[0071] (Configuration of the first temporary support arm 422) A first temporary support arm 422 is fixed to the inner side of the arm 421A in the longitudinal direction of the beam steel material 8 via a collar that is a member that defines the distance (see FIG. 10). The first temporary support arm 422 is plate-shaped and extends downward from the arm 421A and toward the inner side in the width direction of the jig 1.

[0072] The arm portions 421A face the arm portions 521A of the second support portions 5 in the width direction of the jig 1. A second temporary support arm 522 is fixed via a collar to the outer side of the arm portion 521A in the longitudinal direction of the beam steel material 8. The second temporary support arm 522 is plate-shaped and extends downward from the arm portion 521A and toward the inside of the jig 1 in the width direction.

[0073] 15, a first guide surface 4221 is formed on the lower end of each first temporary receiving arm 422. The first guide surface 4221 is located inside the first guide roller 71 in the width direction of the jig 1 when the first guide roller 71 is located at the upper part of the first roller shaft 711. A portion of the first inclined surface 7131 of the first guide roller 71 located at the upper part of the first roller shaft 711 that contacts the upper surface of the upper flange 82 is located in the same plane as the first guide surface 4221. The first guide surface 4221 can contact the upper surface of the upper flange 82 on one side together with the first guide roller 71 located at the upper part of the first roller shaft 711 (FIG. 18(B)).

[0074] Similarly, a second guide surface 5221 is formed on the lower end of each second temporary receiving arm 522. The second guide surface 5221 is located inside the second guide roller 72 located at the upper part of the second roller shaft 721 in the width direction of the jig 1. A portion of the second inclined surface 7231 of the second guide roller 72 located at the upper part of the second roller shaft 721 that contacts the upper surface of the upper flange 82 is located in the same plane as the second guide surface 5221. The second guide surface 5221 can contact the upper surface of the upper flange 82 on the other side together with the second guide roller 72 located at the upper part of the second roller shaft 721.

[0075] As a result, by separating the first and second support parts 4, 5 using the connecting part 6 and abutting the four first and second guide surfaces 4221, 5221 against the upper surface of the beam steel material 8, the jig 1 can be temporarily placed in a stably position on the beam steel material 8 before being transported to and installed at the beam steel material 8 at a high location (see also Figure 16).

[0076] The first temporary support arms 422 are disposed at positions offset from the opposite second temporary support arms 522 in the longitudinal direction of the beam steel material 8 (FIG. 10). This allows the first and second support parts 4, 5 to be brought close to each other until the opposing arm parts 421A, 521A come into contact without interference between the first and second temporary support arms 422, 522 when storing the jig 1, as shown in FIG. 17. This allows the jig 1 to be made compact and stable.

[0077] (Configuration Related to First Under-Roller 73) Returning to FIG. 9, the first under roller 73 is an outer ring of the cam follower 731 in this embodiment. The cam follower 731 is a component of the first support portion 4, and is installed on the lower part of the inner surface of the first body plate 41 in the width direction of the jig 1. The first under roller 73 is provided between the two first guide rollers 71 in the length direction of the beam steel material 8 (FIG. 11). In this embodiment, the first under roller 73 is provided in the center of the two first guide rollers 71 in the length direction of the beam steel material 8, and only one first under roller 73 is provided. When the jig 1 is installed, the first under roller 73 contacts the lower surface of the upper flange 82 on one side as shown in FIG. 1, and sandwiches the first guide roller 71 and the upper flange 82 on one side from above and below (FIG. 14). The first under roller 73 may be provided on the outside of the two first guide rollers 71, or two or more first under rollers may be provided. The second support portion 5 is also provided with a second under-roller 74 corresponding to the first under-roller 73. The first and second under-rollers 73, 74 prevent the jig 1 from slipping out upward.

[0078] (Correspondence between elements of the first and second units 100 and 200) The second support arm 3, second brake 38, second support part 5, second guide roller 72, and second under roller 74 of the second unit 200 correspond to the first support arm 2, first brake 28, first support part 4, first guide roller 71, and first under roller 73 of the first unit 100. Elements 31A, 311, 312, 381 to 383, 51, 511, 512, 514 to 516, 52A, 52B, 521 to 523, 721 to 723, 741, 7231, and 7232 of the second unit 200 in the figure correspond to elements 21A, 211, 212, 281 to 283, 41, 411, 412, 414 to 416, 42A, 42B, 421 to 423, 711 to 713, 731, 7131, and 7132 of the first unit 100.

[0079] (Configuration of connecting portion 6) Returning to Fig. 9, the connecting unit 6 connects the first and second support units 4, 5 and moves the first and second support units 4, 5 in the width direction of the jig 1. In this embodiment, the connecting unit 6 connects the first and second support units 4, 5 so that they can approach and move apart in the width direction of the jig 1. In this embodiment, the connecting unit 6 is a screw jack equipped with a screw shaft 61 and an operating unit 62, and converts the rotational motion of the operating unit 62 into translational motion of the first and second support units 4, 5 that screw into the screw shaft 61.

[0080] The screw shaft 61 is extended in the width direction of the jig 1 above the upper flange 82 of the beam steel material 8. On one side of the screw shaft 61 in the width direction of the jig 1, a first screw portion 611 that screws into the first support portion 4 is formed. On the other side of the screw shaft 61 in the width direction of the jig 1, a second screw portion 612 that screws into the second support portion 5 and has a reverse screw relationship with the first screw portion 611 is formed. The first screw portion 611 is a solid rod-shaped member having a male screw formed on its outer circumferential surface, and screws into the female screw portion 415 of the first support portion 4. The second screw portion 612 is a cylindrical member having a male screw that has a reverse screw relationship with the first screw portion 611 formed on its outer circumferential surface and a hexagonal shaft hole formed therein, and screws into the female screw portion 515 of the second support portion 5.

[0081] The first and second screw portions 611, 612 are connected by being screwed from both sides into a female screw portion inside a joint 613. Several joints 613 of different lengths that connect the first screw portion 611 and the second screw portion 612 are prepared in advance, and when installing the jig 1 on a wide beam steel material 8 and using this to install a trolley 9, for example, the long joint 613 can be replaced. This makes it possible to widen the range of widths of beam steel material 8 that the jig 1 can accommodate.

[0082] The operating unit 62 includes a handle shaft 621 and an adjustment handle 622. The handle shaft 621 is hexagonal in cross section, and is fitted into a hexagonal shaft hole of the second screw shaft 612, and rotates the screw shaft 61 by its own rotation. The outer circumferential surface of the handle shaft 621 has notches spaced apart in the axial direction. The handle shaft 621 is fixed to the second screw shaft 612 in the axial direction by fitting fixing protrusions, which protrude retractably from the inner circumferential surface of the shaft hole of the second screw shaft 612, into the notches. When a certain amount of axial force or more is applied to the handle shaft 621, the fixing protrusions of the second screw shaft 612 are retracted, and the handle shaft 621 slides so that the fixing protrusions fit into other notches. Based on this principle, the handle shaft 621 can be inserted and removed from the second screw shaft 612 in stages. When operating (hand-turning) the operating unit 62, the worker pulls out the operating unit 62 an appropriate length from the second screw shaft 612, and at other times, the worker can slide the operating unit 62 toward the second screw shaft 612 and store the operating unit 62 inside the second screw shaft 612.

[0083] The adjustment handle 622 is connected to an end of the handle shaft 621, and when an operator rotates it, the screw shaft 61 is rotated via the handle shaft 621. The adjustment handle 622 can be folded inward in the width direction of the jig 1.

[0084] The operating unit 62 rotates the screw shaft 61 to move the first and second support units 4, 5 between an initial installation position (first position: Figure 18(A)) in which the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 are spaced apart more than the width of the upper flange 82, and a completed installation position (second position: Figure 18(D)) in which the first and second guide rollers 71, 72 clamp the upper flange 82 on both sides and the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 clamp the upper flange 82 on both sides from above and below.

[0085] (Installation of jig 1) A rope 99 is wound around the jig 1, and first and second movable pulleys 93, 94 are attached to the rope 99. A worker gets into the bucket of an aerial work vehicle (or uses a temporary scaffold) and carries the jig 1 to the elevated beam steel material 8. At this time, the end of the rope 99 is hung down on the ground, and the rope 99 is let out from a reel 94 held by a worker on the ground.

[0086] 18(A) to 18(D) are schematic diagrams for explaining the fixed state of the jig 1 by operating the adjustment handle 622. In these drawings, the first and second support arms 2, 3, etc. are omitted. A worker on the bucket of the work platform turns the adjustment handle 622 to position the first and second support parts 4 and 5 in an initial installation position where the first and second guide rollers 71, 72 and the first and second under-rollers 73, 74 are spaced apart by a width greater than the upper flange 82 and the first and second guide surfaces 4221, 5221 can contact the upper surface of the beam steel material 8. For example, the A dimension (FIG. 9) between the first and second under-rollers 73, 74 is set to be approximately 20 mm larger than the width of the beam steel material 8 (step 1 in the flow chart in FIG. 2). This operation may be performed on the ground in advance.

[0087] The worker on the bucket of the aerial work platform positions jig 1 so that the end of rope 99 hangs down on the side where the hand chain of trolley 9 is to be installed relative to the beam steel material 8. The worker on the bucket of the aerial work platform abuts the first and second guide surfaces 4221, 5221 against the top surface of the upper flange 82, as shown in Fig. 18(A), and temporarily places jig 1 on the beam steel material 8 directly above the bucket of the aerial work platform (Step 2).

[0088] 18(B), a worker on the bucket of the aerial work platform turns the adjustment handle 622 to bring the first and second support parts 4, 5 closer to each other until the roller contact position (third position) where the corners of the upper flange 82 on both sides abut against the V-shaped grooves 713, 723 of the first and second guide rollers 71, 72. At this time, the first and second guide surfaces 7131, 7231 are always in contact with the top surface of the upper flange 82.

[0089] In this embodiment, the first and second guide surfaces 7131, 7231 and the portions of the first and second inclined surfaces 7131, 7231 of the first and second guide rollers 71, 72 located at the top that contact the upper surface of the upper flange 82 are located on the same plane. Therefore, by simply turning the adjustment handle 622 of the jig 1 temporarily placed on the beam steel material 8, the corners of the upper flanges 82 on both sides can be smoothly brought into contact with the V-shaped grooves 713, 723 of the first and second guide rollers 71, 72.

[0090] As shown in FIG. 18(C), the worker further turns the adjustment handle 622 to bring the first and second support parts 4 and 5 closer to each other. The first and second guide rollers 71 and 72 are restricted from moving closer to each other in the horizontal direction by the side of the upper flange 82 that abuts horizontally against the second inclined surfaces 7132 and 7232 of the grooves 713 and 723. Therefore, when the first and second support parts 4 and 5 receive a force from the connecting part 6 in the horizontal direction in the direction in which they move closer to each other, they also move upward due to the upward reaction force from the first and second guide rollers 71 and 72 at the first and second roller shafts 711 and 721. The first and second guide rollers 71 and 72 move downward relative to the first and second support parts 4 and 5.

[0091] In this manner, by turning the adjustment handle 622 and moving the first and second support parts 4, 5 closer to each other and upward, the first and second under-rollers 73, 74, which were positioned below the upper flange 82 and at both ends, move inward and upward in the width direction of the jig 1.

[0092] As shown in Fig. 18(D), the worker turns the adjustment handle 622 to move the first and second support parts 4, 5 upward while moving them closer to each other, thereby moving the first and second under-rollers 73, 74 upward and toward the inside in the width direction of the jig 1 until they abut the lower surface of the upper flange 82. In this way, the worker turns the adjustment handle 622 to position the first and second support parts 4, 5 at the installation completion position (second position) where the upper flange 82 is sandwiched from both sides by the first and second guide rollers 71, 72 and the first and second under-rollers 73, 74. At this time, the worker on the bucket of the aerial work vehicle tightens the adjustment handle 622 until there is no backlash between the first and second guide rollers 71, 72 and the first and second under-rollers 73, 74 relative to the upper flange 82.

[0093] As a result, the jig 1 is temporarily installed on the beam steel material 8 directly above the bucket of the aerial work platform (Step 3). Figure 19 is a reference diagram showing the jig 1 in the installed state as viewed from diagonally above, and Figure 20 is a reference enlarged diagram showing the second under-roller 74 and upper flange 82 in the installed state as viewed from below.

[0094] The jig 1 installed on the beam steel material 8 holds down the upper side of one (left side in FIG. 18(D)) upper flange 82 at two points by the first guide rollers 71, and holds down the lower side at one point by the first under roller 73 between the first guide rollers 71 in the longitudinal direction of the beam steel material 8. The jig 1 holds down the upper side of the other (right side in FIG. 18(D)) upper flange 82 at two points by the second guide rollers 72, and holds down the lower side at one point by the second under roller 74 between the second guide rollers 72 in the longitudinal direction of the beam steel material 8. This allows the jig 1 to maintain its posture while withstanding loads on either side in the width direction applied when hoisting the trolley 9.

[0095] The jig 1 installed on the beam steel material 8 restrains the upper flange 82 of the beam steel material 8 with the first and second guide rollers 71, 72 and the first and second under rollers 73, 74, so it can move on the beam steel material 8, and installation is completed simply by moving it, and it can be used for lifting and suspending work. As shown in Figure 22, a worker on the bucket of the aerial work platform pushes the jig 1 that was once installed on the beam steel material 8 directly above the bucket, and installs it outside the bucket (Step 4). This makes it possible to perform the lifting work of the first and second division bodies 91, 92 of the trolley 9 without the rope 99 hanging on the bucket, and installation of the jig 1 is completed.

[0096] As described above, the installation method of the jig 1 of the embodiment includes a first step of abutting the upper corners of the upper flanges 82 on both sides against the V-shaped grooves 713, 723 of the first and second guide rollers 71, 72 with the first and second under-rollers 73, 74 positioned below the upper flange 82, as shown in Figures 18(A) and 18(B).

[0097] In the first step, the jig 1, in which the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 are spaced apart by a distance greater than the width of the upper flange 82, is temporarily placed on the beam steel material 8 by abutting the first and second guide surfaces 4221, 5221 against the upper surface of the upper flange 82. While constantly keeping the first and second guide surfaces 4221, 5221 in contact with the upper surface of the upper flange 82, the first and second support parts 4, 5 are moved inward in the width direction by the connecting parts 6, so that the upper corners of the upper flanges 82 on both sides are abutted against the V-shaped grooves 713, 723 of the first and second guide rollers 71, 72.

[0098] 18(C) and 18(D), the method of installing the jig 1 includes a second step of using the connecting parts 6 to move the first and second support parts 4, 5 inward in the width direction of the jig 1 from the first step, thereby sandwiching the upper flange 82 from both sides with the first and second guide rollers 71, 72, and sandwiching each of the upper flanges 82 on both sides from above and below with the first and second guide rollers 71, 72 and the first and second under rollers 73, 74. In the second step, as the first and second support parts 4, 5 move inward in the width direction of the jig 1, they move upward due to the upward reaction force received from the first and second guide rollers 71, 72, and the first and second under rollers 73, 74 come into contact with the lower surface of the upper flange 82.

[0099] (Effects of the embodiment) The installation and removal of the jig 1 and the trolley 9 on the beam steel material 8 is performed using a temporary scaffold or the bucket of an aerial work vehicle. The jig 1 needs to be installed in a position on the beam steel material 8 that is offset from the temporary scaffold or the bucket so that the rope 99 does not get caught on the temporary scaffold or the bucket when the trolley 9 is hoisted up and lowered. The installation and removal of the jig 1 and the trolley 9 includes work that requires strength. When using conventional jigs, workers need to perform these physically demanding tasks in an unstable position leaning over the temporary scaffold or the bucket, requiring safety measures.

[0100] The jig 1 of this embodiment is installed on the beam steel material 8 by sandwiching the upper flange 82 of the beam steel material 8 from both sides with the first and second guide rollers 71, 72, and sandwiching the upper flanges 82 on both sides from above and below with the first and second guide rollers 71, 72 and the first and second under rollers 73, 74. Therefore, the jig 1 can handle the load applied when the first and second divided bodies 91, 92 of the trolley 9 are lifted using the first and second support arms 2, 3. In addition, the jig 1 can be moved stably on the beam steel material 8 by a worker pushing the jig 1 by hand, and can be installed simply by moving it. The jig 1 can be moved on the beam steel material 8 with the trolley 9 and the chain block lifted.

[0101] As a result, a worker on the temporary scaffolding or on the bucket of the aerial work vehicle can install the jig 1 outside the temporary scaffolding or bucket by simply pushing the jig 1 on the beam steel material 8 to the outside of the temporary scaffolding or bucket after installing the jig 1 on the beam steel material 8 directly above. When removing the jig 1, a worker on the temporary scaffolding or on the bucket of the aerial work vehicle can pull the jig 1 installed outside the temporary scaffolding or outside the bucket to the beam steel material 8 directly above the temporary scaffolding or bucket, and can remove the jig 1 from the beam steel material 8 on the temporary scaffolding or on the bucket. Therefore, in this embodiment, when installing and removing the jig 1, it is not necessary to perform work that requires force in an unstable state of leaning out from the temporary scaffolding or the bucket of the aerial work vehicle, and the safety and workability of the installation and removal work of the jig 1 can be improved. In this embodiment, when installing the trolley 9, a worker on the temporary scaffold or on the bucket of the aerial work vehicle and a worker on the ground use the jig 1 installed outside the temporary scaffold or outside the bucket to hoist the first and second divided bodies 91, 92 of the trolley 9. Then, a worker on the temporary scaffold or on the bucket of the aerial work vehicle can pull the jig 1 with the first and second divided bodies 91, 92 hoisted up to the beam steel material 8 directly above the temporary scaffold or the bucket of the aerial work vehicle. Then, the worker connects the first and second divided bodies 91, 92 to install the trolley 9 on the beam steel material 8. When removing the trolley 9, a worker on the temporary scaffold or on the bucket of the aerial work vehicle moves the jig 1 to the beam steel material 8 directly above the temporary scaffold or the bucket. Next, the worker moves the trolley 9 directly under the jig 1, and slings the first and second division bodies 91, 92 of the trolley 9 in a connected state to the jig 1 directly above the trolley 9. Next, the worker separates the trolley 9 into the first and second division bodies 91, 92, and hangs the first and second division bodies 91, 92 from the jig 1 directly above. The worker pushes the jig 1 with the first and second division bodies 91, 92 hanging therefrom, and installs it outside the temporary scaffolding or outside the bucket of the aerial work vehicle. Then, the worker on the temporary scaffolding or on the bucket of the aerial work vehicle and the worker on the ground hang the first and second division bodies 91, 92 to the ground using the jig 1. In this way, by using the jig 1 of this embodiment when installing or removing the trolley 9, it is possible to eliminate the need to perform forceful work in an unstable position leaning over the temporary scaffolding or the bucket of the aerial work vehicle, which leads to improved safety when installing or removing the trolley 9. In particular, when the trolley 9 is large and the first and second divided bodies 91, 92 are heavy, this effect of being able to perform the connecting work of the first and second divided bodies 91, 92 in a stable position on the temporary scaffolding or the bucket of the aerial work vehicle is remarkable. In addition, the same effect can be achieved when using the jig 1 of this embodiment when connecting or removing a chain block to the trolley 9.

[0102] The first and second support parts 4, 5 that support the first and second support arms 2, 3 are connected by a screw shaft 61 so as to be able to approach and separate in the width direction of the jig 1. Therefore, the force of the screw shaft 61 pulling the first and second support parts 4, 5 toward the inside of the jig 1 in the width direction can counter the tensile force applied to the first and second support parts 4, 5 in the width direction of the jig 1 when the first and second divided bodies 91, 92 are lifted.

[0103] When lifting is performed on the first support part 4 side, a force is applied to the second support part 5 connected to the first support part 4 by the screw shaft 61, which tends to lift the second support part 5. However, the second under-roller 74 of the second support part 5 presses down the underside of the upper flange 82 on the second support part 5 side, so that the second support part 5 can be prevented from lifting up. Similarly, when lifting is performed on the second support part 5 side, a force is applied to the first support part 4 connected to the second support part 5 by the screw shaft 61, which tends to lift the first support part 4. However, the first under-roller 73 of the first support part 4 presses down the underside of the upper flange 82 on the first support part 4 side, so that the first support part 4 can be prevented from lifting up.

[0104] By turning the adjustment handle 622 to rotate the screw shaft 61, the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 can be moved closer to or farther apart via the first and second support parts 4, 5. The movable direction of the conventional V-shaped clamp members that clamp the beam steel material 8 from both sides is the circumferential direction around the axis. On the other hand, in this embodiment, the movable direction of the first and second support parts 4, 5 that support the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 is the width direction of the jig 1, so that the movable range can be made wider, and the width range of the upper flange 82 of the beam steel material 8 on which the jig 1 can be installed can be made wider. In this embodiment, the joint 613 connecting the first screw portion 611 and the second screw portion 612 can be replaced depending on the width of the upper flange 82 of the beam steel material 8. This further widens the range of widths of the beam steel material 8 that the jig 1 can accommodate. In the jig 1 of this embodiment, the range of widths of the upper flange 82 of the beam steel material 8 that is an I-beam and H-beam that can be installed is, for example, 75 to 200 mm when a short joint 613 is used, and is, for example, 175 to 300 mm when a long joint 613 is used.

[0105] From a state in which the upper corners of the upper flange 82 abut against the grooves 713, 723 of the first and second guide rollers 71, 72, simply by turning the adjustment handle 622 to bring the first and second support parts 4, 5 closer to each other, the first and second under-rollers 73, 74 can be moved upward to abut against the undersides of the upper flanges 82 on both sides, and the jig 1 can be installed on the beam steel material 8.

[0106] Since the first and second guide rollers 71, 72 can move up and down relative to the first and second roller shafts 711, 721, the first and second under rollers 73, 74 can be moved upward to abut against the underside of the upper flange 82 according to the thickness of the upper flange 82 of the beam steel material 8. Therefore, in this embodiment, the range of thicknesses of the upper flange 82 of the beam steel material 8 that can be installed in the jig 1 can be widened. In the jig 1 of this embodiment, the range of thicknesses of the upper flange 82 of the beam steel material 8 that is an I-beam steel and an H-beam steel that can be installed is, for example, 8 to 39 mm. In addition, the height of the beam steel material 8 that is an I-beam steel and an H-beam steel that can be installed in the jig 1 is, for example, 200 mm or more.

[0107] The first and second guide surfaces 4221, 5221 of the jig 1 are brought into contact with the upper surface of the upper flange 82 with the first and second guide rollers 71, 72 and the first and second under rollers 73, 74 spaced apart by a distance greater than the width of the upper flange 82, thereby temporarily placing the jig 1 on the beam steel material 8. After the jig 1 of this embodiment is installed at the temporarily placed position, the trolley 9 can be pushed to move the jig 1 over the beam steel material 8 to the position where it is desired to hoist the jig 1, and the jig 1 can be installed at that position.

[0108] In the jig 1 temporarily placed on the beam steel material 8, by turning the adjustment handle 622 to bring the first and second support parts 4, 5 closer to each other, the first and second guide rollers 71, 72 approach each other with the first and second guide surfaces 4221, 5221 always in contact with the upper surface of the upper flange 82, and the upper corners of the upper flanges 82 on both sides can be abutted against the grooves 713, 723 of the first and second guide rollers 71, 72. By further turning the adjustment handle 622 from this state to bring the first and second support parts 4, 5 closer to each other, the first and second under-rollers 73, 74 can be abutted against the lower surfaces of the upper flanges 82 on both sides, and the jig 1 can be installed on the beam steel material 8.

[0109] Thus, in this embodiment, with the jig 1 temporarily placed on the beam steel material 8, it is possible to fix the jig 1 in the left-right and up-down directions relative to the beam steel material 8 with just one action of turning the adjustment handle 622. Therefore, in this embodiment, it is possible to easily install the jig 1 and also to shorten the time required for the installation work of the jig 1. In this embodiment, since the adjustment handle 622 can be operated with the jig 1 temporarily placed on the beam steel material 8 by the first and second guide surfaces 4221, 5221, it is possible to stably install the jig 1 by one person even at a high place.

[0110] In this embodiment, the upper corner of the upper flange 82 on one side is held down by two first guide rollers 71 spaced apart in the length direction of the beam steel material 8, and the upper corner of the upper flange 82 on the other side is held down by two second guide rollers 72 spaced apart in the length direction of the beam steel material 8. Therefore, in this embodiment, the first and second support parts 4 and 5 can be sufficiently resisted against the force that twists the jig 1 in the width direction. In this embodiment, the first and second under rollers 73 and 74 are provided between the two first and second guide rollers 71 and 72 in the length direction of the beam steel material 8, respectively, so that the jig 1 can be made smaller. Also, in this embodiment, only one each of the first and second under rollers 73 and 74 is provided, so that the jig 1 can be made lighter in weight.

[0111] Since the first and second temporary support arms 422, 522 are offset from each other in the longitudinal direction of the beam steel material 8, the width of the first and second support parts 4, 5 can be narrowed without the first and second temporary support arms 422, 522 colliding with each other, allowing the jig 1 to be kept compact when stored, etc.

[0112] The first support frames 42A and 42B supporting the first and second guide rollers 71 and 72 pass through the first opening 412 of the first body plate 41, with their upper ends positioned inside the first body plate 41 and their lower ends positioned outside the first body plate 41. The first support frames 42A and 42B are provided at the same position in the length direction of the beam steel material 8 as the base ends 211 of the corresponding first support angles 21A and 21B. The upper ends of the first support frames 42A and 42B overlap with the lower parts of the base ends 211 in the height direction and are fixed to the first body plate 41 together with the lower parts of the base ends 211 by the screws 411. The same is true for the second support frames 52A and 52B. This allows the jig 1 to be a strong structure with a simple configuration, and the plate thicknesses of the first and second body plates 41 and 51 can be thinned, resulting in a reduction in weight.

[0113] Using a single rope 99 and jig 1, the first and second division bodies 91, 92 of the trolley 9 can be lifted and suspended separately on both sides of the beam steel material 8, and the lifting and suspension positions can be fixed by the first and second brakes 28, 38. The first and second handles 281, 381 are provided on the support plates 212, 312 on the outer sides of the jig 1 in the width direction of the first and second support arms 2, 3, and the first and second handles 281, 381 are located at low positions, allowing for good operability. By turning the first and second handles 281, 381, it is possible to easily switch with light force between a brake fixed state in which the first and second stoppers 282, 382 are pressed against the rope 99 and a brake released state in which they are removed from the rope 99.

[0114] When working without using the adjustment handle 622 or when storing the jig 1, the handle shaft 621 of the jig 1 can be shortened and folded so that the adjustment handle 622 does not get in the way. In this embodiment, the handle shaft 621 can be extended or retracted, and the length of the handle shaft 621 can be set to a length that is easy to work with depending on the width of the beam steel material 8. The handle shaft 621 has a notch, and can be extended in stages depending on the size of the beam steel material 8. When temporarily placing the jig 1, the adjustment handle 622 can be positioned close to the second handle 381 of the second stopper 38, thereby improving operability and portability. By making the jig 1 from an aluminum alloy (suralumin), the total weight including the first and second movable pulleys 93 and 94 can be set to, for example, 10.5 kg, and both weight reduction and strength can be achieved. [Explanation of symbols]

[0115] 1... Lifting jig 2...First support arm 3…Second support arm 4...First support part 5…Second support part 6...Connection part 8…Beam steel material 9. Trolley 29…1st fixed pulley 39…Second fixed pulley 71…First guide roller 72...Second guide roller 81…Lower flange 82…Upper flange 91...first division body 92…Second division body 93…First movable pulley 94…Second movable pulley 73…First under roller 74…Second under roller 713...Groove 723…Groove 911, 921...wheels

Claims

1. A lifting jig for attaching the trolley to a lower flange on both sides of a beam steel material, which is an I-beam or H-beam steel, that is spanned at a height by connecting a first division body and a second division body of the trolley, each of which has one of a pair of wheels, with the pair of wheels placed on the lower flanges on both sides of the beam steel material, the jig comprising: a first support arm for supporting a first fixed pulley above and on one side of the beam steel material and for hoisting the first movable pulley on which the first divided body is suspended to one side of the beam steel material using the first fixed pulley; A first support portion that supports the first support arm; A first guide roller supported by the first support portion and guided to an upper corner portion of the upper flange on one side of the beam steel by a V-shaped groove formed along an outer circumferential surface; a first under roller that contacts a lower surface of the upper flange on one side and vertically sandwiches the first guide roller and the upper flange on one side; A second support arm supports a second fixed pulley above and on the other side of the beam steel, and uses the second fixed pulley to hoist the second movable pulley from which the second divided body is suspended to the other side of the beam steel; A second support portion that supports the second support arm; A second guide roller is supported by the second support portion, and is guided to an upper corner of the upper flange on the other side of the beam steel by a V-shaped groove formed along an outer circumferential surface thereof, and sandwiches the first guide roller and the upper flange from both sides. a second under roller that contacts a lower surface of the upper flange on the other side and vertically sandwiches the second guide roller and the upper flange on the other side; A lifting jig characterized in that it is mounted on the beam steel material so as to be movable in the longitudinal direction of the beam steel material.

2. a connecting portion that connects the first and second support portions so that the first and second support portions can approach and move away from each other in a width direction of the lifting jig; The connecting portion is A screw shaft extending in the width direction, having a first screw portion screwed into the first support portion on one side in the width direction, and a second screw portion screwed into the second support portion and having a reverse screw relationship with the first screw portion on the other side in the width direction; The lifting jig described in claim 1, characterized in that it is equipped with an operating unit for rotating the screw shaft to move the first and second support parts to a first position where the first and second guide rollers and the first and second under rollers are spaced apart by a distance greater than the width of the upper flange, and a second position where the first and second guide rollers sandwich the upper flange from both sides and the first and second guide rollers and the first and second under rollers sandwich each of the upper flanges on both sides from above and below.

3. the first support portion includes a first roller shaft inclined downward and outward in the width direction, the first guide roller being provided so as to be movable in the axial direction, and a first elastic member that biases upward the first guide roller that moves downward with respect to the first roller shaft from a state in which the first guide roller is located above the first roller shaft, the second support portion includes a second roller shaft inclined downward and outward in the width direction, on which the second guide roller is provided so as to be movable in the axial direction, and a second elastic member that biases upward the second guide roller that moves downward with respect to the second roller shaft from a state in which the second guide roller is located above the second roller shaft, the first and second support portions are moved by the connecting portions from a third position in which the corners of the upper flanges on both sides abut against the V-shaped grooves of the first and second guide rollers with the first and second under-rollers positioned below the upper flanges, to the second position; The lifting jig described in claim 2, characterized in that as the first and second support parts move from the third position to the second position, they move upward due to upward reaction forces received from the first and second guide rollers, causing the first and second under rollers to abut against the underside of the upper flange.

4. the first support portion includes a first guide surface located on the inner side in the width direction of the first guide roller when the first guide roller is located on the upper part of the first roller shaft, and the first guide surface is capable of contacting an upper surface of the upper flange on the one side together with the first guide roller when the first guide roller is located on the upper part of the first roller shaft, the second support portion includes a second guide surface located on the inner side in the width direction of the second guide roller when the second guide roller is located on the upper part of the second roller shaft, and the second guide surface is capable of contacting an upper surface of the upper flange on the other side together with the second guide roller when the second guide roller is located on the upper part of the second roller shaft, The lifting jig described in claim 3, characterized in that when the lifting jig with the first and second support parts positioned at the first position is placed on the beam steel by abutting the first and second guide surfaces against the upper surface of the upper flange, the first and second guide surfaces are constantly in contact with the upper surface of the upper flange while the first and second support parts move from the first position to the third position by the connecting part.

5. The first guide rollers are provided in two positions spaced apart from each other in the longitudinal direction, and the first under roller is provided between the two first guide rollers in the longitudinal direction, The lifting jig described in any one of claims 1 to 4, characterized in that the second guide rollers are provided in two positions spaced apart in the longitudinal direction, and the second under roller is provided between the two second guide rollers in the longitudinal direction.

6. The first guide rollers are provided in pairs spaced apart from each other in the length direction, and the second guide rollers are provided in pairs spaced apart from each other in the length direction, The first support arm has an L-shape in a plan view with a base end bent outward in the length direction along the width direction, and includes a pair of first support angles that support the first fixed pulley, The first support portion is a first body plate along the length direction, the first body plate having a pair of first openings aligned in the length direction; a pair of first support frames formed in a U-shape that opens downward and inward in the width direction, supporting both ends of the first roller shaft with both arms, passing through the first opening, with upper ends positioned inside the first body plate and lower ends positioned outside the first body plate; Each of the first support frames is provided at the same position as the corresponding base end in the longitudinal direction, and an upper end is fixed to the first main body plate by a fixing member together with a lower part of the base end that overlaps with the upper end in the height direction; The second support arm has an L-shape in a plan view with a base end bent outward in the length direction along the width direction, and includes a pair of second support angles that support the second fixed pulley, The second support portion is a second body plate along the length direction having a pair of second openings aligned in the length direction; a pair of second support frames each formed in a U-shape that is open downward and inward in the width direction, supporting both ends of the second roller shaft with both arms, passing through the second opening, with an upper end located inside the second body plate and a lower end located outside the second body plate; A lifting jig as described in any one of claims 1 to 4, characterized in that each second support frame is provided at the same position in the longitudinal direction as the corresponding base end, and its upper end is fixed to the second main plate together with the lower part of the base end which overlaps in the height direction by a fixing member.

7. a first brake that can be switched between a brake fixed state in which a first stopper is pressed against the rope wound around the first fixed pulley to fix the lifting position of the first divided body and a brake released state in which the first stopper is released from the rope by operating a first handle installed on the outer side portion of the lifting jig in the width direction of the first support arm; A lifting jig as described in any one of claims 1 to 6, characterized in that it is equipped with a second brake that can be switched between a brake fixed state in which a second stopper is pressed against the rope wound around the second fixed pulley to fix the lifting position of the second section, and a brake released state in which the second stopper is released from the rope, by operating a second handle installed on the outer side portion of the second support arm in the width direction.

8. A method for installing a lifting tool, comprising: connecting a first division body and a second division body of a trolley, each of which has one of a pair of wheels, so that the pair of wheels are placed on lower flanges on both sides of a beam steel material, which is an I-beam or H-beam steel, that is spanned at a height; and installing a lifting tool for attaching the trolley to the lower flanges on the beam steel material so as to be movable in the longitudinal direction of the beam steel material, The lifting jig is a first support arm for lifting the first divided body to one side of the beam steel material using a first fixed pulley; a first support part for supporting the first support arm; a first guide roller supported by the first support part and having a V-shaped groove formed along an outer circumferential surface; and a first under roller supported by the first support part; a second support arm for lifting the second divided body to the other side of the beam steel material using a second fixed pulley; a second support part for supporting the second support arm; a second guide roller supported by the second support part and having a V-shaped groove formed along an outer circumferential surface; and a second under roller supported by the second support part; a connecting portion that connects the first and second support portions and moves the first and second support portions in a width direction of the lifting jig, the first support portion includes a first roller shaft inclined downward and outward in the width direction, the first guide roller being axially movable, and a first elastic member that biases upward the first guide roller that moves downward from a state where the first guide roller is located above the first roller shaft; the second support portion includes a second roller shaft inclined downward and outward in the width direction, on which the second guide roller is movably provided in the axial direction, and a second elastic member that biases upward the second guide roller that moves downward from a state in which the second guide roller is located above the second roller shaft, The installation method includes: a first step of contacting upper corners of both upper flanges with the V-shaped grooves of the first and second guide rollers in a state in which the first and second under rollers are positioned below the upper flanges; a second step of moving the first and second support parts inward in the width direction by the connecting parts from the first step, thereby sandwiching the upper flange from both sides with the first and second guide rollers, and sandwiching each of the upper flanges on both sides vertically with the first and second guide rollers and the first and second under rollers, A method for installing a lifting jig, characterized in that in the second step, as the first and second support parts move inward in the width direction, they move upward due to the upward reaction force received from the first and second guide rollers, causing the first and second under-rollers to abut against the underside of the upper flange.

9. the first support portion includes a first guide surface located on the inner side in the width direction of the first guide roller when the first guide roller is located on the upper part of the first roller shaft, and the first guide surface is capable of contacting an upper surface of the upper flange on the one side together with the first guide roller when the first guide roller is located on the upper part of the first roller shaft, the second support portion includes a second guide surface located on the inner side in the width direction of the second guide roller when the second guide roller is located on the upper part of the second roller shaft, and the second guide surface is capable of contacting an upper surface of the upper flange on the other side together with the second guide roller when the second guide roller is located on the upper part of the second roller shaft, A method for installing a lifting jig as described in claim 8, characterized in that in the first step, the lifting jig, in which the first and second guide rollers and the first and second under rollers are spaced apart by a distance greater than the width of the upper flange, is placed on the beam steel by abutting the first and second guide surfaces against the upper surface of the upper flange, and then, while constantly keeping the first and second guide surfaces in contact with the upper surface of the upper flange, the first and second support parts are moved inward in the width direction by the connecting parts, thereby abutting the upper corners of the upper flanges on both sides against the V-shaped grooves of the first and second guide rollers.

Citation Information

Patent Citations

  • JP1979009474U

  • For amine - crane truck floating prevention device

    JP1985170388U

  • JP1990108994U

  • Lifting conveying device having auxiliary support device

    JP1992251095A

  • Lifting tool and lifting method

    JP2020083487A