Lining concrete pouring method

The use of extruded polystyrene foam in tunnel construction stabilizes installation and prevents concrete leakage by improving workability and reducing the need for heavy air bulks, addressing the instability and handling issues of traditional air bulk methods.

JP7557255B2Active Publication Date: 2024-09-27OKUMURA CORP
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2021150218
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-09-15
Publication Date
2024-09-27
Estimated Expiration
2041-09-15

AI Technical Summary

Technical Problem

The construction method using air bulk in tunnel construction results in unstable installation due to reduced contact area between cylindrical air bulks, poor workability due to the weight and length of air bulks, and difficulty in handling, leading to concrete leakage during lining concrete placement.

Method used

The method involves using extruded polystyrene foam, which is lightweight and easy to handle, installed between the inner formwork and shotcrete, with air bulks expanded to stabilize the installation and prevent concrete leakage, and optionally applying a release treatment to improve peelability.

Benefits of technology

The method stabilizes the installation, improves workability, and effectively prevents concrete leakage by using lightweight extruded polystyrene foam, reducing the need for heavy air bulks and enhancing the ability to handle and reuse materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007557255000011
    Figure 0007557255000011
  • Figure 0007557255000004
    Figure 0007557255000004
  • Figure 0007557255000005
    Figure 0007557255000005
Patent Text Reader

Abstract

To provide a lining concrete placing method capable of simply preventing outflow of concrete from a gable side of a form of tunnel lining when the lining concrete is placed between the inner form of the form of tunnel lining and shotcrete.SOLUTION: A form of tunnel lining C comprising an inner form extending in the extension direction of a tunnel and curved in the transverse direction of the tunnel and a flange Cb installed so as to protrude outward in the tunnel transverse direction on a gable side of the inner form, is installed at a position where the shotcrete 12 is placed. Between the inner form Ca and the shotcrete 12 along the flange Cb, at least one layer of extruded polystyrene foam PF, which is a long plate member having a predetermined thickness, is installed. A long air bulk AB is inflated and installed in one layer. A space between the inner form Ca on the gable side and the shotcrete 12 is closed, and the lining concrete is placed in the space 13g formed by the inner form Ca and the shotcrete 12.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for pouring lining concrete, and more particularly to a technique that is effective when applied to pouring lining concrete in the construction of mountain tunnels. [Background technology]

[0002] In the construction of mountain tunnels, the blasting method is used, in which dynamite is planted in the rock and then exploded to excavate the tunnel. This method involves spraying concrete into the excavated area, allowing it to harden, and installing rock bolts in the rock, using the natural rock's own holding power to hold the tunnel in place. After the rock bolts are installed, a semi-cylindrical formwork called a center is fitted into the excavated area, and lining concrete is poured (filled) between the sprayed concrete and the center to complete the construction.

[0003] Here, air bulk is used to prevent concrete from leaking out from the gable side of the center tube when filling the gap between the center tube and the shotcrete (pouring the lining concrete).

[0004] That is, as shown in Fig. 11, which is a cross-sectional view in the tunnel extension direction, and Fig. 12, which is a cross-sectional view along line ZZ in Fig. 11, the center C comprises an inner formwork Ca arranged opposite the shotcrete 12 through which the rock bolts B pass, and a flange Cb installed on the gable side of the inner formwork Ca so as to protrude outward in the tunnel crossing direction of the inner formwork Ca. An air bulk AB not filled with air is installed on the inner formwork Ca on the flange Cb side, and air is filled into the air bulk AB to expand it so that it is in close contact with the shotcrete 12, and lining concrete is poured into the space 13g between the inner formwork Ca and the shotcrete 12.

[0005] In addition, when the gap between the gable side of the inner formwork Ca and the shotcrete 12 becomes large, multiple air bulks AB are used in layers to seal the gap, as shown in the figure.

[0006] 11 and 12, reference symbol G denotes the natural ground, reference symbol S denotes a steel support, and reference symbol 11 denotes temporary shotcrete for holding the steel support S.

[0007] One known technology that describes tunnel construction using air bulk is, for example, Patent Document 1 (JP 2017-223013 A). [Prior art documents] [Patent documents]

[0008] [Patent Document 1] JP 2017-223013 A Summary of the Invention [Problem to be solved by the invention]

[0009] However, the construction method using the Air Bulk AB described above has the following problems.

[0010] That is, when the air bulk AB is expanded, its shape becomes cylindrical. When the air bulk AB is used in a stacked manner, the cylindrical air bulk AB is placed on top of the cylindrical air bulk AB, and when considering the cross section of the air bulk AB, it becomes like a curved surface is being supported by a curved surface, as shown in Figure 11. As a result, the contact area between the air bulks AB becomes smaller, making the installation unstable and worsening workability.

[0011] In addition, the air bulks AB are long and about 4m long, and therefore heavy (for example, an air bulk with a diameter of 150mm weighs about 6kg, and an air bulk with a diameter of 200mm weighs about 8kg), making it extremely difficult to install them in the transverse direction on the inner formwork Ca of the center C.

[0012] The present invention has been made in view of the above-mentioned technical background, and has an object to provide a method for pouring lining concrete that can easily prevent concrete from flowing out from the gable side of the center tunnel when pouring the lining concrete between the inner formwork of the center tunnel and the shotcrete. [Means for solving the problem]

[0013] In order to solve the above problems, the method of pouring lining concrete of the present invention described in claim 1 is a method of pouring lining concrete in the construction of a mountain tunnel, which comprises: installing a center having an inner formwork extending in the extension direction of the tunnel and curved in the transverse direction of the tunnel and a flange installed on the gable side of the inner formwork so as to protrude outward in the transverse direction of the tunnel; and placing a center at the position where the shotcrete is poured; and placing a center between the inner formwork and the shotcrete along the flange. After placing one layer of long, airless air bulk on the inner formwork side, at least one layer of extruded polystyrene foam, which is a long, plate-like member having a predetermined thickness, is placed on top of the air bulk in accordance with the gap between the inner formwork and the sprayed concrete, and then the air bulk is expanded to close the gap between the inner formwork on the gable side and the sprayed concrete, The method is characterized in that lining concrete is poured into the space formed by the inner formwork and the sprayed concrete.

[0017] Claim 2 The method for pouring lining concrete of the present invention described in Claim 1 In the described invention, the extruded polystyrene foam has cutouts formed at predetermined intervals along the extension direction of the tunnel on one or both sides.

[0018] Claim 3 The method for pouring lining concrete of the present invention described in Claim 1 or 2 In the described invention, the extruded polystyrene foam is characterized in that it has been subjected to a release treatment to improve its releasability from hardened lining concrete.

[0019] Claim 4 The method for pouring lining concrete of the present invention described in Claim 3In the invention described in the above, the peeling treatment is characterized by wrapping the entire extruded polystyrene foam in the short direction with an adhesive tape having a release agent surface, or applying a release agent to the entire extruded polystyrene foam. Effect of the Invention

[0020] According to the present invention, the extruded polystyrene foam has a flat shape in the extension direction of the tunnel. This makes the air bulk more stable and improves workability.

[0021] In addition, by using extruded polystyrene foam, which is lightweight and easy to handle, workability during installation is improved.

[0022] This makes it possible to simply prevent concrete from flowing out from the gable side of the center column when pouring lining concrete between the inner formwork of the center column and the shotcrete. [Brief description of the drawings]

[0023] [Figure 1] FIG. 1A is a plan view of a continuous belt conveyor system used in the construction of a mountain tunnel in accordance with this embodiment, and FIG. 1B is a side view of the continuous belt conveyor system of FIG. [Diagram 2] 1 is a flowchart outlining the construction of a mountain tunnel. [Diagram 3] 1(a) to 1(d) are explanatory diagrams showing the sequence of pouring of lining concrete in the construction of a mountain tunnel according to this embodiment. [Figure 4] This is a cross-sectional view in the tunnel extension direction, including an anti-flow member according to one embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. [Diagram 5] FIG. 5 is a cross-sectional view taken along line WW in FIG. [Figure 6]FIG. 1(a) is an oblique view showing the extruded polystyrene foam used in the outflow prevention member of this embodiment, FIG. 1(b) is an oblique view showing the extruded polystyrene foam of (a) with a notch formed on one side, and FIG. 1(c) is an oblique view showing the extruded polystyrene foam of (a) with notches formed on both sides. [Figure 7] 1 is a cross-sectional view in the direction of tunnel extension including a flow prevention member according to another embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. [Figure 8] FIG. 8 is a cross-sectional view taken along line XX in FIG. [Figure 9] 1 is a cross-sectional view in the tunnel extension direction including a flow prevention member as yet another embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. [Figure 10] 10 is a cross-sectional view taken along line YY in FIG. 9. [Figure 11] FIG. 1 is a cross-sectional view in the direction of tunnel extension, including a conventional anti-flow member that is installed when pouring lining concrete in the construction of a mountain tunnel. [Figure 12] FIG. 12 is a cross-sectional view taken along line ZZ in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In the drawings for explaining the embodiment, the same components are generally designated by the same reference numerals, and the repeated description will be omitted.

[0025] The method of pouring lining concrete in this embodiment is particularly applicable to pouring lining concrete in the construction of mountain tunnels.

[0026] In the construction of mountain tunnels, a blasting method is used, in which dynamite is planted in the rock and then exploded to excavate the tunnel. This method is called NATM (New Austrian Tunneling Method), in which concrete is sprayed into the excavated area, hardened, and rock bolts are installed in the rock, and the tunnel is maintained by utilizing the holding power of the natural ground.

[0027] First, a configuration example of a continuous belt conveyor system used in the construction of a mountain tunnel according to this embodiment will be described with reference to Fig. 1. Here, Fig. 1(a) is a plan view of the continuous belt conveyor system used in the construction of a mountain tunnel according to this embodiment, and Fig. 1(b) is a side view of the continuous belt conveyor system of Fig. 1(a).

[0028] The continuous belt conveyor system 1 shown in the figure is a system for transporting debris (excavated material) generated when the face K of a tunnel T is excavated by blasting to the entrance of the tunnel T, and a crusher 2, a tailpiece cart 3, and a belt conveyor 4 are arranged in a vertical line in that order from the face K to the entrance.

[0029] The crusher 2 is a self-propelled crusher that crushes the rubble generated by blasting into a size that can be transported by the belt conveyor 4. The tailpiece cart 3 is a self-propelled relay transport device that transports the rubble crushed by the crusher 2 to the belt conveyor 4, and is installed at the end of the belt conveyor 4 (i.e., the face K side of the belt conveyor 4). The belt conveyor 4 is a transport device that loads the rubble transported via the tailpiece cart 3 onto a long transport belt 4a and transports it toward the mouth of the tunnel T, and is installed in a state of continuously extending from the rear end of the tailpiece cart 3 to the mouth side of the tunnel T. Furthermore, the continuous belt conveyor system 1 is provided with a belt storage 5 that stores the surplus belt (stretching belt) and provides an appropriate tension to the belt 4a.

[0030] In addition to the above, the continuous belt conveyor system 1 is also provided with a belt splicing stand (not shown) for joining the belt 4a when the excess belt stored in the belt storage 5 runs out, a main drive (not shown) which is the main driving device for driving the belt 4a in a circular motion, a booster drive (not shown) which drives the belt 4a in the daytime section of the belt conveyor 4, and ventilation and electrical equipment (not shown) for controlling each device.

[0031] In addition, the continuous belt conveyor system 1 is shifted to one side in the width direction of the tunnel T, and the other side in the width direction of the tunnel T can be used as a passage for various heavy machinery such as a spraying machine (not shown) for spraying concrete on the wall surface of the excavated rock, a face drilling machine (not shown) for drilling holes (charge holes) for loading blasting in the face K, a self-propelled side dump 7 equipped with a shovel 7a for loading rubble generated by blasting onto the crusher 2, a backhoe, and a breaker (not shown) for performing work such as crushing, excavating, and breaking the rock. Furthermore, a material storage area (not shown) for storing rock bolts, steel supports, and the like is allocated to the work site.

[0032] In the continuous belt conveyor system 1, during blasting, the tip of the crusher 2 located at the front is positioned so that it cannot be reached by debris scattered from the face K. This makes it possible to prevent damage to the crusher 2, tailpiece cart 3, and belt conveyor 4 caused by debris scattered from the face K during blasting. Then, when transporting the debris after blasting, the side dump 7 moves toward the face K, and the excavated debris is thrown into the crusher 2 by the shovel 7a.

[0033] In Fig. 1(b), the dotted lines extending to the left and right indicate the area of ​​the shotcrete in the longitudinal direction of the tunnel T, and the symbol B indicates a rock bolt installed in the concrete. The shotcrete and the rock bolt B will be described later.

[0034] Next, an outline of the construction of mountain tunnels will be explained using the flowchart in Figure 2.

[0035] First, as described above, charge holes are drilled in the tunnel face (step St01), explosives are loaded (step St02), and blast excavation is performed (step St03). Then, the debris is removed (step St04).

[0036] Next, it is determined whether or not to install steel supports S (Figs. 4, 6, 9) based on the state of the rock mass, etc. (Step St05), and if it is to be installed, concrete is temporarily sprayed (Step St06), and the steel supports S are erected (Step St07). If the steel supports S are erected in Step St07, concrete is sprayed onto the surface of the temporarily sprayed concrete, or directly onto the surface of the natural ground G (Figs. 4, 5, 7-10) if the steel supports S are not to be installed in Step St05 (Step St08), and rock bolts B (Figs. 4, 6, 9) are installed (Step St09).

[0037] In this application, concrete sprayed when installing steel shoring S is referred to as temporary shotcrete 11 (Figs. 4, 5, 7-10), and concrete sprayed onto the surface of the ground G without installing temporary shotcrete 11 or steel shoring S is simply referred to as shotcrete 12 (Figs. 4, 5, 7-10). In this application, it is assumed that the steel shoring S has been erected, and the shotcrete 12 is sprayed onto the temporary shotcrete 11. However, this does not exclude the case where the shotcrete 12 is sprayed directly onto the ground G without erecting the steel shoring S.

[0038] Now, once the rock bolt B has been installed in step St09, a waterproof sheet is applied as necessary to prevent water leakage into the tunnel, a center is fitted, and lining concrete is poured between the shotcrete 12 applied in step St08 and the center, for finishing work (step St10). The pouring of lining concrete is carried out, for example, every other day. Then, it is determined whether the series of work has been completed (step St11), and if so, the construction of the tunnel is terminated. If the work has not been completed in step St11, the process returns to step St01 and the subsequent steps are repeated.

[0039] Here, the pouring of the lining concrete 13 will be described with reference to Fig. 3. As shown in the figure, the center C is a semi-cylindrical formwork that can be moved on a steel rail (not shown) in order to pour the lining concrete 13 into the shotcrete 12 portion of the tunnel T. As shown in the figure, the center C includes an inner formwork Ca that extends in the extension direction of the tunnel T and curves in the transverse direction of the tunnel T, and a flange Cb that is installed on the end side of the center C so as to protrude outward in the transverse direction of the tunnel. Then, while the center C is being moved, the lining concrete 13 is poured into a space 13g between the center C and the shotcrete 12.

[0040] That is, as shown in Fig. 3(a), the inner formwork Ca of the center C is moved to the pouring position for the lining concrete (i.e., the position where the shotcrete 12 is poured), and then, as shown in Fig. 3(b), a flange Cb is attached to the gable side of the inner formwork Ca. Next, to prevent the poured concrete from flowing out from the gable side of the center C, as shown in Fig. 3(c), a flow prevention member 14 (details will be described later) is installed between the inner formwork Ca along the flange Cb and the shotcrete 12 to block the space between the inner formwork Ca and the shotcrete 12 on the gable side. Then, as shown in Fig. 3(d), the lining concrete 13 is poured into the space 13g formed by the inner formwork Ca and the shotcrete 12.

[0041] Here, even if the outflow prevention member 14 is pressed by the lining concrete 13 when pouring and filling the lining concrete 13, the side of the outflow prevention member 14 is pressed against the flange Cb to prevent movement, so the outflow prevention member 14 will not fall from the end side of the center C. In this way, the flange Cb fulfills the function of supporting the outflow prevention member 14 so that it does not fall from the end side of the center C when the lining concrete 13 is poured.

[0042] When pouring the lining concrete 13, as shown in Fig. 3(d), concrete is poured from the bottom up, and finally poured by spraying it up to the ceiling. In this embodiment, the length of the lining concrete 13 poured at one time is, for example, about 10 to 15 m, and the thickness of the lining concrete 13 is, for example, 30 cm or more. However, the values ​​of the lining concrete 13 in the present invention are not limited to these.

[0043] In addition, in this embodiment, the flange Cb is attached to the inner form Ca, but the inner form Ca and the flange Cb may be integrated, so that the attachment of the flange Cb can be omitted.

[0044] Next, the outflow prevention member 14 that is installed when the lining concrete 13 is poured will be described with reference to Figs.

[0045] Figure 4 is a cross-sectional view in the tunnel extension direction including an anti-flow member according to one embodiment of the present invention which is installed when pouring lining concrete in the construction of a mountain tunnel, Figure 5 is a cross-sectional view taken along line WW in Figure 4, and Figure 6 is a perspective view showing the extruded polystyrene foam used in the anti-flow member.

[0046] 4 and 5, the outflow prevention member 14 is made by installing extruded polystyrene foam PF, which is a long plate-like member having a predetermined thickness, and expanding long air bulk AB. The extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the shotcrete 12 side.

[0047] Here, extruded polystyrene foam PF is a plate-shaped component made by melting polystyrene, mixing it with a foaming agent and a flame retardant, and extruding it into a plate shape (see Fig. 6(a)). This extruded polystyrene foam PF can be processed to the desired size during the manufacturing process, and can also be easily cut at the work site. Furthermore, it has high insulation performance, is resistant to water and moisture, and is lightweight, making it easy to handle. The extruded polystyrene foam PF has a length of 910 mm, a width of 225 mm, and a thickness of 50 mm, but the dimensions are not particularly limited.

[0048] In this embodiment, three layers of such extruded polystyrene foam PF are installed along the inner formwork Ca (i.e., with the longitudinal direction of the extruded polystyrene foam PF circumferentially around the tunnel T), and one layer of air-free air bulk AB is placed on top of them (i.e., on the sprayed concrete 12 side) and allowed to expand, thereby utilizing the expansion of the air bulk AB to seal the space between the inner formwork Ca on the gable side and the sprayed concrete 12 with the air bulk AB and the extruded polystyrene foam PF.

[0049] Although three layers of extruded polystyrene foam PF are shown in Figures 7 and 8, which will be described below, there is no need to be three layers. In other words, the number of extruded polystyrene foam PF to be installed is determined according to the thickness of one sheet of extruded polystyrene foam PF, the diameter of the air bulks AB when expanded, and the distance between the inner formwork Ca on the gable side and the shotcrete 12. Therefore, it is not necessary to install three layers, and it is sufficient to install at least one layer. However, only one layer of air bulks AB is installed.

[0050] Depending on the length of the inner formwork Ca in the tunnel cross direction and the length of the extruded polystyrene foam PF, one sheet of the extruded polystyrene foam PF may be sufficient for one layer, or multiple sheets may be required. Similarly, one sheet of the air bulk AB may be sufficient for one layer, or multiple sheets may be required.

[0051] According to this embodiment, the extruded polystyrene foam PF has a flat shape in the extension direction of the tunnel T, so by stacking the extruded polystyrene foam PF and the air bulk AB, it is no longer necessary to support a curved surface with a curved surface, as occurs when a cylindrical air bulk AB is placed on top of a cylindrical air bulk AB (see Figure 11), making the air bulk AB more stable and improving workability.

[0052] In addition, by using extruded polystyrene foam PF, which is lightweight and easy to handle, the use of heavy air bulk AB can be minimized, improving workability during installation.

[0053] This makes it possible to easily prevent concrete from flowing out from the gable side of the center column C when pouring the lining concrete 13 between the inner formwork Ca of the center column C and the shotcrete 12.

[0054] In the case shown in Figures 4 and 5, the extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the shotcrete 12 side, so that expansion provides good conformability to the unevenness of the shotcrete 12, making it possible to more firmly seal the gap between the inner formwork Ca on the gable side and the shotcrete 12.

[0055] As shown in Fig. 6(a), the extruded polystyrene foam PF can be used as it is, but notches PFc may be formed at predetermined intervals along the extension direction of the tunnel T on one side of the extruded polystyrene foam PF as shown in Fig. 6(b) including Figs. 7 to 10 described below, or on both sides of the extruded polystyrene foam PF as shown in Fig. 6(c). As an example, in the case of the extruded polystyrene foam PF of the present embodiment described above (length 910 mm, width 225 mm, thickness 50 mm), notches PFc with a depth of 10 mm are formed at 30 mm intervals. When notches PFc are formed on both sides, the notches PFc are alternately formed on both sides.

[0056] By forming the cutout PFc in this manner, it becomes easy to conform the extruded polystyrene foam PF to the shape of the inner formwork Ca (the shape of the tunnel T), or, when the extruded polystyrene foam PF is installed on the side of the sprayed concrete 12 as shown in Figures 7 and 8 described below, to the shape of the sprayed concrete 12, making it possible to more firmly seal the gap between the inner formwork Ca on the gable side and the shotcrete 12.

[0057] In this embodiment, the cross-sectional shape of the notch PFc along the longitudinal direction of the extruded polystyrene foam PF is triangular, but it may be other shapes such as a rectangle.

[0058] 7 to 10 described below, it is desirable to perform a release treatment on the extruded polystyrene foam PF to improve its releasability from the hardened lining concrete 13. Specific examples of the release treatment include wrapping the entire extruded polystyrene foam PF with an adhesive tape having a release agent surface, or applying a release agent to the entire extruded polystyrene foam PF.

[0059] In this way, the hardened lining concrete 13 adheres to the extruded polystyrene foam PF, preventing the ends of the extruded polystyrene foam PF from tearing off, improving workability when demolding and enabling multiple reuse, improving durability. In addition, since extruded polystyrene foam PF is generally cheaper than Air Bulk AB, costs can be reduced.

[0060] When the extruded polystyrene foam PF is wrapped with adhesive tape, the tape should be wrapped along the short side of the extruded polystyrene foam PF. By wrapping the tape along the short side, the extruded polystyrene foam PF is not easily bent in the longitudinal direction (i.e., along the inner formwork Ca), and the strength of the extruded polystyrene foam PF is improved.

[0061] Here, in the case shown in Figures 4 and 5, the extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the sprayed concrete 12 side, but as shown in Figures 7 and 8, the installation positions of the two can be reversed, with the air bulk AB installed on the inner formwork Ca side, and the extruded polystyrene foam PF installed on the sprayed concrete 12 side.

[0062] In this way, the heavy air bulk AB is placed on the inner formwork Ca, eliminating the need for workers to lift the air bulk AB to a high position (i.e., to the top surface of the extruded polystyrene foam PF), thereby reducing the amount of work required.

[0063] 9 and 10, the gap between the inner formwork Ca on the gable side and the shotcrete 12 may be closed only by the extruded polystyrene foam PF, without using the air bulk AB. In the illustrated example, the extruded polystyrene foam PF is installed in three layers, but it does not have to be three layers. In other words, the number of extruded polystyrene foam PF to be installed is determined according to the thickness of one sheet of extruded polystyrene foam PF and the distance between the inner formwork Ca on the gable side and the shotcrete 12, so it is not necessarily required to install three layers, and it is sufficient to install at least one layer.

[0064] In this way, heavy air bulks AB are no longer necessary, and the space between the inner formwork Ca on the gable side and the sprayed concrete 12 can be sealed using only the comparatively lightweight extruded polystyrene foam PF, thereby reducing the amount of work required.

[0065] The invention made by the inventor has been specifically described above based on the embodiment, but the embodiment disclosed in this specification is illustrative in all respects and is not limited to the disclosed technology. In other words, the technical scope of the present invention should not be interpreted restrictively based on the description in the above embodiment, but should be interpreted strictly according to the description in the claims, and includes technologies equivalent to the described technologies in the claims and all modifications that do not deviate from the gist of the claims. [Industrial Applicability]

[0066] The above explanation shows the application of the present invention to the sealing between the inner formwork on the gable side of the center tunnel and the shotcrete when pouring the lining concrete, but it can also be applied to the flat-backed tunnel lining method (FILM (Flat Insulated Lining Method)). The flat-backed tunnel lining method is a method in which the gap between the uneven parts of the shotcrete and the waterproof sheet installed on the inner formwork is filled with a backfilling material such as mortar to completely bond the waterproof sheet, and in this method, the present invention can be applied to sealing the gap between the inner formwork on the gable side and the shotcrete. [Explanation of symbols]

[0067] 11 Temporary shotcrete 12 Shotcrete 13 Lining concrete 13g space 14 Anti-spill material AB Air Bulk B Rock bolt C Center Ca Inner formwork Cb flange G. Ground PF Extruded Polystyrene Foam PFc Notch S steel shoring T-Tunnel

Claims

1. A method for pouring lining concrete in the construction of a mountain tunnel, comprising: The tunnel is then fitted with a concrete splinter, which is located at the end of the tunnel and extends along the tunnel's length. The concrete splinters are then fitted with a splinter to secure the tunnel to the tunnel's width. A layer of elongated air bulk that does not contain air is placed on the inner formwork side between the inner formwork and the sprayed concrete along the flange, and then at least one layer of extruded polystyrene foam, which is a long plate-like member having a predetermined thickness, is placed on top of the air bulk in accordance with the gap between the inner formwork and the sprayed concrete, and then the air bulk is expanded to close the gap between the inner formwork on the gable side and the sprayed concrete, A lining concrete is poured into the space formed by the inner formwork and the shotcrete. A method for pouring lining concrete.

2. One or both sides of the extruded polystyrene foam have notches formed at predetermined intervals along the extension direction of the tunnel. A method for pouring lining concrete according to claim 1.

3. The extruded polystyrene foam is subjected to a release treatment to improve its releasability from hardened lining concrete.

3. A method for pouring lining concrete according to claim 1 or 2.

4. The peeling treatment is A treatment of wrapping the entire extruded polystyrene foam along the short side direction with an adhesive tape having a release agent surface; Or a treatment of applying a release agent to the entire extruded polystyrene foam.

4. A method for pouring lining concrete according to claim 3.

Citation Information

Patent Citations

  • Open-type TBM synchronous lining method and device

    CN108316946A

  • Construction method of single shield TBM (tunnel boring machine) in urban subway tunnel

    CN108386202A

  • Pattern formwork

    JP1985239208A

  • Gable form device in concrete lining of tunnel

    JP1993010095A

  • End frame set-up method and its device for tunnel covering concrete

    JP1998077796A