Construction elevators and methods for extending the compensating ropes of construction elevators
The construction elevator system simplifies compen rope extension by using a pulley and gripping devices to raise the machine room unit, allowing simultaneous extension and reducing operational complexity and time.
Patent Information
- Application Number
- JP2023559332
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-11-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-11-12
AI Technical Summary
The extension of a compen rope in construction elevators is complicated and requires separate lifting work, making it difficult to expand the operating range of the elevator car.
A construction elevator system with a compen rope reel, pulley, first and second rope gripping devices, and a movable support mechanism that allows the pulley to be raised, enabling simultaneous extension of the compen rope and machine room unit, simplifying the extension process.
The system enables easy and efficient extension of the compen rope, reducing the time required for expanding the operating floor and preventing rope slippage, while maintaining operational efficiency of the elevator.
Smart Images

Figure 0007559261000001 
Figure 0007559261000002 
Figure 0007559261000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction elevator and a method for extending a compensating rope of a construction elevator. [Background technology]
[0002] In recent years, construction elevators have been proposed as elevators that are installed in architectural structures under construction to transport materials and people. These construction elevators expand the range in which the car can ascend and descend, i.e., the range in which it can operate, by raising the machine room unit that contains the hoist and control panel, etc., according to the progress of the construction of the architectural structure. In addition, as the range in which the car can ascend and descend is expanded, the main rope connected to the car is also extended.
[0003] An example of a conventional construction elevator is described in Patent Document 1. In the technology described in Patent Document 1, when the machine room unit is raised, the main rope is held with a predetermined force by a gripping device to prevent the main rope from being pulled out from the main rope reel by its own weight against the worker's will. Then, by raising the machine room unit, the main rope slides on the gripping device, and the main rope is extended.
[0004] In addition, in construction elevators, compensation chains are installed on the car and counterweight to adjust the weight balance between the car and counterweight as they ascend and descend. In addition, in elevators for long journeys, compensation ropes are used instead of compensation chains from the viewpoint of strength. And, as the ascending and descending range of the car expands, this compensation rope needs to be extended. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2001-287881 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, in the case of a compensating rope, it is not possible to extend it by simply adding pieces, as with a compensating chain. The work of lifting the machine room and the work of extending the compensating rope must be carried out separately, making the work of extending the compensating rope very complicated.
[0007] In consideration of the above problems, the present invention has an object to provide a construction elevator that can easily extend a compensating rope and a method for extending a compensating rope of a construction elevator. [Means for solving the problem]
[0008] In order to solve the above problems and achieve the object, a construction elevator includes a compensating rope reel, a lifting body, a pulley, at least one or more first rope gripping devices, and at least one or more second rope gripping devices. A compensating rope is wound around the compensating rope reel. The lifting body is wound with the compensating rope unwound from the compensating rope reel and moves up and down a hoistway of an architectural structure. The pulley is disposed between the compensating rope reel and the lifting body in the compensating rope, and the compensating rope unwound from the compensating rope reel is wound around the pulley. The first rope gripping device releasably grips the compensating rope on the compensating rope reel side relative to the pulley. The second rope gripping device releasably grips the compensating rope on the lifting body side relative to the pulley. The pulley is supported movably along the lifting direction of the lifting body.
[0009] In addition, the method for extending the compensating rope of the construction elevator having the above-mentioned configuration includes the steps (1) to (4) shown below. (1) The process of gripping the compensating rope with the second rope gripping device. (2) A process of releasing the grip of the compensating rope by the first rope gripping device, raising the pulley to a predetermined height along the ascent and descent direction of the lifting body, and pulling out the compensating rope from the compensating rope reel. (3) After raising the pulley to a predetermined height, the process of gripping the compensating rope with the first rope gripping device and releasing the grip of the compensating rope by the second rope gripping device. (4) A process of raising the machine room unit in which the second rope gripping device is installed to a predetermined height. Effect of the Invention
[0010] According to the construction elevator and the compensating rope extension method configured as described above, the compensating rope can be easily extended. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a schematic diagram showing a construction elevator according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing the state of a gripping device during normal operation in the construction elevator according to the first embodiment. [Diagram 3] FIG. 1 shows a method for extending a compensating rope in a construction elevator according to a first embodiment, illustrating the state during movement of a pulley. [Figure 4] FIG. 10 shows a method for extending a compensating rope in a construction elevator according to a first embodiment, and is a diagram showing a state during movement of a machine room unit. [Diagram 5] 5 is a diagram showing the state of the gripping device in the state shown in FIG. 4. [Figure 6] FIG. 11 shows a method for extending a compensating rope in a construction elevator according to a first embodiment, and is a diagram showing the state after the machine room unit has been moved. [Figure 7] 7 is a diagram showing the state of the gripping device in the state shown in FIG. 6. [Figure 8] FIG. 11 is a schematic diagram showing a construction elevator according to a second embodiment. [Figure 9] FIG. 13 is a schematic diagram showing a construction elevator according to a third embodiment. [Figure 10]FIG. 13 shows a method for extending the main rope in a construction elevator according to a third embodiment, illustrating the state during movement of the second machine room. [Figure 11] FIG. 13 shows a method for extending the main rope in a construction elevator according to a third embodiment, illustrating the state during movement of the first machine room. [Figure 12] FIG. 13 shows a method for extending a compensating rope in a construction elevator according to a third embodiment, and is a diagram showing the state after the machine room unit has been moved. [Figure 13] FIG. 13 is a schematic diagram showing a construction elevator according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, a construction elevator and a method for extending a main rope according to an embodiment will be described with reference to Fig. 1 to Fig. 13. Note that common members in each drawing are given the same reference numerals.
[0013] 1. First embodiment 1-1.Example of a construction elevator configuration First, the configuration of a construction elevator according to a first embodiment (hereinafter, referred to as "this example") will be described with reference to FIG. FIG. 1 is a schematic diagram showing the construction elevator of this example.
[0014] The elevator shown in Fig. 1 is a construction elevator that is installed in a building structure under construction and used to transport materials and people. As shown in Fig. 1, the construction elevator 1 includes a support member 2 arranged at the top of a hoistway 100 of the building structure, a machine room unit 3, and a lifting machine 6 that lifts the machine room unit 3. The construction elevator 1 also includes a hoisting machine 9, a main rope 10, a car 11 for carrying people and materials, a counterweight 12, a compensating rope 14, and a pulley 19.
[0015] The car 11 and the counterweight 12 are an example of a lifting body. The positional relationship between the car 11 and the counterweight 12 may be reversed. That is, in FIG. 1, the counterweight may correspond to the reference symbol 11, and the car may correspond to the reference symbol 12. Hereinafter, the direction in which the lifting body, the car 11 and the counterweight 12, rise and fall is defined as the up-down direction.
[0016] The car 11 has a car side pulley 11a and a car side compensation pulley 11b. The car side pulley 11a is provided on the upper part of the car 11, and the car side compensation pulley 11b is provided on the lower part of the car 11. The counterweight 12 has a weight side pulley 12a and a weight side compensation pulley 12b. The weight side pulley 11a is provided on the upper part of the counterweight 12, and the weight side compensation pulley 12b is provided on the lower part of the counterweight 12.
[0017] A main rope 10 is wound around the car-side pulley 10a and the weight-side pulley 12a. The main rope 10 is wound around a sheave of a hoisting machine 9 installed in a machine room unit 3 described later. Furthermore, both ends of the main rope 10 are fixed to the machine room unit 3 by rope fixing parts 18a and 18b. That is, one end of the main rope 10 is fixed to the rope fixing part 18a, and is wound around the car-side pulley 10a, the hoisting machine 9, and the weight-side pulley 12a in this order. The other end of the main rope 10 is fixed to a rope fixing part 18b provided in the machine room unit 3. Then, the car 11 and the counterweight 12 move up and down in the hoistway 100 as the hoisting machine 9 is driven.
[0018] A compensating rope 14 is wound around the car side compensating pulley 11b of the car 11 and the weight side compensating pulley 12b of the counterweight 12. The detailed configuration of the compensating rope 14 will be described later.
[0019] Furthermore, a buffer 21 and lower pulleys 22, 23 are installed in a pit, which is the lower part in the vertical direction of the elevator shaft 100. The buffer 21 is disposed below the car 11 and the counterweight 12 in the vertical direction. A compensating rope 14 is wound around the lower pulleys 22, 23.
[0020] The support member 2 is installed on a beam 101a provided at the top of the elevator shaft 100 or in a recess provided in a wall surface of the elevator shaft 100. A lifting machine 6 is provided on the support member 2. A machine room unit 3 is arranged vertically below the support member 2. The machine room unit 3 is suspended from the support member 2 via the lifting machine 6. The machine room unit 3 is supported by the lifting machine 6 so that it can be lifted (moved). The lifting machine 6 may be provided in a first machine room 4 and a second machine room 5 of the machine room unit 3 described below, and a lifting rope for the lifting machine 6 may be provided on the support member 2.
[0021] Moreover, one of the plurality of lifting machines 6 is connected to a pulley 19, which will be described later. The lifting machine 6 supports the pulley 19 so as to be capable of lifting (moving) the pulley 19 in the vertical direction.
[0022] The machine room unit 3 has a first machine room 4 and a second machine room 5. The first machine room 4 is disposed below the second machine room 5 in the up-down direction.
[0023] A movable support mechanism 7 is provided at the bottom of the first machine room 4 in the vertical direction. The movable support mechanism 7 is configured to be extendable and retractable from the first machine room 4 toward the wall surface of the elevator shaft 100. The movable support mechanism 7 is placed on beams 101b, 101c, and 101d provided in the elevator shaft 100 or on recesses provided in the wall surface of the elevator shaft 100. The movable support mechanism 7 supports the machine room unit 3 or the first machine room 4 at a predetermined position in the elevator shaft 100. Note that the movable support mechanism 7 is not limited to the above-mentioned one, and various other fixing mechanisms such as a guide rail that supports the car 11 so that it can rise and fall, an engagement member that engages with the wall surface of the elevator shaft 100, and a fastening member that fastens and fixes it to the wall surface may be used.
[0024] In the first machine room 4, rope fixing parts 18a, 18b for fixing ends of the main rope 10 are installed. Furthermore, in the first machine room 4, a hoisting machine 9 is installed.
[0025] In the second machine room 5, a first rope holding device 16, a second rope holding device 17, a compensating rope reel 15, a control panel 8, and a tail cord reel 20 are installed. The control panel 8 controls the hoisting machine 9, the car 11, and the like. The control panel 8 and the car 11 are electrically connected via a tail cord 13. In addition, in the vicinity of the control panel 8, the tail cord reel 20 is installed. An extension of the tail cord 13 is wound around the tail cord reel 20. When the machine room unit 3 rises, the tail cord is pulled out from the tail cord reel 20.
[0026] An extension of the compensating rope 14 is wound around the compensating rope reel 15. When the machine room unit 3 is raised, the extension of the compensating rope 14 is pulled out from the compensating rope reel 15 via the pulley 19. Note that in this example, an example in which the compensating rope reel 15 is installed in the machine room unit 3 has been described, but the present invention is not limited to this. The compensating rope reel 15 may be installed in a pit, which is a lower part of the hoistway 100, or outside the hoistway 100.
[0027] During normal operation, a pulley 19 supported by the lifting machine 6 is disposed in the second machine room 5. The pulley 19 is disposed between the compensating rope reel 15 and the car 11 and counterweight 12 which represent the lifting body. The compensating rope 14 pulled out from the compensating rope reel 15 is wound around the pulley 19. The pulley 19 changes the direction in which the compensating rope 14 extends from upward to downward.
[0028] As described above, the compensating rope 14 is wound around the compensating rope reel 15 and is pulled out from the compensating rope reel 15. Therefore, one end of the compensating rope 14 is fixed to the compensating rope reel 15.
[0029] The compensating rope 14 is pulled out from the compensating rope reel 15, and the extending direction is changed from upward to downward by the pulley 19, and the compensating rope 14 is wound around the first lower pulley 23 provided at the bottom of the hoistway 100. The compensating rope 14 is then wound around the car side compensating pulley 11b, the second lower pulley 22, and the weight side compensating pulley 12b, in that order, via the first lower pulley 23. The other end of the compensating rope 14 extending from the weight side compensating pulley 12b is fixed to the pit, which is the bottom of the hoistway 100.
[0030] A first rope holding device 16 is provided between the compensating rope reel 15 and the pulley 19. The first rope holding device 16 releasably holds the compensating rope 14 pulled out from the compensating rope reel 15. The first rope holding device 16 also holds the compensating rope 14 on the rope reel side (hereinafter simply referred to as the "first side") A of the compensating rope 14 with respect to the pulley 19. By holding the compensating rope 14, the first rope holding device 16 restricts the movement of the compensating rope 14.
[0031] Further, a second rope gripping device 17 is provided near the first rope gripping device 16 and the pulley 19. The second rope gripping device 17 is disposed on the lifting body side of the compensating rope 14 with respect to the pulley 19, that is, on the car 11 and counterweight 12 side (hereinafter simply referred to as the second side) B. The second rope gripping device 17 releasably grips the compensating rope 14, similar to the first rope gripping device 16. The second rope gripping device 17 grips the compensating rope 14 to restrict the movement of the compensating rope 14.
[0032] In the drawings, the first rope holding device 16 and the second rope holding device 17 are shown in black when they are holding the compensating rope 14, and are shown in white when they are releasing the compensating rope 14.
[0033] FIG. 2 is a diagram showing the state of the first rope gripping device 16 and the second rope gripping device 17 during normal operation. As shown in Fig. 2, during normal operation of the construction elevator 1, the first rope holding device 16 is released, and the second rope holding device 17 is activated to hold the compensating rope 14. Therefore, one end of the compensating rope 14 is fixed to the second rope holding device 17, and the other end of the compensating rope 14 is fixed to the pit of the hoistway 100.
[0034] In this embodiment, the second rope holding device 17 holds the compensating rope 14 to fix one end of the compensating rope 14, but the present invention is not limited to this. For example, the second rope holding device 17 may be released and one end of the compensating rope 14 may be fixed by the first rope holding device 16. In addition, the compensating rope reel 15, the first rope holding device 16 and the second rope holding device 17 may be disposed in the first machine room 4.
[0035] In the construction elevator 1 of this example, the machine room unit 3 has a two-story structure consisting of a first machine room 4 and a second machine room 5. This allows the horizontal space occupied by the machine room unit 3 in the elevator shaft 100 to be reduced. The machine room unit 3 is not limited to a two-story structure, and may have a one-story structure with the control panel 8, hoisting machine 9, rope fixing parts 18a, 18b, compensating rope reel 15, first rope holding device 16, second rope holding device 17, and tail cord reel 20 installed in one machine room. Furthermore, the first machine room 4 and the second machine room 5 may be divided into two or more machine rooms.
[0036] 1-2.How to extend the compensating rope Next, a method for extending the compensating ropes 14 in the construction elevator 1 having the above-mentioned configuration, i.e., a method for expanding the operating floor by raising the machine room unit 3, will be described with reference to Figs. 3 to 7. 3 to 7 are explanatory diagrams showing a method for extending the compensating rope 14.
[0037] First, as shown in Fig. 3, the counterweight 12 is lowered to the pit and placed on the buffer 21 installed in the pit. Next, as in normal operation, the second rope holding device 17 holds the compensating rope 14, and the first rope holding device 16 releases its hold on the compensating rope 14.
[0038] Next, the lifting machine 6 connected to the pulley 19 is driven to raise only the pulley 19 to a predetermined height. At this time, the other end of the compensating rope 14, i.e., the second side B relative to the pulley 19, is fixed by the second rope holding device 17. Also, one end side of the compensating rope 14, i.e., the first side A which is the compensating rope reel 15 side, is not fixed. Therefore, by raising the pulley 19, the compensating rope 14 can be pulled out from the compensating rope reel 15. Also, since the compensating rope 14 is folded back by the pulley 19, the length (height) by which the pulley 19 is raised may be approximately half the length of the extension of the compensating rope 14.
[0039] When the pulley 19 is moved, one end of the compensating rope 14 is fixed by the second rope gripping device 17 provided in the machine room unit 3. Therefore, the compensating rope 14 is not pulled out downward in the vertical direction from the first machine room 4 of the machine room unit 3. This allows the hoisting machine 9 to be driven and the car 11 to be used even while the pulley 19 is moving.
[0040] 4, the car 11 and the machine room unit 3 are connected by a chain 201. The car 11 and the machine room unit 3 may be connected before the pulley 19 is raised.
[0041] When the connecting work between the car 11 and the machine room unit 3 is completed, as shown in Fig. 5, the first rope holding device 16 holds the compensating rope 14, and the second rope holding device 17 releases its hold on the compensating rope 14. Therefore, one end of the compensating rope 14 is fixed to the first rope holding device 16, and the other end of the compensating rope 14 is fixed to the pit of the hoistway 100.
[0042] Next, as shown in Fig. 4, the movable support mechanism 7 is contracted to release the support of the machine room unit 3 by the movable support mechanism 7. Then, the lifting machine 6 connected to the machine room unit 3 is driven to raise the machine room unit 3 to a predetermined height (beam 101c in the example shown in Figs. 4 and 6). As a result, the extension of the compensating rope 14 pulled out from the compensating rope reel 15 by the operation shown in Fig. 3 is sent out to the car 11 and counterweight 12 side via the pulley 19 and the second rope gripping device 17.
[0043] When the machine room unit 3 has risen to a predetermined height, as shown in Fig. 6, the driving of the lifting machine 6 is stopped and the movable support mechanism 7 is extended so that the movable support mechanism 7 is placed on the beam 101c. This allows the machine room unit 3 to be raised to a predetermined height.
[0044] Next, as shown in Figures 6 and 7, the compensating rope 14 is gripped by the second rope gripping device 17. This makes it possible to prevent the compensating rope 14 from being pulled out from the compensating rope reel 15 due to its own weight. In addition, the grip of the compensating rope 14 by the first rope gripping device 16 is released. Then, the car 11 is released from the machine room unit 3, and the counterweight 12 is pulled up from the buffer 21. By carrying out these steps, the extension work of the compensating rope 14 and the expansion work of the operating floor of the construction elevator 1 are completed.
[0045] According to the construction elevator 1 and the method for extending the compensating rope 14 of this example, the extension work of the compensating rope 14 can be performed simultaneously with the lifting of the machine room unit 3. This makes it easy to extend the compensating rope 14, and reduces the time required for the expansion work of the operating floor of the construction elevator 1.
[0046] Furthermore, the compensating rope 14 can be extended without slipping on the first rope holding device 16 or the second rope holding device 17. This makes it possible to prevent wear on the compensating rope 14 and to easily adjust the gripping force of the rope holding devices 16 and 17.
[0047] 2. Second embodiment Next, a construction elevator according to a second embodiment will be described with reference to FIG. FIG. 8 is a schematic diagram showing a construction elevator according to the second embodiment. As shown in FIG.
[0048] The construction elevator according to the second embodiment differs from the construction elevator according to the first embodiment in the order in which the compensating ropes are stretched over the car and the counterweight. Therefore, here, the parts common to the construction elevator 1 according to the first embodiment are given the same reference numerals and overlapping explanations are omitted.
[0049] As shown in Fig. 8, the construction elevator 1B includes a machine room unit 3B, a car 11, a counterweight 12, and a pulley 19. The machine room unit 3B includes a compensating rope reel 15, a hoist 9, a control panel 8, a first rope gripping device 16, a second rope gripping device 17, and the like.
[0050] In the construction elevator 1B according to the second embodiment, the compensating rope 14 is pulled out from the compensating rope reel 15 to the pulley 19, and is wound around the weight side compensating pulley 12b, the second lower pulley 22, and the car side compensating pulley 11b in this order via the first lower pulley 23. The other end of the compensating rope 14 extending from the car side compensating pulley 11b is fixed to the pit of the elevator shaft 100.
[0051] The second rope gripping device 17 is disposed between the pulley 19 of the compensating rope 14 and the first lower pulley 23. The second rope gripping device 17 releasably grips the compensating rope 14 on the lifting body side, i.e., the counterweight 12 side (hereinafter simply referred to as the second side) B', relative to the pulley 19 of the compensating rope 14.
[0052] Other configurations are the same as those of the construction elevator 1 according to the first embodiment, so their explanation will be omitted. The construction elevator 1B according to the second embodiment can also provide the same effects as those of the construction elevator 1 according to the first embodiment described above.
[0053] 3. Third embodiment Next, a construction elevator according to a third embodiment will be described with reference to Figs. FIG. 9 is a schematic diagram showing a construction elevator according to the second embodiment, and FIG. 10 to FIG. 12 are diagrams showing a method of extending a compensating rope in the construction elevator according to the second embodiment.
[0054] The construction elevator according to the third embodiment differs from the construction elevator 1 according to the first embodiment in the configuration of the machine room unit. Therefore, here, the parts common to the construction elevator 1 according to the first embodiment are given the same reference numerals and duplicated explanations are omitted.
[0055] As shown in Fig. 9, the construction elevator 1C has a machine room unit 3C consisting of a first machine room 4 and a second machine room 5. The second machine room 5 is placed on the top in the vertical direction of the first machine room 4. The first machine room 4 and the second machine room 5 are connected so as to be separable, and each is lifted independently by a lifting machine 6.
[0056] The first machine room 4 accommodates a hoisting machine 9, rope fixing parts 18a, 18b, a compensating rope reel 15, a first rope holding device 16, and a second rope holding device 17. In addition, a movable support mechanism 7 is provided in the lower part of the first machine room 4.
[0057] A control panel 8, a tail cord reel 20, and a pulley 19 are installed in the second machine room 5. The pulley 19 is rotatably supported in the second machine room 5. The pulley 19 is lifted up and down together with the second machine room 5 in accordance with the lifting operation of the second machine room 5.
[0058] The compensating rope 14 wound around the compensating rope reel 15 is pulled out to a pulley 19 installed in the second machine room 5. The first rope gripping device 16 is disposed between the compensating rope reel 15 and the pulley 19 in the first machine room 4, and releasably grips the first side A of the compensating rope 14.
[0059] The compensating rope 14, folded back downward in the vertical direction by the pulley 19, passes from the second machine room 5 to the first machine room 4. A second rope holding device 17 is disposed at a location in the first machine room 4 where the compensating rope 14 extends downward in the vertical direction. The second rope holding device 17 releasably holds the second side B of the compensating rope 14. The second rope holding device 17 may be disposed in the second machine room 5.
[0060] During normal operation of the construction elevator 1C, the first rope holding device 16 is released, and the second rope holding device 17 holds the second side B of the compensating rope 14. Therefore, one end of the compensating rope 14 is fixed to the second rope holding device 17, and the other end of the compensating rope 14 is fixed to the pit of the hoistway 100. Note that the first rope holding device 16 may hold the first side A of the compensating rope 14, and the second rope holding device 17 may be released.
[0061] Next, a method for extending the compensating rope 14 of the construction elevator 1C according to the third embodiment will be described with reference to Figs. As shown in Fig. 10, when performing the extension work of the compensating rope 14, first, the car 11 and the first machine room 4 are connected with a chain 201, and the car 11 is fixed. In addition, the counterweight 12 is lowered to the pit, and the counterweight 12 is placed on the buffer 21 installed in the pit. As a result, tension from the car 11 and the counterweight 12 is no longer applied to the compensating rope 14.
[0062] Next, the second rope holding device 17 holds the compensating rope 14, and the first rope holding device 16 releases its hold on the compensating rope 14. If the first rope holding device 16 is holding the compensating rope 14, the first rope holding device 16 releases its hold on the compensating rope 14. Then, the first machine room 4 and the second machine room 5 are separated.
[0063] Next, the lifting machine 6 connected to the second machine room 5 is operated to lift only the second machine room 5 to a predetermined height (beam 101b in the example shown in FIG. 10). Since the compensating rope 14 is folded back by the pulley 19, the length (height) by which the second machine room 5 is lifted may be approximately half the length of the extension of the compensating rope 14. As the second machine room 5 is lifted, the pulley 19 provided in the second machine room 5 is also lifted. When the second machine room 5 is lifted to a predetermined height, the lifting machine 6 is stopped, and the second machine room 5 and the pulley 19 are temporarily fixed using the lifting machine 6 or a second machine room support mechanism (not shown) or the like.
[0064] Here, the other end of the compensating rope 14 is fixed by the second rope gripping device 17, but one end side of the compensating rope 14, i.e., the compensating rope reel 15 side, is not fixed. Therefore, as the second machine room 5 and the pulley 19 rise, the compensating rope 14 on the compensating rope reel 15 side is pulled, and an extended portion of the compensating rope 14 is pulled out from the compensating rope reel 15. This allows the lifting operation of the second machine room 5 and the pulley 19 and the operation of pulling out the compensating rope 14 from the compensating rope reel 15 to be performed simultaneously.
[0065] When the second machine room 5 is moved, one end of the compensating rope 14 is fixed by the second rope gripping device 17 provided in the first machine room 4. Therefore, the compensating rope 14 is not pulled out downward in the up-down direction from the first machine room 4. This allows the hoisting machine 9 to be driven and the car 11 to be used even while the second machine room 5 is moving.
[0066] 11, the first rope holding device 16 holds the compensating rope 14, and the second rope holding device 17 releases the compensating rope 14. Therefore, the other end of the compensating rope 14 is fixed to the pit of the hoistway 100, and one end of the compensating rope 14 is fixed to the first rope holding device 16.
[0067] Next, the movable support mechanism 7 is contracted to release the support of the first machine room 4 by the movable support mechanism 7. Then, the lifting machine 6 connected to the first machine room 4 is operated to raise the first machine room 4 to a predetermined height (the beam 101c in the example shown in Figs. 11 and 12). As a result, the extension of the compensating rope 14 that has been pulled out from the compensating rope reel 15 by the operation shown in Fig. 10 is sent out to the counterweight 12 and the car 11 side via the pulley 19 and the second rope gripping device 17.
[0068] When the first machine room 4 has risen to a predetermined height, the lifting machine 6 is stopped. Then, as shown in Fig. 12, the movable support mechanism 7 is extended so that the movable support mechanism 7 is placed on the beam 101c. In addition, the first machine room 4 and the second machine room 5 are connected. This allows the machine room unit 3C consisting of the first machine room 4 and the second machine room 5 to be raised to a predetermined height.
[0069] Next, as shown in Fig. 12, the compensating rope 14 is gripped by the second rope gripping device 17. This makes it possible to prevent the compensating rope 14 from being pulled out from the compensating rope reel 15 due to its own weight. In addition, the grip of the compensating rope 14 by the first rope gripping device 16 is released. Then, the connection between the car 11 and the machine room unit 3C is released, and the counterweight 12 is pulled up from the buffer 21. By carrying out these steps, the extension work of the compensating rope 14 and the expansion work of the operating floor of the construction elevator 1 are completed.
[0070] In addition, the machine room unit 3C is divided into the first machine room 4 and the second machine room 5, and each is lifted independently. This reduces the weight on the lifting machine 6 and prevents the lifting machine 6 from becoming large.
[0071] Other configurations are the same as those of the construction elevator 1 according to the first embodiment, so their explanation will be omitted. The construction elevator 1C according to the third embodiment can also provide the same effects as those of the construction elevator 1 according to the first embodiment described above.
[0072] 4. Second embodiment Next, a construction elevator according to a fourth embodiment will be described with reference to FIG. FIG. 13 is a schematic diagram showing a construction elevator according to the fourth embodiment. As shown in FIG.
[0073] The construction elevator according to the fourth embodiment is the construction elevator 1C according to the third embodiment, with the second machine room 5 also provided with a movable support mechanism 7. Therefore, here, the parts common to the construction elevator 1 according to the first embodiment and the construction elevator 1C according to the third embodiment are given the same reference numerals, and duplicated explanations are omitted.
[0074] As shown in Fig. 13, the construction elevator 1D has a machine room unit 3D consisting of a first machine room 4D and a second machine room 5D. In the first machine room 4D, a hoisting machine 9, rope fixing parts 18a, 18b, a compensating rope reel 15, a first rope holding device 16, and a second rope holding device 17 are arranged. In addition, a movable support mechanism 7 is provided in the lower part of the first machine room 4D.
[0075] A control panel 8, a tail cord reel 20, and a pulley 19 are installed in the second machine room 5D. Similarly to the first machine room 4D, a movable support mechanism 7 is provided in the lower part of the second machine room 5D in the vertical direction. The configuration of the movable support mechanism 7 provided in the second machine room 5D is similar to that of the movable support mechanism 7 provided in the first machine room 4D, and therefore a description thereof will be omitted.
[0076] As shown in Fig. 13, during operation of the construction elevator 1D, the second rope holding device 17 is actuated to hold the second side B of the compensating rope 14, and the first rope holding device 16 is released. Therefore, one end of the compensating rope 14 is fixed to the second rope holding device 17, and the other end of the compensating rope 14 is fixed to the pit of the hoistway 100.
[0077] In addition, in the construction elevator 1D according to the fourth embodiment, the second rope holding device 17 may be released, the compensating rope 14 may be held by the first rope holding device 16, and one end of the compensating rope 14 may be fixed by the first rope holding device 16.
[0078] In addition, in the construction elevator 1D according to the fourth embodiment, the second machine room 5D is also provided with a movable support mechanism 7. Therefore, as shown in Fig. 13, the first machine room 4D can be installed on the beam 101d, and the second machine room 5D can be installed on the beam 101c provided above the beam 101d in the vertical direction. In this way, according to the construction elevator 1D according to the fourth embodiment, the first machine room 4D and the second machine room 5D can be installed in different positions.
[0079] This allows the height at which the second machine room 5D is installed to be changed while driving the hoist 9 provided in the first machine room 4D and raising and lowering the car 11. Therefore, the work of pulling out the compensating rope 14 from the compensating rope reel 15 can be performed simultaneously while the construction elevator 1D is operating normally. As a result, when pulling out the compensating rope 14, the compensating rope 14 can be pulled out without stopping the raising and lowering operation of the car 11, which makes it possible to improve work efficiency.
[0080] Other configurations are the same as those of the construction elevator 1 according to the first embodiment, so their explanation will be omitted. The construction elevator 1D according to the fourth embodiment can also provide the same effects as those of the construction elevator 1 according to the first embodiment and the construction elevator 1C according to the third embodiment.
[0081] The present invention is not limited to the embodiment described above and shown in the drawings, and various modifications can be made without departing from the spirit of the invention as defined in the claims.
[0082] In this specification, the words "parallel" and "orthogonal" are used, but these do not mean only "parallel" and "orthogonal" in the strict sense, but may also mean a "substantially parallel" or "substantially orthogonal" state that includes "parallel" and "orthogonal" and is within a range in which the respective functions can be exerted.
[0083] The number of compensating ropes is not limited to one, and multiple compensating ropes may be provided. The multiple first rope holding devices and second rope holding devices are provided in accordance with the number of compensating ropes. Furthermore, multiple first rope holding devices and second rope holding devices may be provided on one compensating rope. [Explanation of symbols]
[0084] 1, 1B, 1C, 1D...construction elevator, 2...support member, 3, 3B, 3C, 3D...machine room unit, 4, 4D...first machine room, 5, 5D...second machine room, 6...lifting machine, 7...movable support mechanism, 8...control panel, 9...hoisting machine, 10...main rope, 11...car (lifting body), 11a...car side pulley, 11b...car side compensation pulley, 12...balancing weight (lifting body), 12a...weight side pulley, 12b...weight side compensation pulley, 13...tail cord, 14...compensation rope, 15...compensation rope reel, 16...first rope holding device, 17...second rope holding device, 19...pulley, 20...tail cord reel, 100...hoistway, 101a, 101b, 101c, 101d...Beam
Claims
1. a compensating rope reel on which a compensating rope is wound; A lifting body around which the compensating rope unwound from the compensating rope reel is wound and which moves up and down a lifting shaft of a building structure; A pulley is disposed between the compensating rope reel and the lifting body in the compensating rope, and around which the compensating rope pulled out from the compensating rope reel is wound; At least one first rope gripping device that releasably grips the compensating rope on the compensating rope reel side relative to the pulley; At least one second rope gripping device that releasably grips the compensating rope on the lifting body side relative to the pulley, The pulley is supported so as to be movable along the ascending and descending direction of the ascending and descending body. Construction elevator.
2. A machine room unit in which a hoist that moves the lifting body up and down is installed; A lifting machine that supports the machine room unit so that it can be lifted. The construction elevator according to claim 1.
3. The pulley is lifted independently of the machine room unit. The construction elevator according to claim 2.
4. The pulley is rotatably supported by the machine room unit and is lifted together with the machine room unit. The construction elevator according to claim 2.
5. The machine room unit is divided into a plurality of machine rooms. The construction elevator according to claim 2.
6. The machine room unit includes: a first machine room in which the first rope gripping device and the second rope gripping device are installed; a second machine room disposed above the first machine room in the vertical direction and in which the pulley is installed; The construction elevator according to claim 5.
7. A method for extending a compensating rope for a construction elevator, the compensating rope being provided with a compensating rope reel around which a compensating rope is wound; a lifting body around which the compensating rope unwound from the compensating rope reel is wound and which moves up and down a hoistway of an architectural structure; a pulley disposed between the compensating rope reel and the lifting body on the compensating rope and around which the compensating rope unwound from the compensating rope reel is wound; a first rope holding device that releasably holds the compensating rope on the compensating rope reel side relative to the pulley; and a second rope holding device that releasably holds the compensating rope on the lifting body side relative to the pulley, gripping the compensating rope with the second rope gripping device; A step of releasing the grip of the compensating rope by the first rope gripping device, raising the pulley to a predetermined height along the lifting direction of the lifting body, and pulling out the compensating rope from the compensating rope reel; After raising the pulley to a predetermined height, the first rope gripping device grips the compensating rope, and the second rope gripping device releases the grip of the compensating rope; Lifting the machine room unit in which the second rope gripping device is installed to a predetermined height; This includes a method for extending the compensation rope of a construction elevator.
Citation Information
Patent Citations
Elevator for construction and its installation method
JP2001287881A
Elevator arrangement and method
US20100163347A1
Elevator arrangement and method
US20150034425A1
Method and arrangement for installing an elevator
US20170166419A1
Elevator system
WO2000050328A2