Ship storage element monitoring system, ship storage equipment, and ship storage element monitoring method
The marine power storage element monitoring system addresses the challenge of remote monitoring by using a battery management device and communication devices with a power supply switching mechanism to ensure continuous data acquisition and transmission, facilitating compliance with regulatory requirements and reducing power consumption.
Patent Information
- Application Number
- JP2019101445
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2019-05-30
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2039-05-30
AI Technical Summary
The challenge of monitoring power storage elements on ships outside the range of mobile phone lines, which is necessary for compliance with stricter exhaust gas regulations, as remote monitoring is hindered by the ship's location.
A marine power storage element monitoring system that includes a battery management device, communication devices, and a power supply switching mechanism to ensure continuous data acquisition and transmission of power storage element information, even when the ship is outside mobile phone range, using power storage elements for backup power and remote communication.
Enables continuous monitoring and remote acquisition of power storage element information, reducing power consumption and allowing maintenance personnel to check the state of power storage elements without boarding the ship, ensuring compliance with regulatory requirements.
Smart Images

Figure 0007562940000001 
Figure 0007562940000002 
Figure 0007562940000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a ship energy storage element monitoring system, a ship energy storage facility, and a ship energy storage element monitoring method. [Background technology]
[0002] Energy storage devices are used for stationary industrial applications, such as uninterruptible power supplies and stabilized power supplies, and are also used in large-scale storage battery systems that store electricity generated by renewable energy or existing power generation systems. In recent years, energy storage devices have also been used in hybrid and electric vehicles for automotive applications, and in other moving objects such as trains and ships.
[0003] It is known that repeated charging and discharging of energy storage elements leads to deterioration. Patent Document 1 discloses a storage battery system management device. This management device connects storage battery systems having storage units to substation facilities at multiple locations in a power grid, and evaluates the storage battery performance and operability when a combination of storage units to be replaced selected from each storage battery system is replaced. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2016-46960 A Summary of the Invention [Problem to be solved by the invention]
[0005] In order to comply with exhaust gas regulations that are becoming stricter every year, the shipping industry is investigating the use of energy storage devices to make ships hybrid or electric, and some of these have already been put to practical use. Energy storage device information on the status of energy storage devices used in industrial stationary applications can be obtained via the Internet or mobile phone lines, making remote monitoring of the energy storage devices possible. However, depending on the route, ships may sail outside the range of mobile phone lines. There are cases where energy storage device information cannot be obtained while the ship is sailing.
[0006] An object of the present invention is to provide a ship energy storage element monitoring system, a ship energy storage facility, and a ship energy storage element monitoring method. [Means for solving the problem]
[0007] The ship storage element monitoring system includes a storage element installed on a ship, a battery management device installed on the ship and configured to acquire storage element information relating to the status of the storage element, a first communication device installed on the ship, and a power supply switching device that switches from the power supply equipment on the ship that supplies power to the battery management device and the first communication device to the storage element when the power supply equipment on the ship that supplies power to the battery management device and the first communication device is stopped, and supplies power to the battery management device and the first communication device, wherein when the first communication device determines that a predetermined event has occurred while the power supply equipment on the ship is stopped, it transmits the storage element information acquired by the battery management device to a second communication device installed outside the ship, and further includes a monitoring device that acquires the storage element information received by the second communication device.
[0008] The ship's energy storage equipment installed on the ship includes a storage element, a battery management device that acquires storage element information regarding the state of the storage element, a first communication device, and a power supply switching device that switches from the power supply equipment to the storage element and supplies power to the battery management device and the first communication device when power supply equipment on the ship that supplies power to the battery management device and the first communication device stops, and when the first communication device determines that a specified event has occurred while the power supply equipment on the ship is stopped, transmits the storage element information acquired by the battery management device to a second communication device installed outside the ship.
[0009] A method for monitoring a ship's energy storage element includes a battery management device installed on a ship acquiring energy storage element information relating to the state of the energy storage element installed on the ship, and when power supply equipment on the ship that supplies power to the battery management device and a first communication device installed on the ship stops, switching from the power supply equipment to the energy storage element to supply power to the battery management device and the first communication device, and when the power supply equipment on the ship is stopped and the first communication device determines that a predetermined event has occurred, transmitting the energy storage element information acquired by the battery management device to a second communication device installed outside the ship, and the energy storage element information received by the second communication device is acquired by a monitoring device.
[0010] The battery management device is mounted on the ship and acquires storage element information relating to the state of the storage element mounted on the ship. The battery management device may be, for example, a BMS (Battery Management System). The storage element information includes, for example, the voltage, current, temperature, SOC (State Of Charge), SOH (State Of Health), etc. of the storage element. The storage element information may be acquired repeatedly at an appropriate period, for example, 0.1 seconds, 0.5 seconds, 1 second, etc. The storage device is mounted on the ship and can store the storage element information acquired by the battery management device. The storage device may be incorporated in the battery management device or may be a device separate from the battery management device. Alternatively, the storage device may be incorporated in the first communication device or may be a device separate from the first communication device.
[0011] When the power supply equipment on the ship that supplies power to the battery management device and the first communication device installed on the ship stops, the power supply switching device switches from the power supply equipment to the power storage element to supply power to the battery management device and the first communication device. The power supply equipment includes a power supply device for supplying power to electrical equipment on the ship. The power supply equipment operates even when the ship is anchored, but when the ship is moored for a while, the power supply device is turned off and the power supply equipment is stopped. When the power supply equipment stops, the power supply switching device can supply power from the power storage element to the battery management device and the first communication device instead of the power supply equipment.
[0012] When the first communication device determines that a predetermined event has occurred while the power supply equipment in the ship is stopped, the first communication device transmits the storage element information acquired by the battery management device to the second communication device installed outside the ship. The predetermined event may be any event that indicates that communication between the first communication device and the second communication device is possible.
[0013] The monitoring device can obtain information on the energy storage elements installed on the ship by obtaining the energy storage element information received by the second communication device. The monitoring device can obtain information on the energy storage elements installed on the ship without any significant loss. The monitoring device can continuously grasp the type of usage environment in which the energy storage elements are placed.
[0014] In a ship energy storage element monitoring system, the battery management device may stop operation of the battery management device when the power supply equipment on the ship is stopped, and the first communication device may resume operation of the battery management device when it determines that the specified event has occurred.
[0015] The battery management device stops operation of the battery management device when the power supply equipment on the ship is stopped. This makes it possible to reduce power consumption due to the operation of the battery management device. When the first communication device determines that a predetermined event has occurred, it resumes operation of the battery management device. This makes it possible to transmit the storage element information acquired by the battery management device to the second communication device via the first communication device.
[0016] The vessel energy storage element monitoring system may stop operation of the battery management device and the first communication device when the first communication device transmits energy storage element information to the second communication device.
[0017] When the first communication device transmits the storage element information to the second communication device, the operation of the battery management device and the first communication device is stopped, thereby reducing power consumption due to the operation of the battery management device and the first communication device.
[0018] In the vessel energy storage element monitoring system, the first communication device may determine that the predetermined event has occurred when a predetermined signal is received.
[0019] When the first communication device receives a predetermined signal, it determines that a predetermined event has occurred. For example, when the ship is moored, the first communication device can receive the predetermined signal by transmitting an activation signal from a mobile terminal carried by a maintenance worker. This allows the storage element information stored in the storage device to be transmitted to the second communication device. The maintenance worker can obtain the storage element information from the second communication device or via a monitoring device using the mobile terminal carried by the maintenance worker. This allows the maintenance worker to check the status of the storage element without, for example, carrying a measuring device for measuring the storage element and boarding the ship.
[0020] In the vessel energy storage element monitoring system, the first communication device may determine that the predetermined event has occurred when communication with the second communication device is possible.
[0021] When communication with the second communication device is possible, the first communication device determines that a predetermined event has occurred. For example, even if communication between the first communication device and the second communication device is impossible when the ship is sailing, it is considered that the first communication device can communicate with the second communication device when the ship is moored and the first communication device enters the communication range with the second communication device. This makes it possible to transmit the storage element information acquired by the battery management device to the second communication device installed outside the ship.
[0022] In the ship storage element monitoring system, the battery management device may be provided with a memory unit that stores the acquired storage element information, and when the first communication device determines that the specified event has occurred, it may resume operation of the battery management device and transmit the storage element information stored in the memory unit to the second communication device.
[0023] The battery management device includes a storage unit, and the storage unit can store the storage element information acquired by the battery management device. When the first communication device determines that a predetermined event has occurred, the first communication device resumes operation of the battery management device and transmits the storage element information stored in the storage unit to the second communication device. This allows the storage element information acquired by the battery management device to be temporarily stored in the storage unit even if there is a period during which the first communication device is unable to transmit the storage element information. The first communication device can transmit the storage element information stored in the storage unit to the second communication device when it becomes able to communicate with the second communication device.
[0024] In the vessel energy storage element monitoring system, the memory unit may store energy storage element information relating to a state of the energy storage element while the vessel is sailing.
[0025] The storage unit stores the storage element information on the state of the storage element while the ship is sailing. Thus, even if the ship is sailing and a situation exists in which the storage element information cannot be transmitted, the monitoring device can obtain the storage element information while the ship is sailing, so that the storage elements installed on the ship can be remotely monitored. Effect of the Invention
[0026] According to the present invention, it is possible to continuously grasp the usage environment in which an energy storage device mounted on a ship is placed. [Brief description of the drawings]
[0027] [Figure 1] 1 is a schematic diagram showing an example of the configuration of a marine energy storage element monitoring system; [Diagram 2]FIG. 1 is a diagram illustrating an example of a configuration of a marine power storage facility. [Diagram 3] FIG. 2 is a diagram illustrating an example of a configuration of a bank. [Figure 4] FIG. 1 is a schematic diagram showing an example of an electric power system in a ship. [Diagram 5] FIG. 2 is a diagram illustrating an example of the configuration of a mobile terminal device and a server. [Figure 6] 11 is a flowchart illustrating a first example of processing by a communication device. [Figure 7] 13 is a flowchart showing a second example of processing by the communication device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] Hereinafter, an embodiment will be described with reference to the drawings. FIG. 1 is a schematic diagram showing an example of the configuration of a ship storage element monitoring system. A ship S is equipped with a ship storage equipment 100. The ship S is a hybrid ship equipped with a propulsion (driving) storage element and having two types of drive power sources, a main engine and a motor, or a battery-propelled ship having a drive power source of only a motor. In this specification, the ship S is described as a hybrid ship, but it may be a battery-propelled ship. A pier or wharf D is provided at a port so that the ship S can be anchored or moored. A carrier network 2 such as a mobile phone line includes multiple base stations 3, and a communication area A of the base station 3 as a second communication device installed outside the ship includes an area including the pier or wharf D. A mobile terminal device 200 can communicate with the base station 3 of the carrier network 2. The carrier network 2 is connected to a network 1 such as a public communication network including the Internet. A server 300 as a monitoring device can transmit and receive information between the mobile terminal device 200 and the ship storage equipment 100 in the communication area A via the network 1 and the carrier network 2. The use of the storage element is not limited to propulsion applications, but may alternatively be used in emergency equipment or auxiliary equipment.
[0029] FIG. 2 is a diagram showing an example of the configuration of the vessel power storage equipment 100, and FIG. 3 is a diagram showing an example of the configuration of a bank. As shown in FIG. 2, the vessel power storage equipment 100 includes a communication device 10 as a first communication device, a relay device 20, a domain management device 30 as a higher-level battery management device (BMS), multiple banks, a power supply switching device 50, and the like. As shown in FIG. 3, the bank is a plurality of battery storage modules connected in series, and includes a battery management device (BMS) 40, multiple battery storage modules 41, and a measurement board (CMU: Cell Monitoring Unit) 42 provided on each battery storage module 41. Although FIG. 2 shows a configuration including multiple banks, the vessel power storage equipment 100 may alternatively be configured to include only one bank having multiple battery storage modules 41, or may be configured to include only one battery storage module 41.
[0030] The communication device 10 includes a control unit 11, a storage unit 12, a first communication unit 13, a second communication unit 14, and a relay unit 15. The control unit 11 is composed of a CPU (Central Processing Unit) and the like, and controls the entire communication device 10 using built-in memories such as a ROM (Read Only Memory) and a RAM (Random Access Memory).
[0031] For example, a non-volatile memory such as a flash memory can be used as the storage unit 12. The storage unit 12 can store required information, for example, information obtained by processing of the control unit 11.
[0032] The first communication unit 13 can communicate between the domain management device 30 and the power supply switching device 50, and can use a communication interface 61 such as a LAN (Local Area Network), although other communication interfaces may be used instead of a LAN.
[0033] A communication antenna 16 is connected to the second communication unit 14. The second communication unit 14 can communicate with a base station 3 of the carrier network 2. That is, when the ship S during navigation enters the communication area A, the second communication unit 14 can establish communication with the base station 3.
[0034] The relay unit 15 can communicate with the first communication unit 22 of the relay device 20 via the communication interface 61.
[0035] The relay device 20 includes a control unit 21, a first communication unit 22, and a storage unit 23. The control unit 21 is configured with a CPU (Central Processing Unit) and the like, and controls the entire relay device 20 using built-in memories such as a ROM (Read Only Memory) and a RAM (Random Access Memory).
[0036] For example, a non-volatile memory such as a flash memory can be used as the storage unit 23. The storage unit 23 can store required information, for example, information obtained by processing of the control unit 21.
[0037] The first communication unit 22 can communicate with the domain management device 30 and the relay unit 15 using the communication interface 61 .
[0038] Each of the domain management devices 30 connected to the communication device 10 and the relay device 20 transmits and receives information to and from the battery management device 40 in each bank using a communication interface 62 such as a controller area network (CAN). In Fig. 2, N banks are connected to each of the domain management devices 30. N can be, for example, 8, but may be a number other than 8.
[0039] Each of the banks 1 to N includes a plurality of storage modules 41, and each storage module 41 includes a control board 42. Each storage module 41 includes a plurality of storage cells (storage elements) connected in series. The control board 42 can acquire storage element information related to the state of each storage cell of the storage module 41. The storage element information includes, for example, the voltage, current, temperature, SOC, and SOH of the storage cell. The storage element information can be acquired repeatedly at appropriate intervals, for example, every 0.1 second, 0.5 second, or 1 second. The storage cells are preferably rechargeable, such as secondary batteries, such as lead-acid batteries and lithium-ion batteries, or capacitors. Some of the storage cells may be primary batteries that cannot be recharged. The marine power storage equipment 100 preferably uses lithium-ion batteries, which have a high energy density.
[0040] The battery management device 40 can communicate with a control board 42 with a communication function via serial communication, and can acquire the energy storage element information detected by the control board 42. The battery management device 40 can transmit and receive information to and from the domain management device 30. The domain management device 30 aggregates the energy storage element information from the battery management devices 40 of the banks belonging to the domain. The domain management device 30 connected to the communication device 10 outputs the aggregated energy storage element information to the communication device 10. The domain management device 30 connected to the relay device 20 outputs the aggregated energy storage element information to the relay device 20. The relay device 20 outputs the aggregated energy storage element information to the communication device 10. In this way, the communication device 10 can acquire energy storage element information related to the state of the energy storage cells mounted on the ship S via the domain management device 30.
[0041] The storage unit 12 has a function as a storage device, and can store the energy storage element information acquired via the domain management device 30. The storage unit 12 may be incorporated in the communication device 10, may be incorporated in the domain management device 30, or may be configured as a storage device separate from the communication device 10 and the domain management device 30.
[0042] FIG. 4 is a schematic diagram showing an example of a power system in a ship. As shown in FIG. 4, power (DC voltage) from the first storage battery unit and the second storage battery unit, each of which is composed of banks 1 to N, is supplied to a propulsion converter 110 and a standby converter 51 via a DC bus 71. The propulsion converter 110 converts the power from the first storage battery unit and the second storage battery unit and supplies it to a motor generator 111, and can perform engine assist, for example. The standby converter 51 converts the power from the first storage battery unit and the second storage battery unit and outputs a predetermined DC voltage to the power supply switching device 50. The standby converter 51 may obtain power not from all of the banks in the first storage battery unit and the second storage battery unit, but from some of the banks.
[0043] The onboard power supply equipment 112, which serves as power supply equipment on the ship, obtains electric power from a generator engine installed in juxtaposition to a main engine (not shown, for example, a diesel engine or a steam turbine engine), and supplies electric power (for example, AC 100V) to onboard loads 113. The onboard power supply equipment 112 includes a power supply device for supplying electric power to electrical equipment on the ship. This power supply equipment operates even when the ship S is at anchor, but if the ship S is moored for a while, the power supply device is turned off and the onboard power supply equipment 112 is stopped. The onboard power supply equipment 112 also outputs a predetermined DC voltage to the power supply switching device 50.
[0044] When the ship S is sailing or anchored and the onboard power supply equipment 112 is operating (supplying power) (referred to as a normal mode), the power supply switching device 50 receives power from the onboard power supply equipment 112. The power supply switching device 50 supplies power to the communication device 10, the relay device 20, the domain management device 30, and the battery management device 40 via the power line 72. On the other hand, when the ship S is moored or the like and the onboard power supply equipment 112 is stopped, the power supply switching device 50 receives power from the standby converter 51 (referred to as a standby mode). The power supply switching device 50 can supply power to the communication device 10, the relay device 20, the domain management device 30, and the battery management device 40 via the power line 72. Power supply switching by the power supply switching device 50 is controlled by the communication device 10.
[0045] 5 is a diagram showing an example of the configuration of the mobile terminal device 200 and the server 300. The mobile terminal device 200 is a device carried by a maintenance staff member of the vessel power storage equipment 100 on the vessel S, and may be, for example, a smartphone or a tablet-type communication terminal, or a desktop or laptop-type personal computer. The mobile terminal device 200 includes a control unit 201, a storage unit 202, a communication unit 203, a display unit 204, and an operation unit 205.
[0046] The control unit 201 can be configured with a CPU, a ROM, a RAM, etc. The control unit 201 can display a web page provided by the server 300 or the communication device 10 on the display unit 204 based on a web browser program stored in the storage unit 202.
[0047] The storage unit 202 uses a non-volatile memory such as a hard disk or a flash memory, etc. The storage unit 202 can store a web browser program and the like.
[0048] A communication antenna 206 is connected to the communication unit 203. The communication unit 203 is capable of transmitting and receiving information to and from a base station 3 of the carrier network 2.
[0049] Display unit 204 can be configured with a liquid crystal display, an organic EL (Electro Luminescence) display, etc. Display unit 204 can display an image of a web page provided by server 300 by control unit 201 performing processing based on a web browser program.
[0050] The operation unit 205 is configured with a touch panel or the like, and can accept operations by a maintenance technician by operating icons or the like displayed on the display unit 204. The operation unit 205 outputs the accepted operations to the control unit 201.
[0051] The server 300 includes a control unit 301, a communication unit 302, a monitoring unit 303, and a storage unit 304. The server 300 can be configured as one or more servers.
[0052] The control unit 301 may be configured with a CPU, a ROM, a RAM, etc., and controls the entire server 300 using built-in memories such as a ROM and a RAM. The control unit 301 executes information processing based on a server program stored in the storage unit 304. The server program includes a web server program, and the control unit 301 functions as a web server that provides web pages to the mobile terminal device 200, accepts logins to web services, etc. Based on the server program, the control unit 301 can collect power storage element information from the communication device 10 as a server for SNMP (Simple Network Management Protocol).
[0053] The communication unit 302 can transmit and receive information between the communication device 10 and the mobile terminal device 200 via the network 1.
[0054] A non-volatile memory such as a hard disk or a flash memory can be used as the storage unit 304. The storage unit 304 can store the storage element information of the marine power storage equipment 100 acquired via the communication unit 302.
[0055] The monitoring unit 303 can generate monitoring information required for monitoring the vessel power storage equipment 100 based on the storage element information of the vessel power storage equipment 100 acquired via the communication unit 302. The generated monitoring information can be displayed, for example, on the mobile terminal device 200 or a monitoring display device (not shown).
[0056] Next, the operation when the ship S enters the communication area A of the carrier network 2 will be described.
[0057] When communication with the base station 3 is established, the communication device 10 can transmit the storage element information stored in the storage unit 12 to the base station 3. For example, when the ship S is sailing, the communication device 10 may be outside the communication area A of the carrier network 2, in which case the communication device 10 cannot communicate with the base station 3. However, when the ship S sails near a port or an island, or when the ship S calls at a port, the communication device 10 is within the communication area A of the carrier network 2, communication between the communication device 10 and the base station 3 is established, and the communication device 10 can transmit the storage element information stored in the storage unit 12 to the base station 3.
[0058] The server 300 can acquire the energy storage element information received by the base station 3. This allows acquisition of the energy storage element information of the energy storage cells mounted on the ship S, so that even if the ship S is sailing and a situation exists in which the energy storage element information cannot be transmitted, the server 300 can acquire the energy storage element information of the energy storage cells mounted on the ship S without any significant loss. The server 300 can continuously grasp what kind of usage environment the energy storage cells are placed in.
[0059] The storage unit 12 can store the energy storage element information related to the state of the energy storage cells while the ship S is sailing. As a result, even if the ship S is sailing and a situation exists in which the energy storage element information cannot be transmitted, the server 300 can acquire the energy storage element information stored while the ship S is sailing without any significant loss at the time when communication is established between the communication device 10 and the base station 3, and therefore can continuously grasp in what kind of usage environment the energy storage cells mounted on the ship S are placed.
[0060] The second communication unit 14 has a function as a determination unit, and can determine whether communication between the communication device 10 and the base station 3 is possible at a predetermined cycle. The predetermined cycle can be an appropriate cycle such as 30 minutes, 1 hour, or 2 hours. This makes it possible to timely detect that the ship S has entered the communication area A where communication between the communication device 10 and the base station 3 is possible.
[0061] When the communication device 10 receives a predetermined signal via the second communication unit 14, the communication device 10 can establish communication with the base station 3. For example, when the ship S calls at a port or is anchored, the second communication unit 14 can receive a predetermined signal via the carrier network 2 by transmitting an activation signal (for example, a call by a telephone number or activation by a short message service) from the mobile terminal device 200 carried by the maintenance staff. This allows the storage element information stored in the storage unit 12 to be transmitted to the base station 3. The maintenance staff can obtain the storage element information from the base station 3 or via the server 300 using the mobile terminal device 200 carried by the maintenance staff. This allows the maintenance staff to check the state of the storage cell remotely, for example, without having to board the ship carrying a measuring device that measures the state of the storage cell. In addition, the server 300 can also obtain the storage element information transmitted from the base station 3, so that the monitor managing the server 300 can also check the state of the storage cell remotely. As described above, when communication between the communication device 10 and the base station 3 is established and the communication device 10 transmits the storage element information stored in the memory unit 12 to the base station 3, it is not necessary for the onboard power supply equipment 112 to be stopped, and power may be supplied from the onboard power supply equipment 112, as described below.
[0062] Next, power switching inside the ship S will be described.
[0063] When the onboard power supply equipment 112 stops, the power supply switching device 50 switches from the onboard power supply equipment 112 to the standby converter 51 and supplies power to the communication device 10, the relay device 20, the domain management device 30, and the battery management device 40.
[0064] When the communication device 10 determines that a predetermined event has occurred while the onboard power supply equipment 112 is stopped, it transmits the storage element information acquired via the domain management device 30 to the base station 3. The predetermined event may be, for example, an event indicating that communication between the second communication unit 14 and the base station 3 is possible.
[0065] In this case as well, the server 300 can acquire the energy storage element information received by the base station 3. This makes it possible to acquire the energy storage element information of the energy storage cells mounted on the ship S, so that even if the ship S is sailing and a situation exists in which the energy storage element information cannot be transmitted, when a predetermined event occurs, the energy storage element information of the energy storage cells mounted on the ship S can be acquired and the state of the energy storage cells can be remotely monitored.
[0066] When the onboard power supply equipment 112 is stopped, the operation of all or part of the domain management device 30 and the battery management device 40 can be stopped. This makes it possible to reduce power consumption due to the operation of the domain management device 30 and the battery management device 40 in the standby mode.
[0067] When the communication device 10 determines that a predetermined event has occurred, it can resume the operation of the domain management device 30 and the battery management device 40. This allows the domain management device 30 to transmit the storage element information acquired to the base station 3 via the second communication unit 14.
[0068] When the communication device 10 transmits the power storage element information to the base station 3, the operation of all or part of the communication device 10, the relay device 20, the domain management device 30, and the battery management device 40 can be stopped. The operation may be stopped, for example, by the control unit 11 of the communication device 10 or by the power supply switching device 50. This makes it possible to reduce power consumption due to the operation of the communication device 10, the relay device 20, the domain management device 30, and the battery management device 40. When the supply of power to the communication device 10 and the relay device 20 is resumed, the communication device 10 and the relay device 20 can be started up.
[0069] When the second communication unit 14 receives a predetermined signal, it can determine that a predetermined event has occurred. For example, when the ship S is moored, the second communication unit 14 can receive the predetermined signal by transmitting an activation signal (for example, a call by a telephone number or activation by a short message service) from the mobile terminal device 200 carried by the maintenance staff. This allows the storage element information stored in the storage unit 12 to be transmitted to the base station 3. The maintenance staff can obtain the storage element information from the base station 3 or via the server 300 using the mobile terminal device 200 carried by the maintenance staff. This allows the maintenance staff to check the state of the storage cell remotely, for example, without having to board the ship carrying a measuring device for measuring the state of the storage cell. In addition, the server 300 can also obtain the storage element information transmitted from the base station 3, so that the monitor managing the server 300 can also check the state of the storage cell remotely.
[0070] When communication with the base station 3 is possible, the communication device 10 can determine that a predetermined event has occurred. For example, even if communication between the second communication unit 14 and the base station 3 is impossible when the ship S is sailing, it is considered that the communication device 10 can communicate with the base station 3 when the ship S is moored. This allows the communication device 10 to transmit the energy storage element information acquired via the domain management device 30 to the base station 3.
[0071] In a case where the storage unit 12 is incorporated in the domain management device 30 instead of the communication device 10, when the communication device 10 determines that a predetermined event has occurred, it can resume the operation of the domain management device 30, acquire the storage element information stored in the storage unit in the domain management device 30, and transmit the acquired storage element information to the base station 3. This allows the storage element information acquired by the domain management device 30 to be temporarily stored in the storage unit even if there is a period during which the communication device 10 is unable to transmit the storage element information. When the communication device 10 becomes able to communicate with the base station 3, it can transmit the storage element information stored in the storage unit of the domain management device 30 to the base station 3.
[0072] The memory unit 12 or a memory unit in the domain management device 30 can store the energy storage element information related to the state of the energy storage cells acquired while the ship S is sailing. As a result, even if a situation exists in which the ship S is sailing and the energy storage element information cannot be transmitted, if an event occurs in which communication between the second communication unit 14 and the base station 3 becomes possible, the server 300 can acquire the energy storage element information while the ship S is sailing, and therefore the state of the energy storage cells mounted on the ship S can be monitored remotely.
[0073] 6 is a flowchart showing a first example of the processing of the communications device 10. In the following, for convenience, the processing will be described with the control unit 11 as the subject. The control unit 11 determines whether it is time to acquire the power storage element information (S11), and if it is not time to acquire the information (NO in S11), continues the processing of step S11. The acquisition timing may be the cycle at which the control board 42 acquires the power storage element information, or may be a cycle longer than the cycle (for example, 1 minute, 2 minutes, 5 minutes, etc.).
[0074] If it is the acquisition timing (YES in S11), the control unit 11 acquires the power storage element information from the domain management apparatus 30 and the relay device 20 (S12), and stores the acquired power storage element information in the storage unit 12 (S13).
[0075] The control unit 11 determines whether communication with the base station 3 (a communication device outside the ship) is possible (S14), and if communication is possible (YES in S14), that is, if the communication device 10 determines whether communication with the base station 3 is possible at a predetermined period (e.g., every hour) and determines that communication is possible, it transmits the storage element information stored in the memory unit 12 to the base station 3 (S15), and terminates the processing.
[0076] If communication is not possible (NO in S14), the control unit 11 judges whether or not a predetermined signal has been received (S16). If the predetermined signal has been received (YES in S16), that is, if the communication device 10 receives the predetermined signal without judging whether communication with the base station 3 is possible, the control unit 11 establishes communication with the base station 3 (communication device outside the ship) (S17) and performs the process of step S15. If the predetermined signal has not been received (NO in S16), the control unit 11 performs the process of step S11.
[0077] 7 is a flowchart showing a second example of the processing of the communications device 10. The control unit 11 determines whether it is time to acquire the power storage element information (S21), and if it is not time to acquire the information (NO in S21), continues the processing of step S21. The acquisition timing may be the cycle at which the control board 42 acquires the power storage element information, or may be a cycle longer than the cycle (for example, 1 minute, 2 minutes, 5 minutes, etc.).
[0078] If it is the acquisition timing (YES in S21), the control unit 11 acquires the power storage element information from the domain management apparatus 30 and the relay device 20 (S22), and stores the acquired power storage element information in the storage unit 12 (S23).
[0079] The control unit 11 determines whether the ship S is at anchor (S24), and if the ship S is not at anchor (NO in S24), continues the processing of step S21. If the ship S is at anchor (YES in S24), the control unit 11 determines whether the onboard power supply equipment 112 (power supply equipment for the ship) has stopped (S25), and if the onboard power supply equipment 112 has not stopped (NO in S25), continues the processing of step S25.
[0080] If the onboard power supply equipment 112 is stopped (YES in S25), i.e., if the ship S is moored, the control unit 11 stops operation of the domain management device 30 and the battery management device 40 (management device) and transitions to standby mode (S26).
[0081] The control unit 11 determines whether or not a predetermined event has occurred (S27), and if there has been no predetermined event (NO in S27), continues the processing of step S27. If there has been a predetermined event (YES in S27), the control unit 11 resumes the operation of the domain management device 30 and the battery management device 40 (management devices) (S28), transmits the stored energy storage element information to the base station 3 (S29), stops the operation of the communication device 10, the relay device, the domain management device 30, and the battery management device 40 (S30), and ends the processing.
[0082] In the present embodiment, the communication device 10 is configured to transmit the energy storage element information via a mobile phone line, but satellite communication can be used instead of a mobile phone line. This makes it possible to obtain the energy storage element information of the energy storage cells mounted on the ship regardless of time or location on the ship, and to remotely monitor the state of the energy storage cells mounted on the ship in real time. Through a Web screen presented by the communication device 10, it is possible to monitor the energy storage cells and control the energy storage cells through a battery management device.
[0083] As described above, according to this embodiment, the storage element information of the storage cells installed on the ship can be obtained via mobile phone lines when the ship calls at port, so that the storage element information detected during the voyage can be obtained and the status of the storage cells installed on the ship can be monitored remotely.
[0084] Furthermore, according to this embodiment, when the ship is moored, maintenance personnel can obtain storage element information of the storage cells installed on the ship at any time without having to board the ship, and can check the status of the storage cells.
[0085] The present invention is intended to be illustrative and not restrictive in all respects, and the scope of the present invention is defined by the claims, and includes all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0086] 1 Network 2. Carrier Network 3 base station 100 Marine power storage equipment 10. Communication Devices 11 Control section 12 Storage section 13 First Communications Department 14 2nd Communications Department 15 Relay Section 16 Communication Antennas 20 Relay Devices 21 Control section 22 First Communications Department 23 Memory section 30 Domain Management Device 40 Battery management device 41 Energy Storage Module 42 Control Board 50 Power supply switching device 51 Standby converter 61, 62 Communication Interface 71 DC bus 72 Power Lines 112 Onboard power supply equipment 200 Portable terminal device 201 Control section 202 Storage section 203 Communications Department 204 Display section 205 Operation section 300 Servers 301 Control Unit 302 Communications Department 303 Monitoring Department 304 Storage section
Claims
1. A storage element mounted on the ship; a battery management device that is installed on the ship, acquires storage element information related to a state of the storage element while the ship is sailing, and has a memory unit that stores the acquired storage element information; a first communication device mounted on the vessel; Equipped with The first communication device is When it is determined that a predetermined event has occurred by receiving a predetermined signal from a mobile terminal device carried by a maintenance worker, the storage element information stored in the memory unit at the time when the first communication device was unable to transmit the storage element information is transmitted to a second communication device installed outside the ship; The marine vessel energy storage element monitoring system further includes a monitoring device that acquires the energy storage element information received by the second communication device.
2. The battery management device includes: Stopping the operation of the battery management device when the power supply equipment in the vessel is stopped; The first communication device is The marine energy storage element monitoring system according to claim 1 , wherein when it is determined that the predetermined event has occurred, the operation of the battery management device is resumed.
3. A marine storage element monitoring system as described in claim 1 or claim 2, wherein when the first communication device transmits storage element information to the second communication device, operation of the battery management device and the first communication device is stopped.
4. A ship power storage facility installed on a ship, A storage element; a battery management device that acquires storage element information related to a state of the storage element while the ship is sailing and has a memory unit that stores the acquired storage element information; A first communication device; Equipped with The first communication device is A ship energy storage equipment that, when it determines that a specified event has occurred by receiving a specified signal from a mobile terminal device carried by a maintenance worker, transmits the energy storage element information stored in the memory unit when the first communication device was unable to transmit the energy storage element information to a second communication device installed outside the ship.
5. A battery management device is installed on the ship, acquires storage element information related to a state of a storage element while the ship is sailing, and stores the acquired storage element information in a storage unit; When a first communication device determines that a predetermined event has occurred by receiving a predetermined signal from a mobile terminal device carried by a maintenance worker, the first communication device transmits the storage element information stored in the memory unit at the time when the first communication device was unable to transmit the storage element information to a second communication device installed outside the ship; A marine vessel energy storage element monitoring method, in which a monitoring device acquires the energy storage element information received by the second communication device.
Citation Information
Patent Citations
Monitor of small ship
JP1999165696A
Monitoring device for small-sized vessel
JP1999175866A
Ship information collection device
JP2011113538A
Battery management system
JP2012103095A
Storage battery system management device, storage battery system management method, and storage battery system
JP2016046960A