Joint structure and construction method of joint structure

The joint structure uses a bundling strip of bending fixing bars with specific positional arrangements to enhance pull-out strength and prevent cracking, addressing the rigidity and anchoring challenges in RC wall-composite beam joints.

JP7564500B1Active Publication Date: 2024-10-09NIPPON STEEL CORPORATION
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2024537838
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2023-03-27
Filing Date
2024-03-19
Publication Date
2024-10-09
Estimated Expiration
2044-03-19

AI Technical Summary

Technical Problem

Conventional joint structures between RC walls and composite beams face issues with rigidity, resistance to pull-out forces, and cracking due to the use of large-diameter reinforcing bars, which are difficult to anchor effectively without causing concrete cracks.

Method used

A joint structure is proposed where multiple bending fixing bars are arranged in a bundling strip with anchoring portions at equivalent positions in the butt direction and extending parts at different vertical positions, forming a multi-layer reinforcement that mimics the pull-out strength of single-layer reinforcement used in column-beam joints.

Benefits of technology

This configuration enhances the pull-out strength and prevents cracking, allowing for reliable anchoring and ductile fracture, while avoiding interference with wall reinforcing bars, achieving strength comparable to single-layer reinforcement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564500000013
    Figure 0007564500000013
  • Figure 0007564500000014
    Figure 0007564500000014
  • Figure 0007564500000015
    Figure 0007564500000015
Patent Text Reader

Abstract

This joint structure comprises a supporting member made of reinforced concrete and a floor slab joined to the supporting member in the butt joint direction, the supporting member having supporting concrete, the floor slab having floor concrete and a plurality of bent anchor bars embedded in the supporting concrete and the floor concrete, each bent anchor bar having an anchoring portion extending in the vertical direction within the supporting concrete and an extension portion extending in the butt joint direction from the upper end of the anchoring portion within the supporting concrete and the floor concrete, two or more of the plurality of bent anchor bars form a bundling bar in which the anchoring portions are arranged in contact with each other, and one extension portion and another extension portion of the extension portions of the two or more bent anchor bars forming the bundling bar are arranged at different positions from each other in the vertical direction.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a joint structure and a method for constructing the joint structure. This application claims priority based on Japanese Patent Application No. 2023-050171, filed on March 27, 2023, the contents of which are incorporated herein by reference. [Background technology]

[0002] In the past, in joint structures where an RC wall (supporting member) is joined to a floor slab of a composite beam, the crack prevention bars of the floor slab, with a nominal diameter of about 6 to 10 mm and intervals of about 200 mm, were bent and fixed to the wall. In such conventional structures, the amount of bent and fixed bars is small, and the rigidity and strength against pull-out forces are very low, so the joint between the composite beam and the RC wall was designed as if it were a pin joint (rigidity and moment resistance are zero). Most of the conventional techniques for the pull-out strength of bent anchor bars in RC members are aimed at RC beam-column joints. In many cases, the diameter of the bent anchor bars is relatively large, ranging from 16 to 36 mm.

[0003] In contrast, in the semi-rigid joint between the RC wall and the composite beam, which is the subject of this disclosure, in order to ensure the rigidity and strength of the joint, it is necessary to fix the floor slab to the RC wall using a large amount of reinforcing bars compared to a general floor slab. However, it is known that when large-diameter reinforcing bars are used with a shallow cover, cracks are likely to occur on the concrete surface. In many cases, the concrete thickness of a floor slab is about 130 mm to 180 mm, and in the case of a deck composite slab, the net concrete thickness on the top of the deck is about 80 mm to 130 mm, so it is difficult to increase the cover thickness from the reinforcing bars to the floor slab surface. In other words, if large-diameter reinforcing bars are used near the surface of the floor slab, cracks are likely to be induced in the floor concrete.

[0004] For these reasons, in order to ensure the rigidity and strength of the joints, it is necessary to place a larger amount of rebar in the floor slab than in a typical floor slab and fix it to the RC wall, while at the same time restricting the diameter of the rebar in the floor slab, especially in the surface layer of the floor concrete, in order to prevent cracks in the floor concrete. Therefore, it is considered an effective measure to restrict the diameter of the rebar in the floor slab (to about 6 to 16 mm in diameter) and arrange it in multiple layers to ensure the amount of rebar.

[0005] However, RC walls have a smaller depth (thickness in the longitudinal direction of the floor slab rebars) than RC columns, and if the floor slab rebars are shifted in the depth direction (butt joint direction), the anchorage length of the shallower floor slab rebars cannot be secured, and scraping anchorage failure, in which the concrete breaks into a cone shape below the yield strength of the floor slab rebars, becomes more likely to occur. Also, although Patent Document 1 proposes a method for evaluating the anchorage strength when multiple bent anchor bars are anchored as bundled bars, no verification has been carried out through experiments, etc., and it is unclear whether the strength calculated using the existing anchorage strength calculation formula established based on the results of experiments that do not use bundled bars can actually be obtained. In response to this, Non-Patent Document 1 discloses that in the case of bent anchor bars arranged in two stages with a shift in the direction of the abovementioned height, the calculated anchor strength per bar is only 0.7 times that of single-stage arrangement. One possible solution is to use a staggered arrangement without using bundling bars, to distribute the compressive force from the bent anchor bars to the concrete. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Japanese Patent Application Publication No. 11-148172 [Non-patent literature]

[0007] [Non-Patent Document 1] Murakami, Kubota, "Estimation method and strength improvement method of anchorage strength of 90 degree bent concrete with two-stage reinforcement", Proceedings of the Japan Concrete Institute, Vol.14, No.2, 1992 Summary of the Invention [Problem to be solved by the invention]

[0008] However, in RC walls, the wall rebars (support rebars) are thicker than the rebars in the floor slabs, for example the vertical rebars (vertical rebars) are D25@150 (diameter 25mm, 150mm pitch), and are arranged relatively densely. If the rebars in the floor slab are staggered, it is difficult to establish a layout for the main rebars without interfering with the wall rebars. It is especially difficult to avoid interference when the pitch of the rebars in the wall and floor slabs is different.

[0009] The present disclosure has been made in consideration of such problems, and has an object to provide a joint structure which prevents cracks in the floor slab caused by bent anchor bars, while preventing the bent anchor bars from interfering with the supporting rebars, and which can obtain a strength equivalent to that of the bent anchor bars used in column-beam joints, or to provide a construction method for a joint structure which prevents cracks in the floor slab caused by bent anchor bars, while preventing the bent anchor bars from interfering with the supporting rebars, and which can obtain a pull-out strength equivalent to that of the bent anchor bars used in column-beam joints. [Means for solving the problem]

[0010] In order to solve the above problems, this disclosure proposes the following means. (1) Aspect 1 of the present disclosure is a joint structure comprising a supporting member made of reinforced concrete and a floor slab joined to the supporting member in a butt-joint direction, wherein the supporting member has supporting concrete, and the floor slab has floor concrete and a plurality of bent anchor bars embedded in the supporting concrete and the floor concrete, each of the bent anchor bars has an anchoring portion extending in the vertical direction within the supporting concrete and an extension portion extending in the butt-joint direction from the upper end of the anchoring portion within the supporting concrete and the floor concrete, wherein two or more of the plurality of bent anchor bars form a bundling bar in which the anchoring portions are arranged in contact with each other, and among the extension portions of the two or more bent anchor bars forming the bundling bar, one of the extension portions and another of the extension portions are arranged at different positions from each other in the vertical direction.

[0011] (2) Aspect 2 of the present disclosure is a construction method for a joint structure that constructs a joint structure including a supporting member of reinforced concrete and a floor slab that is butted against and joined to the supporting member in a butt direction, wherein the supporting member has supporting concrete, the floor slab has floor concrete and a plurality of bent anchor bars embedded in the supporting concrete and the floor concrete, each of the bent anchor bars has an anchoring portion extending in a vertical direction within the supporting concrete and an extension portion extending in a butt direction from an upper end of the anchoring portion within the supporting concrete and the floor concrete, two or more of the plurality of bent anchor bars form a bundling bar in which the anchoring portions are arranged in contact with each other, and one of the extension portions of the two or more bent anchor bars that form the bundling bar and one of the extension portions are arranged at different positions from each other in the vertical direction.

[0012] In these disclosures, for example, even if the length of the support member in the butt direction is relatively short, two or more anchoring parts can be arranged in a small space in the supporting concrete of the support member. Therefore, it is possible to make the two or more anchoring parts less likely to interfere with, for example, the supporting rebar of the support member.

[0013] (3) Aspect 3 of the present disclosure may be a joint structure described in (1), in which the fixing portions of the two or more bent fixing bars forming the bundling bar are arranged at equal positions to each other in the butt joint direction. (4) A fourth aspect of the present disclosure may be a construction method for a joint structure described in (2), in which the fixing portions of the two or more bent fixing bars that form the bundling bar are positioned at equal positions to each other in the butt direction. In these disclosures, it is possible to provide a multi-layered bent anchor bar capable of obtaining a pull-out resistance equivalent to that of a single-layered bent anchor bar used in a column-beam joint. The inventors have thoroughly studied the positions of the respective anchor parts and the respective extension parts of two or more bent anchor bars forming a bundling bar in the floor concrete of the floor slab. As a result, it has been found that by arranging one extension part and another extension part of two or more extension parts at different positions in the vertical direction (arranging one extension part and another extension part of two or more extension parts at different positions in the vertical direction), and arranging the two or more anchor parts at the same positions in the butt joint direction, each bent anchor bar can exhibit a pull-out resistance equivalent to that of a single-layered bent anchor bar used in a column-beam joint. Therefore, in a joint structure, it is possible to provide a multi-layered reinforcement bent anchor bar capable of obtaining a pull-out resistance strength equivalent to that of a single-layered reinforcement bent anchor bar used in a column-beam joint. Also, in a construction method for a joint structure, it is possible to construct a joint structure provided with a multi-layered reinforcement bent anchor bar capable of obtaining a pull-out resistance strength equivalent to that of a single-layered reinforcement bent anchor bar used in a column-beam joint. In these disclosures, it is possible to more reliably fix a plurality of bent anchor bars to a support member, improve the concrete fracture resistance of the fixing part, and induce yielding of the bent anchor bars in advance, inducing ductile fracture due to elongation deformation of the bent anchor bars.

[0014] (5) A fifth aspect of the present disclosure may be a joint structure described in (1) or (3), in which the extension portion of the bent anchor bar having the smallest diameter among the two or more bent anchor bars forming the bundling bar is positioned at the uppermost position among the extension portions of the two or more bent anchor bars. (6) A sixth aspect of the present disclosure may be a construction method for a joint structure described in (2) or (4), in which the extension portion of the bent anchor bar having the smallest diameter among the two or more bent anchor bars that form the bundling bar is positioned at the uppermost position among the extension portions of the two or more bent anchor bars. These disclosures make it possible to suppress the occurrence of cracks in floor concrete.

[0015] (7) In the seventh aspect of the present disclosure, the bundling bars are provided at intervals in a cross direction that crosses imaginary planes parallel to the butt direction and the vertical direction, respectively, and the equivalent rebar diameter d r,eq When the above formula (1) is used, the distance between adjacent bundles in the cross direction is the equivalent rebar diameter d r,eq The joint structure may be any one of (1), (3), and (5), in which the thickness is six times or more. where d r,i is the diameter of the i-th bent anchor bar among the two or more bent anchor bars that make up one bundling bar, which are n bars.

[0016]

number

[0017] (8) In the eighth aspect of the present disclosure, the bundling bars are installed so that they are spaced apart from each other in a cross direction that crosses imaginary planes parallel to the butt direction and the vertical direction, respectively, and the equivalent rebar diameter d r,eq When the distance between adjacent bundled bars in the cross direction is defined by the formula (2), the equivalent rebar diameter d r,eq The method may be any one of the methods (2), (4), and (6), in which the joint structure is constructed so that the thickness of the joint is six or more times larger than the thickness of the joint. where d r,i is the diameter of the i-th bent anchor bar among the two or more bent anchor bars that make up one bundling bar, which are n bars.

[0018]

number

[0019] According to these disclosures, for example, conventional strength evaluation formulas that were not intended for use with bundled reinforcement or bent anchor reinforcement of reinforcing bars arranged in multiple layers can be used for bundled reinforcement or bent anchor reinforcement of reinforcing bars arranged in multiple layers. Effect of the Invention

[0020] According to the joint structure of the present disclosure, it is possible to provide a bent anchor bar having a pull-out strength equivalent to that of a bent anchor bar of a single-layer reinforcement arrangement used in a column-beam joint by using a bundled reinforcement or a bent anchor bar of a reinforcing bar arranged in multiple layers. Also, according to the construction method of the joint structure of the present disclosure, it is possible to construct a joint structure provided with a bent anchor bar having a pull-out strength equivalent to that of a bent anchor bar of a single-layer reinforcement arrangement used in a column-beam joint. [Brief description of the drawings]

[0021] [Figure 1] FIG. 1 is a floor layout diagram of a building in which a joint structure of Specification 1, which is one embodiment of the present disclosure, is used. [Diagram 2] 2 is a cross-sectional view taken along line A1-A1 in FIG. [Diagram 3] 3 is a cross-sectional view taken along line A2-A2 in FIG. 2. [Figure 4] FIG. 13 is a diagram showing an example of the collapse mode of wall concrete due to anchorage reinforcement. [Diagram 5] 13A and 13B are diagrams showing other examples of the collapse patterns of wall concrete due to anchor reinforcement. [Figure 6] 13A and 13B are diagrams showing other examples of the collapse patterns of wall concrete due to anchor reinforcement. [Figure 7] 13A and 13B are diagrams showing other examples of the collapse patterns of wall concrete due to anchor reinforcement. [Figure 8] This is a cross-sectional view of a key part of a building in which the joint structure of Specification 2 is used. [Figure 9] This is a cross-sectional view of a key part of a building in which the joint structure of Specification 3 is used. [Figure 10] This is a cross-sectional view of a key part of a building in which the joint structure of Specification 4 is used. [Figure 11] FIG. 1 is a diagram showing a schematic configuration of a test specimen used in an experiment. [Figure 12] 12 is a view taken in the direction of the arrow A5 in FIG. 11. [Figure 13] FIG. 1 is a front view of the experimental apparatus with the test specimen attached. [Figure 14] 14 is a cross-sectional view taken along line A8-A8 in FIG. 13. [Figure 15] FIG. 13 is a diagram showing the experimental results of average stress intensity relative to rebar stress intensity at the expected maximum load. [Figure 16] FIG. 13 is a graph showing the change in calculated anchorage strength for test specimens. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] Hereinafter, a building in which an embodiment of a joint structure according to the present disclosure is used will be described with reference to FIGS. First, we will explain the joint structure for considering floor reinforcement (reinforcing bars) described later, which can obtain a pull-out strength equivalent to that of the bent anchor bars of single-layer reinforcement used in column-beam joints.

[0023] [1. Structure of buildings using Specification 1 joint structure] As shown in Figures 1 and 2, this building 1 includes a core wall 10, a plurality of columns 20, and a composite beam 25. In Figure 1, the composite beam 25 is indicated by a two-dot chain line. The core wall 10 has a rectangular cylindrical shape. The core wall 10 has a pair of first walls (support members) 11 and a pair of second walls (support members) 12. The pair of first walls 11 and the pair of second walls 12 are each made of RC (Reinforced Concrete).

[0024] As shown in FIG. 2, the first wall 11 has wall concrete (supporting concrete) 14, a plurality of wall reinforcing bars (supporting reinforcing bars) 15, a base plate 16, and a plurality of headed studs 17. The wall concrete 14 is in the form of a rectangular plate when viewed in its thickness direction (butt direction X). The wall concrete 14 is disposed so that its thickness direction is along a horizontal plane and extends in the vertical direction Z. The wall reinforcing bars 15 include a plurality of vertical bars 15a and a plurality of horizontal bars 15b. The vertical bars 15a and the horizontal bars 15b are embedded in the wall concrete 14. The vertical bars 15a are arranged to be spaced apart from each other and extend in the up-down direction Z. The horizontal bars 15b extend along the horizontal plane and are respectively joined to the vertical bars 15a.

[0025] As shown in Figures 2 and 3, the base plate 16 is disposed on the outer surface of the wall concrete 14. The base plate 16 is exposed to the outside. The base plate 16 may be disposed offset toward the wall concrete 14 from the outer surface of the wall concrete 14, and the surface of the base plate 16 may be covered by the wall concrete 14. Note that Figure 3 only shows the schematic configuration of a floor slab 28, which will be described later. As shown in Fig. 2, the headed studs 17 are fixed to a main surface 16a of the base plate 16 that faces the inside of the wall concrete 14. The headed studs 17 protrude from the base plate 16 toward the inside of the wall concrete 14. The headed studs 17 are embedded in the wall concrete 14. The base plate 16 may be fixed to the wall concrete 14 by a method that does not use the headed studs 17. For example, the base plate 16 may be fixed by a post-installed anchor, or a stud dowel (perforated steel plate) or mechanical fixing may be used.

[0026] As shown in FIG. 1, the pair of first walls 11 face each other in a direction along a horizontal plane. 2, a shear plate 18 is joined to a main surface 16b of the base plate 16 opposite to the main surface 16a by welding, bolts, etc. The shear plate 18 is joined to the first wall 11. A plurality of bolt holes (not shown) are formed in the shear plate 18. The plurality of bolt holes are arranged side by side in the up-down direction Z and spaced apart from each other.

[0027] As shown in FIG. 1, the pair of second walls 12 are configured similarly to the pair of first walls 11. The second walls 12 are disposed such that their thickness direction is along the horizontal plane and they extend in the vertical direction Z. The pair of second walls 12 face each other in a direction along the horizontal plane. The pair of second walls 12 connect the widthwise ends of the first walls 11 to each other. In the space within the core wall 10, an elevator shaft, a staircase, etc. (not shown) are arranged.

[0028] The pillars 20 extend along the vertical direction Z. The multiple pillars 20 are arranged around the core wall 10 at intervals from each other and at positions spaced apart from the core wall 10. For example, the pillars 20 are made of reinforced concrete. However, the pillars may also be made of steel, SRC (steel encased reinforced concrete / steel framed reinforced concrete), CFT (concrete-filled steel tube), or the like.

[0029] 1 and 2, the composite beam 25 has a plurality of first steel beams (steel beams) 26, a plurality of second steel beams (steel beams) 27, and a floor slab 28. The first wall 11 and the floor slab 28 constitute a joint structure 29 of specification 1. Similarly, the second wall 12 and the floor slab 28 constitute a joint structure 29 of specification 1. In other words, either the first steel beam 26 or the second steel beam 27 that abuts against the walls 11, 12 can be used for the joint structure 29 of specification 1 in this embodiment. For example, the first steel beam 26 and the second steel beam 27 are each an H-shaped steel beam. The first steel beam 26 and the second steel beam 27 do not have to be an H-shaped steel beam. For example, a T-shaped steel beam without an upper flange of an H-shaped steel beam may be used. Also, a T-shaped beam in which a reinforced concrete beam and a floor slab 28 are integrated may be used. The first steel beams 26 are respectively bridged between adjacent core walls 10 and columns 20 and between adjacent columns 20, and extend in a direction along the horizontal plane. The second steel beams 27 are respectively bridged between adjacent core walls 10 and first steel beams 26 and between adjacent first steel beams 26, and extend along the horizontal plane. Since the first steel beam 26 and the second steel beam 27 have the same configuration, the following description will use the second steel beam 27, which is stretched between the adjacent core walls 10 and the first steel beam 26, as an example.

[0030] 2 and 3, the second steel beam 27 includes a first flange 31, a second flange 32, and a web 33. The first flange 31 and the second flange 32 are each disposed along a horizontal plane and face each other in the up-down direction Z. The first flange 31 is disposed above the second flange 32. The web 33 is disposed between the first flange 31 and the second flange 32. The web 33 is joined to the center of the first flange 31 in the width direction and the center of the second flange 32 in the width direction, respectively. Alternatively, the web 33 is integrally formed with the first flange 31 and the second flange 32 so as to be located at the center of the first flange 31 in the width direction and the center of the second flange 32 in the width direction. A plurality of bolt holes (not shown) are formed in each end of the web 33 in the butt direction X. The plurality of bolt holes are arranged side by side in the up-down direction Z while being spaced apart from each other.

[0031] As shown in Fig. 2, the floor slab 28 is disposed so that the thickness direction of the floor slab 28 is along the up-down direction Z. The floor slab 28 is butted against and joined to the first wall 11 in the butt direction X. Hereinafter, the first wall 11 side relative to the floor slab 28 is referred to as the first side X1 in the butt direction X (also simply referred to as the first side X1). The side opposite to the first side X1 is referred to as the second side X2 in the butt direction X (also simply referred to as the second side X2). As shown in FIGS. 2 and 3, the floor slab 28 has a deck plate 36, floor concrete 37, and a plurality of binding bars 45. The deck plate 36 is formed by bending a steel plate, etc. The deck plate 36 is disposed on the first flange 31 of the second steel beam 27. The floor concrete 37 is formed into a flat plate shape and placed on the deck plate 36. The bundling bars 45 have a plurality (two or more) of bent anchor bars (bent anchor steel bars) 38 and a wire (bundling member) 44. The plurality of bent anchor bars 38 have a plurality of first anchor bars 42A and a plurality of second anchor bars 42B.

[0032] Although not shown, the multiple bent anchor bars 38 (floor slab 28) may have reinforcing bars in a direction intersecting the butting direction X. Also, although not shown, the multiple bent anchor bars 38 may have reinforcing bars that are arranged along the butting direction X and are not embedded (anchored) in the wall concrete 14, in addition to the multiple first anchor bars 42A and the multiple second anchor bars 42B.

[0033] In this embodiment, the configuration of the first anchoring bar 42A and the configuration of the second anchoring bar 42B are the same as each other except for their diameters and lengths. Therefore, the configuration of the first anchoring bar 42A is indicated by adding the capital letter "A" to the number of the symbol, or the number and lowercase English letter. The configuration of the second anchoring bar 42B corresponding to the first anchoring bar 42A is indicated by adding the capital letter "B" to the number or the number and lowercase English letter that is the same as the symbol of the first anchoring bar 42A. This avoids redundant explanations. For example, the anchoring portion 42aA of the first anchoring bar 42A (described later) and the anchoring portion 42aB of the second anchoring bar 42B (described later) are the same as each other except for their diameters and lengths.

[0034] The first anchor bar 42A is formed, for example, by bending a reinforcing bar. The first anchor bar 42A has an anchoring portion 42aA, an extension portion 42bA, and a bent portion 42cA. The first anchor bar 42A may have an enlarged diameter portion that resists the first anchor bar 42A from slipping out instead of the bent portion 42cA. The anchoring portion 42aA extends in the vertical direction Z within the wall concrete 14. The anchoring portion 42aA is embedded (anchored) in the wall concrete 14. The extending portion 42bA extends toward the second side X2 along the butting direction X. An end portion of the extending portion 42bA on the first side X1 is embedded in the wall concrete 14. The remaining portion of the extension 42bA other than the end portion is embedded in the floor concrete 37.

[0035] The bent portion 42cA is formed in a quadrant arc shape and is joined to an upper end of the fixing portion 42aA and an end of the extending portion 42bA on the first side X1. The first anchor bar 42A may have a second anchor bar extending downward from the end of the second side X2 of the extension portion 42bA. Alternatively, the first anchor bar 42A may have a second anchor bar that folds back toward the first side X1 via a hook with a central angle of 180° at the end of the second side X2 of the extension portion 42bA.

[0036] The diameter of the second anchor bar 42B is larger than that of the first anchor bar 42A. That is, the bent anchor bar 38 with the smallest diameter among the anchor bars 42A and 42B is the first anchor bar 42A. The second anchor bar 42B has an anchor portion 42aB, an extension portion 42bB, and a bent portion 42cB that are configured similarly to the anchor portion 42aA, the extension portion 42bA, and the bent portion 42cA of the first anchor bar 42A. The first anchoring bar 42A and the second anchoring bar 42B may have the same diameter. The first anchoring bar 42A may have an enlarged diameter portion instead of the bent portion 42cA that resists the first anchoring bar 42A from slipping out.

[0037] The anchoring portions 42aA, 42aB are arranged at the same positions in the butt direction X. Here, the anchoring portions 42aA, 42aB are arranged at the same positions in the butt direction X, which means, for example, that the absolute value of the difference in projected anchoring length of the anchoring bars 42A, 42B is four times or less the diameter of the second anchoring bar 42B (the largest diameter among the multiple bent anchoring bars 38). The projected anchoring length of the first anchoring bar 42A means the length in the butt direction X of the portion of the first anchoring bar 42A that is fixed to the wall concrete 14 (the projected anchoring length L in FIG. 2). dh (See ). The same applies to the projected anchor length of the second anchor bar 42B.

[0038] The anchoring parts 42aA, 42aB may be arranged in contact with each other. By arranging the anchoring parts 42aA, 42aB in this manner, the lengths of the anchoring bars 42A, 42B in the butt direction X that are fixed to the wall concrete 14 are uniform. This makes it easier to position the anchoring bars 42A, 42B, improving the workability of the anchoring bars 42A, 42B.

[0039] The minimum value of the projected anchor length of the multiple anchor bars 42A, 42B (multiple bent anchor bars 38) is the length in the butting direction X of the first wall 11 (length D in FIG. 2 w This is because a tensile stress acts in the vertical direction Z on the edge of the second side X2 in the thickness direction (butt direction X) of the wall concrete 14 due to a bending moment acting on the first RC wall 11 from the composite beam 25. This causes a biaxial tensile stress to act due to a combined stress with the pull-out force of the anchor reinforcements 42A, 42B, making the wall concrete 14 more likely to break. In general, the RC walls 11 and 12 are constantly subjected to compressive force in the height direction (Z direction) to support the vertical force (self-weight, live load) acting on the building 1. Therefore, the minimum value of the projected anchorage length is the length D w However, when additional tensile stress acts on the walls 11 and 12 in the vertical direction Z due to horizontal forces caused by wind loads or earthquake forces, in order to more reliably obtain the pull-out resistance of the anchorage bars 42A and 42B, the minimum projected anchorage length should be length D w On the other hand, it is preferable that the covering thickness from the anchoring parts 42aA, 42aB to the side surface of the wall concrete 14 is at least about 20 mm, and the maximum value of the projected anchoring length is (D w -20mm) or less is preferable.

[0040] The fixing portions 42aA, 42aB are bound to each other by wire 44 or the like. The bundling member is not limited to wire 44, and may be a cable tie or may be joined by welding. In addition, the plurality of bent fixing bars 38 constituting the bundling bar 45 may not be bound by a bundling member, and other means may be used to fix the positions of the fixing portions 42aA, 42aB so that they are close to each other (in contact). The extending portion 42bA and the extending portion 42bB are disposed at different positions in the vertical direction Z. The extending portion 42bA and the extending portion 42bB are disposed at different positions in the vertical direction Z, which means, for example, that the central axis of the extending portion 42bA and the central axis of the extending portion 42bB are disposed at different positions in the vertical direction Z.

[0041] More specifically, the extensions 42bA, 42bB are spaced apart from each other in the vertical direction Z. The extension 42bA of the first anchoring bar 42A is located at the top of the extensions 42bA, 42bB. In other words, the extension 42bA of the first anchoring bar 42A, which is located at the top of the extensions 42bA, 42bB and has a smaller diameter, is located above the extension 42bB of the second anchoring bar 42B, which has a larger diameter than the first anchoring bar. The number of bent anchor bars 38 is not limited to two layers of anchor bars 42A and 42B, and can be three or four layers as described above. In this case, the bundling bar 45 is a bundling of three or four anchor bars. Even if the bundling bar has three or more bent anchor bars, it is preferable that the extension of at least one anchor bar with the smallest diameter is located at the top.

[0042] The configuration in Fig. 2 has the effect of improving the fracture resistance corresponding to the fracture mode (Figs. 4 to 7 described later) of the wall concrete (supporting concrete) 14. In Figs. 4 to 7, for example, a reinforced concrete column 100 and a floor concrete 101 are connected by a plurality of first anchoring bars 42A. Figs. 4(B) to 7(B) are cross-sectional views of Figs. 4(A) to 7(A) viewed from above. Figs. 4(B) to 7(B) do not show the floor concrete 101. For example, when concrete resisting the support pressure acting from the bent portions 42cA, 42cB between the extension portions 42bA, 42bB and the anchor portions 42aA, 42aB of the anchor bars 42A, 42B (multiple bent anchor bars 38), respectively, suffers a raking-out failure (see Figure 6), the effective area of ​​the cone (approximately cone-shaped) failure surface of the scraped-out portion is the region R1 surrounded by the solid line in Figure 2 in the case of this embodiment (Figure 2), and is the region R2 surrounded by the solid line in Figure 9 in the case of a configuration different from the present disclosure described later (Figures 9 and 10).

[0043] These cone fracture surfaces are obtained by the following common concept. First, a cone fracture surface (area R3 shown by dotted lines in Fig. 2 and Fig. 9; however, areas where the solid and dotted lines overlap are areas R1 and R2, which are part of the fracture surface) where scraping fracture occurs when the anchor bars 42A and 42B (multiple bent anchor bars 38) are assumed to exist independently is assumed for each of the anchor bars 42A and 42B. Of the areas surrounded by these cone fracture surfaces, the areas included in both cone fracture surfaces (area R1 in Fig. 2, area R2 in Fig. 9) become the actual cone fracture surface. The farther the positions of the bent portions 42cA, 42cB are from the beam side of the wall concrete 14 in the butt direction X, the deeper the cone fracture occurs in the butt direction X. Therefore, the effective area shown in the region R1 in FIG. 2 is larger than the effective area shown in the region R2 in FIG. 9, and the fracture resistance is greater.

[0044] 3, a direction perpendicular to an imaginary plane S1 parallel to the butt direction X and the up-down direction Z is defined as an orthogonal direction (intersecting direction) Y. The intersecting direction may be a direction intersecting the imaginary plane S1. The multiple bundling bars 45 are arranged in the orthogonal direction Y at intervals from each other. The number of bundling bars 45 that the floor slab 28 has is not limited, and may be as small as one. Here, the equivalent rebar diameter d of the bundled reinforcing bars 45 is r,eq (mm) is defined by formula (5).

[0045]

number

[0046] However, d r,i is the diameter (mm) of the i-th bending anchor bar 38 among the n bending anchor bars 38 that make up one bundling bar 45. i is a natural number, and in the example of Figures 2 and 3, n is 2. The distance S in the perpendicular direction Y between adjacent bundled bars 45 in the perpendicular direction Y is the equivalent rebar diameter d r,eq It is preferable that the distance S is 6 times or more of the equivalent rebar diameter d r,eqIf the resistance is less than six times, the areas of the wall concrete 14 that resist the pull-out force of the bundling bars 45 will overlap between adjacent bundling bars in the perpendicular direction Y, making the wall concrete 14 more susceptible to destruction. In addition, the distance S is preferably large from the viewpoint of preventing destruction of the wall concrete 14 at the anchoring portion, and there is no particular upper limit, but the larger the distance S, the fewer the number of bent anchor bars 38 that can be placed within the effective width of the floor slab 28, and the smaller both the strength and rigidity become. Therefore, the distance S is determined by the equivalent rebar diameter d r,eq It is preferable to set the upper limit at about 20 times.

[0047] As shown in Fig. 2, a plurality of headed studs (shear connectors) 48 are fixed to the first flange 31 of the second steel beam 27. The headed studs 48 are spaced apart from one another in the butt joint direction X. The headed studs 48 are embedded in the floor concrete 37 through the deck plate 36 of the floor slab 28. Alternatively, the deck plate 36 may be divided above the first flange 31, in which case the multiple headed studs 48 are directly joined to the first flange 31 and embedded in the floor concrete 37.

[0048] 2 and 3, the web 33 of the second steel beam 27 and the shear plate 18 are joined together by a bolt 51 and a nut 52. To explain in more detail, the shaft portion (reference number omitted) of the bolt 51 is passed through a bolt hole in the shear plate 18 and a bolt hole in the web 33 of the second steel beam 27. The head portion (reference number omitted) of the bolt 51 is engaged with the shear plate 18 from the side opposite the web 33. The nut 52 engages with the web 33 from the side opposite the shear plate 18, and is fitted onto the shaft of the bolt 51. Although not shown, washers are provided between the head of the bolt 51 and the shear plate 18, and between the nut 52 and the web 33. 2, the second flange 32 of the second steel beam 27 and the base plate 16 of the first wall 11 are joined by a connecting part 53. The connecting part 53 may be formed by inserting a bearing member (contact plate) that transmits stress by metal contact, or may be joined by welding.

[0049] In the joint structure 29, the ends of the second side X2 of the multiple bent anchor bars 38 preferably extend to the negative bending region of the second steel beam 27. That is, when both ends of the second steel beam 27 are supported in the vertical direction Z by some joint, the range including the center of the butt direction X of the second steel beam 27 becomes the positive bending region. Since the floor slab 28 in this range receives compressive force, only the crack prevention bars need to be arranged. Therefore, the multiple first anchor bars 42A, which are upper layer bars, are arranged over the entire length of the second steel beam 27 as crack prevention bars, and the multiple second anchor bars 42B, which are lower layer bars, do not need to be arranged in the positive bending region. The crack prevention bars may be divided into two or more in the length direction and arranged continuously with the multiple first anchor bars 42A by providing lap joints. Furthermore, in the negative bending region of the first side X1 of the second steel beam 27, the multiple bent anchor bars 38 may be arranged only near the joint where the tensile force of the floor slab 28 is large. Even in the negative bending region, the multiple second anchor bars 42B do not need to be provided in the range close to the positive bending region.

[0050] For example, the length of the second steel beam 27 is L b In this case, the second anchor bar 42B is 0.15L from the joint. b The length of the second anchor bars 42B may be shorter depending on the rotational rigidity of the joint. However, in order to transmit the tensile force from the headed studs 48 embedded in the floor slab 28 to the multiple bent anchor bars 38, it is preferable to ensure that the length of the second anchor bars 42B is at least about 40 times the diameter of the multiple bent anchor bars 38.

[0051] [2. Construction method for joint structure of Specification 1] The construction method of the joint structure 29 of specification 1 (hereinafter, simply referred to as the construction method) will be described. In the construction method, for example, before the wall concrete 14 and the floor concrete 37 are poured, the anchoring portions 42aA, 42aB of the anchoring bars 42A, 42B are disposed at equal positions in the butting direction X. The extension portion 42bA and the extension portion 42bB are disposed at different positions in the vertical direction Z. To explain in more detail, in the construction method, it is preferable to dispose the extension portion 42bA of the first anchor bar 42A, which has a smaller diameter, at the uppermost position of the extension portions 42bA, 42bB. In the construction method, it is preferable to construct the multiple anchor reinforcements 42A, 42B so that the minimum projected anchorage length of the multiple anchor reinforcements 42A, 42B is at least 1 / 2 or at least 2 / 3 times the length of the first wall 11 in the butt direction X.

[0052] In the construction method, the wall concrete 14 and the floor slab 28 may be constructed so as to have a plurality of bundling bars 45 arranged in the perpendicular direction Y. In this case, the distance in the perpendicular direction Y between adjacent bundling bars 45 in the perpendicular direction Y is equal to or less than the equivalent rebar diameter d r,eq It may be constructed so that the thickness is at least six times the above. The base plate 16, having a plurality of headed studs 17, is installed prior to pouring the wall concrete 14 and floor concrete 37. Next, the wall concrete 14 is poured. After the wall concrete 14 hardens and the formwork is removed, the first steel beam 26 and the second steel beam 27 are joined to the shear plate 18 installed on the base plate 16, floor concrete 37 is poured on the deck plate 36, and the joint structure 29 is constructed. The shear plate 18 may be joined to the base plate 16 after the formwork for the wall concrete 14 is removed. In this case, the formwork for the wall concrete 14 and the shear plate 18 do not interfere with each other, so the formwork for the wall concrete 14 is easily installed. The formwork for the wall concrete 14 may be installed with the shear plate 18 joined to the base plate 16 in advance. In this case, it is necessary to provide an opening in part of the formwork to avoid interference between the formwork and the shear plate 18, but the process of installing the shear plate 18 after removing the formwork can be omitted.

[0053] [3. Structure of buildings using joint structures (specifications 2 to 4) other than those disclosed herein] Next, a joining structure different from that of the present disclosure will be described for comparison with the joining structure of the present disclosure. The building 1A shown in Fig. 8 has a joint structure 60 of Specification 2 instead of the joint structure 29 in each configuration of the building 1. This joint structure 60 of Specification 2 is a joint structure different from that of the present disclosure. In the joint structure 60, the fixing portion 42aA of the first fixing bar 42A and the fixing portion 42aB of the second fixing bar 42B are not in contact with each other and are arranged at different positions in the butt direction X. To explain in more detail, the fixing portion 42aB is arranged on the first side X1 of the fixing portion 42aA. On the other hand, the extending portion 42bA and the extending portion 42bB are disposed at the same positions in the up-down direction Z. The building 1B shown in Fig. 9 has a joint structure 65 of Specification 3 instead of the joint structure 29 in each configuration of the building 1. This joint structure 65 of Specification 3 is a joint structure different from that of the present disclosure. In the joint structure 65, the fixing portion 42aA of the first fixing bar 42A and the fixing portion 42aB of the second fixing bar 42B are not in contact with each other and are located at different positions in the butt direction X. In addition, the extension portion 42bA and the extension portion 42bB are also located at different positions in the vertical direction Z.

[0054] Moreover, the building 1C shown in FIG. 10 has a joint structure 70 of specification 4 instead of the joint structure 29 in each configuration of the building 1. In the joint structure 70, the first anchor bar 42A and the second anchor bar 42B are arranged at intervals in the perpendicular direction Y. That is, when viewed in the butt joint direction X, the extension portion 42bA of the first anchor bar 42A and the extension portion 42bB of the second anchor bar 42B are not in contact with each other and are arranged in a staggered manner. The first anchor bar 42A and the second anchor bar 42B are not bundled by the wire 44. This joint structure 70 of specification 4 is also a joint structure different from that disclosed herein.

[0055] According to Non-Patent Document 1, the calculated anchor strength of the bent anchor bars 38 in the joint structures 60 (specification 2) and 65 (specification 3) is reduced to 0.7 times the calculated anchor strength of the reinforcing bars arranged in one layer. On the other hand, in the joint structure 70 (specification 4) in the example of Figure 10, the spacing of the bent anchor bars 38 in the orthogonal direction Y is the same as the spacing of the wall rebars, so there is no interference. However, if the spacing of the bent anchor bars 38 and the spacing of the wall rebars are different, interference is likely to occur unless the larger spacing is an integer multiple of the smaller spacing. Avoiding interference with the wall rebars makes the spacing of the bent anchor bars 38 uneven, making it difficult to predict the pull-out strength of the anchorage parts. The following describes the experimental results of the calculated anchor strength of the bent anchor bars 38.

[0056] [4. Experiments using test specimens] As shown in Figures 11 and 12, five test specimens 75 were used, each having a plurality of bent anchor bars 38 anchored to the first wall 11. Note that the wires 44 are not shown in Figures 11 and 12. 11 and 12, the dimensions of each component of the test specimen 75 are shown in units of "mm." The number immediately after "@" indicates the pitch. The specifications of test specimen 75 are shown in Tables 1 to 4.

[0057] [Table 1]

[0058] [Table 2]

[0059] [Table 3]

[0060] [Table 4]

[0061] The size of all first walls 11 was 800 mm wide and 2000 mm high. The bent anchor bars (anchor bars) 38 were shifted in the vertical direction Z (thickness direction of the floor slab 28) to form a two-layer arrangement. Four test specimens 75, Nos. 1, 2, 4, and 5, were manufactured in which the anchor parts 42aA, 42aB in the RC first wall 11 were bundled with wire 44 and multiple bent anchor bars 38 were arranged. One test specimen 75, No. 3, was manufactured in which the bent anchor bars 38 were shifted in the vertical direction Z to form a two-layer arrangement, and the layered bent anchor bars 38 were shifted in the perpendicular direction Y to form a staggered arrangement. Specimen No. 3 75 (staggered arrangement) has the same thickness and amount of reinforcing bars as specimen No. 2 75 (bundled bars), and is a specimen for comparison. In all test specimens 75, No. 1 to No. 5, the bending anchor bars 38 were bent hooks at 90°, and the inside radius of the bend was six times the diameter of the bending anchor bars 38.

[0062] Other experimental parameters were the diameter and pitch of the bent anchor bars 38, and the thickness of the first wall 11. When pouring concrete for the test specimen 75, the test specimen 75 was erected so that the height direction of the first wall 11 of the test specimen 75 was the same as the up-down direction Z of the actual first wall 11. This ensured that the concrete pouring direction was the same as that of the actual building.

[0063] Specimens 75 Nos. 1, 2, 4, and 5 correspond to specification 1. Specimen 75 No. 3 corresponds to the joint structure 70 of specification 4. In addition, in all test specimens 75, the bending anchor bars 38 were bent hooks at 90°, and the inside radius of the bend was six times the diameter of the bending anchor bars 38.

[0064] 13 and 14 show the test specimen 75 placed in an experimental device 80. FIG. The experimental apparatus 80 comprises a gate-shaped loading frame 81 , a pair of pin roller supports 82 , a hydraulic jack 83 , and a load cell 84 . The test specimen 75 is laid so that the height direction of the first wall 11 is in a direction along the horizontal plane. The lower ends of the multiple (three in this example) bent anchor bars 38 of the test specimen 75 are fixed to the loading girder 81a of the portal loading frame 81. A pair of pin roller supports 82 support both ends of the first wall 11 so as not to move in the vertical direction. When the hydraulic jack 83 pushes the loading girder 81a downward, the first wall 11 is bent at three points by the loading girder 81a and the pair of pin roller supports 82. Then, the multiple bent anchor bars 38 are pulled out downward from the first wall 11. A pulling force P was applied downward by a hydraulic jack 83 so that the displacement of the first wall 11 was constant. A load cell 84 was connected to the hydraulic jack 83 and measured the compressive load applied by the hydraulic jack 83.

[0065] Expected maximum load P of the experiment u,calc is the concrete fracture strength T of the bent anchor bar 38, assuming that the bar is arranged in one layer (single layer). u (See Figure 4 or Figure 5) Scraping anchorage fracture resistance T cu (See Figure 6) The cross-sectional yield strength T of the bent anchor bar 38 ry , the anchor bar pull-out force T of the bent anchor bar 38 of the first wall 11 of the RC structure at the time of joint shear failure s (See Figure 7) The smallest strength of the four is used as the basis. u,calc =min(T u ,T cu ,T ry ,T s ) was decided. Sectional yield strength T ry is defined as the product of the yield strength of the rebar used in the experiment and the total cross-sectional area. u , Scraping anchorage destruction resistance T cu , Pull-out force of anchorage bar at the time of joint shear failure T s The calculation method was as described in Reference 1. Reference 1: Architectural Institute of Japan, "Guidelines for and Commentary on Ductility-Guaranteed Earthquake-Resistant Design of Reinforced Concrete Buildings," Maruzen Co., Ltd., 2001

[0066] Pull-out force of anchorage bar at the time of joint shear failure T s Regarding the shear force acting on the first wall 11, the shear crack strength V c and the reliable shear strength V u The pull-out force (T s =2×(max(V c ,V u )) The concrete fracture strength of the anchorage T u Regarding the bundled bar 45, the equivalent rebar diameter d of the bundled bar 45 defined by equation (5) is r,eq The folding anchorage strength f described in Reference 1 was calculated using u This value was calculated by multiplying it by the total cross-sectional area of ​​the anchor reinforcement. Concrete fracture strength of anchorage in staggered arrangement T u is the equivalent rebar diameter d calculated using equation (8) r,eq The number of bent anchor bars 38 having a length of 10 mm (mm) was treated as being equal to the total number of the upper layer first anchor bars 42A and the lower layer second anchor bars 42B. The spacing of the bent anchor bars 38 in the orthogonal direction Y was set to the spacing in the orthogonal direction Y between the first anchor bars 42A and the second anchor bars 42B.

[0067]

number

[0068] where n t is the number of first anchor bars 42A. d r,t is the nominal diameter of the first anchor bar 42A (mm), n b is the number of second anchor bars 42B, d r,b is the nominal diameter (mm) of the second anchorage bar 42B. u , Scraping anchorage destruction strength T cu , and the anchorage bar pull-out force T at the time of joint shear failure s In both calculations, the concrete strength used was the actual compressive strength and splitting tensile strength on the day of the experiment.

[0069] Expected maximum load P u,calc, Calculated strength T corresponding to various fracture modes u , T cu , T ry , T s Table 5 shows the predicted failure mode, the maximum strength obtained in the experiment, and the failure mode that occurred in the experiment.

[0070] [Table 5]

[0071] Figure 15 shows the expected maximum load (calculated anchorage strength) P u,calc The expected maximum load reinforcing bar stress f is calculated by dividing the total cross-sectional area of ​​the multiple bent anchor bars 38. u,calc and the maximum load T max The average stress f of the bent anchor bars 38 is calculated by dividing the stress f by the sum of the cross-sectional areas of the bent anchor bars 38. u,exp The results of the comparison are shown below. In FIG. 15, when a circle is on the line L1, the average stress f u,exp The expected maximum load rebar stress f is calculated assuming that the rebar is placed in one layer (single layer). u,calc This means that the strength was not reduced to 0.7 times that of a single-layer reinforcement used in beam-column joints, and the strength was equivalent to that of a single-layer reinforcement used in beam-column joints. For all test pieces 75, f u,exp f u,calc The values ​​were roughly equivalent to those of T max is the expected maximum load P u,calc It was confirmed that the anchorage strength was roughly equivalent to that of the staggered arrangement, and that the proposed method used here could accurately predict the anchorage strength. In addition, the results of test specimens 75 No. 2 and No. 3 confirmed that the bundled reinforcement had the same strength as the staggered arrangement if the configuration disclosed herein was used. In other words, according to the configuration disclosed herein, the bent anchorage reinforcement 38 is less likely to interfere with the wall rebars 15, making it easier to install than the staggered arrangement, and it was shown that the same strength could be obtained as with the staggered arrangement.

[0072] [5. Verification experiment of calculated anchorage strength] The No. 1 and No. 2 test specimens 75 were used as the basis (examples), and cases in which the projected anchorage length of each of the second anchor bars 42B was shorter than the projected anchorage length of the first anchor bar 42A were used as comparative examples (No. 1' and No. 2' shown in Table 6), and the calculated anchorage strength of a total of four cases was calculated. The calculations here are based on the findings of Non-Patent Document 1.

[0073] [Table 6]

[0074] The results are shown in FIG. It can be seen that the calculated fixing strength of the comparative examples No. 1' and No. 2' is lower than that of the examples No. 1 and No. 2 of the present disclosure.

[0075] 6. Effects of this embodiment As described above, in the joint structure 29 and construction method of this embodiment, the inventors have thoroughly examined the positions of the anchoring parts 42aA, 42aB and the positions of the extension parts 42bA, 42bB of the anchoring bars 42A, 42B forming the bundling bars 45 in the floor concrete 37 of the floor slab 28. As a result, it has been found that by arranging the extension parts 42bA and 42bB at different positions in the vertical direction Z and arranging the anchoring part 42aA of the first anchoring bar 42A and the anchoring part 42aB of the second anchoring bar 42B in contact with each other, each of the anchoring bars 42A, 42B exhibits a pull-out strength equivalent to that of a bent anchoring bar arranged in one stage (single layer) such as that used in a column-beam joint. Therefore, the joint structure 29 can be provided with the anchor bars 42A, 42B of multi-layered reinforcement, which have a pull-out resistance equivalent to that of the bent anchor bars arranged in a single layer. Also, in the construction method, the joint structure 29 can be constructed with the anchor bars 42A, 42B of multi-layered reinforcement, which have a pull-out resistance equivalent to that of the bent anchor bars arranged in a single layer, such as those used in column-beam joints. Furthermore, by arranging the anchor bars 42A, 42B as the bundling bars 45, it is possible to prevent the wall reinforcing bars 15 of the first wall 11 from interfering with the anchor bars 42A, 42B.

[0076] The fixing parts 42aA, 42aB are disposed at equivalent positions to each other in the butting direction X (in the construction method, the fixing parts 42aA, 42aB are disposed at equivalent positions to each other in the butting direction X). This allows the fixing parts 42aA, 42aB to be disposed in the wall concrete 14 of the first wall 11, for example, even if the length of the first wall 11 in the butting direction X is relatively short. Furthermore, when the smallest diameter reinforcing bar is used for the first anchor bar 42A among the multi-layered bent anchor bars 38, the extension part 42bA of the first anchor bar 42A is positioned at the top of the extension parts 42bA and 42bB (in the construction method, the extension part 42bA of the first anchor bar 42A is positioned at the top of the extension parts 42bA and 42bB). Therefore, cracks in the floor concrete 37 can be suppressed.

[0077] The minimum value of the projected anchorage length of the anchorage bars 42A, 42B may be 1 / 2 or more times the length in the butting direction X of the first wall 11 (in the construction method, the anchorage bars 42A, 42B are constructed so that the minimum value of the projected anchorage length of the anchorage bars 42A, 42B is 1 / 2 or more times the length in the butting direction X of the first wall 11). This makes it possible to more reliably fix the multiple bent anchorage bars 38 to the first wall 11, and to induce yielding of the multiple bent anchorage bars 38 prior to concrete destruction at the anchorage parts, thereby inducing ductile destruction due to elongation deformation of the multiple bent anchorage bars 38, even when additional tensile stress acts in the vertical direction Z of the walls 11, 12 due to horizontal forces caused by wind loads or earthquake forces. The distance in the perpendicular direction Y between adjacent bundled bars 45 in the perpendicular direction Y is the equivalent rebar diameter d r,eq In some cases, the distance between adjacent bundled bars 45 in the perpendicular direction Y is 6 times or more than the equivalent rebar diameter d r,eq(In some cases, the bent anchor bars 38 are constructed so that the width of the bent anchor bars 38 is six or more times the width of the first wall 11. In this case, the bent anchor bars 38 can be more securely fixed to the first wall 11. Furthermore, for example, the conventional design formula (which assumes a column-beam joint) disclosed in the literature 1 and the like can be easily applied to the joint structure.

[0078] [7. Additional Notes] In this embodiment, it is desirable to satisfy the following conditions. In order to prevent cracks in the floor slab 28, it is desirable to restrict the maximum diameter of the bent anchor bars 38 and to bundle together a number of small diameter bent anchor bars 38. For example, the maximum diameter of the bent anchor bars 38 is desirably 19 mm or less, and more desirably 16 mm or less. In addition, from the viewpoint of restricting cracks and dispersing them into a large number of small cracks to prevent corrosion of the bent anchor bars 38, it is desirable that the bent anchor bars 38 in the uppermost layer (hereinafter referred to as the bent anchor bars 38 in the top layer) have a minimum diameter of 6 mm to 13 mm, and that the interval between the bent anchor bars 38 is 200 mm or less. Furthermore, it is desirable that the bent anchor bars 38 in the topmost layer be mesh reinforcement with crossed horizontal bars.

[0079] There are no particular limitations on the diameter or arrangement of the bending anchor bars 38 other than the top layer bending anchor bars 38, but it is desirable to arrange them with a diameter equal to or larger than the top layer bending anchor bars 38 and at equal or larger intervals than the top layer bending anchor bars 38. For example, a conceivable method is that the top layer bending anchor bars 38 are 100 mm square mesh bars made of φ6 round steel, and D16 bending anchor bars 38 are arranged at 150 mm intervals in the layer below. In this case, the φ6 round steel bars and D16 bent anchor bars 38 in the top layer are fixed by forming bundled bars at intervals of 300 mm, which is the least common multiple. The remaining φ6 round steel bars in the top layer that are bent anchor bars 38 may or may not be fixed individually to the supporting member (wall concrete, etc.).

[0080] It is preferable that the concrete covering thickness on the upper part of the floor slab 28 is at least twice the diameter of the bent anchor bars 38 of the top layer. For example, in the case of an environment that is harsh for the bent anchor bars 38, such as outdoors, it is preferable that the concrete covering thickness on the upper part of the floor slab 28 is about three times the diameter of the bent anchor bars 38. For example, in an indoor composite beam 25, if the bent anchor bars 38 of the top layer are 200 mm square mesh bars using D10 deformed reinforcing bars and D16 deformed reinforcing bars are arranged at 200 mm pitches in the lower layer, a concrete covering thickness of 20 mm is ensured from the outer periphery of the D10 deformed reinforcing bars of the bent anchor bars 38 of the top layer to the upper part. In other words, a spacer is placed below the floor slab 28 so that the center of the diameter of the D10 deformed reinforcing bars of the bent anchor bars 38 of the top layer is 25 mm deep from the top surface of the floor slab 28, and the covering thickness is ensured.

[0081] In addition, the bent anchor bars 38 of the lower layer must be contained within the thickness of the floor slab 28. For this reason, the upper limit of the depth of the bent anchor bars 38 of the lower layer (the distance from the bent anchor bars 38 of the uppermost layer) is naturally determined by the parameters of the thickness of the floor slab 28 and the thickness (height) of the deck plate 36. Furthermore, it is preferable that a horizontal bar is arranged to transmit the shear force from the headed stud (shear connector) 48 installed in the first flange 31 of the second steel beam 27 to the bent anchor bars 38 farther from the second steel beam 27 among the bent anchor bars 38 extending along the butt joint direction X. In order to properly transmit force from the horizontal reinforcement to the bent anchor reinforcement 38, it is preferable that the lower layer bent anchor reinforcement 38 and the uppermost layer bent anchor reinforcement 38 are not too far away from the horizontal reinforcement. Specifically, it is preferable to arrange the horizontal reinforcement within 2 to 3 times the diameter of each of the uppermost layer bent anchor reinforcement 38 or the lower layer bent anchor reinforcement 38 in the vertical direction Z (thickness direction of the floor slab 28) relative to the horizontal reinforcement.

[0082] For example, if the floor slab 28 is a composite deck slab with a thickness of 150 mm and the crest height of the deck plate 36 is 50 mm, the minimum thickness of the floor concrete 37 of the floor slab 28 is 100 mm. The top layer of this floor slab 28 is made of 200 mm square mesh reinforcement using D13 deformed rebars, and the layer below that is made of D16 deformed rebars arranged at 200 mm intervals. In this case, a covering thickness of 26 mm of floor concrete 37 is ensured from the outer periphery of the D13 deformed rebars in the top layer to the top. Furthermore, if the mesh reinforcement is arranged so that the horizontal reinforcement of D13 is directly below the top layer D13, the cover thickness will be 26 mm + top layer reinforcement 13 mm + horizontal reinforcement 13 mm = 52 mm. Therefore, the minimum thickness of the floor concrete 37 directly below the horizontal reinforcement is 100 mm - 52 mm = 48 mm. Furthermore, if the lower layer bent anchor reinforcement 38 of D16 is arranged directly above the crest of the deck plate 36, the distance between the lower layer bent anchor reinforcement 38 and the horizontal reinforcement in the vertical direction Z will be 48 mm - 16 mm = 32 mm. 32 mm is twice the diameter of the lower layer bent anchor reinforcement 38, which meets the above-mentioned preferable conditions.

[0083] In the embodiment, the bent fixing bar 38 is a hook bent at 90 degrees, but the bent angle may be any angle within the range of 90 to 180 degrees. In either case, in order to prevent the bent fixing bar 38 from being broken due to its coming out, the bent excess length L on the end side of the bent portion (fixing portion) is dv is preferably at least 10 times the diameter of each bent anchor bar 38. The inside diameter of the bent part is preferably at least 6 times the diameter of the bent anchor bar 38 from the viewpoint of preventing localized concrete bearing failure.

[0084] Although one embodiment of the present disclosure has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and configuration changes, combinations, deletions, etc. are also included within the scope that does not deviate from the gist of the present disclosure. For example, in the above embodiment, the support member is the first wall 11 of RC construction. However, the support member is not limited to this, and may be a column of RC construction or a beam of RC construction. Multiple floor reinforcements may be arranged in three or more layers. The composite beam 25 does not necessarily have to include a deck plate 36 . [Industrial Applicability]

[0085] The joint structure can be provided with bent anchor bars that have the same pull-out strength as bent anchor bars in single-layer reinforcement such as those used in column-beam joints, using bundled reinforcement or bent anchor bars of reinforcing bars arranged in multiple layers. Also, the construction method for the joint structure can construct a joint structure that has bent anchor bars that have the same pull-out strength as bent anchor bars in single-layer reinforcement such as those used in column-beam joints. Therefore, the industrial applicability is great. [Explanation of symbols]

[0086] 11 First wall (support member) 12 Second wall (support member) 14 Wall concrete (support concrete) 28 Floor slab 29 Joint structure 37 Floor Concrete 38 Bend Fixation Muscles 42aA, 42aB Fixing part 42bA,42bB extension part 45 Bundle Muscles S1 Virtual Plane X butting direction Y perpendicular direction (cross direction) Z vertical direction

Claims

1. A joint structure comprising a RC support member and a floor slab joined to the support member in a butting direction, The support member includes a support concrete. The floor slab is Concrete floor and A plurality of bent anchor bars embedded in the supporting concrete and the floor concrete, Each of the bent anchor bars is An anchoring portion extending in the vertical direction within the supporting concrete; An extension portion extending from an upper end of the fixing portion along the butt direction within the supporting concrete and the floor concrete, Two or more of the bent anchoring bars among the plurality of bent anchoring bars form bundling bars in which the anchoring portions are arranged in contact with each other, A joint structure in which, among the extension portions of the two or more bent anchor bars that form the bundling bar, one extension portion and another extension portion are arranged at different positions in the vertical direction.

2. The joint structure according to claim 1 , wherein the fixing portions of the two or more bent fixing bars forming the bundling bar are arranged at equal positions to each other in the butt direction.

3. The joint structure described in claim 1 or 2, wherein the extension portion of the bent anchor reinforcement having the smallest diameter among the two or more bent anchor reinforcements that form the bundling reinforcement is positioned at the topmost among the extension portions of the two or more bent anchor reinforcements.

4. The bundling bars are provided at intervals in a cross direction intersecting imaginary planes parallel to the butt direction and the vertical direction, The equivalent rebar diameter d of the bundling bar r,eq When is defined by the formula (1), The distance in the cross direction between the adjacent bundle bars in the cross direction is the equivalent rebar diameter d r,eq The joint structure according to claim 1 or 2, wherein the thickness of the joint is six times or more. Here, d r,i is the diameter of the i-th bent anchor bar among the two or more bent anchor bars that make up one bundling bar. [0010]

5. A construction method for a joint structure comprising a RC support member and a floor slab joined to the support member in a butt direction, The support member includes a support concrete. The floor slab is Concrete floor and A plurality of bent anchor bars embedded in the supporting concrete and the floor concrete, Each of the bent anchor bars is An anchoring portion extending in the vertical direction within the supporting concrete; An extension portion extending from the upper end of the fixing portion along the butt direction within the supporting concrete and the floor concrete, Two or more of the bent anchoring bars among the plurality of bent anchoring bars form bundling bars in which the anchoring portions are arranged in contact with each other, A construction method for a joint structure in which one of the extension portions of the two or more bent anchor reinforcements that form the bundling reinforcement is positioned at different positions in the vertical direction from another extension portion.

6. A construction method for a joint structure as described in claim 5, wherein the fixing portions of the multiple bent fixing bars that form the bundling bars are positioned at equal positions to each other in the butt direction.

7. A construction method for a joint structure as described in claim 5 or 6, wherein the extension portion of the bent anchor reinforcement having the smallest diameter among the two or more bent anchor reinforcements that form the bundling reinforcement is positioned at the topmost among the extension portions of the two or more bent anchor reinforcements.

8. The bundling reinforcement is installed so that a plurality of bundling reinforcements are provided at intervals in a cross direction that crosses imaginary planes parallel to the butt direction and the vertical direction, respectively; The equivalent rebar diameter d of the bundling bar r,eq When is defined by the formula (2), The distance in the cross direction between the adjacent bundle bars in the cross direction is the equivalent rebar diameter d r,eq The method for constructing a joint structure according to claim 5 or 6, wherein the joint is constructed so that the thickness of the joint is six or more times larger than the thickness of the joint. Here, d r,i is the diameter of the i-th bent anchor bar among the two or more bent anchor bars that make up one bundling bar. [0025]

Citation Information

Patent Citations

  • PC flat slab structure

    JP1988268850A

  • Intercolumnar shear reinforcing structure of flat plate

    JP2008208576A

  • External wall structure of reinforced concrete outside insulation building, and external wall construction method

    JP2008266965A

  • Joint structure

    JP6631679B1

  • Joint structure

    JP7335540B1