Power management device and power generation forecast management method for multiple power generation facilities

The power management device improves power generation forecasting by accounting for facility location and weather conditions, enhancing prediction accuracy and supply-demand management.

JP7565178B2Active Publication Date: 2024-10-10SHIKOKU INSTR CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2020146551
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-01
Publication Date
2024-10-10
Estimated Expiration
2040-09-01

AI Technical Summary

Technical Problem

Existing power management systems struggle to accurately predict the power generation amounts of renewable energy facilities due to neglecting the installation location and weather conditions at each facility, leading to inaccuracies in power generation forecasting and supply-demand imbalances.

Method used

A power management device that considers the installation location (latitude and longitude) and capacity of each renewable energy facility, using weather information and representative points to calculate power generation ratios for each area, allowing precise prediction of power generation amounts.

Benefits of technology

Enhances the accuracy of power generation forecasting by breaking down predicted values for each facility, enabling better supply-demand management and reducing the risk of power outages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000012_0000
    Figure 00000012_0000
  • Figure 00000012_0001
    Figure 00000012_0001
  • Figure 00000012_0002
    Figure 00000012_0002
Patent Text Reader

Abstract

To provide a power management device which can predict a power generation amount of a power generating facility with high accuracy, and a power generation amount prediction management method for a plurality of power generating facilities.SOLUTION: A power management device includes: weather information acquisition means 10 for acquiring weather information for each area in a management object region; facility information acquisition means 10 for acquiring facility information for a plurality of power generating facilities 2 installed in each area; representative point setting means 10 for setting a representative point of each area on the basis of the weather information of that area and the facility information for the plurality of power generating facilities 2 installed in that area; power generation ratio calculation means 10 for calculating, as a power generation ratio of each area, a power generation amount per unit facility capacity of the power generating facility 2 in each area on the basis of the weather information for that area and the facility information of the plurality of power generating facilities 2 installed in that area; and prediction means 10 for predicting the power generation amount of a target power generating facility 2t on the basis of an installation point of the objective power generating facility 2t as a target of prediction and the representative point of a plurality of areas around the target power generating facility 2t and the power generation ratio.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power management device that manages a plurality of renewable energy power generation facilities, such as photovoltaic power generation facilities and wind power generation facilities, connected in a power system, and a power generation amount prediction management method for a large number of power generation facilities. [Background technology]

[0002] In recent years, renewable energy power generation facilities such as solar power generation facilities and wind power generation facilities have increased, and the amount of electricity generated by these power generation facilities has increased. In spring and autumn, when the weather is warm, the demand for electricity tends to decrease because electricity is not used for heating and cooling equipment, and the increase in the amount of electricity generated by renewable energy power generation facilities may cause the amount of electricity supply to exceed the amount of demand. In the past, in such cases, the balance between demand and supply of electricity was achieved by suppressing the amount of electricity supplied in the management area through output control of thermal power generation facilities, use of electricity for pumping of water by pumped storage power generation facilities, and utilization of interconnection lines. However, due to the increase in the amount of electricity generated by renewable energy power generation facilities in recent years, the amount of electricity supplied may greatly exceed the amount of demand, even if only output control of thermal power generation facilities, use of electricity for pumping of water by pumped storage power generation facilities, and utilization of interconnection lines are used. This greatly disrupts the balance between demand and supply, and the possibility of large-scale blackouts has increased due to automatic shutdown of power generation facilities, system isolation due to system accidents, load drop, etc. Therefore, there is an increasing need to predict the amount of power generated by renewable energy power generation facilities with high accuracy and to appropriately control the output of each renewable energy power generation facility.

[0003] For example, Patent Document 1 discloses a technique for dividing a certain area into mesh-like sections, predicting the wind speed and solar radiation for each section, and predicting the power generation capacity of a power generation facility in each section based on the predicted wind speed and solar radiation for each section. Patent Document 2 discloses a technique for estimating an interpolated value of observation data at any target point other than the observation point by principal component analysis using observation data such as wind speed and solar radiation acquired from an observation point network. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2011-239488 A [Patent Document 2] Patent No. 4908972 Summary of the Invention [Problem to be solved by the invention]

[0005] For example, when predicting the power generation amount of a power generation facility installed in a section A near the boundary between section A and section B adjacent to section A, the actual wind speed and solar radiation of the power generation facility are considered to be close to the intermediate value between the average wind speed and solar radiation of section A and the average wind speed and solar radiation of section B. However, in the invention described in Patent Document 1, the position of the power generation facility in the area is not taken into consideration, and the power generation amount of each power generation facility is predicted according to the average wind speed and solar radiation of section A in which the power generation facility is installed, so there is a problem that a high prediction accuracy cannot be obtained for the power generation amount of the power generation facility. In addition, in the invention described in Patent Document 2, the wind speed and solar radiation at the position of each power generation facility are predicted by interpolating the observation data such as the wind speed and solar radiation at the measurement point based on the distance from the measurement point to the power generation facility, but since the wind speed and solar radiation of each section are not used, there is a problem that the power generation amount of each power generation facility installed in the section cannot be predicted with high accuracy in a power management device that acquires observation data such as the wind speed and solar radiation of each section from an external system.

[0006] The present invention aims to provide a power management device that manages the output control of multiple power generation facilities while taking into account various conditions such as contract conditions and output control history, and that can predict the power generation amount of each power generation facility with high accuracy by taking into account the output prediction value (power generation amount) per area obtained from an external system, the installation location (latitude and longitude) of each power generation facility, and the facility capacity (rated output capacity or maximum power generation output) of each power generation facility, and a power generation amount prediction management method for multiple power generation facilities. [Means for solving the problem]

[0007] The present invention The first point of view The power management device according to the present invention includes a weather information acquisition means for acquiring weather information for each area within a management area, and an equipment information acquisition means for acquiring equipment information for a plurality of power generation equipment installed in each area. ,before The equipment information for the multiple power generation facilities installed in each area is To A representative point setting means for setting a representative point for each area based on the above information; before The equipment information for the multiple power generation facilities installed in each area is To and a power generation ratio calculation means for calculating the power generation amount per unit facility capacity of the power generation facility in each area as a power generation ratio for each area based on the power generation ratio of the power generation facility in each area. and a prediction means for predicting the power generation amount of the target power generation facility based on the installation point of the target power generation facility, which is the prediction target, and the representative points and power generation ratios of a plurality of areas around the target power generation facility. The weather information for the area includes information on the amount of power generation per area predicted based on weather conditions, and the power generation ratio calculation means calculates a value obtained by dividing the amount of power generation per area by a total value of the installation capacity of a plurality of power generation facilities installed in the area as the power generation ratio for the area. do. According to the second aspect of the present invention power management device the system includes a weather information acquisition means for acquiring weather information for each area within a management target area, an equipment information acquisition means for acquiring equipment information for a plurality of power generation facilities installed in each area, a representative point setting means for setting a representative point for each area based on the equipment information for the plurality of power generation facilities installed in each area, a power generation ratio calculation means for calculating the amount of power generation per unit equipment capacity of the power generation facilities in each area as a power generation ratio for each area based on the weather information for each area and the equipment information for the plurality of power generation facilities installed in each area, and a prediction means for predicting the amount of power generation of the target power generation facility based on the installation location of the target power generation facility that is the prediction target and the representative points and power generation ratios of the plurality of areas surrounding the target power generation facility. The representative point setting means calculates a center of gravity point of each area by using the facility capacity of each power generation facility at the installation point of the power generation facility installed in each area as a weight, and sets the calculated center of gravity point of each area as a representative point of each area. do. In the above power management device, the prediction means can be configured to predict the power generation amount of the target power generation equipment based on the center of gravity point and power generation ratio of the three areas closest to the target power generation equipment and the installation location of the target power generation equipment. In the above power management device, the prediction means can be configured to calculate a plane passing through the x, y, and z coordinates of the x, y, and z coordinates of the latitude, longitude, and power generation ratio of the center of gravity of the three areas, calculate the z coordinate value on the plane at the x and y coordinates where the latitude and longitude of the installation point of the target power generation equipment in the coordinate space are the x and y coordinates, as the power generation ratio of the target power generation equipment, and predict the power generation amount of the target power generation equipment as the power generation amount of the target power generation equipment multiplied by the power generation ratio and equipment capacity of the target power generation equipment. According to the third aspect of the present invention power management device the system includes a weather information acquisition means for acquiring weather information for each area within a management target area, an equipment information acquisition means for acquiring equipment information for a plurality of power generation facilities installed in each area, a representative point setting means for setting a representative point for each area based on the equipment information for the plurality of power generation facilities installed in each area, a power generation ratio calculation means for calculating the amount of power generation per unit equipment capacity of the power generation facilities in each area as a power generation ratio for each area based on the weather information for each area and the equipment information for the plurality of power generation facilities installed in each area, and a prediction means for predicting the amount of power generation of the target power generation facility based on the installation location of the target power generation facility that is the prediction target, and the representative points and power generation ratios of the plurality of areas surrounding the target power generation facility, The representative point setting means is Mega solar power plant If there is, Mega solar power plant Based on the equipment information of the power generation equipment excluding the above, a representative point of the area is set, and the power generation ratio calculation means calculates a representative point of the area based on the equipment information of the power generation equipment excluding the above. Mega solar power plant If there is, Mega solar power plant The power generation ratio of the above area is calculated based on the equipment information of the power generation equipment excluding do. A power management device according to a fourth aspect of the present invention includes weather information acquisition means for acquiring weather information for each area within a management target area, equipment information acquisition means for acquiring equipment information for a plurality of power generation facilities installed in each area, representative point setting means for setting a representative point for each area based on the equipment information for the plurality of power generation facilities installed in each area, power generation ratio calculation means for calculating the amount of power generation per unit equipment capacity of the power generation facilities in each area as a power generation ratio for each area based on the weather information for each area and the equipment information for the plurality of power generation facilities installed in each area, and and a prediction means for predicting the power generation amount of the target power generation facility based on a representative point and a power generation ratio of the area, wherein the equipment information of the power generation facility includes type information including whether the power generation facility is a large-scale power generation facility or not, and the representative point setting means, based on the type information, sets a representative point of the area based on the equipment information of the power generation facility excluding the large-scale power generation facility, if a large-scale power generation facility is present in the area, and the power generation ratio calculation means, based on the type information, calculates the power generation ratio of the area based on the equipment information of the power generation facility excluding the large-scale power generation facility, if a large-scale power generation facility is present in the area.

[0008] The present invention The first point of view The power generation forecast management method for a plurality of power generation facilities according to the present invention includes: A Equipment information for multiple installed power generation facilities To Based on the above, a representative point for each area is set, and the amount of power generated per unit facility capacity of the power generation facility in each area is calculated as the power generation ratio for each area. The amount of power generated by the target power generation facility is predicted based on the installation location of the target power generation facility and the representative points and power generation ratios of a plurality of areas around the target power generation facility. The weather information for the area includes information on the amount of power generation per area predicted based on weather conditions, and the amount of power generation per area is divided by the total capacity of a plurality of power generation facilities installed in the area to calculate the power generation ratio for the area. do. A power generation prediction management method for multiple power generation facilities according to a second aspect of the present invention sets a representative point for each area based on equipment information of multiple power generation facilities installed in each area within a managed area, calculates the power generation per unit equipment capacity of the power generation facilities in each area as the power generation ratio for each area, and predicts the power generation of a target power generation facility based on the installation point of the target power generation facility that is the subject of prediction and the representative points and power generation ratios of a plurality of areas surrounding the target power generation facility.If a mega solar power plant is present in the area, a representative point for the area is set based on equipment information of the power generation facilities excluding the mega solar power plant, and if a mega solar power plant is present in the area, the power generation ratio for the area is calculated based on equipment information of the power generation facilities excluding the mega solar power plant. A power generation forecast management method for a plurality of power generation facilities according to a third aspect of the present invention includes the steps of: setting a representative point for each area based on equipment information of a plurality of power generation facilities installed in each area within a managed area; calculating the power generation per unit equipment capacity of the power generation facilities in each area as a power generation ratio for each area; and predicting the power generation of a target power generation facility based on the installation point of the target power generation facility that is the prediction target and representative points and power generation ratios of a plurality of areas surrounding the target power generation facility, wherein the equipment information of the power generation facilities includes type information including whether the power generation facility is a large-scale power generation facility; determining whether a large-scale power generation facility is present in the area based on the type information; and, if the large-scale power generation facility is present in the area, setting a representative point for the area based on equipment information of the power generation facilities excluding the large-scale power generation facility; and, if the large-scale power generation facility is present in the area, calculating the power generation ratio for the area based on the equipment information of the power generation facilities excluding the large-scale power generation facility. Effect of the Invention

[0009] According to the present invention, even when an external system predicts the power generation amount of a large number of power generation facilities and reduces it to a numerical value representing a group such as an area unit, and information is shared between the external system and a power management device, the power generation amount predicted by the external system per area unit can be decomposed with high accuracy into a large number of factors as the power generation amount of each power generation facility, taking into account the installation location (latitude and longitude) of each power generation facility, the facility capacity, etc., so that the power generation amounts of each of the large number of power generation facilities can be recombined and regrouped according to the control purpose. [Brief description of the drawings]

[0010] [Figure 1] 1 is a configuration diagram of a power management device according to an embodiment of the present invention. [Diagram 2] 2 is a diagram for explaining a management target region managed by a power management apparatus and each area within the management target region. FIG. [Diagram 3] FIG. 2 is a diagram illustrating an example of a plurality of power generation facilities installed in an area. [Figure 4] FIG. 1 is a diagram for explaining a conventional method for predicting the amount of power generated by a power generation facility. [Diagram 5] FIG. 13 is a diagram showing an example of representative points in each area and installation points of target power generation facilities. [Figure 6] FIG. 4 is a diagram for explaining a method for calculating a power generation ratio of a target power generation facility according to the present embodiment. [Figure 7] FIG. 2 is a diagram for explaining a method for predicting the amount of power generated by the power generation facility according to the embodiment. [Figure 8] 4 is a flowchart showing a power generation amount prediction process of the power generation facility according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] FIG. 1 is a configuration diagram of a power management device 1 according to the present embodiment. As shown in FIG. 1, the power management device 1 according to the present embodiment includes a plurality of power generation facilities 21, 22 to 2 n The power generation equipment 21, 22-2 nIn the following description, the power generation facilities 21, 22-2 n are collectively referred to as the power generation facility 2. In this embodiment, the power generation facility 2 will be described by taking as an example a renewable energy power generation facility such as a solar power generation facility or a wind power generation facility, but the power generation facility 2 is not limited to a renewable energy power generation facility and may include a thermal power generation facility or a hydroelectric power generation facility.

[0012] 1, a power management device 1 according to this embodiment includes a processing device 10, a storage device 20, and a communication device 30. Each component of the power management device 1 will be described below.

[0013] The communication device 30 communicates with each power generation facility 2 in a remote location via a telecommunication line such as an Internet line or a dedicated communication line, and transmits output control information to each power generation facility 2. In this embodiment, as will be described later, the processing device 10 generates output control information for requesting the power generation facility 2 to implement output control, and the communication device 30 transmits the output control information generated by the processing device 10 to each power generation facility 2.

[0014] The communication device 30 can communicate with an external server installed in a weather station or the like via an electric communication line, and obtains weather information in the area managed by the power management device 1 from the external server. Specifically, the external server is a server that predicts weather information for each predetermined area (section) and provides the weather information for each area to the power management device 1, and the power management device 1 periodically receives weather information for a plurality of areas that overlap with the area managed by the power management device 1 from the external server. In addition, in this embodiment, the external server predicts the amount of power generation for each area based on the weather conditions for each area (including any of weather such as rain, cloudy, and sunny, solar radiation, and wind speed), and provides information including the amount of power generation for each area to the power management device 1 as weather information for each area. Note that FIG. 2 is a diagram for explaining the area managed by the power management device 1 and each area within the managed area. In addition, the managed area is an area that covers all areas in which the power generation facilities 2 managed by the power management device 1 are installed, and can be an area including, for example, a plurality of neighboring prefectures. An area is a section or region of a size predetermined by an external server, and can be, for example, a square region of several square kilometers to several hundred square kilometers.

[0015] In the power management device 1 according to the present embodiment, a plurality of power generation facilities 2 existing in the management target area are divided into a plurality of groups, and output control is performed for each group. The groups are determined from the viewpoint of maintaining the supply-demand balance and stabilizing the frequency, regardless of the area. For example, when the generator frequency characteristic is about 8% MW / Hz, the load frequency characteristic is about 2% MW / Hz, and the frequency deviation is 0.5 Hz, the groups are grouped for a control scale of about 4% of the management target area. In the present embodiment, as described later, the amount of power obtained in each area is appropriately distributed to the plurality of power generation facilities 2 installed in the area, and the amount of power generated by each power generation facility 2 is predicted, so that the amount of power generated in each group can be appropriately grasped, and the output control for each group is appropriately performed.

[0016] The storage device 20 stores facility information of each power generation facility 2. Specifically, the storage device 20 stores the installation location (latitude and longitude), facility capacity, and type information of each power generation facility 2. The type information of the power generation facility 2 includes whether the power generation facility 2 is a large-scale power generation facility or not. Note that, in terms of the system capacity scale of the management target area, a large-scale power generation facility is optimized from the frequency control target resolution based on the generator frequency characteristics and the load frequency characteristics, and the bundle to be controlled, that is, the unit scale of grouping, is designed to be tens of thousands of kW or more. Note that, when the management target area is even larger, it may be hundreds of thousands of kW.

[0017] The processing device 10 manages the output control of each power generation facility 2 by predicting the power generation amount of each power generation facility 2 and generating output control information for requesting output control from each power generation facility 2 based on the predicted power generation amount of each power generation facility 2. Also, the power management device 1 according to this embodiment is characterized in that it predicts the power generation amount of each power generation facility 2 taking into consideration the installation location (latitude and longitude) of each power generation facility 2, thereby making it possible to improve the prediction accuracy of the power generation amount of each power generation facility 2.

[0018] Here, FIG. 3 is a diagram showing an example of a plurality of power generation facilities 2 installed in an area. A plurality of power generation facilities 2 are installed in a management area managed by the power management device 1, and as shown in FIG. 3, a plurality of power generation facilities 2 are installed in each area A2. For example, in the example shown in FIG. 3, 24 power generation facilities 2 are installed in one area A2. In a conventional method for predicting the amount of power generated by the power generation facilities 2, the amount of power generated per area A is proportionally divided by the capacity of the power generation facilities 2 existing in the area A, and the amount of power generated by each power generation facility 2 is predicted. Therefore, in the past, as shown in FIGS. 4(A) and (B), the predicted value (FIG. 4(B)) of the amount of power generated by each power generation facility 2 is a value proportional to the capacity (FIG. 4(A)) of each power generation facility 2, and as described below, there was a problem that the difference in weather conditions due to the difference in the installation location (latitude and longitude) of each power generation facility 2 in the area A is not reflected in the amount of power generated by each power generation facility 2, and the amount of power generated cannot be predicted with high accuracy.

[0019] That is, for example, as shown in FIG. 3, when the same area A is divided into a cloudy area and a sunny area, the power generation amount of the target power generation equipment 2t to be predicted is expected to vary depending on whether it is located in a cloudy area or a sunny area. However, in the conventional power generation method, the power generation amount for each area based on the weather information for each area is a value prorated by the equipment capacity of each power generation equipment 2 installed in the area, so that the difference in the weather conditions (whether it is located in a cloudy area or a sunny area, etc.) due to the difference in the installation point (latitude and longitude) of each power generation equipment 2 in area A is not reflected in the power generation amount of each power generation equipment 2. In the example shown in FIG. 5, the target power generation equipment 2t is installed in area A2, but is located near the border between area A2 and area A4, so that the actual solar radiation amount and wind speed of the target power generation equipment 2t are considered to be approximately intermediate values ​​between the solar radiation amount and wind speed of area A2 and the solar radiation amount and wind speed of area A4, respectively. However, in conventional power generation prediction methods, the power generation of the target power generation equipment 2t is predicted based on the average amount of solar radiation and wind speed in area A2. Therefore, the differences in meteorological conditions due to the differences in the installation locations (latitude and longitude) of each power generation equipment 2 within area A are not reflected in the power generation of each power generation equipment 2, and the power generation of each power generation equipment 2 cannot be predicted with high accuracy.

[0020] In contrast to this, in the present embodiment, as described below, the power generation amount of the target power generation equipment 2t is predicted taking into consideration the installation location (latitude and longitude) of the target power generation equipment 2t within the area (for example, in the case of the target power generation equipment 2t shown in FIG. 5, the power generation amount of the target power generation equipment 2t is predicted based on its position near the border between areas A2 and A4), thereby making it possible to predict the power generation amount of the target power generation equipment 2t with higher accuracy by taking into consideration the weather conditions at the installation location of the target power generation equipment 2t.

[0021] In this way, the processing device 10 according to this embodiment has a weather information acquisition function for acquiring weather information for each area, an equipment information acquisition function for acquiring equipment information for each power generation facility 2, a representative point setting function for setting a representative point for each area, a power generation ratio calculation function for calculating the power generation ratio for each area, and a power generation prediction function for predicting the power generation amount of the target power generation facility 2t, in order to predict the power generation amount of each power generation facility 2 taking into account the installation point (latitude and longitude) of each power generation facility 2 in the area. Each function of the processing device 10 will be described below.

[0022] The weather information acquisition function of the processing device 10 acquires weather information for each area in the management area of ​​the power management device 1 from an external server that performs prediction calculations based on weather conditions and the like. As described above, the external server provides weather information for each area in the management area of ​​the power management device 1, and the weather information acquisition function acquires the weather information for each area from the external server via the communication device 30. Also, as described above, the external server predicts the amount of power generation for each area based on the weather conditions in each area (weather and climate such as cloudy, rainy, and sunny, solar radiation, wind speed, etc.), and provides the amount of power generation for each area as weather information to the power management device 1. Therefore, from the perspective of the power management device, the weather information is acquired from the external server as the amount of power generation per area that reflects the weather conditions. Also, the weather information acquired from the external server can be configured to include the weather conditions for each area (weather and climate such as cloudy, rainy, and sunny, solar radiation, wind speed, etc.). In this embodiment, when the external server provides the amount of power generation per area as weather information, it predicts the amount of power generation per area excluding large-scale power generation facilities, and provides the amount of power generation per area excluding the large-scale power generation facilities to the power management device 1.

[0023] The equipment information acquisition function acquires equipment information of each power generation facility 2 stored in the storage device 20. In this embodiment, the equipment information acquisition function acquires information including the installation location (latitude and longitude) of the power generation facility 2, the facility capacity, and type information from the storage device 20 as the equipment information of the power generation facility 2.

[0024] The representative point setting function calculates the center of gravity of each area as a representative point for each area, with the equipment capacity of each power generation facility 2 at the installation point of each power generation facility 2 as a weight, based on the information on the installation point (latitude and longitude) and equipment capacity of each power generation facility 2 acquired by the equipment information acquisition function. For example, if power generation facilities 21 to 2 are installed in an area, m m power generation facilities 2 are installed, and each of the power generation facilities 21 to 2 m The latitude of X1~X m , longitude Y1~Y m , the equipment capacity is G1~G m In this case, the representative point setting function can calculate the center of gravity point of the area as the representative point of the area, as shown in the following formula 1.

number

[0025] The power generation ratio calculation function calculates the power generation amount per unit equipment capacity of the power generation equipment 2 in each area as the power generation ratio of the area based on the power generation amount for each area acquired by the weather information acquisition function and the total value of the equipment capacity of the power generation equipment 2 in each area acquired by the equipment information acquisition function. Specifically, the power generation ratio calculation function calculates the value obtained by dividing the power generation amount for each area by the total value of the power generation capacity of the power generation equipment 2 in each area as the power generation ratio of the area, as shown in the following formula 2.

number

[0026] The power generation prediction function predicts the power generation amount of the target power generation facility 2t based on the representative points of each area set by the representative point setting function, the power generation ratios of each area calculated by the power generation ratio calculation function, and the installation points of each power generation facility 2 acquired by the facility information acquisition function. Specifically, the power generation prediction function first extracts representative points AC of the area A that are closest to the target power generation facility 2t from among representative points AC of the area A around the target power generation facility 2t. For example, in the example shown in FIG. 5, the power generation prediction function extracts representative points AC1, AC2, and AC4 of the three areas A1, A2, and A4 that are closest to the target power generation facility 2t from among representative points AC1 to A4 of the areas A1 to A4 around the target power generation facility 2t.

[0027] Then, as shown in FIG. 6, the power generation prediction function calculates a plane P passing through the xyz coordinates of each of the three areas A in a coordinate space in which the representative points AC (latitude and longitude) and the power generation ratios of the three extracted areas A are respectively set as x coordinates, y coordinates, and z coordinates. For example, in the example shown in FIG. 6, the power generation prediction function calculates a plane P passing through three xyz coordinates (x1, y1, z1), (x2, y2, z2), and (x4, y4, z4) in which the latitude and longitude and area power generation ratios of the representative points AC1, AC2, and AC4 of the three areas A1, A2, and A4 are respectively set as xyz coordinates. Note that FIG. 6 is a diagram for explaining a method of calculating the power generation ratio of the target power generation facility 2t according to this embodiment. In addition, a publicly known method can be used as the calculation method of the plane P.

[0028] Furthermore, the power generation prediction function calculates the value of the z coordinate on the plane P in the xy coordinates when the latitude and longitude of the installation point of the target power generation equipment 2t are the x coordinates and the y coordinates in the above coordinate space as the power generation ratio of the target power generation equipment 2t. For example, in the example shown in FIG. 6, when the latitude and longitude of the installation point of the target power generation equipment 2t are the x coordinate (xt) and the y coordinate (yt) in the coordinate space where the plane P is calculated, the power generation prediction function can calculate the value of the z coordinate (zt) on the plane P in the xy coordinates (xt, yt) as the power generation ratio of the target power generation equipment 2t. Note that, as shown in FIG. 5, there are cases where the installation point of the target power generation equipment 2t does not fall within the range of a triangle connecting the representative points of the three areas closest to the target power generation equipment 2t. Even in such a case, the plane P can be treated as having an infinite width to calculate the z coordinate of such a target power generation equipment 2t on the P plane, and the power generation ratio of the target power generation equipment 2t can be calculated. Then, the power generation amount prediction function predicts the value obtained by multiplying the calculated power generation ratio of the target power generation facility 2t by the facility capacity of the target power generation facility 2t as the power generation amount of the target power generation facility 2t.

[0029] In this manner, in this embodiment, the amount of power generated by the target power generating facility 2t is not predicted based on the weather information for each area, but the power generation ratio of the target power generating facility 2t is calculated based on the installation point of the target power generating facility 2t, and the amount of power generated by the target power generating facility 2t is predicted. This makes it possible to predict the amount of power generated according to the installation point (latitude and longitude) of the target power generating facility 2t with high accuracy. Here, FIG. 7(A) is a diagram showing the amount of power generated by each power generating facility predicted by the conventional power generating facility, as in FIG. 4(B), and FIG. 7(B) is a diagram showing the amount of power generated by each power generating facility predicted by the power generating facility according to this embodiment. In the conventional method for predicting the amount of power generated by the power generating facility 2, the amount of power generated by each area based on the weather information for each area is predicted as the amount of power generated by each power generating facility 2, and therefore, as shown in FIGS. 4(A), (B) and 7(A), the amount of power generated by each power generating facility 2 is a value proportional to the installation capacity of each power generating facility 2. In contrast, in the method for predicting the amount of power generated by the power generating equipment 2 according to the present embodiment, as described above, the amount of power generated is predicted taking into consideration the installation location (latitude and longitude) of the target power generating equipment 2t. Therefore, for example, as shown in FIG. 3, when a cloudy area and a sunny area are separated within the same area A, as shown in FIG. 7(B), the amount of power generated by the power generating equipment 2q located in the cloudy area can be predicted to a value smaller than the amount of power generated by the conventional prediction method, and the amount of power generated by the power generating equipment 2p located in the sunny area can be predicted to a value larger than the amount of power generated by the conventional prediction method. In addition, for the power generating equipment 2 installed near the border between the areas, the amount of power generated is predicted based on a power generation ratio according to the distance from the representative point of each area, so that the amount of power generated can be predicted with higher accuracy than the amount of power generated by the conventional prediction method.

[0030] Next, the power generation amount prediction process according to this embodiment will be described. Fig. 8 is a flowchart showing the power generation amount prediction process according to this embodiment. The power generation amount prediction process shown in Fig. 8 is repeatedly executed by the processing device 10, for example, every predetermined time (for example, every 24 hours).

[0031] First, in step S101, the weather information acquisition function acquires the power generation amount (output prediction value) for each area from an external server that performs prediction calculations based on weather conditions, etc. In step S102, the equipment information acquisition function refers to the storage device 20 and acquires equipment information including the installation location (latitude and longitude), equipment capacity, and equipment type of each power generation equipment 2.

[0032] In step S103, the representative point setting function calculates and sets the center of gravity (latitude and longitude) of each area as a representative point for each area, weighted by the equipment capacity of each power generation facility 2 at the installation point of each power generation facility 2, based on the information on the installation point and equipment capacity of the power generation facility 2 included in the equipment information acquired in step S102. Note that the center of gravity of an area does not change unless there is new construction or removal of power generation facilities within the area, or a change in the power generation capacity of the power generation facilities within the area. Therefore, the process of step S103 can be configured to be performed only when an event occurs that changes the center of gravity of the area.

[0033] In step S104, the power generation ratio of each area is calculated based on the power generation amount in each area acquired in step S101 and the equipment information of each power generation equipment in each area acquired in step S102, using the power generation ratio calculation function. Specifically, as shown in the above formula 2, the power generation ratio calculation function can calculate the power generation ratio for each area by dividing the predicted value of the power generation amount per area by the total value of the equipment capacity of the power generation equipment 2 in the area.

[0034] In step S105, the power generation ratio calculation function links the power generation ratio for each area calculated in step S104 with the representative point of each area acquired in step S103. Then, in step S106, the power generation ratio calculation function performs a process of calculating the power generation ratio of the target power generation facility 2t based on the representative point and power generation ratio of each area linked in step S105 and the installation point of the target power generation facility 2t acquired in step S102. Specifically, the power generation ratio calculation function first extracts representative points of the three areas closest to the target power generation facility 2t. Then, in a coordinate space in which the latitude and longitude and power generation ratio of the representative points of the extracted three areas are respectively the x coordinate, y coordinate, and z coordinate, the power generation ratio calculation function calculates a plane P on which the xyz coordinates of these three areas are located. Then, in the above coordinate space, when the latitude and longitude of the target power generation equipment 2t are set as the x coordinates and y coordinates, the power generation ratio calculation means calculates the z coordinate on plane P in the xy coordinates as the power generation ratio of the target power generation equipment 2t.

[0035] In step S107, the power generation amount measurement function calculates the power generation amount of the target power generation equipment 2t by multiplying the power generation ratio of the target power generation equipment 2t calculated in step S106 by the equipment capacity of the target power generation equipment 2t included in the equipment information of the target power generation equipment 2t acquired in step S102. Furthermore, in step S108, the power generation amount measurement device determines whether the power generation amount of all the power generation equipment 2 has been predicted. If the power generation amount of all the power generation equipment 2 has not been predicted, the process returns to step S106, the power generation equipment 2 whose power generation amount has not been predicted is set as the target power generation equipment 2t, and steps S106 and S107 are repeated. Then, when the power generation amount of all the power generation equipment 2 has been predicted, the power generation equipment power generation amount prediction process of FIG. 8 is terminated. Note that in this embodiment, a configuration in which the power generation amount of all the power generation equipment 2 is predicted is exemplified, but for example, a configuration in which only the power generation amount of a certain number of power generation equipment 2 determined in advance is predicted may also be used.

[0036] As described above, in the power management device 1 according to this embodiment, a representative point (latitude and longitude) for each area is set based on weather information for each area within the management target area and equipment information for the multiple power generation equipment 2 installed in each area, and the amount of power generated per unit equipment capacity of the power generation equipment 2 in each area is calculated as the power generation ratio for each area, thereby predicting the amount of power generated by the target power generation equipment 2t based on the installation point (latitude and longitude) of the target power generation equipment 2t and the representative points and power generation ratios of the multiple areas surrounding the target power generation equipment 2t. As a result, in this embodiment, the amount of power generated by the target power generation equipment 2t can be predicted based on the positional relationship between the representative point of each area and the installation point of the target power generation equipment 2t, so that the amount of power generated by the target power generation equipment 2t can be predicted with higher accuracy.

[0037] Although the preferred embodiment of the present invention has been described above, the technical scope of the present invention is not limited to the description of the above embodiment. Various modifications and improvements can be made to the above embodiment, and such modifications and improvements are also included in the technical scope of the present invention.

[0038] For example, in the above embodiment, the processing device 10 acquires the amount of power generation for each area based on the weather conditions for each area from an external server that performs prediction calculations based on weather conditions, etc., as weather information for each area, but the present invention is not limited to this configuration, and may acquire the weather conditions for each area from an external server that performs prediction calculations based on weather conditions, etc., and predict the amount of power generation for each area based on the acquired weather conditions for each area in the processing device 10. In this case, the processing device 10 predicts the amount of power generation for each area by taking into account the weather conditions for each area (weather and climate such as cloudy, rainy, sunny, amount of solar radiation, wind speed, etc.) and information on the equipment capacity of each power generation facility 2 set in each area, thereby making it possible to predict the amount of power generation for each area with higher accuracy.

[0039] In the above-described embodiment, the center of gravity of each area is set as the representative point of each area, weighted by the capacity of each power generation facility 2 at the installation point of each power generation facility 2 installed in each area, but the present invention is not limited to this configuration, and a specific point in each area (for example, the center point of the area) may be set as the representative point of each area. In the above-described embodiment, the representative point of each area and the installation point of each power generation facility 2 are expressed by latitude and longitude, but the representative point of each area and the installation point of each power generation facility 2 are not limited to latitude and longitude, and original point information may be used. [Explanation of symbols]

[0040] 1...Power management device 10...Processing equipment 20…Storage device 30...Communication equipment 2. Power generation facilities

Claims

1. A weather information acquisition means for acquiring weather information for each area within a management area; An equipment information acquisition means for acquiring equipment information of a plurality of power generation equipment installed in each area; a representative point setting means for setting a representative point for each area based on equipment information of a plurality of power generation facilities installed in each area; a power generation ratio calculation means for calculating a power generation amount per unit equipment capacity of the power generation equipment in each area as a power generation ratio of each area based on the meteorological information of each area and equipment information of a plurality of power generation equipment installed in each area; a prediction means for predicting the amount of power generated by a target power generation facility based on an installation location of the target power generation facility and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The meteorological information for the area includes information on the amount of power generation per area predicted based on meteorological conditions, The power generation ratio calculation means calculates a power generation ratio for the area by dividing the amount of power generation per area by the total capacity of a plurality of power generation facilities installed in the area.

2. A weather information acquisition means for acquiring weather information for each area within a management area; An equipment information acquisition means for acquiring equipment information of a plurality of power generation equipment installed in each area; a representative point setting means for setting a representative point for each area based on equipment information of a plurality of power generation facilities installed in each area; a power generation ratio calculation means for calculating a power generation amount per unit equipment capacity of the power generation equipment in each area as a power generation ratio of each area based on the meteorological information of each area and equipment information of a plurality of power generation equipment installed in each area; a prediction means for predicting the amount of power generated by a target power generation facility based on an installation location of the target power generation facility and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The representative point setting means calculates a center of gravity point for each area using the equipment capacity of each power generation facility at the installation point of the power generation facility installed in each area as a weight, and sets the calculated center of gravity point for each area as a representative point for each area.

3. 3. The power management device according to claim 2, wherein the prediction means predicts the amount of power generated by the target power generation facility based on the center of gravity points and power generation ratios of the three areas closest to the target power generation facility and the installation location of the target power generation facility.

4. 4. The power management device according to claim 3, wherein the prediction means calculates a plane passing through the x, y, and z coordinates of the three areas in a coordinate space in which the latitude, longitude, and power generation ratio of the center of gravity of the three areas are defined as the x, y, and z coordinates, respectively, calculates the z coordinate value on the plane in the x and y coordinates in which the latitude and longitude of the installation point of the target power generation equipment in the coordinate space are defined as the x and y coordinates, as the power generation ratio of the target power generation equipment, and predicts the power generation amount of the target power generation equipment as the power generation amount of the target power generation equipment multiplied by the power generation ratio and equipment capacity of the target power generation equipment.

5. A weather information acquisition means for acquiring weather information for each area within a management area; An equipment information acquisition means for acquiring equipment information of a plurality of power generation facilities installed in each area; a representative point setting means for setting a representative point for each area based on equipment information of a plurality of power generation facilities installed in each area; a power generation ratio calculation means for calculating a power generation amount per unit equipment capacity of the power generation equipment in each area as a power generation ratio of each area based on the meteorological information of each area and equipment information of a plurality of power generation equipment installed in each area; a prediction means for predicting the amount of power generated by a target power generation facility based on an installation location of the target power generation facility and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The representative point setting means, when a mega solar power plant is present in the area, sets a representative point of the area based on equipment information of power generation facilities excluding the mega solar power plant; The power generation ratio calculation means is a power management device that, if a mega solar power plant is present in the area, calculates the power generation ratio of the area based on equipment information of power generation facilities excluding the mega solar power plant.

6. A weather information acquisition means for acquiring weather information for each area within a management area; An equipment information acquisition means for acquiring equipment information of a plurality of power generation facilities installed in each area; a representative point setting means for setting a representative point for each area based on equipment information of a plurality of power generation facilities installed in each area; a power generation ratio calculation means for calculating a power generation amount per unit equipment capacity of the power generation equipment in each area as a power generation ratio of each area based on the meteorological information of each area and equipment information of a plurality of power generation equipment installed in each area; a prediction means for predicting the amount of power generated by a target power generation facility based on an installation location of the target power generation facility and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The facility information of the power generation facility includes type information including whether the power generation facility is a large-scale power generation facility, the representative point setting means sets a representative point for the area based on facility information of power generation facilities excluding the large-scale power generation facility when the large-scale power generation facility is present in the area based on the type information; The power generation ratio calculation means is a power management device that, when a large-scale power generation facility is present in the area based on the type information, calculates the power generation ratio of the area based on equipment information of the power generation facilities excluding the large-scale power generation facility.

7. Based on equipment information of a plurality of power generation facilities installed in each area within the management area, a representative point for each area is set, and the amount of power generation per unit installed capacity of the power generation facilities in each area is calculated as the power generation ratio for each area; A method for predicting and managing power generation amount of a plurality of power generation facilities, comprising: predicting a power generation amount of a target power generation facility based on an installation location of the target power generation facility that is a prediction target, and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The meteorological information for the area includes information on the amount of power generation per area predicted based on meteorological conditions, The method of claim 1, further comprising: dividing the amount of power generation per area by the total capacity of a plurality of power generation facilities installed in the area to calculate a power generation ratio for the area.

8. Based on equipment information of a plurality of power generation facilities installed in each area within the management area, a representative point for each area is set, and the amount of power generation per unit installed capacity of the power generation facilities in each area is calculated as the power generation ratio for each area; A method for predicting and managing power generation amount of a plurality of power generation facilities, comprising: predicting a power generation amount of a target power generation facility based on an installation location of the target power generation facility that is a prediction target, and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, If a mega solar power plant is present in the area, a representative point of the area is set based on equipment information of power generation facilities excluding the mega solar power plant; A power generation forecasting and management method, in which, if a mega solar power plant is present in the area, the power generation ratio of the area is calculated based on equipment information of power generation facilities excluding the mega solar power plant.

9. Based on equipment information of a plurality of power generation facilities installed in each area within the management area, a representative point for each area is set, and the amount of power generation per unit installed capacity of the power generation facilities in each area is calculated as the power generation ratio for each area; A method for predicting and managing power generation amount of a plurality of power generation facilities, comprising: predicting a power generation amount of a target power generation facility based on an installation location of the target power generation facility that is a prediction target, and representative locations and power generation ratios of a plurality of the areas around the target power generation facility, The facility information of the power generation facility includes type information including whether the power generation facility is a large-scale power generation facility, determining whether a large-scale power generation facility is present in the area based on the type information; When the large-scale power generation facility is present in the area, a representative point of the area is set based on facility information of the power generation facilities excluding the large-scale power generation facility; A power generation forecasting and management method, comprising the steps of: when the large-scale power generation facility is present in the area, calculating a power generation ratio of the area based on facility information of power generation facilities excluding the large-scale power generation facility.

Citation Information

Patent Citations

  • JP1974008972A

  • System and method for predicting production of electricity

    JP2006210750A

  • Observation data estimation method and observation data estimation program

    JP2008058109A

  • Maximum power generation amount estimating method for photovoltaic power generation system, method for controlling power distribution system, and distribution system control apparatus