Hot water system
The hot water supply system addresses the issue of inadequate pipe cleaning by implementing a timer-based and drainage-detection mechanism to ensure regular cleaning, maintaining pipe integrity and preventing dirt ingress.
Patent Information
- Application Number
- JP2020192222
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-19
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2040-11-19
AI Technical Summary
Existing hot water systems fail to perform periodic pipe cleaning operations when the bathtub is not filled with hot water, leading to pipe deterioration and potential dirt flow into the bathtub during subsequent filling, especially in prolonged non-use periods.
A hot water supply system with a circulation path, a hot water pouring path, a control circuit, and a timer to initiate periodic pipe cleaning operations based on elapsed time or bathtub drainage detection, ensuring regular cleaning regardless of usage patterns.
Ensures regular execution of pipe cleaning operations, preventing pipe deterioration and dirt ingress, thereby maintaining system hygiene and functionality.
Smart Images

Figure 0007568912000001 
Figure 0007568912000002 
Figure 0007568912000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a hot water supply system, and more particularly to a hot water supply system having a pipe cleaning operation function. [Background technology]
[0002] JP 2018-31546 A (Patent Document 1) describes a bathtub equipment in a hot water supply system that includes a bathtub as a hot water supply destination, which performs a cleaning operation inside the pipes (hereinafter also referred to as "pipe cleaning operation") to reduce germs flowing into the bathtub. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2018-31546 A Summary of the Invention [Problem to be solved by the invention]
[0004] The bathtub device in Patent Document 1 is configured to execute a pipe cleaning operation when it detects that the bathtub is being drained after the bathtub has been filled with water. According to this, if the bathtub is not filled with water, the pipe cleaning operation is not executed because the bathtub is not detected to be drained. Therefore, when the bathtub is not filled with water and people only take showers for long periods of time, such as in the summer, dirt may accumulate in the pipes due to deterioration of the pipes. In such a case, there is a concern that the dirt in the pipes may flow into the bathtub when the next filling operation is started.
[0005] The present invention has been made to solve such problems, and an object of the present invention is to promote the execution of periodic pipe cleaning operation in a hot water supply system having a pipe cleaning operation function. [Means for solving the problem]
[0006] In one aspect of the present invention, a hot water supply system including a bathtub as a hot water supply destination includes a circulation path for circulating and heating bath water in the bathtub, a hot water pouring circuit for supplying hot water to the bathtub via a hot water pouring path configured to include the circulation path, a control circuit for executing a pipe cleaning operation that supplies cleaning water made of hot water from the hot water pouring circuit to the hot water pouring path, and a timing means for measuring the elapsed time from the end of the pipe cleaning operation using a timer. The timing means initializes the elapsed time measured by the timer each time the pipe cleaning operation is executed. Effect of the Invention
[0007] According to the present invention, in a hot water supply system having a pipe cleaning operation function, it is possible to promote the execution of periodic pipe cleaning operation. [Brief description of the drawings]
[0008] [Figure 1] 1 is a schematic diagram illustrating a configuration example of a hot water supply system according to an embodiment of the present invention. [Diagram 2] 1 is a block diagram showing an example of the configuration of a communication system including a hot water supply system according to an embodiment of the present invention. [Diagram 3] 5 is a flowchart illustrating a control process for a pipe cleaning operation according to the present embodiment. [Figure 4] 4 is a flowchart illustrating a control process for the pipe cleaning operation in S14 of FIG. 3. [Diagram 5] FIG. 5 is a diagram illustrating one aspect of the display in step S23 of FIG. [Figure 6] 13 is a diagram illustrating one mode of notification when a notification setting is on. FIG. [Figure 7] FIG. 4 is a diagram illustrating one mode of notification in step S09 in FIG. [Figure 8] FIG. 13 is a diagram illustrating an example of a display of a setting screen for a pipe cleaning operation interval. [Figure 9] 10 is a flowchart illustrating a control process for a pipe cleaning operation according to a first modified example of the present embodiment. [Figure 10]11 is a table for explaining an example of a selectable cleaning mode. [Figure 11] 13 is a flowchart for explaining a control process for setting the supply amount and temperature of cleaning water in a pipe cleaning operation according to a second modified example of the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following, the same or corresponding parts in the drawings are designated by the same reference characters, and their description will not be repeated in principle.
[0010] [Example of hot water system configuration] FIG. 1 is a schematic diagram illustrating a configuration example of a hot water supply system according to the present embodiment.
[0011] 1, hot water supply system 300 includes hot water supply device 100. Hot water supply device 100 includes a bathtub 20 installed in bathroom 200 as a hot water supply destination, in addition to a hot water tap and the like (not shown).
[0012] The water heating device 100 comprises a housing 1, a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, a circulation path 8, temperature sensors 9, 12T, 18, 19, a circulation pump 10, a water level sensor 11, a controller 12, a bath hot water supply valve 13, electrical wiring 14, and remote controls 30, 50.
[0013] The housing 1 is provided so that the inside and outside of the housing 1 are in communication with each other, and has an exhaust port 1a for exhausting combustion gas. The housing 1 is configured to accommodate a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, temperature sensors 9, 12T, 18, 19, a circulation pump 10, a water level sensor 11, a controller 12, and a bath hot water supply valve 13. The housing 1 also accommodates a part of a circulation path 8 for reheating operation.
[0014] The burner 2 is configured to perform combustion operation by receiving a supply of fuel gas from a fuel supply system (not shown). The burner 2 supplies the combustion gas to the heat exchanger 4. The burner 2 has a hot water supply burner 2a and a supplementary heating burner 2b.
[0015] Fan 3 supplies air for combustion to burner 2. Fan 3 has fan 3a that supplies air for combustion to burner 2a, and fan 3b that supplies air for combustion to burner 2b. Fans 3a and 3b are disposed below burners 2a and 2b, respectively, in the height direction of water heating apparatus 100. Note that, regarding fan 3, FIG. 1 illustrates a configuration in which burners 2a and 2b are each provided with one fan 3a and one fan 3b, respectively, but it is also possible to configure a configuration in which one fan is shared by a plurality of burners 2a and 2b.
[0016] Heat exchanger 4 has heat exchanger 4a for hot water supply and heat exchanger 4b for reheating. Heat exchangers 4a and 4b are respectively arranged above burners 2a and 2b in the height direction of water heating apparatus 100. Heat exchangers 4a and 4b are arranged near exhaust port 1a.
[0017] The heat exchanger 4a recovers heat from the combustion gas supplied by the burner 2a. The heat exchanger 4b recovers heat from the combustion gas supplied by the burner 2b. Each of the heat exchangers 4a and 4b may include a primary heat exchanger that heats the incoming water by heat exchange with the sensible heat (combustion heat) of the combustion gas of the burner 2, and a secondary heat exchanger that heats the flowing water by heat exchange with the latent heat of the combustion exhaust gas from the burner 2.
[0018] The water inlet pipe 5 is connected to a water supply pipe at the water inlet port 5a. When the hot water tap is turned on and / or the bath hot water valve 13 is opened, low-temperature water is introduced from the water inlet port 5a to the water heater 100 by the supply pressure of the tap water. A temperature sensor 18 provided on the water inlet pipe 5 detects the temperature Tw of the inlet water introduced from the water inlet port 5a.
[0019] The water inlet pipe 5 is branched into a boiler body pipe 5b and a bypass pipe 7a via a bypass valve 7. The boiler body pipe 5b is connected to one end of the heat exchanger 4a. The flow rate ratio of the bypass pipe 7a and the boiler body pipe 5b to the total flow rate of the water inlet pipe 5 is controlled by the opening degree of the bypass valve 7.
[0020] The other end of the heat exchanger 4a is connected to one end of the hot water supply pipe 6. Low-temperature water supplied from the water inlet pipe 5 to the boiler body pipe 5b is heated to a predetermined temperature by the heat exchanger 4a and output to the hot water supply pipe 6. A flow rate sensor 15 is disposed in the boiler body pipe 5b. The flow rate sensor 15 can detect the flow rate of the heat exchanger 4a (boiler body flow rate).
[0021] On the other hand, bypass piping 7a bypasses heat exchanger 4a and is connected to hot water supply piping 6. Therefore, low-temperature water supplied from water inlet piping 5 to bypass piping 7a is output to hot water supply piping 6 without being heated by heat exchanger 4a. In this way, hot water supply device 100 can mix high-temperature water output from heat exchanger 4a and low-temperature water that has passed through bypass piping 7a, and output hot water at an appropriate temperature according to the set temperature from hot water supply piping 6.
[0022] The other end of the hot water supply pipe 6 is connected to a hot water outlet 6a connected to a hot water tap (not shown) or the like. Therefore, when the hot water tap is opened, hot water at an appropriate temperature controlled to a set temperature is supplied from the hot water supply device 100 to the hot water tap via the hot water outlet 6a.
[0023] The hot water supply pipe 6 is further connected to a hot water supply pipe 13a leading to a bathtub 20. A bath hot water supply valve 13 is interposed and connected to the hot water supply pipe 13a. The bath hot water supply valve 13 can be configured, for example, by a solenoid valve that can be controlled to open and close. By opening the bath hot water supply valve 13, a path can be formed for outputting hot water from the hot water supply pipe 6 to the hot water supply pipe 13a. In this way, the hot water supply device 100 can include the bathtub 20 as a hot water supply destination in addition to a hot water tap, etc.
[0024] In this specification, the supply of hot water from the water heater 100 to the bathtub 20 is referred to as "pouring hot water" to distinguish it from the supply of hot water to the outlet 6a (hot water tap, etc.). A flow rate sensor 16 is provided in the water supply pipe 13a. The flow rate sensor 16 can detect the flow rate of hot water supplied from the water heater 100 to the bathtub 20. In this embodiment, the action of supplying hot water or water to the bathtub 20 via the hot water supply pipe 13a by opening the bath hot water supply valve 13, regardless of the hot water temperature at the hot water supply pipe 6, is referred to as "pouring hot water". In other words, the burner 2a, fan 3a, heat exchanger 4a, water inlet pipe 5, boiler body pipe 5b, hot water supply pipe 6, bypass valve 7, bypass pipe 7a, and bath hot water supply valve 13 of the water heater 100 can constitute one embodiment of a "hot water supply circuit".
[0025] The circulation path 8 is for circulating hot water 21 in the bathtub 20 (hereinafter also referred to as bathtub water 21) within the water heater 100, and has a return pipe 8a, a forward pipe 8b, and a circulation pump 10. One end of the return pipe 8a is connected to a circulation adapter 25 in the bathtub 20, and the other end is connected to the input side of the heat exchanger 4b. One end of the forward pipe 8b is connected to the output side of the heat exchanger 4b, and the other end is connected to the circulation adapter 25.
[0026] By operating the circulation pump 10, a path (reheating circulation path) is formed in which bath water 21 drawn in from the circulation adapter 25 passes through the return pipe 8a, the heat exchanger 4b, and the forward pipe 8b, and is discharged from the circulation adapter 25. When the combustion operation of the burner 2b is turned on while the reheating circulation path is formed, the bath water 21 introduced from the return pipe 8a is heated by the heat exchanger 4b, and the heated bath water 21 is supplied to the bathtub 20 by the forward pipe 8b, thereby performing a reheating operation that raises the temperature of the bath water 21.
[0027] A temperature sensor 9 and a water level sensor 11 are connected to the return pipe 8a. The temperature sensor 9 can detect the temperature of the bathtub water 21. The water level sensor 11 is configured, for example, by a pressure sensor, and detects the level of the bathtub water 21 in the bathtub 20 (hereinafter also simply referred to as the "bathtub water level") based on the water pressure of the bathtub water 21. The temperature sensor 9 and the water level sensor 11 are disposed in an area of the return pipe 8a into which the bathtub water 21 enters, even when the circulation pump 10 is stopped.
[0028] Return pipe 8a is further connected to hot water supply pipe 13a at connection point 8c. As a result, when hot water is poured from hot water supply device 100 while circulation pump 10 is stopped, a first hot water supply path can be formed from pouring pipe 13a to bathtub 20 via connection point 8c and return pipe 8a, and a second hot water supply path can be formed from pouring pipe 13a to bathtub 20 via connection point 8c, return pipe 8a, heat exchanger 4b, and forward pipe 8b. This allows the bath to be filled by pouring hot water from hot water supply device 100.
[0029] In this way, hot and cold water from water heater 100 (hot water pouring circuit) is supplied to bathtub 20 via the first and second hot water pouring paths, including circulation path 8. Bathtub 20 is provided with a drain plug 26. Drain plug 26 can be configured as either a "manual drain plug" that is opened and closed by manual operation by the user, or an "automatic drain plug" that can also be opened and closed automatically in response to an operation command from controller 12.
[0030] The controller 12 can be configured to include, for example, a microcomputer, a memory 12m, and a timer 12t. The memory 12m includes a non-volatile storage device. The timer 12t manages time with a certain degree of accuracy. A real-time clock or a free-running counter that counts up (increments or decrements) at a predetermined cycle can be used as the timer 12t. The current time can be calculated by treating the count value output by the free-running counter as the elapsed time from a certain time, and this allows the timer to function as a timer.
[0031] The controller 12 is electrically connected to the burners 2a, 2b, the fans 3a, 3b, the circulation pump 10, the water level sensor 11, the bath hot water valve 13, and the electrical wiring 14. The electrical wiring 14 is configured to supply power to the controller 12 by being connected to a power source (not shown). The controller 12 corresponds to one embodiment of a "control circuit."
[0032] The controller 12 receives detection values from the flow rate sensors 15 and 16 and the temperature sensors 9, 12T, 18 and 19. The temperature sensor 12T is provided in a housing 1 that is usually placed outdoors, and is arranged to measure the atmospheric temperature (outside temperature) that changes with the seasons.
[0033] Controller 12 can obtain inlet water temperature Tw from the detection value of temperature sensor 18, outlet water temperature Th from the detection value of temperature sensor 19, bathtub water temperature from the detection value of temperature sensor 9, and outside air temperature Ta from the detection value of temperature sensor 12T. Controller 12 can also calculate the amount (volume) of hot water poured into bathtub 20 by integrating the flow rate (pouring water flow rate) detected by flow rate sensor 16.
[0034] Furthermore, the controller 12 is communicatively connected to a remote control 30 and a remote control 50. Note that the communication between these devices may be in accordance with any known standard and may be either wired or wireless.
[0035] Remote control 30 is installed on the wall of bathroom 200 and is used to operate water heating apparatus 100. Remote control 30 includes a display unit 31 for displaying information and an operation unit 32 for accepting input setting operations from the user or the like. Display unit 31 is typically configured with a liquid crystal panel and is configured to be able to display the bathtub water level and temperature. Operation unit 32 is typically configured with push buttons or touch buttons and is configured to be able to accept setting operations related to at least the bathtub water level and temperature. Furthermore, remote control 30 may be provided with a human presence sensor 35 for detecting the presence of a person in bathroom 200. For example, human presence sensor 35 can be configured with an infrared sensor (pyroelectric sensor).
[0036] Remote control 50 is installed outside bathroom 200 and is used to operate water heating apparatus 100. Remote control 50 is typically installed on a wall in the kitchen. Remote control 50 includes a display unit 51 for displaying information, and an operation unit 52 for receiving input setting operations from a user or the like. Remote control 50 may further be provided with a lamp 53 whose lighting state is variably controlled.
[0037] Display unit 51 is typically configured with a liquid crystal panel, and is configured to be able to display the hot water supply temperature setting, the bath temperature setting, etc. Operation unit 52 is typically configured with push buttons or touch buttons, and is configured to be able to accept setting operations related to the operation of water heating device 100. Lamp 53 can be configured with, for example, a light emitting diode (LED).
[0038] Based on input setting operations by a user or the like from remote controls 30, 50, controller 12 controls the operation of water heating apparatus 100 so that water heating system 300 is operated according to user instructions.
[0039] As an example of this control, controller 12 executes a bath filling operation when automatic bath operation is instructed by operating remote controls 30, 50. The bath filling operation ends when the bath water level in bathtub 20 reaches the set water level due to hot water poured from water heater 100 and the bath water temperature detected by temperature sensor 9 reaches the bath set temperature.
[0040] In water heating device 100, it is possible to set an automatic mode that maintains the temperature and water level of bathtub water 21 after the bath filling operation is completed. When this automatic mode is selected, if the bathtub water temperature detected by temperature sensor 9 falls below a reference temperature set corresponding to the bath set temperature (for example, set 2 to 3°C lower than the bath set temperature), a reheating operation is automatically started for heat retention control. Furthermore, if the bathtub water level detected by water level sensor 11 falls below the set water level, a hot water top-up operation is started to supply additional hot water from water heating device 100 to bathtub 20.
[0041] In the hot water supply system according to this embodiment, similarly to Patent Document 1, after draining bathtub 20, the inside of the pipes, including circulation path 8, can be cleaned by a pipe cleaning operation in which hot water is poured from hot water supply device 100. As described below, this embodiment promotes the regular execution of pipe cleaning operation by making it possible to visualize the results of pipe cleaning operation using communication system 250 shown in Fig. 2.
[0042] [Example of communication system configuration] FIG. 2 is a block diagram showing an example of the configuration of a communication system including the hot water supply system according to this embodiment.
[0043] 2, hot water supply system 300 according to the embodiment can also constitute a communication system 250 between external devices.
[0044] Communication system 250 further includes water heating apparatus 100, interface device 110, terminal device 130 communicably connected to interface device 110, and server 150 connected to external communication network (representatively, the Internet) 140. Interface device 110 is assumed to be placed in the same house as water heating apparatus 100 (bathtub 20).
[0045] Furthermore, by connecting to an external communication network 140 via a router 160 or a base station 170 outside the home, the terminal device 130 can communicate with the water heating apparatus 100 even from a location where communication with the interface device 110 is not possible.
[0046] According to communication system 250, by the communication connection between water heating apparatus 100 (controller 12) and server 150, information relating to the results of pipe cleaning operation stored in memory 12m (hereinafter also referred to as "pipe cleaning operation result information") can be transmitted to server 150, and the information can be accumulated and managed by server 150. This makes it possible to store the pipe cleaning operation result information without excessively increasing the capacity of memory 12m.
[0047] [Pipe cleaning operation] Next, the control process for the pipe cleaning operation according to this embodiment will be described.
[0048] 3 is a flow chart for explaining the control process of the pipe cleaning operation according to this embodiment. For example, the control process shown in FIG.
[0049] Referring to Figure 3, when the controller 12 detects the start of the bath filling operation in step (hereinafter simply referred to as "S") 10, it waits in S11 to start the processes from S12 onwards until the pouring of hot water is completed, i.e., the bath filling operation is finished. As a result, the series of processes from S12 onwards related to the pipe cleaning operation are started in response to the end of the bath filling operation. As described above, at the end of the bath filling operation, the water level sensor 11 detects that the bathtub water level has reached the set water level.
[0050] In S12, controller 12 determines whether drainage of bathtub 20 has been detected. For example, in the determination in S12, drainage can be detected in response to water level sensor 11 detecting that the bath water level has dropped to a level at which circulation adapter 25 is exposed after the end of the bath filling operation. Alternatively, if drain plug 26 is configured as an automatic drain plug, drainage can also be detected in response to a predetermined time having elapsed after a command to open drain plug 26 is issued. In this way, any method can be used to detect drainage of bathtub 20 without any particular limitation.
[0051] When drainage of bathtub 20 is detected (YES in S12), controller 12 waits for a certain period of time to elapse, then proceeds to S13 and executes pipe cleaning operation. In S13, water heating device 100 (hot water pouring circuit) is controlled to output hot water at a preset temperature Tcl, and bath hot water pouring valve 13 is opened, thereby starting pipe cleaning operation. As a result, cleaning water flows through the hot water pouring circuit including circulation path 8, thereby executing pipe cleaning operation. Furthermore, when the amount of poured hot water (volume) indicated by the time integral value of the flow rate detected by flow sensor 16 reaches a preset supply amount Qcl, bath hot water pouring valve 13 is closed to stop the pouring of hot water from water heating device 100, thereby ending the pipe cleaning operation.
[0052] According to the process of S10 to S13 in FIG. 3, the pipe cleaning operation is performed in response to detection of drainage of the bathtub 20 after the bath filling operation is completed. In other words, if the bath filling operation is not performed, the pipe cleaning operation is not performed either. Therefore, for example, if the bath filling operation is stopped continuously for a long period of time in the summer when the outside temperature is high, the pipe cleaning operation will not be performed for a long period of time either. In such a case, dirt may accumulate in the pipes including the circulation path 8 due to deterioration of the pipes, and there is a concern that the dirt will flow into the bathtub 20 when the next bath filling operation starts.
[0053] Therefore, in this embodiment, if the start of the bath filling operation is not detected in S10 of Fig. 3 (NO in S10), the controller 12 advances the process to S14. In S14, a control process is executed based on the lapse of a predetermined set time from the end of the pipe cleaning operation.
[0054] Fig. 4 is a flowchart illustrating the control process of the pipe cleaning operation in S14 of Fig. 3. For example, the control process shown in Fig. 4 is repeatedly executed by the controller 12.
[0055] Referring to Fig. 4, controller 12 starts a pipe cleaning operation in S21. In S21, similar to S13 in Fig. 3, water heating device 100 (hot water pouring circuit) is controlled to output hot water at a preset temperature Tcl, and bath hot water pouring valve 13 is opened, thereby starting the pipe cleaning operation. As a result, the pipe cleaning operation is performed by causing cleaning water to flow through the hot water pouring circuit including circulation path 8. Furthermore, when the amount of poured hot water (volume) indicated by the time integral value of the flow rate detected by flow sensor 16 reaches a preset supply amount Qcl, the bath hot water pouring valve 13 is closed to stop the pouring of hot water from water heating device 100, thereby ending the pipe cleaning operation.
[0056] When the pipe cleaning operation ends in S22 (YES in S22), the controller 12 displays the execution date and time of the pipe cleaning operation on at least one of the display unit 31 of the remote control 30 and the display unit 51 of the remote control 50 in S23. In S23, the execution date and time of the pipe cleaning operation can further be displayed on the display of the terminal device 130.
[0057] Specifically, the controller 12 uses the timer 12t to collect pipe cleaning operation performance information. The pipe cleaning operation performance information includes data indicating the date and time of execution of the pipe cleaning operation. When the pipe cleaning operation is executed, the controller 12 stores data indicating the date and time of execution in the memory 12m, and displays the date and time of execution of the pipe cleaning operation on at least one of the display unit 31 of the remote control 30 and the display unit 51 of the remote control 50.
[0058] Furthermore, the controller 12 transmits the pipe cleaning operation information stored in the memory 12m to the server 150 via the interface device 110 and the Internet 140. The server 150 accumulates and manages the received pipe cleaning operation record information. The terminal device 130 acquires the pipe cleaning operation record information by communicating with the interface device 110 or the router 160. The terminal device 130 displays the date and time when the pipe cleaning operation was performed on a display.
[0059] In S24, the controller 12 determines whether or not the "notification setting" in the remote control 30, 50 and the terminal device 130 is set to ON (enabled). This "notification setting" is a setting for notifying the user based on the pipe cleaning operation performance information. The remote control 30, 50 and the terminal device 130 can be used as the notification means. The user can set the notification setting to ON (enabled) or OFF (disabled) in each of the remote control 30, 50 and the terminal device 130.
[0060] If the notification setting is off (disabled) (NO in S24), the controller 12 ends the control process.
[0061] On the other hand, when the notification setting is on (enabled) (YES determination in S24), the controller 12 uses the timer 12t to count the time that has elapsed since the end of the pipe cleaning operation. Data indicating the time that has elapsed since the end of the pipe cleaning operation is included in the pipe operation cleaning performance information. In this embodiment, the controller 12 uses the timer 12t to count the number of days that have elapsed since the end of the pipe cleaning operation. The controller 12 stores the count value Day of the timer 12t in the memory 12m.
[0062] Specifically, in S25, the controller 12 initializes the count value Day of the timer 12t to 0. According to S25, the count value Day is initialized to 0 every time the pipe cleaning operation is performed (YES determination in S22).
[0063] In S26, the controller 12 determines whether or not one day has passed since the count value Day was updated. If one day has passed since the count value Day was updated (YES in S26), the controller 12 proceeds to S27 and increments the count value Day by 1.
[0064] On the other hand, if one day has not passed since the count value Day was updated (NO in S26), the controller 12 judges in S32 whether or not a pipe cleaning operation has been performed after the count value Day was updated. If a pipe cleaning operation has not been performed (NO in S32), the controller 12 returns to S26 and increments the count value Day by 1 when one day has passed since the update.
[0065] On the other hand, if a pipe cleaning operation is performed based on bathtub drainage detection or the passage of the set time after updating the count value Day (YES in S32), the controller 12 returns to S23 and displays the date and time of the execution of the pipe cleaning operation on at least one of the display unit 31 of the remote control 30 and the display unit 51 of the remote control 50. In S23, the controller 12 further causes the display of the terminal device 130 to display the date and time of the execution of the pipe cleaning operation.
[0066] In S28, the controller 12 determines whether the count value Day has reached a predetermined set time X (days). As described later, the set time X (days) corresponds to the pipe cleaning operation interval. The pipe cleaning operation interval can be set to any value by the user.
[0067] If the count value Day has not reached the set time X (days) (NO in S28), the controller 12 returns to S26 and continues updating the count value Day (S27) and / or initializing the count value Day (S25).
[0068] When the count value Day reaches the set time X (days) (YES in S28), the controller 12 proceeds to S29 and uses the above-mentioned notification means to notify the user that the set time has elapsed. In S29, the controller 12 can notify the user that the set time has elapsed using the display units 31, 51 and / or audio output units of the remote controls 30, 50, and the display and / or audio output units of the terminal device 130. Examples of notification will be described later.
[0069] In S30, the controller 12 determines whether or not it is within a predetermined time Y (minutes) from the start of notification of the set time in S29 based on the measured value of the timer 12t. The predetermined time Y (minutes) can be set to any value by the user.
[0070] If it is within the predetermined time Y (minutes) from the start of the notification (YES in S30), the controller 12 proceeds to S31 and determines whether or not to execute the pipe cleaning operation. In S31, the controller 12 determines whether or not to execute the pipe cleaning operation based on the content of the user operation accepted by the remote controllers 30, 50 and / or the terminal device 130. When an operation instructing to execute the pipe cleaning operation is accepted, the controller 12 determines to execute the pipe cleaning operation (YES in S31), returns to S21, and starts the pipe cleaning operation.
[0071] On the other hand, if a predetermined time Y (minutes) has elapsed since the start of the alert in S30 (NO judgment in S30), or if it is judged not to perform pipe cleaning operation based on the content of the user operation (NO judgment in S31), the controller 12 returns to S24 and continues updating the count value Day (S27) and / or initializing the count value Day (S25).
[0072] 4, the execution date and time of the pipe cleaning operation is stored in the memory 12m, and the execution date and time of the pipe cleaning operation is displayed on the display unit 31, 51 of the remote control 30, 50 and / or the display of the terminal device 130. Therefore, every time the pipe cleaning operation is executed, the pipe cleaning operation record information stored in the memory 12m is updated, and the execution date and time of the pipe cleaning operation displayed on the display unit 31, 51 of the remote control 30, 50 and / or the display of the terminal device 130 is rewritten to the execution date and time of the most recent pipe cleaning operation. This makes it possible to inform the user when the pipe cleaning operation was executed.
[0073] Furthermore, when the notification setting is on, the elapsed time from the end of the pipe cleaning operation is counted, and the count value Day is stored in the memory 12m. The count value Day is read out from the memory 12m and displayed on the display unit 31, 51 of the remote controller 30, 50 and / or the display of the terminal device 130, so that the user can be informed of how much time has passed since the pipe cleaning operation.
[0074] Furthermore, when the time elapsed since the end of the pipe cleaning operation reaches the set time X (days), the user is notified of the passage of the set time via the remote controller 30, 50 and / or the terminal device 130, so that the user can be prompted to perform the pipe cleaning operation. In this way, according to the control process in Fig. 4, it is possible to visualize the results of the pipe cleaning operation, so that the regular execution of the pipe cleaning operation can be promoted.
[0075] Next, a specific example of reporting the pipe cleaning operation performance information will be described with reference to Figs.
[0076] Fig. 5 is a diagram for explaining one aspect of the display in step S23 in Fig. 4. Fig. 5 shows a display example on display 132 of terminal device 130 (Fig. 2). The display example in Fig. 5 is also applicable to display unit 31 of remote control 30 and display unit 51 of remote control 50.
[0077] 5, display 132 of terminal device 130 displays data 70 indicating the date and time of execution of the pipe cleaning operation.
[0078] Furthermore, data 71 relating to the execution date and time of a pipe cleaning operation executed immediately before a pipe cleaning operation may be displayed on the display 132. This allows the user to know the execution interval between a pipe cleaning operation and the pipe cleaning operation immediately before that pipe cleaning operation. The data 70 and 71 are generated based on the pipe cleaning operation record information stored in the memory 12m.
[0079] Furthermore, when the notification setting is on, data 72 relating to the set time X (days) for the pipe cleaning operation interval may be displayed on the display 132. The data 72 represents the currently set interval for executing the pipe cleaning operation. As described later, the pipe cleaning operation interval can be set to any value by the user using the terminal device 130 or the remote controllers 30, 50. The data 72 allows the user to know the currently set time and to determine whether or not the set time needs to be reviewed.
[0080] Fig. 6 is a diagram illustrating one mode of notification when the notification setting is on. Fig. 6 shows a display example on the display 132 of the terminal device 130 (Fig. 2). The display example in Fig. 6 is also applicable to the display unit 31 of the remote control 30 and the display unit 51 of the remote control 50.
[0081] 6, when the notification setting is on, the time that has elapsed since the end of the pipe cleaning operation can be displayed based on the count value Day by the timer 12t. In the display example of Fig. 6, the display 132 of the terminal device 130 displays data 70 indicating the date and time when the pipe cleaning operation is performed and data 72 indicating the set time for the pipe cleaning operation interval, as well as data 73 indicating the time that has elapsed since the end of the pipe cleaning operation and data 74 indicating the remaining time until the set time.
[0082] The data 73 relating to the time elapsed since the end of the pipe cleaning operation represents the number of days elapsed since the end of the pipe cleaning operation. The number of days elapsed is generated based on the count value Day of the timer 12t. That is, every time the count value Day is incremented by 1, the number of days elapsed is also incremented by 1. In addition, when the count value Day is initialized to 0 as a result of the execution of the pipe cleaning operation, the number of days elapsed is also initialized to 0.
[0083] The data 74 indicating the remaining time until the end of the set time represents the remaining time until the currently set set time X (days) ends. The remaining time can be calculated by subtracting the count value Day from the set time X (days).
[0084] 6, the user can know how much time has passed since the pipe cleaning operation started. Furthermore, the user can know the remaining time until the user is notified that the set time has elapsed.
[0085] Fig. 7 is a diagram for explaining one mode of notification in step S09 in Fig. 3. Fig. 7 shows an example of notification using display 132 of terminal device 130 (Fig. 2). The example of notification in Fig. 7 is also applicable to notifications using display unit 31 of remote control 30 and display unit 51 of remote control 50.
[0086] 7, when the time elapsed since the end of the pipe cleaning operation reaches the set time X (days), data 75 indicating the passage of the set time for the pipe cleaning operation interval is displayed on the display 132 of the terminal device 130. In the example of Fig. 7, the data 75 includes a message saying "The set time has elapsed" and the current set time. Note that the notification may be configured to output a voice or sound instead of or in addition to the message shown in Fig. 7.
[0087] The display 132 further displays a GUI (Graphical User Interface) 76 for inquiring of the user as to whether or not to execute the pipe cleaning operation. This GUI 76 includes a button 77 for instructing to execute the pipe cleaning operation and a button 78 for instructing not to execute the pipe cleaning operation. The user who receives the inquiry can instruct the controller 12 as to whether or not to execute the pipe cleaning operation by operating either the button 77 or 78.
[0088] When an instruction to execute a pipe cleaning operation is given in the terminal device 130 within a predetermined time Y (minutes) from the start of the notification in Fig. 7, a YES determination is made in S31 in Fig. 3, and the controller 12 returns to S21 and executes the pipe cleaning operation. This can promote the execution of regular pipe cleaning operation based on the set time.
[0089] As described above, the user can set the pipe cleaning operation interval to any value. Fig. 8 is a diagram for explaining a display example of a setting screen for the pipe cleaning operation interval. Fig. 8 shows an example of a display of the setting screen on the display 132 of the terminal device 130. The setting screen in Fig. 8 is also applicable to the display unit 31 of the remote control 30 and the display unit 51 of the remote control 50.
[0090] 8, the setting screen displays a GUI 80 for setting the pipe cleaning operation interval, and, as reference data, data 81 indicating the currently set set time X (days) and data based on past set times. In the display example of FIG. 8, as data based on past set times, data 82 indicating an average value of set times over the past few months (e.g., three months) up to the present and data 83 indicating a recommended value of set time are displayed. These data 82 and 83 can be generated based on pipe cleaning operation record information stored in memory 12m.
[0091] Data 83 indicating the recommended value of the set time can display, for example, the interval between pipe cleaning operations recommended by the manufacturer or the like of water heating apparatus 100. Alternatively, a recommended value calculated based on an actual value of the interval between pipe cleaning operations and the number of years of use of water heating apparatus 100 or the like can be displayed.
[0092] [Other configuration examples] The control process for the pipe cleaning operation according to this embodiment can further have the following configuration.
[0093] (1) In the control process for the pipe cleaning operation in the above-described embodiment, a configuration has been exemplified in which, after notifying the elapse of the set time (S29), the controller 12 executes the pipe cleaning operation when the remote control 30, 50 and / or the terminal device 130 receives an operation to instruct the execution of the pipe cleaning operation (when a YES judgment is made in S31). However, the controller 12 may be configured to automatically execute the pipe cleaning operation after notifying the elapse of the set time (S29) without waiting for operation input from the user.
[0094] (2) In the control process of the pipe cleaning operation according to the above-described embodiment, when the predetermined time Y (minutes) has elapsed since the notification of the lapse of the set time (S29) (NO in S30), or when it is determined that the pipe cleaning operation will not be performed (NO in S31), the controller 12 returns to S24 and initializes the count value Day to 0 (S25). Therefore, when the count value Day again reaches the set time X (days) after the initialization, the lapse of the set time is notified.
[0095] If the pipe cleaning operation is not performed even when the notification of the lapse of the set time is given as described above, the notification example in Fig. 6 may be configured to display a value obtained by adding the count value Day before initialization to the count value Day after initialization as the elapsed time (data 73) since the end of the pipe cleaning operation. This makes it possible to inform the user of the actual elapsed time since the end of the pipe cleaning operation.
[0096] (3) In the hot water supply system 300 of the above-described embodiment, when the drain plug 26 is configured as an automatic drain plug, the cleaning water used to clean the pipes can be automatically drained by controlling the opening and closing of the drain plug 26 during pipe cleaning operation.
[0097] 9 is a flow chart illustrating the control process of the pipe cleaning operation according to the first modified example of the present embodiment. For example, the control process shown in FIG.
[0098] The control process according to the first modified example is obtained by adding processes of S40 to S42 to the control process of Fig. 3. In Fig. 9, among S21 to S32 that are common to the control process of Fig. 3, S25 to S32 are not shown.
[0099] 9, when the controller 12 starts the pipe cleaning operation in S21 similar to that in Fig. 3, in S40 it generates a command to open the drain plug 26 and outputs it to the drain plug 26. In response to the open command, the drain plug 26 is opened.
[0100] When the pipe cleaning operation is completed (YES in S22), the controller 12 proceeds to S41 and uses the timer 12t to measure the elapsed time from the end of the pipe cleaning operation. When a predetermined time has elapsed from the end of the pipe cleaning operation (YES in S41), the controller 12 generates a command to close the drain plug 26 in S42 and outputs the command to the drain plug 26. In response to the command, the drain plug 26 is closed.
[0101] (4) In the pipe cleaning operation according to the above-described embodiment, a configuration can be adopted in which a plurality of cleaning modes in which the supply amount Qcl and the temperature Tcl of the cleaning water are set in different manners can be selected. Fig. 10 is a table for explaining an example of the selectable cleaning modes.
[0102] Referring to Fig. 10, the cleaning modes include Mode 1 (Normal Mode), Mode 2 (Hot Cleaning Mode), and Mode 4 (Eco Mode), in which the supply rate Qcl and the temperature Tcl are fixedly set, and Mode 3 (Auto Mode), in which the supply rate Qcl and the temperature Tcl are variably set according to the state of the bathtub water 21 at the start of the pipe cleaning operation.
[0103] When Mode 1 (Normal Mode) is selected, the temperature Tcl is fixedly set to Ta. The temperature Ta can be equal to the bathtub set temperature at that time. Alternatively, the temperature Ta can be set to a predetermined constant temperature (for example, around 40°C). Also, the supply rate Qcl is set to a predetermined Qa.
[0104] When Mode 2 (Hot Cleaning Mode) is selected, the temperature Tcl is set to Tb (Tb > Ta). The temperature Tb can be set by adding a constant temperature (for example, around 5°C) to the temperature Ta in Mode 1. Alternatively, the temperature Tb can be set to a predetermined constant temperature (for example, about 45 - 48°C). The supply rate Qcl is set to a predetermined Qb.
[0105] That is, in Mode 2 (Hot Cleaning Mode), the temperature Tcl of the cleaning water is set higher than in Mode 1 (Normal Mode). Note that the supply rate Qa in Mode 1 (Normal Mode) and the supply rate Qb in Mode 2 (Hot Cleaning Mode) may be the same or different.
[0106] When Mode 3 (Auto Mode) is selected, for example, the supply rate Qcl and the temperature Tcl are variably set according to an index for estimating and evaluating the amount of sebum eluted in the bathtub water 21.
[0107] When Mode 4 (Eco Mode) is selected, the temperature Tcl is set to Tc (Tc < Ta). The temperature Tc can be set by subtracting a constant temperature (for example, around 5°C) from the temperature Ta in Mode 1. Alternatively, the temperature Tc can be set to a predetermined constant temperature (for example, about 30 - 35°C). The supply rate Qcl is set to a predetermined Qc.
[0108] That is, in mode 4 (eco mode), the temperature Tcl of the wash water is set lower than in mode 1 (normal mode). The supply amount Qa in mode 1 (normal mode) and the supply amount Qc in mode 4 (eco mode) may be the same or different. Mode 4 (eco mode) is the wash mode that consumes the least energy among modes 1 to 4.
[0109] The cleaning mode can be selected by an installer operating operation unit 32 of remote control 30 or operation unit 52 of remote control 50 in response to a user request when installing or maintaining water heating apparatus 100. Furthermore, after installation, the user can also input (change) a selection instruction by directly operating operation unit 32 of remote control 30, operation unit 52 of remote control 50, or terminal device 130.
[0110] In addition, when the device is shipped from the factory, any one of the cleaning modes (for example, the automatic mode) can be set as a default. In this case, too, the cleaning mode can be changed at any time by the operation unit 32, the operation unit 52, or the terminal device 130.
[0111] FIG. 11 is a flowchart for explaining a control process for setting the supply amount and temperature of cleaning water in a pipe cleaning operation according to a second modification of this embodiment.
[0112] 11, when the pipe cleaning operation is started (S13 or S14), the controller 12 reads in an instruction to select one of a plurality of cleaning modes in S51. Then, the controller 12 proceeds to S52 and determines whether the current pipe cleaning operation is a pipe cleaning operation based on bathtub drainage detection (S13 in FIG. 3) or a pipe cleaning operation based on the passage of a set time (S14 in FIG. 3).
[0113] If the current pipe cleaning operation is a pipe cleaning operation based on bathtub drainage detection (S13 in FIG. 3) (YES in S52), the controller 12 sets the supply amount Qcl and temperature Tcl of cleaning water in S53 according to the cleaning mode selected by the selection instruction (S51).
[0114] On the other hand, if the current pipe cleaning operation is the pipe cleaning operation based on the lapse of the set time (S14 in FIG. 3) (NOT judgment in S52), the controller 12 sets the supply amount Qcl and temperature Tcl of cleaning water according to mode 4 (eco mode) in S54.
[0115] According to the control process of Fig. 11, when a pipe cleaning operation based on the passage of a set time is performed, mode 4 (eco mode) is selected regardless of the selection instruction. This is because the pipe cleaning operation based on the passage of a set time does not cause sebum dissolved in bath water 21 during bathing to adhere to the inside of the pipes, and therefore the degree of dirt in the pipes is small, compared to a pipe cleaning operation performed after the bathtub 20 is drained. That is, the pipe cleaning operation based on the passage of a set time does not require cleaning power to dissolve sebum, as in the pipe cleaning operation performed after the bathtub 20 is drained, and therefore energy consumption can be reduced by selecting a pipe cleaning operation in mode 4 (eco mode), which consumes the least energy (lowest cleaning power).
[0116] (5) In the above-described embodiment, the timer 12t corresponds to an example of the "time measuring means," the memory 12m corresponds to an example of the "storage unit," and the controller 12, the remote controls 30 and 50, and the terminal device 130 correspond to an example of the "notification means" and the "input means." In the present embodiment, a configuration in which the "time measuring means" and the "storage unit" are arranged in the controller 12 has been exemplified, but it is also possible to arrange at least a part of the functions of these means in the server 150.
[0117] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0118] 8 Circulation circuit, 20 Bathtub, 21 Bathtub water, 26 Drain plug, 30,50 Remote control, 100 Water heater, 110 Interface device, 130 Terminal device, 140 External communication network, 200 Bathroom, 250 Communication system, 300 Water heater system.
Claims
1. A hot water supply system including a bathtub as a hot water supply destination, A circulation path for circulating and heating the bath water in the bathtub; A hot water supply circuit for supplying hot water to the bathtub through a hot water supply path configured to include the circulation path; a control circuit for executing a pipe cleaning operation for supplying cleaning water from the pouring circuit to the pouring path; a timing means for timing an elapsed time from the end of the pipe cleaning operation using a timer; a notification means for notifying a user of information, The time measuring means initializes the elapsed time measured by the timer every time the pipe cleaning operation is performed, the notification means notifies a user of the elapsed time reaching a set time when the elapsed time reaches the set time; The notification means notifies a user of the elapsed time.
2. A hot water supply system including a bathtub as a hot water supply destination, A circulation path for circulating and heating the bath water in the bathtub; A hot water supply circuit for supplying hot water to the bathtub through a hot water supply path configured to include the circulation path; a control circuit for executing a pipe cleaning operation for supplying cleaning water from the pouring circuit to the pouring path; a timing means for timing an elapsed time from the end of the pipe cleaning operation using a timer; a notification means for notifying a user of information, The time measuring means initializes the elapsed time measured by the timer every time the pipe cleaning operation is performed, the notification means notifies a user of the elapsed time reaching a set time when the elapsed time reaches the set time; A storage unit for storing the execution date and time of the pipe cleaning operation, The notification means notifies a user of a date and time when the pipe cleaning operation is to be performed.
3. A hot water supply system including a bathtub as a hot water supply destination, A circulation path for circulating and heating the bath water in the bathtub; A hot water supply circuit for supplying hot water to the bathtub through a hot water supply path configured to include the circulation path; a control circuit for executing a pipe cleaning operation for supplying cleaning water from the pouring circuit to the pouring path; a timing means for timing an elapsed time from the end of the pipe cleaning operation using a timer; a notification means for notifying a user of information, The time measuring means initializes the elapsed time measured by the timer every time the pipe cleaning operation is performed, the notification means notifies a user of the elapsed time reaching a set time when the elapsed time reaches the set time; the control circuit is configured to be communicatively connectable to an external communication network via a communication repeater; The notification means transmits the information to the communication repeater or a terminal device communicatively connected to the external communication network.
4. A hot water supply system including a bathtub as a hot water supply destination, A circulation path for circulating and heating the bath water in the bathtub; A hot water supply circuit for supplying hot water to the bathtub through a hot water supply path configured to include the circulation path; a control circuit for executing a pipe cleaning operation for supplying cleaning water from the pouring circuit to the pouring path; a timing means for timing an elapsed time from the end of the pipe cleaning operation using a timer; a notification means for notifying a user of information, The time measuring means initializes the elapsed time measured by the timer every time the pipe cleaning operation is performed, the notification means notifies a user of the elapsed time reaching a set time when the elapsed time reaches the set time; The control circuit executes the pipe cleaning operation when it detects drainage of the bathtub after the bathtub filling operation by the pouring circuit is completed, When the elapsed time reaches the set time, the control circuit executes the pipe cleaning operation upon receiving an instruction to execute the pipe cleaning operation from a user.
Citation Information
Patent Citations
Reheater of bath tub water with water heater
JP1999241857A
Hot water feeding and circulating device
JP2001336821A
Hot water system
JP2016211751A
Bath device
JP2018031546A
Water heater
JP2021001714A
