Portable loading and unloading equipment for liquid hydrogen
The portable cargo handling equipment for liquid hydrogen uses a shutoff valve, atmosphere open channel, and heating section to minimize leakage by reducing pressure and vaporizing hydrogen, addressing the challenge of increased leakage in emergency situations.
Patent Information
- Application Number
- JP2020217761
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-12-25
AI Technical Summary
Existing emergency release devices for cryogenic fluid handling systems, such as those handling LNG, suffer from slight leakage during operation, and this issue is exacerbated with liquid hydrogen due to its lower boiling point, leading to the formation of liquid air and increased leakage with pressure.
A portable cargo handling equipment for liquid hydrogen includes a shutoff valve, an emergency disconnection device, an atmosphere open channel with an on-off valve, and a heating section to reduce pressure and vaporize liquid hydrogen before disengagement, minimizing leakage.
The system effectively suppresses the amount of liquid hydrogen leakage by reducing pressure differences and vaporizing hydrogen, preventing liquid air formation during emergency disengagement.
Smart Images

Figure 0007569683000001 
Figure 0007569683000002 
Figure 0007569683000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a portable loading and unloading facility for transferring liquid hydrogen between a ship-side cryogenic tank and a land-side cryogenic tank, and to an emergency release method thereof. [Background technology]
[0002] As equipment for loading and unloading cryogenic fluids between a ship-side cryogenic tank and a land-side cryogenic tank, Patent Document 1 discloses a mobile body having a fluid flow pipe for carrying LNG between the land-side cryogenic tank and the ship-side cryogenic tank, in order to improve the degree of freedom in relation to geographical constraints when loading and unloading cryogenic fluids.
[0003] The mobile body is equipped with an emergency shutoff valve that shuts off the flow of fluid between the ship and the loading and unloading equipment in the fluid flow pipe, and an emergency release device that separates the ship from the loading and unloading equipment in an emergency. In the event that the ship moves due to a sudden gust of wind or the like while loading and unloading cryogenic fluid, the emergency release device is released to separate the ship from the loading and unloading equipment. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-104830 A Summary of the Invention [Problem to be solved by the invention]
[0005] Normally, an emergency detachment device has a shutoff function to prevent leakage of fluid when detached. If the emergency detachment device in the moving body of Patent Document 1 has a shutoff function, leakage of LNG can be prevented after detachment of the emergency detachment device, but a small amount of LNG leaks while the emergency detachment device is in operation. Moreover, the amount of LNG leakage increases as the pressure of LNG in the fluid flow pipe increases.
[0006] Meanwhile, while the boiling point of LNG is about -161°C, which is higher than the boiling points of nitrogen (about -196°C) and oxygen (about -183°C), the boiling point of liquid hydrogen is about -253°C, which is lower than the boiling points of nitrogen and oxygen. For this reason, in the case of facilities that load and unload liquid hydrogen instead of LNG, if liquid hydrogen leaks when the emergency release device is released, the air near the emergency release device will be cooled, generating liquid air.
[0007] Therefore, an object of the present invention is to provide a portable loading and unloading facility for liquid hydrogen and an emergency detachment method that can suppress the amount of liquid hydrogen leakage when the emergency detachment device is detached. [Means for solving the problem]
[0008] In order to solve the above problems, a portable loading and unloading equipment for liquid hydrogen according to one embodiment of the present invention is a portable loading and unloading equipment for liquid hydrogen interposed between a ship-side cryogenic tank and a land-side cryogenic tank, and comprises: a liquid hydrogen piping having a first joint connectable to an end of a ship-side liquid pipe extending from the ship-side cryogenic tank and a second joint connectable to an end of a land-side liquid pipe extending from the land-side cryogenic tank; an emergency release device provided on the liquid hydrogen piping; a shutoff valve provided in a portion of the liquid hydrogen piping between the emergency release device and the second joint; an atmosphere release device having one end connected to the portion of the liquid hydrogen piping between the first joint and the shutoff valve and the other end open to the atmosphere; an opening and closing valve for opening and closing the atmosphere release passage; and a heating unit provided in the atmosphere release passage.
[0009] According to this configuration, the pressure of the liquid hydrogen remaining between the emergency separation device and the shutoff valve in the liquid hydrogen piping can be reduced by opening the on-off valve before the emergency separation device is separated. This reduces the pressure difference between the remaining liquid hydrogen and atmospheric pressure, and suppresses the amount of liquid hydrogen leaking when the emergency separation device is separated. Furthermore, the liquid hydrogen or the hydrogen gas vaporized from the liquid hydrogen can be heated by a heating section provided in the atmosphere open flow path. This prevents the liquid hydrogen from flowing out to the atmosphere through the atmosphere open flow path, and also suppresses the generation of liquid air by the hydrogen gas released to the atmosphere through the atmosphere open flow path.
[0010] Moreover, an emergency removal method according to one embodiment of the present invention is an emergency removal method for separating a liquid hydrogen transfer system into a ship side and a land side in the event of an emergency, the system comprising: a liquid pipe for directing liquid hydrogen from one of a ship side cryogenic tank and a land side cryogenic tank to the other; an emergency removal device provided in the liquid pipe; a first shutoff valve provided in a portion of the liquid pipe between the emergency removal device and the land side cryogenic tank; a second shutoff valve provided in a portion of the liquid pipe between the emergency removal device and the ship side cryogenic tank; and an on-off valve capable of opening a portion of the liquid pipe between the first shutoff valve and the second shutoff valve to the atmosphere, the method comprising: a first step of closing the first shutoff valve and the second shutoff valve; a second step of opening the on-off valve; and a third step of initiating detachment of the emergency removal device after the first and second steps.
[0011] According to this method, the pressure of the liquid hydrogen remaining in the liquid pipe between the first and second shutoff valves can be reduced by opening the on-off valve before the emergency separation device is separated. This reduces the pressure difference between the remaining liquid hydrogen and atmospheric pressure, making it possible to suppress the amount of liquid hydrogen leaking when the emergency separation device is separated. Effect of the Invention
[0012] According to the present invention, it is possible to suppress the amount of liquid hydrogen leakage when the emergency detachment device is detached. [Brief description of the drawings]
[0013] [Figure 1] FIG. 2 is a diagram showing a state in which the portable loading and unloading equipment according to the embodiment is connected to a land-side cryogenic tank and a ship-side cryogenic tank. [Diagram 2] FIG. 2 is a piping diagram of the liquid hydrogen transport system shown in FIG. [Diagram 3] FIG. 13 is a diagram showing a part of a piping system of a liquid hydrogen transport system equipped with a portable loading and unloading facility according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0015] FIG. 1 is a diagram showing a state in which a portable loading and unloading equipment 3 according to an embodiment is connected to a land-side cryogenic tank 10 and a ship-side cryogenic tank 20. In this embodiment, the land-side cryogenic tank 10 is a tank that constitutes a part of a tank truck 1. However, the land-side cryogenic tank 10 may also be a tank that constitutes a part of a tank container transported by a traveling vehicle or the like. The ship-side cryogenic tank 20 is, for example, a fuel tank or a cargo tank mounted on a ship 2. The tank truck 1, the ship 2, and the portable loading and unloading equipment 3 constitute a liquid hydrogen transfer system that transfers liquid hydrogen from one of the land-side cryogenic tank and the ship-side cryogenic tank to the other tank.
[0016] The portable loading and unloading equipment 3 is a loading and unloading equipment that transfers liquid hydrogen from one of the land-side cryogenic tank 10 and the ship-side cryogenic tank 20 to the other tank. In this embodiment, the portable loading and unloading equipment 3 transfers liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20. In this embodiment, the portable loading and unloading equipment 3 is a traveling vehicle that includes a frame 31, a vehicle body 32 that supports the frame 31, and a traveling drive source that is supported by the vehicle body 32 and drives a plurality of wheels that support the vehicle body 32. Various devices that the portable loading and unloading equipment 3 includes are supported on the frame 31. The frame 31 is, for example, a container frame.
[0017] Figure 2 is a piping diagram of the liquid hydrogen transfer system shown in Figure 1. In the following explanation, for convenience, the side of the piping system closer to the land-side cryogenic tank 10 will be referred to as the "land side," and the side of the piping system closer to the ship-side cryogenic tank 20 will be referred to as the "ship side." In Figure 2, the piping system for supplying air in the control system 100, which will be described later, is shown by dashed lines to distinguish it from the piping system for cryogenic fluid.
[0018] The tank truck 1 is equipped with a land-side low-temperature tank 10, a land-side liquid pipe 11 extending from the land-side low-temperature tank 10, and a land-side gas pipe 12 extending from the land-side low-temperature tank 10.
[0019] The land-side liquid pipe 11 is connected to the lower part of the land-side cryogenic tank 10. In this embodiment, it is connected to the liquid phase part of the land-side cryogenic tank 10 in a state in which liquid hydrogen is stored. The land-side liquid pipe 11 is provided with a shutoff valve 11a. In addition, a joint 11b is provided at the end of the land-side liquid pipe 11 opposite the land-side cryogenic tank 10.
[0020] The land-side gas pipe 12 is connected to an upper portion of the land-side cryogenic tank 10. In this embodiment, it is connected to a gas phase portion of the land-side cryogenic tank 10 in which liquid hydrogen is stored. The land-side gas pipe 12 is provided with a boil-off gas shutoff valve 12a. In addition, a joint 12b is provided at the end of the land-side gas pipe 12 opposite to the land-side cryogenic tank 10.
[0021] In addition, a portion of the land-side liquid pipe 11 between the shutoff valve 11a and the joint 11b and a portion of the land-side gas pipe 12 between the boil-off gas shutoff valve 12a and the joint 12b are connected by a land-side connection pipe 13. An opening / closing valve 13a is provided in the land-side connection pipe 13. The land-side connection pipe 13 constitutes a flow path for passing a purge gas from a purge gas supply device 70 described later.
[0022] In addition to the ship's cryogenic tank 20 , the ship 2 is equipped with a ship's liquid pipe 21 extending from the ship's cryogenic tank 20 , and a ship's gas pipe 22 extending from the ship's cryogenic tank 20 .
[0023] The ship side liquid pipe 21 is connected to a lower part of the ship side cryogenic tank 20. In this embodiment, it is connected to a liquid phase part of the ship side cryogenic tank 20 in a state where liquid hydrogen is stored. The ship side liquid pipe 21 is provided with a shutoff valve 21a. The shutoff valve 21a is an example of a second shutoff valve of the present invention. The shutoff valve 21a is an air-driven valve with an air cylinder to which air is supplied. In this embodiment, the shutoff valve 21a is a so-called normally closed type valve that is in a closed state when air is not supplied and is switched from a closed state to an open state when air is supplied. The ship 2 has a ship side air pipe 24 that guides air to the shutoff valve 21a, and air is supplied to the shutoff valve 21a through the ship side air pipe 24. In addition, a joint 21b is provided at the end of the ship side liquid pipe 21 on the opposite side to the ship side cryogenic tank 20.
[0024] The ship's gas pipe 22 is connected to an upper portion of the ship's cryogenic tank 20. In this embodiment, it is connected to a gas phase portion of the ship's cryogenic tank 20 in which liquid hydrogen is stored. The ship's gas pipe 22 is provided with a boil-off gas shutoff valve 22a. In addition, a joint 22b is provided at the end of the ship's gas pipe 22 opposite to the ship's cryogenic tank 20.
[0025] In addition, a portion of the ship side liquid pipe 21 between the shutoff valve 21a and the joint 21b and a portion of the ship side gas pipe 22 between the boil-off gas shutoff valve 22a and the joint 22b are connected by a ship side connection piping 23. An opening / closing valve 23a is provided in the ship side connection piping 23. The ship side connection piping 23 forms a flow path for passing purge gas from a purge gas supply device 70 described later.
[0026] The portable loading and unloading equipment 3 includes a liquid hydrogen pipe 40 and a hydrogen gas pipe 50. The liquid hydrogen pipe 40 and the hydrogen gas pipe 50 may have, for example, a known double pipe structure, or a single pipe structure wrapped with a heat insulating material. One end of the liquid hydrogen pipe 40 is connected to the ship side end of the land side liquid pipe 11, and the other end of the liquid hydrogen pipe 40 is configured to be connected to the land side end of the ship side liquid pipe 21. In addition, one end of the hydrogen gas pipe 50 is connected to the ship side end of the land side gas pipe 12, and the other end of the hydrogen gas pipe 50 is configured to be connected to the land side end of the ship side gas pipe 22.
[0027] Specifically, the liquid hydrogen piping 40 includes a liquid pipe 41 , a first hose 42 connected to one end of the liquid pipe 41 , and a second hose 43 connected to the other end of the liquid pipe 41 .
[0028] The fixed liquid pipe 41 is fixed to the frame 31 by a fixing member. The fixed liquid pipe 41 is a pipe having higher rigidity than flexible hose parts 42c, 43c described later. The fixed liquid pipe 41 is provided at both ends with joints 41a, 41b, respectively.
[0029] At least a portion of the first hose 42 is configured with a flexible hose portion 42c. One end of the first hose 42 is provided with a joint 42a connectable to the joint 41a of the fixed liquid pipe 41, and the other end of the first hose 42 is provided with a joint 42b connectable to the joint 21b of the ship side liquid pipe 21. The joint 42b is an example of the first joint of the present invention.
[0030] At least a portion of the second hose 43 is configured with a flexible hose portion 43c. One end of the second hose 43 is provided with a joint 43a connectable to the joint 41b of the fixed liquid pipe 41, and the other end of the second hose 43 is provided with a joint 43b connectable to the joint 11b of the land-side liquid pipe 11. The joint 43b is an example of the second joint of the present invention.
[0031] The hydrogen gas piping 50 also includes a fixed gas pipe 51 , a third hose 52 connected to one end of the fixed gas pipe 51 , and a fourth hose 53 connected to the other end of the fixed gas pipe 51 .
[0032] The fixed gas pipe 51 is fixed to the frame 31 by a fixing member. The fixed gas pipe 51 is a pipe having higher rigidity than flexible hose parts 52c and 53c described later. The fixed gas pipe 51 is provided at both ends with joints 51a and 51b, respectively.
[0033] At least a portion of the third hose 52 is configured with a flexible hose portion 52c. One end of the third hose 52 is provided with a joint 52a connectable to the joint 51a of the fixed gas pipe 51, and the other end of the third hose 52 is provided with a joint 52b connectable to the joint 22b of the ship's side gas pipe 22. The joint 52b is an example of the third joint of the present invention.
[0034] At least a portion of the fourth hose 53 is configured with a flexible hose portion 53c. One end of the fourth hose 53 is provided with a joint 53a connectable to the joint 51b of the fixed gas pipe 51, and the other end of the fourth hose 53 is provided with a joint 53b connectable to the joint 12b of the land-side gas pipe 12.
[0035] Note that the first hose 42, the second hose 43, the third hose 52, and the fourth hose 53 are disconnected from the fixed liquid pipe 41 and the fixed gas pipe 51 while the portable loading and unloading equipment 3 is moving, for example, when it is moving to a loading and unloading site. For example, the first hose 42, the second hose 43, the third hose 52, and the fourth hose 53 are supported by the frame 31 while the portable loading and unloading equipment 3 is moving.
[0036] The liquid hydrogen piping 40 is provided with a first emergency detachment device 61. In this embodiment, the first emergency detachment device 61 is disposed in the first hose 42 in the liquid hydrogen piping 40. More specifically, the first emergency detachment device 61 is disposed in a portion of the first hose 42 between the joint 42b and the flexible hose portion 42c.
[0037] The hydrogen gas piping 50 is provided with a second emergency detachment device 62. In this embodiment, the second emergency detachment device 62 is disposed in the third hose 52 in the hydrogen gas piping 50. More specifically, the second emergency detachment device 62 is disposed in a portion of the third hose 52 between the joint 52b and the flexible hose portion 52c.
[0038] The first emergency separation device 61 has a shutoff function to prevent leakage of fluid during separation. Specifically, the first emergency separation device 61 has a first unit 61a on the land side and a second unit 61b on the ship side that is separably connected to the first unit 61a by a connecting means. The first unit 61a and the second unit 61b each have an emergency shutoff valve therein. These emergency shutoff valves are switched to a closed state when the first emergency separation device 61 is caused to perform a release operation.
[0039] The second emergency separation device 62 has a shutoff function to prevent leakage of fluid during separation. Specifically, it has a first unit 62a on the land side and a second unit 62b on the ship side that is separably connected to the first unit 62a. The first unit 62a and the second unit 62b each have an emergency shutoff valve therein. These emergency shutoff valves are switched to a closed state when the second emergency separation device 62 is caused to perform a separation operation.
[0040] In this embodiment, the first emergency detachment device 61 and the second emergency detachment device 62 are configured to be detached by supplying air. Furthermore, the first emergency detachment device 61 and the second emergency detachment device 62 can also be manually operated so that they can be detached according to the operator's judgment.
[0041] A shutoff valve 44 is provided in a portion of the liquid hydrogen piping 40 between the first emergency separation device 61 and the joint 43b. The shutoff valve 44 is an example of the first shutoff valve of the present invention. Specifically, the shutoff valve 44 is provided in the fixed liquid pipe 41. The shutoff valve 44 is an air-driven valve with an air cylinder to which air is supplied. In this embodiment, the shutoff valve 44 is a so-called normally closed type valve that is in a closed state when air is not supplied and switches from a closed state to an open state when air is supplied.
[0042] A purge gas shut-off valve 45 is provided on the land side of the shut-off valve 44 in the liquid hydrogen piping 40. Specifically, the purge gas shut-off valve 45 is provided in a portion between the shut-off valve 44 and the joint 41b in the fixed liquid pipe 41. A purge gas shut-off valve 54 is provided in the fixed gas pipe 51 in the hydrogen gas piping 50, and a purge gas shut-off valve 55 is provided in a portion of the fixed gas pipe 51 between the purge gas shut-off valve 54 and the joint 51b.
[0043] The portable loading and unloading facility 3 further includes a purge gas supplying device 70 configured to selectively supply nitrogen gas and hydrogen gas as a purge gas to the liquid hydrogen piping 40. Specifically, the purge gas supplying device 70 includes a nitrogen gas supply source 71 and a hydrogen gas supply source 72. The nitrogen gas supply source 71 is, for example, a nitrogen gas cylinder, and a cylinder opening / closing valve 71a is provided in a flow path that supplies nitrogen gas from the nitrogen gas supply source 71 to the liquid hydrogen piping 40. The hydrogen gas supply source 72 is, for example, a hydrogen gas cylinder, and a cylinder opening / closing valve 72a is provided in a flow path that supplies hydrogen gas from the hydrogen gas supply source 72 to the liquid hydrogen piping 40. The purge gas supplying device 70 supplies either nitrogen gas or hydrogen gas as a purge gas to a portion of the liquid hydrogen piping 40 between the shutoff valve 44 and the purge gas shutoff valve 45.
[0044] The portable loading and unloading equipment 3 further includes a vent pipe 80. The vent pipe 80 releases hydrogen gas guided from the ship-side cryogenic tank 20 to the atmosphere. The vent pipe 80 also releases purge gas supplied from the purge gas supply device 70 to the liquid hydrogen pipe 40 to the atmosphere. The vent pipe 80 may be, for example, a well-known double-pipe structure, or a single-pipe structure wrapped with a heat-insulating material. The vent pipe 80 is fixed, for example, to the frame 31 by a fixing member. One end of the vent pipe 80 is connected to the hydrogen gas pipe 50. More specifically, one end of the vent pipe 80 is connected to a portion between the purge gas stop valve 54 and the purge gas stop valve 55 in the fixed gas pipe 51. The other end of the vent pipe 80 is open to the atmosphere.
[0045] The vent pipe 80 is provided with a vent valve 81. The vent valve 81 opens and closes the flow path formed by the vent pipe 80. A heating unit 82 is provided in a portion between the vent valve 81 and the connection point of the vent pipe 80 with the fixed gas pipe 51. The heating unit 82 is configured to heat the introduced liquid hydrogen or the hydrogen gas vaporized from the liquid hydrogen. In this embodiment, the heating unit 82 is configured as a pipe body formed in a bellows shape so as to heat the internal low-temperature fluid by exchanging heat between the external air and the internal low-temperature fluid. The configuration of the heating unit 82 is not limited to this. For example, the heating unit 82 may use a refrigerant other than air, such as hot water, as a refrigerant that exchanges heat with the internal low-temperature fluid.
[0046] The portion of the liquid hydrogen pipe 40 between the joint 42b and the shutoff valve 44 and the hydrogen gas pipe 50 are connected by a connection pipe 90. More specifically, one end of the connection pipe 90 is connected to the portion of the fixed liquid pipe 41 between the joint 41a and the shutoff valve 44, and the other end of the connection pipe 90 is connected to the fixed gas pipe 51. The connection pipe 90 may be, for example, a well-known double pipe structure, or a single pipe structure wrapped with a heat insulating material. The diameter of the connection pipe 90 is equal to or larger than the diameter of the liquid hydrogen pipe 40. In addition, the diameter of the connection pipe 90 is larger than the diameter of the ship-side connection pipe 23 for purge gas.
[0047] An on-off valve 91 is provided on the connection pipe 90. In this embodiment, the on-off valve 91 is an air-operated valve with an air cylinder to which air is supplied. In this embodiment, the on-off valve 91 is a so-called normally closed valve that is in a closed state when air is not supplied and switches from the closed state to an open state when air is supplied.
[0048] The connection pipe 90, the vent pipe 80, and a portion of the hydrogen gas pipe 50 between a connection point 90a of the connection pipe 90 and a connection point 80a of the vent pipe 80 form an atmosphere release flow path. That is, one end of the atmosphere release flow path communicates with a portion of the liquid hydrogen pipe 40 between the joint 42b and the shutoff valve 44, and the other end is open to the atmosphere. The atmosphere release flow path, the on-off valve 91, and the heating unit 82 constitute an atmosphere release device.
[0049] The portable loading and unloading equipment 3 includes a control system 100 that controls the opening and closing of the on-off valve 91, the opening and closing of the shutoff valve 21a, the opening and closing of the shutoff valve 44, and the release of the first emergency release device 61 and the second emergency release device 62. The control system 100 includes an air supply source 101, a plurality of air pipes 110, a plurality of electromagnetic on-off valves 120, and a control device 102.
[0050] The air supply source 101 supplies air to the on-off valve 91, the shutoff valve 21a, the shutoff valve 44, the first emergency release device 61, and the second emergency release device 62 through a plurality of air pipes 110. As the air supply source 101, for example, a compressor, a cylinder filled with air, or the like is used.
[0051] The multiple air pipes 110 include a first air pipe 111, a second air pipe 112, a third air pipe 113, a fourth air pipe 114, and a fifth air pipe 115. The first air pipe 111 guides air from the air supply source 101 to the shutoff valve 44. One end of the second air pipe 112 is connected to one end of the ship side air pipe 24. The second air pipe 112 and the ship side air pipe 24 guide air from the air supply source 101 to the shutoff valve 21a. The third air pipe 113 guides air from the air supply source 101 to the on-off valve 91. The fourth air pipe 114 guides air from the air supply source 101 to the first emergency release device 61. The fifth air pipe 115 guides air from the air supply source 101 to the second emergency release device 62. Note that some or all of the multiple air pipes 110 may have common pipes.
[0052] At least a portion of the second air piping 112 is composed of a tube 112a that has lower strength than the liquid hydrogen piping 40 and the hydrogen gas piping 50. When the ship 2 moves away from the shore in an emergency, the tube 112a can be torn off to separate the ship-side air piping 24 from the portable loading and unloading equipment 3.
[0053] The multiple solenoid on-off valves 120 include a first solenoid on-off valve 121 provided in the first air piping 111, a second solenoid on-off valve 122 provided in the second air piping 112, a third solenoid on-off valve 123 provided in the third air piping 113, a fourth solenoid on-off valve 124 provided in the fourth air piping 114, and a fifth solenoid on-off valve 125 provided in the fifth air piping 115. All of the multiple solenoid on-off valves 120 are so-called normally closed type solenoid valves that are open when energized and closed when de-energized.
[0054] The air supply source 101, the plurality of air pipes 110, and the plurality of electromagnetic on-off valves 120 constitute an air supply device controlled by a control device .
[0055] The control device 102 controls the plurality of electromagnetic on-off valves 120 to control the opening and closing of the on-off valve 91, the opening and closing of the shutoff valve 21a, the opening and closing of the shutoff valve 44, and the release of the first emergency release device 61 and the second emergency release device 62. The control device 102 has an arithmetic processing unit such as a CPU and a storage unit such as a ROM and a RAM. Moreover, the control of the plurality of electromagnetic on-off valves 120 is realized by the arithmetic processing unit executing a predetermined program stored in the storage unit in the control device 102.
[0056] (Method of transporting liquid hydrogen) Next, a method for transferring liquid hydrogen using the portable loading and unloading equipment 3 will be described. The transfer method described below is for transferring liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20. In the following description, the shutoff valve 21a, the shutoff valve 44, and the on-off valve 91 are controlled and opened by the control device 102, and the other valves are opened and closed by manual operation by the operator.
[0057] First, the portable loading and unloading equipment 3 is connected to the land-side low-temperature tank 10 and the ship-side low-temperature tank 20. Specifically, the ship 2 is anchored at a port, and the tank truck 1 is placed on land near the anchorage of the ship 2. Also, the portable loading and unloading equipment 3 is placed on land near the tank truck 1. Then, as shown in FIG. 1, the portable loading and unloading equipment 3 is interposed between the land-side low-temperature tank 10 and the ship-side low-temperature tank 20. The first hose 42 is connected to the fixed liquid pipe 41 and the ship-side liquid pipe 21, the second hose 43 is connected to the fixed liquid pipe 41 and the land-side liquid pipe 11, the third hose 52 is connected to the fixed gas pipe 51 and the ship-side gas pipe 22, and the fourth hose 53 is connected to the fixed gas pipe 51 and the land-side gas pipe 12. Also, the second air pipe 112 is connected to the ship-side air pipe 24. In addition, in order to simplify the drawing, FIG. 1 shows only the first hose 42 and the second hose 43, and omits the third hose 52, the fourth hose 53, the second air piping 112, and the ship side air piping 24.
[0058] Next, the air in the piping is purged with nitrogen gas. Specifically, first, in the piping system for liquid hydrogen, the cylinder on-off valve 71a, the purge gas shutoff valve 45, the on-off valve 13a, the purge gas shutoff valve 55, and the vent valve 81 are opened, and the valves other than those in the air supply system are closed, and then nitrogen gas is supplied from the nitrogen gas supply source 71. As a result, the air in the piping on the land side of the nitrogen gas supply source 71 and the vent piping 80 in the piping system for liquid hydrogen is discharged from the vent piping 80.
[0059] In addition, in the liquid hydrogen piping system, the cylinder on-off valve 71a, shutoff valve 44, on-off valve 23a, purge gas shut-off valve 54, and vent valve 81 are opened, and all valves other than those in the air supply system are closed, after which nitrogen gas is supplied from the nitrogen gas supply source 71. As a result, air in the piping on the ship side of the liquid hydrogen piping system is discharged from the nitrogen gas supply source 71 and vent piping 80 through the vent piping 80.
[0060] Next, the nitrogen gas in the piping is purged with hydrogen gas. Specifically, first, in the piping system for liquid hydrogen, the cylinder on-off valve 72a, the purge gas shutoff valve 45, the on-off valve 13a, the purge gas shutoff valve 55, and the vent valve 81 are opened, and the valves other than those in the air supply system are closed, and then hydrogen gas is supplied from the hydrogen gas supply source 72. As a result, the nitrogen gas in the piping on the land side of the hydrogen gas supply source 72 and the vent piping 80 in the piping system for liquid hydrogen is discharged from the vent piping 80.
[0061] In addition, in the liquid hydrogen piping system, the cylinder on-off valve 72a, shutoff valve 44, on-off valve 23a, purge gas shut-off valve 54, and vent valve 81 are opened, and all valves other than those in the air supply system are closed, after which hydrogen gas is supplied from the hydrogen gas supply source 72. As a result, nitrogen gas in the piping on the ship's side in the liquid hydrogen piping system is discharged from the hydrogen gas supply source 72 and vent piping 80.
[0062] Next, liquid hydrogen is transferred from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20. Specifically, first, in the liquid hydrogen piping system, the shutoff valve 11a, the purge gas shutoff valve 45, the shutoff valve 44, the shutoff valve 21a, the boil-off gas shutoff valve 22a, the purge gas shutoff valve 54, and the vent valve 81 are opened, and the other valves except for the valves in the air supply system are closed. Then, liquid hydrogen is pumped from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20 through the land-side liquid pipe 11, the liquid hydrogen pipe 40, and the ship-side liquid pipe 21. The pumping of liquid hydrogen may be realized, for example, by a self-pressurizing system of the tank truck 1, or by providing a pump on the portable loading and unloading equipment 3.
[0063] In addition, while liquid hydrogen is being supplied to the ship-side cryogenic tank 20, hydrogen gas produced by vaporizing liquid hydrogen in the ship-side cryogenic tank 20 can be discharged through the ship-side gas pipe 22, the hydrogen gas piping 50, and the vent piping 80. This releases the pressure of the gas phase in the ship-side cryogenic tank 20, making it possible to pump liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20 with little power.
[0064] (Emergency exit method) Next, an emergency separation method for separating the ship 2 from the portable loading and unloading equipment 3 in the event of an emergency such as when a strong wind, tsunami, earthquake, or the like occurs during the transfer of liquid hydrogen will be described. The emergency separation method described in this embodiment is executed by sequence control by the control device 102.
[0065] First, in the first step, the shutoff valve 44 and the shutoff valve 21a are closed. This prevents the transfer of liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20. In addition, in the liquid pipe that guides liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20, which is composed of the land-side liquid pipe 11, the liquid hydrogen piping 40, and the ship-side liquid pipe 21, liquid hydrogen remains under high pressure in the portion between the shutoff valve 44 and the shutoff valve 21a, which are now in the closed state. In addition to the shutoff valve 44 and the shutoff valve 21a, the shutoff valve 11a and the boil-off gas stop valve 22a are also closed.
[0066] Next, in the second step, the on-off valve 91 is opened. Since the vent valve 81 is in the open state during the transfer of liquid hydrogen, by opening the on-off valve 91, the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a is depressurized.
[0067] Next, in the third step, the first emergency separation device 61 and the second emergency separation device 62 begin to be separated. A small amount of liquid hydrogen leaks while the first emergency separation device 61 is in operation, but since the pressure of the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a has been released in the second step, the amount of liquid hydrogen leakage is kept to a small amount.
[0068] As described above, in this embodiment, the pressure of liquid hydrogen remaining in the portion of the liquid pipe between the shutoff valve 44 and the shutoff valve 21a can be reduced by opening the on-off valve 91 before detaching the first emergency separation device 61. This reduces the pressure difference between the remaining liquid hydrogen and atmospheric pressure, making it possible to suppress the amount of liquid hydrogen leaking when the first emergency separation device 61 is detached.
[0069] Furthermore, the liquid hydrogen or the hydrogen gas vaporized from the liquid hydrogen can be heated by the heating section 82 provided in the vent piping 80. This makes it possible to prevent the liquid hydrogen from leaking into the atmosphere through the vent piping 80, and also makes it possible to suppress the generation of liquid air due to the hydrogen gas released into the atmosphere at the end of the vent piping 80.
[0070] In this embodiment, while liquid hydrogen is being supplied from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20, the hydrogen gas vaporized from the liquid hydrogen in the ship-side cryogenic tank 20 can be released to the atmosphere through the ship-side gas pipe 22, the hydrogen gas piping 50, and the vent piping 80. This makes it possible to suppress a pressure increase in the ship-side cryogenic tank 20, and to transfer liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20 with little power. In addition, the heating unit 82 can be used both for heating the hydrogen gas vaporized in the ship-side cryogenic tank 20 when it is released into the atmosphere, and for heating the hydrogen gas vaporized from the residual liquid hydrogen when the first emergency release device 61 is released into the atmosphere.
[0071] Furthermore, in this embodiment, the bore of the connecting pipe 90 is equal to or larger than the bore of the liquid hydrogen pipe 40. Therefore, the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a can be depressurized quickly before the first emergency separation device 61 is released. Furthermore, the bore of the connecting pipe 90 is larger than the bore of the ship side connecting pipe 23 for purge gas. Therefore, in the above-mentioned second step, the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a can be depressurized more quickly by opening the on-off valve 91 of the connecting pipe 90 than by opening the on-off valve 23a of the ship side connecting pipe 23.
[0072] Since air and nitrogen are solidified by liquid hydrogen, it is necessary to fill the piping with hydrogen gas before transferring liquid hydrogen. In this embodiment, the portable loading and unloading equipment 3 is equipped with a purge gas supply device 70 configured to be able to selectively supply nitrogen gas and hydrogen gas as a purge gas to the liquid hydrogen piping 40, so that the portable loading and unloading equipment can purge the air in the piping with nitrogen gas, and then purge the nitrogen gas in the piping with hydrogen gas.
[0073] Furthermore, in this embodiment, the control device 102 controls the opening and closing of the on-off valve 91 so as to open the on-off valve 91 after the shutoff valve 44 is closed and before the detachment of the first emergency separation device 61 begins, so that the pressure of the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a can be automatically reduced before the first emergency separation device 61 is detached.
[0074] Furthermore, in this embodiment, the control device 102 controls the opening and closing of the on-off valve 91, as well as the opening and closing of the shutoff valve 44 and the release of the first emergency release device 61, so that the control device 102 can automatically execute a series of procedures, such as closing the shutoff valve 44, opening the on-off valve 91, and then releasing the first emergency release device 61.
[0075] Furthermore, in this embodiment, the control device 102 controls not only the opening and closing of the shutoff valve 44, but also the opening and closing of the shutoff valve 21a provided in the ship-side liquid pipe 21. Therefore, the control device 102 of the portable loading and unloading equipment 3 can operate both the shutoff valve 44 provided in the portable loading and unloading equipment 3 and the shutoff valve 21a which is a ship-side device. Therefore, the shutoff valve 44 and the shutoff valve 21a can be easily operated simultaneously.
[0076] In this embodiment, the shutoff valve 21a, which is a ship-side facility, is configured to be operable depending on the presence or absence of air supply. Therefore, the shutoff valve 21a can be controlled from the portable loading and unloading equipment 3 without providing wiring to the ship 2 for sending a control signal to the shutoff valve 21a.
[0077] (Other embodiments) The present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention.
[0078] For example, in a piping system, the diameter and rigidity of the pipes, the positions of the devices installed in the pipes, and the connection points between the pipes are not limited to those described in the above embodiment.
[0079] The positions of the first emergency detachment device 61 and the second emergency detachment device 62 are not limited to those described in the above embodiment. For example, the first emergency detachment device 61 may be provided in the fixed liquid pipe 41 instead of the first hose 42 in the liquid hydrogen pipe 40. The second emergency detachment device 62 may be provided in the fixed gas pipe 51 instead of the third hose 52 in the hydrogen gas pipe 50.
[0080] Moreover, the heating unit 82 does not have to be provided in the vent pipe 80. For example, the heating unit 82 may be provided in a portion of the hydrogen gas pipe 50 between a connection point 90a with the connection pipe 90 and a connection point 80a with the vent pipe 80, or may be provided in a portion of the connection pipe 90 between the connection point 90a and the on-off valve 91.
[0081] In the above embodiment, the purge gas supply device 70 is configured to selectively supply nitrogen gas and hydrogen gas as a purge gas to the liquid hydrogen piping 40, but the configuration of the purge gas supply device 70 is not limited to this. For example, the purge gas supply device 70 may be configured to supply helium gas to the liquid hydrogen piping 40 as a purge gas for purging air.
[0082] Furthermore, the object of control by the control device 102 is not limited to the air supply device. For example, the control device 102 may control the purge gas supply device 70, i.e., the cylinder opening and closing valves 71a and 72a. The control device 102 may also control some or all of the purge gas shutoff valves 45, 54, and 55 and the vent valve 81. Some or all of the purge gas shutoff valves 45, 54, and 55, the vent valve 81, and the cylinder opening and closing valves 71a and 72a may also be air-driven valves.
[0083] The shutoff valve 21a, the shutoff valve 44, and the on-off valve 91 may be so-called normally open type valves that switch from a closed state to an open state when air is no longer supplied. Each of the multiple electromagnetic on-off valves 120 is a so-called normally open type electromagnetic valve that is closed when energized and open when deenergized.
[0084] In addition, in the above embodiment, the control device 102 controlled the opening and closing of the on-off valve 91, the opening and closing of the shut-off valve 21a, the opening and closing of the shut-off valve 44, and the release of the first emergency release device 61 and the second emergency release device 62, but the control device 102 may control only some of these, and those that are not controlled by the control device 102 may be manually operated by an operator.
[0085] In the above embodiment, the opening and closing of the on-off valve 91, the shutoff valve 21a, the shutoff valve 44, and the release of the first emergency release device 61 and the second emergency release device 62 are controlled by the supply of air from the air supply source 101, but the present invention is not limited to this. For example, the on-off valve 91, the shutoff valve 21a, the shutoff valve 44, the first emergency release device 61, and the second emergency release device 62 may each be electromagnetic, electric, or hydraulic, or may be configured to be manually operable. In addition, the first emergency release device 61 and the second emergency release device 62 may be configured to be released when a load equal to or greater than a predetermined value is applied as a result of the ship 2 moving in a direction away from the shore due to strong winds or the like.
[0086] In the above embodiment, the on-off valve 91 is opened in the second step, but the emergency separation method of the present invention is not limited to this. For example, in the piping system described in the above embodiment, the on-off valve 23a, which is a ship-side device, may be opened instead of the on-off valve 91. Even in this case, the pressure difference between the liquid hydrogen remaining between the shutoff valve 44 and the shutoff valve 21a and the atmospheric pressure can be reduced, and the amount of liquid hydrogen leaking when the first emergency separation device 61 is detached can be suppressed.
[0087] Furthermore, the emergency detachment method according to the present invention can also be applied to a liquid hydrogen transfer system that does not include the ship's gas pipe 22, the hydrogen gas pipe 50, or the like.
[0088] For example, a part of the piping system of the liquid hydrogen transfer system including the portable loading and unloading equipment according to the modified example is shown in Fig. 3. The liquid hydrogen transfer system shown in Fig. 3 includes a liquid pipe 131 for guiding liquid hydrogen from one of the ship-side cryogenic tank and the land-side cryogenic tank to the other, an emergency release device 132 provided in the liquid pipe 131, a first shutoff valve 133 provided in the liquid pipe 131 between the emergency release device 132 and the land-side cryogenic tank, a second shutoff valve 134 provided in the liquid pipe 131 between the emergency release device 132 and the ship-side cryogenic tank, an atmosphere release pipe 140 having one end connected to the liquid pipe 131 between the emergency release device 132 and the first shutoff valve 133 and the other end open to the atmosphere, and an opening / closing valve 141 provided in the atmosphere release pipe 140. The liquid pipe 131 is composed of a land-side liquid pipe extending from the land-side cryogenic tank, a ship-side liquid pipe extending from the ship-side cryogenic tank, and liquid hydrogen piping of the portable loading and unloading facility connected to the land-side liquid pipe and the ship-side liquid pipe. In Fig. 3, the connection points between the land-side liquid pipe, the ship-side liquid pipe, and the liquid hydrogen piping are omitted. In such a liquid hydrogen transfer system, the first shutoff valve 133 and the second shutoff valve 134 are closed, the on-off valve 141 is opened, and then the release of the emergency release device 132 is started, thereby obtaining the same effect as the above embodiment.
[0089] In the liquid hydrogen transfer system shown in Fig. 3, it is preferable that a heating unit 142 is provided between the on-off valve 141 and the end 140a open to the atmosphere in the atmosphere open pipe 140. The heating unit 142 may have a structure similar to that of the heating unit 82 described in the above embodiment. The heating unit 142 can heat the liquid hydrogen that has passed through the on-off valve 141 or the hydrogen gas vaporized from the liquid hydrogen. This can prevent the liquid hydrogen from flowing out into the atmosphere through the atmosphere open pipe 140, and can also suppress the generation of liquid air by the hydrogen gas released into the atmosphere at the end 140a of the atmosphere open pipe 140.
[0090] In addition, in the above embodiment, a method of transferring liquid hydrogen from the land-side cryogenic tank 10 to the ship-side cryogenic tank 20 has been described, but the present invention is also applicable to transferring liquid hydrogen from the ship-side cryogenic tank 20 to the land-side cryogenic tank 10. [Explanation of symbols]
[0091] 3: Portable loading and unloading equipment 10:Landside low temperature tank 11:Land side liquid pipe 12: Landside gas pipe 20: Ship's cryogenic tank 21: Ship's side liquid pipe 21a: Shut-off valve (second shut-off valve) 22: Ship side gas pipe 23: Ship side connection piping 23a: Opening and closing valve 24: Ship side air piping 40: Liquid hydrogen piping 42b: Joint (first joint) 43b: Joint (second joint) 44: Shut-off valve (first shut-off valve) 50: Hydrogen gas piping 52b: Joint (third joint) 61: First emergency release device (emergency release device) 62: Second emergency release device 70: Purge gas supply device 80: Vent piping 81: Vent valve 82:Heating part 90: Connection pipe 91: Opening and closing valve 101: Air supply source 102: Control device 110: Air piping 120: Solenoid valve
Claims
1. A portable loading and unloading equipment for liquid hydrogen that is interposed between a ship-side cryogenic tank and a land-side cryogenic tank, a liquid hydrogen piping having a first joint connectable to an end of a ship-side liquid pipe extending from the ship-side cryogenic tank and a second joint connectable to an end of a land-side liquid pipe extending from the land-side cryogenic tank; an emergency release device provided in the liquid hydrogen pipe; a shutoff valve provided in a portion of the liquid hydrogen piping between the emergency release device and the second joint; an atmosphere opening device having an atmosphere opening passage, one end of which is connected to a portion of the liquid hydrogen piping between the first joint and the shutoff valve and the other end of which is open to the atmosphere, an on-off valve for opening and closing the atmosphere opening passage, and a heating unit provided in the atmosphere opening passage; a hydrogen gas pipe having a third joint connectable to an end of a ship-side gas pipe extending from the ship-side low-temperature tank; a vent pipe having one end connected to the hydrogen gas pipe and the other end open to the atmosphere, for discharging the hydrogen gas guided from the ship-side low-temperature tank; A second emergency detachment device provided on the hydrogen gas piping, which is different from the first emergency detachment device, which is the emergency detachment device; a connection pipe that connects a portion of the liquid hydrogen pipe between the first joint and the shutoff valve to the hydrogen gas pipe, the atmosphere release passage is formed by the connection pipe, the vent pipe, and a portion of the hydrogen gas pipe between the connection pipe and the vent pipe, The on-off valve is provided in the connection pipe, The heating unit is provided in the vent pipe or in a portion of the hydrogen gas pipe between the connection pipe and the vent pipe, A portable loading and unloading facility for liquid hydrogen, wherein the diameter of the connecting pipe is equal to or larger than the diameter of the liquid hydrogen pipe.
2. 2. The portable loading and unloading facility for liquid hydrogen according to claim 1, further comprising a purge gas supply device configured to selectively supply nitrogen gas and hydrogen gas as a purge gas to the liquid hydrogen piping.
3. 3. The portable loading and unloading facility for liquid hydrogen according to claim 1, further comprising a control device that controls opening and closing of the on-off valve so as to open the on-off valve after the shutoff valve is closed and before detachment of the emergency detachment device is started.
4. 4. The portable loading and unloading facility for liquid hydrogen according to claim 3, wherein the control device controls opening and closing of the shutoff valve and release of the emergency release device in addition to opening and closing of the on-off valve.
5. A portable loading and unloading equipment for liquid hydrogen disposed between a ship-side cryogenic tank and a land-side cryogenic tank, comprising: a liquid hydrogen piping having a first joint connectable to an end of a ship-side liquid pipe extending from the ship-side cryogenic tank and a second joint connectable to an end of a land-side liquid pipe extending from the land-side cryogenic tank; an emergency release device provided in the liquid hydrogen pipe; a shutoff valve provided in a portion of the liquid hydrogen piping between the emergency release device and the second joint; an atmosphere vent device having an atmosphere vent passage, one end of which is connected to a portion of the liquid hydrogen piping between the first joint and the shutoff valve and the other end of which is open to the atmosphere, an on-off valve for opening and closing the atmosphere vent passage, and a heating unit provided in the atmosphere vent passage, the shutoff valve is a first shutoff valve, a second shutoff valve is provided in the ship side liquid pipe, The portable loading and unloading facility for liquid hydrogen further includes a control device that controls opening and closing of both the first shutoff valve and the second shutoff valve.
6. the first shutoff valve and the second shutoff valve are a first air-driven valve and a second air-driven valve that are switched between a closed state and an open state when air is supplied or when air is not supplied, respectively; 6. The portable loading and unloading facility for liquid hydrogen according to claim 5, further comprising an air supply device controlled by the control device and supplying air to the first air driven valve and the second air driven valve.
Citation Information
Patent Citations
JP1975139421A
JP1986167000U
Preservation of cryogenic liquefied gas in container
JP1987237199A
Fuel oil supply vehicle for ships
JP2007331823A
Cargo facility for liquefied cryogenic fluid
JP2020104830A
