Disaster support system, disaster support method, and disaster support program
The disaster support system addresses the challenge of managing resources post-disaster by predicting recovery times and controlling resource usage, ensuring continued operations and appropriate actions through its disaster mode control.
Patent Information
- Application Number
- JP2020133643
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-08-06
- Publication Date
- 2024-10-23
- Estimated Expiration
- 2040-08-06
AI Technical Summary
During chaotic periods after a disaster, it is challenging to accurately manage resources like electricity and water to support continued business and life operations due to varying recovery times and potential resource restrictions, making appropriate actions difficult.
A disaster support system with a control unit that acquires damage and victim status, predicts recovery time, and executes disaster mode control to manage resource usage based on the situation, including modes for rescue, recovery, and minimum necessary activities.
The system supports the management of resources necessary for resident activities, enabling continued operations by accurately predicting recovery times and managing resource usage to ensure appropriate actions during disasters.
Smart Images

Figure 0007571415000001 
Figure 0007571415000002 
Figure 0007571415000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a disaster support system, a disaster support method, and a disaster support program that support responses when a disaster occurs. [Background technology]
[0002] In the event of a disaster, there is an increasing demand for buildings to continue to be used after the disaster. For example, in a business continuity plan (BCP), a company prepares measures to continue important operations even in a crisis situation. In addition, a life continuity plan (LCP) that emphasizes the maintenance of life and living environment at home is also being considered. A management system for supporting the execution of BCP and LCP and maintaining the functions of specific buildings, etc. is being considered (for example, see Patent Document 1). In the technology disclosed in this document, a specific information detection means detects the receiving status of lifeline elements supplied from the outside and detects the connection status of the supplied lifeline elements within a specific range. In addition, a specific device operation means self-supplies all or part of the lifeline elements and operates the opening and closing of the supply route. A management means stores the lifeline elements necessary for continuing operations and operates the self-supply device. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2015-111379 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the chaotic period immediately after a disaster, there is a possibility that various information may be mixed up, making it difficult to respond appropriately. For example, in order to continue business and life, it is necessary to maintain resources such as electricity and water until they are restored. The time required for restoration varies depending on the disaster situation and the victims. Furthermore, if resource use is severely restricted, it is not possible to support appropriate actions at the time of the disaster. [Means for solving the problem]
[0005] A disaster support system for solving the above problems includes a control unit connected to a monitoring device. The control unit, upon detection of a disaster, acquires a damage status of equipment, a victim status, and an equipment status from the monitoring device, predicts a required recovery time according to the damage status and the relief activity status, and executes a disaster mode control process for outputting control information for limiting the use of the equipment according to the victim status and the equipment status with respect to the required recovery time. Effect of the Invention
[0006] According to the present invention, in the event of a disaster, it is possible to support the management of resources necessary for activities so that people can continue their activities. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is an explanatory diagram of a system according to an embodiment. [Diagram 2] FIG. 2 is an explanatory diagram of a hardware configuration of the embodiment. [Diagram 3] 1A is an explanatory diagram of a building information storage unit, FIG. 1B is an explanatory diagram of a user information storage unit, FIG. 1C is an explanatory diagram of a facility information storage unit, and FIG. [Figure 4] FIG. 4 is an explanatory diagram of data used in the embodiment. [Diagram 5] FIG. [Figure 6] FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] An embodiment of a disaster support system, a disaster support method, and a disaster support program will be described below with reference to Figs. 1 to 6. In this embodiment, the activities of disaster victims (occupants) in a building are supported within the building. For this reason, the disaster support system will be described as managing limited resources based on the time required for various facilities to be restored to a state where they can be normally used (required restoration time). Note that the target may not only be people who were in the building at the time of the disaster, but also people who enter and leave the building until each facility is restored. For this reason, the term "occupants" will be used below. As shown in FIG. 1, this embodiment uses a monitoring device group 10, a management server 20, a management terminal 30, and an external system 40, all of which are connected to a network.
[0009] (Hardware configuration description) 2, a hardware configuration of an information processing device H10 constituting the monitoring device group 10, the management server 20, the management terminal 30, and the external system 40 will be described. The information processing device H10 includes a communication device H11, an input device H12, a display device H13, a storage unit H14, and a processor H15. Note that this hardware configuration is an example, and it is also possible to realize the information processing device H10 using other hardware.
[0010] The communication device H11 is an interface that establishes a communication route with other devices and transmits and receives data, and is, for example, a network interface or a wireless interface.
[0011] The input device H12 is a device that accepts input of various information, such as a mouse, a keyboard, etc. The display device H13 is a display or the like that displays various information. The storage unit H14 is a storage device that stores data and various programs for executing various functions of the monitoring device group 10, the management server 20, the management terminal 30, and the external system 40. Examples of the storage unit H14 include a ROM, a RAM, and a hard disk.
[0012] The processor H15 uses the programs and data stored in the storage unit H14 to control each process in the monitoring device group 10, the management server 20, the management terminal 30, and the external system 40. Examples of the processor H15 include a CPU and an MPU. The processor H15 loads a program stored in a ROM or the like into a RAM and executes various processes for each process.
[0013] The processor H15 is not limited to a processor that performs software processing for all the processes it executes. For example, the processor H15 may be equipped with a dedicated hardware circuit (e.g., an application specific integrated circuit: ASIC) that performs hardware processing for at least a part of the processes it executes. That is, the processor H15 may be configured as a circuit including: (1) one or more processors that operate according to a computer program (software); (2) one or more dedicated hardware circuits that execute at least a part of various processes; or (3) a combination thereof. The processor includes a CPU and memory such as RAM and ROM, and the memory stores program code or instructions configured to cause the CPU to execute processes. The memory, i.e., computer-readable medium, includes any available medium that can be accessed by a general-purpose or dedicated computer.
[0014] (System Configuration) Next, each function of the disaster support system will be explained using FIG. The monitoring device group 10 includes so-called IoT (Internet of Things) devices and acquires various information about the inside of the building. In this embodiment, the monitoring device group 10 includes an equipment monitoring device 11, a monitoring camera 12, a communication base station 13, a human presence sensor 14, an entrance management server 15, and the like.
[0015] The equipment monitoring device 11 detects the status of various equipment using sensors and the like. The various equipment includes resources (resources, utilities, etc.) used in a building to continue human activities. For example, there are a water tank, a fuel tank, a gas tank, supplies, a drainage tank, etc. The equipment monitoring device 11 for the water tank detects, for example, the water level and operation status of the supply equipment for drinking water and flushing water supplied to the building. The equipment monitoring device 11 for the fuel tank detects, for example, the stockpile amount and operation status of the supply equipment for fuel used for emergency power generation. The equipment monitoring device 11 for the gas tank detects, for example, the stockpile amount and operation status of the supply equipment for gas used in the building, such as oxygen, nitrous oxide (laughing gas), medical air, carbon dioxide, etc., supplied in the hospital. The equipment monitoring device 11 for the stockpile reads RFID tags attached to stockpile items such as drinking water, emergency food, clean items, and first aid supplies in the stock warehouse with a wireless tag reader to detect the stockpile amount of the stockpile items.
[0016] The surveillance camera 12 generates images capturing the conditions inside the building. These captured images are used to identify the damage state of the building and the location of disaster victims (occupants) inside the building. The communication base station 13 is a relay device for local wireless communication using a communication device used by a user. The relay status of this local wireless communication is used to identify the location of the user of the communication device.
[0017] The human presence sensor 14 is a sensor that detects the presence of a person using infrared rays, ultrasonic waves, visible light, or the like. The entrance management server 15 manages the entry and exit status of users in rooms in the building by reading cards, name tags, etc., held by the users with a reader. This entry and exit status is used to identify the user's location.
[0018] The management server 20 is a computer system that supports disaster response by using various information acquired from the monitoring device group 10. This management server 20 includes a control unit 21, a building information storage unit 22, a user information storage unit 23, a facility information storage unit 24, and a location information storage unit 25.
[0019] The control unit 21 performs processes (including a management stage, an acquisition stage, an evaluation stage, a prediction stage, etc.) described below. Therefore, by executing a program for each process, the control unit 21 functions as a management unit 211, an acquisition unit 212, an evaluation unit 213, a prediction unit 214, etc.
[0020] The management unit 211 executes a process for managing the use of the facilities in the building. In the event of a disaster, the management unit 211 outputs control information in disaster mode and manages the operation of each facility in the building. In this embodiment, in the disaster mode, the following three-stage disaster mode control process is switched according to the activity status in the building (rescue, recovery).
[0021] - First mode: When rescue or recovery activities are detected, the necessary amount of water is supplied to the area where the rescue activities are taking place. - Second mode: A control mode that limits supply destinations and supply according to available capacity and the time required for restoration while waiting for rescue or restoration. -Third mode: A control mode that limits the supply destination, supply amount, and supply time in response to the minimum necessary activities while waiting for rescue and recovery.
[0022] The management unit 211 outputs messages for responding to disasters and controls facilities within the building according to each disaster mode.
[0023] The management unit 211 also holds rescue support level information for determining whether or not a request for support to the external system 40 is necessary, based on the damage level and the time required for recovery. With this rescue support level information, when the damage level is high or the time required for recovery is long, it is determined that a request for support is necessary.
[0024] The acquisition unit 212 executes a process of acquiring various information from the monitoring device group 10, etc. Furthermore, when the acquisition unit 212 acquires an image of a person from the monitoring camera 12, the acquisition unit 212 identifies a user identifier recorded in the user information storage unit 23 by face recognition of the face image. Furthermore, the acquisition unit 212 estimates attribute information such as gender and age from the image of the person acquired from the monitoring camera 12 using image recognition. In addition, the occupation of the affected employee, recovery worker, etc. may be estimated as attribute information.
[0025] The evaluation unit 213 executes a process of evaluating the damage situation based on the acquired information. In this embodiment, the damage level (damage situation) of each facility in the building is identified based on the captured images and sensor information. Machine learning or the like can be used to identify the damage level. For example, a damage situation prediction model for predicting the damage level is generated by machine learning (deep learning) using teacher data associated with the damage level for the captured images and sensor information of each facility in the building at the time of the disaster, and is stored in the evaluation unit 213. Then, the evaluation unit 213 applies the damage situation prediction model to the captured images and sensor information acquired at the time of the disaster to predict the damage level.
[0026] The prediction unit 214 executes a process of predicting the time required to complete restoration based on the damage level and restoration status. This prediction unit 214 holds information for calculating the restoration time required according to the damage level and restoration status of each facility in the building.
[0027] 3(a), a floor map 220 is recorded in the building information storage unit 22. This floor map 220 is recorded when information on the layout of the building and facilities within the building is registered. The layout of each floor is set on this floor map 220. The installation position (for example, coordinates) of each sensor is recorded on the layout.
[0028] As shown in Fig. 3(b), user management data 230 for users who use the building is recorded in the user information storage unit 23. This user management data 230 is recorded when a user is registered. The user management data 230 records data related to a user identifier, affiliation, and user attributes.
[0029] The user identifier data area stores data relating to an identifier for identifying each user. In the affiliation data area, data regarding an identifier for identifying the department to which this user belongs is recorded. In the user attribute data area, data on the attributes of this user (gender, job title, etc.) is recorded. In addition, feature amounts used for face recognition may also be recorded.
[0030] 3(c), facility information storage unit 24 records facility management data 240 relating to facility within the building that can be used. Facility management data 240 is updated when status information of each facility within the building is acquired from facility monitoring device 11. Facility management data 240 records data relating to facility identifiers, available capacity, and facility status.
[0031] The facility identifier data area stores data on identifiers for identifying each facility in the building. Facility equipment includes water tanks, fuel tanks, gas tanks, supplies, drainage tanks, etc. The available amount data area records data on the status of the facility within the building. For example, for a "water tank" facility, the amount of stored water is recorded as the available amount. For a "fuel tank" facility, the amount of stored water and the supply status from outside are recorded as the available amount. For a "gas tank" facility, the stockpiled amount is recorded as the available amount. For a "stockpile" facility, the number of each stockpile item is recorded as the available amount. For a "sewage tank, etc." facility, the amount that can be stored and the status of drainage to the outside are recorded as the available amount.
[0032] The equipment status data area records data on the damage status (damage level) of the facility in the building and the recovery status obtained from the management terminal 30, etc. The disaster mode is determined based on the facility status. The facility status also includes data on the locations where resources managed by the facility can be used (e.g., resource supply destinations).
[0033] As shown in Fig. 3(d), the occupant information storage unit 25 records occupant management data 250 about occupants in the building. This occupant management data 250 is recorded when an occupant is detected. The occupant management data 250 records data about an occupant identifier, a location, and occupant attributes.
[0034] The occupant identifier data area records data regarding an identifier for identifying each occupant within the building. The location data area records data regarding the location (eg, coordinates) of this person. The occupant attribute data area records data related to the occupant's attributes. When the individual is identified by facial recognition of an image acquired from the surveillance camera 12, or when occupant information is acquired from the entrance management server 15, a user identifier is recorded in this occupant attribute data area. When image recognition is performed on an image of a person acquired from the surveillance camera 12, attributes (such as gender and age estimated using image recognition) are recorded. On the other hand, when the individual cannot be identified, such as an individual detected by the human presence sensor 14, this occupant attribute data area is left blank.
[0035] 1 is a computer terminal used by a building manager. The management terminal 30 is used to input, for example, a restoration status relating to restoration activities. The external system 40 is a computer system of other bases (head office and branches) or rescue destinations that can be linked.
[0036] (Disaster support processing) Next, the processing procedure of the disaster support method in the management server 20 configured as above will be described with reference to Figs. 4 to 6. First, data used in the disaster support processing will be described. Then, the normal mode (Fig. 5) and the disaster mode (Fig. 6) will be described in that order.
[0037] 4, when a disaster occurs, the available capacity D1 of the facility in the building is acquired. The available capacity is detected using, for example, sensor information acquired from the facility monitoring device 11. Then, a required recovery time D4 is predicted according to the damage status D2 and recovery status D3 of the facilities in the building. The damage status D2 is detected, for example, using images captured by the surveillance camera 12 and sensor information from the facility monitoring device 11. The recovery status D3 is detected, for example, using input information from the management terminal 30.
[0038] Furthermore, the total usage of each facility in the building per unit time is predicted according to the location information D5 of the people in the building (location, number of people, and attributes of the people). For example, images captured by the surveillance camera 12, the human sensor 14, and the entrance management server 15 are used to detect the people.
[0039] Then, the use of the facilities in the building is controlled so that the occupants can use the facilities during the predicted required recovery time D4. This control includes restrictions on the use of the facilities in the building and output of messages to guide the occupants.
[0040] (Normal mode) First, the normal mode will be described with reference to FIG. Here, the control unit 21 of the management server 20 executes a monitoring process (step S101). Specifically, the acquisition unit 212 of the control unit 21 acquires status information of each facility in the facility from the facility monitoring device 11, and records it in the facility information storage unit 24. In addition, when the acquisition unit 212 detects a person in the surveillance camera 12 or the human presence sensor 14, the acquisition unit 212 records it in the presence information storage unit 25. When the acquisition unit 212 can identify a user identifier recorded in the user information storage unit 23 by face recognition of a photographed image of a person acquired from the surveillance camera 12, the acquisition unit 212 records the identified user identifier as a presence attribute in the presence information storage unit 25. In addition, when a person can be identified by information acquired from the communication base station 13 or the entrance management server 15, the acquisition unit 212 also records the user attribute associated with the user identifier as a presence attribute in the presence information storage unit 25. On the other hand, when the user identifier cannot be identified, attribute information such as gender and age estimated from the photographed image is recorded as a presence attribute. Furthermore, when the acquiring unit 212 acquires location information of a user's communication device from the communication base station 13, it identifies the user identifier of the user of the communication device and records it as a resident attribute in the resident information storage unit 25. Furthermore, when the acquiring unit 212 acquires entrance and exit information from the entrance management server 15, it identifies the identifier of the user who is currently in the room and records it as a resident attribute in the resident information storage unit 25.
[0041] Next, the control unit 21 of the management server 20 executes a process of determining whether a disaster has occurred (step S102). Specifically, when a disaster occurs, a person in charge inputs disaster information to the management terminal 30. In this case, the acquisition unit 212 of the control unit 21 acquires the disaster occurrence information to determine that a disaster has occurred. The acquisition unit 212 may acquire the disaster occurrence information from another system (for example, a disaster information site or a fire alarm).
[0042] When it is determined that a disaster has occurred ("YES" in step S102), the control unit 21 of the management server 20 executes a disaster mode transition process (step S103). Specifically, the management unit 211 of the control unit 21 switches to the disaster mode and starts the evaluation unit 213 and the prediction unit 214. On the other hand, if it is determined that no disaster has occurred ("NO" in step S102), the control unit 21 of the management server 20 continues the monitoring process (step S101).
[0043] (Disaster mode) First, the disaster mode will be described with reference to FIG. Here, the control unit 21 of the management server 20 executes a process of identifying a resident (step S201). Specifically, the acquisition unit 212 of the control unit 21 acquires the resident management data 250 of a resident in the building from the resident information storage unit 25.
[0044] Next, the control unit 21 of the management server 20 executes a process of acquiring attribute information of the occupants (step S202). Specifically, the acquisition unit 212 of the control unit 21 acquires the location and attributes of the occupants from the occupant management data 250 recorded in the occupant information storage unit 25. If a user identifier is recorded as the occupant attribute in the occupant management data 250, the acquisition unit 212 acquires the user attribute from the user information storage unit 23. This user attribute is used in the facility use control process described later. Then, the acquisition unit 212 generates a map screen that displays the location of the occupants on the floor map of the building information storage unit 22, and outputs the map screen to the management terminal 30. As a result, the number and attributes of the occupants in the building are identified as the occupant status.
[0045] Next, the control unit 21 of the management server 20 executes a process for evaluating the damage situation (step S203). Specifically, the acquisition unit 212 of the control unit 21 acquires images captured by the monitoring cameras 12 and sensor information (operation status) from the equipment monitoring devices 11. The evaluation unit 213 then identifies the damage level for each piece of in-building equipment based on the captured images and the sensor information. The evaluation unit 213 then records the identified damage level in the equipment information storage unit 24 as the equipment status. Furthermore, when a recovery status is input at the management terminal 30, the evaluation unit 213 records the recovery status in the equipment information storage unit 24 as the equipment status in association with the current date and time. The acquisition unit 212 then outputs the damage level of each piece of in-building equipment to the floor map on the map screen.
[0046] Next, the control unit 21 of the management server 20 executes a process of predicting the time required for restoration (step S204). Specifically, the prediction unit 214 of the control unit 21 predicts the time required for restoration based on the identified damage level and restoration status.
[0047] Next, the control unit 21 of the management server 20 executes a facility status acquisition process (step S205). Specifically, the acquisition unit 212 of the control unit 21 acquires the available capacity of each facility in the building from the facility information storage unit 24. Here, the available capacity is the stockpile of resources that can be used until the recovery of each facility in the building and the accumulatable amount of wastewater.
[0048] Next, the control unit 21 of the management server 20 executes a facility use control process (step S206). Specifically, the management unit 211 of the control unit 21 determines an operation mode according to the disaster level and the recovery situation. For example, when rescue operations are being performed, the first mode is executed to provide the required amount to the rescue operation location.
[0049] In the second mode, the facilities in the building are managed so that they can continue to be used during the predicted recovery time. For example, the management unit 211 predicts the total usage of each facility in the building per unit time according to the occupancy status (number of people present, attributes of the occupants). The management unit 211 compares the product of the total usage per unit time and the time required for restoration with the available capacity of each facility in the building to determine whether or not usage restrictions are necessary. If it is determined that usage restrictions are necessary, restrictions on the supply amount are imposed so that the facility in the building can be used within the time required for restoration. For example, this supply restriction involves restricting the power supply by controlling power control devices (power distribution devices, lighting, heating and cooling equipment, etc.). In addition, the supply of water and gas is restricted by operating valves in the supply equipment. Furthermore, if the time required for recovery is longer than a reference value, the supply destination, supply amount, and supply time are restricted in the third mode.
[0050] Next, a message regarding restrictions on the use of facilities within the building is sent to the people in the building according to each mode. This message is output to the people in the building by broadcasting to their user terminals, or by transmitting to the in-building broadcasting equipment or display devices in public spaces. This message includes, for example, the damage status, the recovery status (rescue activity status), the resource restriction status, information on where resources are available, evacuation requests, and suggestions for recommended actions.
[0051] Next, the control unit 21 of the management server 20 executes system cooperation processing (step S207). Specifically, the management unit 211 of the control unit 21 uses the rescue support level information to determine whether or not a rescue request is necessary based on the damage level and available capacity of each facility in the building. Then, when it is determined that a support request is necessary, the management unit 211 transmits a rescue request to the external system 40. Here, the acquisition unit 212 may acquire support information (available amount, provision time) related to resources that can be supported from the external system 40. In this case, the acquisition unit 212 records the support information as a recovery status in the facility management data 240 of the facility information storage unit 24.
[0052] Next, the control unit 21 of the management server 20 executes a process of determining whether the disaster support is complete (step S208). Specifically, the management unit 211 of the control unit 21 determines that the disaster support is complete when restoration completion information is recorded in the equipment status of all the equipment management data 240 recorded in the equipment information storage unit 24. On the other hand, when there is any in-building equipment remaining for which restoration completion information is not recorded, the management unit 211 determines that the disaster support is incomplete.
[0053] When it is determined that the disaster support is not completed ("NO" in step S208), the control unit 21 of the management server 20 executes the monitoring process (step S209) similarly to step S101. Then, the control unit 21 of the management server 20 continues the process from step S201 onward.
[0054] On the other hand, when it is determined that the disaster support is completed (if "YES" in step S208), the control unit 21 of the management server 20 executes a normal mode transition process (step S210). Specifically, the management unit 211 of the control unit 21 transitions to the normal mode and releases the usage restrictions on each facility in the building. In this case, each facility in the building can be used within the range that is normally available.
[0055] According to this embodiment, the following effects can be obtained. (1) In this embodiment, the control unit 21 of the management server 20 executes a monitoring process (steps S101 and S209), which makes it possible to grasp the status of the facilities in the building and the status of the people present.
[0056] (2) In this embodiment, the control unit 21 of the management server 20 executes a process of identifying a person (step S201) and a process of acquiring attribute information of the person (step S202). This allows the attributes of the person to be identified and a response to be taken according to the attributes.
[0057] (3) In this embodiment, the control unit 21 of the management server 20 executes a process for evaluating the damage situation (step S203), which makes it possible to identify facilities within the building that are subject to restrictions. (4) In this embodiment, the control unit 21 of the management server 20 executes a process for predicting the time required for recovery (step S204), thereby making it possible to identify the time during which it is necessary to restrict the use of the facilities in the building.
[0058] (5) In this embodiment, the control unit 21 of the management server 20 executes a facility status acquisition process (step S205), which makes it possible to identify the available capacity of each facility in the building.
[0059] (6) In this embodiment, the control unit 21 of the management server 20 executes a facility usage control process (step S206). This allows the usage to be restricted in consideration of the available capacity of the facility and the time required for recovery. Furthermore, the destination and amount of resources to be supplied can be adjusted according to the rescue operation situation.
[0060] (7) In this embodiment, the control unit 21 of the management server 20 executes a system cooperation process (step S207), which makes it possible to request support from other systems as necessary.
[0061] This embodiment can be modified as follows: This embodiment and the following modifications can be combined with each other to the extent that there is no technical contradiction. In the above embodiment, the disaster support is applied to a building, but the target of the disaster support is not limited to this. For example, disaster support may be provided in an office or in multiple buildings in a specified area. Also, the switching conditions of each disaster mode control process may be changed according to the attributes of the building. In this case, the management unit 211 holds the switching conditions according to the attributes of the building.
[0062] In the above embodiment, in order to detect people, the surveillance camera 12, the communication base station 13, the human sensor 14, and the entrance management server 15 are used. The means for detecting people is not limited to these.
[0063] In the above embodiment, the control unit 21 of the management server 20 executes a process for evaluating the damage situation (step S203). This damage situation is identified based on images captured by the monitoring camera 12 and sensor information (operation status) acquired from the facility monitoring device 11. Information for identifying the damage situation is not limited to these. For example, the damage situation input to the management terminal 30 may be acquired.
[0064] In the above embodiment, the facility facilities are assumed to be water tanks, fuel tanks, gas tanks, emergency supplies, drainage tanks, etc. The targets for usage restriction are not limited to these, as long as they are resources or utilities used for human activities. The facility facilities are not limited to multiple facilities, and may be one. In this case, it is not necessary for the facilities to be a group of monitoring devices, and information is obtained from the monitoring device of this facility.
[0065] In the above embodiment, disaster response is performed in the first to third modes. The operation modes of the facilities in the building are not limited to these. In the above embodiment, the management unit 211 predicts the total usage of each facility in the building per unit time according to the occupancy status (number of occupants, occupant attributes). Here, the prediction of the total usage is not limited to using the number of occupants and occupant attributes. The total usage may be predicted using either one of the occupancy statuses (for example, only the number of occupants). The number of occupants may also be specified by a number range, such as "10 or more and less than 20 people." In the above embodiment, the disaster mode control process controls the destination, amount, and time of resource supply. The control content is not limited to this. For example, the restriction content may be changed according to user attributes. For example, a priority may be determined according to user attributes, and the use of resources may be permitted according to this priority. In the above embodiment, the control unit 21 of the management server 20 executes a prediction process for the required recovery time (step S204). Here, the required recovery time is predicted based on the identified damage level and recovery status. Alternatively, the required recovery time may be predicted from captured images and sensor information acquired at the time of the disaster using machine learning. In this case, a prediction model for the required recovery time is created using the required recovery time according to the damage status as training data.
[0066] Next, the technical ideas that can be understood from the above-described embodiment and other examples will be described below. (a) A disaster support system as described in any one of claims 1 to 5, characterized in that the control unit controls at least one of the destination, supply amount, and supply time of resources provided from the equipment in the disaster mode control.
[0067] (b) A disaster support system according to any one of claims 1 to 5 or (a), characterized in that the control unit outputs a message for guiding a person in the disaster mode control. [Explanation of symbols]
[0068] 10...group of monitoring devices, 11...facility monitoring device, 12...surveillance camera, 13...communications base station, 14...human presence sensor, 15...entrance management server, 20...management server, 21...control unit, 211...management unit, 212...acquisition unit, 213...evaluation unit, 214...prediction unit, 22...building information storage unit, 23...user information storage unit, 24...facility information storage unit, 25...occupancy information storage unit, 30...management terminal, 40...external system.
Claims
1. A disaster support system including a control unit connected to a monitoring device that monitors equipment, The control unit: When a disaster is detected, the damage status of the facility, the location status, and the available capacity are acquired from the monitoring device; As the location status, the number of people and their attributes are specified; Predict the time required for recovery based on the damage situation and the relief activity situation, A disaster support system characterized by executing a disaster mode control process that outputs control information for limiting the use of the equipment depending on the number of people present, the attributes of the people present, and the available capacity for the required recovery time.
2. 2. The disaster support system according to claim 1, wherein the control unit acquires from the monitoring device information on an available amount of resources handled by the facility.
3. A method for providing support during a disaster using a disaster support system having a control unit connected to a monitoring device that monitors a facility, comprising: The control unit: When a disaster is detected, the damage status of the facility, the location status, and the available capacity are acquired from the monitoring device; As the location status, the number of people and their attributes are specified; Predict the time required for recovery based on the damage situation and the relief activity situation, A disaster support method, comprising: executing a disaster mode control process that outputs control information for limiting the use of the equipment in accordance with the number of people present, the attributes of the people present, and the available capacity for the required recovery time.
4. A program for providing disaster support using a disaster support system having a control unit connected to a monitoring device that monitors equipment, The control unit, When a disaster is detected, the damage status of the facility, the location status, and the available capacity are acquired from the monitoring device; As the location status, the number of people and their attributes are specified; Predict the time required for recovery based on the damage situation and the relief activity situation, A disaster support program characterized by functioning as a means for executing a disaster mode control process that outputs control information for limiting the use of the equipment depending on the number of people present, the attributes of the people present, and the available capacity for the required recovery time.
Citation Information
Patent Citations
Maintenance / inspection management system
JP2007238202A
Pipeline management system, pipeline management method and pipeline management program
JP2012146078A
Emergency management system and emergency management device
JP2015111379A
Disaster information display system
JP2017187874A
Consumption prediction apparatus
JP2018055546A
