Tower bolt maintenance device and maintenance program
The device and program automate the calculation and placement of locking materials for bolts in power transmission towers, addressing labor and error issues in existing methods, thereby improving tower safety and stability.
Patent Information
- Application Number
- JP2020205477
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-11
- Publication Date
- 2024-10-23
- Estimated Expiration
- 2040-12-11
AI Technical Summary
Existing methods for determining the appropriate number and location of bolts to prevent their removal from power transmission towers are labor-intensive, time-consuming, and prone to errors, posing a risk of tower collapse or insufficient strength.
A device and program that calculates the number and type of locking materials needed to secure bolts by acquiring tower input information, including bolt sizes and numbers, and outputs installation diagrams and guidance for optimal placement.
Automated calculation reduces labor, time, and errors in determining bolt security measures, enhancing the safety and stability of power transmission towers.
Smart Images

Figure 0007571510000001 
Figure 0007571510000002 
Figure 0007571510000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a tower bolt preservation device and a preservation program that calculate the number of locking materials to be attached to prevent the bolts of a tower from being pulled out. [Background technology]
[0002] A power transmission tower is, for example, made up of angle irons connected with bolts and nuts, and a lifting prevention device is attached at a certain height from the ground to prevent unauthorized lifting. However, there is a risk that someone may intentionally remove the bolts and nuts between the ground and the lifting prevention device, so it is necessary to implement maintenance measures to prevent this. For example, in cases where the power transmission lines of a power transmission tower pass above major crossings such as expressways and national roads, and the collapse of the power transmission tower would have a large social impact or be a great danger to the public, maintenance measures (bolt removal measures) are implemented for the main pillar materials of the power transmission tower.
[0003] In addition, as a measure against bolt removal, a locking material has been attached to the fastened bolt and nut, and various locking materials have been developed. For example, a bolt guard that covers the fastening point of the bolt and nut to prevent removal is known (for example, see Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2002-39146 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, if bolt pull-out measures are taken for all bolts, it will cost a lot of money, and if there are too few, there is a risk that the transmission tower will collapse or become insufficient in strength due to bolt pull-out. In other words, it is necessary to take measures against bolt pull-out in the right number of bolts and in the right positions, and traditionally, electric power company personnel and others have determined and calculated the amount according to a specified standard. This not only requires a lot of effort and time, but also has the risk of making decisions and calculations incorrectly. Furthermore, it is necessary to calculate the cost of taking measures against bolt pull-out, but traditionally, electric power company personnel and others have calculated this according to a specified standard, which not only requires a lot of effort and time, but also has the risk of making calculations incorrectly.
[0006] Therefore, an object of the present invention is to provide a tower bolt maintenance measure device and a maintenance measure program that can accurately and easily obtain the number of bolts that require bolt removal measures, etc. [Means for solving the problem]
[0007] In order to solve the above problem, the invention of claim 1 is a tower bolt preservation measure device, characterized in that it comprises an anti-climbing device attached to a predetermined height of a tower composed of main pillars whose main pillar materials are connected by connecting bolts, and an input information acquisition means for acquiring tower input information including the size and number of the connecting bolts of each connecting part of the main pillar materials below the anti-climbing device, and a calculation means for calculating the number and type of locking materials to be attached to the connecting bolts of each connecting part as a bolt pull-out countermeasure based on the tower input information and predetermined calculation criteria.
[0008] The invention of claim 2 is characterized in that, in the tower bolt conservation measures device described in claim 1, the calculation means calculates the cost required for the bolt removal measures based on the number and type of the locking materials and a predetermined calculation criterion.
[0009] The invention of claim 3 is characterized in that, in the tower bolt safety measures device described in claim 1 or 2, it is provided with an output means for outputting an installation diagram showing the positions at which the locking materials should be installed at each of the connecting parts.
[0010] The invention of claim 4 is characterized in that, in the tower bolt conservation countermeasure device according to claim 3, the output means outputs construction guidance for the bolt removal countermeasure.
[0011] The invention of claim 5 is characterized in that, in the tower bolt safety measures device described in claims 1 to 4, the input information acquisition means acquires the size and number of the connecting bolts of each connection part of the main pillar material below the lifting prevention device from an assembly drawing in which the size and number of the connecting bolts of each connection part of the main pillar material are indicated in a structural drawing of the tower.
[0012] The invention of claim 6 is a tower bolt conservation measures program characterized by having a computer function as: an input information acquisition means for acquiring tower input information including the size and number of the connecting bolts of each connecting part of the main pillar materials below the climbing prevention device, in which an anti-climbing device is attached at a predetermined height of a tower composed of main pillars whose main pillar materials are connected by connecting bolts; and a calculation means for calculating the number and type of locking materials to be attached to the connecting bolts of each connecting part as a bolt pull-out countermeasure based on the tower input information and predetermined calculation criteria. Effect of the Invention
[0013] According to the inventions of claims 1 and 6, when tower input information including the size and number of connecting bolts of each connecting part below the climbing prevention device is acquired, the number and type of locking materials to be attached to the connecting bolts of each connecting part are automatically calculated based on this tower input information and a predetermined calculation standard. In this way, the number and type of locking materials to be attached to each connecting part as a bolt pull-out countermeasure can be properly and easily acquired, which not only reduces the labor and time required for calculation, but also makes it possible to prevent calculation errors and improve the safety and soundness of the tower.
[0014] According to the invention described in claim 2, the cost required for measures against bolt pull-out is automatically calculated based on the number and type of locking materials and a predetermined calculation standard. This not only reduces the labor and time required for calculating the cost, but also makes it possible to prevent calculation errors.
[0015] According to the invention described in claim 3, an installation diagram showing the position where the locking material should be attached at each connection is output, so it is clear at a glance which connecting bolt the locking material should be attached to. This not only reduces the time required to consider where the locking material should be attached, but also makes it possible to attach the locking material to the appropriate position, thereby improving the safety and soundness of the tower.
[0016] According to the invention described in claim 4, construction guidance for bolt removal countermeasures is output, making it possible for anyone to properly and easily construct bolt removal countermeasures, thereby making it possible to improve the safety and soundness of the tower.
[0017] According to the invention described in claim 5, the size and number of connecting bolts of each connecting part below the anti-climbing device are automatically obtained from the assembly drawing, which not only reduces the effort and time required for acquisition, but also prevents acquisition errors and improves the safety and soundness of the tower. [Brief description of the drawings]
[0018] [Figure 1] 1 is a schematic diagram showing a tower bolt conservation countermeasure device according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 1 is an assembly diagram of a transmission tower according to an embodiment of the present invention. [Diagram 3] 1A and 1B are diagrams showing target joints of a transmission tower for bolt pull-out prevention measures in an embodiment of the present invention, where FIG. 1A shows the case of a flat leg, and FIG. 1B shows the case of a single-joint leg. [Figure 4] FIG. 3 is a schematic plan view showing the positional relationship of each leg of the transmission tower in FIG. 2. [Diagram 5] FIG. 2 is a diagram showing a quantity table of tower maintenance measures by the tower bolt maintenance measure device of FIG. 1. [Figure 6] FIG. 2 is a diagram showing a locking material installation standard by the tower bolt conservation device of FIG. 1. [Figure 7] FIG. 2 is a diagram showing a budget breakdown of tower maintenance measures using the tower bolt maintenance measures device of FIG. 1. [Figure 8] FIG. 2 is a diagram showing construction guidance using the tower bolt conservation countermeasure device of FIG. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, the present invention will be described based on the illustrated embodiment.
[0020] Figures 1 to 8 show this embodiment, and Figure 1 is a schematic diagram showing a tower bolt conservation device 1 according to the embodiment of the present invention. This tower bolt conservation device 1 is a device that supports tower conservation measures, i.e., bolt extraction measures, by calculating the number of locking materials 201 attached to prevent the extraction of tower bolts, and this embodiment will be mainly described in the case where the tower is a power transmission tower 100 as shown in Figures 2 to 4.
[0021] Here, the shape of the transmission tower 100 varies depending on its type, the terrain on which it is installed, and the like, and the transmission tower 100 is configured with four main pillars 101, legs a to d, arranged at the apex of a substantially regular square, as shown in Fig. 4. In this embodiment, the heights Ha to Hd of each main pillar 101 from the foundation (ground) to the construction base surface FL are different, as shown in Fig. 2, and the heights Ha and Hb of the main pillars 101 of legs a and b from the foundation are the highest (deepest), the height Hc of the main pillar 101 of leg c from the foundation is the next highest, and the height Hd of the main pillar 101 of leg d from the foundation is the lowest.
[0022] Each main pillar 101 is formed by connecting a plurality of main pillar materials 102 made of angle steel having an L-shaped cross section with connecting bolts 103 at connecting parts (parts where the ends overlap) J, and a climbing prevention device 105 is attached to a predetermined height of the transmission tower 100. As shown in FIG. 3, bolt pull-out measures are taken at the connecting parts J below the climbing prevention device 105. Therefore, the number of bolt pull-out measures varies depending on the height from the foundation (ground) of each main pillar 101 to the climbing prevention device 105. That is, in the case of the flat legs shown in FIG. 3(a), bolt pull-out measures are taken only at the connecting parts J at the upper part (above the lowest panel) and lower part (below the lowest panel) from the ground to the climbing prevention device 105, and in the case of the single-joint legs shown in FIG. 3(b), bolt pull-out measures are taken at the connecting parts J at the upper part and lower part from the ground to the climbing prevention device 105, and at the first intermediate part and the second intermediate part therebetween.
[0023] The tower component inspection device 1 mainly comprises a tower database 2, a display unit (output means) 3, an input unit (input information acquisition means) 4, a communication unit (output means) 5, an extraction unit (input information acquisition means) 6, a calculation unit (calculation means) 7, and a central processing unit 8 that controls these.
[0024] The tower database 2 is a storage means for storing information on tower components of the transmission tower 100 and bolt removal countermeasures, and stores, for example, the unit price of the locking material 201, locking material installation standards, and construction guidance, which will be described later. The display unit 3 is a display for displaying and outputting various information and images, and displays, for example, a quantity table and budget details table for tower conservation measures, locking material installation diagrams, and construction guidance, which will be described later. The input unit 4 is an interface for inputting and acquiring various information and commands, and for example, inputs and acquires the size and number of connecting bolts 103. The communication unit 5 is an interface for communicating with external devices, and communicates, for example, with a tower manufacturer's computer, a communication terminal of a specified department, and a communication terminal of a worker.
[0025] The extraction unit 6 is a task program that extracts and acquires tower input information from an assembly drawing received from a tower manufacturer's computer or the like via the communication unit 5 or input from the input unit 4. That is, from an assembly drawing as shown in Fig. 2 in which the size and number of the connecting bolts 103 of each connecting part J of the main pillar material 102 are indicated in the structural drawing of the power transmission tower 100, the extraction unit 6 extracts and acquires the size and number of the connecting bolts 103 of each connecting part J of the main pillar material 102 below the climbing prevention device 105, that is, the size and number of the connecting bolts 103 of each connecting part J that needs to be protected against bolt pull-out.
[0026] Specifically, the size and number of the connecting bolts 103 of each connecting part J below the ascent prevention device 105 are read from the assembly drawing, and are entered in each connecting part J for each leg a to d in the "tower bolt size and number" of the quantity table of the tower conservation measures as shown in FIG. 5. Here, the ascent prevention device 105 is omitted in FIG. 2, but the ascent prevention device 105 is attached directly above the connecting part J directly above the construction base FL (lowest panel), and the size and number of the target connecting bolts 103 may be read based on the position of the construction base FL or the lowest panel. In this way, in this embodiment, the tower input information is extracted and acquired from the assembly drawing by the extraction unit 6, but part or all of the tower input information may be acquired by inputting it from the input unit 4.
[0027] In this embodiment, as shown in Figure 5, it is extracted and acquired that, in legs a and b, 12 connecting bolts 103 of size M24 are fastened to each of the connecting parts J of the upper, first intermediate section, second intermediate section, and lower section, in legs c, 12 connecting bolts 103 of size M24 are fastened to each of the connecting parts J of the upper, first intermediate section, and lower section, and in legs d, 12 connecting bolts 103 of size M24 are fastened to each of the connecting parts J of the upper and lower sections.
[0028] The calculation unit 7 is a task program that performs calculations of the number of bolt pull-out countermeasures and the cost based on the tower input information acquired by the extraction unit 6 and a predetermined calculation standard. First, it calculates the number and type of locking materials 201 to be attached to the connecting bolts 103 of each connecting part J that requires bolt pull-out countermeasures.
[0029] First, the locking material attachment standard shown in Fig. 6 stored in the tower database 2 illustrates how many bolt pull-out countermeasures should be applied to each of the connecting bolts 103 in one connecting part J, and which connecting bolts 103 should be subjected to the bolt pull-out countermeasures. That is, as a predetermined calculation standard, the basis is that locking materials 201 should be attached to half (rounded up to an integer value) of the number of connecting bolts 103 in a connecting part J, and when the number of connecting bolts 103 is six, four is applied in consideration of balance.
[0030] As a predetermined calculation criterion, the locking materials 201 are attached in a well-balanced manner so that the strength of the transmission tower 100 is not significantly reduced even if the connecting bolts 103 to which the locking materials 201 are not attached are pulled out or loosened, and the positions of the connecting bolts 103 to which the locking materials 201 should be attached (black circles in the figure) are set. In this case, when the number of connecting bolts 103 is 8 to 16, and two rows of connecting bolts 103 are arranged on each side of the ridge line and center line of the main pillar material 102, which is an angle steel, as shown in Figure 6, the locking materials 201 are attached to the connecting bolts 103 on the outside and outside or the connecting bolts 103 on the inside and inside as shown in Figure 6. In this embodiment, such locking material attachment criteria are stored in the tower database 2 in advance, but they may be automatically calculated and created by the calculation unit 7 according to the above-mentioned predetermined calculation criterion.
[0031] Furthermore, the locking member 201 may be of any type as long as it can prevent the connecting bolt 103 from being pulled out, but in this embodiment, it has a structure as shown in Fig. 8. That is, it is composed of an outer nut, an inner nut, and a nut cover, and the nut cover is placed over the connecting nut 104 of the connecting bolt 103, the protrusion of the inner nut is fitted into the groove of the outer nut and screwed onto the connecting bolt 103, and the outer nut is tightened until the protrusion of the inner nut is cut off (until the outer nut spins freely). This makes it impossible to remove the nut cover, preventing the connecting bolt 103 from being pulled out. Such locking members 201 are available in a number of sizes (types) according to the size of the connecting bolt 103.
[0032] Then, based on the above-mentioned locking material installation standard, the size and number of the connecting bolts 103 of each connecting part J to be treated against bolt pull-out, and the size of the prepared locking material 201, the number and size of the locking material 201 to be installed are calculated and entered for each leg a to d in the "locking material quantity" of the quantity table for tower conservation measures as shown in FIG. 5. That is, according to the size and number of the connecting bolts 103 in the "tower bolt size and number", the required number of locking materials 201 is entered in the locking material 201 of the corresponding size for the corresponding connecting part J in the "locking material quantity". For example, if the size of the connecting bolts 103 of the connecting part J at the top of leg a is M24 and the number is 12, the size of the locking material 201 is M24 and the required number is 6. In addition, the subtotal of the required size of the locking material 201 is calculated and entered for each leg a to d, and further, the total of the required size of the locking material 201 for all legs a to d is calculated and entered. At this time, in the areas where there is no connecting bolt 103 (for example, the second intermediate part of leg c and the first and second intermediate parts of leg d in FIG. 5), the locking material 201 is obviously not required, so zero (NULL) is entered.
[0033] Secondly, the cost required for bolt removal countermeasures is calculated based on the number and size of the locking members 201 and a predetermined calculation standard. That is, the unit price for each size of the locking members 201 is stored in the tower database 2 as the predetermined calculation standard. At this time, as shown in the budget statement for tower conservation measures in FIG. 7, different unit prices are set and stored according to the quantity of the locking members 201. Then, the cost is calculated based on the size, number and unit price of the locking members 201 calculated earlier and entered in the budget statement. Specifically, the cost is calculated by multiplying the unit price corresponding to the calculated size and number (total) of the locking members 201 by the required number of the locking members 201, and entered in the corresponding amount column. At this time, when multiple sizes of locking members 201 are required, the cost is calculated and entered for each size to calculate the total cost.
[0034] Thirdly, an installation diagram showing the position where the locking material 201 should be installed in each connecting part J and construction guidance for bolt pull-out countermeasures are output. That is, together with the quantity table and budget details table of the tower conservation measures calculated and entered as described above, the locking material installation standard (installation diagram) shown in FIG. 6 and the construction guidance shown in FIG. 8 are displayed and output on the display unit 3 or the like. Here, the locking material installation standard shown in FIG. 6 illustrates the position where the locking material 201 should be installed for each number of connecting bolts 103 in the connecting part J, and all diagrams may be output as installation diagrams, but only the diagrams corresponding to the number of connecting bolts 103 of each connecting part J in the quantity table of the tower conservation measures may be output. In addition, the construction guidance in FIG. 8 describes the structure, installation method, and precautions of the locking material 201, and is designed to guide the user to install the locking material 201 properly and easily.
[0035] In addition, the quantity table, budget details, installation diagram (locking material installation criteria), and construction guidance for such tower conservation measures can be output by a specified output method using the input unit 4, etc. In other words, instead of just displaying them on the display unit 3 or printing them on paper, they can be sent to and output from a communication terminal in a specified department or a communication terminal of a worker, etc. This allows, for example, a worker to install the locking material 201 in the correct position by referring to the installation diagram, and to install the locking material 201 correctly and easily by referring to the construction guidance.
[0036] When tower bolt maintenance measures are taken using the tower bolt maintenance measures device 1 configured as described above, first, an assembly drawing of the transmission tower 100 is received from the tower manufacturer's computer or the like, or is input from the input unit 4. Next, when the extraction unit 6 is started, the size and number of connecting bolts 103 of each connecting part J for which bolt removal measures should be taken are extracted and obtained from the assembly drawing, and are entered into "tower bolt size and number" in the quantity table shown in Fig. 5.
[0037] Next, when the calculation unit 7 is started, the number and size of the locking materials 201 to be attached to the connecting bolts 103 of each connection part J that requires bolt pull-out countermeasures are calculated, and entered into "Locking material quantity" in the quantity table shown in Fig. 5. Next, the cost required for the bolt pull-out countermeasures is calculated, and entered into the budget statement shown in Fig. 7. Then, the calculated and created quantity table and budget statement, an installation drawing showing the positions where the locking materials 201 should be attached, and construction guidance for bolt pull-out countermeasures are output using the specified output method.
[0038] As described above, according to this tower bolt conservation countermeasure device 1, when tower input information including the size and number of the connecting bolts 103 of each connecting part J below the ascent / descent prevention device 105 is acquired, the number and size of the locking materials 201 to be attached to the connecting bolts 103 of each connecting part J are automatically calculated based on this tower input information and a predetermined calculation standard. In this way, the number and size of the locking materials 201 to be attached to each connecting part J as a bolt pull-out countermeasure can be properly and easily acquired, which not only reduces the labor and time required for calculation, but also makes it possible to prevent calculation errors and improve the safety and soundness of the transmission tower 100.
[0039] Furthermore, since the size and number of the connecting bolts 103 of each connecting part J below the anti-lifting device 105 are automatically obtained from the assembly drawing, not only can the effort and time required for obtaining the data be reduced, but also errors in obtaining the data can be prevented, thereby improving the safety and soundness of the transmission tower 100.
[0040] In addition, the cost required for measures to prevent bolt extraction is automatically calculated based on the number and size of the locking materials 201 and a predetermined calculation standard, which not only reduces the effort and time required to calculate the cost, but also makes it possible to prevent calculation errors.
[0041] Meanwhile, since an installation diagram showing the position where the locking member 201 should be attached to each connecting portion J is output, it is clear at a glance to which connecting bolt 103 the locking member 201 should be attached. This not only reduces the time required to consider where the locking member 201 should be attached, but also makes it possible to attach the locking member 201 to the appropriate position, thereby improving the safety and soundness of the transmission tower 100.
[0042] Furthermore, construction guidance for bolt removal countermeasures is output, enabling anyone to properly and easily construct bolt removal countermeasures, thereby improving the safety and soundness of the transmission tower 100.
[0043] Although the embodiment of the present invention has been described above in detail, the specific configuration is not limited to this embodiment, and the present invention includes design changes and the like that do not deviate from the gist of the present invention. For example, the above embodiment has been described as a case in which the size and number of connecting bolts 103 of all connections J that are the target of maintenance measures are obtained and input from an assembly drawing, and the required number and type of locking materials 201 for all target connections J are calculated, but it is also possible to obtain and input the size and number of connecting bolts 103 of an individual / specific connection J, and calculate the required number and type of locking materials 201 for that connection J.
[0044] Furthermore, although the size of the locking material 201 is calculated and output as the type in the calculation unit 7, the type of the locking material 201 may be calculated and output as the type. For example, when the type of the locking material 201 to be attached as a measure against bolt pull-out differs depending on the size or position of the connecting bolt 103, the type of tower, etc., the calculation unit 7 may calculate and output the type of the locking material 201 as the type. Furthermore, although the case where the tower is the power transmission tower 100 has been described, it goes without saying that the present invention can be applied to towers other than the power transmission tower 100.
[0045] Meanwhile, the following tower bolt conservation measures program may be installed in a general-purpose computer to configure the tower bolt conservation measures device 1. That is, the tower bolt conservation measures program is characterized in that the computer is made to function as: input information acquisition means (input unit 4, extraction unit 6) for acquiring tower input information including the size and number of connecting bolts 103 of each connecting part J of the main pillar material 102, where an anti-climbing device 105 is attached at a predetermined height of the tower 100 composed of the main pillars 101 connected to the main pillar materials 102 by connecting bolts 103, and the size and number of connecting bolts 103 of each connecting part J of the main pillar material 102 below the anti-climbing device 105; and calculation means (calculation unit 7) for calculating the number and type of locking materials 201 to be attached to the connecting bolts 103 of each connecting part J as a bolt pull-out countermeasure, based on the tower input information and a predetermined calculation standard. [Explanation of symbols]
[0046] 1. Steel tower component inspection device 2. Tower Database 3 Display section (output means) 4. Input section (means for acquiring input information) 5. Communication unit (output means) 6 Extraction unit (means for acquiring input information) 7 Arithmetic unit (arithmetic means) 100 Power transmission tower (pylon) 101 Main pillar 102 Main pillar material 103 Connecting bolt 104 Connecting nut 105 Lifting prevention device J connection part
Claims
1. An anti-climbing device is attached to a predetermined height of a steel tower composed of main columns connected to each other by connecting bolts, and an input information acquisition means acquires steel tower input information including the size and number of the connecting bolts of each connecting portion of the main columns below the anti-climbing device; A calculation means for calculating the number and type of locking materials to be attached to the connecting bolts of each connecting portion as a bolt pull-out countermeasure based on the tower input information and a predetermined calculation standard; A tower bolt conservation device comprising:
2. The calculation means calculates the cost required for the bolt extraction countermeasure based on the number and type of the locking materials and a predetermined calculation criterion.
2. A tower bolt preservation device according to claim 1.
3. an output unit for outputting an installation diagram showing a position where the locking member should be installed in each of the connecting portions; 3. A tower bolt preservation device according to claim 1 or 2.
4. The output means outputs a construction guidance for the bolt pull-out countermeasure. A tower bolt preservation device according to claim 3.
5. The input information acquisition means acquires the size and number of the connecting bolts of each connecting portion of the main pillar material below the climbing prevention device from an assembly drawing in which the size and number of the connecting bolts of each connecting portion of the main pillar material are indicated in a structural drawing of the steel tower. A tower bolt preservation device according to any one of claims 1 to 4.
6. Computer, An anti-climbing device is attached to a predetermined height of a steel tower composed of main columns connected to each other by connecting bolts, and an input information acquisition means acquires steel tower input information including the size and number of the connecting bolts of each connecting portion of the main columns below the anti-climbing device; a calculation means for calculating the number and type of locking materials to be attached to the connecting bolts of each connecting portion as a bolt pull-out countermeasure based on the tower input information and a predetermined calculation standard; A tower bolt preservation program characterized by functioning as a.