Standby machine management device, standby machine management method, and standby machine management program
The spare machine management system addresses the challenge of temporary shortages by calculating and recommending optimal relocation strategies to minimize service degradation and operational impact, ensuring efficient spare machine distribution.
Patent Information
- Application Number
- JP2023512501
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-05
- Publication Date
- 2024-10-24
- Estimated Expiration
- 2041-04-05
AI Technical Summary
Existing spare machine management systems struggle to automatically relocate spare machines to minimize service degradation when there is a temporary shortage, considering the impact on users and on-site operations due to uneven equipment failures.
A spare machine management system that calculates and automatically recommends the optimal relocation of spare machines based on user impact and on-site operation factors, integrating the number of affected users and travel time to minimize service interruption.
The system effectively reduces the risk of prolonged service interruptions by automatically determining the optimal relocation of spare machines, considering user impact and operational efficiency, thus maintaining service quality.
Smart Images

Figure 0007572653000001 
Figure 0007572653000002 
Figure 0007572653000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a standby machine management device, a standby machine management method, and a standby machine management program. [Background technology]
[0002] Communication carriers have established maintenance and operation systems for maintaining and operating facilities such as communication devices.
[0003] For example, when a failure occurs in a device that constitutes a network, the remote monitoring department detects a failure alarm and checks which area the device failure occurs in. The remote monitoring department then notifies the dispatch base of the repair team in the area where the building with the failed device is located of the building name, device name, name of the replaced part, etc., and instructs the repair team to repair the failed device. For example, if a device failure occurs in Hokkaido, the remote monitoring department gives instructions to the repair team in Hokkaido. The repair team then brings a spare device from the dispatch base to the building specified and replaces the package of the failed device, etc.
[0004] If local repair teams stored a large number of spare equipment at their dispatch bases, they could respond immediately to equipment failures, but storing a large number of spare equipment is economically wasteful, so generally, a minimum number of spare equipment is used. However, if equipment failures temporarily increase in frequency in a given area, there will be a shortage of spare equipment in that area, causing the impact of service degradation to last for a long time. Therefore, a technology for managing the location and quantity of spare equipment is known (see Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 07-249070 Summary of the Invention [Problem to be solved by the invention]
[0006] However, since the technology of Patent Document 1 is merely a management technology for managing the location, quantity, etc. of spare machines, if there is a temporary shortage of spare machines in a given area, the reallocation of the spare machines must be decided manually. Also, since some spare machines require several months for repairs by the manufacturer, it is necessary to consider whether service quality can be maintained every time a failure occurs in each area. There are many different types of devices that make up a communication carrier's network, and it is difficult to manually manage whether the spare machines are located in a way that can maintain service quality for all the devices.
[0007] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to provide a technique capable of presenting a method for rearranging standby machines of equipment (all or some of the standby machines of the equipment). [Means for solving the problem]
[0008] A spare machine management device of one embodiment of the present invention, in which the spare machine management device manages each storage base for a plurality of spare machines for facilities in various locations, is provided with a calculation unit that, when a change occurs in the deployment status of the spare machines at each storage base, calculates a method for rearranging the plurality of spare machines based on a user impact degree for users who will be affected by a degradation in service in the event of a failure of the facilities in each location and an on-site operation impact degree for repairs to the facilities in each location, and a notification unit that notifies the method for rearranging the plurality of spare machines.
[0009] One aspect of the spare machine management method of the present invention is a spare machine management method for managing storage bases for a plurality of spare machines for facilities in various locations, in which when a change occurs in the deployment status of the spare machines at the respective storage bases, a spare machine management device performs the following steps: calculating a method for rearranging the plurality of spare machines based on a user impact degree for users who will be affected by service degradation in the event of a failure of the facility in each location, and an on-site operation impact degree for repairs to the facility in each location, and notifying the method for rearranging the plurality of spare machines.
[0010] A spare machine management program according to one aspect of the present invention causes a computer to function as the spare machine management device. Effect of the Invention
[0011] According to the present invention, it is possible to provide a technique capable of presenting a method for rearranging standby machines of equipment (all or some of the standby machines of the equipment). [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a spare machine management system according to the present embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of standby unit arrangement information and standby unit failure information. [Diagram 3] FIG. 3 is a diagram illustrating an example of a process flow of the spare machine management method. [Figure 4] FIG. 4 is a diagram showing an example of changing the spare device information. [Diagram 5] FIG. 5 is a diagram showing an example of the arrangement of each dispatch base and each dispatch target building. [Figure 6A] FIG. 6A is a diagram showing spare machine rearrangement methods 1 and 2. [Figure 6B] FIG. 6B is a diagram showing spare machine rearrangement methods 3 to 5. [Figure 7] FIG. 7 is a diagram illustrating an example of a method for transferring control of a spare machine. [Figure 8] FIG. 8 is a diagram illustrating an example of a hardware configuration of the standby machine management device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the description of the drawings, the same parts are given the same reference numerals and the description will be omitted.
[0014] [Summary of the Invention] In order to solve the above problems, the present invention aims to provide a method for reallocating spare equipment (all or part of the equipment) for equipment. In particular, the present invention aims to enable an immediate decision to minimize the impact of service degradation even if an area temporarily runs out of spare equipment due to uneven distribution of equipment failures, while realizing economical spare equipment allocation.
[0015] Therefore, in the present invention, when a change occurs in the placement status of multiple spare machines placed at each storage base, a method for rearranging the multiple spare machines is calculated and notified based on the user impact level for users affected by service degradation when equipment at each location breaks down and the on-site operation impact level for repairs to the equipment at each location. This makes it unnecessary to manually consider the rearrangement of the spare machines, and makes it possible to automatically present a method for rearranging the spare machines of the equipment.
[0016] Furthermore, the present invention calculates, from among a plurality of rearrangement methods, a rearrangement method that minimizes the sum of the user impact degree (at least the integrated value of the number of users affected in the event of equipment failure and the shortest travel time from the storage base to the equipment building) and the on-site operation impact degree (at least the shortest travel time from the storage base to the equipment building). This makes it possible to suppress the risk of an increase in service interruption time and minimize the impact of service degradation.
[0017] [Example of spare machine management system configuration] 1 is a diagram showing an example of the configuration of a standby unit management system 1 according to this embodiment. The standby unit management system 1 is an information processing system equipped with a function for recommending optimal reallocation of standby units. The standby unit management system 1 includes, for example, a standby unit management device 10, a facility management DB 20, a building location information DB 30, and a map information DB 40.
[0018] The spare machine management device 10 is a device that manages the storage bases of multiple spare machines for facilities in various locations, calculates the rearrangement and transfer methods of the multiple spare machines, and presents them to a manager or a breakdown repair team. The spare machine management device 10 is connected to a facility management DB 20, a building location information DB 30, and a map information DB 40 so that they can communicate with each other.
[0019] The facility management DB 20 is a DB that manages facility information related to facilities such as communication devices.
[0020] The building location information DB 30 is a DB that manages location information relating to the location of the building in which the equipment is installed.
[0021] The map information DB 40 is a DB that manages map information related to maps.
[0022] [Example of spare machine management device configuration] As shown in FIG. 1, the spare machine management device 10 includes, for example, a spare machine management DB 11, a change confirmation unit 12, an optimal allocation calculation engine 13, and an optimal allocation notification unit 14.
[0023] The spare machine management DB 11 is a DB that stores and manages spare machine location information in which a plurality of spare machines are arranged at each storage base (a base where a repair team is dispatched). Fig. 2(a) is a diagram showing an example of the spare machine location information. In the spare machine location information, for example, the package name of the spare machine, the unique information of the package, and the storage base (a base where a repair team is dispatched) of the spare machine are stored in association with each other.
[0024] The spare machine management DB 11 is a DB that stores and manages spare machine failure information related to the failure of the spare machine. Fig. 2(b) is a diagram showing an example of the spare machine failure information. The spare machine failure information stores, for example, the package name of the spare machine, the failure rate of the package, and the return period from the manufacturer in association with each other.
[0025] The change confirmation unit 12 is a judgment unit that refers to the spare machine deployment information in the spare machine management DB 11 and the equipment information in the equipment management DB 20, and judges whether or not a change has occurred in the deployment status of the spare machines, in which multiple spare machines are deployed at each storage base.
[0026] The optimal placement calculation engine 13 is a calculation engine that calculates the optimal relocation of the spare machines, and includes a placement method calculation unit 131 and a transfer method calculation unit 132.
[0027] The deployment method calculation unit 131 is a calculation unit that calculates an optimal re-deployment method for multiple spare machines when a change occurs in the deployment status of the spare machines, based on the user impact degree for users who will be affected by service degradation when equipment in each location fails, and the on-site operation impact degree for repairs to equipment in each location.
[0028] For example, the user impact degree is at least an integrated value of the number of users affected when an equipment failure occurs and the shortest travel time from a storage base (dispatch base) to the building where the equipment is located. The on-site operation impact degree is at least the shortest travel time from a storage base (dispatch base) to the building where the equipment is located. The placement method calculation unit 131 calculates, from among a plurality of re-placement methods, a re-placement method that minimizes the total value of the user impact degree and the on-site operation impact degree, as the optimal re-placement method.
[0029] The transfer method calculation unit 132 is a calculation unit that calculates a transfer method of the spare aircraft between storage bases (between dispatch bases) based on the optimal relocation method of the multiple spare aircraft calculated by the allocation method calculation unit 131.
[0030] The optimum allocation notification unit 14 is a notification unit that notifies a manager or a repair team of the optimum rearrangement method and transfer method of the spare machines calculated by the optimum allocation calculation engine 13.
[0031] [Example of operation of the standby machine management device] 3 is a diagram showing an example of a process flow of a standby unit management method. The standby unit management method is executed by a standby unit management device 10.
[0032] Step S1; First, the change confirmation unit 12 periodically or irregularly refers to the spare machine arrangement information in the spare machine management DB 11 and the equipment information in the equipment management DB 20, and determines whether or not a change has occurred in the arrangement status of the spare machines. If a change has occurred in the arrangement status of the spare machines, the change confirmation unit 12 notifies the optimal arrangement calculation engine 13 of change information indicating the change, and proceeds to step S2. If no change has occurred, the change confirmation unit 12 ends the processing flow.
[0033] For example, the change confirmation unit 12 determines that a change has occurred in the deployment status of spare aircraft when the total number of spare aircraft has changed due to the use or repair of spare aircraft, such as when there are no spare aircraft at even one of the dispatch bases, or when the deployment of spare aircraft has changed due to the rearrangement of spare aircraft.
[0034] Specifically, when a spare machine is repaired on-site at a dispatch base, when the spare machine is returned after repairs by the manufacturer, the administrator of the spare machine management system 1 or the breakdown repair team at the dispatch base changes (registers / updates) the spare machine allocation information in the spare machine management DB 11 (see FIG. 4). As a result, a change occurs in the allocation status of the spare machines, so the change confirmation unit 12 grasps the allocation status of the spare machines from the spare machine allocation information and notifies the optimal allocation calculation engine 13 that there has been a change in the allocation status of the spare machines or the number of spare machines.
[0035] Specifically, when equipment is added or removed, or when a service order is added or changed, the administrator of the spare machine management system 1 changes (registers, updates, changes to accommodated users) the equipment information in the equipment management DB 20. As a result, the number of pieces of equipment increases or decreases, and the arrangement of the spare machines may change accordingly, so the change confirmation unit 12 obtains various information related to the impact of service degradation in the event of a failure from the equipment management DB 20, and notifies the optimal arrangement calculation engine 13 that there has been a change in the arrangement of the spare machines.
[0036] Step S2; Next, in the optimal allocation calculation engine 13, the allocation method calculation unit 131 acquires the total number of standby machines and the total number of dispatch bases at the current time from the standby machine allocation information in the standby machine management DB 11. The allocation method calculation unit 131 also acquires the latest failure rate of standby machines and the return period from the standby machine failure information in the standby machine management DB 11. The allocation method calculation unit 131 also acquires the location information of the building in which the equipment is installed from the building location information DB 30. The allocation method calculation unit 131 also calculates the travel time from each dispatch base to each building using the map information in the map information DB 40. After that, the allocation method calculation unit 131 uses the various acquired and calculated information to calculate the optimal rearrangement method of standby machines between dispatch bases for each standby machine currently arranged at each dispatch base.
[0037] An example of calculation of an optimal method for rearranging spare machines will now be described.
[0038] Let the total number of bases storing spare aircraft be n. Let the total number of spare aircraft be m. Both n and m are natural numbers. In this case, when allocating m spare aircraft to n bases, mathematically, it is sufficient to consider combinations of m elements selected from n elements, so n H m (= n+m-1 C m ) selection methods (methods of reallocating spare aircraft).
[0039] Therefore, the placement method calculation unit 131 performs the above n H m Equation (1) is calculated for all selection methods.
[0040] S = A + B (1) Where A = α Σ x=1~N {FU Dx Tmin(x)}, Also, B=β Σ x=1~N {W Tmin(x)}.
[0041] The variable A is a user impact value for users affected by the degradation of service when equipment in each area fails. α is a weighting coefficient for the impact of the degradation of service on users, and can be defined arbitrarily. N is the total number of buildings in which equipment is installed. FU is a weighting coefficient associated with the number of outages caused by equipment failure. The number of outages is, for example, the number of users (number of contracted lines) affected when equipment fails. For example, FU can be defined based on the failure rate of spare equipment, return period, etc. Dx is the number of equipment contained in the xth building. Tmin(x) is the shortest travel time (minutes) from the selected mth dispatch base to the xth building, calculated by changing m from 1 to N. In other words, Tmin(x) is the shortest time to reach the xth building from multiple dispatch bases.
[0042] The variable B is the on-site operation impact value for equipment repairs in each location. β is the weighting coefficient for on-site operation and can be defined arbitrarily. N is the total number of buildings in which the equipment is installed. W is the operation cost. Tmin(x) is the shortest travel time (in minutes) from the selected mth dispatch base to the xth building, calculated by changing m from 1 to N. In other words, Tmin(x) is the shortest time to reach the xth building from among multiple dispatch bases.
[0043] Then, the placement method calculation unit 131 n H m Among these selection methods, we find the "selection of m bases" that "minimizes" the value of S. This "selection of m bases" is the optimal deployment method for deploying m spare aircraft to n dispatch bases.
[0044] A specific example of the above calculation will be described.
[0045] FIG. 5 is a diagram showing an example of the arrangement of each dispatch base P and each dispatch target building B. Area 1 has one dispatch base P1 and four buildings B11 to B14. The number of outages of building B13 is large, and the number of outages of the other buildings B11, B12, and B14 is small. Area 2 has one dispatch base P2 and three buildings B21 to B23. The number of outages of each of the buildings B21 to B23 is small. Area 3 has one dispatch base P3 and three buildings B31 to B33. The number of outages of each of the buildings B31 to B33 is small. Area 4 has one dispatch base P4 and four buildings B41 to B44. The number of outages of building B43 is large, and the number of outages of the other buildings B41, B42, and B44 is small. Area 5 has one dispatch base P5 and three buildings B51 to B53. The number of outages in each of the buildings B51 to B53 is small. The distance and location relationship between each dispatch base P and each building B is as shown in Figure 5.
[0046] Consider a case where there are only four spare aircraft temporarily for the five dispatch bases P1 to P5. In this case, possible methods for rearranging the four spare aircraft that can be rearranged to the five dispatch bases P1 to P5 include rearrangement method 1 for rearranging to dispatch bases P1 to P4, rearrangement method 2 for rearranging to dispatch bases P1 to P3, and P5, rearrangement method 3 for rearranging to dispatch bases P1, P2, P4, and P5, rearrangement method 4 for rearranging to dispatch bases P2 to P5, and rearrangement method 5 for rearranging to dispatch bases P1, P3 to P5, as shown in Figures 6A and 6B.
[0047] Therefore, the allocation method calculation unit 131 calculates formula (1) for each of the above five rearrangement methods 1 to 5. In this case, when considering the provision of a spare unit to each building in an area where a spare unit is not allocated, in rearrangement method 1, the spare unit is provided from dispatch base P2 in adjacent area 2 to building B51 in area 5 where a spare unit is not allocated, and the spare unit is provided from dispatch base P4 in adjacent area 4 to buildings B52 and B53.
[0048] In rearrangement method 2, buildings B41 and B42 in area 4 where no spare unit is located are provided with service from dispatch base P1 in adjacent area 1, building B43 is provided with service from dispatch base P2 in adjacent area 2, and building B44 is provided with service from dispatch base P5 in adjacent area 5. Arrangement methods 3 to 5 are omitted.
[0049] Comparing rearrangement method 1 and rearrangement method 2, in the case of rearrangement method 2, there is building B43 with a large number of outages in non-standby unit area 4, and the travel time to said building B43 is long. On the other hand, in rearrangement method 1, there is no building with a large number of outages in non-standby unit area 5, and the travel time to each of buildings B51 to B53 in non-standby unit area 5 is short.
[0050] Therefore, as shown in formula (1), for example, for the user impact value, the placement method calculation unit 131 determines, as the optimal placement method, the rearrangement method that minimizes the integrated value of the number of affected users (FU) affected by equipment failure, the number of pieces of equipment (Dx) housed in a building, and the shortest travel time to each building (Tmin(x)). In the above specific example, the placement method calculation unit 131 determines the optimal rearrangement method to be the rearrangement method 1. Note that the above calculation method can also be applied to cases where it is better to place multiple spare machines at one dispatch base.
[0051] Step S3; Next, in the optimal allocation calculation engine 13, the transfer method calculation unit 132 determines a method for transferring the standby aircraft between the dispatch bases so that the standby aircraft is reallocated according to the optimal reallocation method determined by the allocation method calculation unit 131 (see FIG. 7). For example, the transfer method calculation unit 132 transfers the standby aircraft from the dispatch base that is closest in distance and time to the dispatch base to which the standby aircraft should be reallocated.
[0052] Step S4; Next, the transfer method calculation unit 132 compares the optimal backup machine relocation method determined in step S2 with the current backup machine allocation status stored in the backup machine allocation information in the backup machine management DB 11, and if they differ, notifies the optimal allocation notification unit 14 of the optimal allocation change information regarding the determined backup machine relocation method and transfer method. If they are the same, the transfer method calculation unit 132 does not notify the optimal allocation notification unit 14 of anything.
[0053] Step S5; Finally, the optimum placement notification unit 14 outputs and displays the method for rearranging and transferring the spare machines, which is included in the optimum placement change information, on the information processing terminal of an operator such as a manager or a repair team, and presents recommendations such as changing the building in which the spare machine should be located or purchasing a new one.
[0054] [Application example 1] The above explanation has been given on the assumption that a change occurs in the allocation status of spare machines (specifically, when the total number of spare machines changes due to the use or repair of spare machines, or when the allocation of spare machines changes due to the reallocation of spare machines). However, since there are various factors for allocating spare machines, the present invention is also applicable to cases where there is no change in the current allocation status of spare machines, such as when production of equipment or spare machines has ended (EOL: End Of Life) and spare machines cannot be secured and new purchases cannot be made.
[0055] [effect] According to this embodiment, when a change occurs in the placement status of multiple spare machines placed at each storage base, a method for rearranging the multiple spare machines is calculated and notified based on a user impact value (A) related to users who will be affected by service degradation when equipment at each location breaks down, and an on-site operation impact value (B) related to the repair of equipment at each location. This makes it unnecessary to manually consider the rearrangement of spare machines, and makes it possible to automatically present a method for rearranging the spare machines of equipment.
[0056] According to the present embodiment, the system calculates a relocation method that minimizes the sum (A+B) of the weight (α) of the impact of service degradation on users, the number of users affected when equipment breaks down, the number of equipment contained in a building (Dx), and the shortest travel time (Tmin(x)) from the dispatch base to the equipment building, which is the user impact value (A), which is the sum of the weight (β) of on-site operation, the operation cost (W), and the shortest travel time (Tmin(x)) from the dispatch base to the equipment building. As a result, even if there is a dispatch base where spare equipment is depleted due to a temporary uneven distribution of failures between regional areas, the system can propose the optimal allocation until the equipment is returned from the manufacturer in almost real time, which makes it possible to minimize the risk of an increase in service interruption time.
[0057] Furthermore, according to this embodiment, it can be applied even when there is no change in the current arrangement of spare machines. Therefore, even if the equipment and spare machines continue to be used even after they become EOL and cannot be repaired, it is possible to calculate a storage base that minimizes the impact on services in the event of a failure based on the current number of spare machines, and it becomes possible to easily derive the optimal arrangement of the spare machines.
[0058] [others] The present invention is not limited to the above-described embodiment, and various modifications are possible within the scope of the present invention.
[0059] The above-described spare machine management device 10 of the present embodiment can be realized, for example, as shown in Fig. 8, by using a general-purpose computer system including a CPU 901, a memory 902, a storage 903, a communication device 904, an input device 905, and an output device 906. The memory 902 and the storage 903 are storage devices. In the computer system, the CPU 901 executes a predetermined program loaded on the memory 902, thereby realizing each function of the spare machine management device 10.
[0060] The spare machine management device 10 may be implemented by one computer. The spare machine management device 10 may be implemented by multiple computers. The spare machine management device 10 may be a virtual machine implemented in a computer. The program for the spare machine management device 10 may be stored in a computer-readable recording medium such as an HDD, SSD, USB memory, CD, or DVD. The program for the spare machine management device 10 may also be distributed via a communication network. [Explanation of symbols]
[0061] 1: Spare machine management system 10: Spare machine management device 11: Spare machine management DB 12: Change confirmation section 13: Optimal placement calculation engine 131: Placement method calculation section 132: Transfer Method Calculation Department 14: Optimal placement notification section 20: Equipment management DB 30: Building location information DB 40: Map information database 901:CPU 902: Memory 903: Storage 904: Communication equipment 905: Input device 906: Output device
Claims
1. In a spare machine management device that manages storage locations of a plurality of spare machines for facilities in various locations, a calculation unit that calculates a method for rearranging the plurality of spare machines based on a user impact degree for users who are affected by a deterioration in service when a breakdown occurs in the equipment at each location and an on-site operation impact degree for repairs to the equipment at each location when a change occurs in the arrangement of the plurality of spare machines arranged at each storage location; a notification unit that notifies a user of a method for rearranging the plurality of standby machines, The user impact level is an integrated value obtained by multiplying the number of users affected by the equipment failure by the shortest travel time required to travel from the storage base to the equipment building, The on-site operation impact degree is the shortest travel time from the storage base to the facility building, The calculation unit is a spare machine management device that calculates a total value of the user impact and the on-site operation impact for each of nHm rearrangement methods (n is the total number of storage bases, and m is the total number of spare machines), and determines the rearrangement method that has the smallest total value as the optimal rearrangement method among the nHm rearrangement methods.
2. The user influence degree is 2. The standby machine management device according to claim 1, wherein the value is further multiplied by the number of pieces of equipment housed in the building.
3. When a change occurs in the deployment status of the backup aircraft, 3. The spare machine management device according to claim 1, wherein the number of spare machines is changed or the location of the spare machines is changed.
4. The calculation unit is 3. The spare machine management device according to claim 1, wherein a method for rearranging the spare machines is calculated when there is no change in the arrangement status of the spare machines, instead of when there is a change in the arrangement status of the spare machines.
5. 5. The spare machine management device according to claim 1, further comprising a calculation unit that calculates a method of transferring spare machines between storage bases based on the method of rearrangement of the plurality of spare machines.
6. A spare machine management method for managing storage locations of a plurality of spare machines for facilities in various locations, comprising: The spare machine management device, a first step of calculating a method for rearranging the plurality of spare machines based on a user impact degree for users who are affected by service degradation when a breakdown occurs in equipment at each storage base and an on-site operation impact degree for repairs to the equipment at each base when a change occurs in the arrangement of the plurality of spare machines; a second step of notifying a method for rearranging the plurality of spare machines; The user impact level is an integrated value obtained by multiplying the number of users affected by the equipment failure by the shortest travel time required to travel from the storage base to the equipment building, The on-site operation impact degree is the shortest travel time from the storage base to the facility building, In the first step, A spare machine management method, which calculates a total value of the user impact and the on-site operation impact for each of nHm possible relocation methods (n is the total number of storage bases, and m is the total number of spare machines), and determines the relocation method that has the smallest total value as the optimal relocation method among the nHm possible relocation methods.
7. A standby machine management program that causes a computer to function as the standby machine management device according to any one of claims 1 to 5.
Citation Information
Patent Citations
Method for estimating spare parts supply probability and minimum spare parts number for electric power communication equipment
CN104573329A
Stand-by equipment management system
JP1995249070A
Maintenance parts logistics operation system, method, and program
JP2004246468A
Failure risk evaluation device
JP2010102461A
Information processing method, information processing apparatus, and program
JP2014002783A