Learning device and program, and die abnormality prediction device

The learning device uses machine learning to create predictive models for mold abnormalities in press machines, addressing the challenge of accurate mold defect detection and reducing operator reliance by predicting issues in real-time.

JP7572865B2Active Publication Date: 2024-10-24KURIMOTO LTD
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
JP2021009639
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-25
Publication Date
2024-10-24
Estimated Expiration
2041-01-25

AI Technical Summary

Technical Problem

Existing technologies struggle to accurately detect and predict mold abnormalities in press machines, particularly due to the inability to specify the cause of defects and the high frequency of mold failures.

Method used

A learning device and program that utilizes machine learning to generate predictive models for mold abnormalities by analyzing load and vibration data from press machines, incorporating features like load characteristics, vibration patterns, mold temperature, and lubricant amounts, to accurately predict mold conditions.

Benefits of technology

Enables precise detection of mold abnormalities in real-time, reducing the reliance on operator experience and preventing defective product production by identifying issues early.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572865000002
    Figure 0007572865000002
  • Figure 0007572865000003
    Figure 0007572865000003
  • Figure 0007572865000004
    Figure 0007572865000004
Patent Text Reader

Abstract

To accurately detect the abnormality of a mold mounted on a press machine.SOLUTION: A learning device (100) includes: data obtaining means (101) that obtains measurement data (DT1) including load data applied on a workpiece during press operation by a press machine (11) and vibration data of a flame of the press machine, for each press cycle; feature amount calculating means (102) for calculating plural kinds of future amounts including load feature amount and vibration feature amount for each press cycle, on the basis of the obtained measurement data; generating means (104) for mechanically learning correlation between the calculated plural kinds of feature amounts and a mold state, and generating a prediction model for predicting the presence / absence of abnormality of a mold for each press cycle; and model memory means (114) that stores the generated prediction models (M1, M2,...).SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a learning device and program, and a die abnormality prediction device, and in particular to a learning device and program that generate a predictive model by machine learning to predict the presence or absence of an abnormality in a die mounted on a press machine, and a die abnormality prediction device that predicts the presence or absence of an abnormality in a die based on the predictive model generated by machine learning. [Background technology]

[0002] A forging press machine presses a workpiece by rotating a crankshaft and raising and lowering a slide. In such a forging press machine, as described in JP 2019-13947 A (Patent Document 1), it has been conventional to monitor the load applied to the workpiece during processing and detect anomalies based on the peak value of the load. This is because it is known that the peak value of the load is highly correlated with the quality of the product.

[0003] In addition, as described in JP 2019-13976 A (Patent Document 2), a technology has been proposed for predicting press machine failures by using multiple sensors that detect the operating status of the press machine. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-13947 A [Patent Document 2] JP 2019-13976 A Summary of the Invention [Problem to be solved by the invention]

[0005] In Patent Document 1, it is possible to detect defective products based on the peak value of the load, but it is not possible to identify the cause (cause of abnormality).

[0006] In Patent Document 2, changes from the initial normal state in measurement results obtained from multiple sensors are checked on a monitoring PC and past empirical rules are also taken into consideration to predict press failures, making it difficult for inexperienced operators to accurately predict failures.

[0007] In particular, because press machine dies tend to break down more frequently than other parts, there was a demand for technology that could detect die abnormalities (breakdowns, damage, etc.) without relying on the experience of the operator.

[0008] The present invention has been made to solve the above-mentioned problems, and its object is to provide a learning device and program for enabling accurate detection of abnormalities in a die mounted on a press machine, as well as a die abnormality prediction device. [Means for solving the problem]

[0009] A learning device according to an aspect of the present invention is a learning device that generates a prediction model for predicting the presence or absence of an abnormality in a die mounted on a press machine by machine learning, and includes a data acquisition means, a feature calculation means, a generation means, and a model storage means. The data acquisition means acquires measurement data for each press cycle, including load data applied to a workpiece during press operation by the press machine and vibration data of a frame of the press machine. The feature calculation means calculates, for each press cycle, multiple types of feature amounts including load feature amounts and vibration feature amounts based on the measurement data acquired by the data acquisition means. The generation means performs machine learning on the correlation between the multiple types of feature amounts calculated by the feature calculation means and the die state, and generates a prediction model for predicting the presence or absence of an abnormality in the die for each press cycle. The model storage means stores the prediction model generated by the generation means.

[0010] Preferably, the generation means performs machine learning to learn correlations between multiple types of features and the mold condition for each mold pattern, and the model storage means stores the prediction model in association with mold identification information that identifies the mold pattern.

[0011] When the press is a multi-stage press equipped with multiple dies, it is preferable that the generating means generates a prediction model that takes multiple types of feature quantities as input and outputs the presence or absence of an abnormality for each die. Note that, in a broad sense, each die means a die for each process, without distinguishing between upper and lower dies, and in a narrow sense, means the upper and lower dies for each process.

[0012] In a configuration in which the frame has first and second support columns provided on the upstream and downstream sides of the molds, respectively, the feature amount calculation means preferably calculates a first vibration feature amount based on vibration data from a vibration meter attached to the first support column, and calculates a second vibration feature amount based on vibration data from a vibration meter attached to the second support column. Each vibration feature amount includes at least one of a wave height vector, a time vector, and a frequency vector, and preferably includes at least a frequency vector. More preferably, each vibration feature amount includes a frequency vector, and a wave height vector or a time vector.

[0013] In addition to the load feature and the vibration feature, the feature calculation means preferably further calculates at least one of the die contact time, the die height value, the die temperature, the amount of die lubricant, and the number of die shots. The types of feature preferably include the die temperature and the amount of die lubricant. By adding these to the explanatory variables of the prediction model, the magnitude of the load on the die can be detected with high accuracy. When the press is a multi-stage press equipped with multiple dies, it is preferable that the die temperature, the amount of die lubricant, and the number of die shots are measured for each die (at least for each process).

[0014] A die abnormality prediction device according to another aspect of the present invention is a die abnormality prediction device for predicting the presence or absence of an abnormality in a die mounted on a press machine, and includes a storage means for storing a prediction model generated by any one of the learning devices described above. Also, the device includes a data acquisition means for acquiring measurement data, including load data applied to a workpiece during press operation by the press machine and vibration data of a frame of the press machine, for each press cycle, a feature amount calculation means for calculating, for each press cycle, a plurality of types of feature amounts, including load feature amounts and vibration feature amounts, based on the measurement data acquired by the data acquisition means, a prediction means for inputting the plurality of types of feature amounts calculated by the feature amount calculation means into a prediction model stored in the storage means to predict the presence or absence of an abnormality in the die for each press cycle, and an output means for outputting a prediction result by the prediction means.

[0015] Preferably, the storage means stores a plurality of prediction models in association with die identification information for identifying a die pattern. In this case, it is preferable that the die abnormality prediction device further includes a model discrimination means for discriminating a prediction model to be used for die abnormality prediction from among the plurality of prediction models, based on the die pattern corresponding to the current press operation, before the start of press operation by the press machine.

[0016] A learning program according to yet another aspect of the present invention is a learning program that generates a predictive model by machine learning to predict the presence or absence of an abnormality in a die mounted on a press machine, and causes a computer to execute the following steps: calculating multiple types of feature quantities including load feature quantities and vibration feature quantities for each press cycle based on measurement data including load waveform data applied to a workpiece during press operation by the press machine and vibration waveform data of the frame of the press machine; learning the correlation between the calculated multiple types of feature quantities and the die state by machine learning to generate a predictive model for predicting the presence or absence of an abnormality in the die for each press cycle; and storing the generated predictive model in a model storage means. Effect of the Invention

[0017] According to the present invention, abnormalities in a mold can be detected with high accuracy using a prediction model. [Brief description of the drawings]

[0018] [Figure 1] 1 is a diagram showing a schematic configuration of a forging press apparatus according to an embodiment of the present invention; [Diagram 2] 1 is a diagram showing a schematic diagram of a press machine and sensors provided in a forging press apparatus according to an embodiment of the present invention. FIG. [Diagram 3] FIG. 2 is a diagram showing a schematic diagram of the peripheral structure of a press machine according to an embodiment of the present invention, and operating status information detected by sensors. [Figure 4] FIG. 2 is a diagram showing a schematic example of an arrangement of dies provided in a press machine according to an embodiment of the present invention. [Diagram 5] 1 is a block diagram showing a functional configuration of a learning device according to an embodiment of the present invention; [Figure 6] 1 is a flowchart showing a method for generating a prediction model by a learning device according to an embodiment of the present invention. [Figure 7] 13(A) to 13(C) are graphs for explaining a method for calculating a feature amount of frame vibration. [Figure 8] 13(A) to 13(D) are graphs for explaining a method for calculating a feature amount of frame vibration. [Figure 9] 1 is a block diagram showing a functional configuration of a mold abnormality prediction device according to an embodiment of the present invention. [Figure 10] 4 is a flowchart showing a mold abnormality prediction method by the mold abnormality prediction device according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.

[0020] In this embodiment, the forging press machine will be described as having a function of detecting an abnormality in the die based on the learning results of the learning device.

[0021] <Outline of forging press equipment> First, a schematic configuration of a forging press apparatus 10 will be described with reference to Fig. 1 to Fig. 3. As shown in Fig. 1, the forging press apparatus 10 includes a press machine 11 that presses a workpiece, and a PLC (programmable logic controller) 40 that controls the operation of the press machine 11.

[0022] 2, the press 11 includes a slide 1 and a bolster 2 that are provided vertically facing each other within a frame 3. The frame 3 includes a pair of support columns 3a, 3b arranged on the front side of the press 11, and a pair of support columns 3c, 3d arranged on the rear side of the press 11. The press 11 is configured such that the slide 1 connected to a connecting rod 5 moves up and down by driving the crankshaft 4 to rotate.

[0023] A flywheel 8, which is driven to rotate by a belt 7 by a main motor 6, is connected to one end of the crankshaft 4 via a clutch 9. A brake device 12 is attached to the other end of the crankshaft 4, which stops the rotation of the crankshaft 4 and stops the slide 1. In the press 11, the main motor 6 drives the flywheel 8 to rotate at a constant speed, and the clutch 9 is turned on to transmit the rotation of the flywheel 8 to the crankshaft 4, thereby raising and lowering the slide 1, thereby forging the workpiece placed on the bolster 2. The workpiece is processed into a size and shape according to the pattern of a die including a lower die (not shown) installed on the bolster 2 and an upper die (not shown) installed at the lower end of the slide 1, to become a final product. The "die" means a die used for forging. The die is typically made of special steel.

[0024] The forging press 10 in this embodiment is a device that processes a workpiece by hot forging. The forging press 10 is equipped with a plurality of sensors as described below in order to detect the operating status of the press 11. As will be described later, the press 11 may be a multi-stage press that processes a workpiece through a plurality of steps. In other words, the press 11 may be equipped with a plurality of dies. Load sensor 20: Detects the load applied to the workpiece. For example, it is configured with a strain gauge that detects the distortion of the frame 3. Angle sensor 21: Detects the rotation angle (press angle) of the crankshaft 4 to detect the position of the slide 1 and the speed (stroke) of the slide 1. Brake release pressure sensor 22: Detects the release pressure of the brake device 12. Clutch pressure sensor 23: Detects the pressure of the clutch 9. Clutch tank pressure sensor 24: Detects the pressure of the hydraulic oil that drives the clutch 9. Brake tank pressure sensor 25: Detects the pressure of the cooling water for the brake device 12. Coolant flow rate sensor 26: Detects the flow rate of the cooling water for the brake device 12. BKO position displacement sensor 27: Detects the position of the lower knockout device of the press machine 11 (BKO position). · SKO position displacement sensor 28: Detects the position of the upper knockout device (SKO position). Resistance temperature detector 29: Detects the temperature of each part of the press machine 11. Lubricant flow rate sensor 30: Detects the flow rate of the lubricant that lubricates the die. Air blow pressure sensor 31: Detects the pressure of the high-pressure air supplied to the press machine 11. Material temperature sensor 32: Detects the temperature of the material supplied to the press machine 11. Die height displacement sensor 33: Detects the die height of the press machine 11 (the distance between the bolster 2 and the bottom dead center position of the slide 1). Mold temperature sensor 34: Detects the temperature of the mold.

[0025] 3, the forging press 10 further includes a conveying device 13 and a heater 14. The conveying device 13 is, for example, a belt conveyor, and conveys the workpiece W from the previous process to the press 11 (position of the bolster 2). The heater 14 is disposed upstream of the press 11, and is provided to prevent hardening of the workpiece W during transport by the conveying device 13. The heater 14 is, for example, a tunnel furnace.

[0026] The material temperature sensor 32 detects the temperature of the workpiece W (the workpiece W near the outlet of the heater 14) immediately after passing through the heater 14. The die temperature sensor 34 detects the temperature of a die mounted on the press machine 11.

[0027] In addition to the above-mentioned sensors, the forging press device 10 may further include a timer (not shown) that detects the time required for the workpiece W to reach the press position from the outlet of the heater 14 (heater outlet-press time). Also, a workpiece presence / absence sensor (not shown) that detects the presence or absence of the workpiece W near the outlet of the heater 14 may be further provided.

[0028] The press machine 11 in this embodiment is a multi-stage press machine, which uses a plurality of dies to form the workpiece W in stages. An example of the arrangement of the dies is shown in Fig. 4. In the example of Fig. 4, the press machine 11 is equipped with three dies 51 to 53 arranged along the conveying direction A1 of the workpiece W. In this case, the workpiece W is formed in stages through a first step (step I) using the die 51, a second step (step II) using the die 52, and a third step (step III) using the die 53 in this order.

[0029] Upper dies 51a, 52a, 53a of the respective dies 51 to 53 are fixed to the lower end of the slide 1 in the frame 3, and move up and down simultaneously. Lower dies 51b, 52b, 53b of the respective dies 51 to 53 are fixed to the upper end of the bolster 2 in the frame 3. In the following description, when it is not necessary to distinguish between the three pairs of upper and lower dies 51a, 51b, 52a, 52b, 53a, 53b, they will be referred to as "dies 50."

[0030] Each of the dies 51-53 of the press machine 11 is lubricated by a lubricating liquid supplied from a die lubricating means 60 (shown in phantom lines). In this case, the lubricating liquid flow rate sensor 30 and the die temperature sensor 34 are typically provided for each die 50.

[0031] The load sensor 20 is attached to one of the pillars (for example, the pillar 3c) of the frame 3. Also, a vibrometer 35 is attached to each of the left and right pillars 3c, 3d of the frame 3. One of the pillars 3c, 3d (pillar 3c) is located upstream in the conveying direction from the die 51 of step I, and the other of the pillars 3c, 3d (pillar 3d) is located downstream in the conveying direction from the die 53 of step III. Each of the vibrometers 35 is, for example, an acceleration sensor, and detects vibrations of the frame 3. Specifically, each of the vibrometers 35 detects vibrations in the approximately horizontal direction (front-back or left-right direction) of the pillars 3c, 3d to which it is attached.

[0032] 1 again, the forging press machine 10 is equipped with a die abnormality prediction device (hereinafter abbreviated as "abnormality prediction device") 200 that predicts the presence or absence of abnormality in the dies 51 to 53. The abnormality prediction device 200 predicts the presence or absence of abnormality in each die 50 based on a prediction model generated by the learning device 100. The learning device 100 and the abnormality prediction device 200 constitute a die abnormality prediction system SYS.

[0033] The learning device 100 and the anomaly prediction device 200 acquire detection signals from a plurality of sensors through or without the PLC 40. The PLC 40 and these devices 100, 200 are connected by wire or wirelessly. The learning device 100 and the anomaly prediction device 200 are realized by a computer including a processor such as a CPU (Central Processing Unit) and a memory. Note that, although an example in which the PLC 40 and the anomaly prediction device 200 are provided separately is shown in the present embodiment, this is not limiting, and the PLC 40 may have the function of the anomaly prediction device 200 as described later.

[0034] <Learning device> (Functional configuration) 5 is a block diagram showing the functional configuration of a learning device 100 according to this embodiment. The learning device 100 mainly includes a data acquisition unit 101, a format conversion unit 102, a result acquisition unit 103, a learning unit 104, and a model storage unit 114. The model storage unit 114 stores prediction models M1, M2, ... for each die pattern.

[0035] In this embodiment, the "die pattern" is specified by the product number (model number) corresponding to the shape of the dies 51 to 53 and the work pattern indicating the arrangement pattern of the workpiece W on the dies 51 to 53. When the workpieces W are continuously pressed by the forging press device 10, the product numbers of these workpieces W are common. The arrangement pattern of the workpiece W on the dies 51 to 53 includes a pattern in which the workpiece W is arranged on all of the dies 51 to 53, a pattern in which the workpiece W is arranged only on the first die 51, a pattern in which the workpiece W is arranged only on the last die 53, and the like. Although the arrangement mode of the workpiece W corresponding to the product number is determined one-to-one, since the workpiece W is transported sequentially, at the start and end of the press operation, the workpiece W is arranged only on some of the dies 51 to 53 in a pattern different from the arrangement mode of the workpiece W. The arrangement mode of the workpiece W corresponding to the product number includes a pattern in which the workpiece W is arranged sequentially on all of the dies 51 to 53, a pattern in which the workpiece W is arranged on the dies 51 to 53 every other die, and the like. The information for identifying the mold pattern may further include the projected area of ​​the workpiece W.

[0036] The data acquisition unit 101 acquires measurement data from sensors included in the forging press 10 during operation of the press machine 11 (during press operation by the forging press 10). In this embodiment, the data acquisition unit 101 acquires measurement data (hereinafter referred to as "cycle measurement data") and die pattern data for each press cycle.

[0037] The cycle measurement data is primary data, and includes at least the load data obtained from the load sensor 20 and the vibration data obtained from the vibration meter 35. The cycle measurement data desirably further includes at least one of the temperature data of each mold 50 obtained from the mold temperature sensor 34, the lubricant data of each mold 50 obtained from the lubricant flow rate sensor 30, and the shot number data of each mold 50 counted for each press cycle.

[0038] The cycle measurement data acquired by the data acquisition unit 101 is stored in chronological order in the primary data storage unit 111, with a uniquely determined identification number (hereinafter referred to as "cycle No.") as a heading. Each cycle measurement data DT1 is stored in the primary data storage unit 111 together with the corresponding die pattern data. As described above, the die pattern data includes the product number and workpiece pattern of the target workpiece W. The product number of the workpiece W is input by a user (operator or manager) via an input unit (not shown), for example, before the start of press operation by the forging press apparatus 10. The workpiece pattern is detected by a workpiece pattern detection means (not shown) provided in the forging press apparatus 10.

[0039] The format conversion unit 102 converts the format of the primary data into secondary data in a format suitable for machine learning. Specifically, the format conversion unit 102 functions as a feature amount calculation means, and calculates multiple types of feature amounts that become explanatory variables of a prediction model based on the cycle measurement data DT1. More specifically, multiple types of feature amounts including at least a load feature amount and a vibration feature amount are calculated for each press cycle.

[0040] The types of feature quantities (secondary data) calculated by the format conversion unit 102 are detailed in Table 1 below. Table 1 lists the types of feature quantities and the data items for each type. It also lists the type of each data item (scalar or vector).

[0041] [Table 1]

[0042] The "load feature amount" is an index that can be calculated based on the load data obtained from the load sensor 20, and includes the load peak value or the load increase slope. The load increase slope is calculated as the slope of a linear expression that passes through two points, the rising position and the peak position of the forming load curve. In this embodiment, the load feature amount includes both the load peak value and the load increase slope. It is considered that this makes it possible to accurately predict the presence or absence of an abnormality in each mold 50, which is directly related to the quality of the product.

[0043] The "mold contact time" is also an index that can be calculated based on the load data obtained from the load sensor 20, and the time between the rising position and the peak position of the molding load curve is calculated as the mold contact time. In this way, the mold contact time is calculated as one characteristic amount, not for each of the molds 51 to 53.

[0044] The feature amount of the “die height value” is calculated from the output value (die height data) from the die height displacement sensor 33. By taking into consideration not only the load feature amount but also the die height value, it becomes possible to more accurately predict the presence or absence of wear of the dies 51 to 53.

[0045] The feature quantity of "mold temperature" is calculated based on temperature data obtained from the mold temperature sensor 34 attached to each mold 50. The mold temperature sensor 34 may be provided only on the lower molds 51b, 52b, 53b for each of the processes I to III, and only the feature quantities of the temperatures of the lower molds 51b, 52b, 53b may be calculated. The feature quantity of the temperature of each mold 50 (at least the lower molds 51b, 52b, 53b) is calculated as the average temperature of a designated area immediately before pressing (during workpiece transport), for example. Note that the feature quantity of the mold temperature may be the maximum temperature, the minimum temperature, or the like in addition to / instead of the average temperature.

[0046] The feature amount of "die lubricant amount" is calculated based on lubricant amount data obtained from a lubricant flow sensor 30 provided in a lubricant path to each die 50. The feature amount of lubricant for each die 50 is, for example, the amount (total amount) of lubricant for each die 50 immediately before pressing (during workpiece transport).

[0047] The feature amount of "frame vibration" is calculated based on vibration data obtained from vibration meters 35 provided on the left and right supports 3c, 3d of the frame 3. The feature amount of each of the left and right frame vibrations includes, for example, at least one of a wave height vector, a time vector, and a frequency vector in a specific section of one cycle. As shown in Table 1, the feature amount of the frame vibration preferably includes two items, the wave height vector and the frequency vector, but may also include two items, the time vector and the frequency vector. In this way, it is desirable to include at least the frequency vector. A specific method for calculating the feature amount of the frame vibration will be described later in detail.

[0048] The feature quantity of “number of mold shots” is a value common to the primary data and includes the number of shots (cumulative) for each mold 50 .

[0049] The cycle characteristic data DT2 including the multiple types of feature amounts calculated by the format conversion unit 102 is stored as secondary data in the secondary data storage unit 112. Each cycle characteristic data DT2 is stored in the secondary data storage unit 112, for example, in association with the same cycle number and mold pattern data as the original cycle measurement data DT1.

[0050] The result acquisition unit 103 acquires die abnormality information input by a user via an input means such as the operation unit 120. The die abnormality information is information indicating, for example, which die 50 an abnormality occurred in which press cycle. The result acquisition unit 103 generates result data indicating the die state for each press cycle (hereinafter referred to as "cycle result data") based on the acquired die abnormality information. The cycle result data DT3 generated by the result acquisition unit 103 is stored in the result data storage unit 113, for example, in association with a cycle number. The "die state" represents the state (abnormal / absent) of each die 50. Note that each cycle result data DT3 is not limited to being stored in association with a cycle number as long as it is possible to identify which cycle measurement data DT1 or cycle characteristic data DT2 the data corresponds to.

[0051] The learning unit 104 uses a large number of cycle characteristic data DT2 stored in the secondary data storage unit 112 and a large number of cycle result data DT3 stored in the result data storage unit 113 as teacher data to machine-learn correlations between multiple types of feature values ​​for each press cycle and the die state. That is, a prediction model is generated for predicting the presence or absence of a die abnormality for each press cycle. As the machine learning algorithm for the prediction model, a known algorithm, for example, isolation forest, is used. Isolation forest is a general-purpose machine learning algorithm used for anomaly detection.

[0052] In this embodiment, the learning unit 104 performs machine learning of correlations between multiple types of feature amounts and the die state for each "die pattern" and generates prediction models M1, M2, ... for the number of die patterns (i.e., the number of combinations of part numbers and work patterns). The multiple prediction models M1, M2, ... generated by the learning unit 104 are stored in the model storage unit 114. In other words, the model storage unit 114 stores each prediction model in association with die identification information that identifies the die pattern.

[0053] The functions of the above-mentioned data acquisition unit 101, format conversion unit 102, result acquisition unit 103, and learning unit 104 are realized by a processor executing software. The operation unit 120 is composed of a user interface such as a keyboard, a mouse, or a touch panel. The primary data storage unit 111, the secondary data storage unit 112, the result data storage unit 113, and the model storage unit 114 are typically composed of non-volatile storage devices provided in a computer.

[0054] (About operation) FIG. 6 is a flowchart showing a method for generating a prediction model by the learning device 100 according to this embodiment. The model generation process shown in FIG. 6 is realized by the processor of the learning device 100 executing a learning program stored in advance in the memory. This process is started in response to a user inputting an instruction to start learning via the operation unit 120. In this embodiment, it is assumed that before this process is started, a plurality of cycle measurement data DT1 are stored in the primary data storage unit 111 in chronological order in association with the cycle number and the mold pattern data. It is also assumed that a plurality of cycle result data DT3 are stored in the result data storage unit 113 in association with the cycle number.

[0055] Referring to Figure 6, the learning device 100 identifies one die pattern (in a predetermined order) from the combination of the part number of the workpiece W and the workpiece pattern (step S2), and searches the primary data memory unit 111 for cycle measurement data DT1 corresponding to that die pattern (step S4).

[0056] Thereafter, the format conversion unit 102 reads out all of the searched (target) cycle measurement data DT1 from the primary data storage unit 111 (step S6), and converts each of the read cycle measurement data DT1 into cycle feature data DT2 (step S8). In other words, the format conversion unit 102 calculates the multiple types of feature amounts shown in Table 1 above based on each data included in the cycle measurement data DT1, and records them as cycle feature data DT2 in the secondary data storage unit 112. Here, an example of calculating the feature amount for "frame vibration" will be described with reference to Figs. 7 and 8.

[0057] FIG. 7(A) is a graph showing the stroke of slide 1 along the time axis. FIG. 7(B) and (C) are graphs showing the transition of the magnitude of vibration (pulse) along the same time axis as FIG. 7(A), and the unit of the vertical axis is, for example, "m / s 2 " Figure 8(B) is a graph showing the stroke of slide 1, just like Figure 7(A). Figure 8(A) is a graph showing the brake slack signal along the same time axis. Figure 8(C) is a graph showing the transition of the magnitude of vibration (pulse), just like Figures 7(B) and (C). Figure 8(D) is a graph showing the transition of power spectrum density with frequency on the horizontal axis (unit: Hz). Note that in this case, it is assumed that the vibrations detected by a vibration meter 35 attached to the rear left support 3c of the frame 3 are shown.

[0058] A method for calculating a pulse height vector will be described with reference to FIG. 7(B). The format conversion unit 102 extracts pulses in a section TS that are above a baseline (predetermined value) BL, and divides the extracted section TS into d rectangular pieces along the time axis. Then, the pulse data is converted into a d-dimensional vector (p=[h1, h2, . . . , h j ,···,h d ]) and calculate the wave height vector. j " is the average value within each strip.

[0059] A method for calculating a time vector will be described with reference to Fig. 7(C). The format conversion unit 102 converts the pulses in the section TS into a vector with a magnitude of d in the pulse height direction. wDivide it into pieces and cross this dividing line (horizontal line) 2d w Get the time. Then, convert the time data into 2d w dimensional vector (q=[w1,w2,...,w j ,···,w 2d ]) to calculate the time vector. j " selects two outer intersection points relative to the pulse apex position. For example, focusing on the dividing line Lx, times t1 and t4 of the outer intersection points are selected, and times t2 and t3 are not selected. Time t1 corresponds to the time when the upper mold of the dies 51 to 53 starts to contact the workpiece W, and time t4 corresponds to the time when the upper mold of the dies 51 to 53 starts to separate from the workpiece W.

[0060] A method for calculating a frequency vector will be described with reference to Fig. 8. The format conversion unit 102 extracts three types of analysis intervals, namely, a "pre-stroke interval", a "pre-die contact interval", and a "die contact interval", from the vibration waveform shown in Fig. 8(C). The "pre-stroke interval" is an interval before time t11 when the brake release signal shown in Fig. 8(A) turns ON. The "pre-die contact interval" is an interval from time t11 to time t12 when the stroke position shown in Fig. 8(B) turns to the die contact position. The "die contact interval" is an interval from time t12 to time t13 when the brake release signal shown in Fig. 8(A) turns OFF.

[0061] The format conversion unit 102 performs a Fourier transform on the vibration signal for each analysis interval to calculate the power spectrum density PSD. Fig. 8(D) shows the waveform of the power spectrum density from 0 to fs / 2 Hz. "fs" is the sampling frequency, and in this example, fs / 2=50.

[0062] The format conversion unit 102 converts, for example, the lower limit frequency f min =0, upper frequency limit f max = fs / 2, and divide this section FS into d rectangular pieces (for example, 20 pieces). The power spectral density PSD in the section FS is expressed as a d-dimensional vector (p = [h1, h2, . . . , h j ,···,hd ], except for "h j " is the average value within each strip). This gives a frequency vector for each analysis interval.

[0063] Of the three types of analysis intervals, it is possible to calculate the frequency vectors only for the "die contact interval" that is closely related to the dies 51 to 53. In other words, the frequency vectors for the "pre-stroke interval" and the "pre-die contact interval" do not need to be included in the cycle feature data DT2.

[0064] Furthermore, the analysis interval used to calculate the frequency vector may be used to calculate the wave height vector described above. That is, as shown in Fig. 8(C) , each analysis interval may be divided into d rectangular pieces (e.g., 20 pieces), and the pulse data may be processed into a d-dimensional vector for each analysis interval to calculate the wave height vector. In this case, too, the format conversion unit 102 may calculate only the wave height vector of the "mold contact interval".

[0065] Cycle characteristic data DT2 including at least one of the vibration wave height vector, vibration time vector, and vibration frequency vector calculated by the above-mentioned method is associated with the same cycle number as the target cycle measurement data DT1 and recorded in the secondary data storage unit 112. As shown in Fig. 5, the cycle characteristic data DT2 may also be stored in association with the target mold pattern data.

[0066] 6 again, next, the learning unit 104 reads all of the cycle result data DT3 corresponding to the cycle measurement data DT1 read in step S6 from the result data storage unit 113 (step S10). Specifically, the cycle result data DT3 associated with the same cycle number as the target cycle measurement data DT1 is read. This allows the result data corresponding to each cycle characteristic data DT2 obtained in step S8 (i.e., data indicating the presence or absence of anomalies in each type 50) to be extracted.

[0067] The learning unit 104 performs machine learning on the correlation between the cycle feature data DT2 obtained in step S8 and the cycle result data DT3 read out in step S10 (step S12). That is, the learning unit 104 generates a prediction model in which a plurality of types of feature quantities are input and the presence or absence of anomalies in each die 50 (individual die), i.e., the die state, is output. After generating the prediction model, the learning unit 104 stores the prediction model in the model storage unit 114 in association with die identification information that identifies the die pattern (product number, work pattern) specified in step S2 (step S14).

[0068] If there are any unprocessed die patterns among the combinations of the part number of the workpiece W and the workpiece pattern (YES in step S16), the process returns to step S2 and repeats the above process. When the process for all die patterns is completed (NO in step S16), the series of model generation processes ends. As a result, the model storage unit 114 stores prediction models M1, M2, ... for the number of combinations of the part number of the workpiece W and the workpiece pattern. The example in Figure 5 shows that prediction model M1 is a trained model for part number "30" and work pattern No. "15", and prediction model M2 is a trained model for part number "80" and work pattern No. "15".

[0069] As described above, according to this embodiment, in addition to the load feature including the load peak value or load increase slope, at least the vibration feature of the left (upstream) support 3c and the vibration feature of the right (downstream) support 3d are used as explanatory variables of the prediction model. When an abnormality occurs in any of the multiple dies 51-53, depending on the position (process), a difference occurs between the left and right vibration feature, or even if there is almost no difference, both vibration feature values ​​become abnormal values. Therefore, by including the left and right vibration feature in the explanatory variables of the prediction model, it is possible to predict which of the dies 51-53 has an abnormality. In addition, in this embodiment, by adding at least one of the temperature data, lubricant volume data, and shot number data for each die 50 to the explanatory variables of the prediction model, it is possible to accurately predict which of the upper and lower dies of the dies 51-53 has an abnormality.

[0070] <Anomaly prediction device> (Functional configuration) 9 is a block diagram showing a functional configuration of an abnormality prediction device 200 according to this embodiment. The abnormality prediction device 200 mainly includes a model storage unit 213, a data acquisition unit 202, a format conversion unit 203, a prediction unit 204, and an output unit 230.

[0071] The model storage unit 213 stores in advance a plurality of prediction models M1, M2, ... generated by the learning device 100. In the model storage unit 213, each prediction model is also stored in association with the die identification information. The learning device 100 and the abnormality prediction device 200 are connected, for example, via a network, and a communication unit (not shown) of the abnormality prediction device 200 receives the prediction models M1, M2, ... stored in the model storage unit 114 from a communication unit (not shown) of the learning device 100, and stores the received prediction models M1, M2, ... in the model storage unit 213. Alternatively, the prediction models M1, M2, ... stored in the model storage unit 114 of the learning device 100 may be stored in the model storage unit 213 using a removable recording medium.

[0072] After the press machine 11 starts operating, the data acquisition unit 202 acquires, for each press cycle, measurement data (cycle measurement data) DT11 of the same type as the cycle measurement data DT1 in the learning device 100, together with the die pattern data.

[0073] The format conversion unit 203 functions as a feature calculation means, similar to the format conversion unit 102 of the learning device 100. That is, based on the cycle measurement data DT11, the format conversion unit 203 calculates the multiple types of feature amounts shown in Table 1 above, and generates cycle feature data DT12 including these feature amounts.

[0074] The prediction unit 204 first determines a prediction model to be used for predicting an abnormality in the dies 51-53 for each cycle based on the acquired die pattern data. Specifically, the prediction model corresponding to the die pattern in the current cycle is determined from among a plurality of prediction models M1, M2, ... stored in the model storage unit 213. Then, a plurality of types of feature amounts included in the cycle characteristic data DT12 are input to the determined prediction model to predict the presence or absence of an abnormality in the dies 51-53. In other words, the "die state" output by the prediction model becomes the predicted result.

[0075] The output unit 230 outputs the prediction results by the prediction unit 204. The output unit 230 outputs the presence or absence of an abnormality in each mold 50 for each press cycle. In addition, the output unit 230 may further output the importance of the data items listed in Table 1 (degree of influence on the prediction result) and the confidence level of the prediction result.

[0076] The functions of the data acquisition unit 202, the format conversion unit 203, and the prediction unit 204 described above are realized by the processor executing software. The model storage unit 213 is typically configured by a non-volatile storage device included in the computer. The output unit 230 is typically configured by a display unit that displays the prediction result. The output unit 230 may be configured by a communication unit that outputs the prediction result to the monitoring PC 42 shown in FIG. 1 via the PLC 40 or without the PLC 40.

[0077] (About operation) Fig. 10 is a flowchart showing an abnormality prediction method for the dies 51 to 53 by the abnormality prediction device 200 according to the present embodiment. The abnormality prediction process shown in Fig. 10 is realized by the processor of the abnormality prediction device 200 executing an abnormality prediction program stored in advance in the memory.

[0078] Referring to FIG. 10, when the operation of the press machine 11 is started, the data acquisition unit 202 acquires cycle measurement data DT11 including output data from predetermined sensors equipped in the forging press device 10 together with die pattern data (step S26).

[0079] Next, the format conversion unit 203 converts the cycle measurement data DT11 acquired by the data acquisition unit 202 in step S26 into cycle feature data DT12 (step S28). That is, the format conversion unit 203 calculates multiple types of feature amounts shown in Table 1 above based on each data included in the cycle measurement data DT11.

[0080] Furthermore, the prediction unit 204 determines a prediction model to be used this time from among the multiple prediction models M1, M2, ... stored in the model storage unit 213 based on the mold pattern data acquired by the data acquisition unit 202 in step S26 (step S29). The process of determining the prediction model may be performed in parallel with the process of converting the data format.

[0081] The prediction unit 204 inputs the cycle characteristic data DT12 (i.e., multiple types of characteristic amounts for one cycle) obtained in step S28 into the prediction model determined in step S29, and predicts the presence or absence of an abnormality in each mold 50 for each press cycle (step S30).

[0082] The output unit 230 outputs the prediction result, which is the output of the prediction model, that is, the presence or absence of an abnormality for each mold 50 (step S32). As an example, as shown in FIG. 9, the presence or absence of an abnormality is displayed for each of the upper mold (mold I up) of mold 51, the lower mold (mold I down) of mold 51, the upper mold (mold II up) of mold 52, ..., and the lower mold (mold III down) of mold 53. This makes it possible to easily identify a mold 50 that may be abnormal. Note that the abnormality prediction results for molds 51 to 53 may be output without distinguishing between upper and lower molds.

[0083] The output unit 230 also outputs, for example, a graph showing the degree of influence of the data items listed in Table 1 on the prediction result (output of the prediction model) in step S30, and outputs the confidence level of the prediction result in step S30 as a numerical value (%) (step S33). The confidence level may be output for the prediction result (abnormality present / abnormality not present) for each type 50.

[0084] In this manner, in this embodiment, i) the abnormality prediction result of the molds 51 to 53, ii) the importance of each data item with respect to the prediction result, and iii) the confidence level of the prediction result are output. This makes it possible to easily take measures against the prediction result.

[0085] The processes of steps S26 to S33 are repeatedly executed until the press operation is completed (NO in step S34).

[0086] As described above, the die abnormality prediction system SYS according to this embodiment includes the learning device 100. Therefore, the abnormality prediction device 200 can detect (predict) abnormalities in the dies 51-53 without relying on the experience of the worker by using the prediction model generated by the learning device 100. Since the dies 51-53 have a higher failure frequency than other parts, this embodiment can reduce the burden on the worker.

[0087] Furthermore, in this embodiment, since the presence or absence of an abnormality in the dies 51 to 53 can be predicted in real time for each press cycle, the abnormality in the dies 51 to 53 can be found at an early stage. Therefore, it is possible to prevent or suppress mass production of defective products by the press machine 11. Note that, when an abnormality is predicted in any of the dies 50 by the prediction model, the operation of the press machine 11 may be automatically stopped.

[0088] (Modification) In the present embodiment, the example has been described in which the vibrometer 35 is attached to the rear pillars 3c, 3d of the frame 3 and the vibration feature values ​​of the rear pillars 3c, 3d are used for abnormality prediction, but this is not limitative, and the vibrometer 35 may be attached to the front pillars 3a, 3d and the vibration feature values ​​of the rear pillars 3c, 3d may be used for abnormality prediction. Alternatively, the vibrometer 35 may be attached to all four pillars 3a to 3d and the vibration feature values ​​of the four pillars 3a to 3d may be used for abnormality prediction.

[0089] In addition, in this embodiment, the learning unit 104 generates a predictive model that outputs the presence or absence of an abnormality in each mold 50, but it is also possible to generate a predictive model that outputs the presence or absence of an abnormality in the molds 51 to 53 for each process equipped in the press machine 11, regardless of whether they are upper or lower molds.

[0090] In addition, in the present embodiment, an example has been described in which the press machine 11 is equipped with the dies 51 to 53, but the number of dies is not limited to three. Furthermore, the number of dies is not limited to a plurality of dies, and may be one.

[0091] In addition, the prediction models M1, M2, ... are stored in advance in the model storage unit 213 of the anomaly prediction device 200, but the prediction models M1, M2, ... in the model storage unit 213 may be updated in accordance with machine learning by the learning device 100. Alternatively, the anomaly prediction device 200 may have the functions of the learning device 100.

[0092] Further, in the present embodiment, the forging press 10 is equipped with the abnormality prediction device 200, but this is not limited thereto, and the abnormality prediction device 200 may predict the presence or absence of an abnormality in the dies 51-53 offline.

[0093] The learning method executed by the learning device 100 can also be provided as a program. Similarly, the abnormality prediction method for the molds 51-53 executed by the abnormality prediction device 200 can also be provided as a program. Such a program can be provided by being recorded on an optical medium such as a CD-ROM (Compact Disc-ROM) or a computer-readable non-transitory recording medium such as a memory card. Also, the program can be provided by downloading via a network.

[0094] The program according to the present invention may be one that executes processing by calling necessary modules in a predetermined sequence at a predetermined timing among program modules provided as part of a computer's operating system (OS). In this case, the program itself does not include the above modules, and executes processing in cooperation with the OS. Programs that do not include such modules may also be included in the program according to the present invention.

[0095] The program according to the present invention may be provided by being incorporated into a part of another program. In this case, the program itself does not include the modules included in the other program, and executes processing in cooperation with the other program. Such a program incorporated into another program may also be included in the program according to the present invention.

[0096] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0097] 3 frame, 3a, 3b, 3c, 3d pillars, 10 forging press device, 11 press machine, 20 load sensor, 35 vibration meter, 51, 52, 53 mold, 100 learning device, 101, 202 data acquisition unit, 102, 203 format conversion unit, 103 result acquisition unit, 104 learning unit, 111 primary data storage unit, 112 secondary data storage unit, 113 result data storage unit, 114, 213 model storage unit, 120 operation unit, 200 abnormality prediction device, 204 prediction unit, 230 output unit, DT1, DT11 cycle measurement data, DT2, DT12 cycle feature data, DT3 cycle result data, M1, M2 prediction model, SYS mold abnormality prediction system, W work.

Claims

1. A learning device that generates a prediction model by machine learning to predict the presence or absence of an abnormality in a die mounted on a press machine, a data acquisition means for acquiring measurement data for each press cycle, the measurement data including load data applied to a workpiece during press operation by the press machine and vibration data in a substantially horizontal direction detected by a vibration meter attached to a support column of a frame of the press machine; a feature calculation means for calculating a plurality of types of feature amounts including a load feature amount and a vibration feature amount for each press cycle based on the measurement data acquired by the data acquisition means; a generation means for performing machine learning on the correlation between the plurality of types of feature quantities calculated by the feature quantity calculation means and a die state, and generating a prediction model for predicting the presence or absence of an abnormality in the die for each press cycle; A learning device comprising: a model storage means for storing the predictive model generated by the generation means.

2. A learning device that generates a predictive model for predicting the presence or absence of an abnormality in a die mounted on a press machine by machine learning, a data acquisition means for acquiring measurement data including load data applied to a workpiece during press operation by the press machine and vibration data of a frame of the press machine for each press cycle; a feature calculation means for calculating a plurality of types of feature amounts including a load feature amount and a vibration feature amount for each press cycle based on the measurement data acquired by the data acquisition means; a generation means for performing machine learning on the correlation between the plurality of types of feature quantities calculated by the feature quantity calculation means and a die state, and generating a prediction model for predicting the presence or absence of an abnormality in the die for each press cycle; a model storage means for storing the prediction model generated by the generation means, The vibration feature includes at least one of a wave height vector, a time vector, and a frequency vector.

3. The generating means performs machine learning on correlations between a plurality of types of feature amounts and a mold state for each mold pattern, 3. The learning device according to claim 1, wherein the model storage means stores the prediction model in association with die identification information for identifying a die pattern.

4. The press machine is a multi-stage press machine equipped with a plurality of dies, The learning device according to any one of claims 1 to 3, wherein the generating means generates a predictive model that receives a plurality of types of feature quantities as input and outputs the presence or absence of an abnormality for each individual die.

5. the frame has first and second support columns provided on the upstream and downstream sides of the plurality of dies, respectively; 5. The learning device according to claim 4, wherein the feature calculation means calculates a first vibration feature based on vibration data from a vibrometer attached to the first support, and calculates a second vibration feature based on vibration data from a vibrometer attached to the second support.

6. The learning device according to any one of claims 1 to 5, wherein the feature calculation means further calculates at least one of a die contact time, a die height value, a die temperature, a die lubricant amount, and a die shot count in addition to the load feature and the vibration feature.

7. A die abnormality prediction device for predicting the presence or absence of an abnormality in a die mounted on a press machine, A storage means for storing a prediction model generated by the learning device according to any one of claims 1 to 6; a data acquisition means for acquiring measurement data including load data applied to a workpiece during press operation by the press machine and vibration data of a frame of the press machine for each press cycle; a feature calculation means for calculating a plurality of types of feature amounts including a load feature amount and a vibration feature amount for each press cycle based on the measurement data acquired by the data acquisition means; a prediction means for inputting the plurality of types of feature quantities calculated by the feature quantity calculation means into a prediction model stored in the storage means, and predicting the presence or absence of an abnormality in the die for each press cycle; An output means for outputting a prediction result by the prediction means.

8. The storage means stores a plurality of prediction models in association with die identification information for identifying a die pattern, The die abnormality prediction device according to claim 7, further comprising a model discrimination means for discriminating a prediction model to be used for die abnormality prediction from among the plurality of prediction models, based on a die pattern corresponding to a current press operation, before the press operation is started by the press machine.

9. A learning program that generates a predictive model by machine learning to predict the presence or absence of an abnormality in a die mounted on a press machine, calculating a plurality of types of feature quantities including a load feature quantity and a vibration feature quantity for each press cycle based on measurement data including load data applied to a workpiece during press operation by the press machine and vibration data in a substantially horizontal direction detected by a vibrometer attached to a support column of a frame of the press machine; A step of performing machine learning on the correlation between the calculated multiple types of feature amounts and the die state to generate a prediction model for predicting the presence or absence of an abnormality in the die for each press cycle; and storing the generated prediction model in a model storage means.

10. A learning program for generating a predictive model for predicting the presence or absence of an abnormality in a die mounted on a press machine by machine learning, comprising: calculating a plurality of types of feature quantities, including a load feature quantity and a vibration feature quantity including at least one of a wave height vector, a time vector, and a frequency vector, for each press cycle, based on measurement data including load data applied to a workpiece during a press operation by the press machine and vibration data of a frame of the press machine; A step of performing machine learning on the correlation between the calculated multiple types of feature amounts and the die state to generate a prediction model for predicting the presence or absence of an abnormality in the die for each press cycle; and storing the generated prediction model in a model storage means.

Citation Information

Patent Citations

  • Monitoring operation of press by processing vibration signals for each defined event to identify trend

    DE19952834A1

  • Press machine abnormality detector

    JP1979131182A

  • Die changing system

    JP1988199034A

  • Method and device for automatically changing schedule in breakdown of die

    JP1992033721A

  • Strip-shaped material feeding device

    JP2011079050A