Purging device and container storage facility equipped with purging device

The purge device controls supply and discharge flow rates to maintain negative pressure and stability within containment vessels, addressing issues of negative pressure and vibration in existing systems, particularly benefiting sensitive items like semiconductor wafers.

JP7574779B2Active Publication Date: 2024-10-29DAIFUKU CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2021174884
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-10-26
Publication Date
2024-10-29
Estimated Expiration
2041-10-26

AI Technical Summary

Technical Problem

Existing purge gas control systems for containment vessels do not effectively manage the discharge flow rate during changes in supply flow rate, leading to potential negative pressure and vibration of stored objects, particularly sensitive items like semiconductor wafers.

Method used

A purge device with controlled supply and discharge flow rates, where the supply flow rate increases gradually to a first rate, discharge flow rate is initially zero, then maintained at a second rate lower than the first, and finally adjusted to a third rate for stable gas supply and prevention of negative pressure.

Benefits of technology

This configuration maintains negative pressure within the containment vessel, minimizes object vibration, and prevents external contaminants from entering, ensuring a stable and clean environment for stored items.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007574779000001
    Figure 0007574779000001
  • Figure 0007574779000002
    Figure 0007574779000002
  • Figure 0007574779000003
    Figure 0007574779000003
Patent Text Reader

Abstract

To simplify a control configuration while avoiding negative pressure inside a storage container to be purged.SOLUTION: A supply flow control unit performs supply flow increase control for gradually increasing the supply flow rate so that the supply flow rate reaches a first flow rate after the supply of purge gas to a storage container has started and performs supply flow rate maintenance control for maintaining the supply flow rate at equal to or greater than the first flow rate after the supply flow rate has reached the first flow rate. A discharge flow control unit sets the discharge flow rate to zero while executing the supply flow increase control and performs discharge flow maintenance control for maintaining the discharge flow rate at equal to or less than a second flow rate, which is smaller than the first flow rate, after the supply flow rate has reached the first flow rate.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a purge device that uses a purge gas to purge the inside of a containment vessel in which stored objects are stored, and to a container storage facility equipped with the purge device. [Background technology]

[0002] For example, Japanese Patent No. 6052469 (Patent Document 1) discloses a technology for performing a so-called purging process, in which a purge gas is injected into a containment vessel in which objects such as semiconductor wafers or glass substrates are stored to keep the inside of the containment vessel clean. In the following description of the background art, the reference numerals in parentheses refer to those in Patent Document 1.

[0003] In the technique disclosed in Patent Document 1, a purge gas is supplied to the inside (54) of the containment vessel (50) and the purge gas is discharged from the inside (54) of the containment vessel (50). The supply flow rate of the purge gas is adjustable to at least two levels, a first flow rate and a second flow rate that is larger than the first flow rate, and the discharge flow rate of the purge gas from the inside (54) of the containment vessel (50) is controlled to be zero when the supply flow rate of the purge gas is the first flow rate. Even when the supply flow rate of the purge gas is the first flow rate that is smaller than the second flow rate, the discharge flow rate of the purge gas from the inside (54) of the containment vessel (50) is set to zero to prevent the inside (54) of the containment vessel (50) from becoming negative pressure. In this way, the technique disclosed in Patent Document 1 is intended to prevent external dirty air and dust from being sucked into the inside (54) of the containment vessel (50). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 6052469 Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, although Patent Document 1 discloses controlling the flow rate of the purge gas in two stages, it does not disclose how to control the discharge flow rate while the supply flow rate is changing.

[0006] In view of the above circumstances, it is desirable to appropriately control the discharge flow rate of purge gas from the containment vessel while the supply flow rate of purge gas to the containment vessel is changing, while avoiding negative pressure inside the containment vessel being purged. [Means for solving the problem]

[0007] A purge device that purges the inside of a containment vessel in which a stored object is stored with a purge gas, a supply pipe connected to the containment vessel to supply the purge gas to the containment vessel; a supply flow rate control unit that controls a supply flow rate of the purge gas supplied to the containment vessel through the supply pipe; an exhaust pipe connected to the containment vessel to exhaust the purge gas from the containment vessel; a discharge flow rate control unit that controls a discharge flow rate of the purge gas discharged from the containment vessel through the discharge pipe, the supply flow rate control unit performs a supply flow rate increase control to gradually increase the supply flow rate so that the supply flow rate reaches a first flow rate after starting the supply of the purge gas to the containment vessel, and performs a supply flow rate maintenance control to maintain the supply flow rate at or above the first flow rate after the supply flow rate reaches the first flow rate; The discharge flow rate control unit sets the discharge flow rate to zero while the supply flow rate increase control is being executed, and performs discharge flow rate maintenance control to maintain the discharge flow rate at or below a second flow rate which is smaller than the first flow rate after the supply flow rate reaches the first flow rate.

[0008] According to this configuration, the internal pressure of the containment vessel may be low from when the supply of purge gas to the containment vessel starts until the supply flow rate of the purge gas reaches the first flow rate, but since the discharge flow rate of the purge gas is set to zero in that state, it is possible to prevent the inside of the containment vessel from becoming negative pressure. After the supply flow rate of the purge gas to the containment vessel reaches the first flow rate, the discharge of the purge gas starts and the discharge flow rate is maintained at or below the second flow rate which is smaller than the first flow rate, so that the flow rate of the purge gas supplied to the inside of the containment vessel can be maintained in a state greater than the flow rate of the purge gas discharged from the inside of the containment vessel. This makes it possible to prevent the inside of the containment vessel from becoming negative pressure while appropriately discharging the purge gas. Therefore, it is possible to prevent the outside air and dust from being sucked into the inside of the containment vessel. Furthermore, according to this configuration, the supply flow rate is gradually increased in the supply flow rate increase control, so that the vibration of the object stored in the containment vessel can be minimized. Therefore, this is particularly suitable for the case where the object is an object that is weak against vibration, such as a semiconductor wafer. As described above, according to this configuration, while the supply flow rate of the purge gas to the containment vessel is changing, it is possible to appropriately control the discharge flow rate of the purge gas from the containment vessel, and to prevent the inside of the containment vessel being purged from becoming negative pressure.

[0009] Further features and advantages of the techniques disclosed herein will become more apparent from the following description of exemplary and non-limiting embodiments, which proceeds with reference to the drawings. [Brief description of the drawings]

[0010] [Figure 1] Side view of container storage facility [Diagram 2] Conceptual diagram of the purge device [Diagram 3] Purge process time chart [Figure 4] Purge process flow chart [Diagram 5] Flowchart of purge process according to another embodiment DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] The purging device and the container storage facility equipped with the purging device will be described with reference to the drawings.

[0012] As shown in FIG. 1, the container storage facility 100 includes a container storage shelf 1 having a mounting section 10 on which a storage container 9 is placed, and a purging device P (see FIG. 2). The purging device P is a device that uses a purge gas to purge the inside of the storage container 9 in which a stored object (not shown) is stored. In this embodiment, the container storage shelf 1 includes a plurality of mounting sections 10. The purging device P is capable of purging the inside of the storage container 9 placed on each of the plurality of mounting sections 10.

[0013] In this embodiment, the storage container 9 placed on the placement part 10 is a container into which an inert gas is supplied as a purge gas. For example, the storage container 9 is a front opening unified pod (FOUP) in which semiconductor wafers are stored. However, without being limited thereto, the storage container 9 may be a reticle pod in which reticles are stored.

[0014] In the purging process, a process of supplying a purge gas into the inside of the storage container 9 is performed to suppress oxidation of the semiconductor wafers stored in the FOUP as the storage container 9 and the reticles stored in the reticle pod, and to keep the inside of the FOUP clean. The purging process makes it possible to keep the inside of the storage container 9 in an environment suitable for storage. This makes it possible to store, for example, the semiconductor wafers and reticles stored in the storage container 9 in good condition. For example, an inert gas such as nitrogen gas or clean air is used as the purge gas.

[0015] In this embodiment, the container storage shelf 1 includes a wall body 11 that covers a plurality of mounting sections 10. The mounting sections 10 are arranged side by side in the vertical and lateral directions (horizontal direction). A storage container 9 is placed on each mounting section 10. In this example, one storage container 9 is placed on one mounting section 10.

[0016] In this embodiment, the container storage facility 100 includes a transport device M that transports the storage container 9. The transport device M is configured to perform an entry operation for transporting the storage container 9 to the container storage shelf 1 and an exit operation for transporting the storage container 9 from the container storage shelf 1.

[0017] In this embodiment, the transport devices M include a first transport device M1 that transports the storage container 9 from another location to an input / output port 81 provided outside the container storage shelf 1, a second transport device M2 that transports the storage container 9 from the input / output port 81 of the container storage shelf 1 to a transfer position 82 provided inside the container storage shelf 1, and a third transport device M3 that transports the storage container 9 from the transfer position 82 to the placement unit 10 inside the container storage shelf 1. Note that the first transport device M1, second transport device M2, and third transport device M3 also transport in the opposite direction to the above.

[0018] The first transport device M1 is configured, for example, as a ceiling transport vehicle that runs along a rail provided on the ceiling while holding the storage vessel 9. In addition, this first transport device M1 has a lifting mechanism and is configured to be able to lift and lower the storage vessel 9. In other words, the first transport device M1 transports the storage vessel 9 from another location to the in-and-out port 81 of the container storage shelf 1 and hands over the storage vessel 9 to the second transport device M2 arranged below the first transport device M1. In addition, the first transport device M1 receives the storage vessel 9 from the second transport device M2 at the in-and-out port 81 of the container storage shelf 1 and transports the storage vessel 9 from the in-and-out port 81 to another location.

[0019] The second conveying device M2 is configured as a conveyor, for example. The second conveying device M2 may be a conveyor using a conveying cart, a belt conveyor, a roller conveyor, a chain conveyor, or the like. The second conveying device M2 is provided between the outside of the container storage shelf 1 and the inside of the container storage shelf 1. The second conveying device M2 receives the storage container 9 from the first conveying device M1 at an in-and-out port 81 provided outside the container storage shelf 1, conveys the storage container 9 to a transfer position 82 provided inside the container storage shelf 1, and delivers the storage container 9 to the third conveying device M3 at the transfer position 82. The second conveying device M2 receives the storage container 9 from the third conveying device M3 at the transfer position 82 of the container storage shelf 1, conveys the storage container 9 to the in-and-out port 81 of the container storage shelf 1, and delivers the storage container 9 to the first conveying device M1 at the in-and-out port 81.

[0020] The third transfer device M3 is disposed inside the container storage shelf 1, and is configured, for example, as a stacker crane having a vertical lifting mechanism and a horizontal traveling mechanism. The third transfer device M3 moves in the vertical and horizontal directions while holding the storage container 9, and transfers the storage container 9 to one of the multiple placement units 10 arranged in the vertical and horizontal directions. The third transfer device M3 receives the storage container 9 from the second transfer device M2 at a transfer position 82 inside the container storage shelf 1, and transfers the storage container 9 to the placement unit 10. The third transfer device M3 also transfers the storage container 9 placed on the placement unit 10, and hands over the storage container 9 to the second transfer device M2 at the transfer position 82.

[0021] FIG. 2 is a conceptual diagram of the purging device P according to this embodiment.

[0022] 2, the purge device P includes a purge gas supply source 20, a main supply pipe 21 through which the purge gas supplied from the supply source 20 flows, a main discharge pipe 31 through which the purge gas discharged from the containment vessel 9 flows, and a negative pressure generator 30. In addition to the purge gas discharged from the containment vessel 9, the main discharge pipe 31 also carries air discharged from the inside of the containment vessel 9 in the initial stage of the purging process.

[0023] The purge device P includes a supply pipe 22 that is connected to the storage vessel 9 to supply a purge gas to the storage vessel 9. In this embodiment, the supply pipe 22 branches off from a main supply pipe 21 and is connected to the mounting parts 10. In this example, each of the multiple supply pipes 22 branches off from one main supply pipe 21 and is connected to each mounting part 10.

[0024] The purging device P includes a supply flow rate control unit 23 that controls the supply flow rate of the purge gas supplied to the containment vessel 9 through the supply pipe 22. The supply flow rate control unit 23 is configured, for example, as a mass flow controller that controls the mass flow rate of the purge gas, and controls the mass flow rate of the purge gas flowing through the supply pipe 22. However, without being limited thereto, the supply flow rate control unit 23 may be configured to control the flow rate of the purge gas, for example, to control the volumetric flow rate of the purge gas. In this example, the supply flow rate control unit 23 is provided in each of the multiple supply pipes 22.

[0025] In this embodiment, the purge device P includes a filter 24 that removes impurities from the purge gas. The filter 24 is provided upstream of the mounting part 10 with respect to the flow direction of the purge gas. This makes it possible to supply the purge gas from which the impurities have been removed to the mounting part 10. In this embodiment, the filter 24 is provided in the supply pipe 22. In detail, the filter 24 is provided downstream of the supply flow rate control part 23 in the supply pipe 22. In this example, the filter 24 is provided in each of the multiple supply pipes 22.

[0026] The mounting part 10 is provided with a supply port 10S connected to a supply pipe 22. The supply port 10S is configured to be connected to the containment vessel 9 when the containment vessel 9 is placed on the mounting part 10. This allows the purge gas flowing through the supply pipe 22 to be supplied to the inside of the containment vessel 9. In this example, the supply port 10S is provided in each of the multiple mounting parts 10.

[0027] In this embodiment, the placement unit 10 is provided with a detection unit 12 that detects that the storage vessel 9 has been placed thereon. The detection unit 12 is configured as a presence sensor. As the presence sensor, a photoelectric sensor, a proximity sensor, or other known sensors can be used. The supply flow rate control unit 23 controls the supply flow rate of the purge gas to be supplied to the storage vessel 9 based on the detection result of the detection unit 12. In this example, the detection unit 12 is provided on each of the multiple placement units 10.

[0028] The purging device P includes an exhaust pipe 32 that is connected to the containment vessel 9 to exhaust the purge gas from the containment vessel 9. In this embodiment, the exhaust pipe 32 extends from the placement portion 10 and is connected to the main exhaust pipe 31. In this example, the exhaust pipe 32 is connected to each of the multiple placement portions 10. The multiple exhaust pipes 32 merge into the main exhaust pipe 31.

[0029] The mounting portion 10 is provided with an exhaust port 10E connected to an exhaust pipe 32. The exhaust port 10E is configured to be connected to the storage vessel 9 when the storage vessel 9 is placed on the mounting portion 10. This allows the purge gas discharged from the inside of the storage vessel 9 to flow through the exhaust pipe 32. In this example, the exhaust port 10E is provided in each of the multiple mounting portions 10. The exhaust pipe 32 is connected to the exhaust port 10E of each of the multiple mounting portions 10.

[0030] The purge device P includes an exhaust flow rate control unit 33 that controls the exhaust flow rate of the purge gas exhausted from the storage vessel 9 through the exhaust pipe 32. In this embodiment, the exhaust flow rate control unit 33 includes an exhaust valve 33V provided in each of the multiple exhaust pipes 32. The exhaust valve 33V is configured to control the flow rate of the purge gas by changing the flow path cross-sectional area of ​​the exhaust pipe 32. The exhaust valve 33V may be capable of changing the valve opening in multiple steps or continuously, or may be capable of linearly opening and closing the valve only. In this example, the exhaust valve 33V is configured to change the valve opening depending on the energized state. For example, a solenoid valve can be used as such an exhaust valve 33V. However, the present invention is not limited to this, and various known valves can be used as the exhaust valve 33V.

[0031] In this embodiment, the purging device P includes a hygrometer 34 that measures the humidity inside the containment vessel 9. In this example, the hygrometer 34 is provided downstream of the placement unit 10 in the discharge pipe 32, and is configured to measure the humidity of the purge gas (air containing the purge gas) discharged from the containment vessel 9. In the illustrated example, the hygrometer 34 is provided upstream of the discharge flow rate control unit 33 in the discharge pipe 32. In this embodiment, the hygrometer 34 also has a function of detecting temperature. That is, the hygrometer 34 is configured as a thermo-hygrometer. In this example, the hygrometer 34 is provided in each of the multiple discharge pipes 32.

[0032] In this embodiment, the purging device P includes a flowmeter 35 that measures the flow rate of the purge gas flowing through the exhaust pipe 32. The flowmeter 35 is provided upstream of the exhaust flow rate control unit 33 in the exhaust pipe 32. In the illustrated example, the flowmeter 35 is provided downstream of the hygrometer 34 in the exhaust pipe 32. In this example, the flowmeter 35 is provided in each of the multiple exhaust pipes 32.

[0033] As described above, the purge device P includes the negative pressure generator 30. The negative pressure generator 30 is configured to generate a negative pressure in the discharge pipe 32. When the discharge pipe 32 is placed under negative pressure, the gas inside the storage vessel 9 connected to the discharge pipe 32 is sucked into the discharge pipe 32. In this embodiment, the negative pressure generator 30 is provided in the main discharge pipe 31, and generates a negative pressure in the main discharge pipe 31, thereby generating a negative pressure in each of the multiple discharge pipes 32 connected to the main discharge pipe 31. That is, in this embodiment, the multiple discharge pipes 32 are connected to one negative pressure generator 30. This allows the purge gas to be discharged from the storage vessel 9 placed on the multiple placement units 10 using one negative pressure generator 30. Therefore, it is easier to simplify the configuration and reduce costs compared to the case where the negative pressure generator 30 is disposed in each of the multiple placement units 10 (discharge pipes 32). In this example, the negative pressure generator 30 is configured to include, for example, a pump, and is configured to generate a negative pressure in the discharge pipe 32 by driving the pump.

[0034] In this embodiment, the container storage facility 100 includes a host controller H that manages the entire facility. In this example, the host controller H is configured to control the operation of the transport device M and the operation of the purging device P. The host controller H includes, for example, a processor such as a microcomputer, peripheral circuits such as a memory, and the like. Each function is realized by cooperation between these hardware components and a program executed on a processor such as a computer.

[0035] The host controller H is configured to control the supply flow rate control unit 23 and the discharge flow rate control unit 33. In this embodiment, the host controller H is configured to control the plurality of supply flow rate control units 23, the plurality of discharge flow rate control units 33, the supply source 20, and the negative pressure generating device 30. The host controller H is also configured to be able to acquire detection results by various detection units provided in the purging device P. In this example, the host controller H is configured to be able to acquire detection results by the detection unit 12 provided in the placement unit 10, and measurement results by the hygrometer 34 and flowmeter 35 provided in the discharge pipe 32.

[0036] In this embodiment, the host controller H includes a timer Tm. The host controller H is configured to control the purging device P based on the time measured by the timer Tm. Specifically, the host controller H outputs various commands to the supply flow rate control unit 23 and the discharge flow rate control unit 33 based on the time measured by the timer Tm.

[0037] The purging process for the storage vessel 9 is performed by controlling the supply flow rate by the supply flow rate control unit 23 and the discharge flow rate by the discharge flow rate control unit 33. In this embodiment, the supply flow rate control unit 23 and the discharge flow rate control unit 33 receive commands from the upper controller H to control each unit.

[0038] 3 is a time chart of the purging process. The purging process will be described below with reference to FIG.

[0039] As shown in FIG. 3, the supply flow rate control unit 23 performs a supply flow rate increase control Cs1 to gradually increase the supply flow rate of the purge gas to the storage vessel 9 so that the supply flow rate reaches the first flow rate A1 at T1 after a specified time has elapsed from the supply start time T0 of the purge gas to the storage vessel 9. In this example, the supply flow rate is zero at the supply start time T0 of the purge gas. In this embodiment, the supply flow rate control unit 23 gradually increases the supply flow rate of the purge gas from zero to the first flow rate A1 in the supply flow rate increase control Cs1. That is, the supply flow rate control unit 23 increases the supply flow rate of the purge gas at a constant increase rate from the supply start time T0 of the purge gas to the time T1 when a specified time has elapsed. This can minimize the vibration of the object stored in the storage vessel 9 due to the influence of the purge gas. Such a configuration is particularly suitable for the case where the object is an object that is weak against vibration, such as a semiconductor wafer. The "supply flow rate" refers to the flow rate of purge gas supplied per unit time, and is expressed in units of, for example, "L / min." Similarly, the "discharge flow rate" described below refers to the flow rate of purge gas discharged per unit time, and is expressed in units of, for example, "L / min."

[0040] In this embodiment, when the detector 12 detects that the storage vessel 9 has been placed on the placement unit 10, the supply flow rate controller 23 starts supplying the purge gas to the storage vessel 9. That is, the supply flow rate controller 23 performs the supply flow rate increase control Cs1 based on the detection result by the detector 12 (steps #1 and #2 in FIG. 4).

[0041] After the supply flow rate reaches the first flow rate A1, the supply flow rate control unit 23 performs a supply flow rate maintenance control Cs2 to maintain the supply flow rate at or above the first flow rate A1. In this embodiment, after starting the supply flow rate increase control Cs1, the supply flow rate control unit 23 performs a supply flow rate maintenance control Cs2 to maintain the supply flow rate at or above the first flow rate A1 at a specified time T1 after the supply start time T0. In this example, the supply flow rate control unit 23 maintains the supply flow rate at approximately the first flow rate A1 in the supply flow rate maintenance control Cs2.

[0042] In this embodiment, the specified time (T1-T0) is set so that the rate of increase of the supply flow rate until it increases to the first flow rate A1 is the upper limit range of the range in which the stored objects in the storage container 9 do not vibrate due to the supply of purge gas. This makes it possible to quickly realize a clean state in which the inside of the storage container 9 is filled with an appropriate amount of purge gas while preventing the stored objects inside the storage container 9 from vibrating due to the influence of the purge gas. The "upper limit range" is a range of values ​​set on the lower side of the upper limit value, which is the limit at which the stored objects do not vibrate. Since the actual upper limit value fluctuates due to various factors, the upper limit range is set on the lower side of the upper limit value so that the stored objects do not vibrate even when the upper limit value fluctuates. For example, the "upper limit range" is preferably set in the range of 80 to 95% of the upper limit value obtained experimentally.

[0043] The discharge flow rate control unit 33 sets the discharge flow rate to zero during execution of the supply flow rate increase control Cs1, and performs discharge flow rate maintenance control Ce to maintain the discharge flow rate at or below a second flow rate A2 smaller than the first flow rate A1 after the supply flow rate reaches the first flow rate A1. In this embodiment, the discharge flow rate control unit 33 sets the discharge flow rate to zero within a specified time (T0 to T1) from the supply start time, and performs discharge flow rate maintenance control Ce to maintain the discharge flow rate at or below a second flow rate A2 smaller than the first flow rate A1 at T1 after the specified time has elapsed from the supply start time T0. As a result, at T1 after the specified time has elapsed from the supply start time T0 of the purge gas, the purge gas is supplied to the containment vessel 9 at the first flow rate A1 by the supply flow rate maintenance control Cs2, and the purge gas inside the containment vessel 9 is discharged at the second flow rate A2 smaller than the first flow rate A1 by the discharge flow rate maintenance control Ce. Therefore, after a specified time T1 has elapsed since the start of purge gas supply T0, the flow rate of purge gas supplied into the containment vessel 9 can be maintained to be greater than the flow rate of purge gas discharged from the inside of the containment vessel 9. Therefore, it is possible to prevent the inside of the containment vessel 9 from becoming negative pressure while appropriately discharging the purge gas. Since the adjustment of the discharge flow rate is triggered by the elapsed time T1 from the start of purge gas supply T0, the control configuration can be simplified compared to the case where the change in the supply flow rate is used as a trigger. In this example, the discharge flow rate control unit 33 maintains the discharge flow rate at approximately the second flow rate A2 in the discharge flow rate maintenance control Ce. The second flow rate A2 may be, for example, about 10% to 15% of the first flow rate A1.

[0044] In this embodiment, after a prescribed filling time has elapsed from the start time T1 of the supply flow rate maintenance control Cs2, the supply flow rate control unit 23 performs a post-filling maintenance control Cs3 for maintaining the supply flow rate at a third flow rate A3 that is less than the first flow rate A1 and greater than the second flow rate A2, at T2. This allows the supply of purge gas to the storage container 9 at the third flow rate A3 that is lower than the first flow rate A1. This post-filling maintenance control Cs3 is suitable, for example, when the storage container 9 is stored in the placement unit 10 for a long period of time, and by performing the post-filling maintenance control Cs3, it is possible to prevent outside air and dust from entering the inside of the storage container 9 during the period in which the storage container 9 is stored. The "filling time" is set based on the fact that the inside of the storage container 9 is in a clean state, and may vary depending on the characteristics and size of the storage container 9. The third flow rate A3 may be, for example, about 30% to 50% of the first flow rate A1.

[0045] In this embodiment, the discharge flow rate control unit 33 continues the discharge flow rate maintenance control Ce while the supply flow rate control unit 23 is executing the post-filling maintenance control Cs3. As a result, during the period in which the supply flow rate control unit 23 is executing the post-filling maintenance control Cs3, the purge gas is supplied to the storage vessel 9 at the third flow rate A3, and the purge gas inside the storage vessel 9 is discharged at the second flow rate A2 smaller than the third flow rate A3 by the discharge flow rate maintenance control Ce. Therefore, after the time T2 when the supply flow rate control unit 23 starts the post-filling maintenance control Cs3, the flow rate of the purge gas supplied inside the storage vessel 9 can be maintained in a state larger than the flow rate of the purge gas discharged from the inside of the storage vessel 9. Therefore, it is possible to prevent the inside of the storage vessel 9 from becoming a negative pressure while appropriately discharging the purge gas. The second flow rate A2 may be, for example, about 20% to 40% of the third flow rate A3.

[0046] 3, the purge process performed between time T0 and time T2 is sometimes called an initial purge. Also, the purge process performed between time T2 and time T3 is sometimes called a maintenance purge. That is, the purge device P is configured to perform an initial purge and a maintenance purge.

[0047] The first flow rate A1, the second flow rate A2, and the third flow rate A3 are appropriately determined based on the characteristics and size of the containment vessel 9. The "characteristics of the containment vessel 9" includes the airtightness of the containment vessel 9. The level of airtightness can also affect the settings of the first flow rate A1, the second flow rate A2, and the third flow rate A3.

[0048] Fig. 4 is a flow chart of the purging process. Hereinafter, the control procedure when the purging process is performed will be described with reference to Fig. 4.

[0049] 4, when the storage vessel 9 is placed on the placement unit 10 (step #1: Yes), the supply flow rate control unit 23 performs the supply flow rate increase control Cs1 (step #2). In this example, whether or not the storage vessel 9 is placed on the placement unit 10 is detected by the detection unit 12 and grasped by the upper controller H, and the supply flow rate control unit 23 performs the supply flow rate increase control Cs1 in response to a command from the upper controller H.

[0050] When a specified time has elapsed since the start of the supply of the purge gas (step #3), the supply flow rate control unit 23 executes the supply flow rate maintenance control Cs2, and the exhaust flow rate control unit 33 executes the exhaust flow rate maintenance control Ce (step #4). In this example, the specified time is measured by a timer Tm provided in the upper controller H. The upper controller H issues various commands to the supply flow rate control unit 23 and the exhaust flow rate control unit 33 based on the time measurement result by the timer Tm.

[0051] If the specified filling time has elapsed since the start of processing in step #4 (step #5: Yes), the supply flow rate control unit 23 executes the post-filling maintenance control Cs3, and the discharge flow rate control unit 33 continues the discharge flow rate maintenance control Ce (step #6).

[0052] Thereafter, when the storage vessel 9 is no longer placed on the placement unit 10, i.e., when the storage vessel 9 undergoing the purging process is removed from the placement unit 10 (step #7: No), the supply flow rate control unit 23 stops the supply of purge gas to the storage vessel 9, and the discharge flow rate control unit 33 stops the discharge of purge gas from the storage vessel 9 (step #8). In this example, as shown at time T3 in FIG. 3, the supply flow rate is set to zero, and the discharge flow rate is set to zero. This makes it easy to simplify the control configuration, since the supply and discharge of purge gas can be stopped simultaneously, triggered by the storage vessel 9 not being placed on the placement unit 10. However, the discharge of purge gas may be stopped with a certain delay from the stop of the supply of purge gas. Such a configuration can be easily realized by measuring time using the timer Tm. With such a configuration, the purge gas remaining in the discharge pipe 32 can be appropriately collected.

[0053] Other embodiments Next, other embodiments of the purging device and the container storage facility equipped with the purging device will be described.

[0054] (1) In the above embodiment, an example has been described in which the supply flow rate control unit 23 starts the supply flow rate increase control Cs1, and then performs the supply flow rate maintenance control Cs2 to maintain the supply flow rate at or above the first flow rate A1 at the specified time T1 after the supply start time T0. However, without being limited to such an example, the supply flow rate control unit 23 may be configured to detect the flow rate of the purge gas supplied to the containment vessel 9, and may perform the supply flow rate maintenance control Cs2 (step #14) when it is determined that the detected supply flow rate has reached the first flow rate A1 (step #13: Yes), as shown in FIG. 5, for example. Note that the control procedure shown in FIG. 5 differs from the control procedure shown in FIG. 4 only in the process of step 13.

[0055] (2) In the above embodiment, the discharge flow rate control unit 33 performs the discharge flow rate maintenance control Ce, which sets the discharge flow rate to zero for a specified time from the supply start time point, and maintains the discharge flow rate at or below the second flow rate A2, which is smaller than the first flow rate A1, at T1 after the specified time has elapsed from the supply start time point T0. However, without being limited to such an example, the discharge flow rate control unit 33 may perform the discharge flow rate maintenance control Ce (step #14) when it is determined that the supply flow rate detected by the supply flow rate control unit 23 has reached the first flow rate A1 (step #13: Yes), as shown in FIG. 5. In this case, the discharge flow rate control unit 33 may be configured to directly obtain information indicating that the supply flow rate has reached the first flow rate A1 from the supply flow rate control unit 23, or indirectly obtain information via the upper controller H.

[0056] (3) In the above embodiment, an example has been described in which the host controller H includes a timer Tm and measures the time for each step of the purging process. However, the present invention is not limited to this example, and the supply flow rate control unit 23 may include a timer Tm and perform various controls based on the time measured by the timer Tm. Also, the discharge flow rate control unit 33 may include a timer Tm and perform various controls based on the time measured by the timer Tm.

[0057] (4) In the above embodiment, the supply flow rate control unit 23 increases the supply flow rate at a constant rate of increase from the purge gas supply start time T0 to time T1 when a specified time has elapsed. However, the present invention is not limited to this example, and the supply flow rate control unit 23 may increase the supply flow rate while varying the rate of increase.

[0058] (5) In the above embodiment, an example has been described in which the discharge flow rate control unit 33 continues the discharge flow rate maintenance control Ce while the supply flow rate control unit 23 is executing the post-filling maintenance control Cs3. However, without being limited to such an example, the discharge flow rate control unit 33 may discharge the purge gas at a discharge flow rate corresponding to the supply flow rate of the purge gas supplied by the post-filling maintenance control Cs3 while the supply flow rate control unit 23 is executing the post-filling maintenance control Cs3. For example, while the post-filling maintenance control Cs3 is being executed, the purge gas may be discharged at a flow rate smaller than the discharge flow rate of the purge gas while the supply flow rate maintenance control Cs2 is being executed.

[0059] (6) In the above embodiment, an example has been described in which the supply flow rate control unit 23 performs the post-filling maintenance control Cs3 to maintain the supply flow rate at the third flow rate A3 that is less than the first flow rate A1 and greater than the second flow rate A2 after the specified filling time has elapsed T2 from the start time T1 of the supply flow rate maintenance control Cs2. However, the present invention is not limited to this example, and the supply flow rate control unit 23 does not have to perform the post-filling maintenance control Cs3.

[0060] (7) In the above embodiment, an example has been described in which the supply flow rate control unit 23 starts the supply of purge gas to the storage vessel 9 when the detection unit 12 detects that the storage vessel 9 has been placed on the placement unit 10. However, the present invention is not limited to this example, and the supply of purge gas may be started without being based on the detection result by the detection unit 12. The supply flow rate control unit 23 may, for example, cooperate with the transfer device M to start the supply of purge gas to the storage vessel 9 when the transfer device M transfers the storage vessel 9. Note that the above-mentioned cooperation between the supply flow rate control unit 23 and the transfer device M may be performed via the upper controller H.

[0061] (8) In the above embodiment, an example has been described in which a plurality of exhaust pipes 32 are connected to one negative pressure generating device 30. However, the present invention is not limited to such an example, and a negative pressure generating device 30 may be provided corresponding to each of the plurality of exhaust pipes 32.

[0062] (9) The configurations disclosed in the above-described embodiments can be applied in combination with configurations disclosed in other embodiments, as long as no contradiction occurs. As for other configurations, the embodiments disclosed in this specification are merely examples in all respects. Therefore, various modifications can be made as appropriate within the scope of the present disclosure.

[0063] [Summary of the above embodiment] The above-described purging device and the container storage facility equipped with the purging device will be described below.

[0064] A purge device that purges the inside of a containment vessel in which a stored object is stored with a purge gas, a supply pipe connected to the containment vessel to supply the purge gas to the containment vessel; a supply flow rate control unit that controls a supply flow rate of the purge gas supplied to the containment vessel through the supply pipe; an exhaust pipe connected to the containment vessel to exhaust the purge gas from the containment vessel; a discharge flow rate control unit that controls a discharge flow rate of the purge gas discharged from the containment vessel through the discharge pipe, the supply flow rate control unit performs a supply flow rate increase control to gradually increase the supply flow rate so that the supply flow rate reaches a first flow rate after starting the supply of the purge gas to the containment vessel, and performs a supply flow rate maintenance control to maintain the supply flow rate at or above the first flow rate after the supply flow rate reaches the first flow rate; The discharge flow rate control unit sets the discharge flow rate to zero while the supply flow rate increase control is being executed, and performs discharge flow rate maintenance control to maintain the discharge flow rate at or below a second flow rate which is smaller than the first flow rate after the supply flow rate reaches the first flow rate.

[0065] According to this configuration, the internal pressure of the containment vessel may be low from when the supply of purge gas to the containment vessel starts until the supply flow rate of the purge gas reaches the first flow rate, but since the discharge flow rate of the purge gas is set to zero in that state, it is possible to prevent the inside of the containment vessel from becoming negative pressure. After the supply flow rate of the purge gas to the containment vessel reaches the first flow rate, the discharge of the purge gas starts and the discharge flow rate is maintained at or below the second flow rate which is smaller than the first flow rate, so that the flow rate of the purge gas supplied to the inside of the containment vessel can be maintained in a state greater than the flow rate of the purge gas discharged from the inside of the containment vessel. This makes it possible to prevent the inside of the containment vessel from becoming negative pressure while appropriately discharging the purge gas. Therefore, it is possible to prevent the outside air and dust from being sucked into the inside of the containment vessel. Furthermore, according to this configuration, the supply flow rate is gradually increased in the supply flow rate increase control, so that the vibration of the object stored in the containment vessel can be minimized. Therefore, this is particularly suitable for the case where the object is an object that is weak against vibration, such as a semiconductor wafer. As described above, according to this configuration, while the supply flow rate of the purge gas to the containment vessel is changing, it is possible to appropriately control the discharge flow rate of the purge gas from the containment vessel, and to prevent the inside of the containment vessel being purged from becoming negative pressure.

[0066] the supply flow rate control unit performs the supply flow rate increase control so that the supply flow rate reaches the first flow rate after a specified time has elapsed from a supply start point of the purge gas to the containment vessel, and performs the supply flow rate maintenance control after the specified time has elapsed from the supply start point of the purge gas, It is preferable that the discharge flow rate control unit sets the discharge flow rate to zero during the specified time from the supply start point, and performs the discharge flow rate maintenance control after the specified time has elapsed from the supply start point.

[0067] According to this configuration, the exhaust flow rate is adjusted using the elapsed time from the start of the supply of purge gas as a trigger. This makes it possible to simplify the control configuration, as compared to, for example, a case in which the trigger is a change in the supply flow rate.

[0068] It is preferable that the specified time is set so that the rate of increase of the supply flow rate until it increases to the first flow rate is the upper limit of a range in which the contained object in the containment vessel is not vibrated by the supply of the purge gas.

[0069] According to this configuration, it is possible to quickly achieve a clean state in which the inside of the containment vessel is filled with an appropriate amount of purge gas while preventing vibration of the objects contained inside the containment vessel.

[0070] the supply flow rate control unit performs a post-filling maintenance control to maintain the supply flow rate at a third flow rate that is less than the first flow rate and greater than the second flow rate after a specified filling time has elapsed from a start point of the supply flow rate maintenance control, It is preferable that the discharge flow rate control unit continues the discharge flow rate maintenance control while the supply flow rate control unit is performing the post-filling maintenance control.

[0071] According to this configuration, after the filling of the containment vessel with the purge gas is completed, the supply flow rate of the purge gas is set to the third flow rate less than the first flow rate by executing the post-filling maintenance control, and the required flow rate of the purge gas can be stably supplied to the containment vessel. Since such an adjustment of the supply flow rate is also performed using the elapse of a specified filling time from the start of the supply flow rate maintenance control as a trigger, the control configuration can be easily simplified. Moreover, according to this configuration, by continuing the discharge flow rate maintenance control during the execution of the post-filling maintenance control, the purge gas continues to be discharged from the inside of the containment vessel with the discharge flow rate set to the second flow rate less than the third flow rate, it is possible to appropriately prevent the inside of the containment vessel from becoming negative pressure.

[0072] The purge device having the above configuration; A container storage shelf having a placement portion on which the storage container is placed, the placement unit is provided with a supply port connected to the supply pipe, a discharge port connected to the discharge pipe, and a detection unit that detects that the storage vessel is placed on the placement unit; the supply port and the discharge port are configured to be connected to the storage container when the storage container is placed on the placement section, The supply flow rate control unit starts supplying the purge gas to the storage vessel when the detection unit detects that the storage vessel has been placed.

[0073] According to this configuration, when the storage vessel to be purged is not placed on the placement part, it is possible to avoid unnecessary consumption of purge gas.

[0074] In the container storage facility, The container storage shelf includes a plurality of the storage sections, The discharge pipe is connected to the discharge port of each of the plurality of placement sections, A plurality of the exhaust pipes are connected to one negative pressure generating device, The exhaust flow rate control section preferably includes an exhaust valve provided in each of the plurality of exhaust pipes.

[0075] According to this configuration, a single negative pressure generating device can be used to exhaust purge gas from storage vessels placed on multiple placement sections, which makes it easier to simplify the configuration and reduce costs compared to a case in which a negative pressure generating device is provided for each of the multiple placement sections. [Industrial Applicability]

[0076] The technology disclosed herein can be used in a purge device that uses a purge gas to purge the inside of a containment vessel in which stored objects are stored, and in a container storage facility equipped with the purge device. [Explanation of symbols]

[0077] 100: Container storage facility P: Purge device 1: Container storage shelf 10: Placement section 10E: Outlet 10S: Supply port 12: Detection section 22: Supply pipe 23: Supply flow rate control section 30: Negative pressure generator 32: Discharge pipe 33: Discharge flow control section 33V: Exhaust valve 9: Containment vessel A1: 1st flow rate A2:Second flow rate A3: 3rd flow rate Ce: Discharge flow rate maintenance control Cs1: Supply flow rate increase control Cs2: Supply flow rate maintenance control Cs3: Post-filling maintenance control

Claims

1. A purge device that purges the inside of a containment vessel in which a stored object is stored with a purge gas, a supply pipe connected to the containment vessel to supply the purge gas to the containment vessel; a supply flow rate control unit that controls a supply flow rate of the purge gas supplied to the containment vessel through the supply pipe; an exhaust pipe connected to the containment vessel to exhaust the purge gas from the containment vessel; a discharge flow rate control unit that controls a discharge flow rate of the purge gas discharged from the containment vessel through the discharge pipe, the supply flow rate control unit performs a supply flow rate increase control to gradually increase the supply flow rate so that the supply flow rate reaches a first flow rate after starting the supply of the purge gas to the containment vessel, and performs a supply flow rate maintenance control to maintain the supply flow rate at or above the first flow rate after the supply flow rate reaches the first flow rate; The discharge flow rate control unit sets the discharge flow rate to zero while the supply flow rate increase control is being executed, and after the supply flow rate reaches the first flow rate, performs discharge flow rate maintenance control to maintain the discharge flow rate at or below a second flow rate which is smaller than the first flow rate.

2. In the supply flow rate maintenance control, after the supply flow rate reaches the first flow rate, the supply flow rate is maintained at the first flow rate, In the discharge flow rate maintenance control, the discharge flow rate is maintained at the second flow rate, the discharge flow rate control unit performs the discharge flow rate maintenance control in conjunction with the supply flow rate maintenance control performed by the supply flow rate control unit, 2. The purging system of claim 1, wherein the relative flow rates of the supply flow rate and the exhaust flow rate are maintained constant.

3. the supply flow rate control unit performs the supply flow rate increase control so that the supply flow rate reaches the first flow rate after a specified time has elapsed from a supply start point of the purge gas to the containment vessel, and performs the supply flow rate maintenance control after the specified time has elapsed from the supply start point of the purge gas, 3. The purging device according to claim 1, wherein the discharge flow rate control unit sets the discharge flow rate to zero during the specified time from the start of the supply, and performs the discharge flow rate maintenance control after the specified time has elapsed from the start of the supply.

4. 4. The purging device according to claim 3, wherein the specified time is set so that an increase rate of the supply flow rate until the supply flow rate is increased to the first flow rate is an upper limit range of a range in which the contained object in the containment vessel is not vibrated by the supply of the purge gas.

5. the supply flow rate control unit performs a post-filling maintenance control to maintain the supply flow rate at a third flow rate that is less than the first flow rate and greater than the second flow rate after a specified filling time has elapsed from a start point of the supply flow rate maintenance control, The purging device according to claim 1 , wherein the discharge flow rate control unit continues the discharge flow rate maintenance control while the supply flow rate control unit is performing the post-filling maintenance control.

6. A purge device according to any one of claims 1 to 5; A container storage shelf having a placement portion on which the storage container is placed, the placement unit is provided with a supply port connected to the supply pipe, a discharge port connected to the discharge pipe, and a detection unit that detects that the storage vessel is placed on the placement unit, the supply port and the discharge port are configured to be connected to the storage container when the storage container is placed on the placement section, The supply flow rate control unit starts supplying the purge gas to the storage container when the detection unit detects that the storage container has been placed.

7. The container storage shelf includes a plurality of the storage sections, The discharge pipe is connected to the discharge port of each of the plurality of placement sections, A plurality of the exhaust pipes are connected to one negative pressure generating device, The container storage facility according to claim 6 , wherein the discharge flow rate control section includes an exhaust valve provided in each of the plurality of discharge pipes.

Citation Information

Patent Citations

  • Paper folding device

    JP1985052469A

  • Storage system and storage means

    JP2010182747A

  • Inactive gas injection apparatus

    JP2013131712A

  • Substrate processing apparatus, manufacturing method of semiconductor device, and program

    JP2013153159A

  • Recirculating Substrate Container Purging System and Method

    JP2017504963A