Surveying fixtures
The surveying jig magnetically attaches to anchor bolts, addressing inaccuracies and labor issues in manual measurement by providing stable, efficient, and error-free positioning of anchor bolts in reinforced concrete structures.
Patent Information
- Application Number
- JP2024089069
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-05-31
AI Technical Summary
Manual measurement of post-installed anchor bolts in reinforced concrete structures is inaccurate, labor-intensive, and prone to transcription errors, and existing automated methods require manual assembly on the anchor bolt, which is time-consuming and difficult due to issues like clogged or protected threaded parts.
A surveying jig that magnetically attaches to the anchor bolt using a magnet, comprising an anchor side member and a marker side member, allowing for accurate positioning without manual assembly, and includes features like a tightening bolt and hanging ring for stability and ease of use.
The jig provides stable measurement accuracy, reduces labor and time, and avoids the need for manual assembly, even in challenging conditions such as cured or protected anchor bolts, while preventing transcription errors.
Smart Images

Figure 0007575633000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a technique relating to a surveying tool, and more specifically, to a surveying tool capable of surveying the tip of an anchor bolt embedded in concrete. [Background technology]
[0002] A bridge is mainly composed of a substructure, such as abutments and piers, and a superstructure, such as girders and decks. The superstructure is generally made of concrete or steel, while the substructure is generally made of reinforced concrete (RC), which contains reinforcing bars inside.
[0003] By the way, there are cases where equipment is retroactively installed on bridges that are in service. For example, a "displacement limiting device" is installed to suppress the displacement of the superstructure, a "bridge fall prevention device" is installed to prevent the superstructure from falling, or a reaction frame is installed to jack up the deck during bearing replacement work. Usually, in this type of work, so-called "post-installed anchor bolts" are embedded in the reinforced concrete piers, and then brackets are attached using the post-installed anchor bolts, and then the displacement limiting device is installed.
[0004] Brackets to be attached to bridge piers, etc. are manufactured in a factory, and bolt holes for inserting post-installed anchor bolts are provided at this time. On the other hand, post-installed anchor bolts are naturally installed on-site, and are basically embedded in bridge piers, etc., at the planned position. However, when drilling holes in reinforced concrete structures (e.g., bridge piers) for post-installed anchor bolts, the main reinforcement bars or distribution bars may be located in unexpected positions, in which case the position must be changed before drilling the holes so as not to interfere with the main reinforcement bars, etc. In this way, the position where the post-installed anchor bolt is embedded is often not as planned, and for this reason, the current situation is that the embedded post-installed anchor bolt is surveyed to obtain the tip coordinates, and then the bolt holes for the bracket are provided.
[0005] Conventionally, surveying of post-installed anchor bolts was done manually by surveyors. Specifically, the planned position of the post-installed anchor bolt was indicated on the surface of the reinforced concrete wall with a cross, and the difference from the intersection of the cross to the actual position of the post-installed anchor bolt was measured with a ruler or the like. However, this type of manual measurement method had problems such as the measurement accuracy differing depending on the experience and skill of the surveyor, transcription errors occurring when recording the results of on-site measurements using a ruler or the like in a field notebook, and the fact that it took a long time and considerable effort to manually measure all the post-installed anchor bolts in the first place.
[0006] Therefore, various improved techniques for measuring the position of a post-installed anchor bolt have been proposed. For example, Patent Document 1 proposes a technique for acquiring the position coordinates of a post-installed anchor bolt by installing a measuring jig at the tip of the post-installed anchor bolt and performing photogrammetry using a marker plate of the measuring jig. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2016-121450 A Summary of the Invention [Problem to be solved by the invention]
[0008] The technology disclosed in Patent Document 1 involves attaching a measuring jig to an anchor bolt by screwing the female threaded part of the measuring jig into the male threaded part at the tip of the anchor bolt, and acquiring the position coordinates of the anchor bolt by photographing a marker plate attached to the measuring jig. This technology provides more stable measurement accuracy than conventional manual measurement, prevents human errors such as transcription errors, and reduces the time and effort required for measurement.
[0009] However, the task of screwing the measuring jig onto the tip of the anchor bolt is still a manual task that requires a certain amount of time and effort, and performing this task for all anchor bolts would require a certain amount of work time and effort. In addition, in cases where the male thread of the anchor bolt is not cured, it is possible that mortar or debris is stuck in the male thread, in which case work must be done to remove the mortar, etc., and in some cases, it may be difficult to screw in. On the other hand, in cases where the male thread of the anchor bolt is cured, work must be done to remove the curing in order to screw in the measuring jig, and work must be done to re-cur it after the measurement, which requires work time and effort.
[0010] An object of the present invention is to solve the problems associated with the prior art, that is, to provide a surveying tool that can be more easily installed on the tip of an anchor bolt than the prior art. [Means for solving the problem]
[0011] The present invention was made with a focus on the fact that a surveying tool is fixed to an anchor bolt by magnetically attaching the anchor bolt to a magnet attached to the top surface of the "accommodation hole" that accommodates the tip of the anchor bolt, and is an invention based on an unprecedented idea.
[0012] The surveying tool of the present invention is a tool to be installed at the tip of an anchor bolt embedded in concrete, and includes an anchor-side member and a sign-side member. The anchor-side member is composed of a cylindrical outer shell and a flange extending from the outer shell, and the sign-side member is composed of a base and a wall. The anchor-side member is formed with an insertion hole penetrating in the axial direction, and a steel plate is attached to the upper surface of the base and a magnet is attached to the lower surface of the base. The sign-side member is formed with an accommodation hole surrounded by the lower surface of the base and the inner surface of the wall. The outer shell is accommodated in the accommodation hole to attach the anchor-side member to the sign-side member, and the anchor bolt is inserted into the insertion hole until the tip of the anchor bolt abuts against the magnet, whereby the sign-side member is fixed to the anchor bolt, and the tip coordinate of the anchor bolt can be measured using a magnetic surveying marker magnetically attached to the steel plate.
[0013] The surveying jig of the present invention may also be a combination of one marker side member and two or more anchor side members. However, the two or more anchor side members each have an outer insert body with approximately the same (including the same) outer diameter, and an insertion hole with a different inner diameter. This makes it possible to select an appropriate anchor side member to be attached to the marker side member depending on the diameter of the anchor bolt.
[0014] The surveying tool of the present invention may further include a guide wall disposed so as to surround the steel plate. In this case, the survey marker can be magnetically attached to the steel plate while being guided by the guide wall.
[0015] The surveying tool of the present invention may further include a tightening bolt that is screwed into a bolt hole that penetrates the wall. In this case, the anchor-side member can be fixed to the marker-side member by tightening the tightening bolt with the outer shell housed in the housing hole.
[0016] The surveying tool of the present invention may further include a suspending ring attached to the sign-side member. In this case, when the sign-side member is fixed to the anchor bolt, the suspending ring can be hoisted with a pole to prevent the sign-side member from falling. Effect of the Invention
[0017] The surveying tool of the present invention has the following advantages. (1) Compared to conventional manual measurement, the measurement accuracy is more stable and human errors such as transcription errors can be prevented. (2) In addition, the time and labor required for measurement can be reduced compared to conventional manual measurement. (3) Furthermore, compared to the technology disclosed in Patent Document 1, the manual work of screwing into the tip of the anchor bolt is not required, so the work time and labor can be reduced. (4) Depending on the curing method, it may be possible to fix the curing to the anchor bolt without removing the curing, and at least there is no need to remove mortar or the like from the threaded part in order to measure the anchor bolt. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1A is a cross-sectional view showing a schematic diagram of a surveying jig in a disassembled state before being attached to an anchor bolt, and FIG. 1B is a cross-sectional view showing a schematic diagram of the surveying jig fixed to an anchor bolt. [Diagram 2] Front view showing a magnetic survey marker. [Diagram 3] 2A is a plan view showing a schematic view of the anchor side member, and FIG. 2B is a cross-sectional view showing a schematic view of the anchor side member taken along the line AA. [Figure 4] 4A is a plan view showing a schematic diagram of the sign-side member, and FIG. 4B is a cross-sectional view showing a schematic diagram of the sign-side member along the line BB. [Diagram 5] 1A is a cross-sectional view showing a tightening bolt, a bolt hole, and a sign-side member, and FIG. 1B is a cross-sectional view showing an anchor-side member attached to the sign-side member using a tightening bolt. [Figure 6]1A is a cross-sectional view showing a surveying jig with a hanging ring attached to a sign side component, and FIG. 1B is a cross-sectional view showing a surveying jig hoisted by a sign member via the hanging ring. [Figure 7] A cross-sectional view showing a schematic diagram of a "surveying jig set" consisting of a combination of one sign side component and three types of anchor side components. [Figure 8] 1A is a plan view showing a schematic diagram of a "standalone surveying jig" consisting only of a marker side component, and FIG. 1B is a cross-sectional view taken along the CC arrow showing a schematic diagram of a "standalone surveying jig" consisting only of a marker side component. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] An embodiment of the surveying tool of the present invention will be described with reference to the drawings.
[0020] 1 is a diagram for explaining an overview of the surveying jig 100 of the present invention, where (a) is a cross-sectional view showing the surveying jig 100 in a disassembled state before being attached to an anchor bolt AB, and (b) is a cross-sectional view showing the surveying jig 100 in a state fixed to the anchor bolt AB. As shown in this figure, the surveying jig 100 of the present invention is fixed to the tip of an anchor bolt AB embedded in a concrete structure CO, and therefore the target anchor bolt AB has a part protruding from the surface of the concrete structure CO.
[0021] The surveying tool 100 of the present invention is configured to include an "anchor side member 200" and a "signature side member 300" formed as separate bodies, and the anchor side member 200 is attached to the sign side member 300 and then fixed to the tip of the anchor bolt AB. The sign side member 300 is formed with a bottomed accommodation hole 330 that accommodates a part of the anchor side member 200 (an extrapolated body 210 described later), and one of the anchor side members 200 is formed with an insertion hole 230 that penetrates in the axial direction (i.e., the hole axial direction). As a result, the anchor side member 200 is attached to the sign side member 300 by accommodating a part of the anchor side member 200 in the accommodation hole 330, and the surveying tool 100 (the anchor side member 200 and the sign side member 300) can be fitted into the tip of the anchor bolt AB by inserting the anchor bolt AB into the insertion hole 230. Then, the magnet 312 attached inside the receiving hole 330 and the tip of the anchor bolt AB are magnetically attracted to each other, so that the surveying tool 100 (particularly, the marker side member 300) is fixed to the anchor bolt AB.
[0022] As shown in Fig. 1, a steel plate 311 is attached to the surface of the sign side member 300, for example, by adhesive, and this steel plate 311 can be used to magnetically attach a plate-shaped magnetic survey marker TG as shown in Fig. 2. A so-called target used in conventional photogrammetry can be used as the survey marker TG, and by photographing this with a digital camera or the like, information (such as an identifier) that can identify the survey marker TG and its central position can be ascertained. Then, by performing photogrammetry using the survey marker TG, the three-dimensional coordinates of the center of the survey marker TG can be obtained, that is, the three-dimensional coordinates of the tip of the anchor bolt AB can be obtained.
[0023] Below, each of the main elements constituting the surveying tool 100 of the present invention will be described in detail.
[0024] (Anchor side component) 3 is a schematic diagram of the anchor-side member 200, where (a) is a plan view seen from above, and (b) is a cross-sectional view seen from the arrow AA. As shown in this figure, the anchor-side member 200 is configured to include a cylindrical outer member 210 and a plate-like flange 220, and the flange 220 is installed so as to protrude outward at the end of the outer member 210 on the anchor bolt AB side (the lower side in FIG. 3(b)). The outer member 210 and the plate-like flange 220 are formed as a single unit, and can be made of resin such as polyvinyl chloride. Note that the flange 220 shown in FIG. 3 has an octagonal planar shape, but is not limited thereto and can have any planar shape such as a circle or a hexagon.
[0025] The anchor side member 200 is formed with an insertion hole 230 penetrating in the axial direction. Since the anchor bolt AB is inserted into this insertion hole 230, it is preferable to form the insertion hole 230 with an inner diameter slightly larger than the outer diameter of the target anchor bolt AB. In addition, a band-shaped outer circumferential groove 211 that is slightly recessed from the other surfaces can be formed on the outer circumferential surface of the outer fitting body 210, and the tip of a tightening bolt 351 described later can be abutted against this outer circumferential groove 211.
[0026] (Sign side component) 4 is a schematic diagram of the sign-side member 300, where (a) is a plan view seen from above and (b) is a cross-sectional view seen from the arrow BB. As shown in this figure, the sign-side member 300 is mainly composed of a plate-shaped base body 310 and a cylindrical wall body 320, and can also be composed of a guide wall 340. The base body 310, the wall body 320, and the guide wall 340 are formed as a single unit, and like the anchor-side member 200, can be made of a resin such as polyvinyl chloride.
[0027] The base body 310 has an external shape of, for example, a solid, generally cylindrical shape, and the tip of the anchor bolt AB is in contact with one of the front and back surfaces (hereinafter referred to as the "lower surface"), while the steel plate 311, which is a steel plate material, is attached to the other surface (hereinafter referred to as the "upper surface"). As described above, by using this steel plate 311, a magnetic survey marker TG as shown in FIG. 2 can be installed by magnetic attachment. The three-dimensional coordinates of the center of the survey marker TG are obtained by performing photogrammetry, and the three-dimensional coordinates of the tip of the anchor bolt AB are obtained by this. For this purpose, it is desirable to arrange the survey marker TG so that the center of the anchor bolt AB and the center of the survey marker TG approximately coincide with each other. Therefore, it is preferable to arrange a plurality of guide walls 340 (four in the figure) on the base body 310 so as to rise from the upper surface and to surround the steel plate 311. The position of the survey marker TG, which is guided by these guide walls 340, is forcibly determined; that is, the survey marker TG is placed so that the center of the anchor bolt AB and the center of the survey marker TG approximately coincide with each other.
[0028] An accommodating hole 330 for accommodating the extrapolation body 210 of the anchor side member 200 is formed inside the wall body 320. More specifically, the accommodating hole 330 is a bottomed space surrounded by the inner surface of the wall body 320 and having a bottom defined by the lower surface of the base body 310. Since the extrapolation body 210 is accommodated in this accommodating hole 330, it is preferable to form the accommodating hole 330 with an inner diameter slightly larger than the outer diameter of the extrapolation body 210.
[0029] A slight recess is formed in the center of the underside of the base body 310, and the magnet 312 is attached to the wall body 320 while being housed in this recess. For example, a neodymium magnet can be used as this magnet 312, but any of a variety of conventional magnets can be used as long as they are magnetically attracted to the anchor bolt AB. In addition, when attaching the magnet 312 to the underside of the base body 310, screws 313 can be used as shown in Fig. 4(b), or any of a variety of conventional methods can be used, such as adhesive bonding.
[0030] As described above, the anchor-side member 200 is attached to the sign-side member 300 by accommodating the outer insert 210 in the accommodation hole 330. At this time, it is desirable to configure the anchor-side member 200 to be firmly attached so that it does not come off from the sign-side member 300. Therefore, as shown in Fig. 5, it is preferable to attach the anchor-side member 200 to the sign-side member 300 using a tightening bolt 351. Fig. 5(a) is a cross-sectional view that typically shows the tightening bolt 351, the bolt hole 352, and the sign-side member 300, and Fig. 5(b) is a cross-sectional view that typically shows the anchor-side member 200 attached to the sign-side member 300 using the tightening bolt 351.
[0031] The fastening bolt 351 is screwed into a bolt hole 352 penetrating the wall 320 of the sign-side member 300. For this purpose, a thread is formed on the inner peripheral surface of the bolt hole 352. When the fastening bolt 351 is fastened while the outer insert 210 is accommodated in the accommodation hole 330, the outer surface of the outer insert 210 is pressed against the fastening bolt 351, i.e., the anchor-side member 200 is firmly attached to the sign-side member 300. At this time, if an outer peripheral groove 211 is formed in the outer insert 210, it is preferable to abut the tip of the fastening bolt 351 against the outer peripheral groove 211. The outer insert 210 is pressed down by the axial force of the fastening bolt 351, and the displacement of the outer insert 210 in the direction perpendicular to the axis of the fastening bolt 351 (the vertical direction in FIG. 5(b)) is suppressed, which is preferable. Although Figure 5 shows the sign side component 300 in which one tightening bolt 351 is screwed into the bolt hole 352, the sign side component 300 may also have two or more tightening bolts 351 screwed into the bolt holes 352.
[0032] The surveying jig 100, in which the anchor side member 200 is attached to the sign side member 300, is fixed to the anchor bolt AB by magnetically attaching the tip of the anchor bolt AB to the magnet 312. However, it is possible that the surveying jig 100 may fall off the anchor bolt AB due to an unexpected event such as a strong wind. In this case, if the location is low enough for people to reach, it is not difficult to re-fix the surveying jig 100 to the anchor bolt AB. On the other hand, if the target is an anchor bolt AB installed at a high place, it is necessary to prepare a high-altitude work vehicle or set up new scaffolding, and it will take considerable cost and time to re-fix the surveying jig 100 to the anchor bolt AB.
[0033] Therefore, as shown in FIG. 6, it is advisable to attach a hanging ring 360 to the sign-side member 300 to prevent it from falling. FIG. 6(a) is a cross-sectional view showing the surveying jig 100 with the hanging ring 360 attached to the sign-side member 300, and FIG. 6(b) is a cross-sectional view showing the surveying jig 100 with the measure WR lifted up via the hanging ring 360. As shown in this figure, the hanging ring 360 is formed with a ring portion for connecting the measure WR such as a wire rope, and can be attached to, for example, a base body 310. As shown in FIG. 6(b), when the surveying jig 100 is magnetically fixed to the anchor bolt AB, the lower end of the measure WR hanging down from above is connected to the hanging ring 360. This prevents the surveying jig 100 from falling to the ground even if it falls off the anchor bolt AB due to an unexpected event, and the surveying jig 100 can be easily re-fixed to the anchor bolt AB.
[0034] (Surveying tool set) The insertion hole 230 of the anchor side member 200 is formed with an inner diameter slightly larger than the outer diameter of the target anchor bolt AB. However, the outer diameters of commonly used anchor bolts AB are diverse, such as 27 mm, 29 mm, 33 mm, 36 mm, 39 mm, and 48 mm. For this reason, it is desirable to prepare multiple types of anchor side members 200 according to the anchor bolts AB, in other words, it is desirable to prepare multiple types of anchor side members 200 having insertion holes 230 according to the outer diameters of the anchor bolts AB.
[0035] On the other hand, the receiving hole 330 of the sign side member 300 only needs to have an inner diameter that can receive the outer insert 210, and does not need to have an inner diameter that corresponds to the outer diameter of the anchor bolt AB. Therefore, it is advisable to prepare a set of the surveying tool 100 (hereinafter simply referred to as a "surveying tool set") that is composed of a combination of one sign side member 300 and two or more anchor side members 200. However, the two or more anchor side members 200 that constitute the surveying tool set are each formed with an outer insert 210 having approximately the same (including the same) outer diameter, and each formed with an insertion hole 230 having a different inner diameter. Of course, the receiving hole 330 of the sign side member 300 is formed with an inner diameter that is slightly larger than the outer diameter of the outer insert 210 of the two or more anchor side members 200. For example, FIG. 7 shows a surveying tool set that is composed of a combination of one sign side member 300 and three types of anchor side members 200A to 200C that have different inner diameters of the insertion hole 230. This makes it possible to appropriately select the anchor side member 200 to be attached to the sign side member 300 depending on the outer diameter of the target anchor bolt AB.
[0036] (Single-type surveying fixture) So far, the surveying tool 100 consisting of the anchor side member 200 and the sign side member 300 has been described, but the surveying tool 100 of the present invention can also be one consisting of only the sign side member 300 (hereinafter referred to as a "single-type surveying tool"). FIG. 8 is a diagram showing a schematic diagram of a single-type surveying tool, where (a) is a plan view seen from above, and (b) is a cross-sectional view seen in the direction of the arrow CC. As shown in this figure, the single-type surveying tool has a configuration roughly the same as that of the sign side member 300. However, the anchor bolt AB is directly inserted into the receiving hole 330 instead of the extrapolation body 210 of the anchor side member 200. Therefore, it is preferable to form the insertion hole 230 with an inner diameter slightly larger than the outer diameter of the target anchor bolt AB in the receiving hole 330. Since the single-type surveying tool does not have the anchor side member 200, it does not have the tightening bolt 351 or the bolt hole 352, but it can have a hanging ring body 360. [Industrial Applicability]
[0037] The surveying tool of the present invention can be used for various concrete structures, such as bridges, concrete retaining walls, concrete dams, tunnel lining concrete, etc. Considering that the present invention can efficiently install equipment such as bridge collapse prevention devices and ultimately extend the life of social capital (infrastructure), it can be said to be an invention that can be expected to not only be used industrially but also to make a great contribution to society. [Explanation of symbols]
[0038] 100 Surveying tool of the present invention 200 (Surveying jig) Anchor side member 210 (Anchor side member) outer shell 211 (of an extrapolated body) peripheral groove 220 (Anchor side member) flange 230 (Anchor side member) insertion hole 300 (Surveying tool) sign side member 310 (Sign-side component) base 311 (Base) Steel Plate 312 (Base) Magnet 313 (Base) Screw 320 (Sign-side component) Wall 330 (Sign side member) receiving hole 340 (Sign side component) guide wall 351 (Surveying fixture) fastening bolt 352 (Surveying fixture) bolt hole 360 (surveying jig) hanging ring AB anchor bolt CO Concrete Structure TG survey sign WR strategy material
Claims
1. A jig to be installed at the tip of an anchor bolt embedded in concrete, An anchor side member including a cylindrical outer shell and a flange extending from the outer shell; A sign side member including a base body and a wall body, The anchor side member has an insertion hole formed therethrough in the axial direction, A steel plate is attached to the upper surface of the base body, and a magnet is attached to the lower surface of the base body, The sign member has a receiving hole formed therein and surrounded by a lower surface of the base body and an inner surface of the wall body. The anchor side member is attached to the sign side member by accommodating the outer insert body in the accommodation hole, and when the anchor bolt is inserted into the insertion hole until the tip of the anchor bolt abuts against the magnet, the sign side member is fixed to the anchor bolt, and the tip coordinate of the anchor bolt can be surveyed using a magnetic survey marker magnetically attached to the steel plate. A surveying tool characterized by the above.
2. The combination of one of the marker side members and two or more of the anchor side members, The two or more anchor-side members are each formed with the outer insert body having the same or approximately the same outer diameter, and the insertion holes are each formed with different inner diameters, The anchor side member to be attached to the sign side member can be selected according to the diameter of the anchor bolt.
2. The surveying tool according to claim 1.
3. Further comprising a guide wall arranged to surround the steel plate, The survey marker can be magnetically attached to the steel plate while being guided by the guide wall.
2. The surveying tool according to claim 1.
4. The wall body further includes a fastening bolt that is screwed into a bolt hole that penetrates the wall body, When the fastening bolt is fastened with the outer insert body accommodated in the accommodation hole, the anchor side member is fixed to the marker side member.
2. The surveying tool according to claim 1.
5. The sign further includes a hanging ring attached to the sign member, When the sign-side member is fixed to the anchor bolt, the hanging ring body can be lifted with a rope to prevent the sign-side member from falling.
2. The surveying tool according to claim 1.
Citation Information
Patent Citations
small electric car
JP1993082632U
Measuring jig
JP2016121450A
Surveying target and method for measuring inner-space displacement
JP2018179651A