Abnormality determination method and production management system
The abnormality determination method generates dummy data to address data gaps, ensuring accurate and efficient identification of production process abnormalities by predicting missing operating times and waiting periods, thus overcoming data loss issues in machine learning-based systems.
Patent Information
- Application Number
- JP2023575234
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-01-19
- Filing Date
- 2023-01-13
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-01-13
AI Technical Summary
Existing methods for determining abnormalities in production equipment using machine learning fail to accurately identify issues when input data is missing or exceeds allowable ranges, leading to incomplete or inaccurate determinations.
An abnormality determination method that generates dummy operating status data based on existing data to fill gaps, allowing for comprehensive abnormality determination across multiple production processes even when data is missing, using predicted times and waiting periods to maintain accuracy.
Enables accurate and timely identification of abnormalities in production processes by generating dummy data to compensate for missing input, ensuring high-precision determination without prolonged processing times or increased memory requirements.
Smart Images

Figure 0007576766000001 
Figure 0007576766000002 
Figure 0007576766000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an abnormality determination method and a production management system. [Background technology]
[0002] In production sites such as factories, it is necessary to properly manage the operation status of equipment in order to quickly respond when an abnormality occurs. The use of machine learning (AI) is being considered when managing the status of various devices such as equipment. When using machine learning to manage the status, if input data that exceeds the allowable range is entered, or if no input data is entered at all, it becomes impossible to accurately determine abnormalities.
[0003] In response to this, for example, Patent Document 1 discloses a status determination device that performs guard processing to bring input data closer to the allowable range when data outside the allowable range is input. Patent Document 2 discloses a communication method for a facility operation monitoring device that transfers data using two types of communication methods to prevent data loss. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent Publication No. 2021-55668 [Patent Document 2] JP 2000-134680 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, the state determination device disclosed in Patent Document 1 cannot perform guard processing unless input data is input. Also, the communication method disclosed in Patent Document 2 may be able to reduce the possibility of data loss, but if data loss occurs, it is not possible to determine whether an abnormality has occurred.
[0006] Therefore, the present disclosure provides an abnormality determination method and a production management system that can determine abnormalities with high accuracy. [Means for solving the problem]
[0007] An abnormality determination method according to one embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, the method comprising: determining an abnormality in at least (i) the first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process; (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process; and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. iii) acquiring the third operation status data via a network, and when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, predicting a dummy operation time corresponding to the second operation time based on the first operation time and the third operation time, predicting a dummy wait time in the second process based on the first wait time and the fourth wait time, generating dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time, performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data, and outputting determination result information indicating a result of the abnormality determination process to be displayed on a display device included in the production management system.
[0008] An abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, the abnormality determination method comprising the steps of: acquiring, via a network, (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. a dummy operation time of the second production equipment is calculated based on the first operation time and the third operation time; a dummy waiting time in the second process is predicted based on the first waiting time and the fourth waiting time; dummy operation status data including the dummy operation time and the dummy waiting time is generated; an abnormality determination process is performed for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0009] An abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process and a second production device corresponding to a second process that is a terminal process following the first process, the abnormality determination method comprising the steps of: acquiring, via a network, at least the first operation status data among (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process; if it is determined that the second operation status data has not been acquired based on the result of the above, a dummy operation time corresponding to the second operation time is predicted based on the first operation time, a dummy wait time in the second process is predicted based on the first wait time, dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated, an abnormality determination process is performed for the entire production process including the first process and the second process based on the first operation status data and the dummy operation status data, and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0010] An abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process that is a leading-edge process, and a second production device corresponding to a second process subsequent to the first process, the abnormality determination method comprising the steps of: acquiring, via a network, at least second operation status data among (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process; if it is determined that the first operation status data has not been acquired based on the above, a dummy operation time corresponding to the first operation time is predicted based on the second operation time, a dummy wait time in the first process is predicted based on the second wait time, dummy operation status data corresponding to the first operation status data including the dummy operation time and the dummy wait time is generated, an abnormality determination process is performed for the entire production process including the first process and the second process based on the dummy operation status data and the second operation status data, and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0011] A production management system according to one embodiment of the present disclosure is a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, and the production management system manages at least (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process, and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. The third operation status data is acquired via a network, and when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, a dummy operation time corresponding to the second operation time is predicted based on the first operation time and the third operation time, a dummy wait time in the second process is predicted based on the first wait time and the fourth wait time, dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated, an abnormality determination process is performed for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data, and determination result information indicating the result of the abnormality determination process is output to be displayed on a display device included in the production management system.
[0012] A production management system according to another embodiment of the present disclosure is a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, and the production management system (i) acquires first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process via a network, calculates a dummy operation time of the second production device based on the first operation time and the third operation time, predicts a dummy waiting time in the second process based on the first waiting time and the fourth waiting time, generates dummy operation status data including the dummy operation time and the dummy waiting time, performs an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data, and outputs determination result information representing a result of the abnormality determination process to be displayed on a display device included in the production management system.
[0013] Moreover, one aspect of the present disclosure can be realized as a program for causing a computer to execute the abnormality determination method. Alternatively, one aspect of the present disclosure can be realized as a computer-readable non-transitory recording medium storing the program. Effect of the Invention
[0014] According to the present disclosure, abnormalities can be determined with high accuracy. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a diagram showing a configuration of a production management system according to an embodiment. [Diagram 2] FIG. 2 is a block diagram showing a functional configuration of the production management system according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of the production log data. [Figure 4] FIG. 4 is a sequence diagram showing the operation of the production management system according to the embodiment. [Diagram 5] FIG. 5 is a flowchart showing the operation of the production management system according to the embodiment. [Figure 6] FIG. 6 is a flowchart showing the process of generating dummy operating status data. [Figure 7] FIG. 7 is a diagram showing the relationship between the learned probability distribution and the degree of anomaly, which is a production model of one production line. [Figure 8] FIG. 8 is a flowchart showing the abnormality cause identification process. [Figure 9] FIG. 9 is a flowchart showing the process of generating a learning model by machine learning. [Figure 10] FIG. 10 is a diagram illustrating an example of dummy operation status data that is generated when operation status data for an intermediate process is missing. [Figure 11] FIG. 11 is a diagram showing input data and output data related to the process of generating dummy operational status data. [Figure 12] FIG. 12 is a diagram illustrating an example of dummy operation status data that is generated when operation status data of a leading edge process is missing. [Figure 13] FIG. 13 is a diagram illustrating an example of dummy operation status data that is generated when operation status data for a terminal process is missing. [Figure 14] FIG. 14 is a diagram showing an example of dummy operational status data that is generated in place of operational status data that is not scheduled to be acquired. [Figure 15] FIG. 15 is a diagram showing an example of display of the determination result by the production management system according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] (Summary of the Disclosure) An abnormality determination method according to one embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, the method comprising: determining an abnormality in at least (i) the first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process; (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process; and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. iii) acquiring the third operation status data via a network, and when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, predicting a dummy operation time corresponding to the second operation time based on the first operation time and the third operation time, predicting a dummy wait time in the second process based on the first wait time and the fourth wait time, generating dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time, performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data, and outputting determination result information indicating a result of the abnormality determination process to be displayed on a display device included in the production management system.
[0017] As described above, in a production line including the first production device, the second production device, and the third production device, if any of the production devices malfunctions, the overall operation rate drops and the production volume decreases. If an anomaly determination process is performed for each process and the cause is determined for each process, the determination time becomes long and a large amount of memory is required.
[0018] On the other hand, in the case of a production line in which a first production device, a second production device, and a third production device are connected, it is possible to identify the process in which an abnormality has occurred by performing an abnormality determination process on the entire production process including the first process, the second process, and the third process. In addition, since the amount of processing is reduced, the determination can be made in a shorter period of time.
[0019] However, in the case where there is a first operation status data corresponding to a first process, a second operation status data corresponding to a second process, and a third operation status data corresponding to a third process, if any of the data is lost, the anomaly determination process for the entire production process cannot be performed. Such data loss can occur, for example, due to the status of a network that communicates the first operation status data, the second operation status data, and the third operation status data.
[0020] Therefore, in the anomaly determination method according to one aspect of the present disclosure, as described above, when data loss is determined, corresponding dummy operation status data is generated, so that anomaly determination processing for the entire production process can be continued even if data loss occurs.
[0021] The dummy operation status data is generated based on the operation status data of the processes before and after the process where the data loss occurred. For example, the waiting time (i.e., downtime) per operation hour in the process where the data loss occurred is estimated based on the operation status data of the processes before and after.
[0022] As a result, even if operational status data corresponding to any process is lost due to network conditions or the like, the abnormality detection process for the entire production process can be continued, making it possible to detect abnormalities in a short time without sacrificing accuracy.
[0023] Also, for example, when outputting the determination result information, it may be output that the abnormality determination process was performed using the dummy operating status data in the second step.
[0024] This allows notification that an abnormality determination process was performed using dummy operational status data, making it clear that a problem has occurred with the data transfer, which can lead to improvements.
[0025] Furthermore, for example, the abnormality determination process may be a process for determining the presence or absence of an abnormality in the entire production process based on the total waiting time in the entire operation time of the entire production process.
[0026] This makes it possible to accurately determine abnormalities in the entire production process.
[0027] Furthermore, for example, the abnormality determination process may be a process of determining the presence or absence of an abnormality in each process in the entire production process based on the waiting time during the operation time of the process.
[0028] This makes it possible to accurately determine abnormalities in each process and to accurately identify the cause of the abnormality.
[0029] Also, for example, a result of the abnormality determination process may include that there is no abnormality in the production process.
[0030] This makes it possible to clearly determine whether or not there is an abnormality.
[0031] Also, for example, in the production line, the first production device, the second production device, and the third production device may be connected by a belt conveyor.
[0032] Further, a production management system according to an embodiment of the present disclosure is a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, and the production management system manages at least (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process, and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. i) acquiring the third operation status data via a network, and when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, predicting a dummy operation time corresponding to the second operation time based on the first operation time and the third operation time, predicting a dummy wait time in the second process based on the first wait time and the fourth wait time, generating dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time, performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data, and outputting determination result information indicating a result of the abnormality determination process to be displayed on a display device included in the production management system.
[0033] This provides the same effect as the above-mentioned anomaly determination method, i.e., even if a loss of operational status data occurs for any process, the anomaly determination process for the entire production process can be continued, and anomalies can be determined in a short time without sacrificing accuracy.
[0034] Further, an abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, the method comprising: acquiring, via a network, (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process. a dummy operation time of the second production equipment based on the first operation time and the third operation time; a dummy wait time of the second process based on the first wait time and the fourth wait time; dummy operation status data including the dummy operation time and the dummy wait time; an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; and an abnormality determination process outputting determination result information indicating a result of the abnormality determination process to be displayed on a display device included in the production management system.
[0035] This allows dummy data to be generated in place of data that will not be acquired, not only when data is missing, but also when there is no plan to acquire data. This allows anomaly detection processing to be performed for the entire production process, and anomalies can be detected in a short time without sacrificing accuracy.
[0036] Also, for example, when outputting the determination result information, it may be output that the abnormality determination process was performed using the dummy operating status data in the second step.
[0037] This allows notification that an abnormality determination process was performed using dummy operational status data, making it clear that a problem has occurred with the data transfer, which can lead to improvements.
[0038] A production management system according to another embodiment of the present disclosure is a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, and that acquires, via a network, (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process, a dummy operation time of the second production equipment is calculated based on the first operation time and the third operation time; a dummy wait time in the second process is predicted based on the first wait time and the fourth wait time; dummy operation status data including the dummy operation time and the dummy wait time is generated; an abnormality determination process is performed for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0039] This makes it possible to obtain the same effect as the above-mentioned anomaly determination method. That is, not only when data is missing, but also when there is no plan to acquire data, anomaly determination processing can be performed for the entire production process, and anomalies can be determined in a short time without sacrificing accuracy.
[0040] Further, an abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process and a second production device corresponding to a second process that is a terminal process following the first process, the abnormality determination method comprising the steps of: acquiring, via a network, at least the first operation status data among (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process; when it is determined that the second operation status data has not been acquired based on the time, a dummy operation time corresponding to the second operation time is predicted based on the first operation time, a dummy wait time in the second process is predicted based on the first wait time, dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated, an abnormality determination process is performed for the entire production process including the first process and the second process based on the first operation status data and the dummy operation status data, and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0041] As a result, even if there is a loss of operational status data corresponding to a final process among the entire production process, the abnormality determination process for the entire production process can be continued, making it possible to determine abnormalities in a short time without sacrificing accuracy.
[0042] Also, for example, when outputting the determination result information, it may be output that the abnormality determination process was performed using the dummy operating status data in the second step.
[0043] This allows notification that an abnormality determination process was performed using dummy operational status data, making it clear that a problem has occurred with the data transfer, which can lead to improvements.
[0044] Further, an abnormality determination method according to another embodiment of the present disclosure is an abnormality determination method in a production management system that manages a production line including a first production device corresponding to a first process which is an advanced process, and a second production device corresponding to a second process subsequent to the first process, the abnormality determination method comprising the steps of: acquiring, via a network, at least second operation status data among (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process; when it is determined that the first operation status data has not been obtained based on the time, a dummy operation time corresponding to the first operation time is predicted based on the second operation time, a dummy wait time in the first process is predicted based on the second wait time, dummy operation status data corresponding to the first operation status data including the dummy operation time and the dummy wait time is generated, an abnormality determination process is performed for the entire production process including the first process and the second process based on the dummy operation status data and the second operation status data, and determination result information indicating the result of the abnormality determination process is output to a display device included in the production management system for display.
[0045] As a result, even if there is a loss of operational status data corresponding to the most recent process among all production processes, the abnormality determination process for the entire production process can be continued, and abnormalities can be determined in a short time without sacrificing accuracy.
[0046] Also, for example, when outputting the determination result information, it may be output that the anomaly determination process was performed using the dummy operating status data in the first step.
[0047] This allows notification that an abnormality determination process was performed using dummy operational status data, making it clear that a problem has occurred with the data transfer, which can lead to improvements.
[0048] Hereinafter, the embodiment will be specifically described with reference to the drawings.
[0049] The embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, component arrangements and connection forms, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure. Furthermore, among the components in the following embodiments, components that are not described in the independent claims are described as optional components.
[0050] In addition, each figure is a schematic diagram and is not necessarily illustrated precisely. Therefore, for example, the scales in each figure do not necessarily match. In addition, in each figure, substantially the same configurations are given the same reference numerals, and duplicated explanations are omitted or simplified.
[0051] (Embodiment) [1. Overview of the production management system] First, an overview of the production management system according to the present embodiment will be described with reference to FIG.
[0052] Fig. 1 is a diagram showing the configuration of a production management system 1 according to this embodiment. The production management system 1 shown in Fig. 1 is a system that manages a production line including a plurality of production devices. In this embodiment, the production management system 1 manages a group of facilities 10. First, the group of facilities 10 that is the object of management by the production management system 1 will be described below.
[0053] In Fig. 1, in order to distinguish the multiple production lines and the multiple facilities from one another, different reference numerals are given to each of them, such as the multiple production lines 11a and 11b, the multiple facilities 12a_1, 12a_2, and 12b_1, etc. In the following description, when it is not necessary to distinguish between the production lines and the facilities, they will be described as the production line 11 and the facilities 12.
[0054] The facility group 10 includes x production lines 11, where x is a natural number equal to or greater than 1.
[0055] Each of the x production lines 11 includes n pieces of equipment 12. n is a natural number equal to or greater than 2. The number of pieces of equipment 12 included in one production line 11 may be different from the number of pieces of equipment 12 included in the other production lines 11. Each of the x production lines 11 produces a plurality of products. One product is produced by sequentially carrying out a plurality of processes. The plurality of processes are, for example, component mounting, processing, assembly, etc., but are not limited thereto. The product is produced by the n pieces of equipment 12 included in the production line 11 sequentially carrying out the processes assigned to each piece of equipment.
[0056] The equipment 12 is an example of a production device. For example, the equipment 12 is a component mounter, an assembly device, a processing machine, a conveying device, etc. In the example shown in Fig. 1, n pieces of equipment 12 are connected by a conveyer belt. Work-in-progress products are sequentially conveyed to the n pieces of equipment 12 by the conveyer belt.
[0057] For example, when focusing on the production line 11a, the equipment 12a_1 is a production device corresponding to a leading process. The equipment 12a_n is a production device corresponding to a terminal process. The equipment 12a_2 to the equipment 12a_n-1 are production devices corresponding to intermediate processes. The equipment 12a_1 to the equipment 12a_n produce a product by executing the processes in this order.
[0058] The equipment 12 is provided with one or more sensors (not shown). The sensors measure values that represent the operating status of the equipment 12. For example, the sensors may be, but are not limited to, an image sensor, an infrared sensor, a flow sensor, an ammeter, a pressure gauge, etc. The sensors output the measurement results as operating status data of the corresponding equipment 12.
[0059] The group of facilities 10 and the production management system 1 are connected to each other via a network so as to be able to communicate with each other. The communication may be wired communication or wireless communication, and the specific communication method is not particularly limited.
[0060] The production management system 1 according to this embodiment acquires operation status data output by sensors of each piece of equipment 12 in the equipment group 10, and judges an abnormality in the production line 11 based on the acquired operation status data. The production management system 1 also identifies the cause of the abnormality in the production line 11. Specifically, the production management system 1 identifies the equipment 12 that caused the abnormality and the type of the abnormality among the n pieces of equipment 12 included in the production line 11 that have been judged to be abnormal. The judgment of the abnormality and the identification of the cause of the abnormality are performed using a learning model generated by machine learning. The learning model is a model that outputs an abnormality judgment result and, if an abnormality is found, the cause when operation status data of each piece of equipment 12 for each production line 11 is input.
[0061] Operational status data is necessary to determine anomalies. However, depending on the network conditions, operational status data may be missing. Or, there may be cases where there are no plans to collect operational status data from the start, such as when sensors are not installed.
[0062] When operation status data cannot be acquired due to missing data or other reasons, the production management system 1 generates dummy data for the operation status data. The production management system 1 inputs input data including the dummy data into the learning model, thereby obtaining anomaly determination results and, in the case of an anomaly, the cause of the anomaly. In this way, according to the production management system 1 of this embodiment, even when operation status data cannot be acquired, anomaly determination processing for the entire process of the production line 11 can be continued, and anomalies can be determined in a short time without sacrificing accuracy.
[0063] [2. Configuration of the production management system] Next, a specific configuration of the production management system 1 will be described with reference to FIG.
[0064] Fig. 2 is a block diagram showing the functional configuration of the production management system 1 according to the present embodiment. As shown in Fig. 2, the production management system 1 includes an abnormality determination device 2 and an acquisition unit 13. The abnormality determination device 2 includes an input unit 20, a control unit 30, an output unit 40, and a storage unit 50.
[0065] The acquisition unit 13 acquires, via a network, the operation status data of each piece of equipment 12. The acquisition unit 13 attempts to acquire operation status data of all pieces of equipment 12 included in the production line 11, but may not be able to acquire some of the operation status data.
[0066] The operation status data includes the number of production items in each facility 12 and the operation time corresponding to each production. The number of production items in the facility 12 is the number of products produced by the facility 12 during the operation time of the facility 12. In other words, the number of production items is the number of products output by the facility 12.
[0067] The output here is an intermediate product, i.e., work in progress, except when the equipment 12 is the end equipment of the production line 11. The output by the end equipment 12 is the final product of the production line 11. In the following, there is no distinction between intermediate products and final products, and they will be described as "products". For convenience, materials input to the end equipment 12 may also be called products. The number of production items in the equipment 12 may include not only the number of output items, but also the number of input items of products input to the equipment 12.
[0068] The operation time corresponding to each production includes a start time and an end time of a process for one product by the equipment 12. Alternatively, the operation time corresponding to each production may include a start time and an end time of a process on a lot basis.
[0069] The operation status data may include other information related to the equipment 12 and the product. For example, the operation status data may include identification information of the production line 11, identification information of the equipment 12 or the process, identification information of a lot, and product type information.
[0070] The operation status data may also include information related to the stoppage of the equipment 12. "Stoppage" includes a short-term equipment standby (temporary stoppage) called a "choco stoppage," a stoppage due to a malfunction, a planned stoppage for maintenance work, and the like. The information related to the stoppage includes the time when the stoppage occurred, the time when the stoppage ended, and the cause of the stoppage. The time when the stoppage occurred and the time when the stoppage ended can also be regarded as an example of operation time.
[0071] The information related to the stoppage may include at least one of a previous process waiting time and a subsequent process waiting time. The previous process waiting time is the waiting time of the equipment performing the current process between the immediately preceding process and the current process. The subsequent process waiting time is the waiting time of the equipment performing the current process between the current process and the immediately succeeding process. Each waiting time can be calculated, for example, as the difference between the stoppage end time and the stoppage occurrence time. Therefore, the operation status data including a waiting time can be considered to be synonymous with the operation status data including the stoppage occurrence time and the stoppage end time.
[0072] The acquisition unit 13 is a communication interface that communicates via a network with sensors provided in each facility 12. Alternatively, the acquisition unit 13 may be the sensor provided in each facility 12 itself.
[0073] The input unit 20 accepts operation input from a user such as an administrator. The input unit 20 is, for example, various input devices such as a keyboard and a mouse. The operation input is, for example, an instruction to start anomaly determination, an instruction to start machine learning, an instruction to display the determination result, etc. The operation input may include designation of the production line 11 that is to be subjected to the anomaly determination process, and designation of the target period for the anomaly determination process, etc.
[0074] The control unit 30 is a processing unit that performs main processing of the abnormality determination method. The control unit 30 includes, for example, a processor such as a CPU (Central Processing Unit), a non-volatile memory in which a program is stored, a volatile memory that is a temporary storage area for executing the program, and an input / output port. The control unit 30 may be one computer device, or may be multiple computer devices connected via a network. The processing executed by the control unit 30 may be performed by, for example, cloud computing.
[0075] As shown in FIG. 2, the control unit 30 includes a request unit 31, a loss determination unit 32, a calculation unit 33, an abnormality detection unit , an evaluation unit 35, and an output processing unit .
[0076] The request unit 31 requests the storage unit 50 to transmit operation status data. For example, the request unit 31 requests the transmission of operation status data to be used in the abnormality determination process, based on the production line 11 that is the target of the abnormality determination process and the target period that are received by the input unit 20. The request unit 31 also requests the defect determination unit 32 to execute a determination process for the operation status data transmitted from the storage unit 50 that has not yet been acquired.
[0077] The missingness determination unit 32 determines whether the operation status data transmitted from the storage unit 50 has not been acquired. Specifically, the missingness determination unit 32 determines whether or not there is a missing piece of operation status data for a predetermined process based on at least one of the operation time included in the operation status data for the immediately preceding process and the operation time included in the operation status data for the immediately succeeding process. The missingness determination unit 32 outputs the missingness determination result and the operation status data transmitted from the storage unit 50 to the calculation unit 33.
[0078] When it is determined that operation status data for a specific process has not been acquired, that is, when the missingness determination unit 32 determines that operation status data for the process is missing, the calculation unit 33 generates dummy operation status data for the process. Hereinafter, a process for which operation status data has not been acquired will be referred to as a "missing process." In addition, the process immediately before the missing process will be referred to as the "previous process," and the process immediately after the missing process will be referred to as the "immediately following process." The immediately preceding process, the missing process, and the immediately following process are examples of the first process, the second process, and the third process, respectively, and are performed consecutively in this order without any other processes in between.
[0079] Specifically, the calculation unit 33 predicts a dummy operation time corresponding to the planned production quantity in the equipment of the missing process based on at least one of the operation status data of the immediately preceding process and the operation status data of the immediately succeeding process, and generates dummy operation status data including the planned production quantity and the dummy operation time. The dummy operation time is a predicted value corresponding to the operation time of the missing process. For example, the calculation unit 33 predicts a dummy operation time corresponding to the operation time of the missing process based on at least one of the operation time of the immediately preceding process and the operation time of the immediately succeeding process.
[0080] The dummy operation status data may include a dummy waiting time instead of or in addition to the planned production quantity. The dummy waiting time is a predicted value of the waiting time in the missing process. In this case, the calculation unit 33 predicts the dummy waiting time in the missing process based on at least one of the waiting time between the immediately preceding process and the missing process in the equipment performing the immediately preceding process, and the waiting time between the missing process and the immediately succeeding process in the equipment performing the immediately succeeding process.
[0081] The calculation unit 33 generates dummy performance status data by using the model data 52 and the coefficient data 53 stored in the storage unit 50. A specific example of generating the dummy performance status data will be described later.
[0082] Furthermore, the calculation unit 33 may generate a learning model by executing machine learning. The generated learning model is stored in the storage unit 50 as model data 52. Furthermore, the calculation unit 33 may calculate coefficients for generating dummy operation status data by executing machine learning. The calculated coefficients are stored in the storage unit 50 as coefficient data 53.
[0083] The abnormality detection unit 34 performs an abnormality determination process for the entire production process based on the operation status data of each process and the dummy operation status data. When multiple production lines 11 are provided, the abnormality determination process is performed for each production line 11. That is, the abnormality detection unit 34 performs an abnormality determination process for the entire production process including all processes from the leading process to the trailing process for the target production line 11. Specifically, the abnormality determination process includes a process for determining the presence or absence of an abnormality in the entire production process based on the total number of products produced during the entire operation time of the entire production process. The abnormality determination process may also include a process for determining the presence or absence of an abnormality in each process of the entire production process based on the number of products produced during the operation time of the process.
[0084] The abnormality determination process may include a process for determining the presence or absence of an abnormality in the entire production process based on the total waiting time in the entire operation time of the entire production process, in addition to or instead of the process using the number of produced items. The abnormality determination process may also include a process for determining the presence or absence of an abnormality in each process in the entire production process based on the waiting time in the operation time of the process.
[0085] The evaluation unit 35 performs a process of identifying the cause of the abnormality by evaluating the result of the abnormality determination process. Specifically, the evaluation unit 35 identifies the production line 11 that has been determined to be abnormal. The evaluation unit 35 further identifies the abnormal equipment and its cause among all the equipment included in the production line 11 that has been determined to be abnormal.
[0086] The evaluation unit 35 may further evaluate the dummy operation status data. Specifically, the evaluation unit 35 evaluates the likelihood of the dummy operation status data. The higher the likelihood that the dummy operation status data represents the actual operation status, the higher the accuracy of the result of the anomaly determination process.
[0087] The output processing unit 36 outputs determination result information indicating the result of the anomaly determination processing to the output unit 40. The result of the anomaly determination processing may include not only that an anomaly has occurred but also that there is no anomaly. The output processing unit 36 may further output the evaluation result by the evaluation unit 35 to the output unit 40. For example, when outputting the determination result information, the output processing unit 36 may output information indicating that the anomaly determination processing has been performed using dummy operating status data.
[0088] The output unit 40 outputs determination result information indicating the result of the abnormality determination process. Specifically, the output unit 40 includes a display unit such as a liquid crystal display or an organic EL display. The display unit displays the determination result information. Examples of displays by the output unit 40 will be described later. The output unit 40 may include an audio output unit in addition to or instead of the display unit.
[0089] The storage unit 50 stores information and data necessary for processing performed by the production management system 1. The storage unit 50 is a non-volatile storage device such as a hard disk drive (HDD) or a solid state drive (SSD). The storage unit 50 may be a plurality of storage devices connected via a network.
[0090] As shown in FIG. 2, the storage unit 50 stores production log data 51, model data 52, and coefficient data 53.
[0091] The production log data 51 is a collection of operation status data. FIG. 3 is a diagram showing an example of the production log data 51. As shown in FIG. 3, the production log data 51 includes information on a plurality of items (also called attributes) written at the top. Specifically, the plurality of items include a production line, a process, a lot start time, a lot end time, an operation time, a lot number, an input number, an output number, product type information, a stop occurrence time, a stop end time, and a stop cause. The plurality of attributes may include a corresponding equipment name instead of a process. The number and types of items included in the production log data 51 are not particularly limited.
[0092] Each row of data (also called a record) shown in FIG. 3 corresponds to one stop. For example, the records from the first to third rows are data that represent the operation status of "Process A" of production line 11 of "Line 1". The production start time for the lot with lot number "L001" is "12:00", and the end time for the lot is "15:30". The operation time is "210" minutes. This operation time may be calculated as the difference between the lot end time and the lot start time. The number of inputs to the equipment performing "Process A" is "100", and the number of outputs from the equipment, i.e., the number of production, is "100". Since the number of inputs and the number of outputs are equal, it can be seen that all production was carried out without any production defects. The type of product is "Type 01".
[0093] The record in the first line indicates that during the operation of "Process A" of production line 11 of "Line1", the production line was stopped at "12:10" due to the stop cause "Stop a", and the stop ended at "12:12", and production resumed. Similarly, the record in the second line indicates that the production line was stopped at "12:16" due to the stop cause "Stop b", and the stop ended at "12:20", and production resumed. The record in the third line indicates that the production line was stopped at "12:37" due to the stop cause "post-wait", and the stop ended at "12:40", and production resumed. In this way, three stoppages occurred during the operation of "Process A" of production line 11 of "Line1". Note that "post-wait" means a stop to wait for the process immediately after the target process to be processed. "Pre-wait" means a stop to wait for the process immediately before the target process to be processed.
[0094] The operation status data corresponds to records of the same process of the same production line 11. For example, the records from the first line to the third line are collectively configured as one operation status data. Alternatively, the operation status data may be regarded as one record.
[0095] The model data 52 includes one or more learning models generated by machine learning. The learning model is a production model used in the anomaly determination process. The production model is expressed, for example, by the type of probability distribution of the number of production items during the entire operation time of the entire production process and the parameter values. The types of probability distribution include normal distribution, log-normal distribution, zero-excess exponential distribution, gamma distribution, etc. The parameter type of the probability distribution is determined depending on the type of probability distribution. For example, in the case of normal distribution, the parameter type is the mean μ and the standard deviation σ. The parameter values are generated based on past production results, i.e., past operation status data.
[0096] The one or more learning models may include a production model by equipment, which is represented by the type of probability distribution of the number of production items during the operation time of each piece of equipment and the value of a parameter. The one or more learning models may also include a production model by factor, which is represented by the type of probability distribution of the stoppage time for each stoppage cause during the operation time of each piece of equipment and the value of a parameter. By using at least one of the production model by equipment and the production model by factor, it is possible to identify the equipment in which an abnormality has occurred and the cause of the abnormality.
[0097] The one or more learning models may also include a production model represented by a type of probability distribution of the total waiting time during the total operating time of the entire production process and a parameter value. The production model can be used for the anomaly determination process instead of a production model based on the number of produced items. The one or more learning models may also include a production model for each facility represented by a type of probability distribution of the waiting time during the operating time of each facility and a parameter value.
[0098] The parameters of the learning model can be obtained based on Bayesian estimation, for example, by a sampling method such as Markov Chain Monte Carlo Simulation (MCMC) or by variational estimation such as the Variational Bayesian - Expectation Maximization (VB-EM) algorithm.
[0099] The input data when generating the learning model is operation status data for each process. Specifically, the number of items produced in each process, operation time, downtime (waiting time) for each cause, equipment name, and product type are used as the input data. The type of input data used to generate the learning model is the type of data that should be included in the dummy operation status data. In other words, the dummy operation status data does not need to include data of a type that is not used to generate the learning model.
[0100] The coefficient data 53 includes a coefficient for generating dummy operation data. Specifically, the coefficient data 53 includes a coefficient for calculating a dummy wait time. The coefficient is a correction coefficient based on the tact time difference between the missing process and at least one of the process immediately before and after the missing process. In other words, by using the coefficient, the dummy wait time can be calculated with high accuracy, taking into account the tact time difference between processes.
[0101] The coefficients are calculated by, but not limited to, machine learning. The coefficients may be calculated by regression. The coefficient data 53 may also include coefficients for calculating the dummy operation time and the planned production quantity.
[0102] [3. Operation of the production control system (method of detecting abnormalities)] Next, the operation of the production management system 1, that is, the method of determining an abnormality, will be described with reference to the drawings.
[0103] Fig. 4 is a sequence diagram showing the operation of the production management system 1 according to the present embodiment. Fig. 5 is a flowchart showing the operation of the production management system 1 according to the present embodiment.
[0104] 4 and 5, first, the acquisition unit 13 acquires operation status data from the equipment group 10 and stores it in the storage unit 50 (S11). The operation status data is acquired from all of the equipment 12 included in the equipment group 10 and accumulated in the storage unit 50.
[0105] Next, the storage unit 50 transmits the operation status data for a predetermined period to the control unit 30 (S12). The predetermined period is a period targeted for the abnormality determination process, and is determined based on the operation input received by the input unit 20. For example, the predetermined period is a period during which one lot is produced, one hour, or one day. When the operation input received by the input unit 20 is an instruction for a specific production line 11, the storage unit 50 transmits the operation status data of all the equipment 12 included in that production line 11.
[0106] Next, the missingness determination unit 32 of the control unit 30 determines whether the transmitted operation status data for the predetermined period is complete (S13). If there is unobtained operation status data (No in S13), the calculation unit 33 of the control unit 30 generates dummy operation status data (S14).
[0107] FIG. 6 is a flowchart showing the process of generating dummy operating status data (S14).
[0108] As shown in FIG. 6, the calculation unit 33 identifies a missing process for which no operation status data is available (S141).
[0109] Next, the calculation unit 33 acquires the operation status data of the processes before and after the missing process (S142). At this time, if the missing process is an intermediate process among all the production processes, the calculation unit 33 acquires the operation status data of the immediately preceding process and the immediately following process.
[0110] If the missing process is the leading process among all production processes, the calculation unit 33 acquires the operation status data of the immediately preceding process since there is no immediately preceding process. Instead of the operation status data of the immediately preceding process, the calculation unit 33 may acquire the initial values of each of the production quantity and production start time in the production plan of the target production line 11.
[0111] In addition, when the missing process is the last process among all the production processes, since there is no immediately following process, the calculation unit 33 acquires the operation status data of the immediately preceding process. Instead of the operation status data of the immediately following process, the calculation unit 33 may acquire the final values of each of the production quantity and the production end time based on the production record of the target production line 11.
[0112] Next, the calculation unit 33 acquires coefficients for generating dummy operating status data from the storage unit 50 (S143).
[0113] Next, the calculation unit 33 generates dummy operation status data based on the acquired operation status data and coefficients (S144). For example, the calculation unit 33 predicts the planned production quantity and the dummy operation time, and generates dummy operation status data including the predicted planned production quantity and the dummy operation time. The planned production quantity is, for example, the production quantity (i.e., the output quantity) of the immediately preceding process. Alternatively, the planned production quantity may be the input quantity of the immediately following process. The dummy operation time is the average value of the operation time of the immediately preceding process and the operation time of the immediately following process. The calculation unit 33 may also predict a dummy wait time. The coefficients acquired in step S143 can be used to predict the dummy wait time.
[0114] Through the above steps, the production management system 1 generates dummy operation status data corresponding to the missing process.
[0115] 5, when all the operation status data are available (Yes in S13), or after generating the dummy operation status data, the abnormality detection unit 34 acquires the model data 52 (S15). Specifically, the abnormality detection unit 34 acquires a production model of the production line 11 that is the target of the abnormality determination process. In addition, the abnormality detection unit 34 acquires a production model by equipment and a production model by factor for all the equipment 12 included in the production line 11 that is the target of the abnormality determination process.
[0116] Next, the anomaly detection unit 34 performs an anomaly determination process (S16). Specifically, the anomaly detection unit 34 calculates the degree of anomaly based on the total number of produced items during the entire operation time obtained from the operation status data including the dummy operation status data. The anomaly detection unit 34 may also calculate the degree of anomaly based on the total number of waiting items during the entire operation time obtained from the operation status data including the dummy operation status data.
[0117] 7 is a diagram showing the relationship between the learned probability distribution, which is a production model of one production line, and the degree of anomaly. The horizontal axis is, for example, production takt. The production takt is expressed as total operation time ÷ total number of produced items, or (total operation time - total waiting time) ÷ total number of produced items.
[0118] The actual measurement value indicated by the dashed line in Fig. 7 is the value of the production takt time obtained based on the operation status data of all processes. If operation status data has not been obtained, dummy operation status data generated in step S14 is used. The area shaded with diagonal lines in Fig. 7 is the area of the area to the right of the actual measurement value in the probability distribution, and corresponds to the upper probability, i.e., the degree of abnormality. If the upper probability is smaller than a threshold value, the production line 11 is determined to be abnormal.
[0119] Returning to FIG. 5, if it is determined that there is an abnormality ("abnormal" in S16), the evaluation unit 35 performs a cause identification process (S17).
[0120] Fig. 8 is a flowchart showing the process of identifying the cause of an abnormality. As shown in Fig. 8, the evaluation unit 35 identifies the production line 11 that has been determined to be abnormal (S171). Next, the evaluation unit 35 identifies the abnormal process and its cause in the identified production line 11 (S172). Specifically, the evaluation unit 35 calculates an upper probability based on the actual values for each of a plurality of production models by equipment and by cause, in the same way as in the abnormality determination process. When the upper probability is smaller than a threshold value, the equipment and the cause corresponding to the production model can be identified as the abnormal process and its cause.
[0121] Returning to Fig. 5, if no abnormality is determined ("normal" in S16) or after the cause identification process is completed, the control unit 30 records the result of the abnormality determination process and / or the result of the cause identification process in the storage unit 50 (S18). Next, the output processing unit 36 of the control unit 30 outputs determination result information indicative of each result to the output unit 40 (S19). The output unit 40, for example, generates and displays a result display image indicative of the determination result information.
[0122] As described above, in the production management system 1 according to the present embodiment, even when operation status data cannot be obtained, dummy operation status data is generated and used in the abnormality determination process. Since the abnormality determination process uses a learning model generated by machine learning, it could not be executed in the past due to a lack of data. In contrast, according to the present embodiment, it is possible to execute the abnormality determination process that could not be executed due to a lack of data, and obtain a determination result.
[0123] [4. Learning model generation process] Next, the process of generating a learning model by machine learning will be described with reference to Fig. 9. Fig. 9 is a flowchart showing the process of generating a learning model by machine learning.
[0124] 9, first, the storage unit 50 transmits operation status data for a predetermined period to the control unit 30 (S21). The predetermined period here is, for example, a period longer than the predetermined period in step S12 of FIG. 5, and is, for example, a long period such as one day, one week, one month, several months, half a year, or one year.
[0125] The missingness determination unit 32 of the control unit 30 determines whether or not there is a missingness in the operation status data transmitted from the storage unit 50 (S22). When it is determined that there is a missingness (Yes in S22), the calculation unit 33 of the control unit 30 removes the operation status data related to the missingness (S23). For example, assume that the operation status data when production related to a specific lot was performed in the equipment 12b_3 of the production line 11b in FIG. 1 is missing. In this case, the operation status data related to the production, specifically, the operation status data of the other equipment 12 of the production line 11b, is removed. Note that "removal" means not using it for generating a learning model. Only the operation status data for all processes that are available is used for generating a learning model.
[0126] When it is determined that there is no missing data (No in S22), or after the data removal is completed, the calculation unit 33 generates a learning model and coefficients for generating dummy operational status data by machine learning (S24). Next, the calculation unit 33 records the generated learning model and coefficients in the storage unit 50 (S25).
[0127] 9 may be performed by a processing unit other than the control unit 30. That is, the production management system 1 may use a learning model and coefficients generated by other computing devices.
[0128] [5. Specific Examples] Next, several specific examples of generating the dummy performance data will be described.
[0129] [5-1. Example 1] First, an example of a case where the missing process is an intermediate process will be described with reference to Fig. 10. Fig. 10 is a diagram showing an example of dummy operation status data that is generated when operation status data of an intermediate process is missing.
[0130] In this example, it is assumed that one production line 11 is made up of four pieces of equipment: equipment A, equipment B, equipment C, and equipment D. Equipment A, equipment B, equipment C, and equipment D are connected in that order by a conveyor belt. Equipment A performs the end process A. Equipment B performs the middle process B. Equipment C performs the middle process C. Equipment D performs the end process D. The operation status data for equipment A, equipment B, equipment C, and equipment D, respectively, are referred to as data A, data B, data C, and data D.
[0131] 10, each of the data A to D includes the operation time, the operation duration, the total downtime during the operation duration, and the number of products produced. Each of the data A to D also includes detailed time information related to the downtime.
[0132] The operating time includes, for example, the production start time and production end time of a lot. The operating time is the difference between the production end time and the production start time of a lot. The total downtime is the sum of the downtime (i.e., waiting time) for each stop that occurs during the operating time. For example, data A includes the stop start time and stop end time for each of the three causes, "Stop a," "Stop b," and "wait after." Note that while FIG. 10 shows only three causes, many more stoppages have occurred, and the total of these stoppages is "45 minutes." The number of units produced is the number of products produced by equipment A, i.e., the number of output units.
[0133] 10, data B cannot be acquired due to a loss. In this case, the calculation unit 33 of the control unit 30 generates dummy data B for the lost process based on data A of the immediately preceding process and data C of the immediately following process.
[0134] 11 is a diagram showing input data and output data related to the generation process of dummy operation status data. The input data is data A of the immediately preceding process and data C of the immediately following process. The output data is dummy data B of the missing process.
[0135] The operation time, stop time, and production quantity of data A of the immediately preceding process are respectively Ta, Da, and Pa. The operation time, stop time, and production quantity of data C of the immediately following process are respectively Tc, Dc, and Pc. In the example of Fig. 10, Ta = 210 minutes, Da = 45 minutes, Pa = 100 pieces, and Tc = 211 minutes, Dc = 45 minutes, Pc = 95 pieces. Note that the stop times Da and Dc may be the stop times for each stop.
[0136] The calculation unit 33 calculates the predicted values of the operation time, the downtime, and the number of pieces produced by using the functions f(Ta, Tc), fs(Da, Dc), and fp(Pa). Each function is stored in, for example, a storage unit (not shown) included in the control unit 30 or the storage unit 50.
[0137] The function f(Ta, Tc) is a function for calculating the operating time Tb of the dummy data B. Specifically, f(Ta, Tc) is expressed by the following formula (1).
[0138] (1) Tb = f(Ta, Tc) = Ave(Ta, Tc)
[0139] Ave( ) is a function that returns the average value of the values in the parentheses. In other words, the operating time Tb of the dummy data B is the average value of Ta and Tc. If the example in FIG. 10 is applied, the operating time Tb = 210.5 minutes. In FIG. 10, decimal points are omitted.
[0140] The function fs(Da, Dc) is a function for calculating the stop time Db of the dummy data B. Specifically, fs(Da, Dc) is expressed by the following formula (2).
[0141] (2) Db=fs(Da,Dc)=min(Da,Dc)×α
[0142] min() is a function that returns the minimum value of the values in the parentheses. Also, α is a coefficient included in the coefficient data 53. α is a value determined based on the tact difference between process A and process B, and the tact difference between process B and process C, and is within the range of, for example, 0.9 to 1.1, but is not limited to this.
[0143] Here, by using the stop time for each stop as Da and Dc, it is possible to calculate a detailed dummy stop time for each stop. Specifically, the post-process waiting time is used as Da, and the previous process waiting time is used as Db. The post-process waiting time Da of the previous process A and the previous process waiting time Dc of the next process C are likely to be waiting times caused by the stop of the missing process B. Therefore, by using the post-process waiting time Da of the previous process A and the previous process waiting time Dc of the next process C, it is possible to accurately calculate the waiting time Db of the dummy data B. For example, referring to the example shown in FIG. 10, the first waiting time (Dummy1) of the dummy data B is calculated based on the previous process waiting time of data C, which is 12:10 to 12:12.
[0144] The function fp(Pa) is a function for calculating the predicted value of the production quantity of the dummy data B, that is, the planned production quantity Pb. Specifically, fp(Pa) is expressed by the following formula (3).
[0145] (3) Pb = fp(Pa) = Pa
[0146] In other words, the planned production quantity Pb of the dummy data B is considered to be equal to the production quantity Pa of the immediately preceding process A. This is because it can be considered that all of the products produced in the immediately preceding process A have been processed in the missing process B.
[0147] As described above, when data B is missing, dummy data B is generated. Dummy data B contains the same type of data as data B contains. Therefore, dummy data B can be used in place of data B in the anomaly determination process.
[0148] Note that the types of data contained in dummy data B do not have to all match the types of data contained in data B. Dummy data B only needs to include the types of data used when generating the learning model. For example, if the number of production items is not used when generating the learning model, dummy data B does not need to include the number of production items. Similarly, if the waiting time (downtime) is not used when generating the learning model, dummy data B does not need to include the waiting time.
[0149] In addition, the above formulas (1) to (3) are merely examples and are not limited to the above examples. For example, the planned production quantity Pb may be the production quantity Pc of the immediately following process C. Alternatively, the planned production quantity Pb may be the average value of Pa and Pc.
[0150] [5-2. Example 2] Next, an example in which the missing process is a leading process will be described with reference to Fig. 12. Fig. 12 is a diagram showing an example of dummy operation status data that is generated when operation status data for a leading process is missing. Note that the following description will focus on the differences from the first example, and descriptions of commonalities will be omitted or simplified.
[0151] 12, data A of the leading process cannot be acquired due to a missing process. In this case, since there is no data immediately before the missing process, the calculation unit 33 of the control unit 30 generates dummy data A of the missing process based on data B of the immediately following process.
[0152] Specifically, the functions for calculating the predicted values of the operation time, downtime, and production quantity can be expressed as f(Tb), fs(Db), and fp(Pb) using the operation time Tb, downtime Db, and production quantity Pb of the data B of the immediately following process as variables. In this case, the operation time Ta, downtime Da, and production quantity Pa of the dummy data A of the missing process can be expressed by the following formulas (4) to (6).
[0153] (4) Ta = f(Tb) = Tb (5) Da = fs(Db) = Db × β (6) Pa = fp(Pb) = Pb
[0154] β in formula (5) is a coefficient generated by machine learning or the like, similar to α in formula (2). Also, similar to the first example, the stop time Da can be calculated for each stop. By using the above formulas (4) to (6), the calculation unit 33 can generate dummy data A as shown in FIG. 12.
[0155] The above formulas (4) to (6) are merely examples, and are not limited to the above examples. For example, not only the data B of the immediately following process but also an initial value based on a production plan may be used. For example, the planned production quantity Pa may be the planned production quantity determined in the production plan.
[0156] [5-3. Third Example] Next, an example of the case where the missing process is a terminal process will be described with reference to Fig. 13. Fig. 13 is a diagram showing an example of dummy operation status data that is generated when operation status data of a terminal process is missing. Note that the following description will focus on the differences from the first example, and the description of commonalities will be omitted or simplified.
[0157] 13, data D of the last process cannot be acquired due to a missing step. In this case, since there is no data immediately after the missing step, the calculation unit 33 of the control unit 30 generates dummy data D of the missing step based on data C of the immediately preceding step.
[0158] Specifically, the functions for calculating the predicted values of the operation time, downtime, and production quantity can be expressed as f(Tc), fs(Dc), and fp(Pc) using the operation time Tc, downtime Dc, and production quantity Pc of the data C of the immediately preceding process as variables. In this case, the operation time Td, downtime Dd, and production quantity Pd of the dummy data D of the missing process can be expressed by the following formulas (7) to (9).
[0159] (7) Td = f(Tc) = Tc (8) Dd = fs(Dc) = Dc × γ (9) Pd = fp(Pc) = Pc
[0160] γ in formula (8) is a coefficient generated by machine learning or the like, similar to α in formula (2). Also, similar to the first example, the stop time Dd can be calculated for each stop. By using the above formulas (7) to (9), the calculation unit 33 can generate dummy data D as shown in FIG. 13.
[0161] It should be noted that the above formulas (7) to (9) are merely examples, and are not limited to the above examples. For example, not only the data C of the immediately preceding process but also a final value based on the final production result may be used. For example, the planned production quantity Pd may be the number of units actually produced on the production line 11.
[0162] [5-4. Example 4] The first to third examples above are all cases where operation status data that should have been acquired is missing. However, there are also cases where operation status data was not originally planned to be acquired due to some reason such as equipment problems. In these cases, dummy operation status data can also be generated.
[0163] 14 is a diagram showing an example of dummy operational status data generated in place of operational status data that is not scheduled to be acquired. In the following explanation, the differences from the first example will be mainly described, and explanations of commonalities will be omitted or simplified.
[0164] 14 is the same as the first example in that the operational status data has not been obtained, except that the unobtained operational status data is data that should have been obtained and data that was not originally scheduled to be obtained. Therefore, like the first example, dummy data B can be generated based on formulas (1) to (3).
[0165] In the fourth example, the process of determining whether operation status data is missing (unacquired) (step S13 in FIG. 5) can be omitted. Since the equipment for which operation status data is not scheduled to be acquired is identified, it is possible to set up in advance to generate dummy operation status data for that equipment.
[0166] In the fourth example, a case was described in which data for an intermediate process was not scheduled to be acquired. However, if data for an end process or an end process is not scheduled to be acquired, dummy operation status data can be generated by carrying out processing similar to that of the second or third example.
[0167] [6. Display example] Next, a display example of the determination result by the production management system 1 will be described with reference to Fig. 15. Fig. 15 is a diagram showing a display example of the determination result by the production management system 1 according to the present embodiment.
[0168] 15 shows a display screen 60 showing the results of the abnormality determination process for three production lines 1 to 3. Each production line includes four pieces of equipment A to D in this order.
[0169] The display screen 60 includes a schematic diagram 61 showing the configuration of the production line. In addition, an icon 62 indicating whether or not operation status data has been acquired is displayed in the upper part of the schematic diagram 61. In addition, text 63 indicating the cause of the abnormality is displayed in the lower part of the schematic diagram 61. If there is no abnormal equipment (process), the text 63 is not displayed. The abnormal equipment is displayed with a dashed frame 64. This makes it possible to highlight the abnormal equipment and display it in an easy-to-understand manner. In addition, a graph 65 showing the abnormality determination results of the production line in chronological order, and an icon 66 indicating the presence or absence of an abnormality are displayed on the right side of the schematic diagram 61.
[0170] 15, it can be seen that there was no loss of operation status data and no abnormality occurred in production line 1. On the other hand, it can be seen that there was a loss of operation status data in equipment B in production line 2, but the production itself was completed without abnormality. Since the icon 62 shows that there was a loss of operation status data, it is possible to urge the user to carry out an inspection of the network related to obtaining operation status data, for example.
[0171] Furthermore, in production line 3, not only has a loss of operation status data occurred in equipment B, but an abnormality has also occurred in production, and it can be seen that the cause of the abnormality is "stop B" that occurred in equipment B. By displaying the occurrence of the abnormality, it is possible to encourage the user to perform maintenance work. In addition, by displaying the cause of the abnormality, it is also possible to present the specific equipment to be subjected to the maintenance work and the work content. Therefore, the work efficiency of the maintenance work is improved, the equipment downtime is shortened, and production efficiency can be improved.
[0172] 15 is merely an example and is not particularly limited. Instead of displaying the schematic diagram 61, only the icon 66 indicating whether each production line is abnormal or normal (not abnormal) may be displayed. Also, the icon 62 indicating the acquisition status of the operation status data, the text 63 indicating the cause of the abnormality, and the frame 64 representing the abnormal equipment may not be displayed. Instead of the frame 64, the abnormal equipment may be drawn in a thick line or displayed in a flashing manner.
[0173] (Other embodiments) Although the abnormality determination method and the production management system according to one or more aspects have been described based on the embodiments, the present disclosure is not limited to these embodiments. As long as they do not deviate from the gist of the present disclosure, various modifications conceivable by a person skilled in the art to the present embodiments and forms constructed by combining components in different embodiments are also included within the scope of the present disclosure.
[0174] For example, in the above embodiment, two cases have been described: one in which the number of pieces produced in the facility is used to perform the abnormality determination process, and the other in which the waiting time in the facility is used to perform the abnormality determination process. However, both of the two cases may be performed, or only one of them may be performed. When both are performed, if an abnormality is determined in at least one of them, an abnormality can be determined.
[0175] When only one of the two is performed, the amount of data can be reduced by reducing the amount of information included in the operation status data. For example, when the number of pieces produced by the equipment is used, the operation status data does not need to include the waiting time. Also, when the waiting time of the equipment is used, the operation status data does not need to include the number of pieces produced.
[0176] Furthermore, the communication method between the devices described in the above embodiment is not particularly limited. When wireless communication is performed between the devices, the wireless communication method (communication standard) is, for example, short-distance wireless communication such as ZigBee (registered trademark), Bluetooth (registered trademark), or wireless LAN (Local Area Network). Alternatively, the wireless communication method (communication standard) may be communication via a wide area communication network such as the Internet. Furthermore, wired communication may be performed between the devices instead of wireless communication. Specifically, the wired communication is communication using power line communication (PLC) or a wired LAN.
[0177] In the above-described embodiment, a process executed by a specific processing unit may be executed by another processing unit. The order of multiple processes may be changed, or multiple processes may be executed in parallel. The allocation of components of the production management system to multiple devices is one example. For example, components included in one device may be included in another device. The production management system may be realized as a single device.
[0178] For example, the processes described in the above embodiments may be realized by centralized processing using a single device (system), or may be realized by distributed processing using multiple devices. Also, the processor that executes the above programs may be single or multiple. That is, centralized processing or distributed processing may be performed.
[0179] In the above embodiment, all or part of the components such as the control unit may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a CPU or processor reading and executing a software program recorded on a recording medium such as a HDD or semiconductor memory.
[0180] Furthermore, components such as the control unit may be configured with one or more electronic circuits. Each of the one or more electronic circuits may be a general-purpose circuit or a dedicated circuit.
[0181] The one or more electronic circuits may include, for example, a semiconductor device, an integrated circuit (IC), or a large scale integration (LSI). The IC or LSI may be integrated into one chip or into multiple chips. Here, the IC or LSI is referred to as an IC or LSI, but the name may vary depending on the degree of integration, and may be called a system LSI, a very large scale integration (VLSI), or an ultra large scale integration (ULSI). Also, a field programmable gate array (FPGA) that is programmed after the LSI is manufactured can be used for the same purpose.
[0182] In addition, the general or specific aspects of the present disclosure may be realized as a system, an apparatus, a method, an integrated circuit, or a computer program. Alternatively, the present disclosure may be realized as a computer-readable non-transitory recording medium such as an optical disk, a HDD, or a semiconductor memory in which the computer program is stored. Furthermore, the present disclosure may be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.
[0183] Furthermore, each of the above embodiments can be modified, substituted, added, omitted, and the like in various ways within the scope of the claims or their equivalents. [Industrial Applicability]
[0184] The present disclosure can be used, for example, in management systems and abnormality determination devices at production sites such as factories. [Explanation of symbols]
[0185] 1 Production management system 2 Abnormality determination device 10 equipment group 11 Production Line 12 Equipment 13 Acquisition Department 20 Input section 30 Control section 31 Request part 32 Defectiveness determination section 33 Calculation section 34 Anomaly detection section 35 Evaluation Department 36 Output Processing Section 40 Output section 50 Storage section 51 Production log data 52 Model Data 53 Coefficient data 60 display screen 61 Schematic diagram 62, 66 Icon 63 Text 64 slots 65 Graphs
Claims
1. 1. A method for determining an abnormality in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, comprising: (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process, and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process, at least (i) the first operation status data and (iii) the third operation status data are acquired via a network; when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, a dummy operation time corresponding to the second operation time is predicted based on the first operation time and the third operation time, a dummy wait time in the second process is predicted based on the first wait time and the fourth wait time, and dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated; performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Abnormality determination method.
2. When outputting the determination result information, a message is output indicating that the abnormality determination process was performed using the dummy operational status data in the second step. The method for determining an abnormality according to claim 1.
3. The abnormality determination process is a process for determining whether or not there is an abnormality in the entire production process based on a total waiting time in a total operating time in the entire production process. The method for determining an abnormality according to claim 1 or 2.
4. The abnormality determination process is a process for determining the presence or absence of an abnormality in each process in the entire production process based on the waiting time in the operation time of the process. The method for determining an abnormality according to claim 1 or 2.
5. The result of the abnormality determination process includes that there is no abnormality in the production process. The method for determining an abnormality according to any one of claims 1 to 4.
6. In the production line, the first production device, the second production device, and the third production device are connected by a belt conveyor. The method for determining an abnormality according to any one of claims 1 to 5.
7. A production management system for managing a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, (ii) second operation status data including a second operation time of the second production device, a second waiting time between the first process and the second process, and a third waiting time between the second process and the third process, and (iii) third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process, at least (i) the first operation status data and (iii) the third operation status data are acquired via a network; when it is determined that the second operation status data has not been acquired based on the first operation time and the third operation time, a dummy operation time corresponding to the second operation time is predicted based on the first operation time and the third operation time, a dummy wait time in the second process is predicted based on the first wait time and the fourth wait time, and dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated; performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Production management system.
8. 1. A method for determining an abnormality in a production management system that manages a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, comprising: (i) acquiring, via a network, first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) acquiring, via a network, third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process; calculating a dummy operation time of the second production device based on the first operation time and the third operation time, predicting a dummy wait time in the second process based on the first wait time and the fourth wait time, and generating dummy operation status data including the dummy operation time and the dummy wait time; performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Abnormality determination method.
9. When outputting the determination result information, a message is output indicating that the abnormality determination process was performed using the dummy operational status data in the second step. The method for determining an abnormality according to claim 8.
10. A production management system for managing a production line including a first production device corresponding to a first process, a second production device corresponding to a second process subsequent to the first process, and a third production device corresponding to a third process subsequent to the second process, (i) acquiring, via a network, first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) acquiring, via a network, third operation status data including a third operation time of the third production device and a fourth waiting time between the second process and the third process; calculating a dummy operation time of the second production device based on the first operation time and the third operation time, predicting a dummy wait time in the second process based on the first wait time and the fourth wait time, and generating dummy operation status data including the dummy operation time and the dummy wait time; performing an abnormality determination process for the entire production process including the first process to the third process based on the first operation status data, the third operation status data, and the dummy operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Production management system.
11. 1. A method for determining an abnormality in a production management system for managing a production line including a first production device corresponding to a first process and a second production device corresponding to a second process which is a terminal process subsequent to the first process, comprising: (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process, at least the first operation status data being acquired via a network; when it is determined that the second operation status data has not been acquired based on the first operation time, a dummy operation time corresponding to the second operation time is predicted based on the first operation time, a dummy wait time in the second process is predicted based on the first wait time, and dummy operation status data corresponding to the second operation status data including the dummy operation time and the dummy wait time is generated; performing an abnormality determination process for the entire production process including the first process and the second process based on the first operation status data and the dummy operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Abnormality determination method.
12. When outputting the determination result information, a message is output indicating that the abnormality determination process was performed using the dummy operational status data in the second step. The method for determining an abnormality according to claim 11.
13. 1. A method for determining an abnormality in a production management system that manages a production line including a first production device corresponding to a first process which is a leading end process and a second production device corresponding to a second process following the first process, comprising: (i) first operation status data including a first operation time of the first production device and a first waiting time between the first process and the second process, and (ii) second operation status data including a second operation time of the second production device and a second waiting time between the first process and the second process, at least the second operation status data being acquired via a network; when it is determined that the first operation status data has not been acquired based on the second operation time, a dummy operation time corresponding to the first operation time is predicted based on the second operation time, a dummy wait time in the first process is predicted based on the second wait time, and dummy operation status data corresponding to the first operation status data including the dummy operation time and the dummy wait time is generated; performing an abnormality determination process for the entire production process including the first process and the second process based on the dummy operation status data and the second operation status data; outputting judgment result information representing a result of the abnormality judgment process to be displayed on a display device included in the production management system; Abnormality determination method.
14. When outputting the determination result information, a message is output indicating that the abnormality determination process was performed using the dummy operational status data in the first step. The method for determining an abnormality according to claim 13.
15. A program that causes a computer to execute the abnormality determination method according to any one of claims 1 to 6, 8, 9, and 11 to 14.
Citation Information
Patent Citations
Moving type work processing capacity measuring and evaluating device
JP1998175132A
Communication system for installation operation monitoring device
JP2000134680A
Production line analysis device
JP2005032030A
Operation monitor device, filtering method, operation time measuring system, control program and recording medium
JP2007072724A
Production management device, production management system, and production management method
JP2018185610A