DC Power Distribution System

The DC power distribution system optimizes power conversion and distribution by reducing converter losses and prioritizing important loads, enhancing the duration of power supply during standalone operations.

JP7577243B2Active Publication Date: 2024-11-01MITSUBISHI ELECTRIC CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024505755
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-03-10
Publication Date
2024-11-01
Estimated Expiration
2042-03-10

AI Technical Summary

Technical Problem

Existing DC power distribution systems with storage batteries face inefficiencies due to high power consumption by converters, leading to reduced operational duration during standalone operations, especially when prioritizing important loads.

Method used

A DC power distribution system with a control unit that manages power conversion and distribution by switching to a conduction mode for load-side converters, reducing power consumption by stopping switching operations, and prioritizing power supply to important loads using a DC bus and storage battery power converter.

Benefits of technology

The system extends the operational time for supplying power to critical loads by minimizing system power consumption, ensuring reliable power distribution during outages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007577243000001
    Figure 0007577243000001
  • Figure 0007577243000002
    Figure 0007577243000002
  • Figure 0007577243000003
    Figure 0007577243000003
Patent Text Reader

Abstract

When supply from a main power source (911) has been cut off, this DC power distribution system switches between normal self-sustained operation in which power is supplied to a plurality of DC loads (92) as normal, and limited operation in which supply targets are restricted to, among the plurality of DC loads (92), important loads whose priorities are high, in accordance with a charge state of a storage battery (912). In the limited operation, at least one among a storage battery power converter (42), and power converters, among load-side power converters (5), that are connected to the important loads, is configured so as to stop a switching operation in power conversion, and to electrically connect an input side and an output side.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This application relates to a DC power distribution system. [Background technology]

[0002] In recent years, the use of storage batteries has expanded to respond to power outages and to shift the peak power supply to facilities. For example, a DC power supply and distribution system that supplies and distributes DC power to consumers is an example of a power supply system that uses storage batteries. When using storage batteries for peak shifting and power outages, if the charge of the storage battery is discharged too much due to peak shifting, the storage battery may not be able to function as a backup power source during a power outage.

[0003] In order to achieve an appropriate power distribution according to the remaining capacity of the power storage device, a DC power distribution system has been proposed in which the power supply time to DC devices with low priority is set short and the power supply time to DC devices with high priority is set long (see, for example, Patent Document 1). In other words, during independent operation in response to a power outage, the power supply is cut off in order from DC devices with low priority, in order to extend the operation continuity time of DC devices with high priority as much as possible. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2011-83088 A (paragraphs 0041 to 0047, Figures 3 to 4) Summary of the Invention [Problem to be solved by the invention]

[0005] However, even when supplying power from a storage battery during autonomous operation, power is supplied to the load via multiple power converters, and the power consumption of the power converters that make up the power supply system can sometimes result in the operating time being shorter than expected.

[0006] The present application discloses technology for solving the problems described above, and aims to obtain a DC power distribution system that can reduce the power consumption of the system itself during autonomous operation and extend the time that power can be supplied to important loads. [Means for solving the problem]

[0007] The DC power distribution system disclosed in the present application includes a DC bus to which power is supplied as DC power from a grid power, a storage battery power converter arranged between the DC bus and a storage battery and performing power conversion for charging and discharging the storage battery, a plurality of load-side power converters arranged between each of a plurality of DC loads and the DC bus and converting the power supplied to the DC bus into DC power of a voltage according to each load's specification and supplying the converted power, and a control unit that controls the storage battery power converter and the plurality of load-side power converters in a coordinated manner, wherein when the supply from the grid power is cut off, the control unit switches between a normal independent operation mode in which power is supplied to the plurality of DC loads as usual in accordance with the charge state of the storage battery, and a limiting operation in which the supply is limited to important loads having high priority among the plurality of DC loads, and in the limiting operation, stops the switching operation of at least one of the power converters connected to the important loads among the load-side power converters and the power converters for the storage battery that perform power conversion by switching operation using switching elements, thereby connecting the input side and the output side. Effect of the Invention

[0008] According to the DC power distribution system disclosed in the present application, the power consumption of the system itself can be reduced during independent operation, thereby obtaining a DC power distribution system that can extend the time during which power can be supplied from the storage battery to important loads. [Brief description of the drawings]

[0009] [Figure 1] 1 is a block diagram showing a connection relationship between power sources and loads for explaining a configuration of a DC power distribution system according to a first embodiment. [Diagram 2] 1 is a circuit diagram showing a main circuit of a power converter constituting a DC power distribution system according to a first embodiment. [Diagram 3] 2 is a block diagram of a control unit constituting the DC power distribution system according to the first embodiment. FIG. [Figure 4] 4 is a diagram for explaining setting of an operating region according to a charging rate of a storage battery in the DC power distribution system according to the first embodiment. FIG. [Diagram 5] 4 is a flowchart for explaining the operation of the DC power distribution system according to the first embodiment. [Figure 6] FIG. 13 is a diagram for explaining setting of an operating region according to a modified example in accordance with a charging rate of a storage battery in the DC power distribution system according to the first embodiment. [Figure 7] FIG. 11 is a block diagram showing a connection relationship between power sources and loads for explaining the configuration of a DC power distribution system according to a second embodiment. [Figure 8] 11 is a flowchart for explaining an operation after transition to an independent operation in the DC power distribution system according to the second embodiment. [Figure 9] FIG. 11 is a block diagram for explaining a first operation example of a DC power distribution system according to a second embodiment. [Figure 10] FIG. 11 is a block diagram for explaining an operation example 2 of the DC power distribution system according to the second embodiment. [Figure 11] FIG. 11 is a block diagram for explaining an operation example 3 of the DC power distribution system according to the second embodiment. [Figure 12] FIG. 11 is a block diagram for explaining an operation example 4 of the DC power distribution system according to the second embodiment. [Figure 13] FIG. 11 is a block diagram for explaining a fifth operation example of the DC power distribution system according to the second embodiment. [Figure 14] FIG. 11 is a block diagram for explaining a first operation example of a DC power distribution system according to a third embodiment. [Figure 15] FIG. 11 is a block diagram for explaining an operation example 2 of the DC power distribution system according to the third embodiment. [Figure 16]2 is a block diagram showing an example of a hardware configuration of a control unit constituting the DC power distribution system according to each embodiment. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Embodiment 1 Fig. 1 to Fig. 5 are for explaining the configuration and operation of the DC power distribution system according to the first embodiment, Fig. 1 is a schematic block diagram showing the connection relationship between power sources and loads for explaining the configuration of the DC power distribution system, Fig. 2 is a circuit diagram showing the main circuit of a power converter for a storage battery among multiple power converters that make up the DC power distribution system, Fig. 3 is a block diagram of a control unit that makes up the DC power distribution system, Fig. 4 is a diagram for explaining the setting of the operating range for each operating mode according to the charging rate of the storage battery, and Fig. 5 is a flowchart for explaining the operation of the DC power distribution system.

[0011] 1, a DC power distribution system 1 according to the first embodiment is provided with a control unit 3 that controls distributed power, with a plurality of source-side power converters 4 and load-side power converters 5 connected mainly around a DC bus 8. The system also includes an interface circuit 2 for receiving various commands, various setting values, etc., and transmitting and displaying measurement information via a user of the system or a higher-level control device represented by a server, energy management system, etc.

[0012] In this embodiment, the main power source 911 is assumed to be an AC system as a system power, but may be a DC power source. Also, the storage battery 912 is assumed to be a lithium ion battery, but may be another type of storage battery such as a lead storage battery. The power received from the main power source 911 and the storage battery 912 (collectively referred to as power source 91) is collected by the DC bus 8, converted into DC power suitable for each DC load 92, and distributed.

[0013] A main power supply 911 and a storage battery 912 are respectively connected to the power receiving power converter 41 and the power converter for storage battery 42 constituting the power source side power converter 4. One or more load devices 921 and load devices 922 (collectively referred to as DC load 92) are respectively connected to the load power converter 51 and the load power converter 52 constituting the load side power converter 5.

[0014] Switches 61 and 62 (collectively referred to as power supply side switches 6) that can be switched on and off are provided between the main power supply 911 and the power receiving power converter 41, and between the storage battery 912 and the storage battery power converter 42. Similarly, switches 71 and 72 (collectively referred to as load side switches 7) that can be switched on and off are provided between the load power converter 51 and the load device 921, and between the load power converter 52 and the load device 922.

[0015] The power supply side switch 6 and the load side switch 7 use devices that can switch between on and off using external commands, and perform cut-off during a power outage in response to a cut-off signal sent from the control unit 3. If the devices are to be manually turned on when power is restored, then any device that can at least cut off in response to an external command will suffice. The open / closed state of the switches may be output to the control unit 3.

[0016] The types of DC loads 92 to which power is distributed include, for example, general loads such as lighting loads and office automation equipment, power loads such as air conditioning loads, and IT equipment loads such as servers. In the DC power distribution system 1 of this embodiment, the DC loads 92 are classified as important loads or general loads as a priority order for power distribution targets during a power outage. Therefore, the connection between the load-side power converter 5 and the DC loads 92 is allocated according to the importance and type of the DC loads 92.

[0017] Here, the configuration and characteristics of the power converters will be described. The receiving power converter 41 of the DC power distribution system 1 mainly uses a PWM converter (Pulse Width Modulation Converter) or the like, while the storage battery power converter 42 and the load side power converter 5 mainly use DC power converters such as chopper circuits. The storage battery power converter 42 uses a step-up chopper circuit configured with two semiconductor switches S1 and S2 (here, IGBT: Insulated Gate Bipolar Transistor) as shown in Fig. 2. Note that for simplification, only the main circuit is shown in Fig. 2, and the control circuit, sensors, etc. are omitted.

[0018] In this circuit, the DC power of the storage battery is boosted (power converted) to higher voltage DC power by a switching operation that repeatedly turns on the semiconductor switches S1 and S2 alternately. It is generally known that losses occur during the switching operation of switching on / off the semiconductor switches S1 and S2. Therefore, when there is no need to boost the voltage from the storage battery 912, the semiconductor switch S1 is always kept on and in a conductive state, thereby reducing losses due to the switching operation and enabling conductivity between the input and output (between the storage battery 912 and the DC bus 8).

[0019] This operation is called the conduction mode. Therefore, the DC power distribution system 1 of the present application is configured to use the conduction mode depending on the operating state, and to reduce the loss due to the power consumption of the system itself. Note that this conduction mode is not limited to the boost chopper circuit shown in Fig. 2, but other conversion circuits such as a step-down chopper, a step-up / step-down chopper, or a PWM inverter can also perform the same operation.

[0020] In the conduction mode, the input and output can be made conductive while reducing losses due to switching operations, so power consumption can be reduced regardless of the type of power converter. However, there are some types of power converters that cannot operate in the same way as in the conduction mode, and such power converters are not subject to the conduction mode specifications.

[0021] Next, the configuration of the control unit 3 will be described with reference to Fig. 3, including general components for controlling switching between the grid-connected operation mode when grid-connected power is being supplied and the independent operation mode during a power outage, and a configuration for controlling the above-mentioned conduction mode operation. The configuration for mode switching control includes a state detection unit 31 that detects the state of each device in the system based on information from a sensor unit or the like of each device, and an operation mode determination unit 32 that determines the operation mode based on information or commands obtained from the state detection unit 31 and the interface circuit 2.

[0022] As a configuration for executing the above-mentioned conduction mode, the power converter includes an operation mode determination unit 32, a state detection unit 31, and an operation command generation unit 33 that generates operation commands to each power converter based on information and commands from the interface circuit 2. The power converter also includes a threshold database (indicated as DB in the figure) 34 that holds information on thresholds and the like used for operation settings according to the charge state of the storage battery 912, and a priority order database 35 that holds information on the priority order of each DC load 92. The power converter also includes an equipment specification database 36 that holds information on equipment specifications such as the operating voltage range of each DC load 92 and the operating range of the power converter. The operation commands for each power converter include output voltage commands, signals related to starting and stopping the power converter, and commands for charging and discharging power from the storage battery 912.

[0023] Next, the operation setting of the DC power distribution system 1 according to the first embodiment will be described with reference to a conceptual diagram of setting the operation range for each operation mode according to the fluctuation of the state of charge (hereinafter referred to as SoC (State of Charge)) of the storage battery in Fig. 4. The determination of the operation mode and the setting of the operation range are determined by the control unit 3 based on the SoC of the storage battery 912, and the operation states of the main power source 911 and the receiving power converter 41.

[0024] The operating modes are broadly classified into two: an interconnected operation mode in which power is supplied to a DC load 92 using power received from a main power source 911 and a storage battery 912, and an independent operation mode in which there is no connection to the main power source 911 and power is supplied to a DC load 92 using only power from the storage battery 912.

[0025] In the grid-connected operation mode, a normal operation range in which there are no operational restrictions on charging and discharging from the storage battery 912 and a semi-restricted operation range in which discharging from the storage battery 912 is stopped are set depending on whether the SoC is equal to or greater than the threshold Sth1. In the independent operation mode, an independent operation range in which power is supplied to the multiple DC loads 92 as usual and a restricted operation range in which power is supplied only to one or more limited DC loads 92 that are previously determined to be important loads are set depending on whether the SoC is equal to or greater than the threshold Sth1.

[0026] In addition, for any operation mode, a charge stop threshold Smax for preventing shortening of the life of the storage battery 912 due to overcharging and a discharge stop threshold Smin for preventing shortening of the life of the storage battery due to overdischarging are separately set to protect the storage battery 912. An area exceeding the charge stop threshold Smax is set as a charge stop region where charging to the storage battery 912 is stopped, and an area below the discharge stop threshold Smin is set as a discharge stop region where discharging from the storage battery 912 is stopped.

[0027] The threshold value Sth1 is set based on the required power amount roughly calculated in advance from the estimated power consumption and power supply time of the DC load 92 having high importance. For example, the threshold value Sth1 is set to a value such that the amount of power obtained when the storage battery 912 is discharged from the threshold value Sth1 to the discharge stop threshold value Smin exceeds the required power amount, and is stored in the threshold value database 34 together with the charge stop threshold value Smax and the discharge stop threshold value Smin. Also, there are cases where an instruction to change the threshold value Sth1 in real time is given from the interface circuit 2.

[0028] On the premise of the above configuration and settings, the operation of the DC power distribution system 1 will be described with reference to the flowchart in Fig. 5. It is assumed here that an IT device load such as a server is connected to load device 921, and the priority of the load is set as an important load, and that a general load such as lighting is connected to load device 922, and the priority of the load is set as a general load.

[0029] First, the operation mode determination unit 32 determines the operation mode based on the operation states of the main power supply 911 and the power receiving power converter 41 detected by the state detection unit 31 (steps S100 to S110). As described above, when the main power supply 911 and the power receiving power converter 41 are operating, it is determined that the operation mode is the grid-connected operation mode in which power is supplied to the DC load 92 using power received from the main power supply 911 and the storage battery 912. On the other hand, when the main power supply 911 experiences a power outage or the power receiving power converter 41 fails, it is determined that the operation mode is the independent operation mode in which power is supplied to the DC load 92 only by the storage battery 912.

[0030] If it is determined that the system is in the grid-connected operation mode ("No" in step S120), the DC power distribution system 1 performs grid-connected operation to supply power received from the AC system, which is the main power source 911, to the DC load 92 (step S200). At that time, the system is operated so that the Soc is in a range of less than or equal to the charge stop threshold Smax and more than or equal to the discharge stop threshold Smin. Then, until it is determined that the system is in the independent operation mode due to a change in the situation, the system continues grid-connected operation control that switches between a normal operation range in which there is no limit on the charge / discharge operation from the storage battery 912, and a semi-limited operation range in which discharging from the storage battery 912 is stopped, depending on the Soc.

[0031] Furthermore, during grid-connected operation, peak cut control is performed in response to commands from a higher-level control device or a user. Peak cut control refers to control in which, when the received power is greater than a predetermined peak cut command, power is discharged from the storage battery 912 to reduce the received power. Also, when the received power is less than the peak cut command, charging to the storage battery 912 may be performed. However, since the operation of this grid-connected operation mode is the same as that of general grid-connected operation, a detailed description will be omitted.

[0032] If too much power is consumed from the storage battery 912 due to peak cut control during grid-connected operation, there is a concern that the duration of power supply to the DC load 92 during independent operation may not be sufficiently secured. Therefore, as shown in Fig. 4, when the Soc of the storage battery 912 falls below the threshold Sth1, the discharge of the storage battery 912 for peak cut is limited. This operation ensures the duration of power supply to important loads during independent operation.

[0033] On the other hand, if a power outage occurs in the AC system or a failure occurs in the receiving power converter 41 and it is determined that the system is in the independent operation mode ("Yes" in step S120), the storage battery 912 becomes the main power source and performs an independent operation operation to supply power to the DC load 92. When the system transitions from the grid-connected operation operation to the independent operation operation, the determination of the operating range described in Fig. 4 is performed based on the SoC of the storage battery.

[0034] Basically, in grid-connected operation, the SoC operates in a range of not less than the discharge stop threshold Smin and not more than the charge stop threshold Smax, so immediately after transition to independent operation, for example, it is determined whether the SoC of the storage battery 912 is not less than the threshold Sth1 (step S300). If it is not less than the threshold Sth1 ("Yes" in step S300), it is determined that the storage battery 912 is in an independent operation operating range in which full load can be supplied from the storage battery 912 to the load devices 921 and 922 (step S600), and the independent operation is continued until it falls below the threshold Sth1.

[0035] On the other hand, when the SoC of the storage battery 912 is below the threshold value Sth1 ("No" in step S300), it is determined that the storage battery 912 is in a limited operating range in which power is supplied only to important loads with high importance, and operation control is performed to supply power only to the important loads (steps S410 onward). Therefore, the operation command generator 33 selects the load device 921 as a power supply target based on priority information held in the priority database 35 for determining whether the load is a general load or an important load.

[0036] Furthermore, based on the equipment specification information constituting the power supply system from the storage battery 912 to the important load (load device 921), at least one power converter in the power supply system is selected as a target for conduction mode operation (step S410), and an operation command is generated based on the selection result.

[0037] For example, the power converter for storage battery 42 is selected as a target for the conduction mode as an operating configuration that minimizes power consumption based on the output voltage range of the storage battery 912, the operating range (voltage) of the load device 921, and the operating characteristics of the power converter for storage battery 42 and the power converter for load 51. At this time, the input voltage of the power converter for load 51 changes when DC power is directly supplied from the storage battery 912, but a command (operation command) is also generated regarding an operation to compensate for the change and maintain the output voltage to the load device 921. Furthermore, an operation command is generated to stop the operation of devices other than the above power supply system, such as the power converter for load 52.

[0038] If the operating range of the load device 921 is within the output voltage range of the storage battery 912 and no problem occurs with the efficiency of the load device 921, the load power converter 51 may also be set to the conduction mode in addition to the storage battery power converter 42. Alternatively, if selecting the load power converter 51 has a higher effect of suppressing power consumption than the storage battery power converter 42, only the load power converter 51 may be selected for the conduction mode. Furthermore, in addition to selecting the conduction mode, a combination for suppressing power consumption, such as a change in output voltage, may be determined.

[0039] When an apparatus in the system receives an operation command from the operation command generating unit 33, power is supplied from the storage battery 912 to the load apparatus 921 with high importance at a limited level, and at least one of the apparatuses is restricted to operate in a conductive mode (step S420). In this state, when the SoC of the storage battery 912 falls below the discharge stop threshold Smin ("Yes" in step S430), the independent operation is stopped (step S430) and the operation is terminated.

[0040] That is, in the limited operating range, the switching operation of at least one of the storage battery power converter 42 and the load power converter 51 is stopped and operated in a conductive mode depending on the voltage of the storage battery 912 and the distribution voltage to the DC load 92 of high importance. This operation makes it possible to reduce losses caused by switching, reduce losses caused when power is supplied from the storage battery 912 to the load device 921, and increase the power supply time compared to the case where the supply target is simply limited.

[0041] It should be noted that whether the switching operation of the storage battery power converter 42 or the load power converter 51 is to be stopped may be set in advance, and the information on this may be stored in the equipment specification database 36 or the like. In this case as well, the decision is made in consideration of the load on the device and the effect of reducing losses, based on the loss characteristics and rated voltages of the storage battery power converter 42 and the load power converter 51, respectively, and the relationship between the storage battery voltage and the rated voltage of the load device 921, etc.

[0042] Variations. Fig. 6 is a diagram corresponding to Fig. 4 for explaining the setting of the operating range when different thresholds are set for the charging rate of the storage battery during grid-connected operation and during independent operation as a variation example. In the above example, the same threshold Sth1 is used as the threshold for transition to the semi-limited operating range during grid-connected operation and the threshold for transition to the limited operating range during independent operation, but this is not limited to this. As shown in Fig. 6, a second threshold Sth2, which is different from the threshold Sth1 during independent operation, may be used as the threshold during grid-connected operation.

[0043] By setting different thresholds, it becomes possible to set optimal operation settings for grid-connection operation without being bound by the threshold Sth1 that is set based on the duration of the important load.

[0044] Embodiment 2 In the above-mentioned first embodiment, an example in which the power supply is configured only by a storage battery and a main power supply is shown, but the present invention is not limited to this. In the second embodiment, an example in which the power supply is configured by adding a solar panel will be described. Figs. 7 to 13 are for explaining the configuration and operation of the DC power distribution system according to the second embodiment. Fig. 7 is a schematic block diagram showing the connection relationship between the power supply and the load for explaining the configuration of the DC power distribution system, and Fig. 8 is a flowchart for explaining the operation after transition to independent operation.

[0045] Fig. 9 is a block diagram corresponding to Fig. 7 showing an operation example during grid-connected operation as operation example 1, Fig. 10 is a block diagram corresponding to Fig. 7 showing an operation example during independent operation when the solar panel is generating power as operation example 2, and Fig. 11 is a block diagram corresponding to Fig. 7 showing an operation example during independent operation when power generation by the solar panel is stopped as operation example 3. Figs. 12 and 13 are block diagrams corresponding to Fig. 7 showing operation examples during independent operation when power generation by the solar panel is stopped under different conditions as operation examples 4 and 5, respectively. Note that Figs. 2 to 4 described in embodiment 1 are used for the basic configuration of the control unit and the basic operation in independent operation.

[0046] 7, the DC power distribution system 1 according to the second embodiment is an extension example of the DC power distribution system 1 described in the first embodiment, in which a solar panel 913, which is a power generation facility, is added as a power source 91 and the types of DC loads 92 are increased. The solar panel 913 is connected to the DC bus 8 via a switch 63 and a PV power converter 43. As the DC load 92, a load device 923 and a load device 924 are newly added, the load device 923 is connected to the DC bus 8 via a load power converter 53 and a switch 73, and the load device 924 is connected to the DC bus 8 via a switch 74 without going through a power converter.

[0047] Here, it is assumed that the power converters other than the power receiving converter 41 have a function of either stepping up or stepping down the DC power in accordance with the voltage of the device. As shown in Fig. 9, it is assumed that the power obtained from a plurality of power sources 91 with different input forms and voltages is supplied to a plurality of DC loads 92, each of which has a different DC voltage.

[0048] For example, the power source side power converter 4 has a different input power form and voltage, i.e., 400V AC, the storage battery power converter 42 has a different input power form and voltage, i.e., 400V DC, and the PV power converter 43 has a different input power form and voltage, i.e., 350V DC, but they are set to output the same 750V DC power to the DC bus 8. Similarly, the load side power converter 5 receives the same 750V DC input, but is set to output DC power of different voltages, i.e., 600V DC for the load power converter 51, 380V DC for the load power converter 52, and 282V DC for the load power converter 53. In the second embodiment, it is assumed that the priority order of the DC load 92 is set such that the load devices 921 and 924 are general loads, and the load devices 922 and 923 are important loads.

[0049] Next, the operation of the DC power distribution system 1 according to the second embodiment will be described. The solar panel 913 and the PV power converter 43 basically perform maximum power point tracking control operation (hereinafter referred to as MPPT (Maximum Power Point Tracking) control) to maximize the power generated from the solar panel 913, and continue power generation regardless of the operation mode. However, when power generation is not expected due to a time period such as nighttime or weather conditions such as rainy weather, a command to stop is issued by a schedule function or a higher-level control device.

[0050] In the limited operation range, there is no change in the fact that power supply to DC loads 92 classified as general loads in the predetermined priority order of DC loads 92 is stopped, but whether or not to use the conduction mode is determined based on whether or not power generation from the solar panel 913 is possible. This is because, basically, the power generated from the solar panel 913 via the PV power converter 43 is sufficiently greater than the power suppressed by switching to the conduction mode, so that continuing the operation of the PV power converter 43 is prioritized over using the conduction mode.

[0051] In the second embodiment, the operation is basically the same as that described in the first embodiment, except for the operation according to the state of the solar panel 913 and the PV power converter 43. However, since there is a difference in the operation in the limited operation region, the operation after step S300 will be described with reference to the flowchart in Fig. 8. That is, the operation will be described when a power outage occurs in the AC system, the discharge of the storage battery 912 progresses after the transition to independent operation, the SoC falls below the threshold value Sth1, and the transition to the limited region is made.

[0052] If it is determined that the state is in the limited operating range ("No" in step S300), for example, the state detection unit 31 collects information indicating the power generation status of the solar panel 913, such as the operating state of the PV power converter 43 and time information related to sunlight, and information indicating the load state (distribution voltage). Then, it is determined whether or not power exceeding the power suppressed by the conversion to the conduction mode described above can be obtained from the solar panel 913, that is, whether or not effective power generation is possible from the solar panel 913 (step S310). At that time, even if the current amount of power generation is high, if it is determined that the power generation duration is short, such as near sunset, it may be determined that power generation is not possible.

[0053] In a situation where the solar panel 913 continues to generate power during the daytime or the like, the operation mode determination unit 32 determines that the solar panel 913 has sufficient power generation, that is, that power generation is possible ("Yes" in step S320). The operation command generation unit 33 selects the load devices 922 and 923 as targets for power supply based on priority information for determining whether the loads are general loads or important loads, which is held in the priority database 35 (step S510).

[0054] In response to the selection result, the operation command generating unit 33 generates an operation command to stop the load power converter 51, which is a device other than the power supply system leading to the important load, and to stop the power supply to the general load by opening the switch 71 and the switch 74. Then, as shown in Fig. 10, the load power converter 51, which is a device other than the power supply system leading from the storage battery 912 and the solar panel 913 to the load device 922 and the load device 923, is stopped, and the switch 71 and the switch 74 are opened to stop the power supply to the general load (step S520).

[0055] Then, until the SoC of the storage battery 912 falls below the discharge stop threshold Smin ("No" in step S430), the process proceeds to step S310, and the power generation status of the solar panel 913 is determined on an ongoing basis.

[0056] On the other hand, if it is determined that the power generated from the solar panel 913 is insufficient, that is, power generation is not possible ("No" in step S320), the operation transitions to the limited operating range (step S410) described in the first embodiment. Then, as shown in Fig. 11, the power supply to the general loads (load devices 921, 924) is stopped, and the operation of the storage battery power converter 42 is transitioned to a conduction mode based on a preset setting table, thereby reducing losses. When transitioning the operation of the storage battery power converter 42 to the conduction mode, control is performed to transition the operation so that the voltage of the DC bus 8 does not change suddenly.

[0057] Example of operation under different conditions. Here, an example of operation (operation control of the power converter) under different conditions will be described when power generation by the solar panel 913 stops. As shown in Fig. 12, under conditions (e.g., DC 350 V) where the storage battery voltage falls within the operating voltage range of the important loads (load device 922, load device 923), the storage battery power converter 42, the load power converter 52, and the load power converter 53 are all set to the conductive mode.

[0058] On the other hand, as shown in Fig. 13, under conditions where the storage battery voltage is lower (e.g., DC 320V) than the operating voltage range of the important loads (load device 922, load device 923), the switching operation of the storage battery power converter 42 is turned on to perform power conversion operation. At that time, the power conversion operation of the storage battery power converter 42 is controlled so that the voltage of the DC bus 8 becomes an output voltage (e.g., DC 350V) that falls within the operating voltage range of the important loads. Then, the load power converters 52 and 53 are placed in a conductive mode, and the DC voltage of the DC bus 8 (350V in this example) is supplied as is to the important loads.

[0059] As in the second embodiment, when the number of DC loads 92 increases and power generation facilities such as solar panels 913 are added, it is possible to reduce losses by minimizing the number of operating power converters and stopping the supply to general loads while fully utilizing the power generated by the solar panels 913. This makes it possible to extend the time during which power can be supplied from the storage battery 912 to the important loads, compared to when the supply to the general loads is simply stopped.

[0060] In particular, in operation example 4 described in Fig. 12 as an operation example under different conditions, the conversion loss is suppressed by setting both stages of the power converters from the storage battery 912 to the important load to the conduction mode. Also, even under the conditions described in Fig. 11, if the important load can be operated with the voltage of the storage battery 912 (400V in this example), the storage battery power converter 42 may also be set to the conduction mode.

[0061] On the other hand, in operation example 5 described in FIG. 13, by setting one of the two stages of power converters from the storage battery 912 to the important load to the conductive mode, it is possible to expect an effect equivalent to that of operation example 3 described in FIG. 11 (reduction of conversion loss).

[0062] In this embodiment, the configuration shown in FIG. 7 is shown, but it goes without saying that the same effect can be obtained by adding further load devices, or by adding power generation equipment such as a fuel cell, or an electric vehicle used as a storage battery, etc.

[0063] Furthermore, for example, when there is an overlapping region among the operating voltage ranges of a plurality of important loads, the number of switching targets may be reduced by setting the battery power converter 42 to the voltage region of the common portion and setting the load side power converter 5 for the important load to the conductive mode. However, the target power converters should be devices that can at least either respond to changes in input voltage or vary the output voltage in response to an operation command.

[0064] In either case, it is necessary to select a combination that can obtain the effect of suppressing power consumption without placing an excessive burden on the DC load 92 and the devices in the system (especially the power converter). In this case, the combination may be selected based on a preset setting table, or the operation command generating unit 33 or the like may select or determine based on information held in the device specification database 36 or the like.

[0065] Embodiment 3 In the present embodiment 3, the configuration and operation of power distribution in the case of supplying full load in the independent operation mode will be described on the premise of the configuration and operation of the above-mentioned embodiment 1 or embodiment 2. Fig. 14 and Fig. 15 are for explaining the configuration and operation of the DC power distribution system according to the embodiment 3, Fig. 14 is a block diagram corresponding to Fig. 7 of the embodiment 2 showing a state in which power is distributed to the full load in the independent operation operation range as an operation example 1, and Fig. 15 is a block diagram corresponding to Fig. 7 of the embodiment 2 showing a state in which supply to the load is stopped to avoid a voltage drop of the DC bus in the independent operation operation range as an operation example 2. Figs. 2 to 4 and Figs. 7 to 10 used in the embodiments 1 and 2 are used.

[0066] The configuration of the DC power distribution system 1 according to the third embodiment is the same as that shown in Fig. 7 described in the second embodiment, but there is a difference in the operation of the control unit 3, and therefore an operation example will be described. The storage battery 912 and the storage battery power converter 42 are basically selected to have a capacity capable of supplying sufficient power to important loads during independent operation, but due to cost issues, they may not have a capacity capable of supplying sufficient power to all of the DC loads 92.

[0067] In the third embodiment, in order to deal with a case where the power supply capacity becomes insufficient in the full load supply mode, the priority of the DC loads 92 is determined in more detail. In addition to classifying the DC loads 92 as important loads or general loads as in the second embodiment, a second priority order is set to further assign a rank to the DC loads 92 classified as general loads according to their importance.

[0068] Here, it is preferable to judge the insufficiency of the power supply capacity using the output power information from each power converter. This is because in the autonomous operation range, the voltage of the DC bus 8 is maintained using the storage battery power converter 42 and the PV power converter 43, but if the power consumption of the DC load 92 exceeds the supply capacity, the voltage of the DC bus 8 cannot be maintained and drops. Therefore, by detecting this voltage drop, it is possible to judge the insufficiency of the power supply capacity.

[0069] However, it is not realistic to mount a sensor capable of measuring power in all power converters. Therefore, in the third embodiment, a measurement value of the voltage of the DC bus 8 (DC bus voltage) that is always obtained in any of the power converters is used to determine whether or not there is a shortage in the power supply capacity. Then, the presence or absence of a shortage in the power supply capacity is determined based on whether or not the DC bus voltage is below the voltage threshold Vth. If it is determined that there is a shortage in the power supply capacity, the power supply to the DC loads 92 is sequentially stopped according to the second priority order until the shortage in the power supply is resolved.

[0070] For example, it is assumed that the maximum power supply capacity of the storage battery 912 is 50 kW. Furthermore, it is assumed that the priority order of the DC load 92 is set such that the load devices 922 and 923 are important loads, the load devices 921 and 924 are general loads, and the load device 921 has a higher second priority than the load device 924.

[0071] In the autonomous operation mode and autonomous operation range, the total power (power demand) consumed by the four DC loads 92 is assumed to be 80 kW (30 kW + 10 kW + 10 kW + 30 kW) as shown in Fig. 14. In contrast, it is assumed that the solar panel 913 can supply 40 kW of power during power generation. Then, if the storage battery 912 is caused to supply 40 kW, the total (power supply) will be 80 kW (40 kW + 40 kW), which means that there is sufficient power supply capacity.

[0072] If time passes from a state in which the solar panel 913 is capable of generating power until nighttime, at which point power generation from the solar panel 913 stops, the power supply will be insufficient even if the storage battery 912 supplies the maximum amount of power of 50 kW, and the DC bus voltage will drop. For example, the operation mode determination unit 32 compares the DC bus voltage detected by the state detection unit 31 with a voltage threshold Vth, and if the voltage is lower than the voltage threshold Vth, it is determined that there is a power supply shortage.

[0073] Then, in the operation command generating unit 33, an operation command to open the switch 74 is generated to stop the power supply to the load device 924, which is the lowest in the second priority order, and the operation proceeds to that shown in Fig. 15. In the second operation example shown in Fig. 15, the shortage of the power supply is resolved by disconnecting the load device 924, but if the shortage is not resolved, the power supply to the higher-level load device 921 is stopped. If the power generation of the solar panel 913 is resumed thereafter and the power supply increases, the load devices 921 and 924 may be reconnected from the higher-level DC load 92 in response to an input from the user or a command from the higher-level control device.

[0074] In this example, the storage battery 912 and the storage battery power converter 42 that can fully supply power to the important loads are selected, but it is also assumed that the power supply capacity of the storage battery 912 is insufficient for the important loads. In such a case, the important loads are assigned an order of importance (third priority), and, like the general loads, when the power supply capacity is insufficient, an operation is performed to disconnect the DC loads 92 in order of importance.

[0075] In this way, even if the power supply capacity from the power source 91 is insufficient during independent operation and it is difficult to supply power to all of the DC loads 92, the power supply can be continued by disconnecting the DC loads 92 with the lower second or third priority.

[0076] The control unit 3 constituting the DC power distribution system 1 of the present application may be configured by one piece of hardware 30 including a processor 301 and a storage device 302 as shown in FIG. 16. Although not shown, the storage device 302 includes a volatile storage device such as a random access memory and a non-volatile auxiliary storage device such as a flash memory. Also, instead of the flash memory, a hard disk auxiliary storage device may be included. The processor 301 executes a program input from the storage device 302. In this case, the program is input from the auxiliary storage device to the processor 301 via the volatile storage device. Also, the processor 301 may output data such as a calculation result to the volatile storage device of the storage device 302, or may store the data in the auxiliary storage device via the volatile storage device.

[0077] Furthermore, although various exemplary embodiments and examples are described in this application, various features, aspects, and functions described in one or more embodiments are not limited to application in a specific embodiment, but can be applied to the embodiments alone or in various combinations. Therefore, countless modifications not illustrated are expected within the scope of the technology disclosed in this specification. For example, the modification, addition, or omission of at least one component, and the extraction and combination of at least one component with components of other embodiments are included.

[0078] For example, although an example has been shown in which the load side power converters 5 convert to different DC voltages, the present invention is not limited to this, and there may be multiple load side power converters 5 that convert to the same voltage, and the priorities may be the same or different. Furthermore, when the main power source 911, which is the system power, is a DC power source, if its voltage substantially matches the voltage required for the DC bus 8, it is also possible to omit the power receiving converter 41.

[0079] As described above, the DC power distribution system 1 of the present application includes the DC bus 8 to which power is supplied as DC power from the system power (main power source 911) (directly or via the power receiving converter 41), the battery power converter 42 that is disposed between the DC bus 8 and the storage battery 912 and performs power conversion for charging and discharging the storage battery 912, a plurality of load-side power converters 5 that are disposed between each of a plurality of DC loads 92 and the DC bus 8 and convert the power supplied to the DC bus 8 into DC power of a voltage according to the respective specifications and supply the converted power, and the control unit 3 that controls the battery power converter 42 and the plurality of load-side power converters 5 in cooperation with each other, and the control unit 3 When the supply from the grid power (main power source 911, power receiving power converter 41) is cut off, the system switches between a normal independent operation mode in which power is normally supplied to a plurality of DC loads 92 according to the charging state of the storage battery 912 and a limited operation mode in which the supply is limited to important loads having a high priority among the plurality of DC loads 92, and in the limited operation mode, at least one of the power converters that perform power conversion by switching operation of switching elements S1 and S2 among the load-side power converters 5 connected to the important loads and the storage battery power converter 42 is configured to stop switching operation and to make the input side and output side conductive. As a result, the power consumption of the system itself can be suppressed during independent operation by reducing the power consumption by the switching operation, and the time during which power can be supplied from the storage battery 912 to the important loads can be extended.

[0080] The control unit 3 switches from normal independent operation to limited operation when the charge state of the storage battery 912 falls below the threshold Sth1, so that the operation time of the important load can be continued for the required time by maximizing the capacity of the storage battery 912. Also, since the threshold Sth1 can be set lower than when conduction is not performed, the normal independent operation time can also be extended.

[0081] The power consumption of the system itself can be suppressed to the maximum during independent operation by selecting the target for stopping switching operation that maximizes the suppression of power consumption based on the specifications of the important load, the power converter connected to the important load, and the storage battery power converter 42. In this case, the targets may be stored in advance as a table, or the targets may be selected so that the total consumption is minimized by calculating the adjustment margin of the operating range, the consumption amount, etc. from the specifications.

[0082] If an additional power source (e.g., solar panel 913) is provided to supply power to the DC bus 8, and the control unit 3 is configured in the limiting operation to release conduction by stopping the switching operation while power is being supplied from the additional power source, the power from the additional power source can be effectively utilized to extend the operating time of important loads.

[0083] In this case, in normal independent operation, if the amount of power supply from the storage battery 912 and the additional power source is insufficient for the amount of power demand of the multiple DC loads 92, the control unit 3 will disconnect the loads with the lowest priority among the multiple DC loads 92 until the amount of power demand becomes equal to or less than the amount of power supply, thereby allowing the independent operation to continue even if the grid power is cut off.

[0084] Furthermore, at that time, if the control unit 3 determines whether the amount of power supply is insufficient compared to the amount of power demand based on the voltage of the DC bus 8, the above control can be performed without installing an excessive sensor. [Explanation of symbols]

[0085] 1: DC power distribution system, 2: interface circuit, 3: control unit, 31: state detection unit, 32: operation mode determination unit, 33: operation command generation unit, 34: threshold database, 35: priority order database, 36: equipment specification database, 4: power supply side power converter, 42: power converter for storage battery, 5: load side power converter, 6: power supply side switch, 7: load side switch, 8: DC bus, 91: power supply, 911: main power supply (grid power), 912: storage battery, 913: solar panel (additional power supply), 92: DC load, Smax: charge stop threshold, Smin: discharge stop threshold, Sth1: threshold, Vth: voltage threshold.

Claims

1. A DC bus that receives power as DC power from the grid; a battery power converter arranged between the DC bus and the battery and performing power conversion for charging and discharging the battery; a plurality of load-side power converters provided between a plurality of DC loads and the DC bus, each of which converts the power supplied to the DC bus into DC power having a voltage according to the specification of each of the DC loads and supplies the converted power; a control unit that controls the storage battery power converter and the plurality of load side power converters in cooperation with each other, The control unit is when the supply from the grid power is cut off, switching is made between a normal independent operation mode in which power is normally supplied to the plurality of DC loads according to a charging state of the storage battery and a limiting operation in which the supply is limited to an important load having a high priority among the plurality of DC loads; a power converter connected to the important load among the load-side power converters and a power converter for the storage battery that performs power conversion by switching operation using a switching element among the load-side power converters, and at least one of the power converters is stopped from switching operation and conductive between the input side and the output side of the DC power distribution system, in the limiting operation.

2. 2. The DC power distribution system according to claim 1, wherein the control unit switches from the normal independent operation mode to the limited operation mode when the state of charge of the storage battery falls below a threshold value.

3. 3. The DC power distribution system according to claim 1, wherein the control unit selects targets for which the switching operation is to be stopped so as to maximize the reduction in power consumption, based on specifications of the important loads, the power converters connected to the important loads, and the power converter for the storage battery.

4. an additional power source for powering the DC bus; The DC power distribution system according to any one of claims 1 to 3, characterized in that, in the limiting operation, the control unit cancels the conduction caused by stopping the switching operation while power is being supplied from the additional power source.

5. 5. The DC power distribution system according to claim 4, wherein, when the amount of power supply from the storage battery and the additional power source is insufficient for the amount of power demand of the plurality of DC loads during the normal independent operation, the control unit disconnects, among the plurality of DC loads, loads with a lower priority order until the amount of power demand becomes equal to or less than the amount of power supply.

6. 6. The DC power distribution system according to claim 5, wherein the control unit determines whether the amount of power supply is insufficient for the amount of power demand based on a voltage of the DC bus.

Citation Information

Patent Citations

  • DC uninterruptible power supply device

    JP1992125038A

  • DC power distribution system

    JP2011083088A

  • DC power supply system and bidirectional power conversion device

    JP2012120414A

  • DC power feeding system and control method of the same

    JP2012228027A