Test system, method, electronic device and storage medium for power conversion device
The power converter testing system pairs converters to function as both load and source, eliminating the need for additional DC power and enabling simultaneous testing in different modes, thus reducing costs and energy consumption while enhancing efficiency.
Patent Information
- Application Number
- JP2023524167
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-07-31
- Filing Date
- 2022-06-28
- Publication Date
- 2024-11-06
- Estimated Expiration
- 2042-06-28
AI Technical Summary
Existing power converter testing methods require a large amount of DC power input and additional DC power sources and loads, leading to high investment costs and energy consumption, while only allowing for single device testing at a time, resulting in low efficiency.
A power converter testing system where two converters are paired to function as both a load and a power source, allowing simultaneous testing in different operation modes without the need for additional DC power sources or loads, utilizing a control unit and relay control board to manage their operation and communication.
This approach reduces investment and energy costs, saves power, and significantly improves testing efficiency by enabling simultaneous aging tests on multiple devices, occupying less space and maintaining system stability.
Smart Images

Figure 0007578814000001 
Figure 0007578814000002 
Figure 0007578814000003
Abstract
Description
[Technical field]
[0001] (CROSS-REFERENCE TO RELATED APPLICATIONS) This application claims priority to Chinese patent application No. 202110877278.7, entitled "Test system, method, electronic device and storage medium for power conversion apparatus," filed on July 31, 2021, the entire contents of which are incorporated herein by reference.
[0002] TECHNICAL FIELD The present disclosure relates to an aging test technology field, and in particular to a power conversion device test system, method, electronic device, and storage medium. [Background technology]
[0003] The replacement of fuel-powered vehicles with electric vehicles has become a trend in the development of the automobile industry, and the proportion of new energy vehicles in the annual sales of electric vehicles is expected to continue to increase. In order to allow new energy vehicles to play a role in peak shaving in the power grid as energy storage units, the need for power conversion devices is becoming increasingly prominent. Here, the power conversion device refers to a bidirectional AC (alternating current) DC (direct current) device, which can convert the AC current of the power grid into DC current and output it to charge the electric vehicle battery, and can also convert the DC current of the electric vehicle into AC current and feed it back to the power grid.
[0004] In order to ensure the reliability of the power converter and avoid early failure caused by defects in the materials themselves, the power converter needs to undergo 100% aging testing. In the related technology, a DC power supply and a load need to be placed in the power converter to be aged, and when a large number of loads are aged at the same time, a large amount of DC power needs to be input, which results in both high investment costs and high energy consumption. Summary of the Invention
[0005] In view of the above problems, embodiments of the present application provide a power conversion device test system, method, electronic device, and storage medium with low test investment cost and low energy consumption.
[0006] According to a first aspect of an embodiment of the present application, a test system for a power conversion device is provided, the test system includes a first AC input / output unit for connecting an AC terminal of a first power conversion device to a power supply network, a second AC input / output unit used for connecting an AC terminal of a second power conversion device to a power supply network, the DC terminal of the first power conversion device being connected to a DC terminal of the second power conversion device, a control unit for controlling the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, and an evaluation unit for obtaining test data when the first power conversion device and the second power conversion device operate in the different operation modes and evaluating the first power conversion device and the second power conversion device based on the test data.
[0007] According to the above solution, the first power conversion device and the second power conversion device are paired, and both can function as a power supply as well as a load, that is, one power conversion device to be tested can be used as a power supply and a load for the other power conversion device to be tested, and there is no need to additionally arrange a DC power supply and a load when testing, which saves investment costs, and the energy consumption of the system itself is low, saving more power. In addition, in the same test circuit, the first power conversion device and the second power supply conversion Since the devices operate simultaneously in different operating modes, the first power conversion device and the second power conversion device can be subjected to aging tests simultaneously, improving the test efficiency, and eliminating the need to additionally install a DC power supply in the test system, which occupies a small space on the device and does not affect the stability of the test system.
[0008] In some embodiments, the operating modes include a first operating mode and a second operating mode, and the first power conversion device operates in the first operating mode and the second power conversion device operates in the second operating mode, or the first power conversion device operates in the second operating mode and the second power conversion device operates in the first operating mode.
[0009] The above solution allows a first power converter and a second power converter to be connected in the same test circuit. conversion Since the first power conversion device and the second power conversion device are simultaneously operated in different operation modes, aging tests can be performed simultaneously on the first power conversion device and the second power conversion device, thereby improving test efficiency.
[0010] In some embodiments, the control unit includes a relay control board and a plurality of relays, the plurality of relays being disposed on the relay control board, the first power conversion device and the second power conversion device being respectively connected to different relays, and the relays being used to switch communication between the first power conversion device and the second power conversion device.
[0011] With the above solution, the first power conversion device and the second power conversion device are respectively connected to different relays, and the communication state between the first power conversion device and the control unit is changed by the relay, and the communication state between the second power conversion device and the control unit is changed, which makes the control relatively simple and improves the testing efficiency of the power conversion device.
[0012] According to a second aspect of the embodiment of the present application, there is provided a method for testing a power conversion device, the method including the steps of: connecting an AC terminal of a first power conversion device and an AC terminal of a second power conversion device to a power supply network, respectively, connecting a DC terminal of the first power conversion device and a DC terminal of the second power conversion device, controlling the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, obtaining test data when the first power conversion device and the second power conversion device operate in the different operation modes, and evaluating the first power conversion device and the second power conversion device based on the test data.
[0013] According to the above solution, a test circuit is formed between the power supply network and the first and second power converters. In this test circuit, the power supply network, the first and second power converters can function as a power source as well as a load, so that there is no need to additionally arrange a DC power source and a load during testing, which saves investment costs and energy consumption. In addition, the first and second power converters can be connected to each other via a test circuit. conversion Since the first power conversion device and the second power conversion device operate simultaneously in different operation modes, tests can be performed simultaneously on the first power conversion device and the second power conversion device, improving test efficiency.
[0014] In some embodiments, the operating modes include a first operating mode and a second operating mode, and the first power conversion device operates in the first operating mode and the second power conversion device operates in the second operating mode, or the first power conversion device operates in the second operating mode and the second power conversion device operates in the first operating mode.
[0015] The above solution allows a first power converter and a second power converter to be connected in the same test circuit. conversion Since the first power conversion device and the second power conversion device are simultaneously operated in different operation modes, aging tests can be performed simultaneously on the first power conversion device and the second power conversion device, thereby improving test efficiency.
[0016] In some embodiments, the control unit includes a relay control board and a plurality of relays, the plurality of relays being disposed on the relay control board, the first power conversion device and the second power conversion device being respectively connected to different relays, and the relays being used to switch communication between the first power conversion device and the second power conversion device.
[0017] With the above solution, the first power conversion device and the second power conversion device are respectively connected to different relays, and the communication state between the first power conversion device and the control unit is changed through the relay, and the communication state between the second power conversion device and the control unit is changed, which makes the control relatively simple and improves the testing efficiency of the power conversion device.
[0018] In some embodiments, the step of controlling the first power conversion device and the second power conversion device to operate simultaneously in different operating modes includes the steps of controlling the first power conversion device to perform a first stage of charging / discharging in the first operating mode and controlling the second power conversion device to perform the first stage of charging / discharging in the second operating mode, and when the first stage of charging / discharging is completed, controlling the first power conversion device to perform a second stage of charging / discharging in the second operating mode and controlling the second power conversion device to perform the second stage of charging / discharging in the first operating mode.
[0019] According to the above solution, the control unit controls the first power converter and the second power converter to operate simultaneously in different operating modes. conversion The device can be controlled, and the aging test can be performed simultaneously on the first power conversion device and the second power conversion device, thereby improving the test efficiency.
[0020] In some embodiments, the steps of controlling the first power conversion device to perform a first stage of charging / discharging in the first operating mode and controlling the second power conversion device to perform a first stage of charging / discharging in the second operating mode include the steps of controlling a first relay corresponding to the first power conversion device to be closed and sending a first on command to the first power conversion device so that the first power conversion device performs the first stage of charging / discharging in the first operating mode, and controlling the first relay to be disconnected and controlling a second relay corresponding to the second power conversion device to be closed and sending a second on command to the second power conversion device so that the second power conversion device performs the first stage of charging / discharging in the second operating mode.
[0021] With the above solution, the control unit switches the communication between the first power conversion device and the second power conversion device through the relay, which makes the control easy and the control efficiency high. In addition, when controlling, the first power conversion device first performs the first stage of charging and discharging in the first operation mode, and then the second power conversion device first performs the first stage of charging and discharging in the second operation mode, that is, the load is applied after the power is turned on, so that the operation safety is high.
[0022] In some embodiments, the steps of controlling the first power conversion device to perform a second stage of charging / discharging in the second operating mode and controlling the second power conversion device to perform the second stage of charging / discharging in the first operating mode include the steps of controlling the second power conversion device to stop the first stage of charging / discharging in the second operating mode and controlling the first power conversion device to stop the first stage of charging / discharging in the first operating mode, sending a first on command to the second power conversion device so that the second power conversion device performs the second stage of charging / discharging in the first operating mode, and sending a second on command to the first power conversion device so that the first power conversion device performs the second stage of charging / discharging in the second operating mode.
[0023] According to the above solution, the second power converter is controlled to stop the first stage of charging / discharging in the second operating mode first, and then the first power converter is controlled to stop the first stage of charging / discharging in the first operating mode, i.e., the load is removed before the power is cut off, so that the operation safety is high. When the second stage of charging / discharging is turned on, the second power converter is first made to perform the second stage of charging / discharging in the first operating mode, and then the first power converter is made to perform the second stage of charging / discharging in the second operating mode, i.e., the power is turned on before the load is applied, so that the operation safety is high.
[0024] In some embodiments, the steps of controlling the second power conversion device to stop the first stage of charging / discharging in the second operating mode and controlling the first power conversion device to stop the first stage of charging / discharging in the first operating mode include the steps of controlling a second relay corresponding to the second power conversion device to close and sending a first disconnect command to the second power conversion device so that the second power conversion device stops the first stage of charging / discharging in the second operating mode, and controlling the second relay to disconnect and controlling the first relay corresponding to the first power conversion device to close, and sending a second disconnect command to the first power conversion device so that the first power conversion device stops the first stage of charging / discharging in the first operating mode.
[0025] According to the above solution, the control unit switches the communication between the first power converter and the second power converter through the relay, which makes the control easy and the control efficiency high. In addition, the control unit first controls the second power converter to stop the first stage of charging and discharging in the second operation mode, and then controls the first power converter to stop the first stage of charging and discharging in the first operation mode, i.e., the load is removed before the power is cut off, which makes the operation safer.
[0026] In some embodiments, the step of acquiring test data when the first power conversion device and the second power conversion device operate in different operation modes and evaluating the first power conversion device and the second power conversion device based on the test data includes the steps of acquiring first charge / discharge data and determining whether the first power conversion device and the second power conversion device are abnormal during a first stage of charging / discharging based on the first charge / discharge data, where the first charge / discharge data is test data when the first power conversion device performs a first stage of charging / discharging in a first operation mode and test data when the second power conversion device performs a first stage of charging / discharging in a second operation mode; acquiring second charge / discharge data and evaluating the first power conversion device and the second power conversion device based on the second charge / discharge data. conversion The method includes a step of determining whether the device is abnormal during second-stage charging / discharging, the second charging / discharging data being test data when the first power conversion device performs second-stage charging / discharging in the second operating mode, and test data when the second power conversion device performs second-stage charging / discharging in the first operating mode.
[0027] With the above solution, it is possible to determine whether the first and second power conversion devices are abnormal during a first stage of charging and discharging based on the first charge / discharge data, and it is possible to determine whether the first and second power conversion devices are abnormal during a second stage of charging and discharging based on the second charge / discharge data. This makes it easy to determine whether the first and second power conversion devices are faulty products.
[0028] In some embodiments, the step of determining whether the first power conversion device and the second power conversion device are abnormal during the first stage of charging and discharging based on the first charge / discharge data includes the step of determining that the first power conversion device is abnormal during the first stage of charging and discharging if the first charge / discharge data of the first power conversion device exceeds a first threshold range, and the step of determining that the second power conversion device is abnormal during the first stage of charging and discharging if the first charge / discharge data of the second power conversion device exceeds the first threshold range.
[0029] According to the above solution, if the first charge / discharge data of the first power conversion device exceeds the first threshold range, it is determined that the first power conversion device is abnormal during the first stage of charging / discharging. If the first charge / discharge data of the second power conversion device exceeds the first threshold range, it is determined that the second power conversion device is abnormal during the first stage of charging / discharging. This determination method is simple and easy to implement, and can improve the determination efficiency.
[0030] In some embodiments, the step of determining whether the first power conversion device and the second power conversion device are abnormal during the second stage of charging and discharging based on the second charge / discharge data includes the step of determining that the first power conversion device is abnormal during the second stage of charging and discharging if the second charge / discharge data of the first power conversion device exceeds a second threshold range, and the step of determining that the second power conversion device is abnormal during the second stage of charging and discharging if the second charge / discharge data of the second power conversion device exceeds the second threshold range.
[0031] According to the above solution, if the second charge / discharge data of the first power conversion device exceeds the second threshold range, it is determined that the first power conversion device is abnormal during the second stage of charging / discharging. If the second charge / discharge data of the second power conversion device exceeds the second threshold range, it is determined that the second power conversion device is abnormal during the second stage of charging / discharging. This determination method is simple and easy to implement, and can improve the determination efficiency.
[0032] According to a third aspect of the present invention, there is provided a computer-readable storage medium storing a computer program for implementing the power conversion device testing method according to the second aspect when executed by a processor.
[0033] According to a fourth aspect of an embodiment of the present application, there is provided an electronic device including a processor and a memory for storing executable commands of the processor, and configured to perform the power conversion device testing method of the second aspect described above by executing the executable commands by the processor.
[0034] In the embodiment of the present application, the power supply network is connected to the AC terminal of the first power conversion device, the power supply network is also connected to the AC terminal of the second power conversion device, and the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, so that a test circuit is formed between the power supply network, the first power conversion device, and the second power conversion device. Then, the control unit can control the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, and the evaluation unit can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluate the first power conversion device and the second power conversion device based on the test data. In this test circuit, the first power conversion device and the second power conversion device can function as a power source as well as a load, so that there is no need to additionally arrange a DC power source and a load when testing, which saves investment costs and energy consumption. In addition, the first power conversion device and the second power conversion device can be controlled by the control unit to operate simultaneously in different operation modes, and the evaluation unit can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluate the first power conversion device and the second power conversion device based on the test data. In the test circuit, the first power conversion device and the second power conversion device can function as a power source as well as a load, so that there is no need to additionally arrange a DC power source and a load when testing, which saves investment costs and energy consumption. In addition, the first power conversion device and the second power conversion device can be controlled by the control unit to operate simultaneously in different operation modes, and the evaluation unit can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, which saves investment costs and energy consumption. conversion Since the first power conversion device and the second power conversion device are simultaneously operated in different operation modes, aging tests can be performed simultaneously on the first power conversion device and the second power conversion device, thereby improving test efficiency.
[0035] The above description is only an outline of the technical solutions of the embodiments of the present application, which can be implemented according to the content of the specification in order to make the technical means of the present application more clearly understood, and in order to make the above and other objectives, features and advantages of the present application more obvious and understandable, specific embodiments of the present application are specifically cited below. [Brief description of the drawings]
[0036] Various other advantages and benefits will become apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for illustrating the preferred embodiments and should not be considered as limiting the present application. In addition, the same elements are represented by the same reference numerals in all the drawings. The drawings are as follows:
[0037] [Figure 1] FIG. 1 is a structural schematic diagram of a test system for a power conversion device in the related art; [Diagram 2] 1 is a structural schematic diagram of a power conversion device test system provided by an embodiment of the present application; [Diagram 3] FIG. 2 is a structural schematic diagram of a test system for another power conversion device provided by an embodiment of the present application; [Figure 4] FIG. 2 is a structural schematic diagram of a test system for yet another power conversion device provided by an embodiment of the present application; [Diagram 5] FIG. 2 is a structural schematic diagram of a test system for yet another power conversion device provided by an embodiment of the present application; [Figure 6] 4 is a flowchart of a test method for a power conversion device provided by an embodiment of the present application. [Figure 7] 4 is a flowchart of evaluating a first power conversion device and a second power conversion device based on acquired test data provided by an embodiment of the present application. [Figure 8] 2 is a structural schematic diagram of a test device for a power conversion device provided by an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0038] The following describes in detail the embodiments of the technical solution of the present application with reference to the drawings. The following embodiments are only used as examples, because they are intended to more clearly illustrate the technical solution of the present application, and cannot limit the scope of protection of the present application.
[0039] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art of the present application. The terms used herein are only for describing specific embodiments and are not intended to limit the present application. The terms "comprising" and "having" and any variations thereof in the specification and claims of this application, as well as the above description of the drawings, are intended to cover a non-exclusive inclusion.
[0040] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only intended to distinguish different objects, and cannot be understood as indicating or implying relative importance, or implying the number, specific order, or primary and secondary relationship of the technical features shown. In the description of the embodiments of the present application, "plurality" means two or more, unless otherwise defined.
[0041] An "embodiment" referred to in this specification means that a particular feature, structure, or characteristic described with reference to the embodiment may be included in at least one embodiment of the present application. The appearance of such phrases in various places in this specification does not necessarily refer to the same embodiment, nor is it an embodiment independent or alternative to other embodiments that are mutually exclusive. Those skilled in the art can explicitly and implicitly understand that the embodiments described in this specification may be combined with other embodiments.
[0042] In the description of the embodiments of the present application, the term "and / or" is only for describing the associative relationship of related objects, and indicates that three kinds of relationships can exist, for example, A and / or B can indicate three situations: A exists, A and B exist simultaneously, and B exists. In addition, in this specification, the character " / " generally indicates that the related objects before and after it are in an "or" relationship.
[0043] In describing the embodiments of the present application, "multiple" means two or more (including two); similarly, "multiple groups" means two or more groups (including two groups), and "multiple sheets" means two or more sheets (including two sheets).
[0044] In the description of the embodiments of the present application, the orientations or positional relationships indicated by technical terms such as "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "side," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are orientations or positional relationships indicated based on the drawings, and are intended only to explain the embodiments of the present application and to simplify the description, and are not intended to indicate or imply that the devices or elements shown necessarily have a specific orientation or are constructed and operated in a specific orientation, and therefore cannot be understood as limiting the embodiments of the present application.
[0045] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, the terms "attached", "coupled", "connected", "fixed" and the like should be understood in a broad sense, for example, may be a fixed connection, a removable connection, or an integral type, may be a mechanical connection, may be an electrical connection, may be a direct connection, may be an indirect connection via an intermediate medium, may be a communication inside two elements, or may be an interactive relationship between two elements. Those skilled in the art can understand the specific meaning of the above terms in the embodiments of the present application according to the specific situation.
[0046] In order to ensure the reliability of the power conversion device and avoid premature failure caused by defects in the material itself, the power conversion device needs to undergo 100% aging test. The test in this application may be understood as aging test.
[0047] In the related art, as shown in FIG. 1, the DC terminal of the power conversion device is always connected to one end of a DC power source, and both the AC terminal of the power conversion device and the other end of the DC power source are connected to a power grid to form a test circuit. The DC terminal of the power conversion device refers to the DC side of the power conversion device in FIG. 1, the DC power source refers to the DC source in FIG. 1, and the AC terminal of the power conversion device refers to the AC side of the power conversion device in FIG. 1. The control unit 00 controls each power conversion device to operate in different operation modes, thereby performing an aging test on the power conversion device. Here, when the power conversion device operates in a first operation mode, the DC power source is used to function as an electronic load of the power conversion device, and the first operation mode refers to an AC input and DC output mode. When the power conversion device operates in a second operation mode, the DC power source is used to function as a DC power source of the power conversion device, and the second operation mode refers to a DC input and AC output mode. Here, a number of power conversion devices are shown in FIG. 1, which are sequentially labeled as Product 1, Product 2, Product 3, . . . , Product N in FIG.
[0048] In view of this, in the prior art, when performing aging tests on power conversion devices, it is necessary to additionally connect a DC power supply to provide DC current and load. In particular, when performing large-scale testing, it is necessary to input a large number of DC power supplies and develop control software for the DC power supplies. Since one 10-kilowatt DC power supply is estimated to cost 100,000 yuan, in order to meet the production capacity needs, 150 power conversion devices need to be tested simultaneously, resulting in 150 DC power supplies, and thus the investment cost of 15 million yuan needs to be invested in the purchase of DC power supplies, which is very large in investment cost and energy consumption. In addition, only one power conversion device can be tested in one test circuit, and the test efficiency is low. In addition, the volume of the DC power supply is 500 mm x 500 mm x 800 mm, and the space it occupies is large, resulting in a large space occupied by the device in the test system, and low economic benefits.
[0049] Based on this, an embodiment of the present application provides a test system for a power conversion device. A power supply network is connected to an AC terminal of a first power conversion device, the power supply network is also connected to an AC terminal of a second power conversion device, and a DC terminal of the first power conversion device is connected to a DC terminal of the second power conversion device, so that a test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device. Then, the control unit 3 can control the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, and the evaluation unit 4 can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluate the first power conversion device and the second power conversion device based on the test data.
[0050] In the test circuit of the present application, the first power conversion device and the second power conversion device are paired, and both can function as a power supply as well as a load, that is, the present application allows one power conversion device to be tested to be used as a power supply and a load for another power conversion device to be tested, and there is no need to additionally arrange a DC power supply and a load during testing, which saves investment costs, and the energy consumption of the system itself is low, and more power is saved. In addition, in the same test circuit, the first power conversion device and the second power supply conversion Since the devices operate simultaneously in different operating modes, the first power conversion device and the second power conversion device can be subjected to aging tests simultaneously, improving the test efficiency, and eliminating the need to additionally install a DC power supply in the test system, which occupies a small space on the device and does not affect the stability of the test system.
[0051] Below, some test data are provided for ease of comparison. The efficiency of the power conversion device is 93%, the efficiency of the electronic load of the DC power supply is 70%, and the efficiency of the power supply of the DC power supply is 80%, and the first and second operating modes are operated for 5 hours each.
[0052] In the related technology, the system efficiency P1 when the power conversion device operates in the first operating mode = 93% x 70% = 65.1%, and the system efficiency P2 when the power conversion device operates in the second operating mode = 93% x 80% = 74.4%. From this, it can be seen that the system efficiency P of the power conversion device test system in the prior art is P = (P1 + P2) / 2 = 69.75%.
[0053] In the present application, when the first power conversion device operates in the first operating mode and the second power conversion device operates in the second operating mode, the system efficiency P1 = 93% x 93% = 86.49%, and when the first power conversion device operates in the second operating mode and the second power conversion device operates in the first operating mode, the system efficiency P2 = 93% x 93% = 86.49%, which means that the system efficiency P of the power conversion device test system in the present application is (P1 + P2) / 2 = 86.49%.
[0054] By comparison, it can be seen that the efficiency of the power conversion device test system provided by the embodiment of the present application is 16.74% (86.49%-69.75%=16.74%) higher than that of the power conversion device test system in the related art, and the power conversion device test system provided by the present application can effectively improve the system efficiency.
[0055] Hereinafter, the test system for a power conversion device provided by an embodiment of the present application will be described in detail with reference to FIG. 2 to FIG. 5. FIG. 2 is a structural schematic diagram of the test system for a power conversion device provided by an embodiment of the present application. As shown in FIG. 2, the test system includes a first AC input / output unit 1, a second AC input / output unit 2, a first power conversion device, a second power conversion device, a control unit 3, and an evaluation unit 4. Here, the first AC input / output unit 1 is used to connect the power supply network and the AC terminal of the first power conversion device, the second AC input / output unit 2 is used to connect the power supply network and the AC terminal of the second power conversion device, and the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device. The control unit 3 controls the first power conversion device and the second power conversion device to operate simultaneously in different operation modes. conversion The evaluation unit 4 is used to obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and to evaluate the first power conversion device and the second power conversion device based on the test data.
[0056] The first power conversion device and the second power conversion device refer to bidirectional AC and DC current conversion devices, and on the one hand, they can function as a load that receives AC current, convert the received AC current into DC current, and then function as a power supply that outputs DC current, and on the other hand, they can function as a load that receives DC current, convert the received DC current into AC current, and then function as a power supply that outputs AC current. In other words, the first power conversion device and the second power conversion device can function not only as a load but also as a power supply, and can receive AC current and output DC current, and can receive DC current and output AC current.
[0057] Moreover, the first AC input / output unit 1 and the second AC input / output unit 2 may be an AC input / output interface. A test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device by connecting the AC terminal of the first power conversion device to the power supply network through the first AC input / output unit 1, connecting the AC terminal of the second power conversion device to the power supply network through the second AC input / output unit 2, and connecting the DC terminal of the first power conversion device to the DC terminal of the second power conversion device. Here, the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, and this connection method may be called a back-to-back connection method.
[0058] After the test circuit is formed, in some examples, the power grid can function as a power source that outputs AC current to the first power conversion device. The first power conversion device can function as a load that receives the AC current transmitted by the power grid, converts the received AC current to DC current, and then outputs the converted DC current to the second power conversion device. The second power conversion device can function as a load that receives the DC current transmitted by the first power conversion device, converts the received DC current to AC current, and then outputs the converted AC current to the power grid. The power grid can function as a load that receives the AC current transmitted by the second power conversion device.
[0059] In some other examples, the power grid can function as a power source that outputs an AC current to the second power conversion device. For example, the power grid can provide an AC current of 220V, which can be abbreviated as AC220V shown in FIG. 2. The second power conversion device can function as a load that receives the AC current transmitted by the power grid, converts the received AC current to a DC current, and then outputs the converted DC current to the first power conversion device. The first power conversion device can function as a load that receives the DC current transmitted by the second power conversion device, converts the received DC current to an AC current, and then outputs the converted AC current to the power grid. The power grid can function as a load that receives the AC current transmitted by the first power conversion device.
[0060] In the above two examples, the power grid can function as a power source that outputs AC current to the first power conversion device or the second power conversion device, and can also function as a load that receives AC current transmitted by the second power conversion device or the second power conversion device.
[0061] The operation modes include a first operation mode and a second operation mode. The first operation mode may be an AC input and DC output mode, and the second operation mode may be a DC input and AC output mode.
[0062] The control unit 3 is connected to the first power conversion device and the second power conversion device, respectively. The control unit 3 can control the first power conversion device to operate in a first operation mode and control the second power conversion device to operate in a second operation mode. Alternatively, the control unit 3 can control the first power conversion device to operate in the second operation mode and control the second power conversion device to operate in the first operation mode. conversion In short, the control unit 3 can control the first power converter and the second power converter to operate simultaneously in different operating modes. conversion The power conversion device may be controlled to perform charging and discharging. Here, the operation may refer to charging and discharging. Exemplarily, the power conversion device operating in a first operation mode means that the power conversion device performs AC charging and DC discharging in the first operation mode, and the power conversion device operating in a second operation mode means that the power conversion device performs DC charging and AC discharging in the second operation mode.
[0063] Finally, the evaluation unit 4 has a certain data processing function. The evaluation unit 4 is connected to the first power conversion device and the second power conversion device, respectively, via the control unit 3. The evaluation unit 4 can obtain test data when the first power conversion device operates in the first operation mode and the second operation mode, and evaluate the first power conversion device based on these test data. The evaluation unit 4 can also obtain test data when the second power conversion device operates in the first operation mode and the second operation mode, and evaluate the second power conversion device based on these test data.
[0064] Here, the test data may be aging data of the first power conversion device and the second power conversion device under certain test conditions, so that the evaluation unit 4 can evaluate the aging performance of the first power conversion device based on the test data of the first power conversion device, thereby determining whether the first power conversion device is abnormal. Similarly, the evaluation unit 4 can evaluate the aging performance of the second power conversion device based on the test data of the second power conversion device, thereby determining whether the second power conversion device is abnormal.
[0065] In the embodiment of the present application, the power supply network is connected to the AC terminal of the first power conversion device, the power supply network is also connected to the AC terminal of the second power conversion device, and the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, so that a test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device. Then, the control unit 3 can control the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, and the evaluation unit 4 can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluate the first power conversion device and the second power conversion device based on the test data. In this test circuit, the first power conversion device and the second power conversion device can function as a power source as well as a load, so that there is no need to additionally arrange a DC power source and a load when testing, which saves investment costs and energy consumption. In addition, the first power conversion device and the second power conversion device can be controlled ... so that the first power conversion device and the second power conversion device can be controlled to operate simultaneously in different operation modes, which saves investment costs and energy consumption. conversion Since the devices operate simultaneously in different operating modes, aging tests can be performed simultaneously on the first power conversion device and the second power conversion device, improving test efficiency.
[0066] In some embodiments, the control unit 3 may include a relay control board and a plurality of relays, which are provided on the relay control board, and the first power conversion device and the second power conversion device are respectively connected to different relays, and the relays are used to switch communication between the first power conversion device and the second power conversion device.
[0067] In addition, the first power conversion device may be connected to a corresponding relay, and the communication of the first power conversion device may be switched by the relay corresponding to the first power conversion device. The second power conversion device may be connected to a corresponding relay, and the communication of the second power conversion device may be switched by the relay corresponding to the second power conversion device. To facilitate control, the relays may be numbered, and the number of the relay may correspond to the corresponding power conversion device. For example, the relay corresponding to the first power conversion device may be numbered as the first relay, and the relay corresponding to the second power conversion device may be numbered as the second relay.
[0068] Here, switching the communication of the first power conversion device means changing the communication state between the first power conversion device and the control unit 3. Switching the communication of the second power conversion device means changing the communication state between the second power conversion device and the control unit 3. For example, when the first relay is controlled to be closed, the communication state between the first power conversion device and the control unit 3 can be switched from non-communication to communication, and when the first relay is controlled to be disconnected, the communication state between the first power conversion device and the control unit 3 can be switched from communication to non-communication. When the second relay is controlled to be closed, the communication state between the second power conversion device and the control unit 3 can be switched from non-communication to communication, and when the second relay is controlled to be disconnected, the communication state between the second power conversion device and the control unit 3 can be switched from communication to non-communication.
[0069] It should be explained that in order to meet the production needs, it is usually necessary to age several hundred products at a time. In the conventional method, a controller area network (CAN) card is added between the control unit 3 and each power converter, that is, the CAN card and the power converter are in one-to-one correspondence, and the control unit 3 controls the communication of the power converter corresponding to the CAN card through the CAN card, and this method is very costly. In the present application, only one CAN card is provided between the control unit 3 and the relay board, and the relay board is provided with multiple relays, which are connected to the corresponding power converters, and the control unit 3 switches the relays through the CAN card or controls the opening and closing of the relays to change the communication state with each power converter, thereby effectively reducing the cost, facilitating the control, and improving the test efficiency of the power converter. In addition, the number of relays provided on the relay board is expandable, and therefore the test system of the present application can be expanded, that is, it can be easily expanded to test the number of power converters simultaneously.
[0070] The power converter test system shown in the embodiment of FIG. 2 above includes one power converter group, which includes two power converters connected in series back to back, which are referred to as the first power converter and the second power converter in FIG. 2, and the embodiment of FIG. 2 can perform aging tests on two power converters simultaneously. However, in practice, it is always necessary to perform aging tests on a large number of power converters, and in order to realize the simultaneous execution of aging tests on a large number of power converters, the embodiment of the present application further provides another three types of power converter test systems. Hereinafter, the test systems for these three types of power converters will be introduced in detail with reference to FIG. 3, FIG. 4 and FIG. 5.
[0071] FIG. 3 is a structural schematic diagram of a power conversion device test system provided by an embodiment of the present application. Similar to the power conversion device test system shown in the embodiment of FIG. 2, the test system includes a first AC current input / output unit 1, a second AC current input / output unit 2, a control unit 3, and an evaluation unit 4, and the test system also includes one power conversion device group. However, the difference from the power conversion device test system shown in the embodiment of FIG. 2 is that one power conversion device group in the test system shown in the embodiment of FIG. 2 includes one pair of power conversion devices, and the pair of power conversion devices includes two power conversion devices connected in series back to back, while one power conversion device group in the test system shown in the embodiment of FIG. 3 includes multiple pairs of power conversion devices, and each pair of power conversion devices among the multiple pairs of power conversion devices includes two power conversion devices connected in series back to back. Here, multiple power conversion devices are shown in FIG. 3, which are sequentially denoted as Product 1, Product 2, ..., Product N-1, Product N in FIG. 3. Thus, the power converter group in the test system shown in the embodiment of Fig. 3 may include an even number of power converters, such as four, six, eight or more. However, since the power converters consume energy, the number of power converters included in one power converter group should not be too large in general to ensure that all the power converters operate at full power when performing the aging test and meet the aging test conditions.
[0072] In this embodiment, the first AC input / output unit 1 is used to connect the power supply network to the AC terminal of the power converter sorted first in the back-to-back serial order in this power converter group, for example, the AC side of product 1 in Fig. 3, and the second AC input / output unit 2 is used to connect the power supply network to the AC terminal of the power converter sorted last in the back-to-back serial order in this power converter group, for example, the AC side of product N in Fig. 3. Back-to-back serial in this embodiment means that the DC terminals of two power converters in each pair of power converters are connected to each other, and the AC terminals of two adjacent power converters in two adjacent pairs of power converters are connected to each other.
[0073] 3 includes two pairs or four power converters, the four power converters are numbered in a back-to-back serial order, the first sorted power converter is called the first power converter, the second sorted power converter is called the second power converter, the third sorted power converter is called the third power converter, and the fourth sorted power converter is called the fourth power converter. The first power converter and the second second power converter are two adjacent power converters of the first pair of power converters, the third power converter and the fourth power converter are two adjacent power converters of the second pair of power converters, and the second power converter and the third power converter are two adjacent power converters of the two adjacent pairs of power converters. The first AC input / output unit 1 is used to connect the AC terminal of the first power converter to the power supply network, and the second AC input / output unit 2 is used to connect the AC terminal of the fourth power converter to the power supply network. The DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, the AC terminal of the second power conversion device is connected to the AC terminal of the third power conversion device, and the DC terminal of the third power conversion device is connected to the DC terminal of the fourth power conversion device.
[0074] The control unit 3 is used to control the odd-numbered and even-numbered power converters in the series order in the power converter group to operate simultaneously in different operation modes, and the evaluation unit 4 is used to obtain test data when the odd-numbered and even-numbered power converters in the series order in the power converter group operate simultaneously in different operation modes, and evaluate the power converter group based on the test data.
[0075] Continuing with the above example, the first power conversion device and the third power conversion device are odd-numbered power conversion devices in the series order of the power conversion device group, and the second power conversion device and the fourth power conversion device are even-numbered power conversion devices in the series order of the power conversion device group. The control unit 3 can control the first power conversion device and the third power conversion device to operate in the first operation mode, and control the second power conversion device and the fourth power conversion device to operate in the second operation mode. Or, the control unit 3 can control the first power conversion device and the third power conversion device to operate in the second operation mode, and control the second power conversion device and the fourth power conversion device to operate in the first operation mode. The evaluation unit 4 can obtain test data when the target power conversion device operates in the first operation mode and the second operation mode, and evaluate the target power conversion device based on these test data. Here, the target power conversion device is any of these four power conversion devices.
[0076] FIG. 4 is a structural schematic diagram of a power conversion device test system provided by an embodiment of the present application. As shown in FIG. 4, similar to the power conversion device test system shown in the embodiment of FIG. 2, this test system also includes a first AC current input / output unit 1, a second AC current input / output unit 2, a control unit 3 and an evaluation unit 4. However, different from the power conversion device test system shown in the embodiment of FIG. 2, the test system shown in the embodiment of FIG. 4 includes a plurality of power conversion device groups, while the test system shown in the embodiment of FIG. 2 includes one power conversion device group. Each of these plurality of power conversion device groups includes two power conversion devices connected in series back to back as shown in the embodiment of FIG. 2. Here, a plurality of power conversion devices are shown in FIG. 4, which are sequentially denoted as Product 1, Product 2, ..., Product N-1, Product N in FIG. 4. Note that since a large amount of aging tests need to be performed simultaneously, in order to balance the power grid, the test system uses a three-phase power supply, and L1, L2, L3 and N in FIG. 4 represent three-phase and four-wire.
[0077] In this embodiment, the first AC input / output unit 1 is used to connect the power supply network to an AC terminal of a first power converter in each of the multiple power converter groups, and the second AC input / output unit 2 is used to connect the power supply network to an AC terminal of a second power converter in each of the multiple power converter groups. The DC terminal of the first power converter in each of the multiple power converter groups is connected to the DC terminal of the second power converter.
[0078] 4 includes two power converter groups, each of which includes two power converters connected in series back to back. When numbering the four power converters included in this power converter test system, they may be the first power converter of the first power converter group, the second power converter of the first power converter group, the first power converter of the second power converter group, and the second power converter of the second power converter group. The first AC current input / output unit 1 is used to connect the power supply network and the AC terminal of the first power converter of the first power converter group, the first AC current input / output unit 1 is also used to connect the power supply network and the AC terminal of the first power converter of the second power converter group, the second AC current input / output unit 2 is used to connect the power supply network and the AC terminal of the second power converter of the first power converter group, and the second AC current input / output unit 2 is also used to connect the power supply network and the AC terminal of the second power converter of the second power converter group. The DC terminal of the first power conversion device in the first power conversion device group is connected to the DC terminal of the second power conversion device in the first power conversion device group, and the DC terminal of the first power conversion device in the second power conversion device group is connected to the DC terminal of the second power conversion device in the second power conversion device group.
[0079] The control unit 3 is used to control the first power conversion device and the second power conversion device of each of the multiple power conversion device groups to operate simultaneously in different operation modes. The evaluation unit 4 is used to obtain test data when the first power conversion device and the second power conversion device of each of the multiple power conversion device groups operate simultaneously in different operation modes, and to evaluate the first power conversion device and the second power conversion device of each power conversion device group based on the test data.
[0080] Continuing with the above example, the control unit 3 may control the first power converter of the first power converter group and the first / second power converter of the second power converter group to operate in a first operating mode, and control the second power converter of the first power converter group and the second / first power converter of the second power converter group to operate in a second operating mode, or control the first power converter of the first power converter group and the first / second power converter of the second power converter group to operate in a second operating mode, and control the second power converter of the first power converter group and the second / first power converter of the second power converter group to operate in the first operating mode. For ease of control, when multiple power converter groups are included in the test system, it is typically controlled to operate in one operating mode, and control the odd-numbered power converters in the serial order in each power converter group to operate in one operating mode, and control the even-numbered power converters in the serial order in each power converter group to operate in another operating mode.
[0081] The evaluation unit 4 can obtain test data when the target power conversion device operates in the first operation mode and the second operation mode, and evaluate the target power conversion device based on the test data, where the target power conversion device is any one of these four power conversion devices.
[0082] Fig. 5 is a structural schematic diagram of a power conversion device test system provided by an embodiment of the present application, and similar to the power conversion device test system shown in the embodiment of Fig. 4, this test system includes a first AC current input / output unit 1, a second AC current input / output unit 2, a control unit 3, an evaluation unit 4, and multiple power conversion device groups. However, what is different from the power conversion device test system shown in the embodiment of Fig. 4 is that each power conversion device group in the test system shown in the embodiment of Fig. 4 includes one pair of power conversion devices, and this pair of power conversion devices is two power conversion devices connected in series back to back, but each power conversion device group in the test system shown in the embodiment of Fig. 5 includes multiple pairs of power conversion devices, and each pair of power conversion devices among these multiple pairs of power conversion devices includes two power conversion devices connected in series back to back, which is similar to the fact that one power conversion device group in the test system shown in the embodiment of Fig. 3 includes multiple pairs of power conversion devices. Here, multiple power conversion devices are shown in Figure 5, which are sequentially described in Figure 5 as Product 11, Product 12, ..., Product 1(N-1), Product 1N, Product 21, Product 21, Product 22, ..., Product 2(N-1), Product 2N, Product N1, Product N2, ..., Product N(N-1), and Product NN.
[0083] In this embodiment, the first AC input / output unit 1 is used to connect the power supply network to the AC terminals of the power converters sorted first in the back-to-back series order of each of the multiple power converter groups, and the second AC input / output unit 2 is used to connect the AC terminals of the power converters sorted last in the back-to-back series order of each of the power converter groups. Back-to-back series in this embodiment means that the DC terminals of two power converters in each pair of power converters in each power converter group are connected to each other, and the AC terminals of two adjacent power converters in two adjacent pairs of power converters in each power converter group are connected to each other.
[0084] 5 includes two power converter groups, each of which includes two pairs of power converters. When numbering the power converters included in the power converter test system, they may be a first power converter in the first power converter group, a second power converter in the first power converter group, a third power converter in the first power converter group, a fourth power converter in the first power converter group, a first power converter in the second power converter group, a second power converter in the second power converter group, a third power converter in the second power converter group, and a fourth power converter in the second power converter group. The first AC current input / output unit 1 is used to connect the power supply network and the AC terminal of the first power conversion device of the first power conversion device group, the first AC current input / output unit 1 is also used to connect the power supply network and the AC terminal of the first power conversion device of the second power conversion device group, the second AC current input / output unit 2 is used to connect the power supply network and the AC terminal of the fourth power conversion device of the first power conversion device group, and the second AC current input / output unit 2 is also used to connect the power supply network and the AC terminal of the fourth power conversion device of the second power conversion device group. The DC terminal of the first power conversion device of the first power conversion device group is connected to the DC terminal of the second power conversion device of the first power conversion device group, the AC terminal of the second power conversion device of the first power conversion device group is connected to the AC terminal of the third power conversion device of the first power conversion device group, and the DC terminal of the third power conversion device of the first power conversion device group is connected to the DC terminal of the fourth power conversion device of the first power conversion device group. The connections between the four power converters in the second power converter group are similar to the connections between the four power converters in the first power converter group, and therefore will not be described in detail here.
[0085] The control unit 3 is used to control the odd-numbered and even-numbered power conversion devices in the serial order in each of the multiple power conversion device groups to operate simultaneously in different operation modes. The evaluation unit 4 is used to obtain test data when the odd-numbered and even-numbered power conversion devices in the serial order in each of the multiple power conversion device groups operate simultaneously in different operation modes, and to evaluate each power conversion device in each power conversion device group based on the test data.
[0086] Continuing with the above example, the control unit 3 can control the first and third power converters of the first power converter group and the first and third power converters of the second power converter group to operate in the first operation mode / second operation mode, and control the second and fourth power converters of the first power converter group and the second and fourth power converters of the second power converter group to operate in the second operation mode / first operation mode. Of course, in addition to the above two control methods, the control unit 3 can also control the odd-numbered and even-numbered power converters in the series order in each power converter group of these multiple power converter groups with other control methods to operate simultaneously in different operation modes. Here, we will not give examples one by one.
[0087] The evaluation unit 4 can obtain test data when the target power conversion device operates in the first operation mode and the second operation mode, and evaluate the target power conversion device based on the test data, where the target power conversion device is any one of these eight power conversion devices.
[0088] Corresponding to the power conversion device test system shown in the embodiment of Fig. 2, the embodiment of the present application provides a power conversion device test method shown in the embodiment of Fig. 6. Fig. 6 is a flowchart of the power conversion device test method provided by the embodiment of the present application, and the steps of the method may be executed by a host computer. As shown in Fig. 6, the method may be described as follows:
[0089] In step 601, the power supply network is connected to an AC terminal of a first power conversion device and an AC terminal of a second power conversion device, and the DC terminal of the first power conversion device and the DC terminal of the second power conversion device are connected to a power supply network.
[0090] The power supply network and the AC terminal of the first power conversion device can be connected via the first AC input / output unit 1, and the power supply network and the AC terminal of the second power conversion device can be connected via the second AC input / output unit 2. The first power conversion device, the second power conversion device, the first AC input / output unit 1, and the second AC input / output unit 2 are all introduced in the embodiment of FIG. 2, and the description thereof will be omitted here.
[0091] Through this step, a test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device. The first power conversion device and the second power conversion device are connected back-to-back to the power network. After the test circuit is formed, the control unit 3 can control the power network to supply AC current to the power conversion device by controlling the AC contactor. Then, the upper computer tests the first power conversion device and the second power conversion device through the test circuit.
[0092] In step 602, the control unit 3 controls the first power converter and the second power converter to operate simultaneously in different operating modes. conversion Control the device.
[0093] In addition, in this test system, all the power converters including the first power converter and the second power converter have unique corresponding barcodes, and the aging positions of each power converter on the aging car when performing the aging test also have unique corresponding barcodes. After receiving a start-up command triggered by a user and starting the test system based on the start-up command, the upper computer can receive the barcodes of each power converter input by the user and the barcodes corresponding to each aging position on the aging car, and display all the received barcodes for easy confirmation by the technician.
[0094] The operation modes include a first operation mode and a second operation mode. When performing this step, for example, the control unit 3 may control the first power conversion device to operate in the first operation mode based on a barcode corresponding to the first power conversion device and a barcode corresponding to the aging position of the first power conversion device, and control the second power conversion device to operate in the second operation mode based on a barcode corresponding to the second power conversion device and a barcode corresponding to the aging position of the second power conversion device. Alternatively, the control unit 3 may control the first power conversion device to operate in the second operation mode, and control the second power conversion device to operate in the first operation mode. conversion The device can also be controlled.
[0095] In addition, the control unit 3 can first control the first power conversion device to operate in the first operation mode, control the second power conversion device to operate in the second operation mode, then control the first power conversion device to operate in the second operation mode, and control the second power conversion device to operate in the first operation mode. Of course, the control unit 3 can also first control the first power conversion device to operate in the second operation mode, control the second power conversion device to operate in the first operation mode, then control the first power conversion device to operate in the first operation mode, and control the second power conversion device to operate in the second operation mode. The embodiment of the present application is not limited to this.
[0096] When the control unit 3 controls the first power conversion device and the second power conversion device to operate simultaneously in different operating modes, for example, first controlling the first power conversion device to operate in the first operating mode, controlling the second power conversion device to operate in the second operating mode, and then controlling the first power conversion device to operate in the second operating mode and the second power conversion device to operate in the first operating mode, an exemplary implementation form can be described as follows: (1) and (2).
[0097] In step (1), the control unit 3 controls the first power conversion device to perform a first stage of charging and discharging in a first operation mode, and controls the second power conversion device to perform a first stage of charging and discharging in a second operation mode.
[0098] In some examples, the control unit 3 may include a relay control board and a plurality of relays. The plurality of relays are provided on the relay control board, and the first power conversion device and the second power conversion device are respectively connected to the corresponding relays, so that the control unit 3 can switch the communication between the first power conversion device and the second power conversion device through the relays. Exemplarily, when step (1) is performed, the control unit 3 may control the first relay corresponding to the first power conversion device to be closed, and send a first ON command to the first power conversion device so that the first power conversion device performs the first stage of charging and discharging in the first operation mode. Then, the control unit 3 controls the first relay to be disconnected, controls the second relay corresponding to the second power conversion device to be closed, and sends a second ON command to the second power conversion device so that the second power conversion device performs the first stage of charging and discharging in the second operation mode.
[0099] In addition, the first operation mode may be an AC input and DC output mode, and the second operation mode may be a DC input and AC output mode, and the power conversion device operating in the first operation mode corresponds to the power supply of the power conversion device operating in the second operation mode, while the power conversion device operating in the second operation mode corresponds to the load of the power conversion device operating in the first operation mode, and for safe operation, the principle of turning on the power before applying the load is generally followed. Therefore, first, the first power conversion device performs the first stage of charging and discharging in the first operation mode, and then the second power conversion device performs the first stage of charging and discharging in the second operation mode.
[0100] After the first relay corresponding to the first power conversion device is closed, the communication state between the first power conversion device and the control unit 3 is switched from non-communication to communication, so that a first ON command can be sent to the first power conversion device via the control unit 3. Here, the first ON command may be a command that is preset in the upper computer and causes the first power conversion device to operate in the first operation mode. Exemplarily, the first ON command may be ID180180A0 command 61009411000009411 and command 65009411D0079411.
[0101] After the first power conversion device is operated in the first operation mode, the first relay is disconnected and the second relay is closed, the communication state between the first power conversion device and the control unit 3 is switched from communication to non-communication, and the communication state between the second power conversion device and the control unit 3 is switched from non-communication to communication, so that the second on command can be sent to the second power conversion device via the control unit 3. Here, the second on command may be a command that is preset in the upper computer and causes the second power conversion device to operate in the second operation mode. Exemplarily, the second on command may be ID180180A0 command E100941100009411 and command E5009411DC059411.
[0102] According to step (1), the first power conversion device and the second power conversion device can perform a first stage of charging and discharging in different operation modes. When the first power conversion device operates in the first operation mode based on the first on command, it can receive an AC current transmitted by a power grid, convert the AC current to a DC current, and output the DC current to the second power conversion device. When the second power conversion device operates in the second operation mode based on the second on command, it can receive a DC current output by the first power conversion device, convert the DC current to an AC current, and output the DC current to the power grid.
[0103] In some embodiments, when step (1) controls a first power conversion device to perform a first stage of charging / discharging in a first operating mode and a second power conversion device to perform a first stage of charging / discharging in a second operating mode, first charging / discharging data is acquired, and based on the first charging / discharging data, it is possible to determine whether or not the first power conversion device and the second power conversion device are abnormal during the first stage of charging / discharging. The content of this part will be described later in step 6031, so a detailed description thereof will be omitted here.
[0104] However, if it is determined in step 6031 that the first power conversion device is abnormal during the first stage of charging and discharging, the first power conversion device may not be controlled to perform the second stage of charging and discharging in the second operation mode in order to save unnecessary energy consumption in step (2). On the other hand, if the first power conversion device is abnormal during the first stage of charging and discharging, the first power conversion device cannot provide power to the second power conversion device or function as a load, and the second power conversion device cannot perform the test normally, and therefore the second power conversion device is not controlled in step (2) to perform the second stage of charging and discharging in the first operation mode. That is, if the first power conversion device is abnormal during the first stage of charging and discharging, the first stage of charging and discharging is stopped to end the aging test, and step (2) is not performed. Similarly, if it is determined in step 6031 that the second power conversion device is abnormal during the first stage of charging and discharging, the first stage of charging and discharging is stopped to end the aging test, and step (2) is not performed. Here, the operation of stopping the first stage of charging and discharging and ending the aging test will be introduced in detail in the next step (2).
[0105] In step (2), when the first stage of charging / discharging is completed, the control unit 3 controls the first power conversion device to perform a second stage of charging / discharging in the second operating mode, and controls the second power conversion device to perform the second stage of charging / discharging in the first operating mode.
[0106] In general, when performing the aging test, each power conversion device needs to operate in the first operation mode / second operation mode for a certain period of time, and then operate in the second operation mode / first operation mode for a certain period of time. The duration of the first stage charge / discharge may be half of the total test time length, for example, the duration of the first stage charge / discharge may be 5h (hours), and the first power conversion device can perform step (2) after charging / discharging in the first operation mode for 5h and charging / discharging in the second operation mode for 5h. In conjunction with the above description, this embodiment can perform step (2) and continue the aging test when it is determined that the first power conversion device and the second power conversion device are not abnormal during the first stage charge / discharge and the first stage charge / discharge is completed.
[0107] In some embodiments, if it is determined that the first power conversion device and / or the second power conversion device is abnormal during the first stage of charging / discharging, the abnormality may be marked. For example, if it is determined that the first power conversion device and / or the second power conversion device is abnormal during the first stage of charging / discharging, the first data flag bit is set to 1. Here, the first data flag bit 0 indicates that there is no abnormality. Generally, after starting the test system, the upper computer sets the data flag bit to 0, and the first data flag bit is used to mark an abnormality when performing the first stage of charging / discharging. Meanwhile, if there is an abnormality during the first stage of charging / discharging test, the technician may press the stop button to trigger a test stop command. In response, the upper computer may receive the test stop command and record a test stop event by the first data flag bit. Exemplarily, if the first data flag bit is currently 1, the upper computer may not change the first data flag bit. If the first data flag bit is currently 0, the upper computer may set the first data flag bit to 1. In accordance with the above description, in this embodiment, if it is determined that the first data flag bit is 0 and the first stage of charging / discharging is completed, the second stage of charging / discharging can be performed in step (2) to continue the aging test; otherwise, the aging test is stopped.
[0108] In some embodiments, when performing step (2), the second power conversion device may be controlled to stop the first stage of charging / discharging in the second operating mode, and the first power conversion device may be controlled to stop the first stage of charging / discharging in the first operating mode. Then, a first ON command is sent to the second power conversion device so that the second power conversion device performs the second stage of charging / discharging in the first operating mode. Finally, a second ON command is sent to the first power conversion device so that the first power conversion device performs the second stage of charging / discharging in the second operating mode.
[0109] It is noted that in step (1), for safe operation, the principle of turning on the power before applying the load is generally followed. When turning off the power, the principle of removing the load before turning off the power is generally followed, so in step (2), the second power conversion device is first made to stop the first stage of charging and discharging in the second operation mode, then the first power conversion device is made to stop the first stage of charging and discharging in the first operation mode, then the second power conversion device is made to perform the second stage of charging and discharging in the first operation mode, and finally the first power conversion device is made to perform the second stage of charging and discharging in the second operation mode.
[0110] When the second power conversion device is controlled to stop the first stage of charging and discharging in the second operation mode and the first power conversion device is controlled to stop the first stage of charging and discharging in the first operation mode, the second relay corresponding to the second power conversion device is first controlled to be closed, and the communication state between the second power conversion device and the control unit 3 can be switched from non-communication to communication, whereby a first disconnection command is sent to the second power conversion device via the control unit 3, and the second power conversion device can stop the first stage of charging and discharging in the second operation mode. Here, the first disconnection command may be a command preset in the upper computer to cause the second power conversion device to stop the operation in the second operation mode. Exemplarily, the first disconnection command may be ID180180A0 command E2009411000009411.
[0111] Next, the second relay is controlled to be disconnected, the first relay corresponding to the first power conversion device is controlled to be closed, and the communication state between the first power conversion device and the control unit 3 is switched from non-communication to communication, thereby transmitting a second disconnect command to the first power conversion device via the control unit 3, and causing the first power conversion device to stop the first stage of charging and discharging in the first operation mode. Here, the second disconnect command may be a command preset in the upper computer for causing the first power conversion device to stop operation in the first operation mode. Exemplarily, the second disconnect command may be ID180180A0 command 6200941100009411.
[0112] This ends the first stage of charging / discharging in the second operation mode by the second power conversion device and the first stage of charging / discharging in the first operation mode by the first power conversion device.
[0113] When controlling the second power conversion device to perform a second stage of charging / discharging in the first operating mode and controlling the first power conversion device to perform the second stage of charging / discharging in the second operating mode, first, the second relay corresponding to the second power conversion device is controlled to be closed, and the communication state between the second power conversion device and the control unit 3 can be switched from non-communication to communication, whereby a first ON command can be sent to the second power conversion device via the control unit 3 to cause the second power conversion device to perform the second stage of charging / discharging in the first operating mode. Here, the first ON command may be a command preset in the upper computer for operating the second power conversion device in the first operating mode.
[0114] Next, the second relay is controlled to be disconnected, the first relay corresponding to the first power conversion device is controlled to be closed, and the communication state between the first power conversion device and the control unit 3 is switched from non-communication to communication, thereby transmitting a second ON command to the first power conversion device via the control unit 3 and causing the first power conversion device to perform the second stage of charging / discharging in the second operation mode. Here, the second ON command may be a command preset in the upper computer for operating the first power conversion device in the second operation mode.
[0115] As a result, the first power conversion device and the second power conversion device can perform the second stage of charging and discharging in different operation modes. When the second power conversion device operates in the first operation mode based on the first on command, it can receive AC current transmitted by the power grid, convert the AC current to DC current, and output it to the first power conversion device. When the first power conversion device operates in the second operation mode based on the second on command, it can receive DC current output by the second power conversion device, convert the DC current to AC current, and output it to the power grid.
[0116] In some embodiments, before step 602 is performed, the upper computer may perform a pre-check of communication with the test system to troubleshoot the test system. Exemplarily, the relay may control a first relay corresponding to a first power conversion device to close, and determine whether there is a data change in the life frame. If there is a data change in the life frame, it indicates that the communication of the first power conversion device is normal, and if not, it indicates that the communication of the first power conversion device is abnormal. Then, the first relay may be controlled to be disconnected, and a second relay corresponding to a second power conversion device may be controlled to be closed, and it may be determined whether there is a data change in the life frame. If there is a data change in the life frame, it indicates that the communication of the second power conversion device is normal, and if not, it indicates that the communication of the second power conversion device is abnormal. Similarly, according to this method, it may be determined whether the communication of other power conversion devices is normal.
[0117] In step 603, test data is obtained when the first power conversion device and the second power conversion device operate in different operation modes, and the first power conversion device and the second power conversion device are evaluated based on the test data.
[0118] When performing this step, the evaluation unit 4 can be connected to the first power conversion device and the second power conversion device via the control unit 3. When the control unit 3 controls the first power conversion device to operate in the first operation mode and the second power conversion device to operate in the second operation mode, the evaluation unit 4 can obtain test data when the first power conversion device operates in the first operation mode and obtain test data when the second power conversion device operates in the second operation mode. When the control unit 3 controls the first power conversion device to operate in the second operation mode and the second power conversion device to operate in the first operation mode, the evaluation unit 4 can obtain test data when the first power conversion device operates in the second operation mode and obtain test data when the second power conversion device operates in the first operation mode. Thereafter, the evaluation unit 4 can evaluate the first power conversion device based on the test data when the first power conversion device operates in the first operation mode and the test data when the first power conversion device operates in the second operation mode. The second power conversion device is evaluated based on test data when the second power conversion device operates in the second operating mode and test data when the second power conversion device operates in the first operating mode, where evaluating the first power conversion device may be determining whether or not the first power conversion device has a charge / discharge abnormality, and evaluating the second power conversion device may be determining whether or not the second power conversion device has a charge / discharge abnormality.
[0119] In some examples, as shown in FIG. 7, an example implementation of step 603 may be as follows.
[0120] In step 6031, first charge / discharge data is acquired, and based on the first charge / discharge data, it is determined whether or not the first power conversion device and the second power conversion device are abnormal during the first stage of charge / discharge.
[0121] Here, the first charging / discharging data is test data when the first power conversion device performs a first stage of charging / discharging in a first operating mode, and test data when the second power conversion device performs a first stage of charging / discharging in a second operating mode.
[0122] In addition, since the amount of test data is very large, in order to reduce the load of data processing and data storage, the host computer can collect the first charge / discharge data of all the power conversion devices at preset time intervals in a polling manner, for example, the first charge / discharge data of all the power conversion devices can be collected every 5 minutes.
[0123] In some examples, when acquiring the first charge / discharge data, the first relay corresponding to the first power conversion device is controlled to be closed, and all test data when the first power conversion device performs the first stage of charge / discharge in the first operation mode can be collected. Next, the first relay is controlled to be disconnected, and the second relay corresponding to the second power conversion device is controlled to be closed, and all test data when the second power conversion device performs the first stage of charge / discharge in the second operation mode can be collected. Of course, the second relay corresponding to the second power conversion device can be controlled to be closed first, and all test data when the second power conversion device performs the first stage of charge / discharge in the second operation mode can be collected. Next, the second relay is controlled to be disconnected, and the first relay corresponding to the first power conversion device is controlled to be closed, and all test data when the first power conversion device performs the first stage of charge / discharge in the first operation mode can be collected. The embodiment of the present application is not limited thereto.
[0124] Furthermore, after acquiring the first charging / discharging data, the host computer may store the first charging / discharging data. Of course, the acquired first charging / discharging data may be displayed so that the technician can easily view the data. For example, when the first charging / discharging data is stored and displayed, the data may be displayed in the form of a table or a graph, thereby improving storage efficiency and enhancing the intuitiveness and readability of the data.
[0125] After the first charge / discharge data is acquired, it can be determined whether the first power conversion device is abnormal during the first stage of charge / discharge based on the test data when the first power conversion device performs the first stage of charge / discharge in the first operating mode. It can also be determined whether the second power conversion device is abnormal during the first stage of charge / discharge based on the test data when the second power conversion device performs the first stage of charge / discharge in the second operating mode.
[0126] The aging configuration table may include thresholds of each aging parameter, and may include first threshold ranges of each aging parameter when the power conversion device performs the first stage of charging and discharging in the first operation mode and the second operation mode, respectively. The host computer can receive the aging configuration table after starting the test system, and obtain the first threshold ranges of each aging parameter when the first stage of charging and discharging is performed in the first operation mode and the first threshold ranges of each aging parameter when the first stage of charging and discharging is performed in the second operation mode based on the aging configuration table, and then compare the test data when the first power conversion device performs the first stage of charging and discharging in the first operation mode, i.e., the first charging and discharging data of the first power conversion device, with the first threshold ranges of the aging parameters when the first stage of charging and discharging is performed in the first operation mode to determine whether there is an abnormality when the first power conversion device performs the first stage of charging and discharging in the first operation mode. The test data when the second power conversion device performs the first stage of charging and discharging in the second operating mode, i.e., the first charging and discharging data of the second power conversion device, is compared with the first threshold range of the corresponding aging parameter when performing the first stage of charging and discharging in the second operating mode to determine whether the second power conversion device is abnormal during the first stage of charging and discharging in the second operating mode.
[0127] Exemplarily, if the first charge / discharge data of the first power conversion device exceeds a first threshold range, it is determined that the first power conversion device is abnormal during a first stage of charging / discharging in a first operating mode, and if the first charge / discharge data of the second power conversion device exceeds a first threshold range, it is determined that the second power conversion device is abnormal during a first stage of charging / discharging in a second operating mode.
[0128] For example, when two aging parameters are included, they may be named a first aging parameter and a second aging parameter, and the first threshold range includes a first threshold range of the first aging parameter and a first threshold range of the second aging parameter. In this example, when the first aging parameter of the first charge / discharge data of the first power conversion device exceeds the first threshold range of the first aging parameter and / or when the second aging parameter of the first charge / discharge data of the first power conversion device exceeds the first threshold range of the second aging parameter, it is determined that the first power conversion device is abnormal during the first stage of charging / discharging in the first operation mode. That is, when any aging parameter when the first power conversion device performs the first stage of charging / discharging in the first operation mode exceeds the first threshold range corresponding to the parameter, it can be determined that the first power conversion device is abnormal. Similarly, when a first aging parameter in the first charge / discharge data of the second power conversion device exceeds a first threshold range for the first aging parameter and / or when a second aging parameter in the first charge / discharge data of the second power conversion device exceeds a first threshold range for the second aging parameter, it is determined that the second power conversion device is abnormal during a first stage of charging / discharging in the second operating mode. In other words, when any aging parameter when the second power conversion device performs a first stage of charging / discharging in the second operating mode exceeds a first threshold range corresponding to that parameter, it can be determined that the second power conversion device is abnormal.
[0129] In addition, the present application can determine whether the first power conversion device is abnormal at the first stage of charging and discharging based on the test data when the first power conversion device performs the first stage of charging and discharging in the first operation mode, and can determine whether the second power conversion device is abnormal at the first stage of charging and discharging based on the test data when the second power conversion device performs the first stage of charging and discharging in the second operation mode, and the embodiment of the present application is not limited thereto. If it is first determined that the first power conversion device is abnormal at the first stage of charging and discharging, it is not determined whether the second power conversion device is abnormal at the first stage of charging and discharging, and if it is first determined that the second power conversion device is abnormal at the first stage of charging and discharging, it is not determined whether the first power conversion device is abnormal at the first stage of charging and discharging. In addition, in this embodiment, as long as it is determined that either the first power conversion device or the second power conversion device is abnormal at the first stage of charging and discharging, the subsequent aging test step is not executed.
[0130] In step 6032, second charge / discharge data is acquired, and based on the second charge / discharge data, it is determined whether or not the first power conversion device and the second power conversion device are abnormal during the second stage of charge / discharge.
[0131] Here, the second charging / discharging data is test data when the first power conversion device performs a second stage of charging / discharging in the second operating mode, and test data when the second power conversion device performs a second stage of charging / discharging in the first operating mode.
[0132] Note that step 6032 may be executed immediately after step (2). This step may collect the second charge / discharge data of all the power conversion devices at preset time intervals in a polling manner, similar to step 6031. For example, the second charge / discharge data of all the power conversion devices may be collected every 5 minutes.
[0133] In some examples, when acquiring the second charge / discharge data, the first relay corresponding to the first power conversion device is controlled to be closed, and all test data when the first power conversion device performs the second stage of charge / discharge in the second operation mode can be collected. Next, the first relay is controlled to be disconnected, and the second relay corresponding to the second power conversion device is controlled to be closed, and all test data when the second power conversion device performs the second stage of charge / discharge in the first operation mode can be collected. Of course, the second relay corresponding to the second power conversion device can also be controlled to be closed first, and all test data when the second power conversion device performs the second stage of charge / discharge in the first operation mode can also be collected. Next, the second relay is controlled to be disconnected, and the first relay corresponding to the first power conversion device is controlled to be closed, and all test data when the first power conversion device performs the second stage of charge / discharge in the second operation mode can be collected. The embodiment of the present application is not limited thereto.
[0134] Furthermore, after the host computer acquires the second charging / discharging data, the host computer can store the second charging / discharging data. Of course, the acquired second charging / discharging data can also be displayed so that the technician can easily view the data. For example, when the second charging / discharging data is stored and displayed, the data can be displayed in the form of a table or a graph, thereby improving storage efficiency and enhancing the intuitiveness and readability of the data.
[0135] After the second charge / discharge data is acquired, it can be determined whether the first power conversion device is abnormal during the second stage of charge / discharge based on the test data when the first power conversion device performs the second stage of charge / discharge in the second operation mode. It can also be determined whether the second power conversion device is abnormal during the second stage of charge / discharge based on the test data when the second power conversion device performs the second stage of charge / discharge in the first operation mode.
[0136] The aging configuration table also includes the first threshold value of each aging parameter when the power conversion device performs the second stage of charging and discharging in the first operation mode and the second operation mode. The host computer obtains the second threshold range of each aging parameter when the second stage of charging and discharging is performed in the first operation mode and the second threshold range of each aging parameter when the second stage of charging and discharging is performed in the second operation mode based on the aging configuration table, and then compares the test data when the first power conversion device performs the second stage of charging and discharging in the second operation mode, i.e., the second charge / discharge data of the first power conversion device, with the threshold value of the aging parameter when the second stage of charging and discharging is performed in the second operation mode to determine whether the first power conversion device is abnormal when the second stage of charging and discharging is performed in the second operation mode. The test data when the second power conversion device performs the second stage of charging and discharging in the first operation mode, i.e., the second charge / discharge data of the second power conversion device, is compared with the threshold value of the corresponding aging parameter when the second stage of charging and discharging is performed in the first operation mode to determine whether the second power conversion device is abnormal when the second stage of charging and discharging is performed in the first operation mode.
[0137] Exemplarily, if the second charge / discharge data of the first power conversion device exceeds the second threshold range, it is determined that the first power conversion device is abnormal during the second stage of charging / discharging in the second operation mode. If the second charge / discharge data of the second power conversion device exceeds the second threshold range, it is determined that the second power conversion device is abnormal during the second stage of charging / discharging in the first operation mode. A specific example thereof is similar to the related example in step 6031, and therefore will not be described here by way of example.
[0138] If step 6031 determines that the first power conversion apparatus is not abnormal during the first stage of charging and discharging, and step 6032 determines that the first power conversion apparatus is not abnormal during the second stage of charging and discharging, then it is determined that the first power conversion apparatus is not faulty. Otherwise, it is determined that the first power conversion apparatus is a faulty product. Similarly, if step 6031 determines that the second power conversion apparatus is not abnormal during the first stage of charging and discharging, and step 6032 determines that the second power conversion apparatus is not abnormal during the second stage of charging and discharging, then it is determined that the second power conversion apparatus is not faulty. Otherwise, it is determined that the second power conversion apparatus is a faulty product.
[0139] In some embodiments, the host computer can upload the evaluation results of the first power converter and the second power converter to the MES system based on the test data, so that the MES system supervises the management and control work on the pipeline. For the manner in which the MES system supervises the management and control work on the pipeline, please refer to the related art, and the description will be omitted here.
[0140] In the embodiment of the present application, the power supply network is connected to the AC terminal of the first power conversion device, the power supply network is also connected to the AC terminal of the second power conversion device, and the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, so that a test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device. Then, the first power conversion device and the second power conversion device are configured to operate simultaneously in different operating modes. conversion Finally, test data is obtained when the first power conversion device and the second power conversion device operate in different operation modes, and the first power conversion device and the second power conversion device are evaluated based on the test data. In this test circuit, the first power conversion device and the second power conversion device can function as a power supply as well as a load, so there is no need to additionally arrange a DC power supply and a load during testing, which saves investment costs and energy consumption. In addition, the first power conversion device and the second power conversion device can be used as a power supply. conversionSince the devices operate simultaneously in different operation modes, tests can be performed simultaneously on the first power conversion device and the second power conversion device, improving test efficiency.
[0141] Corresponding to the power conversion device test system shown in FIG. 3, an embodiment of the present application provides a power conversion device test method 2.
[0142] What is different from the embodiment shown in FIG. 3 is that in step 1 of this method, the power supply network is connected to the AC terminal of the power conversion device sorted first in the back-to-back series order in this power conversion device group and the AC terminal of the power conversion device sorted last in the back-to-back series order in this power conversion device group, the DC terminals of two power conversion devices in each pair of power conversion devices are connected, and the AC terminals of two adjacent power conversion devices in two adjacent pairs of power conversion devices are connected.
[0143] In step 2 of the method, the control unit 3 controls the odd-numbered and even-numbered power converters in the series sequence of the power converter group to operate simultaneously in different operating modes.
[0144] In some embodiments, the control unit 3 may first control the odd-numbered / even-numbered power converters in the series order in the power converter group to perform a first stage of charging / discharging in the first operation mode, and control the even-numbered / odd-numbered power converters in the series order in the power converter group to perform a first stage of charging / discharging in the second operation mode. When the first stage of charging / discharging is completed, the control unit 3 may control the odd-numbered / even-numbered power converters in the series order in the power converter group to perform a second stage of charging / discharging in the second operation mode, and control the even-numbered / odd-numbered power converters in the series order in the power converter group to perform the second stage of charging / discharging in the first operation mode.
[0145] In step 3 of the method, test data is obtained when the odd-numbered and even-numbered power conversion devices in the series order in the power conversion device group operate simultaneously in different operating modes, and the power conversion device group is evaluated based on the test data.
[0146] In some embodiments, similar to steps 6031 to 6032, first charging / discharging data and second charging / discharging data are acquired, and based on the first charging / discharging data and the second charging / discharging data, it is possible to determine whether or not there is a charging / discharging abnormality in any of the power conversion devices in the power conversion device group.
[0147] The difference from step 6031 to step 6032 is that the first charge / discharge data is test data when an odd-numbered power conversion device in the serial order in this power conversion device group performs a first stage of charge / discharge in a first operation mode, and test data when an even-numbered power conversion device in the serial order performs a first stage of charge / discharge in a second operation mode, and the second charge / discharge data is test data when an odd-numbered power conversion device in the serial order in this power conversion device group performs a second stage of charge / discharge in a second operation mode, and test data when an even-numbered power conversion device in the serial order performs a second stage of charge / discharge in the first operation mode.
[0148] It should be noted that the power converter test system shown in the embodiment of FIG. 2 includes one power converter group, and the power converter group includes one pair of power converters. In the power converter test method shown in FIG. 6, if the first power converter or the second power converter is abnormal during the first stage of charging and discharging, the first stage of charging and discharging is stopped to end the aging test, and the second stage of charging and discharging is not performed. In the power converter test system shown in the embodiment of FIG. 3, one power converter group includes multiple pairs of power converters, and if a power converter is abnormal during the first stage of charging and discharging, the first stage of charging and discharging of the power converter with the charging and discharging abnormality and the power converter paired with it can be stopped without stopping all the first stage of charging and discharging to end the aging test, and the second stage of charging and discharging of the paired power converter is not performed, and the aging test of the other pairs of power converters can be performed normally.
[0149] Corresponding to the power conversion device test system shown in the embodiment of FIG. 4, the embodiment of the present application provides a power conversion device test method 3.
[0150] What differs from the embodiment of Figure 3 is that in step 1 of this method, the power supply network is connected to an AC terminal of a first power conversion device in each of the multiple power conversion device groups and an AC terminal of a second power conversion device in each power conversion device group, and the DC terminal of the first power conversion device in each power conversion device group is connected to a DC terminal of the second power conversion device.
[0151] In the method steps, the control unit 3 controls the first power converter and the second power converter of each power converter group among the plurality of power converter groups to operate simultaneously in different operating modes.
[0152] In some embodiments, the control unit 3 may first control the first power converter / second power converter of each power converter group to perform a first stage of charging / discharging in the first operation mode, and control the second power converter / first power converter of each power converter group to perform a first stage of charging / discharging in the second operation mode. When the first stage of charging / discharging is completed, the control unit 3 may control the first power converter / second power converter of this power converter group to perform a second stage of charging / discharging in the second operation mode, and control the second power converter / first power converter of this power converter group to perform the second stage of charging / discharging in the first operation mode.
[0153] It should be noted that in this embodiment, the first power converter in each group is not necessarily the first power converter in the group, and the second power converter in each group is not necessarily the last power converter in the group. Taking the example of the embodiment of FIG. 4 as an example, the first power converter in the first power converter group may be the first power converter in the first power converter group, and the first power converter in the second power converter group may be the last power converter in the second power converter group. The embodiment of the present application is not limited thereto.
[0154] In step 3 of the method, test data is obtained when the first power conversion device and the second power conversion device of each of the multiple power conversion device groups operate simultaneously in different operating modes, and each power conversion device of the multiple power conversion device groups is evaluated based on the test data.
[0155] In some embodiments, similar to steps 6031 to 6032, first charging / discharging data and second charging / discharging data are acquired, and based on the first charging / discharging data and the second charging / discharging data, it is possible to determine whether or not there is a charging / discharging abnormality in each power conversion device of the multiple power conversion device groups.
[0156] The difference from steps 6031 to 6032 is that the first charge / discharge data is test data when the first power conversion device in each of the multiple power conversion device groups performs a first stage of charging / discharging in a first operating mode, and test data when the second power conversion device in each power conversion device group performs a first stage of charging / discharging in a second operating mode, and the second charge / discharge data is test data when the first power conversion device in each of the multiple power conversion device groups performs a second stage of charging / discharging in a second operating mode, and test data when the second power conversion device in each power conversion device group performs a second stage of charging / discharging in the first operating mode.
[0157] It should be noted that the power converter test system shown in the embodiment of Fig. 4 includes a plurality of power converter groups, and each of the plurality of power converter groups includes two power converters connected in series back to back as shown in the embodiment of Fig. 2. If a power converter is abnormal during the first stage of charging and discharging, the first stage of charging and discharging of the power converter with the charging and discharging abnormality and the power converters in the same group can be stopped without stopping all the first stage of charging and discharging to end the aging test, and the second stage of charging and discharging of this power converter group can be prevented, and the aging test of the other power converter groups can be normally performed.
[0158] Corresponding to the power conversion device test system shown in the embodiment of FIG. 5, the embodiment of the present application provides a power conversion device test method 4.
[0159] What differs from the embodiment shown in FIG. 3 is that in step 1 of this method, a power supply network is connected to the AC terminal of the power conversion device sorted first in the back-to-back series order in each of the multiple power conversion device groups and to the AC terminal of the power conversion device sorted last in the back-to-back series order in each power conversion device group, DC terminals of two power conversion devices among each pair of power conversion devices in each power conversion device group, and AC terminals of two adjacent power conversion devices of two adjacent pairs of power conversion devices in each power conversion device group.
[0160] In step 2 of the method, the control unit 3 controls the odd-numbered and even-numbered power converters in the series order in each of the multiple power converter groups to operate simultaneously in different operating modes.
[0161] In some embodiments, the control unit 3 may first control the odd-numbered / even-numbered power converters in the series order in each power converter group to perform a first stage of charging / discharging in the first operation mode, and control the even-numbered / odd-numbered power converters in the series order in each power converter group to perform a first stage of charging / discharging in the second operation mode. When the first stage of charging / discharging is completed, the control unit 3 may control the odd-numbered / even-numbered power converters in the series order in each power converter group to perform a second stage of charging / discharging in the second operation mode, and control the even-numbered / odd-numbered power converters in the series order in each power converter group to perform the second stage of charging / discharging in the first operation mode.
[0162] In step 3 of this method, test data is obtained when the odd-numbered and even-numbered power conversion devices in the serial order in each of the multiple power conversion device groups operate simultaneously in different operating modes, and each power conversion device in the multiple power conversion device groups is evaluated based on the test data.
[0163] In some embodiments, similar to steps 6031 to 6032, first charging / discharging data and second charging / discharging data are acquired, and based on the first charging / discharging data and the second charging / discharging data, it is possible to determine whether or not there is a charging / discharging abnormality in each power conversion device of the multiple power conversion device groups.
[0164] The difference from step 6031 to step 6032 is that the first charge / discharge data is test data when an odd-numbered power conversion device in the serial order in each power conversion device group performs a first stage of charge / discharge in a first operation mode, and test data when an even-numbered power conversion device in the serial order performs a first stage of charge / discharge in a second operation mode, and the second charge / discharge data is test data when an odd-numbered power conversion device in the serial order in each power conversion device group performs a second stage of charge / discharge in a second operation mode, and test data when an even-numbered power conversion device in the serial order performs a second stage of charge / discharge in the first operation mode.
[0165] It should be noted that in the test system shown in the embodiment of Fig. 5, each power converter group includes multiple pairs of power converters, and each pair of the multiple pairs of power converters includes two power converters connected in series back to back. If a power converter is abnormal during the first stage of charging and discharging, it is possible to stop only the first stage of charging and discharging of the power converter with the charging and discharging abnormality and the power converter paired with it, without stopping all the first stage of charging and discharging to end the aging test, and the second stage of charging and discharging of this pair of power converter groups is not performed, and the aging test of the power converters of other pairs or groups can be performed normally.
[0166] An embodiment of the present application further provides a computer-readable storage medium storing a computer program or commands that, when executed by a processor, implements a method for testing a power conversion device provided by any of the above method embodiments.
[0167] The computer-readable storage medium may include, but is not limited to, electronic circuits, semiconductor memory devices, read-only memory (ROM), flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, fiber optic media, radio frequency (RF) links, and the like.
[0168] 8 is a structural schematic diagram of another power conversion device test apparatus provided by an embodiment of the present application. Referring to FIG. 8, the power conversion device test apparatus includes a processor 810, a memory 820, and an interface 830, the processor 810, the memory 820, and the interface 830 are connected via a bus 840, and the bus may be realized by connecting circuits. Here, the memory 820 is used to store a program, and when the program is called by the processor 810, the method performed by the power conversion device test apparatus in the above embodiment can be realized. The interface 830 is used to realize communication with other power conversion device test apparatuses, and the interface 830 can communicate with other power conversion device test apparatuses by wired connection or wireless connection.
[0169] The functions of each unit of the power conversion device test apparatus may be realized by calling a program stored in the memory 820 by the processor 810. That is, the power conversion device test apparatus includes the processor 810 and the memory 820, the memory 820 is used to store a program, and the program is called by the processor 810 to execute the method in the above embodiment of the method. The processor 810 here may be a general-purpose processor or another processor capable of calling a program, or the processor 810 may be configured as one or more integrated circuits for implementing the execution method of the power conversion device test apparatus in the above embodiment, such as one or more application specific integrated circuits (ASICs), one or more microprocessors (DSPs), one or more field programmable gate arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. In addition, when the units in the power conversion device test device can be realized by calling a program by a processor, the processor 810 may be a general-purpose processor, such as a central processing unit (CPU), a controller, a microcontroller, a single-chip microcomputer, or another processor capable of calling a program. These units may also be integrated and realized in the form of a system-on-chip.
[0170] The number of memories 820 is not limited and may be one or more.
[0171] The memory 820 includes at least one type of readable storage medium, the readable storage medium includes non-volatile memory or volatile memory, such as flash memory, hard disk, multimedia card, card memory (such as SD or DX memory), random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), programmable read-only memory (PROM), magnetic memory, magnetic disk or optical disk, etc., and the RAM can include static RAM or dynamic RAM. In some embodiments, the memory 820 may be an internal storage device of the device, such as a hard disk or internal memory of the device. In some other embodiments, the memory 820 may also be an external storage device of the device, such as a plug-in hard disk, a Smart Media Card (SMC), a Secure Digital (SD) card, or a Flash Card, etc., disposed in the device. Of course, the memory 820 may include not only the internal storage device of the device, but also its external storage device. In this embodiment, the memory 820 is typically used to store the operating system and various application software installed in the device, such as program code of a test method for a power conversion device. The memory 820 may also be used to temporarily store output data or various data to be output.
[0172] The bus 840 may be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, etc. The bus 840 may include an address bus, a data bus, a control bus, etc. For ease of illustration, a single thick line is shown in the figure, but does not indicate that there is only one bus or one type of bus.
[0173] The processor 810 typically controls the overall operation of the device. In this embodiment, the memory 820 is used to store program codes or commands, the program codes including computer operation commands, and the processor 810 is used to execute the program codes or commands or process data stored in the memory 820, such as the program codes for executing a test method for a power conversion device.
[0174] As described above, in the embodiment of the present application, the power supply network is connected to the AC terminal of the first power conversion device, the power supply network is also connected to the AC terminal of the second power conversion device, and the DC terminal of the first power conversion device is connected to the DC terminal of the second power conversion device, so that a test circuit can be formed between the power supply network, the first power conversion device, and the second power conversion device. Then, the control unit 3 can control the first power conversion device and the second power conversion device to operate simultaneously in different operation modes, and the evaluation unit 4 can obtain test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluate the first power conversion device and the second power conversion device based on the test data. In this test circuit, the first power conversion device and the second power conversion device can function as a power source as well as a load, so that there is no need to additionally arrange a DC power source and a load when testing, which saves investment costs and energy consumption. In addition, the first power conversion device and the second power conversion device can be controlled ... so that the first power conversion device and the second power conversion device can be controlled to operate simultaneously in different operation modes, which saves investment costs and energy consumption. conversionSince the devices operate simultaneously in different operating modes, tests can be performed simultaneously on the first power conversion device and the second power conversion device, improving test efficiency.
[0175] Those skilled in the art will appreciate that some embodiments of the present specification include some features that are included in other embodiments but not other features, and that combinations of features from different embodiments are within the scope of the present application and form different embodiments. For example, in the claims, any of the embodiments for which protection is claimed may be used in any combination.
[0176] Finally, it should be noted that the above examples are only for illustrating the technical solutions of the present application, and are not intended as limitations thereon. Although the present application has been described in detail with reference to the above examples, it should be understood that those skilled in the art can still modify the technical solutions described in the above examples, or make equivalent replacements for some technical features therein, and these modifications or replacements do not deviate from the essence of the corresponding technical solutions from the spirit and scope of each technical solution of each embodiment of the present application.
Claims
1. A power conversion device test system, a first AC input / output unit for connecting a power supply network and an AC terminal of the first power conversion device; a second AC input / output unit used to connect the power supply network and an AC terminal of a second power conversion device, the DC terminal of the first power conversion device being connected to a DC terminal of the second power conversion device; a control unit for controlling the first power converter and the second power converter to operate simultaneously in different operating modes; an evaluation unit for acquiring test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluating the first power conversion device and the second power conversion device based on the test data; Including, Controlling the first power conversion device and the second power conversion device by the control unit to operate simultaneously in different operation modes Controlling the first power conversion device to perform a first stage of charging and discharging in a first operation mode, and controlling the second power conversion device to perform a first stage of charging and discharging in a second operation mode; When the first stage of charging / discharging is completed, controlling the first power conversion device to perform a second stage of charging / discharging in a second operation mode, and controlling the second power conversion device to perform the second stage of charging / discharging in the first operation mode; 1. A power conversion device test system comprising:
2. The operation modes include a first operation mode and a second operation mode, the first power conversion device operates in the first operating mode and the second power conversion device operates in the second operating mode; or 2. The system of claim 1, wherein the first power converter operates in the second mode of operation and the second power converter operates in the first mode of operation.
3. The control unit includes a relay control board and a plurality of relays. The system described in claim 1 or 2, characterized in that the multiple relays are provided on the relay control board, the first power conversion device and the second power conversion device are each connected to a different relay among the multiple relays, and the relay is used to switch communication between the first power conversion device and the second power conversion device.
4. A method for testing a power conversion device, comprising: connecting an AC terminal of the first power conversion device and an AC terminal of the second power conversion device to a power supply network; connecting a DC terminal of the first power conversion device and a DC terminal of the second power conversion device; controlling, by a control unit, the first power conversion device and the second power conversion device to operate simultaneously in different operating modes; acquiring test data when the first power conversion device and the second power conversion device operate in different operation modes, and evaluating the first power conversion device and the second power conversion device based on the test data; Including, The step of controlling the first power conversion device and the second power conversion device to simultaneously operate in the different operation modes includes: controlling the first power conversion device to perform a first stage of charging and discharging in a first operation mode, and controlling the second power conversion device to perform a first stage of charging and discharging in a second operation mode; When the first stage of charging / discharging is completed, controlling the first power conversion device to perform a second stage of charging / discharging in a second operation mode, and controlling the second power conversion device to perform the second stage of charging / discharging in the first operation mode; 13. A method for testing a power conversion device, comprising:
5. The operation modes include a first operation mode and a second operation mode, the first power conversion device operates in the first operating mode and the second power conversion device operates in the second operating mode; or 5. The method of claim 4, wherein the first power converter operates in the second mode of operation and the second power converter operates in the first mode of operation.
6. the control unit includes a relay control board and a plurality of relays; The method according to claim 4, characterized in that the plurality of relays are provided on the relay control board, the first power conversion device and the second power conversion device are each connected to a different relay among the plurality of relays, and the relay is used to switch communication between the first power conversion device and the second power conversion device.
7. The step of controlling the first power conversion device to perform a first stage of charging and discharging in the first operation mode and controlling the second power conversion device to perform a first stage of charging and discharging in the second operation mode includes: controlling a first relay corresponding to the first power conversion device to be closed, and transmitting a first ON command to the first power conversion device so that the first power conversion device performs a first stage of charging / discharging in a first operation mode; controlling the first relay to be disconnected, controlling the second relay corresponding to the second power conversion device to be closed, and transmitting a second ON command to the second power conversion device so that the second power conversion device performs a first stage of charging / discharging in a second operating mode; 5. The method of claim 4, comprising:
8. a step of controlling the first power conversion device to perform a second stage of charging / discharging in a second operation mode when the first stage of charging / discharging is completed, and controlling the second power conversion device to perform the second stage of charging / discharging in the first operation mode, controlling the second power conversion device to stop a first stage of charging / discharging in a second operation mode, and controlling the first power conversion device to stop a first stage of charging / discharging in a first operation mode; sending a first ON command to the second power conversion device so that the second power conversion device performs a second stage of charging / discharging in a first operation mode; sending a second ON command to the first power conversion device so that the first power conversion device performs a second stage of charging / discharging in a second operation mode; 5. The method of claim 4, comprising:
9. The step of controlling the second power conversion device to stop a first stage of charging / discharging in the second operation mode and controlling the first power conversion device to stop a first stage of charging / discharging in the first operation mode includes: controlling a second relay corresponding to the second power conversion device to be closed, and sending a first disconnect command to the second power conversion device so that the second power conversion device stops a first stage of charging / discharging in a second operating mode; controlling the second relay to be disconnected, controlling the first relay corresponding to the first power conversion device to be closed, and transmitting a second disconnect command to the first power conversion device so that the first power conversion device stops a first stage of charging / discharging in a first operating mode; 9. The method of claim 8, comprising:
10. The step of acquiring test data when the first power conversion device and the second power conversion device operate in different operation modes and evaluating the first power conversion device and the second power conversion device based on the test data includes: a step of acquiring first charge / discharge data, and judging whether or not the first power conversion device and the second power conversion device are abnormal during a first stage of charging / discharging based on the first charge / discharge data, the first charge / discharge data being test data when the first power conversion device performs a first stage of charging / discharging in a first operating mode, and test data when the second power conversion device performs a first stage of charging / discharging in a second operating mode; a step of acquiring second charge / discharge data, and judging whether or not the first power conversion device and the second power conversion device are abnormal during a second stage of charge / discharge based on the second charge / discharge data, the second charge / discharge data being test data when the first power conversion device performs a second stage of charge / discharge in a second operating mode, and test data when the second power conversion device performs a second stage of charge / discharge in a first operating mode; 5. The method of claim 4, comprising:
11. The step of acquiring the first charge / discharge data and determining whether or not the first power conversion device and the second power conversion device are abnormal during a first stage of charging / discharging based on the first charge / discharge data, determining that the first power conversion device is abnormal during a first stage of charging / discharging when the first charging / discharging data of the first power conversion device exceeds a first threshold range; determining that the second power conversion device is abnormal during a first stage of charging / discharging when the first charging / discharging data of the second power conversion device exceeds a first threshold range; 11. The method of claim 10, comprising:
12. A computer-readable storage medium storing a computer program, the computer-readable storage medium realizing the method for testing a power conversion device according to any one of claims 4 to 11 when the computer program is executed by a processor.
13. 1. An electronic device comprising: A processor; a memory for storing executable commands for said processor; Including, An electronic device, wherein the processor is configured to perform the method for testing a power conversion apparatus according to any one of claims 4 to 11 by executing the executable commands.
Citation Information
Patent Citations
Testing method for self-excited converter
JP2004104891A
Power conversion device
JP2016214030A
