Power failure detection system and power failure detection method
The power outage detection system addresses the inability of conventional systems to detect high-voltage distribution line issues by using smart meters and a management system to display alarms and issue tickets, facilitating quick power restoration.
Patent Information
- Application Number
- JP2020196534
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-27
- Publication Date
- 2024-11-13
- Estimated Expiration
- 2040-11-27
AI Technical Summary
Conventional power distribution automation systems cannot detect distribution line accidents such as disconnections in high-voltage distribution lines or open phases, leading to delayed and labor-intensive power outage restoration.
A power outage detection system that includes a power distribution automation system, smart meters at customer homes, and a smart meter management operation system, which detects power outages from consecutive or discontinuous banks on the distribution line and displays alarms or issues failure tickets to facilitate quick restoration.
Enables rapid identification and restoration of power outages caused by high-voltage distribution line breaks or open phases by displaying alarms for consecutive banks and issuing failure tickets for individual outages, reducing the time and effort required for recovery.
Smart Images

Figure 0007581800000001 
Figure 0007581800000002 
Figure 0007581800000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a system and method for detecting and sensing a power outage, and more particularly to a power outage detection system and a power outage detection method for detecting a power outage that cannot be detected by a power distribution automation system. [Background technology]
[0002] Conventionally, distribution automation systems have been installed and operated to monitor distribution systems and control switches, identify the outage area on the distribution system when a power outage occurs, and generate outage information such as the occurrence of a power outage and the restoration of power supply based on the results of monitoring and control. In other words, distribution line accidents accompanied by the tripping of a feeder circuit breaker (FCB) or automatic tripping of a pole switch (DM) can be actively handled as an accident restoration by detecting the accident in the distribution automation system. However, distribution automation systems cannot detect distribution line accidents such as breaks or open phases in high-voltage distribution lines that do not involve tripping of an FCB or automatic tripping of a DM. For this reason, they have responded passively to outage and failure information from consumers.
[0003] There is also a known system that receives power outage information from an electric power meter installed in each home and determines the cause and factors of the power outage (see, for example, Patent Document 1). When this system receives power outage information from an electric power meter, it counts up the number of power outages on the corresponding service pole, and when that number reaches a threshold, it requests power outage information from electric power meters that have not transmitted power outage information within the service pole's area, thereby determining whether the power outage is caused by that service pole. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2013-42609 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, because distribution automation systems cannot detect power distribution line accidents such as breaks in high-voltage distribution lines or loss of phase, conventionally, responses were made after checking the site based on information about power outages and failures from customers. In other words, when information about power outages and failures was received from customers, the initial response was usually made by one person, and then, when the site was checked and it was determined that the cause was a break in a high-voltage distribution line or loss of phase, multiple recovery personnel were secured to respond to the restoration. This meant that it could take a lot of time and effort to restore the power.
[0006] In addition, although the system of Patent Document 1 can determine whether the cause of the power outage is a lead-in pole, it cannot detect whether the cause is a break in a high-voltage distribution line or a missing phase. For this reason, as in the past, it may take time and effort to restore the power outage.
[0007] Therefore, an object of the present invention is to provide a power outage detection system and a power outage detection method that enable rapid restoration of power even in the case of a power outage caused by a break or loss of phase in a high-voltage distribution line. [Means for solving the problem]
[0008] In order to solve the above problem, the invention of claim 1 is a power outage detection system comprising: a power distribution automation system that monitors a power distribution system and, when a power outage occurs, controls a switch to distribute power to areas other than the power outage section; a power meter that is installed in each consumer's home and measures the amount of power consumed and has a function of detecting power outages; and a power outage management means that is communicatively connected to the power distribution automation system and the power meter, wherein the power outage management means displays an alarm on a display unit of the power distribution automation system when it receives information that a power outage has been detected from the power meters in two or more consecutive banks of the same distribution line in an area other than the power outage section detected by the power distribution automation system.
[0009] The invention of claim 2 is characterized in that, in the power outage detection system described in claim 1, the power outage management means, when displaying the alarm, displays in chronological order the receipt of information that the power outage has been detected.
[0010] The invention of claim 3 is characterized in that, in the power outage detection system of claim 1 or 2, when the power outage management means receives information that the power outage has been detected from the electricity meters of non-contiguous banks on the same distribution line in an area other than the power outage section detected by the power distribution automation system, it issues a fault ticket to accept individual faults.
[0011] The invention of claim 4 is a power outage detection method comprising: a power distribution automation system that monitors a power distribution system and, when a power outage occurs, controls a switch to distribute power to areas other than the power outage section; and a power meter that is installed in each consumer's home and measures the amount of power consumed and has a function of detecting power outages, wherein when information that a power outage has been detected from the power meters in two or more consecutive banks on the same distribution line in an area other than the power outage section detected by the power distribution automation system is received, an alarm is displayed on a display unit of the power distribution automation system.
[0012] The invention of claim 5 is characterized in that, in the power outage detection method described in claim 4, when the alarm is displayed, the reception of information that the power outage has been detected is displayed in chronological order.
[0013] The invention of claim 6 is characterized in that, in the power outage detection method according to claim 4 or 5, when information indicating that the power outage has been detected is received from the electricity meters of non-contiguous banks on the same distribution line in an area other than the power outage section detected by the power distribution automation system, a fault ticket is issued to accept an individual fault. Effect of the Invention
[0014] According to the inventions described in claims 1 and 4, when information that a power outage has been detected is received from two or more consecutive watt-hour meters on the same distribution line in an area other than the outage section detected by the distribution automation system, that is, when a power outage occurs in two or more consecutive banks of consumers on the same distribution line, an alarm is displayed on the display unit of the distribution automation system. Therefore, even if a power outage occurs due to a break or phase loss of a high-voltage distribution line that cannot be detected by the distribution automation system, it is possible to quickly restore the power outage. In other words, when a power outage occurs due to a break or phase loss of a high-voltage distribution line, a power outage may occur in two or more consecutive banks of consumers on the same distribution line. Therefore, by displaying an alarm when information that a power outage has been detected is received from two or more consecutive watt-hour meters on the same distribution line, it is possible to quickly respond to a power outage due to a break or phase loss of a high-voltage distribution line and quickly restore the power outage.
[0015] According to the inventions described in claims 2 and 5, the information that a power outage has been detected is received, i.e., the occurrence of a power outage at a consumer's house is displayed in chronological order on the display unit of the power distribution automation system. This makes it possible to accurately and easily grasp when a power outage occurred at which bank or consumer's house, and makes it possible to quickly restore power even in the case of a power outage caused by a break or loss of phase in a high-voltage distribution line that cannot be detected by the power distribution automation system.
[0016] According to the inventions described in claims 3 and 6, when information is received from a watt-hour meter of a non-contiguous bank on the same distribution line in an area other than the outage section detected by the distribution automation system that a power outage has been detected, that is, when a power outage occurs at a consumer's home in a non-contiguous bank on the same distribution line, a fault ticket is issued to accept the individual fault. Therefore, even if an individual power outage occurs due to a service line fault or a transformer fault that cannot be detected by the distribution automation system, the power outage can be quickly restored. In other words, when an individual power outage occurs due to a service line fault or a transformer fault, a power outage may occur at a consumer's home in a non-contiguous bank (a single bank or multiple distant banks) on the same distribution line. Therefore, by issuing a fault ticket when information is received from a watt-hour meter of a non-contiguous bank on the same distribution line that a power outage has been detected, it is possible to quickly respond to an individual power outage due to a service line fault or a transformer fault, and quickly restore the power outage. [Brief description of the drawings]
[0017] [Figure 1] 1 is a schematic configuration diagram showing a power outage detection system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic configuration diagram showing a power distribution automation system of the power failure detection system of FIG. 1. [Diagram 3] 1. FIG. 4 is a diagram showing a first example determined by the smart meter management operation system of the power outage detection system of FIG. [Figure 4] FIG. 2 is a diagram showing a second example determined by the smart meter management operation system of the power outage detection system of FIG. 1. [Diagram 5] FIG. 13 is a diagram showing a third example determined by the smart meter management operation system of the power outage detection system of FIG. [Figure 6] FIG. 13 is a diagram showing a fourth example determined by the smart meter management operation system of the power outage detection system of FIG. [Figure 7] 3A is a diagram showing an example of a first alarm displayed on the display of the power distribution automation system of FIG. 2, and FIG. 3B is a diagram showing an example of a second alarm displayed on the display of the power distribution automation system of FIG. 2. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, the present invention will be described based on the illustrated embodiment.
[0019] FIG. 1 is a schematic configuration diagram showing a power outage detection system 1 according to an embodiment of the present invention. This power outage detection system 1 is a system that detects and notifies of power outages, and in particular can detect power outages that cannot be detected by a power distribution automation system 2, and mainly includes the power distribution automation system 2, a smart meter (electricity meter) 3 installed in each consumer's home H, and a smart meter management operation system (power outage management means) 4. The power distribution automation system 2 and the smart meter management operation system 4 are communicatively connected via a communication network NW, and each smart meter 3 and the smart meter management operation system 4 are communicatively connected via the communication network NW. Here, the communication network NW may be one communication network or multiple different communication networks.
[0020] In addition, a distribution line L is erected via a utility pole 101, and a service line 31 drawn from a pole-mounted transformer 102 installed on the utility pole 101 is connected to a smart meter 3, and electricity is supplied to a consumer's home H via the smart meter 3.
[0021] The power distribution automation system 2 is a system that monitors the power distribution system and, when a power outage occurs, controls switches and feeder breakers to distribute power to areas other than the power outage section, and has the same configuration as the power distribution automation system widely introduced by electric power companies, etc. That is, as shown in Fig. 2, it includes a power distribution automation server, a power distribution remote control device (remote monitoring and control device), a monitoring and control desk 21, a system planning desk (workstation), etc., each of which is connected by a LAN (Local Area Network). In addition, a pole-mounted switch (DM) 103 attached to a utility pole 101 is connected to the power distribution remote control device by a transmission line (dedicated line) 22, and further, a distribution substation 24 and the power distribution remote control device are connected by the transmission line 22 via a general control center 23.
[0022] The operation state of the distribution line L is constantly monitored, and when a power outage occurs due to a power distribution line accident, the pole switch 103 and the like are opened and closed while controlling the opening and closing of the pole switch 103, and power is distributed (automatic reverse transmission) to the distribution line L other than the power outage section. In this way, the power outage section is defined by the opening and closing control of the pole switch 103, and the power outage section and the non-power outage section are separated by the pole switch 103 and the like. Also, when a power outage occurs due to a substation accident (extra-high voltage accident, instantaneous voltage drop, etc.), power is distributed (automatic reverse transmission) from the surrounding distribution line L to the area where the power outage occurred. Such a power distribution automation system 2 can detect accidental power outages due to ground faults and short circuit accidents, but cannot detect individual power outages due to breaks or missing phases in the high-voltage distribution line (power distribution line L), or faults (breaks, etc.) in the service line 31 or faults (fuse blown, etc.) in the pole transformer 102.
[0023] The smart meter 3 is an electricity meter that measures the power consumption at the consumer's house H where the smart meter 3 is installed, and has a communication function and a function of detecting a power outage and power restoration. That is, the smart meter 3 can communicate with other smart meters 3 and the smart meter management operation system 4 by using power line communication (PLC) via the service line 31 and the distribution line L. The smart meter 3 also constantly monitors the voltage on the power source side, i.e., the service line 31 side, detects a power outage by detecting that the voltage has dropped below a predetermined value, and transmits information to the smart meter management operation system 4 that the power outage has been detected (hereinafter, appropriately referred to as "power outage information"). At this time, the power outage information includes the meter number, which is identification information of the smart meter 3, and the date and time of the power outage. The smart meter 3 also detects power outage recovery by detecting that the voltage on the power source side has recovered to a predetermined value or higher, and transmits information to the smart meter management operation system 4 that the power outage recovery has been detected (hereinafter, appropriately referred to as "recovery information"). At this time, the recovery information includes the meter number of the smart meter 3 and the date and time of recovery.
[0024] The smart meter management operation system 4 is connected to be able to communicate with the power distribution automation system 2 and each smart meter 3, and manages and operates each smart meter 3, as well as functions as a power outage management means for detecting and notifying of power outages that are not detected by the power distribution automation system 2. In this embodiment, an explanation of the management and operation of each smart meter 3 will be omitted, but the smart meter management operation system 4 is provided with a database that stores, for each meter number of each smart meter 3, identification information of the bank to which the smart meter 3 belongs (identification information of the utility pole 101, utility pole number), the name and title of the customer, the customer's contact information (email address, telephone number, etc.), installation location, status (in operation, out of service, power outage, etc.), etc.
[0025] Next, as a power outage management means (power outage detection method), first, when power outage information is received from two or more consecutive smart meters 3 on the same distribution line L in an area other than the power outage section detected by the power distribution automation system 2, an alarm is displayed on the display (display unit) 211 of the monitoring and control desk 21 of the power distribution automation system 2. That is, when power outage information is received from smart meters 3 of multiple consecutive banks on the same distribution line L in an area (power distribution line area) where a power outage is not detected by the power distribution automation system 2, it is determined that a power outage has occurred in the area / bank due to a break in a high-voltage distribution line or a loss of phase, and an alarm is displayed on the display 211 of the power distribution automation system 2. Here, a bank is formed by a single or multiple consumer homes H that branch off from a pole-mounted transformer 102 of a utility pole 101 that is a bank pole and are connected by a service line 31. That is, it is a group formed by a single or multiple consumer homes H that correspond to a bank pole installed in a power distribution system and are connected to the bank pole.
[0026] 3 to 6, for example, it is assumed that utility poles 101, which are bank poles, are installed in order on a distribution line L from a feeder breaker FCB on the power source side, a first pole switch DM1, a second pole switch DM2, a third pole switch DM3... are installed on each utility pole 101 in order from the power source side, and a customer's house H is connected to a pole transformer 102 on each utility pole 101. Here, it is assumed that a first utility pole 1011, a second utility pole 1012, a third utility pole 1013... are installed in order from the power source side, and a first bank B1, a second bank B2, a third bank B3... are formed in order from the power source side.
[0027] 3, the power distribution automation system 2 detects no power outage in any area or section, and the feeder circuit breaker FCB and each pole-mounted switch DM1, DM2, DM3, ... are in the "ON" state. In this state, for example, if power outage information is received from the smart meter 3 of the first bank B1 and the smart meter 3 of the second bank B2, which are multiple consecutive banks on the same distribution line L, it is determined that a power outage has occurred in the area from the feeder circuit breaker FCB to the second bank B2 (second utility pole 1012) due to a break or loss of phase in the high-voltage distribution line. Then, as described below, an alarm is displayed on the display 211 of the power distribution automation system 2.
[0028] Also, as shown in Fig. 4, suppose that the distribution automation system 2 detects a power outage on the opposite power source side (opposite FCB side) from the third pole switch DM3, controls the third pole switch DM3 to "off" (automatically shuts off), and identifies the opposite power source side from the third bank B3 as the power outage section. In this state, even if power outage information is received from the smart meter 3 in the power outage section including the third bank B3, the distribution automation system 2 is already able to recognize the power outage and therefore does not display an alarm or the like. On the other hand, when power outage information is received from the smart meters 3 of multiple consecutive banks on the same distribution line L in an area other than the power outage section, for example, the first bank B1 and the second bank B2, an alarm is displayed on the display 211 of the distribution automation system 2.
[0029] 5, it is further assumed that the feeder circuit breaker FCB is shut off in the power distribution automation system 2. In this case, the power distribution automation system 2 can recognize that the feeder circuit breaker FCB has been shut off and that power is not being supplied from the power distribution line L. Therefore, even if power outage information is received from the smart meters 3 of multiple consecutive banks, for example, the first bank B1 and the second bank B2, no alarm is displayed or the like.
[0030] 6, it is assumed that the first pole switch DM1 and the second pole switch DM2 are automatically shut off by the distribution automation system 2. In this case, the distribution automation system 2 can recognize that the pole switches DM1 and DM2 on the power source side have been shut off and that power will no longer be supplied from the same distribution line L. Therefore, even if power outage information is received from the smart meters 3 of multiple consecutive banks of the same distribution line L, no alarm is displayed or the like.
[0031] Here, to display an alarm on the display 211 of the power distribution automation system 2, an alarm display command is sent from the smart meter management operation system 4 to the power distribution automation system 2, and upon receiving this command, the power distribution automation system 2 displays the alarm on the display 211. This alarm display command includes the alarm content and display method to be displayed, and in this embodiment, when displaying the alarm, the reception of the power outage information is displayed in chronological order. That is, to make it easy to know when a power outage occurred in which bank / consumer's house H, for example, as shown in the alarm information W of Fig. 7, the power outage history such as the utility pole number corresponding to the meter number included in the power outage information is displayed in the order of the power outage date and time included in the power outage information (or in the order of reception of the power outage information).
[0032] Such alarm information W may be displayed in any way, at any position on any screen, for example, as shown in FIG. 7(a), in a pop-up screen on a screen that chronologically displays monitoring and control information by the power distribution automation system 2, or as shown in FIG. 7(b), in a pop-up screen on a screen that chronologically displays operation information by the power distribution automation system 2. In this case, as shown in FIG. 7(b), a "SM power outage information" tab T or the like may be displayed on each screen, and the alarm information W may be displayed or closed when this tab T is clicked. Also, a "close" tab may be displayed in the alarm information W, and the alarm information W may be closed when this tab is clicked. Furthermore, the alarm information W may be displayed in a flashing manner to call attention.
[0033] Furthermore, as a power outage management means, the smart meter management operation system 4 issues a fault ticket to accept an individual fault when it receives power outage information from a smart meter 3 of a non-consecutive bank on the same distribution line L in an area other than the power outage section detected by the distribution automation system 2. In other words, when it receives power outage information from a smart meter 3 of a non-consecutive bank (one bank or multiple distant banks) on the same distribution line L in an area where a power outage is not detected by the distribution automation system 2, it determines that an individual power outage has occurred in that bank due to a defective service line, a defective transformer, or the like, and issues a fault ticket.
[0034] For example, as shown in FIG. 3 above, in a state where the distribution automation system 2 does not detect a power outage in any area or section of the distribution line L, it is assumed that power outage information is received only from the smart meter 3 of the second bank B2 on the same distribution line L. In this case, it is determined that an individual power outage has occurred in the second bank B2, and a fault ticket is issued. Similarly, in the state shown in FIG. 3, if power outage information is received from the smart meters 3 of the discontinuous first bank B1 and third bank B3 on the same distribution line L, it is determined that an individual power outage has occurred in each bank B1 and B3, and a fault ticket is issued for each bank. Furthermore, as shown in FIG. 4 above, in a state where the opposite power source side from the third bank B3 on the distribution line L is specified as the power outage section by the distribution automation system 2, it is assumed that power outage information is received only from the smart meter 3 of the second bank B2 on the same distribution line L, which is not in the power outage section. In this case, it is determined that an individual power outage has occurred in the second bank B2, and a fault ticket is issued.
[0035] Here, a fault ticket is a reception ticket for receiving individual faults and inquiries from customers at a customer center or sales office, and is created by filling in a specified format with the identification information of the bank / utility pole 101 that has been determined to be an individual power outage, the name and title of the customer belonging to this bank, the date and time of the power outage, etc. Then, such a fault ticket is sent to and issued by a server computer at a customer center or sales office, and individual measures are taken for the relevant bank / utility pole 101 and customer.
[0036] As described above, according to the power outage detection system 1 and the power outage detection method by the power outage detection system 1, when power outage information is received from the smart meters 3 of two or more consecutive banks on the same distribution line L in an area other than the power outage section detected by the power distribution automation system 2 (a distribution line area where a power outage is not detected by the power distribution automation system 2), that is, when a power outage occurs in the consumer homes H of two or more consecutive banks on the same distribution line L, an alarm is displayed on the display 211 of the power distribution automation system 2. Therefore, even if a power outage occurs due to a break or loss of phase in a high-voltage distribution line that cannot be detected by the power distribution automation system 2, it is possible to quickly respond to the power outage and restore the power outage. In other words, when a power outage occurs due to a break or loss of phase in a high-voltage distribution line, a power outage may occur in the consumer homes H of two or more consecutive banks on the same distribution line L. Therefore, by displaying an alarm when power outage information is received from the smart meters 3 of two or more consecutive banks on the same distribution line L, it is possible to quickly respond to a power outage due to a break or loss of phase in a high-voltage distribution line and quickly restore the power outage.
[0037] Furthermore, the receipt of the power outage information, i.e., the occurrence of a power outage at the consumer's home H, is displayed in chronological order on the display 211 of the power distribution automation system 2. This makes it possible to accurately and easily grasp the occurrence situation, such as when the power outage occurred at which bank or consumer's home H, and makes it possible to quickly respond to and restore power even in the case of a power outage caused by a break or loss of phase in a high-voltage distribution line that cannot be detected by the power distribution automation system 2.
[0038] On the other hand, when power outage information is received from a smart meter 3 of a non-contiguous bank on the same distribution line in an area other than the power outage section detected by the power distribution automation system 2, that is, when a power outage occurs at a consumer's home H of a non-contiguous bank on the same distribution line, a fault ticket is issued to accept the individual fault. Therefore, even if an individual power outage occurs due to a service line fault or a transformer fault that cannot be detected by the power distribution automation system 2, it is possible to quickly restore the power outage. In other words, when an individual power outage occurs due to a service line fault or a transformer fault, a power outage may occur at a consumer's home H of a non-contiguous bank (single bank or multiple distant banks) on the same distribution line. Therefore, by issuing a fault ticket when power outage information is received from a smart meter 3 of a non-contiguous bank on the same distribution line, it is possible to quickly respond to an individual power outage due to a service line fault or a transformer fault, and quickly restore the power outage.
[0039] Although the embodiment of the present invention has been described above in detail, the specific configuration is not limited to this embodiment, and even if there are design changes within the scope of the present invention, they are included in the present invention. For example, in the above embodiment, the power outage management means is provided in the smart meter management operation system 4, but the power outage management means may be incorporated into another system or configured as an independent server computer. In addition, in the above embodiment, the power distribution automation system 2 displays the alarm information W only when power outage information is received from the smart meter 3, but when recovery information is received from the smart meter 3, it may display that the power has been restored, or delete the corresponding utility pole number, etc. (power outage history) from the alarm information W. [Explanation of symbols]
[0040] 1. Power outage detection system 2. Power distribution automation system 21 Monitoring and control console 211 Display (display unit) 3. Smart meter (electricity meter) 4. Smart meter management and operation system (power outage management means) 101 Electric pole 102 Pole transformer 103, DM pole switch FCB Feeder circuit breaker H Consumer's house L distribution line NW Communication network
Claims
1. An automated power distribution system that monitors the power distribution system and, when a power outage occurs, controls switches to distribute power to areas other than those affected by the outage. A power meter is installed in each customer's home to measure the amount of power consumed and has the function of detecting power outages. A power outage management means communicatively connected to the power distribution automation system and the watt-hour meter; and when the power outage management means receives information indicating that a power outage has been detected from two or more consecutive watt-hour meters in the same distribution line in an area other than the power outage section detected by the power distribution automation system, the power outage management means displays an alarm on a display unit of the power distribution automation system. A power outage detection system comprising:
2. The power outage management means, when displaying the warning, displays in chronological order the reception of information indicating that the power outage has been detected. The power failure detection system according to claim 1 .
3. When the power outage management means receives information that the power outage has been detected from the watt-hour meter of a non-consecutive bank on the same distribution line in an area other than the power outage section detected by the power distribution automation system, the power outage management means issues a fault ticket to accept an individual fault. The power failure detection system according to claim 1 or 2.
4. An automated power distribution system that monitors the power distribution system and, when a power outage occurs, controls switches to distribute power to areas other than those affected by the outage. A power meter is installed in each customer's home to measure the amount of power consumed and has the function of detecting power outages. and when information indicating that a power outage has been detected from two or more of the watt-hour meters in succession on the same distribution line in an area other than the power outage section detected by the distribution automation system is received, a warning is displayed on a display unit of the distribution automation system. A power outage detection method comprising:
5. When displaying the warning, the reception of the information indicating that the power outage has been detected is displayed in chronological order.
5. The method of claim 4, wherein the power failure detection method is
6. When receiving information indicating that the power outage has been detected from the watt-hour meter of a non-consecutive bank in the same distribution line in an area other than the power outage section detected by the power distribution automation system, a fault ticket is issued to accept an individual fault.
6. The power failure detection method according to claim 4 or 5.
Citation Information
Patent Citations
Power failure information management system
JP2013042609A
Power failure section determining system
JP2014150647A
Short circuit accident trial power transmission system and short circuit accident trial power transmission method
JP2019088147A
Master station device of power distribution automated system
JP2019115182A