Split offsetting recording device, split offsetting recording method, and split offsetting recording program

The division offset accounting device automates the division and offsetting of construction costs across months, addressing inefficiencies and errors in existing systems, ensuring accurate and efficient rent management.

JP7583701B2Active Publication Date: 2024-11-14OBIC CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2021188172
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2021-03-30
Filing Date
2021-11-18
Publication Date
2024-11-14
Estimated Expiration
2041-11-18

AI Technical Summary

Technical Problem

Existing systems fail to account for division offset on a construction unit basis, leading to inefficiencies and risks of human error in managing construction costs and rent offsetting.

Method used

A division offset accounting device and method that includes a storage section for rental management data, with features to determine if the construction cost exceeds a monthly limit, split the cost across months, and adjust payments accordingly, allowing for automated and accurate offsetting of construction costs.

Benefits of technology

Reduces time and effort in creating transfer inputs, minimizes human error, enables arbitrary division of construction costs, and ensures accurate offsetting across months, thereby improving efficiency and reducing clerical errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583701000001
    Figure 0007583701000001
  • Figure 0007583701000002
    Figure 0007583701000002
  • Figure 0007583701000003
    Figure 0007583701000003
Patent Text Reader

Abstract

To provide a split offset accounting device, a split offset accounting method, and a split offset accounting program that allow an offset month and an offset amount to be entered by splitting a total billed amount for each construction unit, and automatically link a construction detail to the split offset.SOLUTION: A split offset accounting device includes: a construction detail acquisition unit that acquires construction detail data that sets a construction landlord burden amount and billing method for a construction of a rental property; an offset determination unit that determines whether the construction landlord burden amount exceeds a collection upper limit monthly amount when the billing method is the offset; a collection schedule acquisition unit that acquires collection schedule data that sets a split landlord burden monthly amount that is obtained by splitting the construction landlord burden amount by month when the offset determination unit determines that the construction landlord burden amount exceeds the collection upper limit monthly amount; and a payment acquisition unit that acquires payment data that sets a monthly payment amount to a landlord based on the collection upper limit monthly amount and the collection schedule data.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a split offsetting accounting device, a split offsetting accounting method, and a split offsetting accounting program. [Background technology]

[0002] Patent Document 1 discloses a configuration in which, when a management company of a rental property transfers rent to an owner, it offsets construction costs from the rent and pays the remaining amount to the owner. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-159963 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the invention described in Patent Document 1 above had the problem that it was not possible to account for offsetting on a construction unit basis.

[0005] The present invention has been made in consideration of the above problems, and aims to provide a split offset accounting device, a split offset accounting method, and a split offset accounting program that can split and enter the offset month and offset amount for the total billing amount on a per-construction basis, and automatically link each construction detail to the split offset. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the split offset accounting device of the present invention is a split offset accounting device equipped with a memory unit and a control unit, wherein the memory unit comprises a rental management memory means for storing rental management data setting an upper limit monthly recovery amount to the landlord of the rental property, and the control unit comprises a construction detail acquisition means for acquiring construction detail data setting the construction landlord's share of the construction work for the rental property and a billing method, an offset determination means for determining whether the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount if the offset determination means determines that the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount, a collection schedule acquisition means for acquiring collection schedule data setting a split landlord's share of the construction work amount divided by month, and a payment acquisition means for acquiring payment data setting a monthly payment to the landlord based on the upper limit monthly recovery amount and the collection schedule data.

[0007] In addition, in the installment offset accounting device of the present invention, the rental management data further includes a monthly rent for the rental property, and the payment acquisition means acquires the payment data in which the monthly payment amount to the landlord is set to the amount obtained by subtracting the installment monthly landlord contribution from the monthly rent based on the maximum monthly collection amount and the scheduled collection data.

[0008] In addition, in the installment offset accounting device of the present invention, the upper limit monthly collection amount is the monthly rent of the rental property.

[0009] In addition, in the split offset accounting device of the present invention, the recovery schedule acquisition means, when the offset determination means determines that the construction landlord's share of the cost exceeds the monthly recovery limit, displays a split offset screen on which the offset amount included in the construction landlord's share of the cost can be set, and when the offset amount is set on the split offset screen, acquires the recovery schedule data in which the amount obtained by dividing the offset amount by month is set as the split landlord's monthly share of the cost.

[0010] In addition, in the installment offset accounting device of the present invention, the construction details acquisition means displays a details input screen on which the construction amount, the landlord's share of the cost, and the billing method can be set, and when the construction amount, the landlord's share of the cost, and the billing method are set on the details input screen, the amount obtained by multiplying the construction amount by the landlord's share of the cost, and acquires the construction details data in which the billing method is set.

[0011] In addition, in the split offset accounting device according to the present invention, the billing method is offset or billing.

[0012] In addition, in the installment offset accounting device of the present invention, the control unit is further characterized by having a billing creation means for creating landlord billing data setting the landlord's share of the construction work when the billing method set in the construction details data is the billing.

[0013] In addition, in the installment offset accounting device of the present invention, the construction details acquisition means further acquires the construction details data which sets the construction tenant's share of the cost for construction work on the rental property, and the control unit further includes a billing creation means which creates tenant billing data which sets the construction tenant's share of the cost.

[0014] In addition, the split offset accounting method of the present invention is a split offset accounting method to be executed by a split offset accounting device equipped with a memory unit and a control unit, the memory unit comprising a rental management memory means for storing rental management data setting an upper limit monthly recovery amount to the landlord of the rental property, and the control unit is characterized in that the method includes a construction detail acquisition step for acquiring construction detail data setting the construction landlord's share of the construction work for the rental property and a billing method, and, if the billing method is offset, an offset determination step for determining whether the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount, if it is determined in the offset determination step that the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount, a collection schedule acquisition step for acquiring collection schedule data setting split landlord's share of the construction work amount divided by month, and a payment acquisition step for acquiring payment data setting the monthly payment to the landlord based on the upper limit monthly recovery amount and the collection schedule data.

[0015] In addition, the split offset accounting program of the present invention is a split offset accounting program to be executed by a split offset accounting device having a memory unit and a control unit, the memory unit having a rental management memory means for storing rental management data setting an upper limit monthly recovery amount to the landlord of the rental property, and the control unit is characterized in that it executes the following: a construction detail acquisition step for acquiring construction detail data setting the construction landlord's share of the construction work for the rental property and a billing method, an offset determination step for determining whether the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount if it is determined in the offset determination step that the construction landlord's share of the construction work exceeds the upper limit monthly recovery amount, a collection schedule acquisition step for acquiring collection schedule data setting split landlord's share of the construction work amount divided by month, and a payment acquisition step for acquiring payment data setting the monthly payment to the landlord based on the upper limit monthly recovery amount and the collection schedule data. Effect of the Invention

[0016] According to the present invention, it is possible to reduce the time and effort required to create a transfer entry. In addition, according to the present invention, it is possible to suppress the risk of mistakes due to human error. In addition, according to the present invention, it is possible to develop a function that allows not only construction costs but also deduction information for the landlord's burden to be divided at will. In addition, according to the present invention, it is possible to reduce the burden of offsetting construction costs. In addition, in the past, many management companies divided the amount at the time of deduction, and each person in charge had to make individual adjustments by inputting billing corrections, so calculations were done manually. However, according to the present invention, it is possible to reduce the risk of clerical errors. In addition, according to the present invention, it is possible to offset a single month by dividing the collection schedule data by offset month. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of a split offset accounting device in this embodiment. [Diagram 2] FIG. 2 is a flowchart showing an example of the process of the installment offset accounting device in this embodiment. [Diagram 3] FIG. 3 is a diagram showing an example of the split offsetting accounting process in this embodiment. [Figure 4] FIG. 4 is a diagram showing an example of the split offsetting accounting process in this embodiment. [Diagram 5] FIG. 5 is a diagram showing an example of the split offsetting accounting process in this embodiment. [Figure 6] FIG. 6 is a diagram showing an example of the split offsetting accounting process in this embodiment. [Figure 7] FIG. 7 is a diagram showing an example of the split offset accounting process in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to the embodiment.

[0019] [1. Overview] First, an overview of the present invention will be described.

[0020] In real estate rental management, the total amount billed to the landlord for one construction project may be paid by applying the current month's rent collected from the tenant, and if it does not cover the amount in a single month, it may be offset against the rent collected the following month.

[0021] Therefore, in the past, there were cases where the ordering contractor was different for each detail, and in order to manage sales and costs, it was necessary to adjust the offset month for each detail, or to transfer the amount that could not be covered as a red invoice for the current month and a black invoice for the following month, which led to operational errors such as missing invoices. In addition, in the past, when transferring the amount, confirmation was required at the time of payment, which was a heavy burden on the person in charge of payment, so it was necessary to make it possible to make partial offsets on a construction unit basis. In addition, in the past, there were multiple construction details within one construction project, and it was necessary to determine the burden ratio for the homeowner, contractor, our company, etc. for each detail.

[0022] Therefore, in this embodiment, the cost is allocated to each payer for each construction item, and the landlord can specify the billing method for each item.If the billing method is offset, an arbitrary amount can be offset from the total amount of the offset burden against the scheduled collection of rent due from the current month onwards, and the amount can be deducted from the amount remitted to the landlord.

[0023] [2. Configuration] An example of the configuration of the split offset accounting device 100 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the split offset accounting device 100 according to this embodiment.

[0024] As shown in Fig. 1, the divisional offset calculation device 100 is a commercially available desktop personal computer. The divisional offset calculation device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

[0025] The split offset accounting device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the split offset accounting device 100 is connected to each other so as to be able to communicate with each other via any communication path.

[0026] The communication interface unit 104 communicably connects the split offset calculation device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the split offset calculation device 100 and the server 200 to each other so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

[0027] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a touch panel), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114 or the printer 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

[0028] The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 includes a rental management database 106a.

[0029] Rental management database 106a stores rental management data for real estate properties. Here, rental management database 106a may store rental management data that sets an upper limit monthly amount to be collected from the landlord of the rental property. The rental management data may also set the monthly rent for the rental property. The upper limit monthly amount to be collected may be the monthly rent for the rental property. The rental management data may also include the monthly rent. Rental management database 106a may also store construction details data, scheduled collection data, payment data, and / or billing data, etc.

[0030] The control unit 102 is a CPU or the like that comprehensively controls the installment offset accounting device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, etc., and executes various information processing based on these stored programs. In terms of functional concept, the control unit 102 includes a construction details acquisition unit 102a, an offset determination unit 102b, a billing creation unit 102c, a collection schedule acquisition unit 102d, and a payment acquisition unit 102e.

[0031] The construction details acquisition unit 102a acquires construction details data for construction work on a rental property. Here, the construction details acquisition unit 102a may acquire construction details data in which the construction owner's share of the construction work and the billing method for the construction work on the rental property are set. In addition, the construction details acquisition unit 102a may display a details input screen in which the construction amount, the owner's share of the construction work rate, and the billing method can be set, and when the construction amount, the owner's share of the construction work rate, and the billing method are set on the details input screen, the construction details data may be acquired by setting the amount obtained by multiplying the construction amount and the owner's share of the construction work rate as the construction owner's share of the construction work and setting the billing method. In addition, the billing method may be offset or billing. In addition, the construction details acquisition unit 102a may acquire construction details data in which the construction tenant's share of the construction work on the rental property is set. In addition, the construction details acquisition unit 102a may acquire basic construction data in which the construction work on the rental property, the contractor of the rental property, and the owner of the rental property are set.

[0032] The offset determination unit 102b determines whether the construction owner's share exceeds the monthly upper limit of recovery. Here, when the billing method set in the construction details data is offset, the offset determination unit 102b may determine whether the construction owner's share exceeds the monthly upper limit of recovery. The offset determination unit 102b may also determine whether the billing method set in the construction details data is offset.

[0033] The billing creation unit 102c creates billing data in which the construction work share is set. Here, when the billing method set in the construction details data is billing, the billing creation unit 102c may create landlord billing data in which the construction work landlord share is set. The billing creation unit 102c may also create tenant billing data in which the construction work tenant share is set.

[0034] The collection schedule acquisition unit 102d acquires collection schedule data in which the landlord's share for construction work is divided into monthly divided monthly installments. Here, when the offset determination unit 102b determines that the landlord's share for construction work exceeds the monthly upper limit of collection, the collection schedule acquisition unit 102d may acquire collection schedule data in which the landlord's share for construction work is divided into monthly divided monthly installments. In addition, when the offset determination unit 102b determines that the landlord's share for construction work exceeds the monthly upper limit of collection, the collection schedule acquisition unit 102d may display a divided offset screen in which the offset amount included in the landlord's share for construction work can be set, and when the offset amount is set on the divided offset screen, the collection schedule acquisition unit 102d may acquire collection schedule data in which the amount obtained by dividing the offset amount by month is set as the divided monthly installment of the landlord.

[0035] The payment acquisition unit 102e acquires payment data in which the monthly payment amount to the landlord is set. Here, the payment acquisition unit 102e may acquire payment data in which the monthly payment amount to the landlord is set based on the upper monthly collection amount and the collection schedule data. The payment acquisition unit 102e may also acquire payment data in which the monthly payment amount to the landlord is set to the amount obtained by subtracting the monthly installment landlord contribution amount from the monthly rent based on the upper monthly collection amount and the collection schedule data. The payment acquisition unit 102e may also acquire payment data in which the monthly payment amount to the landlord is set to the amount obtained by subtracting the monthly installment landlord contribution amount from the monthly rent when the offset determination unit 102b determines that the construction landlord contribution amount does not exceed the upper monthly collection amount.

[0036] [3. Specific Examples] A specific example of this embodiment will be described with reference to FIGS.

[0037] [Split offsetting accounting process] Here, an example of the split offsetting accounting process in this embodiment will be described with reference to Fig. 2. Fig. 2 is a flowchart showing an example of the process of the split offsetting accounting device 100 in this embodiment.

[0038] As shown in FIG. 2, the work details acquisition unit 102a displays a details input screen on which the work amount, the landlord's share of the cost, and the billing method can be set, and when the user sets the work amount, the landlord's share of the cost, and the billing method on the details input screen via the input device 112, it sets the amount obtained by multiplying the work amount and the landlord's share of the cost as the landlord's share of the work, and acquires the work details data with the billing method set (step SA-1).

[0039] Then, the offset determination unit 102b determines whether or not the billing method set in the construction details data is offset (step SA-2).

[0040] If the offset determination unit 102b determines that the billing method set in the construction details data is not offset (is billing) (step SA-2: No), the process proceeds to step SA-3.

[0041] Then, the billing preparation unit 102c prepares homeowner billing data in which the homeowner's share of the construction work is set based on the construction details data (step SA-3), and ends the process.

[0042] On the other hand, if the offset determination unit 102b determines that the billing method set in the construction details data is offset (step SA-2: Yes), the offset determination unit 102b shifts the process to step SA-4.

[0043] Then, the offset determination unit 102b determines whether the landlord's share of the construction work exceeds the upper limit of the monthly amount to be collected from the landlord of the rental property stored in the rental management database 106a (step SA-4).

[0044] If the offset determination unit 102b determines that the construction owner's share does not exceed the upper limit monthly recovery amount (step SA-4: No), the offset determination unit 102b shifts the process to step SA-5.

[0045] Then, the payment acquisition unit 102e acquires payment data in which the monthly rent amount stored in the rental management database 106a minus the landlord's share of the construction work is set as the monthly payment amount to the landlord (step SA-5), and the process ends.

[0046] On the other hand, if the offset determination unit 102b determines that the construction owner's share exceeds the upper limit monthly recovery amount (step SA-4: Yes), the offset determination unit 102b shifts the process to step SA-6.

[0047] Then, the collection schedule acquisition unit 102d displays on the output device 114 a split offset screen on which the offset amount included in the landlord's share of the construction work can be set, and when the user sets the offset amount on the split offset screen via the input device 112, acquires collection schedule data in which the offset amount divided by month is set as the monthly split landlord's share (step SA-6).

[0048] Then, the payment acquisition unit 102e acquires payment data that sets the monthly payment to the landlord as the amount obtained by subtracting the monthly landlord's share of the monthly rent stored in the rental management database 106a from the monthly rent stored in the rental management database 106a based on the maximum monthly collection amount and the scheduled collection data stored in the rental management database 106a (step SA-7), and terminates the processing.

[0049] Here, an example of the split offset accrual process in this embodiment will be described with reference to Fig. 3 to Fig. 7. Fig. 3 to Fig. 7 are diagrams showing an example of the split offset accrual process in this embodiment.

[0050] As shown in FIG. 3, in this embodiment, basic construction data is registered by construction input by the user.

[0051] In this embodiment, by inputting details by the user, detailed work data for flooring repair with the billing method set to offset is registered as shown in Fig. 4, detailed work data for wallpaper replacement with the billing method set to offset is registered as shown in Fig. 5, and detailed work data for air vent replacement with the billing method set to billing is registered as shown in Fig. 6. Here, as shown in Fig. 6, in this embodiment, the work detail for line number: 3 is not subject to the overall offset amount because it is billed to the homeowner.

[0052] As shown in FIG. 7, in this embodiment, when the offset amount to be offset for the landlord's share is input on the offset screen by the user, if the offset month and amount to be divided based on the total offset amount are input, the construction details for each offset month are automatically allocated. Here, as shown in FIG. 7, in this embodiment, since the entire billing amount (offset amount: 121,000 yen) cannot be offset against the current month's rent of 80,000 yen, it is offset separately for the current month and the next month, and the current month's payment amount is adjusted to 0 yen. Note that in this embodiment, other deductions such as management fees are excluded. Also, as shown in FIG. 7, the collection schedule data in this embodiment may be data only for the landlord's share (landlord offset data).

[0053] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0054] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.

[0055] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0056] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0057] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0058] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0059] Furthermore, with regard to the split offset accounting device 100, the components shown in the figures are merely functional concepts, and do not necessarily have to be physically configured as shown in the figures.

[0060] For example, the processing functions of the division offsetting calculation device 100, particularly the processing functions performed by the control unit 102, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium that includes programmed instructions for causing the information processing device to execute the processing described in this embodiment, and is mechanically read by the division offsetting calculation device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.

[0061] In addition, this computer program may be stored in an application program server connected to the split offset accounting device 100 via any network, and it is also possible to download all or part of it as needed.

[0062] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0063] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a configuration that is distributed as a plurality of modules or libraries, and a program that achieves its function by cooperating with a separate program, such as an OS. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in this embodiment, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0064] The various databases etc. stored in the memory unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0065] The divisional offsetting recording device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The divisional offsetting recording device 100 may be realized by implementing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.

[0066] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0067] The present invention is useful in industries such as the real estate industry, which handles real estate rental management and the like. [Explanation of symbols]

[0068] 100 Split offsetting device 102 Control section 102a Construction Details Acquisition Department 102b Offset determination section 102c Claims Preparation Department 102d Collection Schedule Acquisition Section 102e Payment Acquisition Department 104 Communication interface section 106 Storage section 106a Rental Management Database 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network

Claims

1. A division offset accounting device having a memory unit and a control unit, The storage unit is a rental management storage means for storing rental management data that sets an upper limit of the monthly amount to be collected from the landlord of the rental property; Equipped with The control unit is A construction details acquisition means for acquiring construction details data that sets the construction owner's share of the construction work for the rental property and a billing method; If the billing method is offset, an offset determination means for determining whether the construction owner's share exceeds the upper limit of monthly recovery; a collection schedule acquisition means for acquiring collection schedule data that sets the monthly divided amount of the offset amount as the monthly divided amount of the homeowner's share when the offset determination means determines that the construction work owner's share exceeds the monthly upper limit of collection, and displays a division offset screen that allows the user to set the offset amount included in the construction work owner's share, and when the offset amount is set on the division offset screen, the collection schedule data that sets the monthly divided amount of the offset amount as the monthly divided amount of the homeowner's share; a payment acquisition means for acquiring payment data that sets a monthly payment amount to be paid to the landlord based on the upper monthly collection limit and the collection schedule data; A split offset accounting device comprising:

2. The rental management data is Furthermore, the monthly rent for the rental property is set, The payment acquisition means includes: The installment offset accounting device as described in claim 1, characterized in that the payment data is obtained by subtracting the installment landlord's monthly contribution from the monthly rent based on the maximum monthly collection amount and the planned collection data, and setting the monthly payment to the landlord as the monthly payment.

3. The upper monthly recovery limit is: The installment offset accounting device according to claim 2, characterized in that the rent is the monthly rent for the rental property.

4. The construction details acquisition means includes: A split offset accounting device as described in any one of claims 1 to 3, characterized in that a detail input screen is displayed on which the construction amount, the homeowner's share of the cost, and the billing method can be set, and when the construction amount, the homeowner's share of the cost, and the billing method are set on the detail input screen, the amount obtained by multiplying the construction amount by the homeowner's share of the cost is set as the construction homeowner's share of the cost, and the construction detail data in which the billing method is set is acquired.

5. The method of claiming comprises: A split offset accounting device as claimed in any one of claims 1 to 4, characterized in that the offset is either a split or a bill.

6. The control unit is a billing creation means for creating homeowner billing data that sets the homeowner's share of the construction work when the billing method set in the construction details data is the billing; The split offset accounting device according to claim 5, further comprising:

7. The construction details acquisition means includes: Furthermore, the construction details data is acquired, which sets the amount of the construction tenant's share in the construction of the rental property, The control unit is a billing creation means for creating tenant billing data that sets the tenant's share of the construction work; The split offset accounting device according to any one of claims 1 to 5, further comprising:

8. A split offset accounting method to be executed by a split offset accounting device having a memory unit and a control unit, The storage unit is a rental management storage means for storing rental management data that sets an upper limit of the monthly amount to be collected from the landlord of the rental property; Equipped with The control unit executes A construction details acquisition step for acquiring construction details data that sets the construction owner's share of the construction work for the rental property and a billing method; If the billing method is offset, an offset determination step is performed to determine whether the construction owner's share exceeds the upper limit of monthly recovery. a collection schedule acquisition step of acquiring collection schedule data in which the amount of the landlord's share of the construction work is set as the monthly divided amount of the landlord's share of the construction work when the offset determination step determines that the amount of the landlord's share of the construction work exceeds the monthly upper limit of the collection schedule; and a division offset screen is displayed on which the amount of the landlord's share of the construction work can be set. When the amount of the offset is set on the division offset screen, the division offset amount is set as the monthly divided amount of the landlord's share of the construction work. a payment acquisition step of acquiring payment data that sets a monthly payment amount to be paid to the landlord based on the upper monthly collection limit and the collection schedule data; A method for recording split offsets, comprising:

9. A divisional offsetting recording program for execution by a divisional offsetting recording device having a storage unit and a control unit, The storage unit is a rental management storage means for storing rental management data that sets an upper limit of the monthly amount to be collected from the landlord of the rental property; Equipped with In the control unit, A construction details acquisition step for acquiring construction details data that sets the construction owner's share of the construction work for the rental property and a billing method; If the billing method is offset, an offset determination step is performed to determine whether the construction owner's share exceeds the upper limit of monthly recovery. a collection schedule acquisition step of acquiring collection schedule data in which the amount of the landlord's share of the construction work is set as the monthly divided amount of the landlord's share of the construction work when the offset determination step determines that the amount of the landlord's share of the construction work exceeds the monthly upper limit of the collection schedule; and a division offset screen is displayed on which the amount of the landlord's share of the construction work can be set. When the amount of the offset is set on the division offset screen, the division offset amount is set as the monthly divided amount of the landlord's share of the construction work. a payment acquisition step of acquiring payment data that sets a monthly payment amount to be paid to the landlord based on the upper monthly collection limit and the collection schedule data; A split offset recording program to execute the above.

Citation Information

Patent Citations

  • Credit processing management system, control method for the same, credit processing management system program, and recording medium

    JP2017134796A

  • Management report creation device, management report creation method and management report creation program

    JP2019159963A

  • Object management work support device, object management work support method and object management work support program

    JP2019174938A