Control system, control device and program
A synchronized timer-based control system for FA production lines simplifies process coordination by executing actions at predetermined times, reducing design complexity and enabling flexible adaptation to production changes.
Patent Information
- Application Number
- JP2020133496
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-08-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-08-06
AI Technical Summary
In distributed systems for FA production lines, changing the combination of control processes to adapt to changes in workpiece type or production amount complicates the design due to the need for mechanisms to exchange interlock notifications between controllers.
A control system with synchronized timers across control devices executes processes based on a predefined list of coordinated actions at predetermined times, eliminating the need for interlock notification mechanisms.
This approach simplifies the design and operation of distributed systems by allowing control devices to coordinate processes without complex notification mechanisms, facilitating easy adaptation to changes in production requirements.
Smart Images

Figure 0007585648000001 
Figure 0007585648000002 
Figure 0007585648000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a control system, a control device, and a program, and more particularly to a control system, a control device, and a program for a production line in FA (Factory Automation). [Background technology]
[0002] A distributed system having multiple controllers has been proposed as a control system for controlling objects. In the distributed system, each controller controls the objects so that the target devices connected to the controller operate in accordance with the operations of the target devices connected to the other controllers, that is, so-called cooperative operation is realized.
[0003] As examples of distributed systems, for example, Patent Document 1 (JP Patent Publication No. 2018-68017 A) and Patent Document 2 (JP Patent Publication No. 8-19977 A) have been proposed. Patent Document 1 discloses a distributed control system in which multiple control devices are connected via a network. Patent Document 2 discloses a configuration in which "in a robot controller controlled together with peripheral machines by a programmable controller, in order to realize an interlock between the robot and the peripheral machines, an interface with the programmable controller is provided and soft overtravel can be changed by a command from the programmable controller." [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2018-68017 A [Patent Document 2] Japanese Patent Application Publication No. 8-19977 Summary of the Invention [Problem to be solved by the invention]
[0005] A distributed system is adopted for the production line of an FA. In this case, the functions of the production line are changed in response to a change in the type of work or a change in production volume. Such a change is realized by changing the combination of processes related to the control executed by multiple controllers provided in the distributed system. If a mechanism for exchanging notifications regarding processes such as interlocks for achieving cooperative operation between controllers is required when changing the combination, as in Patent Document 2, it is necessary to design the processes so that the mechanism for notifying the interlocks works properly for each expected combination of processes, which makes the design complicated.
[0006] Therefore, there is a demand for an environment in which each control device can easily execute processes related to control executed in cooperation with other control devices without using a mechanism for notifying the execution of processes by other control devices.
[0007] An object of the present disclosure is to provide a control system, a control device, and a program that enable a control device to execute processing linked to processing of another control device with a simple configuration. [Means for solving the problem]
[0008] In the present disclosure, the control system is a control system provided in a FA (factory automation) production line, the control system comprising a plurality of control devices each controlling an object, each control device having a timer which is time-synchronized with the timers of the other control devices, and a process execution means which executes one or more processes related to control executed in cooperation with the other control devices according to a list associated with information including a predetermined time for executing the process, and when the process execution means of each control device determines that the predetermined time in the list has been reached, it executes the process associated with the predetermined time in the list.
[0009] According to this disclosure, when a time-synchronized control device reaches a predetermined time in the list, it executes a control process associated with that time. This allows the control devices to execute processes in cooperation with each other without using a mechanism for exchanging notifications of the execution status of processes between the control devices, for example, and as a result, cooperative operation of the target can be realized without using the mechanism.
[0010] In the above disclosure, the predetermined time includes at least one of a predetermined time and a period, and when the processing execution means of each control device determines that at least one of the time and a period has been reached based on the time measured by the timer of the control device, it executes the processing associated with the at least one of the predetermined time and a period in the list.
[0011] According to this disclosure, each control device can determine whether or not at least one of a predetermined time and a period of time has been reached based on the time measured by a timer that is time-synchronized with the other control devices, and can execute the above-mentioned associated processing.
[0012] In the above disclosure, the predetermined time includes when a predetermined type of event is detected on the production line, and the processing execution means of each control device, when it detects the predetermined type of event, executes processing associated with the detection of the predetermined type of event in the list.
[0013] According to this disclosure, when a control device detects an event of a predetermined type, it determines that a predetermined time has been reached and executes an associated process.
[0014] In the above disclosure, the processing of the list includes a first process and a second process that is executed after the first process is completed, the predetermined time includes the time when the first process is completed, and the processing execution means of each control device executes the second process after determining that the first process is completed.
[0015] According to this disclosure, it is determined that a predetermined time has been reached by the completion of execution of a process, and an associated process is then executed.
[0016] In the above disclosure, the information corresponding to each of one or more processes in the list includes a processing procedure for that process.
[0017] According to this disclosure, the list can include procedures for controlling operations.
[0018] In the above disclosure, the information corresponding to each of the one or more operations in the list includes an identifier of a control device that executes the operation.
[0019] According to this disclosure, in the list, the control device that is to execute each process can be specified by the identifier of the control device.
[0020] In the above disclosure, the subject matter includes equipment that drives devices installed in association with a production line.
[0021] According to this disclosure, the controlled object can include a driving device.
[0022] In the above disclosure, at least one of the one or more operations in the list includes an operation that determines a control amount for driving a device.
[0023] According to this disclosure, processing the list can include determining the amount of control.
[0024] In the above disclosure, the apparatus installed in relation to the production line includes a workpiece conveying apparatus, and the equipment includes an apparatus that drives the conveying apparatus in accordance with the above control amount.
[0025] According to this disclosure, the objects controlled by the control device can include the device that drives the workpiece transport device.
[0026] In the above disclosure, the list processing includes a first processing and a second processing that is executed after the first processing is completed, the first processing includes a processing for determining a control amount for driving the conveying device, and the control amount for driving the conveying device includes a control amount for driving the conveying device so as to transport the workpiece to a position related to the second processing on the production line by a predetermined time corresponding to the second processing.
[0027] According to this disclosure, in a first process, a control amount can be determined for driving a transport device to transport a workpiece to a position related to a second process, which is a subsequent process.
[0028] In the above disclosure, the apparatus installed in association with the production line includes an imaging unit having an imaging field of view, the equipment includes equipment that drives the imaging unit in accordance with an imaging command, the second processing includes processing of outputting an imaging command to the imaging unit via the equipment that drives the imaging unit, and the position related to the second processing includes a position based on the imaging field of view.
[0029] According to this disclosure, the first process includes a process for determining a control amount for driving the conveying device, and this control amount can include a control amount for transporting the workpiece to a position based on the imaging field of view of the imaging unit driven by the imaging command output by the second process, until a predetermined time corresponding to the second process.
[0030] In the above disclosure, the apparatus installed in association with the production line includes a robot that handles a workpiece, the equipment includes equipment that drives the robot according to a control amount for driving the robot, the second process includes a process of outputting a control command corresponding to the control amount to the equipment that drives the robot, and the position related to the second process includes a position based on a predetermined area for the robot to handle the workpiece.
[0031] According to this disclosure, the first process includes a process for determining a control amount for driving a conveying device, and this control amount can include a control amount for transporting the workpiece to a position based on a predetermined area for handling the workpiece of a robot driven by a control command output by the second process, until a predetermined time corresponding to the second process.
[0032] The control device according to the present disclosure is a control device that is installed in a FA (factory automation) production line and controls an object, and has a timer that is time-synchronized with timers of other control devices installed in the production line, and a process execution means that executes one or more processes related to control executed in cooperation with the other control devices according to a list to which information including a predetermined time for executing the process is associated, and when the process execution means determines that the predetermined time in the list has been reached, it executes the process associated with the predetermined time in the list.
[0033] According to this disclosure, when a control device that is time-synchronized with another control device reaches a predetermined time in the list, the control device executes a control process associated with that time. This allows the control device to execute processes in cooperation with the other control devices without using a mechanism for exchanging notifications of the execution status of processes with the other control devices, for example, and as a result, it is possible to realize cooperative operations of targets with the other control devices without using the mechanism.
[0034] A program according to the present disclosure is a program for causing a computer to execute a method in which a control device provided in a production line of FA (factory automation) controls an object, the control device having a timer that is time-synchronized with timers of other control devices provided in the production line. The method includes a step of executing one or more processes related to control executed by the control device in cooperation with the other control devices, in accordance with a list in which information including a predetermined time for executing the process is associated with the process, and the step of executing the process includes a step of executing the process associated with the predetermined time in the list when it is determined that the predetermined time in the list has been reached.
[0035] According to this disclosure, when a program is executed, the computer realizes a method for executing a control process associated with a predetermined time in the list when the computer determines that the time has been reached. As a result, in a control device to which the method is applied, the control device can execute a process in cooperation with other control devices without using a mechanism for the control device to exchange notifications such as the execution status of a process with other control devices, and as a result, cooperative operation of a target can be realized with other control devices without using the mechanism. Effect of the Invention
[0036] According to the present disclosure, a control device can execute processing linked to processing of another control device with a simple configuration. [Brief description of the drawings]
[0037] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a control system 10A provided in an FA production line 60A according to the present embodiment. [Diagram 2] 2 is a schematic diagram showing an example of a hardware configuration of a PLC 200. FIG. [Diagram 3] FIG. 2 is a diagram showing a functional configuration for implementing processing according to a control processing list 50A possessed by the PLC according to the present embodiment. [Figure 4]It is a flowchart showing an example of the process according to this embodiment. [Diagram 5] It is a flowchart showing an example of the process according to this embodiment. [Figure 6] It is a diagram schematically showing the configuration of the control system 10B provided in the production line 60B of the FA according to this embodiment. [Figure 7] It is a diagram for explaining the advantages of the control system according to this embodiment. [Figure 8] It is a diagram for explaining the advantages of the control system according to this embodiment.
Mode for Carrying Out the Invention
[0038] Hereinafter, embodiments will be described with reference to the drawings. In the following description, the same parts and components are denoted by the same reference numerals. Their names and functions are also the same. Therefore, detailed descriptions thereof will not be repeated.
[0039] <A. Application Example> First, an example of a scene to which the present invention is applied will be described. FIG. 1 is a diagram showing a schematic configuration of a control system 10A provided in a production line 60A of FA (Factory Automation) according to the present embodiment. The production line 60A is provided, for example, in an inspection process of a workpiece 24, which is an example of a product. The production line 60A includes a belt conveyor having a belt 23 constituting a conveying device for the workpiece 24, a sensor 300A installed in relation to the conveying path of the belt 23, a servo motor 300B, an image sensor 300C, and an encoder 300D, which is an example of a sensor for measuring the number of rotations. The belt conveyor further includes a roller driven by the servo motor 300B, and the belt 23 moves in conjunction with the rotation of the roller. The servo motor 300B is an example of a device that drives the belt 23, which is a conveying device for the workpiece 24, according to a control amount. More specifically, the servo motor 300B rotates according to the control amount (angle, direction, speed, etc. of rotation) indicated by the command 11, and the rollers rotate in conjunction with the rotation, causing the belt 23 to move, and the workpiece 24 placed on the conveying surface, which is the upper surface of the belt 23, moves continuously. The encoder 300D detects the amount of rotation of the rollers of the belt conveyor, and outputs a detection value 12 corresponding to the amount of movement of the belt 23. The detection value 12 is based on a pulse signal corresponding to the amount of movement of the belt 23.
[0040] The image sensor 300C includes an imaging unit 302C such as a camera arranged so that the imaging field of view is on the conveying surface of the belt 23 in order to inspect the workpiece 24 on the conveying surface, and a sensor unit 301C. The sensor unit 301C controls the imaging unit 302C to capture images according to an imaging command 13, and processes the captured image output from the imaging unit 302C. The sensor 300A includes, for example, a proximity switch. The sensor 300A has a detection range capable of detecting the workpiece 24 on the conveying surface, and outputs a detection value 10 when the workpiece 24 is detected. The detection range of the sensor 300A is based on a range capable of detecting that the workpiece 24 during conveying approaches the imaging field of the imaging unit 302C.
[0041] The conveying device for conveying the workpiece 24 in the production line 60A is not limited to a belt conveyor. For example, it may be a mobile robot that conveys the workpiece 24. When the conveying device is a mobile robot, the object to be controlled may include a servo motor that drives the wheels of the mobile robot.
[0042] 1, the production line 60A is provided with a configuration capable of capturing an image of the workpiece 24 being transported while the workpiece 24 is being transported on a belt conveyer, but the equipment provided on the production line 60A is not limited to this and may be appropriately selected depending on the type of the FA production line 60A. In addition, the "workpiece 24" handled by the production line 60A is not limited to any one as long as it is possible to track the position of the final product or a part thereof, or an intermediate product or a part thereof, etc.
[0043] 1, a control system 10A has a network configuration in which PLCs (programmable logic controllers) 200A and 200B, a plurality of field devices to be controlled, a communication device 410, a support device 100, and a server computer 190 are communicatively connected to a network. The PLCs 200A and 200B have timers 201A and 201B, respectively. The timer 201A is time-synchronized with the timer 201B. For example, the timers 201A and 201B operate to match the standard time distributed by the server computer 190. As a result, the timers 201A and 201B are time-synchronized to indicate a common time based on the standard time.
[0044] Each of the field devices includes an actuator such as a servo motor that exerts some physical action on a manufacturing device or a production line 60A (hereinafter, also collectively referred to as "the field"), and an input / output device such as a sensor that transmits and receives information to and from the field. In Fig. 1, for example, the field devices include a sensor 300A, a servo motor 300B, an image sensor 300C, and an encoder 300D.
[0045] The PLCs 200A and 200B are connected to a network 120, which is a control level network. The network 120 is connected to a higher level network 400 via a communication device 410. The network 400 connects the server computer 190 and the support device 100.
[0046] In the control system 10A, devices connected to the network 120 and the network 400 can exchange data between the devices via the communication device 410. The PLC 200A and the PLC 200B each communicatively connect one or more field devices via the network 110. In addition to being connected to the PLC 200A and the PLC 200B via the network 110, one or more field devices may be directly connected to the PLC 200A and the PLC 200B via input / output units (not shown) associated with the PLC 200A and the PLC 200B. In FIG. 1, the PLC 200A connects the sensor 300A, the servo motor 300B, and the encoder 300D, which are field devices, and the PLC 200B connects the image sensor 300C, which is a field device. In the following, in describing an embodiment common to PLCs 200A and 200B, they may be collectively referred to as PLC 200, and in describing an embodiment common to the field devices sensor 300A, servo motor 300B, image sensor 300C and encoder 300D, they may be collectively referred to as field device 300.
[0047] In this embodiment, a PLC will be described as a specific example of a typical "control device," but the technical ideas disclosed in this specification are applicable to any control device without being limited to the name PLC.
[0048] In the control system 10A, the PLC 200A and the PLC 200B each execute a process related to an inspection process of the workpiece 24. The process related to the inspection process includes a control process related to the control of the target (field device 300), and the control process is executed in cooperation between the PLCs 200. More specifically, the PLC 200A and the PLC 200B each include a process execution unit 250A and a process execution unit 250B. In the following, in the description of an embodiment common to the process execution unit 250A and the process execution unit 250B, they are collectively referred to as the process execution unit 250. The process execution unit 250 of the PLC 200 executes one or more control processes to be executed in cooperation with other PLCs 200 according to a control process list 50A associated with information including a predetermined time for executing the control process. The "predetermined time" indicated by the control process list 50A is hereinafter also referred to as a "reservation time". In this embodiment, the time is a concept indicating the time when a certain process is executed, and may include a time or a moment based on the time measured by a timer, and a time or a moment when some event (phenomenon) related to the process may occur. In this embodiment, time indicates the length of a continuous period of time, and time indicates a certain point in time.
[0049] The control process list 50A is created by the support device 100 and transferred to the PLC 200 via the networks 400 and 120. The PLC 200 receives the control process list 50A sent from the support device 100 and stores it in a storage unit.
[0050] The control process list 50A includes information indicating the correspondence between each control process 502 and a reservation time 501 at which the control process 502 is executed. The control process list 500 has this information as a plurality of records R. More specifically, the information of each record R includes one or more control processes 502 executed in cooperation with the PLCs 200, and a reservation time 501 associated with each control process 502, which is a predetermined time at which the control process 502 is executed. The information associated with the control process 502 further includes a processing procedure 503 of the process and an identifier 504 of the PLC 200 that executes the process. The control process 502 is, for example, information that defines the control process to be executed at the corresponding reservation time 501, and indicates, for example, the name of a function such as an FB (function block) that is called and executed. The processing procedure 503 indicates a group of instructions consisting of one or more instructions that constitute the corresponding processing procedure 503. The instructions include, for example, instructions in a cyclic execution language (e.g., ladder language) or a sequential execution language (e.g., interpreter language), and the process execution unit 250 is equipped with an execution engine capable of executing instructions in these languages. The identifier 504 indicates the identifier of the PLC 200 that should execute the corresponding control process 502. In this embodiment, the identifiers include a "Conveyor PLC" which is the identifier of the PLC 200A that controls the field devices (sensor 300A, servo motor 300B, encoder 300D) of the belt conveyor, and an "Inspection PLC" which is the identifier of the PLC 200B that controls the field device (image sensor 300C) for inspecting the workpiece 24.
[0051] The control process list 50A includes a control process list 510 whose identifier 504 indicates a "Conveyor PLC" and a control process list 520 whose identifier 504 indicates an "Inspection PLC." When the PLC 200 executes a program in the control process list 50A, it extracts and executes a control process 502 from the control process list 50A whose identifier 504 matches the identifier of its own device. In the case of FIG. 1, the PLC 200A executes the control process 502 in the control process list 510, and the PLC 200B executes the control process 502 in the control process list 520. More specifically, when the process execution unit 250 of each PLC 200 determines that the reservation time 501 has been reached, it executes the control process 502 associated with the reservation time 501.
[0052] When the production line 60A is in operation, the PLC 200 executes control processing while determining whether each reservation time 501 has been reached according to the control processing list 50A at each predetermined control cycle. More specifically, when the production line 60A is in operation, the workpiece 24 is continuously transported by the belt conveyor, and the sensor 300A detects the workpiece 24 at a predetermined position. When the PLC 200A receives a detection value 10 from the sensor 300A, the PLC 200A uses the processing execution unit 250 to determine, based on the detection value 10, that the detection time of the event workpiece detection 40 of the reservation time 501 has been reached, and executes the corresponding control processing 502, workpiece detection time storage 511, according to the command of the processing procedure 503, based on the determination result. As a result, the time of the timer 201A is stored as the workpiece detection time.
[0053] When the PLC 200A, using the process execution unit 250A, determines that the process has reached the end of workpiece detection time storage 511, the PLC 200A uses the process execution unit 250A to execute conveyor speed detection 512, which is the corresponding control process 502, in accordance with the command of process procedure 503. As a result, a value indicating the amount of movement of belt 23 and / or a value indicating the movement speed (conveyor speed) is calculated (detected) based on the count value represented by detection value 12 from encoder 300D.
[0054] When the PLC 200A determines that the conveyor speed detection 512 has been reached, the PLC 200A uses the process execution unit 250A to execute the conveyor speed adjustment 513, which is the corresponding control process 502, according to the command of the process procedure 503. More specifically, the PLC 200A uses the process execution unit 250A to calculate the difference between the target speed for the workpiece 24 being conveyed to move to the imaging field of view or a predetermined position within the imaging field of view at the imaging time 41 (for example, every second or a point in time when a certain time has elapsed from the start of each control cycle) and the conveyor speed calculated in the above procedure, determines the control amount of the servo motor 300B based on the calculated difference, and outputs a command 11 representing the determined control amount to the servo motor 300B. This target speed can be calculated, for example, based on ((the distance between the detection position of the sensor 300A and the imaging position based on the imaging field of view) / (imaging time-(workpiece detection time)). Note that the method of acquiring the target speed is not limited to calculation, and may be table lookup.
[0055] As described above, when the process execution unit 250A executes the control process 502 in accordance with the control process list 50A, for example, when it determines that the work detection time saving 511 (an example of a first process) has been completed, it is configured to thereafter execute the conveyor speed detection 512 (an example of a second process), and when it determines that the conveyor speed detection 512 (an example of a first process) has been completed, it is configured to thereafter execute the conveyor speed adjustment 513 (an example of a second process).
[0056] On the other hand, the PLC 200B uses the process execution unit 250B to determine whether the imaging time 41 has been reached based on the time of the timer 201B. If it is determined that the imaging time 41 has been reached, the PLC 200B uses the process execution unit 250B to execute the process of imaging command output 514, which is the corresponding control process 502. As a result, the image sensor 300C controls the imaging unit 302C according to the imaging command 13 from the PLC 200B, and acquires the captured image of the workpiece 24 from the imaging unit 302C and processes it for inspection.
[0057] The inspection of the workpiece 24 using the captured image includes appearance inspection and the like. The inspection process may be executed by either the image sensor 300C or the PLC 200B, or both may cooperate to execute it. The inspection result may be stored in the storage unit of the server computer 190 transferred via the network 120 and the network 400.
[0058] Thus, in the control system 10A which is an example of a distributed system, the PLCs 200A and 200B synchronized with each other in time execute the control process 502 to be executed in cooperation between them according to the control process list 50A scheduled using the reservation time 501. Thereby, in the control system 10A, the execution state of the control process by the PLC 200 can be executed while coordinating the control process between the PLCs 200 without using a special mechanism such as the PLC 200s notifying each other or connecting the PLCs 200 with signal lines to notify each other. Hereinafter, more specific application examples of the present embodiment will be described.
[0059] <B. Support device> The support device 100 according to the present embodiment provides each PLC 200 with a control process list 50A. Referring to FIG. 1, the support device 100 connected to the network configuration of the control system 10A is configured using, for example, a general-purpose computer, and provides a support tool for supporting a user in operating the control system 10A, for example, on a UI (User Interface) basis. The support device 100 executes a development support program 50. By executing the development support program 50, the support device 100 provides, as one of the support tools described above, a tool for supporting a user in creating a control process list 50A and transferring the created control process list 50A to the PLC 200 by downloading or the like. The support tool provided by the support device 100 is not limited to this, and may include a setting tool for preparing an execution environment of the control program or a communication environment with the PLC 200, etc. In the control system 10A, the PLC 200 and the support device 100 are configured as separate entities, but a configuration in which all or part of these functions are integrated into a single device may be adopted. The support device 100 may be connected to a network 400, or may be built into the PLC 200, or may be provided as a portable terminal.
[0060] The path for downloading the control process list 50A to the PLC 200 is not limited to downloading from the support device 100, but may be downloading from the server computer 190. Also, the control process list 50A may be downloaded to one PLC 200 in the control system 10A, and the control process list 50A may be transmitted from that one PLC 200 to the other PLCs 200 via the network 120. In this case, for example, tag data link communication of EtherNet / IP (registered trademark) may be used.
[0061] In this embodiment, the control processing list 50A is created by the user via the UI tool of the support device 100, but the creation environment is not limited to this. For example, it may be created by a simulator. The simulator may be provided in the support device 100 or a cloud-based computer (for example, the server computer 190).
[0062] <Example of the hardware configuration of C.PLC200> FIG. 2 is a schematic diagram showing an example of the hardware configuration of the PLC200. Referring to FIG. 2, the PLC200 includes a timer 201, a control device 202 including a CPU (Central Processing Unit) or an MPU (Micro-Processing Unit), a chipset 204, a main memory 206 composed of a volatile storage device such as a DRAM (Dynamic Random Access Memory) or an SRAM (Static Random Access Memory), a storage device 208 composed of a non-volatile storage device such as an HDD (Hard Disk Drive) or an SSD (Solid State Drive), an internal bus controller 222, a field bus controller 224, a communication interface 238, and a memory card interface 239.
[0063] The timer 201 is configured to include a counter that increments or decrements a counter value at a predetermined period. The timer 201 may be implemented using a high-precision event timer (HPET: High Precision Event Timer) which is a hardware timer or a dedicated circuit (for example, an ASIC (Application Specific Integrated Circuit) or an FPGA (Field-Programmable Gate Array)).
[0064] The storage device 208 stores a control program 211 and various data 214. The control program 211 includes a system program 212 including an OS (Operating System) and a user program. The user program includes a process execution program 215 that realizes process execution units 250A, 250B when executed, an IO refresh program 216, and a program of a control process list 50A. In addition, the user program includes various programs for executing control processes arbitrarily designed according to the control target.
[0065] The control device 202 realizes control of the field device 300 by reading out the control program 211 stored in the storage device 208, loading it into the main memory 206, and executing it.
[0066] The chipset 204 controls each component to realize processing of the PLC 200 as a whole. The internal bus controller 222 is an interface that exchanges data with various devices connected to the PLC 200 via the internal bus. An example of such a device is an I / O unit 226. When a field device 300 is connected to the I / O unit 226, the I / O unit 226 inputs status values of the connected field device 300, such as detection values 10 and 12, and outputs control commands for the field device 300, such as a control command 11 and an imaging command 13, to the field device 300.
[0067] The field bus controller 224 is an interface for transmitting and receiving data to and from various field devices 300 connected to the PLC 200 via the network 110 .
[0068] The communication interface 238 controls data transmission and reception through various wired / wireless networks. The PLC 200 communicates with the support device 100 or the server computer 190 through the communication interface 238 and the network 120 and the network 400.
[0069] The memory card interface 239 is configured to be detachable for a memory card 240 which is an example of an external storage medium, and is capable of writing data to the attached memory card 240 and reading data from the memory card 240. The path through which the program of the control processing list 50A is supplied to the PLC 200 is not limited to the path downloaded from the support device 100, and may be a path read from the memory card 240 and stored as the user program 210 in the storage device 208. The memory card 240 corresponds to a non-volatile storage device composed of a flash memory such as an SD card.
[0070] The PLC 200 may obtain the control program 211 and various data 214 from an external storage medium such as the memory card 240. Such an external storage medium is a medium that stores information such as programs and data recorded in a computer or other devices and machines by means of electrical, magnetic, optical, mechanical, or chemical actions so that the information can be read. The control device 202 of the PLC 200 may obtain programs and / or data such as the system program 212, the processing execution program 215, the IO refresh program 216, the control processing list 50A, and various data 214 from such an external storage medium.
[0071] Also, the above-described programs and / or data may be downloaded from an external information processing device such as the server computer 190 or the support device 100 to the PLC 100 via the network 120 and stored in a predetermined storage area (for example, the storage device 208, etc.).
[0072] <D.Functional Configuration of PLC 200> FIG. 3 is a diagram showing a functional configuration for implementing processing according to the control process list 50A of the PLC according to the present embodiment. In FIG. 3, the functional configuration is shown as a configuration of modules implemented by the control device 202 executing a program. More specifically, the functional configuration includes a process execution unit 250 implemented by the control device 202 executing a process execution program 215 and an input / output processing unit 251 implemented by the control device 202 executing an IO refresh program 216. The input / output processing unit 251 exchanges data (status values, control commands) with the field device 300 via the internal bus controller 222 or the field bus controller 224 every control period. In this embodiment, when the PLC 200 is in operation, the control process list 50A read from the storage device 208 is expanded in the main memory 206. The process execution unit 250 executes the program of the control process list 50A using data (status values of the detection values 10 and 12) from the field device 300 input via the input / output processing unit 251 every control period, and outputs data based on the execution result (control commands for the command 11 and the imaging command 13). The input / output processor 251 transmits the control command output from the process execution unit 250 to the field device 300 .
[0073] FIG. 3 shows an example of a configuration in which the processor of the control device 202 executes a program to provide necessary modules, but some or all of these provided modules may be implemented using dedicated hardware circuits (e.g., ASIC (application specific integrated circuit) or FPGA (field-programmable gate array)). Alternatively, the main part of the control device 202 may be realized using hardware that conforms to a general-purpose architecture (e.g., an industrial PC based on a general-purpose PC). In this case, virtualization technology may be used to run multiple OSs with different uses in parallel, and necessary applications may be executed on each OS.
[0074] <E.フローチャート> Figures 4 and 5 are flow charts showing an example of processing according to this embodiment. Figures 4 and 5 show processing using the processing execution unit 250 that is realized by executing the processing execution program 215. Referring to Figure 4, the PLC 200 uses the processing execution unit 250 to first set the value of variable n to 0 for initialization (step S1). The variable n is used to count, from the top of the control processing list 50A, the records whose control processing 502 has been executed.
[0075] The PLC 200 executes the control process of the field device 300 according to the control process list 50A using the process execution unit 250 (step S2), and judges whether the execution of the control process according to the control process list 50A of the own device has ended (step S3). In step S3, for example, the PLC 200A judges whether the control process 502 of all the records R in the control process list 510 has been executed based on whether the variable n indicates the total numerical value of the records R in the control process list 510, and similarly, the PLC 200B judges whether the control process 502 of all the records R in the control process list 510 has been executed based on whether the variable n indicates the total numerical value of the records R in the control process list 520.
[0076] If it is determined that the execution of the control process has ended (YES in step S3), the processing in FIG. 4 ends, but if it is determined that the execution of the control process has not ended (NO in step S3), the processing returns to step S1, and the execution of the control process according to the control process list 50A continues.
[0077] The process of step S2 will be described in detail with reference to Fig. 5. The PLC 200 increments the variable n by 1 (step S10). The PLC 200 uses the process execution unit 250 to analyze the reservation time 501 of the n-th record R in the control process list 50A, and determines the type of the reservation time 501 based on the analysis result (step S11). Specifically, the PLC 200 determines whether the reservation time 501 indicates "detection of a predetermined type of event," "reaching a preset time," or "other."
[0078] When the PLC 200 determines that the reservation time 501 indicates that a "preset time has been reached" (step S11: "preset time"), the PLC 200 uses the process execution unit 250 to determine whether the time measured by the timer 201 has reached the preset time indicated by the reservation time 501 (step S12). For example, the PLC 200 compares the time measured by the timer 201 with the preset time indicated by the reservation time 501, and determines whether the preset time has been reached based on the result of the comparison. When the PLC 200 determines that the preset time indicated by the reservation time 501 has been reached (step S12: YES), the PLC 200 uses the process execution unit 250 to execute the control process 502 associated with the reservation time 501 of the n-th record R (step S13). On the other hand, when the PLC 200 determines that the preset time indicated by the reservation time 501 has not been reached (step S12: NO), the PLC 200 repeats step S12.
[0079] Furthermore, when the PLC 200 determines that the reservation time 501 indicates that a "predetermined type of event has been detected" ("predetermined time" in step S11), the PLC 200 uses the process execution unit 250 to determine whether or not a predetermined type of event has been detected based on the status value from the field device 300 (step S15). For example, when the reservation time 501 indicates "when a workpiece is detected," the PLC 200 determines whether or not a predetermined type of event has been detected based on whether or not workpiece detection 40 is acquired as an event from the detection value 10 from the sensor 300A.
[0080] If PLC 200 determines that a predetermined type of event has been detected (YES in step S15), it uses process execution unit 250 to execute control process 502 associated with reservation time 501 of n-th record R (step S16). On the other hand, if PLC 200 determines that a predetermined type of event has not been detected (NO in step S15), it repeats step S15.
[0081] Also, when PLC200 determines that the reservation time 501 indicates "Others" (in step S11, it is "Others"), PLC200 uses the processing execution unit 250 to determine whether the time of "Others" has been reached (step S17). For example, "Others" includes the reservation time 501 of the control processing list 50A in FIG. 1 (after the above processing). In this case, when the execution of the control processing 502 of the (n - 1)th record R ends, PLC200 determines that the reservation time 501 (after the above processing) has been reached, and when the execution has not ended, it determines that the reservation time 501 (after the above processing) has not been reached.
[0082] When PLC200 determines that the "Others" of the reservation time 501 of the nth record R has been reached (YES in step S17), it executes the control processing 502 associated with the reservation time 501 of the nth record R (step S18). On the other hand, when PLC200 determines that the "Others" of the reservation time 501 has not been reached (NO in step S17), it repeats step S17.
[0083] Note that PLC200 may store the control processing list 50A and, during operation, execute processing according to the control processing list 510 (520) corresponding to the own device in the control processing list 50A. Alternatively, PLC200 may store the control processing list 510 (520) corresponding to the own device instead of the entire control processing list 50A and, during operation, execute processing according to the stored control processing list corresponding to the own device.
[0084] <F. Modification Example> FIG. 6 is a diagram showing a schematic configuration of a control system 10B provided in a production line 60B of the FA according to the present embodiment. The control system 10B shows a modified example of the control system 10A of FIG. 1. Referring to FIG. 6, the production line 60B is provided in a process of packing, for example, the workpiece 24 into a box 611. The production line 60B includes a robot controller 300E for controlling a robot 310, instead of the image sensor 300C in the inspection process shown in FIG. 1. The robot 310 has a plurality of joints that are driven by the rotation of a robot servo motor (not shown) in order to handle the workpiece 24. When each joint is driven, an arm connected to the joint operates and a hand opens and closes. The other configuration of the production line 60B is similar to that shown in FIG. 1, and therefore the description will not be repeated.
[0085] The robot 310 performs pick-and-place using the robot hand 301E according to a command from the robot controller 300E. Pick-and-place refers to a series of operations in which the robot 310 picks up the workpiece 24 placed on the belt 23 of the conveyor with the robot hand 301E, moves the workpiece 24 to a box 611 arranged at a predetermined position while picking it up, and places it in the box 611. The robot hand 301E performs, for example, an opening and closing operation to pick up and place the workpiece 24, but the operation for picking and placing is not limited to the opening and closing operation, and may be an operation in which a pneumatic suction device is used for the robot hand 301E, picks up the workpiece 24 by suction, and releases the suction of the workpiece 24 in the box 611 on the place side. The robot controller 300E controls the drive of the robot servo motor according to the control amount (such as the angle, direction, and speed of rotation of the servo motor) indicated by the picking command 14 from the PLC 200B, so that each arm operates three-dimensionally and the robot hand 301E opens and closes. The pick-and-place operation of the robot 310 is realized by the operation of each arm and the robot hand 301E according to the picking command 14.
[0086] 6, the control process list 50B for the production line 60B includes a control process list 515 in which the identifier 504 indicates a "PLC for the conveyor" and a control process list 525 in which the identifier 504 indicates a "PLC for picking." PLC 200A corresponds to the "PLC for the conveyor," and PLC 200B corresponds to the "PLC for picking."
[0087] In the control process list 515 of Fig. 6, the command of the process procedure 503 for conveyor speed adjustment 513 is different from the corresponding process procedure 503 shown in Fig. 1, but the other control processes are similar to those in the control process list 510 of Fig. 1, so that the description will not be repeated. In the process procedure 503 for conveyor speed adjustment 513 in the control process list 515, the PLC 200A uses the process execution unit 250A to calculate the difference between the target speed for the conveyed work 24 to move to a tracking area corresponding to a predetermined position for pick-and-place at the picking time 42 (for example, every second, when a certain time has elapsed from the start of each control cycle), and the conveyor speed calculated by conveyor speed detection 512, determines the control amount of the servo motor 300B based on the calculated difference, and outputs the command 11 representing the determined control amount to the servo motor 300B. This target speed can be calculated, for example, based on (distance between the detection position of sensor 300A and the position based on the tracking area) / (picking time 42-(work detection time)). Note that the method of acquiring the target speed is not limited to calculation, but may be table lookup. In FIG. 6, the tracking area is a predetermined area for robot 301 to handle work 23, but is not limited to this. Also, a position based on the tracking area is exemplified as a position based on a predetermined area for robot 310 to handle a work, but is not limited to this and can be set depending on the type of robot applied to production line 60B.
[0088] On the other hand, the PLC 200B uses the process execution unit 250B to determine whether the picking time 42 has been reached based on the output of the timer 201B. If it is determined that the picking time 42 has been reached, the PLC 200B uses the process execution unit 250B to execute the picking command output 516, which is the corresponding control process 502. As a result, the robot controller 300E controls the arm and robot hand 301E according to the picking command 14 from the PLC 200B, and causes the robot 310 to pick and place the workpiece 24.
[0089] PLC 200B may store control process list 50B and, during operation, execute processes according to control process list 515 (525) corresponding to its own device among control process list 50B. Alternatively, PLC 200B may store control process list 515 (525) corresponding to its own device, rather than the entire control process list 50B, and, during operation, execute processes according to the stored control process list corresponding to its own device.
[0090] The control process of Fig. 6 of the above modified example may be combined with the control process of Fig. 1. For example, a control list may be provided that causes one PLC 200 to execute a control process 502 for outputting an imaging command 13 at a predetermined time (reservation time 501) when the workpiece 24 reaches a predetermined position within the imaging field of view, and causes another PLC 200 to execute a control process 502 for outputting a picking command 14 at a predetermined time, for example, when a predetermined time has elapsed since the output of the imaging command 13 (reservation time 501).
[0091] Also, as a modification of the above, the reservation time 501 of the control process lists 50A and 50B is not limited to a time such as every second (1.0 second, 2.0 seconds, 3.0 seconds...), for example, and may include a time period of a predetermined length such as 1.0 second to 1.5 seconds, 2.0 seconds to 2.5 seconds, 3.0 seconds to 3.5 seconds... Thus, the reservation time 501 may include at least one of time and a time period. When the reservation time 501 indicates a time period, when the PLC 200 determines that the time period has been reached based on the time of the timer 201, the PLC 200 executes the control process 502 associated with the reservation time 501 (the time period).
[0092] <G. Advantages of the Embodiment> FIGS. 7 and 8 are diagrams for explaining the advantages of the control system according to the present embodiment. For example, in a scene where cooperative operation is realized by a conveyor PLC and an inspection PLC in a workpiece inspection process, FIG. 8 schematically shows a processing procedure of a conventional cooperative operation that does not use the control process list 500, and FIG. 7 schematically shows a processing procedure of the cooperative operation in FIG. 1 using the control process list 500.
[0093] In the conventional example of FIG. 8, when the value of the timer of the conveyor PLC indicates "123", the value of the timer of the inspection PLC indicates "1234", and thus the times of the timers of both PLCs are in an asynchronous state. Therefore, for both PLCs, the execution timing (execution time) of the control process is designed according to schedulers based on different time axes respectively.
[0094] More specifically, when the conveyor PLC acquires the event of workpiece detection 40, the conveyor PLC executes processes T1 to T4 (saving the workpiece detection time, calculating the conveyor speed, calculating the imaging time, calculating the timing signal transmission time), and then, when the timing signal transmission time is reached, the conveyor PLC executes process T5 of transmitting the timing signal TM to the inspection PLC. The inspection PLC executes process T6 of receiving the timing signal TM from the conveyor PLC and process T7 of outputting the imaging command 13 according to the received timing signal TM.
[0095] In this way, the inspection PLC determines the timing to output the imaging command 13 based on the time when it receives the timing signal TM notification from the conveyor PLC. In this case, since it takes time from when the conveyor PLC transmits the timing signal TM notification until when the inspection PLC outputs the imaging command 13, the conveyor PLC needs to calculate the time to transmit the timing signal TM taking into account the delay time DL based on the required time on the time axis of the inspection PLC in the process of calculating the timing signal transmission time T4.
[0096] In conventional examples, when designing the timing for coordinating control processes by having PLCs operate objects in a distributed system like this, it was necessary to design detailed timing charts for the control processes of each PLC, taking into account the processing times of other PLCs on a different time axis from that of the PLC in question.
[0097] In contrast, in the embodiment of FIG. 7, each PLC in the distributed system has a timer that is time-synchronized with the timers of the other PLCs, so that all PLCs in the system can determine the timing to execute the linked control processes (workpiece detection time storage 511 in response to event acquisition of workpiece detection 40, conveyor speed detection 512, conveyor speed adjustment 513, and image capture command output 514 for image capture command 13) based on a common time axis. Therefore, unlike the conventional example of FIG. 8, in the embodiment of FIG. 7, the PLC does not need to know the operating state of the other PLCs, and interlocking by notification of the timing signal TM is not required. As a result, the execution timing of the control processes can be designed for the entire distributed system by a simple method of designing the control process list so that each of the multiple control processes executed in cooperation between PLCs is executed when one PLC reaches the reservation time 501.
[0098] Therefore, in this embodiment, by designing the execution timing of the control process of the PLC by the control process lists 50A and 50B to cause the objects to cooperate, it becomes easier to design the PLC 200 alone. That is, even when causing the objects to cooperate, it is possible to determine the timing (reservation timing 501) for executing the control process 502 of each PLC 200 from the overall control process lists 50A and 50B, and it is easy to design. Also, a mechanism for notifying such as a timing signal TM between the PLCs 200 becomes unnecessary. That is, there is no need to notify the execution state of the control process 502 between the PLCs 200, and the notification mechanism can be made unnecessary. Also, it becomes possible to debug the control process 502 with each PLC 200 alone. That is, the control process 502 can be executed with each PLC 200 alone, and the control process 502 can be debugged for each PLC 200 alone.
[0099] Also, it becomes easier to change the functions realized by the control process 502 of the PLCs 200 that cooperate by the control process lists 50A and 50B. Specifically, redesign / debugging of the control process 502 of the existing PLCs 200 that cooperate is not required. That is, design / debugging of the control process 502 of the existing PLCs 200 that cooperate at the time of function change is not required. Also, adjustment of the execution timing of the control process 502 for the entire control system becomes unnecessary. That is, since the execution timing (reservation timing 501) of the control process 502 of each PLC 200 does not change before and after function change, adjustment of the execution timing (reservation timing 501) of the control process 502 in the entire control system can also be made unnecessary.
[0100] <H. Supplementary Note> The above-described embodiment includes the following technical ideas. [Configuration 1] A control system (10A, 10B) provided in a production line (60A, 60B) of FA (Factory Automation), The control system is, equipped with a plurality of control devices (200A, 200B) each of which controls an object (300A, 300B, 300C, 300D), Each of the plurality of control devices is, A timer (201B) whose time is synchronized with a timer (201A) of another control device; and a process execution means (250A, 250B) for executing one or more processes (502) related to the control executed in cooperation with the other control device in accordance with a list (50A, 50B) associated with information including a predetermined time (501) for executing the process, The process execution means of each control device A control system, when determining that the predetermined time in the list has been reached, executes an action associated with the predetermined time in the list. [Configuration 2] the predetermined time period includes at least one of a predetermined time and a predetermined period of time, The process execution means of each of the control devices The control system of configuration 1, when it is determined that at least one of the predetermined time and time has been reached based on the time of the timer of the control device, executes a process associated with at least one of the predetermined time and time in the list. [Configuration 3] the predetermined time includes when a predetermined type of event (40) is detected on the production line; The process execution means of each of the control devices The control system according to configuration 1 or 2, wherein when the control system detects an event of the predetermined type, it executes a process associated with the detection of the event of the predetermined type in the list. [Configuration 4] the list of processes includes a first process and a second process that is executed after the first process is completed; the predetermined time includes a time when the first process is completed, The process execution means of each of the control devices 4. The control system according to any one of configurations 1 to 3, wherein when it is determined that the first process has been completed, a second process is executed thereafter. [Configuration 5] 5. The control system according to any one of configurations 1 to 4, wherein the information corresponding to each of the one or more processes in the list includes a processing procedure (503) for the process. [Configuration 6] The control system according to any one of configurations 1 to 5, wherein the information corresponding to each of the one or more processes in the list includes an identifier (504) of a control device that executes the process. [Configuration 7] The control system of any one of configurations 1 to 6, wherein the target includes equipment that drives devices installed in association with the production line. [Configuration 8] 8. The control system of claim 7, wherein at least one of the one or more processes in the list includes a process for determining a control amount for driving the device. [Configuration 9] The apparatus installed in relation to the production line includes a conveying apparatus (23) for a work (24), The control system according to configuration 8, wherein the device includes a device (300B) that drives the conveying device according to the control amount. [Configuration 10] the list of processes includes a first process and a second process that is executed after the first process is completed; the first process includes a process of determining a control amount for driving the conveying device, The control amount for driving the conveying device is The control system of configuration 9 includes a control variable for driving the transport device to transport the workpiece to a position related to the second process on the production line by the predetermined time corresponding to the second process. [Configuration 11] The apparatus installed in relation to the production line includes an imaging unit (302C) having an imaging field of view; The device includes a device (301C) that drives the imaging unit in accordance with an imaging command (13), the second processing includes a processing of outputting the imaging command to the imaging unit via a device that drives the imaging unit, 11. The control system of claim 10, wherein the position associated with the second process includes a position based on the imaging field of view. [Configuration 12] The apparatus installed in association with the production line includes a robot (310) for handling the workpiece (24); The device includes a device (300E) that drives the robot according to the control amount for driving the robot, The second process includes a process of outputting a control command (14) corresponding to the control amount to a device that drives the robot, The control system of aspect 10 or 11, wherein the position associated with the second process includes a position based on a predetermined area for the robot to handle a workpiece. [Configuration 13] A control device (200A, 200B) that is provided in a production line (60A, 60B) of FA (factory automation) and controls an object (300A, 300B, 300C, 300D), A timer (201B) that is synchronized with a timer (201A) of another control device provided in the production line; and a process execution means (250A, 250B) for executing one or more processes (502) related to the control executed in cooperation with the other control device in accordance with a list (50A, 50B) associated with information including a predetermined time (501) for executing the process, The process execution means includes: a control device that, when it determines that the predetermined time in the list has been reached, executes a process associated with the predetermined time in the list. [Configuration 14] A program (215) for causing a computer (202) to execute a method for controlling an object (300A, 300B, 300C, 300D) by a control device (200A, 200B) provided in a production line (60A, 60B) of FA (factory automation), The control device includes: a timer (201B) synchronized with a timer (201A) of another control device provided in the production line; The method comprises: The method includes a step of executing one or more processes (502) related to control executed by the control device in cooperation with other control devices, in accordance with a list (50A, 50B) associated with information including a predetermined time (501) for executing the process; The step of executing the process includes: a step of executing, when it is determined that the predetermined time in the list has been reached, a process associated with the predetermined time in the list.
[0101] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0102] 10,12 detection value, 10A,10B control system, 11 control command, 13 imaging command, 14 picking command, 23 belt, 24 work, 40 work detection, 41 imaging time, 42 picking time, 50 development support program, 50A,50B,510,515,520,525 control processing list, 60A,60B production line, 100 support device, 110,120,400 network, 190 server computer, 201,201A,201B timer, 202 control device, 204 chip set, 206 main memory, 208 storage device, 210 user program, 211 control program, 212 system program, 214 various data, 215 processing execution program, 216 refresh program, 222 internal bus controller, 224 field bus controller, 226 I / O unit, 238 communication interface, 239 memory card interface, 240 memory card, 250, 250A, 250B processing execution unit, 251 input / output processing unit, 300 field device, 300A sensor, 300B servo motor, 300C image sensor, 300D encoder, 300E robot controller, 301C sensor unit, 301E robot hand, 302C imaging unit, 310 robot, 410 communication device, 501 reservation time, 502 control processing, 503 processing procedure, 504 identifier, 511 work detection time storage, 512 conveyor speed detection, 513 conveyor speed adjustment, 514 imaging command output, 516 picking command output, 611 box.
Claims
1. A control system installed in a production line of FA (factory automation), The control system includes: A plurality of control devices each controlling an object, Each of the plurality of control devices is an interface for communicating with the object through a network to which the object is connected; A timer that is time-synchronized with timers of other control devices; A storage unit that stores a list in which information including a predetermined time for executing one or more processes related to the control of the target executed in cooperation with the other control device is associated with the one or more processes; a process execution means for executing a process according to the list in the storage unit, the list of processes includes a first process and a second process that is executed after the first process is completed, the predetermined time is at least one of a predetermined time and a predetermined period of time, or one of different types of times including a time when a predetermined type of event is detected in the production line, and a time when the first process is completed; The process execution means of each control device A control system that determines the type of the predetermined period in the list in the memory unit of the control device, and when it determines that the period indicated by the determined type has been reached, executes a process associated with the predetermined period in the list.
2. When it is determined that the type of the predetermined time period indicates at least one of a predetermined time and a predetermined period of time, The process execution means of each of the control devices The control system according to claim 1, wherein when it is determined that at least one of the predetermined time and time has been reached based on the time of the timer of the control device, a process associated with at least one of the predetermined time and time in the list is executed.
3. When it is determined that the predetermined type of time indicates when a predetermined type of event is detected on the production line, 3. The control system according to claim 1, wherein the process execution means of each of the control devices executes a process associated with the detection of an event of the predetermined type in the list when the process execution means detects an event of the predetermined type.
4. When it is determined that the type of the predetermined time indicates a time when the first process has been completed, The control system according to claim 1 , wherein the process execution means of each of the control devices executes the second process when it determines that the first process has been completed.
5. The control system according to claim 1 , wherein the information corresponding to each of the one or more processes in the list includes a processing procedure for the process.
6. The control system according to claim 1 , wherein the information corresponding to each of the one or more processes in the list includes an identifier of a control device that executes the process.
7. The control system according to claim 1 , wherein the target includes a device that drives a device installed in association with the production line.
8. The control system of claim 7 , wherein at least one of the one or more processes in the list includes a process for determining a control amount for driving the device.
9. The apparatus installed in relation to the production line includes a workpiece conveying apparatus; The control system according to claim 8 , wherein the device includes a device that drives the transport device in accordance with the controlled variable.
10. The first process includes a process for determining a control amount for driving the conveying device, The control amount for driving the conveying device is The control system according to claim 9, further comprising a control variable for driving the transport device so as to transport the workpiece to a position related to the second process on the production line by the predetermined time corresponding to the second process.
11. The apparatus installed in association with the production line includes an imaging unit having an imaging field of view; the device includes a device that drives the imaging unit in accordance with an imaging command, the second process includes a process of outputting the imaging command to the imaging unit via a device that drives the imaging unit; The control system of claim 10 , wherein the location associated with the second process includes a location based on the field of view.
12. The apparatus installed in association with the production line includes a robot for handling a workpiece; the device includes a device that drives the robot in accordance with the control amount for driving the robot, the second process includes a process of outputting a control command corresponding to the control amount to a device that drives the robot, The control system according to claim 10 or 11, wherein the position related to the second process includes a position based on a predetermined area for the robot to handle a workpiece.
13. A control device that is installed in a production line of FA (factory automation) and controls an object, an interface for communicating with the target through a network to which the target is connected; a timer that is time-synchronized with timers of other control devices provided in the production line; A storage unit that stores a list in which information including a predetermined time for executing one or more processes related to the control of the target executed in cooperation with the other control device is associated with the one or more processes; a process execution means for executing a process according to the list in the storage unit, the list of processes includes a first process and a second process that is executed after the first process is completed, the predetermined time is at least one of a predetermined time and a predetermined period of time, or one of different types of times including a time when a predetermined type of event is detected in the production line, and a time when the first process is completed; The process execution means includes: A control device that determines the type of the predetermined period in the list in the memory unit of the control device, and when it determines that the period indicated by the determined type has been reached, executes a process associated with the predetermined period in the list.
14. A program for causing a computer to execute a method for controlling an object by a control device provided in a production line of FA (factory automation), The control device includes: an interface for communicating with the target through a network to which the target is connected; a timer that is time-synchronized with timers of other control devices provided on the production line; a storage unit for storing a list in which information including a predetermined time for executing one or more processes related to the control of the target, the processes being executed by the control device in cooperation with another control device, is associated with the one or more processes; the list of processes includes a first process and a second process that is executed after the first process is completed, the predetermined time is at least one of a predetermined time and a predetermined period of time, or one of different types of times including a time when a predetermined type of event is detected in the production line, and a time when the first process is completed; The method comprises: Executing a process according to the list in the storage unit; The step of executing the process includes: A program comprising a step of determining the type of the predetermined period in the list in the memory unit of the control device, and when it is determined that the period indicated by the determined type has been reached, executing a process associated with the predetermined period in the list.
Citation Information
Patent Citations
Sequence control method
JP1995311607A
Robot controller
JP1996019977A
Communication method, central control device, and individual control device
JP2018068017A
Control system and control unit
JP2019067046A
