The power supply monitoring device addresses the issue of ground faults by temporarily limiting current through the intersystem switch to isolate faulty loads, ensuring continued operation of non-faulty loads and proper fuse cutting-off, enhancing system resilience.
Patent Information
- Application Number
- JP2021189768
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-11-23
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-11-23
AI Technical Summary
Existing power supply systems fail to properly utilize electrical loads after a ground fault occurs, leading to inconvenience as the remaining loads become unusable when an inter-system switch is opened.
A power supply monitoring device that includes a first system with multiple electrical loads, each with a fuse, and a second system connected via an intersystem switch, where voltage drops are monitored, and the intersystem switch is temporarily made conductive with limited current to isolate faulty loads while ensuring power to the remaining loads.
The solution allows continued use of non-faulty electrical loads by isolating faulty ones, prevents voltage drops in the second system, and ensures appropriate fuse cutting-off, even considering battery state of charge and switch deterioration.
Smart Images

Figure 0007586056000001 
Figure 0007586056000002 
Figure 0007586056000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a power supply monitoring device. [Background technology]
[0002] In recent years, there has been known a power supply system that is applied to, for example, a vehicle and supplies power to various devices of the vehicle. In addition, in the power supply system, a device having a first load and a second load as loads performing one function is known in order to prevent the loss of the function even if an abnormality occurs in an electric load performing a function necessary for driving the vehicle, such as an electric brake device or an electric steering device, during driving of the vehicle.
[0003] As a power supply system applicable to this device, for example, Patent Document 1 discloses a power supply system having a first system having a first load and a second system having a second load. In this power supply system, an inter-system switch is provided in a connection path connecting the systems, and the inter-system switch is opened by the control device when a ground fault occurs in one system and a short-circuit current flows through the connection path. This ensures the functions necessary for driving the vehicle by the load of the other system where no short circuit occurs. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-62727 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the above power supply system, it is considered that a plurality of electric loads are included as the first load of the first system. In such a configuration, for example, when a ground fault occurs in one of the plurality of electric loads, the inter-system switch is opened, which may cause a problem that the remaining electric loads that are not affected by the ground fault cannot be used.
[0006] The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a power supply monitoring device that can realize proper use of an electric load even after a ground fault occurs. [Means for solving the problem]
[0007] A first means for solving the above problem is applied to a power supply system including a first system having a first load and a second system having a second load, the first system and the second system being connectable to each other by an inter-system switch, and a power supply unit being connected to the second system, the first system including a plurality of electric loads connected in parallel as the first load, and a fuse being provided in each of the current paths leading to the electric loads, the first system including a monitoring unit that monitors a voltage drop in the first system when the first load and the second load are driven with the inter-system switch closed, and a switch operation unit that, when it is determined by the monitoring unit that a voltage drop has occurred, causes the inter-system switch to be conductive for a predetermined period from the voltage drop while limiting the conduction current of the inter-system switch.
[0008] If a ground fault occurs in any of the multiple electric loads that are the first loads in the first system, an excessive current flows through the current path connected to the electric load, and there is a concern that the power supply unit may fail, so the inter-system switch is opened. However, in this case, even if a ground fault occurs in one of the multiple electric loads in the first system, the first system as a whole becomes unusable.
[0009] In this respect, in the above configuration, when the first load and the second load are driven with the inter-system switch closed, a voltage drop in the first system is monitored, and when it is determined that a voltage drop has occurred, the inter-system switch is made conductive with the current flowing through the inter-system switch limited for a predetermined period from the voltage drop. In this case, when a voltage drop occurs in the first system due to a ground fault in the first system, the inter-system switch is made conductive for a predetermined period from the voltage drop, and a current is passed from the power supply unit on the second system side to the first system side, thereby cutting off a fuse on the current path connected to the electric load where the ground fault has occurred. As a result, only the electric load where the ground fault has occurred in the first system is separated from the first system, and the remaining electric loads can be used. In addition, when the inter-system switch is made conductive, the current flowing through the inter-system switch is limited, thereby suppressing a voltage drop in the second system even if the inter-system switch is made conductive. As a result, the operating voltage of the second load is secured, and it is possible to suppress the occurrence of a hindrance to the operation of the second load.
[0010] In a second means, the inter-system switch has a configuration that makes a current-carrying resistance variable when current is applied, and the switch operation unit limits the conduction current of the inter-system switch by adjusting the current-carrying resistance of the inter-system switch during the specified period.
[0011] According to the above configuration, by adjusting the current-carrying resistance of the inter-system switch, it is possible to limit the conduction current flowing from the first system side to the second system side, and to properly cut off the fuse.
[0012] In the third means, the switch operation unit obtains a conduction current flowing through the inter-system switch during the predetermined period, and adjusts a conduction resistance of the inter-system switch based on the conduction current.
[0013] When the inter-system switch is turned on in a current-limited state due to a voltage drop in the first system, the current flowing through the inter-system switch may unintentionally decrease depending on the SOC of the power supply unit or the deterioration state of the inter-system switch. In this regard, the above configuration makes it possible to appropriately control the current flowing through the inter-system switch, and to cut off the fuse on the first system side as desired, regardless of the SOC of the power supply unit or the deterioration state of the inter-system switch.
[0014] In a fourth aspect, the power supply unit includes a power storage device, and further includes a current adjusting unit that adjusts a conduction current of the inter-system switch during the predetermined period based on a SOC of the power storage device.
[0015] According to the above configuration, when the SOC of the energy storage device is relatively high, the fuse can be cut off early by making the conduction current of the inter-system switch relatively large during a specified period, and when the SOC of the energy storage device is relatively low, the conduction current can be made relatively small to prevent the energy storage device from entering an over-discharge state.
[0016] The fifth means includes a recovery determination unit that determines whether voltage recovery from the voltage drop has occurred after it is determined by the monitoring unit that a voltage drop has occurred, and a recovery operation unit that releases the limit on the conduction current of the inter-system switch by the switch operation unit and restores the inter-system switch to a conductive state without current limit when it is determined by the recovery determination unit that the voltage recovery has occurred.
[0017] In the above configuration, when the voltage of the first system starts to rise due to the blowing of the fuse and it is determined that the voltage has recovered from the voltage drop, the limit on the current flowing through the inter-system switch is released. This makes it possible to resume power supply to the remaining electric loads that are not affected by the ground fault at an appropriate time after the electric load in the first system where the ground fault has occurred is separated from the first system.
[0018] In a sixth means, the switch operation unit opens the inter-system switch when a predetermined conduction period has elapsed without the voltage recovering from the voltage drop after the monitoring unit has determined that a voltage drop has occurred.
[0019] In the first system, not only can a ground fault occur in one of the multiple electrical loads, but it can also occur in the main path before it branches off to each electrical load. If a ground fault occurs in this path, the fuse will not trip even if current flows from the power supply unit on the second system to the first system, and the current will continue to flow, wasting power in the power supply unit unnecessarily.
[0020] In this regard, in the above configuration, after it is determined that a voltage drop has occurred in the first system, if a conduction period has elapsed without the voltage recovering from the voltage drop, the inter-system switch is opened. In this case, in a situation where a ground fault has occurred in this path, even if a current flows from the power supply unit on the second system side to the first system side, the fuse in the first system is not blown, and the inter-system switch is opened based on the fact that the voltage does not recover. This prevents the power supply unit from continuing to discharge to the first system side, and makes it possible to prevent unnecessary consumption of power from the power supply unit.
[0021] In the seventh means, after the monitoring unit determines that a voltage drop has occurred, the switch operation unit determines that the conduction period has elapsed based on the discharge amount of the power supply unit and a discharge parameter which is a correlation value thereof, and opens the inter-system switch if the conduction period has elapsed without the voltage recovering from the voltage drop.
[0022] When limited-current current is passed from the power supply unit on the second system side to the first system side, during the period in which the current is passed, the amount of stored electricity in the power supply unit decreases, the temperature of the inter-system switch rises, and the integrated current value increases. In this case, the amount of stored electricity in the power supply unit, the temperature of the inter-system switch, and the integrated current value are parameters (discharge parameters) that can be grasped as the amount of discharge from the power supply unit. Depending on the state of change in the discharge parameters, it can be grasped that the discharge required to cut off the fuse has been performed from the power supply unit during the period in which limited-current current is passed. In this regard, in the above configuration, since it is determined that the conduction period has elapsed based on the discharge parameters, limited-current current can be passed within an appropriate period.
[0023] In an eighth embodiment, the power supply system includes a first power supply unit connected to the first system and a second power supply unit connected to the second system, the first power supply unit including a voltage converter that generates an operating voltage for the first load and the second load, and the second power supply unit including a power storage device that can be charged by the operating voltage of the voltage converter, and when a voltage drop occurs in the first system, voltage generation by the voltage converter is stopped, and the switch operation unit causes the inter-system switch to be conductive while limiting the conduction current of the inter-system switch.
[0024] In a configuration including a first power supply unit and a second power supply unit, when no ground fault occurs in either system, the first power supply unit and the second power supply unit redundantly supply power to the first load and the second load. In such a configuration, when a voltage drop occurs due to a ground fault in the first system, voltage generation by the voltage converter of the first power supply unit is stopped. This suppresses overcurrent in the voltage converter, and it is possible to protect the first power supply unit including the voltage converter. However, in this case, it is not possible to blow the fuse by current flow from the first power supply unit. In this regard, the fuse can be properly blown by conducting the inter-system switch in a current-limited state and flowing current from the power storage device of the second power supply unit to the first system side.
[0025] The ninth means includes a direction determination unit that determines a direction in which a conductive current flows through the inter-system switch when the monitoring unit determines that a voltage drop has occurred, and the switch operation unit opens the inter-system switch when the monitoring unit determines that a voltage drop has occurred and the direction determination unit determines that a conductive current flows from the first system to the second system.
[0026] In a power supply system, when the inter-system switch is closed, a voltage drop occurs in the first system regardless of whether a ground fault occurs in the first system or the second system. In this case, if a ground fault occurs in the second system, it is not necessary to blow the fuse on the first system side. In this regard, in the above configuration, when it is determined that a voltage drop has occurred in the first system, the direction in which a conductive current flows through the inter-system switch is determined, and when it is determined that the conductive current flows from the first system to the second system, the inter-system switch is opened. This allows the inter-system switch to be opened and closed appropriately. [Brief description of the drawings]
[0027] [Figure 1] 1 is an overall configuration diagram of a power supply system according to a first embodiment. [Diagram 2] 4 is a flowchart showing the procedure of a control process according to the first embodiment. [Diagram 3] 4 is a time chart showing what happens when a ground fault occurs in the first system while the vehicle is running. [Figure 4] 4 is a time chart showing what happens when a ground fault occurs in the second system while the vehicle is running. [Diagram 5] FIG. 13 is an overall configuration diagram of a power supply system according to a second embodiment. [Figure 6] 10 is a flowchart showing the procedure of a control process according to a second embodiment. [Figure 7] FIG. 13 is a diagram showing another example of an inter-system switch. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] (First embodiment) Hereinafter, an embodiment in which a power supply monitoring device according to the present invention is applied to an in-vehicle power supply system 100 will be described with reference to the drawings.
[0029] 1, the power supply system 100 has two power supply systems, and one of the power supply systems, a first system ES1, is provided with a power supply device 10 as a first power supply unit, and the other power supply system, a second system ES2, is provided with a storage battery 16 as a second power supply unit.
[0030] The power supply device 10 and the storage battery 16 are power sources that supply power to the general load 30 and the specific load 32. The power supply device 10 includes a high-voltage storage battery 11 and a DCDC converter (hereinafter simply referred to as a converter) 12. The high-voltage storage battery 11 is a storage battery capable of outputting a voltage (e.g., several hundred V) higher than the rated voltage (e.g., 12 V) of the storage battery 16, and is, for example, a lithium-ion storage battery. The converter 12 is a voltage converter that reduces the power supplied from the high-voltage storage battery 11 to generate an operating voltage for the general load 30 and the specific load 32. The storage battery 16 is, for example, a power storage device formed of a lithium-ion storage battery.
[0031] The general load 30 is an electric load (hereinafter simply referred to as a load) that is not used in driving the vehicle, such as an air conditioner, an audio device, a power window, and the like.
[0032] On the other hand, the specific load 32 is a load that performs at least one function used in driving the vehicle, such as an electric power steering device 50 that steers the vehicle, an electric braking device 51 that applies braking force to the wheels, a driving monitoring device 52 that monitors the conditions around the vehicle, etc.
[0033] The specific load 32 is configured with redundancy for each function, and by having the first load 34 and the second load 36, all of the functions are not lost even if an abnormality occurs in one of the loads 34, 36. Specifically, the electric power steering device 50 has a first steering motor 50A and a second steering motor 50B. The electric braking device 51 has a first braking device 51A and a second braking device 51B. The travel monitoring device 52 has a camera 52A and a laser radar 52B. The first steering motor 50A, the first braking device 51A, and the camera 52A correspond to the first load 34, and the second steering motor 50B, the second braking device 51B, and the laser radar 52B correspond to the second load 36.
[0034] The first load 34 and the second load 36 are provided redundantly for each function, and the first load 34 and the second load 36 cooperate to realize each function, but each load can also realize part of each function independently. For example, in the electric power steering device 50, the first steering motor 50A and the second steering motor 50B enable free steering of the vehicle, and the vehicle can be steered by each of the steering motors 50A and 50B while there are certain limitations on the steering speed, steering range, etc.
[0035] In the first system ES1, the power supply device 10 is connected to a general load 30 and a first load 34 via a first-system path LA1. In this embodiment, the first system ES1 is configured by the power supply device 10, the general load 30, and the first load 34 connected by the first-system path LA1. Note that in this embodiment, in the first system ES1, no storage device such as a storage battery is connected to the low-voltage side of the converter 12.
[0036] In the second system ES2, the storage battery 16 is connected to a second load 36 via a second system path LA2. In this embodiment, the second system ES2 is configured by the storage battery 16 and the second load 36 connected by the second system path LA2.
[0037] The intra-system paths LA1, LA2 are connected to each other by a connection path LB, and an inter-system switch SW is provided on the connection path LB. One end of the connection path LB is connected to a connection point PA of the first intra-system path LA1, and the other end of the connection path LB is connected to a connection point PB of the second intra-system path LA2. In this embodiment, an N-channel MOSFET (hereinafter simply referred to as MOSFET) is used as the inter-system switch SW. In this embodiment, the first intra-system path LA1, the second intra-system path LA2, and the connection path LB correspond to "current-carrying paths".
[0038] The connection path LB is provided with a voltage sensor 27 that detects the voltage at the connection point PA, a current sensor 28 that detects the conduction current ISW flowing through the inter-system switch SW, and a temperature sensor 29 that detects the temperature of the inter-system switch SW. In this embodiment, the voltage sensor 27 is provided on the second system ES2 side of the inter-system switch SW, and the current sensor 28 is provided on the first system ES1 side of the inter-system switch SW.
[0039] A plurality of loads included in the first load 34 and the general load 30 are connected in parallel to the first intra-system path LA1, and a fuse FA is provided in each of the first branch paths LC1 connected to each of these electrical paths. The fuse FA melts when an excessive current flows, and cuts off the input and output of power to the corresponding load. The fuse FA is not limited to a melting fuse, and may be, for example, a semiconductor fuse that cuts off current when an overcurrent is detected, or a chemical fuse. Each of the first branch paths LC1 is connected to the first main path LD1 before branching, and is connected to the power supply device 10 via the first main path LD1.
[0040] A plurality of loads included in the second load 36 are connected in parallel to the second intra-system path LA2, and a fuse FA is provided in a second branch path LC2 connected to each of the electric paths. Each second branch path LC2 is connected to the second main path LD2 before branching, and is connected to the storage battery 16 via the second main path LD2.
[0041] The control device 40 includes a known microcomputer including a CPU, a ROM, a RAM, a flash memory, and the like. The CPU refers to the calculation program and control data in the ROM to realize various functions for manual and automatic operation. Specifically, the control device 40 controls the open / close state of the system switch SW. The control device 40 also switches the converter 12 between an operating state and an operation stop state.
[0042] In addition, the control device 40 can implement driving assistance functions such as LKA (Lane Keeping Assist), ACC (Adaptive Cruise Control), and PCS (Pre-Crash Safety) using the above-mentioned specific load 32. The control device 40 can switch the driving mode of the vehicle between an assistance mode that uses driving assistance control and a normal mode that does not use driving assistance control, and the vehicle can run in each driving mode.
[0043] The control device 40 is connected to an alarm unit 44, an IG switch 45, and an input unit 46. The alarm unit 44 is a device that visually or audibly notifies the driver, and is, for example, a display or a speaker installed in the vehicle cabin. The IG switch 45 is a start switch for the vehicle. The control device 40 monitors the open / closed state of the IG switch 45. The input unit 46 is a device that accepts operations by the driver, and is, for example, a steering wheel operation input device, a shift lever operation input device, an accelerator pedal operation input device, a brake pedal operation input device, and a voice input device.
[0044] The power supply system 100 includes a converter monitoring device 13. The converter monitoring device 13 includes a converter control unit 14 and a control unit power supply 15. The control unit power supply 15 is connected to the first intra-system path LA1, and receives power from the first intra-system path LA1 to generate a drive voltage for the converter control unit 14. The converter control unit 14 is connected to the converter 12 and the control unit power supply 15, and is a hardware circuit having a built-in switching circuit that switches between an operating state and a non-operating state of the converter 12 by the drive voltage supplied from the control unit power supply 15. When the voltage of the first intra-system path LA1 drops below a predetermined threshold voltage Vth due to a voltage drop in the first system ES1 while the converter 12 is in an operating state, the converter control unit 14 switches the converter 12 from an operating state to a non-operating state, and stops the generation of voltage by the converter 12.
[0045] The power supply system 100 also includes a switch monitoring device 21. The switch monitoring device 21 has a monitoring unit 22 and a switch control unit 23. The monitoring unit 22 is connected to a voltage sensor 27, and is a hardware circuit incorporating a voltage determination circuit that determines whether a voltage value detected by the voltage sensor 27 has dropped below a threshold voltage Vth. The switch control unit 23 is connected to the monitoring unit 22 and the inter-system switch SW, and is a hardware circuit incorporating a voltage adjustment circuit that adjusts a voltage input to a gate terminal of the inter-system switch SW based on a determination result of the monitoring unit 22. The open / closed state of the inter-system switch SW is switched by the switch control unit 23 adjusting the voltage input to the gate terminal of the inter-system switch SW.
[0046] The monitoring unit 22 monitors a voltage drop in the first system ES1 when the first load 34 and the second load 36 are driven with the inter-system switch SW closed by the control device 40. For example, when the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, the inter-system switch SW is opened, and the first system ES1 and the second system ES2 are electrically insulated from each other, thereby ensuring the functions necessary for driving the vehicle by the second load 36 of the second system ES2 in which no short circuit has occurred.
[0047] Incidentally, in the case where a power supply abnormality occurs in the power supply system 100, such as a ground fault occurring in one of the multiple loads included in the first load 34, if the inter-system switch SW is opened, there is a concern that an inconvenience may occur in which the remaining loads among the multiple loads included in the first load 34 that are not affected by a ground fault may become unusable.
[0048] That is, when a ground fault occurs in one of the loads included in the first load 34, the converter control unit 14 stops the voltage generation of the converter 12. In this case, when the inter-system switch SW is opened, the first system ES1 loses a power source for cutting off the fuse FA on the first branch path LC1 connected to the load in which the ground fault occurs. As a result, the remaining loads in which the ground fault does not occur become unavailable.
[0049] In this embodiment, after the IG switch 45 is turned on, the control device 40 turns on the inter-system switch SW, and in this state, power is supplied from the power supply device 10 to the loads 34, 36 of both systems ES1, ES2. If the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1 while the inter-system switch SW is in the on state, the switch operation unit 24 included in the switch control unit 23 brings the inter-system switch SW into a conductive state with the conduction current ISW of the inter-system switch SW limited temporarily, i.e., for a predetermined period after the voltage drop, in other words, into a half-on state.
[0050] The following describes how the switch control unit 23 responds when a power supply abnormality occurs. The switch control unit 23 is a hardware circuit that includes a switch operation unit 24, a period determination unit 25, and a direction determination unit .
[0051] When the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, the switch operation unit 24 sets the inter-system switch SW to a half-on state. As a result, electricity is passed from the storage battery 16 on the second system ES2 side to the first system ES1 side, and the fuse FA on the current path leading to the load where the ground fault has occurred is cut off. When the inter-system switch SW is set to the half-on state, the switch operation unit 24 adjusts the current resistance between the main terminals of the inter-system switch SW to limit the conduction current ISW of the inter-system switch SW. In this case, the switch operation unit 24 adjusts the conduction current ISW of the inter-system switch SW based on the SOC of the storage battery 16 acquired from the control device 40. Specifically, the switch operation unit 24 sets a target current value such that the target current value of the conduction current ISW increases as the SOC of the storage battery 16 increases, and feedback controls the conduction resistance of the inter-system switch SW so that the magnitude of the conduction current ISW acquired using the current sensor 28 becomes the target current value. In this embodiment, the switch operation unit 24 corresponds to the "current adjustment unit."
[0052] When the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, the period determination unit 25 determines that a predetermined conduction period has elapsed since the voltage drop. Specifically, the period determination unit 25 acquires a State Of Charge (SOC) indicating the charge state of the storage battery 16 from the control device 40, and determines that a predetermined conduction period has elapsed since the voltage drop based on the fact that ΔSOC, which is the amount of change in SOC after the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, becomes larger than a predetermined threshold change amount.
[0053] In the first system ES1, a ground fault may occur in any of the loads included in the first load 34, or in the first main path LD1 before branching to each load. In this case, even if a current flows from the storage battery 16 to the first system ES1 side, the fuse FA is not cut off, and the current continues to flow, unnecessarily consuming power from the storage battery 16. Therefore, the switch operation unit 24 opens the inter-system switch SW when the period determination unit 25 determines that a predetermined conduction period has elapsed after a voltage drop occurs in the first system ES1.
[0054] In the power supply system 100, a ground fault may occur in the second system ES2. In such a situation, it is not necessary to blow the fuse on the first system ES1 side, and the inter-system switch SW is shut off. In this case, the direction of the conductive current ISW flowing through the inter-system switch SW changes depending on whether the ground fault occurs in the first system ES1 or the second system ES2. Therefore, the direction determination unit 26 uses the current sensor 28 to determine the direction in which the conductive current ISW flows through the inter-system switch SW.
[0055] When a voltage drop occurs in the first system ES1, if the direction determination unit 26 determines that the conductive current ISW flows from the second system ES2 to the first system ES1, the switch operation unit 24 sets the inter-system switch SW to a half-on state, and if the direction determination unit 26 determines that the conductive current ISW flows from the first system ES1 to the second system ES2, the switch operation unit 24 opens the inter-system switch SW.
[0056] Next, a description will be given of how the control device 40 responds when a power supply abnormality occurs. Fig. 2 shows a flowchart of the control process performed by the control device 40 when a power supply abnormality occurs. When the IG switch 45 is closed, the control device 40 repeatedly performs the control process at a predetermined cycle.
[0057] When the control process starts, first in step S21, it is determined whether or not the first abnormality flag F1 is "1". Here, the first abnormality flag F1 is set to "0" when no abnormality occurs in the first system ES1, and is set to "1" when an abnormality occurs in the first system ES1. If it is determined that the first abnormality flag F1 is "0", the process proceeds to step S22. If it is determined that the first abnormality flag F1 is "1", the process proceeds to step S31.
[0058] In step S22, it is determined whether the second abnormality flag F2 is "1". Here, the second abnormality flag F2 is set to "0" when no abnormality occurs in the second system ES2, and is set to "1" when an abnormality occurs in the second system ES2. If it is determined that the second abnormality flag F2 is "0", the process proceeds to step S23. If it is determined that the second abnormality flag F2 is "1", the process proceeds to step S41.
[0059] In step S23, it is determined whether or not an abnormality has occurred in the first system ES1. If no abnormality has occurred in the first system ES1, in step S24 it is determined whether or not an abnormality has occurred in the second system ES2. The control device 40 acquires the determination results from the monitoring unit 22 and the direction determination unit 26, and determines whether or not an abnormality has occurred in the first system ES1 or the second system ES2 based on these determination results. In this embodiment, the abnormality is a power supply failure abnormality such as a ground fault or a short circuit.
[0060] If it is determined that an abnormality has occurred in the first system ES1, then in step S25, the load to be controlled is switched from the first and second loads 34, 36 to the second load 36. In the following step S26, the first abnormality flag F1 is switched to "1". In the following step S27, the occurrence of the abnormality is notified to the driver via the notification unit 44, and this process is temporarily terminated.
[0061] If it is determined that an abnormality has occurred in the second system ES2, then in step S28, the load to be controlled is switched from the first and second loads 34, 36 to the first load 34. In the following step S29, the second abnormality flag F2 is switched to "1", and the process proceeds to step S27. On the other hand, if it is determined that no abnormality has occurred in either the first or second system ES1, ES2, this process is temporarily terminated.
[0062] In step S31, it is determined that the voltage has recovered from the voltage drop in the first system ES1. For example, in the first system ES1, when a ground fault occurs in at least one of the loads included in the first load 34 and the general load 30, the switch operation unit 24 sets the inter-system switch SW to a half-on state, so that a current flows from the storage battery 16 to the load in which the ground fault has occurred. As a result, when the fuse FA corresponding to the load melts, the voltage recovers in the first system ES1.
[0063] If voltage recovery has occurred, in step S32, the limit on the conduction current ISW of the inter-system switch SW by the switch operation unit 24 is released, and the inter-system switch SW is returned to a conductive state without current limit. In this embodiment, the process of step S31 corresponds to a "recovery determination unit", and the process of step S32 corresponds to a "recovery operation unit".
[0064] In step S33, converter 12 is switched from a stopped state to an operating state. In the following step S34, the load to be controlled is switched from first load 34 to first and second loads 34 and 36, and control of first load 34 is resumed. In the following step S35, voltage recovery is notified to the driver via notification unit 44, and this process is temporarily terminated.
[0065] On the other hand, if the voltage recovery has not occurred, in step S36, the SOC of the storage battery 16 is calculated, and this process is temporarily terminated. The SOC of the storage battery 16 calculated in step S32 is transmitted to the switch operation unit 24 and the period determination unit 25.
[0066] In step S41, it is determined that the voltage has recovered from the voltage drop in the second system ES2. For example, in the second system ES2, when a ground fault occurs in at least one of the loads included in the second load 36, the inter-system switch SW is opened by the switch operation unit 24. In this case, in the second system ES2, when a current flows from the storage battery 16 to the load in which the ground fault has occurred, the fuse FA corresponding to the load melts, and the voltage recovers in the second system ES2.
[0067] If voltage recovery has occurred, in step S42, the inter-system switch SW is opened. In the following step S43, the load to be controlled is switched from the second load 36 to the first and second loads 34 and 36, and control of the second load 36 is resumed. In the following step S44, the driver is notified of voltage recovery via the notification unit 44, and this process is temporarily terminated. On the other hand, if voltage recovery has not occurred, this process is temporarily terminated.
[0068] 3 shows the transition of the first voltage V1 of the first-system path LA1 and the second voltage V2 of the second-system path LA2 when a ground fault occurs in the first system ES1 while the vehicle is traveling. Here, the first voltage V1 is the voltage at the connection point PA, and the second voltage V2 is the voltage at the connection point PB.
[0069] 3, (A) shows the transition of the open / closed state of the inter-system switch SW, (B) shows the transition of the operating state of the converter 12, and (C) shows the transition of the conductive state of the specific fuse. Here, the specific fuse refers to the fuse FA on the branch paths LC1 and LC2 connected to the load where a ground fault has occurred, and if a ground fault has occurred on the main paths LD1 and LD2, there is no specific fuse.
[0070] In addition, (D) shows the transition of the first voltage V1, (E) shows the transition of the second voltage V2, and (F) shows the transition of the conductive current ISW. The conductive current ISW is positive when it flows from the second system ES2 side to the first system ES1 side.
[0071] 3, before time t1, the inter-system switch SW is closed by the control device 40, and the converter 12 is in an operating state by the control device 40. In addition, the first and second voltages V1, V2 have risen above the threshold voltage Vth, and the storage battery 16 is appropriately charged by the operating voltage of the converter 12.
[0072] While the vehicle is traveling, it is determined whether or not an abnormality has occurred in either the first system ES1 or the second system ES2. In Fig. 3, a ground fault occurs in the first system ES1 at time t1. This causes the first voltage V1 to drop, and the conduction current ISW flowing from the second system ES2 side to the first system ES1 side increases. When the first voltage V1 drops to the threshold voltage Vth at time t2, the converter control unit 14 switches the converter 12 from an operating state to an operating stopped state, and the voltage generation by the converter 12 is stopped.
[0073] Furthermore, when the first voltage V1 drops to the threshold voltage Vth, the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, and the switch operation unit 24 sets the inter-system switch SW to the half-on state. This prevents the second voltage V2 from rising to the limit voltage VS higher than the threshold voltage Vth and dropping to the lower limit operating voltage VL of the second load 36 set lower than the threshold voltage Vth.
[0074] When the inter-system switch SW is in the half-on state, the current-carrying resistance of the inter-system switch SW is feedback-controlled so that the magnitude of the conduction current ISW becomes a target current value. Here, the target current value is a current value at which the operating voltage of the second load 36 can be secured by the power supply from the storage battery 16 and the specific fuse can be blown. By feedback-controlling the magnitude of the conduction current ISW to the target current value, it is possible to blow the specific fuse while suppressing the occurrence of a hindrance to the operation of the second load 36, and to separate only the load in which a ground fault has occurred in the first system ES1 from the first system ES1.
[0075] In Figure 3, solid lines show the trends of each value when a ground fault occurs in loads 30, 34 of the first system ES1, and dashed lines show the trends of each value when a ground fault occurs in the first path LD1 of the first system ES1.
[0076] 3, when a ground fault occurs in the loads 30 and 34 of the first system ES1, if the specific fuse is blown at time t3, the first voltage V1 increases and the conduction current ISW decreases. In this case, the period from time t2 to time t3 corresponds to the predetermined period.
[0077] The control device 40 acquires the second voltage V2 using the voltage sensor 27 provided on the second system ES2 side of the system switch SW, and when the second voltage V2 rises from the limit voltage VS at time t3, the control device 40 determines that the voltage recovery has occurred in the first system ES1. In this embodiment, the control device 40 determines that the voltage recovery has occurred in the first system ES1 at time t4 after a specified period has elapsed from time t3. Here, the specified period is, for example, a period required for the first voltage V1 to rise from zero to the threshold voltage Vth.
[0078] Based on this determination, at time t6, the control device 40 opens the inter-system switch SW, i.e., places the inter-system switch SW in a conductive state without current limiting, and switches the converter 12 from a non-operating state to an operating state by the control device 40. This enables the remaining loads 30, 34 in the first system ES1 to be used, and enables redundant power supply to the remaining loads 30, 34.
[0079] During the period from time t3 to time t6, although the specific fuse is blown, the inter-system switch SW is in a half-on state, and therefore the second voltage V2 is lower than the first voltage V1.
[0080] On the other hand, as shown by the dashed line in Fig. 3, if the voltage drop in the first system ES1 continues even when the ΔSOC of the storage battery 16 rises to the threshold change amount at time t5, the inter-system switch SW is opened by the switch operation unit 24. This makes the conduction current ISW zero, suppressing the capacity drop of the storage battery 16. In this case, the period from time t2 to time t5 corresponds to the conduction period.
[0081] Fig. 4 shows the transition of the first voltage V1 and the second voltage V2 when a ground fault occurs in the second system ES2 while the vehicle is traveling. Note that (A) to (G) in Fig. 4 are the same as (A) to (G) in Fig. 3, so duplicated explanations will be omitted.
[0082] In Fig. 4, a ground fault occurs in the second system ES2 at time t11. This causes the second voltage V2 to drop, and the conductive current ISW flowing from the first system ES1 side to the second system ES2 side increases. When the first voltage V1 drops to the threshold voltage Vth at time t12 in accordance with the drop in the second voltage V2, the monitoring unit 22 determines that a voltage drop has occurred in the first system ES1, and the direction determination unit 26 determines that the conductive current ISW is flowing from the first system ES1 side to the second system ES2 side. When the switch operation unit 24 determines that a ground fault has occurred in the second system ES2 based on these determinations, the inter-system switch SW is opened.
[0083] When a ground fault occurs in the second system ES2, the inter-system switch SW is opened, thereby ensuring the operating voltage of the loads 30, 34 of the first system ES1. Even if the inter-system switch SW is opened, the second system ES2 has the storage battery 16 as a power source for cutting off the specific fuse, so that the specific fuse can be blown by power supply from the storage battery 16. This makes it possible to separate only the second load 36 in which a ground fault has occurred in the second system ES2 from the second system ES2 by blowing the specific fuse while preventing interference with the operation of the loads 30, 34 of the first system ES1.
[0084] In Figure 4, the solid lines show the changes in each value when a ground fault occurs in the second load 36 of the second system ES2, and the dashed lines show the changes in each value when a ground fault occurs in the second path LD2 of the second system ES2.
[0085] As shown by the solid line in Fig. 4, when a ground fault occurs in the second load 36 of the second system ES2, the specific fuse is blown at time t13, causing the second voltage V2 to rise. When the second voltage V2 rises to the threshold voltage Vth at time t14, the control device 40 determines that the voltage has returned to the second system ES2. Based on this determination, the control device 40 opens the inter-system switch SW at time t15. This enables the remaining loads in the second system ES2 to be used, and enables redundant power supply to the remaining loads.
[0086] On the other hand, as indicated by the dashed line in FIG. 4, if the voltage drop in the second system ES2 continues even after the ΔSOC of the storage battery 16 has increased to the threshold change amount, the inter-system switch SW is maintained in the open state.
[0087] According to the present embodiment described above in detail, the following effects can be obtained.
[0088] In this embodiment, when the first load 34 and the second load 36 are driven with the inter-system switch SW closed, a voltage drop in the first system ES1 is monitored, and when it is determined that a voltage drop has occurred, the inter-system switch SW is made conductive with the conduction current ISW of the inter-system switch SW limited for a predetermined period from the voltage drop, that is, the inter-system switch SW is made half-on. In this case, when a voltage drop occurs in the first system ES1 due to a ground fault in the first system ES1, the inter-system switch SW is made conductive for a predetermined period from the voltage drop, and a current is passed from the storage battery 16 on the second system ES2 side to the first system ES1 side, thereby cutting off the fuse FA on the first branch path LC1 connected to the load where the ground fault has occurred. As a result, only the load where the ground fault has occurred in the first system ES1 is separated from the first system ES1, and the remaining loads can be used. In addition, when the inter-system switch SW is made conductive, the conduction current ISW of the inter-system switch SW is limited, so that a voltage drop in the second system ES2 is suppressed even if the inter-system switch SW is made conductive. This ensures the operating voltage of the second load 36, and prevents the operation of the second load 36 from being hindered.
[0089] In this embodiment, the switch operation unit 24 limits the conductive current ISW of the inter-system switch SW for a predetermined period by adjusting the conductive resistance of the inter-system switch SW. By adjusting the conductive resistance of the inter-system switch SW, it is possible to limit the conductive current ISW flowing from the first system ES1 side to the second system ES2 side, and to properly cut off the fuse FA.
[0090] When the inter-system switch SW is turned on in a current-limited state due to a voltage drop in the first system ES1, the conduction current ISW flowing through the inter-system switch SW may unintentionally decrease depending on the SOC of the storage battery 16 or the deterioration state of the inter-system switch SW. In this regard, in this embodiment, the conduction resistance of the inter-system switch SW is adjusted based on the conduction current ISW flowing through the inter-system switch SW for a predetermined period of time. This makes it possible to cut off the fuse FA on the first system ES1 side as desired, regardless of the SOC of the storage battery 16 or the deterioration state of the inter-system switch SW.
[0091] In this embodiment, the conduction current ISW of the inter-system switch SW in a predetermined period is adjusted based on the SOC of the storage battery 16. As a result, when the SOC of the storage battery 16 is relatively high, the conduction current ISW is made relatively large, so that the fuse FA can be cut off early, and when the SOC of the storage battery 16 is relatively low, the conduction current ISW is made relatively small, so that the storage battery 16 can be prevented from being in an over-discharged state.
[0092] In this embodiment, when it is determined that the first voltage V1 starts to rise due to the blowing of the fuse FA and the voltage has recovered from the voltage drop, the limit on the conduction current ISW of the inter-system switch SW is released. This makes it possible to resume power supply to the remaining loads that are not affected by the ground fault at an appropriate timing after the load in the first system ES1 in which the ground fault has occurred is separated from the first system ES1.
[0093] In the first system ES1, not only a ground fault may occur in at least one of the multiple loads included in the first load 34 and the general load 30, but also a ground fault may occur in the first main path LD1 before branching into each of the first branch paths LC1. When a ground fault occurs in the first main path LD1, even if a conductive current ISW is caused to flow from the storage battery 16 on the second system ES2 side to the first system ES1 side, the fuse FA cannot be cut off, and the conductive current ISW continues to flow, unnecessarily consuming power from the storage battery 16.
[0094] In this regard, in the present embodiment, after it is determined that a voltage drop has occurred in the first system ES1, if a conduction period has elapsed without the voltage recovering from the voltage drop, the inter-system switch SW is opened. In this case, under a condition in which a ground fault has occurred in the first main path LD1, even if a conduction current ISW flows from the storage battery 16 on the second system ES2 side to the first system ES1 side, the fuse FA in the first system ES1 is not cut off, and the inter-system switch SW is opened based on the fact that the voltage does not recover. This prevents the storage battery 16 from continuing to discharge to the first system ES1 side, and thus prevents the power of the storage battery 16 from being wasted.
[0095] When limited-current current is supplied from the storage battery 16 on the second system ES2 side to the first system ES1 side, a drop in the SOC of the storage battery 16 occurs during the period in which the current is supplied. In this case, the SOC of the storage battery 16 is a parameter (discharge parameter) that can be grasped as the amount of discharge from the storage battery 16. Furthermore, depending on the state of change in the discharge parameter, it can be grasped that the discharge required for fuse blowing has been performed from the storage battery 16 during the period in which limited-current current is supplied. In this regard, in the present embodiment, it is determined that the conduction period has elapsed based on the SOC of the storage battery 16, which is a discharge parameter, so that limited-current current can be supplied within an appropriate period.
[0096] In a configuration including the power supply device 10 and the storage battery 16, when no ground fault occurs in either of the systems ES1 and ES2, the power supply device 10 and the storage battery 16 redundantly supply power to the first load 34 and the second load 36. In this configuration, when a voltage drop occurs due to a ground fault in the first system ES1, the converter 12 of the power supply device 10 stops generating voltage. This suppresses overcurrent in the converter 12, and the power supply device 10 including the converter 12 can be protected. However, in this case, the fuse FA cannot be cut off by current flow from the power supply device 10. In this regard, in the present embodiment, the system switch SW is turned on in a current limiting state, and a current flows from the storage battery 16 on the second system ES2 side to the first system ES1 side, thereby properly cutting off the fuse.
[0097] In the power supply system 100, when the inter-system switch SW is closed, a voltage drop occurs in the first system ES1 regardless of whether a ground fault occurs in the first system ES1 or the second system ES2. In this case, if a ground fault occurs in the second system ES2, it is not necessary to blow the fuse on the first system ES1 side. In this respect, in the present embodiment, when it is determined that a voltage drop has occurred in the first system ES1, the direction in which the conductive current ISW flows through the inter-system switch SW is determined, and when it is determined that the conductive current ISW flows from the first system ES1 to the second system ES2, the inter-system switch SW is opened. This allows the inter-system switch SW to be opened and closed appropriately.
[0098] (Modification of the first embodiment) Instead of determining that the conduction period has elapsed using the SOC of the storage battery 16, the switch operation unit 24 may determine that the conduction period has elapsed using the time elapsed since the voltage drop in the first system ES1. Also, a current integrated value that is an integrated value of the conduction current ISW after the voltage drop in the first system ES1 occurs may be acquired, and when this current integrated value becomes larger than a predetermined threshold integrated value, it may be determined that the conduction period has elapsed. Furthermore, when the temperature of the inter-system switch SW acquired using the temperature sensor 29 becomes higher than a threshold temperature, it may be determined that the predetermined period has elapsed.
[0099] When discharging from the storage battery 16 on the second system ES2 side to the first system ES1 side, the amount of discharge increases over time, and the current integrated value increases and the temperature of the inter-system switch SW increases in response to the increase in the amount of discharge. Therefore, by determining that a predetermined period has passed using the time elapsed since a voltage drop occurred in the first system ES1 or the increase in the current integrated value of the conduction current ISW, it is possible to prevent the storage battery 16 from becoming overdischarged. Also, by determining that a predetermined period has passed using the temperature increase of the inter-system switch SW, it is possible to prevent the storage battery 16 from becoming overdischarged, while also preventing the temperature of the inter-system switch SW from excessively rising due to an increase in the current integrated value.
[0100] Second embodiment The second embodiment will be described below with reference to FIGS. 5 and 6, focusing on the differences from the first embodiment.
[0101] As shown in Fig. 5, in this embodiment, the power supply device 10 is provided in the second system ES2. That is, in this embodiment, the power supply unit that supplies power to the first and second loads 34, 36 and the general load 30 is provided only in the second system ES2, and is not provided in the first system ES1, which is different from the first embodiment. Also, in this embodiment, the converter monitoring device 13 is not provided.
[0102] A flowchart of the control process in this embodiment is shown in Fig. 6. In Fig. 6, the same processes as those shown in Fig. 2 are given the same step numbers for convenience, and the description thereof will be omitted.
[0103] In this embodiment, since the first system ES1 is not provided with a power supply unit, when an abnormality occurs in the second system ES2, power cannot be supplied to the first load 34 on the first system ES1 side where no abnormality occurs. Therefore, when an abnormality occurs in the second system ES2, the control device 40 stops the control of the first and second loads 34, 36 without setting the second abnormality flag F2.
[0104] Specifically, in the control process of this embodiment, if it is determined in step S21 that the first abnormality flag F1 is "0", the process proceeds to step S23. If it is determined in step S24 that an abnormality has occurred in the first system ES1, the control of the first and second loads 34, 36 is stopped in step S51. In the following step S52, the driver is notified of the control stop via the notification unit 44, and this process is temporarily terminated.
[0105] The power supply system 100 described above in detail includes a second system ES2, which is a main system provided with the power supply device 10 and the storage battery 16, and a first system ES1, which is a sub-system that does not have a power supply unit. In the present embodiment, in the above configuration, when a ground fault occurs in at least one of the multiple loads included in the sub-system, the inter-system switch SW is set to a half-on state. This makes it possible to separate only the load in the sub-system where a ground fault has occurred from the sub-system while suppressing interference with the operation of the loads in the main system, and allows the remaining loads to be used.
[0106] (Other embodiments) The present invention is not limited to the above-described embodiment, and may be implemented as follows.
[0107] Each load 34, 36 may be, for example, the following devices:
[0108] The loads 34 and 36 may be a drive circuit for a vehicle that provides power for driving the vehicle. In this case, the loads 34 and 36 are, for example, a three-phase permanent magnet synchronous motor and a three-phase inverter device, respectively.
[0109] An anti-lock brake device that prevents the wheels from locking during braking may be used. In this case, each of the first and second loads 34, 36 is, for example, an ABS actuator that can independently adjust the brake hydraulic pressure during braking.
[0110] The loads 34, 36 do not necessarily have to be the same in configuration, and may be different types of devices that achieve the same function. The first and second loads 34, 36 do not have to be different loads, but may be the same load. In other words, the first and second loads 34, 36 may be the same load that receives power supply from both the first intra-system path LA1 and the second intra-system path LA2.
[0111] The loads 34, 36 may be components for realizing the same function. In this case, the first and second loads 34, 36 are, for example, an actuator of an electric power steering device and an electric power steering ECU, respectively. In this case, the electric power steering ECU may receive power supply from both the first intra-system path LA1 and the second intra-system path LA2.
[0112] In the above embodiment, the control process performed in the normal mode has been described, but the control process may be performed in the support mode. In this case, if a ground fault occurs in either the loads 30, 34 of the first system ES1 or the second load 36 of the second system ES2 during the support mode, the support mode may be continued because control using the first and second loads 34, 36 becomes possible due to the blowing of a specific fuse. On the other hand, if a ground fault occurs in the first main path LD1 of the first system ES1 or the second main path LD2 of the second system ES2, use of one of the first load 34 and the second load 36 becomes impossible, so the support mode may be switched to the normal mode.
[0113] In the above embodiment, an example in which the inter-system switch SW is a MOSFET has been described, but this is not limiting. As shown in Figs. 7(A) to (C), the inter-system switch SW may be composed of contact-switching switches (hereinafter, mechanical switches) SW1 to SW3 and resistive elements R1 and R2. In this case, as shown in Figs. 7(B) and (C), the inter-system switch SW includes a plurality of resistive elements R1 and R2 having different resistance values, so that the conduction resistance of the inter-system switch SW in the half-on state can be adjusted. The number of resistive elements R1 and R2 included in the inter-system switch SW is not limited to one or two, but may be three or more.
[0114] Also, as shown in FIG. 7D, the resistance element may be a variable resistor RA, and a mechanical switch SWA may be used to switch between a path that passes through the variable resistor RA and a path that does not pass through the variable resistor RA.
[0115] In the above embodiment, the voltage sensor 27 is provided on the second system ES2 side of the system switch SW, but the voltage sensor 27 may be provided on the first system ES1 side of the system switch SW. This makes it possible to determine that the voltage recovery in the first system ES1 has occurred based on the first voltage V1 when a ground fault occurs in the first system ES1.
[0116] In the above embodiment, the lapse of the predetermined period is determined based on the change in the discharge parameters such as the SOC of the storage battery 16. However, the present invention is not limited to this. For example, the predetermined period may be a set period that is determined in advance based on the expected discharge amount of the storage battery 16.
[0117] In the above embodiment, the control device 40 opens the inter-system switch SW after the voltage in the first and second systems ES1, ES2 is restored. However, the switch operation unit 24 may perform the opening operation.
[0118] In the above embodiment, an example has been described in which the switch operating unit 24 opens the inter-system switch SW when voltage recovery does not occur in the first and second systems ES1, ES2. However, the control device 40 may perform the opening operation.
[0119] In the above embodiment, the monitoring unit and the switch control unit are configured by hardware circuits having various built-in circuits, but the present invention is not limited to this. They may be configured by a microcomputer including a CPU, a ROM, a RAM, a flash memory, etc.
[0120] In the above embodiment, the power supply unit is a lithium ion battery, but the present invention is not limited to this. The power supply unit may be, for example, another type of battery or an electric double layer capacitor. [Explanation of symbols]
[0121] 16...storage battery, 20...power supply monitoring device, 22...monitoring section, 24...switch operation section, 34...first load, 36...second load, 100...power supply system, ES1...first system, ES2...second system, FA...fuse, SW...inter-system switch.
Claims
1. The present invention is applied to a power supply system (100) including a first system (ES1) having a first load (34) and a second system (ES2) having a second load (36), the first system and the second system being connectable to each other by an inter-system switch (SW), and a power supply unit (16) being connected to the second system, In the first system, a plurality of electric loads are connected in parallel as the first load, and a fuse (FA) is provided in a current path connected to each of the electric loads, a monitoring unit (22) that monitors a voltage drop in the first system when the first load and the second load are driven in a state in which the inter-system switch is closed; a switch operation unit (24) that, when it is determined by the monitoring unit that a voltage drop has occurred, causes the inter-system switch to be conductive in a state in which a current conducted by the inter-system switch is limited for a predetermined period from the voltage drop; A power supply monitoring device (20) comprising:
2. The inter-system switch has a configuration in which a current-carrying resistance during current-carrying is variable, 2. The power supply monitoring device according to claim 1, wherein the switch operation unit limits a conduction current of the inter-system switch by adjusting a current-carrying resistance of the inter-system switch during the predetermined period.
3. 3. The power supply monitoring device according to claim 2, wherein the switch operation unit obtains a conduction current flowing through the inter-system switch during the predetermined period, and adjusts a current-carrying resistance of the inter-system switch based on the conduction current.
4. The power supply unit includes a power storage device (16), The power supply monitoring device according to any one of claims 1 to 3, further comprising a current adjusting unit (24) that adjusts a conduction current of the inter-system switch during the predetermined period based on an SOC of the power storage device.
5. a recovery determination unit (40) that determines whether a voltage recovery from the voltage drop has occurred after the monitoring unit determines that a voltage drop has occurred; and a restoration operation unit (40) that, when it is determined by the restoration determination unit that the voltage restoration has occurred, releases the limitation on the conduction current of the inter-system switch by the switch operation unit, and restores the inter-system switch to a conductive state without current limitation.
6. 6. The power supply monitoring device according to claim 5, wherein the switch operation unit opens the inter-system switch when a predetermined conduction period has elapsed without a voltage recovery from the voltage drop after the monitoring unit has determined that a voltage drop has occurred.
7. 7. The power supply monitoring device according to claim 6, wherein after it is determined by the monitoring unit that a voltage drop has occurred, the switch operation unit determines that the conduction period has elapsed based on a discharge amount of the power supply unit and a discharge parameter that is a correlation value thereof, and opens the inter-system switch when the conduction period has elapsed without a voltage recovery from the voltage drop.
8. The power supply system includes a first power supply unit (10) connected to the first system and a second power supply unit (16) as the power supply unit connected to the second system, The first power supply unit includes a voltage converter (12) that generates an operating voltage for the first load and the second load; the second power supply unit includes a storage device (16) that can be charged by the operating voltage of the voltage converter; 8. The power supply monitoring device according to claim 1, wherein, when a voltage drop occurs in the first system, voltage generation by the voltage converter is stopped, and the switch operation unit causes the inter-system switch to be conductive while limiting a conduction current of the inter-system switch.
9. A direction determination unit (26) for determining a direction in which a conductive current flows through the inter-system switch, 9. The power supply monitoring device according to claim 8, wherein the switch operation unit opens the inter-system switch when the monitoring unit determines that a voltage drop has occurred and the direction determination unit determines that a conduction current flows from the first system to the second system.
Citation Information
Patent Citations
Power supply system for vehicle
JP2006160176A
Electronic equipment
JP2007288952A
Protection system of feeder circuit for electric propulsion device
JP2015167444A
Power supply box device for vehicle
JP2016073068A
Switch device for on-vehicle power supply and power supply device
JP2017140920A