COMMUNICATION CONTROL DEVICE, COMMUNICATION CONTROL METHOD, AND COMMUNICATION CONTROL PROGRAM

The communication control device and method address communication disruptions during edge router maintenance by coordinating DHCP-induced IP address reacquisition, minimizing downtime and load on edge routers and the L2 section.

JP7586278B2Active Publication Date: 2024-11-19NIPPON TELEGRAPH & TELEPHONE CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023500148
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-16
Publication Date
2024-11-19
Estimated Expiration
2041-02-16

AI Technical Summary

Technical Problem

Conventional edge router maintenance and replacement in carrier networks cause communication interruptions due to unicast Reverse Path Forwarding (uRPF) blocking user communications until DHCP lease timers expire, leading to prolonged downtime and increased load on edge routers and the L2 section.

Method used

A communication control device and method that acquires information on edge router switching, instructs DHCP servers to induce IP address reacquisition, and receives notifications of completion, minimizing communication disruptions by coordinating the switching process.

Benefits of technology

Reduces the impact on user communications during edge router maintenance and replacement by reducing communication interruptions and load on edge routers and the L2 section through coordinated IP address reacquisition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007586278000001
    Figure 0007586278000001
  • Figure 0007586278000002
    Figure 0007586278000002
  • Figure 0007586278000003
    Figure 0007586278000003
Patent Text Reader

Abstract

This edge control device (10) comprises: an acquisition unit (15a) that acquires information related to switching edge routers that accommodate user terminals; an instruction unit (15d) that, on the basis of the information related to switching the edge routers that is acquired by the acquisition unit (15a), instructs a Dynamic Host Configuration Protocol (DHCP) server to induce reacquisition of Internet Protocol (IP) address by the user terminals; and a reception unit (15e) that receives, from the DHCP server, a notification that the inducement of the reacquisition of IP address has been completed.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a communication control device, a communication control method, and a communication control program. [Background technology]

[0002] In a carrier network, there is a changeover ("maintenance relocation" as appropriate) of an edge router accommodating a user terminal ("user terminal" or "terminal" as appropriate) for the purpose of maintenance at the convenience of the telecommunications carrier. When switching edge routers, the setting information ("user config" as appropriate) of the accommodated user is deleted from the edge router from which the switchover originates ("source edge router" as appropriate), and the same information is then input to the edge router to which the switchover originates ("destination edge router" as appropriate). For security purposes, unicast reverse path forwarding (uRPF) may be applied to edge routers in a carrier network, and the application of uRPF is recommended by the IETF (Internet Engineering Task Force), a standardization organization for Internet-related technologies (see, for example, Non-Patent Document 1).

[0003] A conventional maintenance relocation will be described with reference to FIG. 6. FIG. 6 is a diagram for explaining a conventional maintenance relocation of an edge router. First, the edge control device 110 deletes the setting information 22 (22A, 22B, 22C, 22D) corresponding to the user terminal 30 (30A, 30B, 30C, 30D) from the source edge router 20A. Next, the edge control device 110 inputs the setting information 23 (23A, 23B, 23C, 23D), which is the same information as the setting information 22, to the destination edge router 20B. Here, the user setting information (user config) is information including the transfer setting of each user, such as information about an IP (Internet Protocol) address, a VLAN (Virtual Local Area Network), and an ACL (Access Control List). [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] NTT Communications, “Introduction of uRPF”, [online], [Retrieved February 3, 2021], Internet <https: / / www.ntt.com / business / services / network / internet-connect / ocn-business / bocn / gijyutsu / urpf.html> Summary of the Invention [Problem to be solved by the invention]

[0005] However, in the above-mentioned conventional technology, there are cases where the maintenance and relocation of edge routers in a carrier network affects user communication services. This is because, in the conventional technology, the change of the edge router cannot be detected by the terminal, and the uRPF applied to the edge router causes communication interruption until the DHCP (Dynamic Host Configuration Protocol) lease timer of the terminal expires. Although IP reachability between the destination and the terminal is normally ensured when the user configuration is input, the uRPF blocks user communication until the DHCP binding table in the edge router is updated.

[0006] A flow of conventional maintenance relocation will be described with reference to Fig. 7. Fig. 7 is a sequence diagram for explaining conventional maintenance relocation of an edge router. First, the user terminal 30 transmits a Dynamic Host Configuration Protocol version 6 (DHCPv6) request or a DHCPv6 request to the DHCP server 40 (step S201). On the other hand, the DHCP server 40 transmits a DHCPv6 advertisement or a DHCPv6 response to the user terminal 30 (step S201). At this time, the source edge router 20A relays DHCP packets between the user terminal 30 and the DHCP server 40. As a result, an IP address is assigned from the DHCP server 40 to the user terminal 30, and a lease timer indicating the validity period of the address is activated (step S202).

[0007] Next, when the maintenance relocation is started (step S203), the edge control device 110 deletes the user configuration of the switching source edge router 20A (step S204) and sets the user configuration of the switching destination edge router 20B (step S205). Note that the reason why the edge control device 110 needs to delete the user configuration of the switching source edge router 20A is that if user configurations are duplicated in multiple edge routers, multicast duplicate delivery, DHCP relay in multiple edges, etc. may occur.

[0008] Then, after the lease timer (T1) has elapsed, the user terminal 30 relays the DHCP update through the edge router 20 (steps S206, S207). At this time, since the user configuration of the source edge router 20A has been deleted, the destination edge router 20B relays the DHCP packet. As a result, the DHCP binding table of the destination edge router 20B is updated (step S208), and the IP address is reassigned. Here, if there are many user terminals 30, the multicast reacquisition request may increase the load on the edge router or temporarily constrict the L2 (Layer 2) section.

[0009] As mentioned above, conventional maintenance relocation has the problem of prolonged communication interruption because the switchover is triggered by an address reacquisition request issued after the lease timer expires. In addition, there are problems such as increased load on edge routers and pressure on the L2 section due to a large number of DHCP address reacquisition request messages from multiple terminals. [Means for solving the problem]

[0010] In order to solve the above-mentioned problems and achieve the objective, the communication control device of the present invention is characterized in that it comprises an acquisition unit that acquires information regarding the switching of an edge router that accommodates a user's terminal, an instruction unit that instructs a DHCP server to induce the terminal to re-acquire an IP address based on the information regarding the switching acquired by the acquisition unit, and a reception unit that accepts a notification from the DHCP server that the induction of the re-acquisition has been completed.

[0011] Furthermore, a communication control method according to the present invention is a communication control method executed by a communication control device, and is characterized in that it includes an acquisition step of acquiring information regarding switching of an edge router accommodating a user's terminal, an instruction step of instructing a DHCP server to induce the terminal to re-acquire an IP address based on the information regarding the switching acquired by the acquisition step, and a reception step of receiving a notification from the DHCP server that the induction of the re-acquisition has been completed.

[0012] In addition, the communication control program of the present invention is characterized in that it causes a computer to execute an acquisition step of acquiring information regarding switching of an edge router that accommodates a user's terminal, an instruction step of instructing a DHCP server to induce the terminal to re-acquire an IP address based on the information regarding the switching acquired by the acquisition step, and a reception step of receiving a notification from the DHCP server that the induction of the re-acquisition has been completed. Effect of the Invention

[0013] According to the present invention, the impact on user communication services can be further reduced during maintenance relocation of an edge router in a carrier network. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of an edge control system according to the first embodiment. [Diagram 2] FIG. 2 is a block diagram illustrating an example of the configuration of the edge control device according to the first embodiment. [Diagram 3] FIG. 3 is a diagram showing a specific example of an address re-acquisition inducement instruction method according to the first embodiment. [Figure 4] FIG. 4 is a sequence diagram showing an example of the overall flow of edge control processing according to the first embodiment. [Diagram 5] FIG. 5 is a diagram illustrating a computer that executes a program. [Figure 6] FIG. 6 is a diagram for explaining the maintenance relocation of a conventional edge router. [Figure 7] FIG. 7 is a sequence diagram for explaining the maintenance relocation of a conventional edge router. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of an edge control device (or communication control device), an edge control method (or communication control method), and an edge control program (or communication control program) according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiment described below.

[0016] [First embodiment] Below, we will explain the configuration of the edge control system related to the first embodiment (or, as appropriate, this embodiment), the configuration of the edge control device, a specific example of an address re-acquisition induction instruction method, and the overall flow of the edge control processing, and finally explain the effects of this embodiment.

[0017] [Edge control system configuration] The configuration of an edge control system (this system, as appropriate) 100 according to this embodiment will be described in detail with reference to FIG. 1. FIG. 1 is a diagram showing a configuration example of an edge control system according to a first embodiment. This system 100 has an edge control device 10, edge routers 20 (20A, 20B), user terminals 30 (30A, 30B, 30C, 30D), a DHCP server 40, a user DB (database) 50 (50A, 50B), and a communication network 60 consisting of a core network 60A and an access network 60B. Here, the edge control device 10, the edge router 20, the user terminal 30, the DHCP server 40, and the user DB 50 are connected to each other via the communication network 60 or a predetermined communication network (not shown) so as to be able to communicate with each other by wire or wirelessly. Note that the edge control system 100 shown in FIG. 1 may include a plurality of edge control devices 10 and a plurality of DHCP servers 40.

[0018] The edge control device 10 has a user DB 50A that manages user information, and inputs a user configuration 21 to the edge router 20 (see FIG. 1(1)). In FIG. 1, the edge control device 10 inputs the user configuration 21 to the edge router 20B, but it is also possible to input the user configuration 21 to the edge router 20A. Also, a link interface is introduced between the edge control device 10 and the DHCP server, and the edge control device 10 and the DHCP server can transmit and receive various information to each other (see FIG. 1(2)).

[0019] The DHCP server 40 assigns an address to the user terminal 30 (see FIG. 1(3)). The DHCP server 40 also has a DB 40B that manages user information, and communicates with the user terminal 30 after identifying the user (see FIG. 1(4)). When identifying the user, the DHCP server 40 refers to the IP, DHCP option values, etc.

[0020] The edge router 20 applies uRPF for security reasons (see FIG. 1(5)). The edge router 20 also relays DHCP packets (see FIG. 1(6)). Each edge router belongs to the same broadcast domain. Details of the edge control process by the edge control device 10 will be described later in [Overall flow of edge control process].

[0021] In the edge control system 100 according to this embodiment, a cooperation interface is provided in the edge control device 10 that controls the edge router 20 and the DHCP server 40, making it possible for the edge control device 10 to instruct the DHCP server 40 to induce address re-acquisition. The DHCP server 40 sends an address re-acquisition inducement message to the user terminal 30 based on the instruction. For this reason, we propose a switching procedure (sequence) for the edge router 20 that can minimize communication interruptions in user communications, including inducing the user terminal 30 to re-acquire an address through cooperation between the edge control device 10 and the DHCP server 40.

[0022] Furthermore, the system 100 has a function that allows the edge control device 10 to set the target users and the time interval of the instruction when instructing address reacquisition. Therefore, by limiting the target users (by device, by LAG (Link Aggregation Group), or by user) and adjusting the time interval of the message, it is possible to reduce the burst load caused by DHCP address reacquisition messages on the edge router 20 and the L2 section.

[0023] [Edge control device configuration] The configuration of the edge control device 10 according to this embodiment will be described in detail with reference to Fig. 2. Fig. 2 is a block diagram showing an example of the configuration of the edge control device according to this embodiment. The edge control device 10 has an input unit 11, an output unit 12, a communication unit 13, a storage unit 14, and a control unit 15.

[0024] The input unit 11 controls the input of various information to the edge control device 10. The input unit 11 is, for example, a mouse or a keyboard, and accepts input of setting information and the like to the edge control device 10. The output unit 12 controls the output of various information from the edge control device 10. The output unit 12 is, for example, a display, and outputs the setting information and the like stored in the edge control device 10.

[0025] The communication unit 13 is responsible for data communication with other devices. For example, the communication unit 13 performs data communication with each communication device. The communication unit 13 can also perform data communication with an operator's terminal (not shown).

[0026] The storage unit 14 stores various information referenced when the control unit 15 operates and various information acquired when the control unit 15 operates. Here, the storage unit 14 is, for example, a semiconductor memory element such as a random access memory (RAM) or a flash memory, or a storage device such as a hard disk or an optical disk. Note that, in the example of Fig. 2, the storage unit 14 is installed inside the edge control device 10, but it may be installed outside the edge control device 10, or multiple storage units may be installed.

[0027] The control unit 15 controls the entire edge control device 10. The control unit 15 has an acquisition unit 15a, a setting unit 15b, an input unit 15c, an instruction unit 15d, a reception unit 15e, and a deletion unit 15f. Here, the control unit 15 is, for example, an electronic circuit such as a CPU (Central Processing Unit) or an MPU (Micro Processing Unit), or an integrated circuit such as an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array).

[0028] The acquiring unit 15a acquires information related to switching of the edge router 20A accommodating the user terminal 30. For example, the acquiring unit 15a acquires, as the information related to switching, information on the switching source edge router 20A, information on the accommodated user terminal 30, information on the switching destination edge router 20B, the purpose of edge router switching, the scheduled switching start time, the scheduled switching end time, etc. Meanwhile, the acquiring unit 15a may store the acquired information related to switching in the storage unit 14.

[0029] When the acquiring unit 15a acquires information regarding switching, the setting unit 15b sets the edge router 20A to block DHCP packets and cancel multicast communication. For example, when the setting unit 15b acquires information regarding maintenance relocation of the edge router 20A as the purpose of edge router switching, the setting unit 15b sets the edge router 20A to block DHCP packets and cancel multicast distribution.

[0030] When the setting unit 15b sets blocking of DHCP packets and cancellation of multicast communication, the input unit 15c inputs user setting information to the switching destination edge router 20B. For example, when the input unit 15c sets blocking of DHCP packets and cancellation of multicast distribution to the switching source edge router 20A for maintenance relocation, the input unit 15c inputs information on individual user transfer settings such as IP address settings, VLAN, and ACL to the switching destination edge router 20B for maintenance relocation.

[0031] The instruction unit 15d instructs the DHCP server 40 to induce the user's terminal 30 to reacquire an IP address based on the information on switching acquired by the acquisition unit 15a. For example, the instruction unit 15d instructs the user's terminal 30 to induce reacquisition of an IP address for each predetermined unit at a predetermined time interval. The instruction unit 15d also instructs the user's terminal 30 to induce reacquisition of an IP address for each device, LAG, or user. Note that the address reacquisition inducement instruction process by the instruction unit 15d will be described in detail later in [Address reacquisition inducement instruction method].

[0032] The reception unit 15e receives a notification from the DHCP server 40 that the user's terminal 30 has completed the inducement to reacquire an IP address. For example, when the DHCP server 40 transmits a DHCPv6 reconfiguration to the user's terminal 30, the reception unit 15e receives a notification transmitted from the DHCP server 40 to the edge control device 10 that the inducement to reacquire an IP address has completed.

[0033] When the reception unit 15e receives a notification that the induction of reacquisition of an IP address by the user terminal 30 has been completed, the deletion unit 15f deletes the user's setting information from the source edge router 20A. For example, the deletion unit 15f deletes information on individual user's forwarding settings such as the IP address setting, VLAN, and ACL of the user's terminal 30 stored in the source edge router 20A for maintenance relocation.

[0034] [Address reacquisition trigger instruction method] The address re-acquisition inducement instruction method according to the present embodiment will be described in detail with reference to Fig. 3. Fig. 3 is a diagram showing a specific example of the address re-acquisition inducement instruction method according to the first embodiment. Fig. 3 shows instruction method 1, instruction method 2, and instruction method 3 as the address re-acquisition inducement instruction method, but is not particularly limited.

[0035] First, the instruction unit 15d of the edge control device 10 acquires information on users related to the maintenance relocation from the user DB 50A. At this time, the instruction unit 15d acquires user identifiers {user identifier 1, user identifier 2, ... user identifier N} corresponding to the number N of users as the user information, and generates a re-acquisition inducement instruction message based on the user identifiers in the following manner. Note that the setting related to the method of the re-acquisition inducement instruction message generated by the instruction unit 15d can be changed statically or dynamically.

[0036] In instruction method 1, instruction unit 15d transmits instruction messages including one user per message to DHCP server 40. In instruction method 1 of FIG. 3, three instruction messages corresponding to user 1, user 2, and user 3 are transmitted. The time intervals for transmitting each message can be set arbitrarily (see instruction method 1 of FIG. 3). For example, instruction unit 15d transmits instruction messages using instruction method 1 when targeting individual users or when leveling the flow rate of reacquired packets to the L2 section.

[0037] In the instruction method 2, the instruction unit 15d transmits an instruction message including multiple users per message to the DHCP server 40. In the instruction method 2 of Fig. 3, one instruction message including all of {user 1, user 2, user 3, ...} is transmitted (see instruction method 2 of Fig. 3). For example, in order to reduce the load on the edge control device 10, when instructing multiple target users collectively, the instruction unit 15d transmits an instruction message using the instruction method 2.

[0038] In instruction method 3, instruction unit 15d transmits a plurality of instruction messages including a plurality of users to DHCP server 40. In instruction method 3 of Fig. 3, two instruction messages corresponding to {user 1, user 2, ...} and {user 10, user 11, ...} are transmitted. The time interval for transmitting each message can be set arbitrarily (see instruction method 3 of Fig. 3). When instruction unit 15d is to issue an instruction as a compromise between instruction methods 1 and 2, it transmits an instruction message using instruction method 3.

[0039] As described above, in the edge control system 100 according to this embodiment, the edge control device 10 has a function of designating a target user in a reacquisition inducement instruction from the edge control device 10 to the DHCP server 40, and can send an instruction message at any user unit and time interval. Also, in this system 100, the opposing DHCP server 40 can induce a designated user to reacquire. Furthermore, the edge control device 10 can reduce the burst load caused by DHCP address reacquisition messages on the edge router and L2 section by limiting the target users (for example, by device unit, LAG unit, or user unit) and adjusting the time interval of the message.

[0040] [Overall flow of edge control processing] The entire flow of the edge control process according to this embodiment will be described in detail with reference to Fig. 4. Fig. 4 is a sequence diagram showing an example of the entire flow of the edge control process according to the first embodiment. Here, a link interface is introduced between the edge control device 10 and the DHCP server 40. The link interface enables the edge control device 10 to issue an address re-acquisition inducement instruction to the DHCP server 40, enables the DHCP server 40 to issue an address re-acquisition inducement completion notification to the edge control device 10, and enables the edge control device 10 and the DHCP server 40 to mutually acquire lease timer information.

[0041] First, the user terminal 30 transmits a Dynamic Host Configuration Protocol version 6 (DHCPv6) request or a DHCPv6 request to the DHCP server 40 (step S101). On the other hand, the DHCP server 40 transmits a DHCPv6 advertisement or a DHCPv6 response to the user terminal 30 (step S101). At this time, the switching source edge router 20A relays DHCP packets between the user terminal 30 and the DHCP server 40. As a result, an IP address is assigned from the DHCP server 40 to the user terminal 30, and a lease timer indicating the validity period of the address is activated (step S102).

[0042] Next, the acquisition unit 15a of the edge control device 10 acquires information about the maintenance relocation and starts the maintenance relocation (step S103). The setting unit 15b of the edge control device 10 sets the source edge router 20A to block DHCP packets (DHCP blocking filter setting) (step S104). The setting unit 15b also sets the source edge router 20A to cancel multicast communication (multicast setting deletion) (step S105).

[0043] In steps S104 and S105, the setting unit 15b sets a filter that blocks DHCP packets without deleting the user configuration, and deletes the multicast setting, thereby preventing DHCP relay and multicast distribution from the source edge router 20A. Note that the processes of steps S104 and S105 may be performed simultaneously. Also, the process of step S105 may be performed prior to the process of step S104.

[0044] Next, the input unit 15c of the edge control device 10 inputs the user's setting information (user configuration setting) to the switching destination edge router 20B (step S106). At this time, since DHCP blocking and multicast setting deletion have been performed in advance, there is no adverse effect even if the user configuration is input to multiple edge routers. For example, in the above process, there is no pressure on the network bandwidth or unexpected operation on the terminal side due to multiplexed distribution of video and the like from multiple edge routers to the terminal.

[0045] Then, the instruction unit 15d of the edge control device 10 instructs the DHCP server 40 to induce the user terminal 30 to reacquire an IP address (reacquisition inducement instruction) (step S107). At this time, the inducement instructed by the instruction unit 15d is "FORCERENEW (RFC3203)" in DHCPv4 (Dynamic Host Configuration Protocol version 4) and "RECONFIGURE (RFC3315)" in DHCPv6, but is not particularly limited.

[0046] On the other hand, the DHCP server 40 that has received the reacquisition inducement instruction transmits a DHCPv6 reconfiguration to the user terminal 30 (step S108). The user terminal 30 then transmits a DHCPv6 update to the source edge router 20A to reacquire the address (step S109). At this time, due to the reacquisition inducement from the DHCP server 40, the user terminal 30 will ignore the lease timer expiration time and issue an address reacquisition request. Note that since a DHCP blocking filter is set in the source edge router 20A, a temporary communication interruption occurs.

[0047] The user terminal 30 also transmits a DHCPv6 update to the destination edge router 20B to reacquire the address (step S110). At this time, since the source edge router 20A has a DHCP blocking filter set, the destination edge router 20B relays the DHCP packet. As a result, the DHCP binding table of the destination edge router 20B is updated (step S111), the IP address is assigned again, and the temporary communication interruption is resolved.

[0048] Finally, the reception unit 15e of the edge control device 10 receives a notification (reacquisition inducement completion notification) from the DHCP server 40 that the inducement of reacquisition of an IP address by the user's terminal 30 has been completed (step S112). The deletion unit 15f of the edge control device 10 deletes the user's setting information (user config deletion) from the source edge router 20A (step S113) and ends the process. At this time, after the user's accommodation edge router is switched, the deletion unit 15f deletes the user config from the source edge router 20A, thereby minimizing the period of communication interruption.

[0049] As described above, in the edge control system 100 according to this embodiment, the edge control device 10 and the DHCP server 40 cooperate to instruct the user terminal 30 to induce address reacquisition, thereby minimizing the impact on the service to the user during maintenance relocation. In addition, the edge control device 10 and the DHCP server 40 cooperate to enable DHCP address reacquisition induction at any timing, so that the terminal lease timer can be ignored and the relocation can be forcibly completed from the network side.

[0050] [Advantages of the First Embodiment] First, in the edge control process according to the present embodiment described above, information on switching of an edge router that accommodates a user terminal is acquired, and based on the acquired information on switching of the edge router, an instruction is given to a DHCP server to induce the user terminal to reacquire an IP address, and a notification is received from the DHCP server that the inducement of reacquisition has been completed. Therefore, in this process, the impact on user communication services can be further reduced when an edge router in a carrier network is relocated for maintenance.

[0051] Secondly, in the edge control process according to the embodiment described above, when information on edge router switching is acquired, the source edge router is set to block DHCP packets and disable multicast communication, and when DHCP packet blocking and the disablement of multicast communication are set, the user's setting information is input to the destination edge router, and when notification is received that the user's terminal has been induced to reacquire an IP address, the user's setting information is deleted from the source edge router. Therefore, in this process, when an edge router in a carrier network is relocated for maintenance, it is possible to reduce the occurrence of adverse effects on communications caused by the edge router and further reduce the impact on user communications services.

[0052] Thirdly, in the edge control process according to the present embodiment described above, the user terminal is prompted to reacquire an IP address for each predetermined unit at a predetermined time interval. Therefore, in this process, when an edge router in a carrier network is relocated for maintenance, the load on the edge router due to a large number of address reacquisition requests and the pressure on the L2 section can be reduced, and the impact on user communication services can be further reduced.

[0053] Fourth, in the edge control process according to the present embodiment described above, the triggering of IP address reacquisition by the user terminal is instructed for each device, LAG, or user. Therefore, in this process, in the maintenance relocation of the edge router of the carrier network, the increase in the load on the edge router and the pressure on the L2 section due to a large number of address reacquisition requests can be more effectively reduced, and the impact on the service of user communication can be further reduced.

[0054] [System configuration, etc.] Each component of each device shown in the figures according to the above embodiment is a functional concept, and does not necessarily have to be physically configured as shown in the figures. In other words, the specific form of distribution and integration of each device is not limited to that shown in the figures, and all or a part of them can be functionally or physically distributed and integrated in any unit according to various loads, usage conditions, etc. Furthermore, each processing function performed by each device can be realized in whole or in any part by a CPU and a program analyzed and executed by the CPU, or can be realized as hardware using wired logic.

[0055] Furthermore, among the processes described in the above embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically by a known method. In addition, the information including the processing procedures, control procedures, specific names, various data and parameters shown in the above documents and drawings can be changed arbitrarily unless otherwise specified.

[0056] 〔program〕 It is also possible to create a program in which the processes executed by the edge control device 10 described in the above embodiment are written in a language executable by a computer. In this case, the same effects as those of the above embodiment can be obtained by having the computer execute the program. Furthermore, such a program may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read and executed by a computer to realize the same processes as those of the above embodiment.

[0057] Fig. 5 is a diagram showing a computer that executes a program. As shown in Fig. 5, a computer 1000 includes, for example, a memory 1010, a CPU 1020, a hard disk drive interface 1030, a disk drive interface 1040, a serial port interface 1050, a video adapter 1060, and a network interface 1070, and these components are connected by a bus 1080.

[0058] The memory 1010 includes a ROM (Read Only Memory) 1011 and a RAM 1012, as exemplified in FIG. 5. The ROM 1011 stores a boot program such as a BIOS (Basic Input Output System). The hard disk drive interface 1030 is connected to a hard disk drive 1090, as exemplified in FIG. 5. The disk drive interface 1040 is connected to a disk drive 1100, as exemplified in FIG. 5. For example, a removable storage medium such as a magnetic disk or an optical disk is inserted into the disk drive 1100. The serial port interface 1050 is connected to, for example, a mouse 1110 and a keyboard 1120, as exemplified in FIG. The video adapter 1060 is connected to, for example, a display 1130, as exemplified in FIG. 5.

[0059] 5, the hard disk drive 1090 stores, for example, an OS 1091, an application program 1092, a program module 1093, and program data 1094. That is, the above programs are stored in, for example, the hard disk drive 1090 as program modules in which instructions to be executed by the computer 1000 are written.

[0060] Furthermore, the various data described in the above embodiment are stored as program data, for example, in the memory 1010 or the hard disk drive 1090. Then, the CPU 1020 reads out the program module 1093 and the program data 1094 stored in the memory 1010 or the hard disk drive 1090 into the RAM 1012 as necessary, and executes various processing procedures.

[0061] Note that the program module 1093 and program data 1094 relating to the program are not limited to being stored in the hard disk drive 1090, and may be stored in, for example, a removable storage medium and read by the CPU 1020 via a disk drive or the like. Alternatively, the program module 1093 and program data 1094 relating to the program may be stored in another computer connected via a network (such as a local area network (LAN) or wide area network (WAN)) and read by the CPU 1020 via the network interface 1070.

[0062] The above-described embodiments and their modifications are included in the technology disclosed in this application, as well as in the scope of the invention described in the claims and their equivalents. [Explanation of symbols]

[0063] 10, 110 Edge control device (communication control device) 11 Input section 12 Output section 13. Communications Department 14 Storage section 15 Control section 15a Acquisition part 15b Setting section 15c Input part 15d Instruction section 15e Reception 15f Deleted section 20, 20A, 20B Edge Router 21, 22, 22A, 22B, 22C, 22D, 23, 23A, 23B, 23C, 23D User setting information (user configuration) 30, 30A, 30B, 30C, 30D User terminal 40 DHCP Server 50, 50A, 50B User DB 60, 60A, 60B communication network 100 Edge Control System

Claims

1. an acquisition unit that acquires information regarding switching of an edge router that accommodates a user terminal; a setting unit that sets the edge router from which the switch is to be made to block DHCP (Dynamic Host Configuration Protocol) packets and cancel multicast communication when the acquisition unit acquires information regarding the switch; an input unit that inputs the user's setting information to a destination edge router when the setting unit sets blocking of the DHCP packet and cancellation of the multicast communication; an instruction unit that instructs a DHCP server to induce the terminal to reacquire an IP (Internet Protocol) address based on the information related to the switching acquired by the acquisition unit; a reception unit that receives a notification from the DHCP server that the re-acquisition invitation has been completed; a deletion unit that deletes the setting information of the user from the switching source edge router when the reception unit receives the notification of completion; A communication control device comprising:

2. The communication control device according to claim 1 , wherein the instruction unit issues an instruction to induce re-acquisition at predetermined intervals in predetermined units.

3. The communication control device according to claim 2 , wherein the instruction unit instructs the triggering of the reacquisition for each device, each LAG (Link Aggregation Group), or each user.

4. A communication control method executed by a communication control device, An acquisition step of acquiring information regarding switching of an edge router that accommodates a user terminal; a setting step of setting the switching source edge router to block DHCP packets and cancel multicast communication when the acquisition step acquires information about the switching; an input step of inputting the user's setting information to a destination edge router when the setting step sets blocking of the DHCP packet and cancellation of the multicast communication; an instruction step of instructing a DHCP server to induce the terminal to reacquire an IP address based on the information related to the switching acquired by the acquisition step; a receiving step of receiving a notification from the DHCP server that the re-acquisition invitation has been completed; a deletion step of deleting the setting information of the user from the switching source edge router when the receiving step receives the notification of completion; A communication control method comprising:

5. An acquisition step of acquiring information regarding switching of an edge router that accommodates a user terminal; a setting step of setting the switching source edge router to block DHCP packets and cancel multicast communication when the acquisition step acquires information regarding the switching; an input step of inputting the user's setting information to a destination edge router when the setting step sets blocking of the DHCP packet and cancellation of the multicast communication; an instruction step of instructing a DHCP server to induce the terminal to reacquire an IP address based on the information related to the switching acquired by the acquisition step; a receiving step of receiving a notification from the DHCP server that the re-acquisition inducement has been completed; a deletion step of deleting the setting information of the user from the switching source edge router when the notification of completion of the receiving step is received; A communication control program that causes a computer to execute the above.

Citation Information

Patent Citations

  • Network system and communication recovery method

    JP2012175199A

  • Communication system, router device, and router switchover method

    JP2013046176A

  • Packet transmission equipment, communication network system and address allocation confirmation method

    JP2017017631A