High-voltage substation equipment abnormality response system
The system distinguishes between internal and external causes of high-voltage equipment abnormalities, optimizing response by identifying external wide-area factors and reducing unnecessary responder dispatch, ensuring efficient handling of equipment issues.
Patent Information
- Application Number
- JP2024076316
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-10-26
- Filing Date
- 2024-05-09
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-09-25
AI Technical Summary
Existing systems fail to distinguish between abnormalities in high-voltage power receiving and transforming equipment caused by internal or external factors, leading to unnecessary dispatch of responders when the issue is due to external wide-area factors.
A system that acquires abnormality information from multiple high-voltage power receiving and transforming facilities, determines whether the cause is an external wide-area factor, and performs individual or exception processing accordingly, including engineer notification and response handling based on location, schedule, and response history.
Enables accurate identification of external wide-area factors, reducing unnecessary responder dispatch and optimizing response strategies, ensuring timely and efficient handling of equipment abnormalities.
Smart Images

Figure 0007587079000001 
Figure 0007587079000002 
Figure 0007587079000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a system for taking different measures when an abnormality occurs in a high-voltage substation equipment, depending on whether the abnormality is specific to the equipment or not, and whether the abnormality is caused by an external wide-area factor that is a common factor to multiple high-voltage substation equipment across multiple different business sites. In relation to this, the invention also includes an invention relating to a method for operating the system, which is a computer, and a program that can be read and operated by the system, which is a computer. [Background technology]
[0002] When a building receives power, a high-voltage substation (e.g., a cubicle) is installed, and the 6600V power received is converted to 100 or 200V within the high-voltage substation and distributed to the factory, building, or facility. If the high-voltage substation becomes abnormal, the factory equipment may stop, or the building or facility may experience a power outage, causing the lighting, air conditioning, elevators, and other building equipment to stop, causing inconvenience to the people in the building or facility, so a prompt recovery is necessary. Even if an emergency power generation facility is installed as a disaster prevention power source, the disaster prevention equipment is thought to only last about two hours as stipulated in the Fire Service Act. In order to quickly identify abnormalities in order to quickly restore power, monitoring devices are installed to monitor the status of the high-voltage substation (power outages, leakage currents, temperature abnormalities, etc.) and are monitored 24 hours a day. When an abnormality occurs, personnel are dispatched to deal with it.
[0003] Patent Document 1 discloses a responder allocation system that selects a responder when a malfunction occurs in equipment, not limited to high-voltage substation equipment installed in a building, such as an elevator, based on the distance from the location of the malfunction, the means of transportation, and whether or not there is any work in progress (including whether it can be interrupted). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent Publication No. 2018-45416 Summary of the Invention [Problem to be solved by the invention]
[0005] The invention described in Patent Document 1 is intended to respond to all faults reported to a monitoring center. When an abnormality occurs in a building or facility, there are cases where the abnormality occurs only in the equipment installed in that building or facility, and cases where there is no abnormality in the equipment, but the abnormality occurs due to a reason outside the building or facility (for example, a power outage caused by a substation accident). In the latter case, if the abnormality occurs due to a cause outside the building or facility in which the equipment with the abnormality is installed, the abnormality cannot be resolved even if a responder is dispatched to the site. In other words, there is a problem in that the dispatch of the responder is wasted.
[0006] Therefore, the present invention provides a high-voltage substation equipment abnormality response system that does not dispatch an engineer urgently when an abnormality is reported in a high-voltage substation equipment among the equipment installed in a building or facility, if the abnormality is not due to a cause specific to the high-voltage substation equipment but due to an external wide-area cause. If the abnormality is due to an inherent cause, i.e., the high-voltage substation equipment, it will respond. For example, elevators, automatic doors, air conditioning equipment, etc. can clearly distinguish whether the abnormality is due to a power outage or an inherent cause, i.e., a problem with the equipment itself, and send information to a monitoring device, but high-voltage substation equipment has the function of distributing power itself, so it cannot clearly distinguish between the two and send information to a monitoring center, etc. In other words, there is a problem that information on whether the abnormality is due to an inherent cause or an external wide-area cause cannot be provided to a monitoring center, etc. connected via the Internet, etc. [Means for solving the problem]
[0007] In order to solve the above problems related to the high-voltage substation equipment abnormality response system, the present application provides, as a first invention, An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor that is not an external / wide-area factor; an individual processing unit (C) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; an exception processing unit (D) that performs an exception process, which is a process different from the individual process, when it is determined that the abnormality information is generated due to an external wide-area factor; The present invention provides a system for responding to abnormalities in high-voltage substation equipment, comprising: a) a system for responding to abnormalities in high-voltage substation equipment, the system having a structure as described above, comprising: a) a system for responding to abnormalities in high-voltage substation equipment, the system receiving operation status information, particularly information indicating an abnormality, from a large number of high-voltage substation equipment via a communication network such as the Internet, and the system determining, separately from the high-voltage substation equipment, whether the abnormality is due to a cause specific to the high-voltage substation equipment, or due to an external wide-area factor not specific to the high-voltage substation equipment.
[0008] As the second invention, An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor that is not an external / wide-area factor; an engineer notification processing unit (E) that performs processing including a response notification, which is a notification to a dispatched engineer (whether an individual, a corporation, or an organization; the same applies below) to respond to the abnormality of the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor, to head to the abnormal high voltage substation equipment; an exception processing unit (D) that performs an exception process, which is a process different from the process including the response notification, when it is determined that the abnormality information is generated due to an external wide-area factor; a high-voltage substation equipment information storage unit (G) that stores high-voltage substation equipment information that associates high-voltage substation equipment identification information with high-voltage substation equipment attribute information including high-voltage substation equipment location information that is information indicating the geographical location of the high-voltage substation equipment; The present invention provides a system for responding to abnormalities in high-voltage substation equipment.
[0009] As the third invention, based on the second invention, A technician location information storage unit (H1) that stores technician identification information, which is information for identifying a technician, and technician location information, which is information indicating the location of the technician, in association with each other; A technician location dependent responder determination rule storage unit (J1) for storing technician location dependent responder determination rules, which are rules for determining a responder based on technician location information, as described below; having The engineer notification processing unit (E) provides a high-voltage substation equipment anomaly response system having a location-dependent response notification processing means (K1) that determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, and the retained engineer location-dependent response decision rule, and performs processing including response notification.
[0010] As a fourth invention, based on either the second invention or the third invention, A technician location information storage unit (H1) that stores technician identification information, which is information for identifying a technician, and technician location information, which is information indicating the location of the technician, in association with each other; A travel time dependent responder determination rule storage unit (J2) for storing a travel time dependent responder determination rule, which is a rule for determining a responder described later based on a travel time to an abnormally high voltage substation equipment calculated from engineer location information; having The engineer notification processing unit (E) provides a high-voltage substation equipment anomaly response system having a travel time dependent response notification processing means (K2) that determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, and the retained travel time dependent response person determination rule, and performs processing including response notification.
[0011] As a fifth invention, based on any one of the second to fourth inventions, A technician schedule information storage unit (H2) that stores technician identification information, which is information for identifying a technician, and technician schedule information, which is information showing the technician's schedule, in association with each other; A schedule-dependent responder determination rule storage unit (J3) for storing schedule-dependent responder determination rules, which are rules for determining responders based on engineer schedule information, as described below; having The engineer notification processing unit (E) provides a high-voltage substation equipment abnormality response system having a schedule-dependent response notification processing means (K3) that determines an engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer schedule information, and the retained schedule-dependent response person determination rule, and performs processing including response notification.
[0012] As a sixth invention, based on any one of the second to fifth inventions, A technician location information storage unit (H1) that stores technician identification information, which is information for identifying a technician, and technician location information, which is information indicating the location of the technician, in association with each other; A technician schedule information storage unit (H2) that stores technician identification information, which is information for identifying a technician, and technician schedule information, which is information showing the technician's schedule, in association with each other; A location schedule dependent responder determination rule storage unit (J4) for storing location schedule dependent responder determination rules, which are rules for determining responders based on engineer location information and engineer schedule information, as described below; having The engineer notification processing unit (E) provides a high-voltage substation equipment anomaly response system having a location schedule dependent response notification processing means (K4) which determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, the retained engineer schedule information, and the retained location schedule dependent response decision rule, and performs processing including response notification.
[0013] As a seventh invention, based on any one of the second to sixth inventions, A technician response history information storage unit (H3) that stores technician identification information, which is information for identifying a technician, and technician response history information, which is information showing the technician's past response history, in association with each other; A response history dependent responder determination rule storage unit (J5) for storing a response history dependent responder determination rule, which is a rule for determining a responder based on the response history information of the engineer, as described below; having The engineer notification processing unit (E) provides a high-voltage substation equipment abnormality response system having a response history-dependent response notification processing means (K5) that determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained response history information, and the retained response history-dependent response decision rule, and performs processing including response notification.
[0014] As an eighth invention, An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor that is not an external / wide-area factor; an individual processing unit (C) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; an exception processing unit (D) that performs an exception process, which is a process different from the individual process, when it is determined that the abnormality information is generated due to an external wide-area factor; an external wide-area factor termination determination unit (L) for determining whether the external wide-area factor has terminated; The present invention provides a system for responding to abnormalities in high-voltage substation equipment.
[0015] Furthermore, there are also provided a method for operating the high-voltage substation equipment abnormality response system, which is the computer of the first to eighth aspects of the present invention, and a program for causing the high-voltage substation equipment abnormality response system, which is the computer, to execute the method. The program may also be recorded on a recording medium. Effect of the Invention
[0016] The high-voltage substation equipment anomaly response system of the present invention having the above configuration can appropriately select the process for response depending on whether the anomaly is specific to the high-voltage substation equipment from which the anomaly information was sent, that is, whether the anomaly is due to an external wide-area factor that is a factor common to multiple high-voltage substation equipment across multiple different business sites. In other words, it is possible to provide a high-voltage substation equipment anomaly response system that does not need to dispatch responders unnecessarily. [Brief description of the drawings]
[0017] [Figure 1] Schematic diagram of the overall configuration of the system of the present invention. [Diagram 2] A schematic diagram of a hardware configuration according to an embodiment of the present invention. [Diagram 3] Functional block diagram of the invention according to embodiment 1 of the present invention. [Figure 4] Example of a screen display according to the first embodiment of the present invention: Obtaining abnormality information [Diagram 5] FIG. 1 is an operation flowchart of the invention according to the first embodiment of the present invention. [Figure 6] Hardware diagram of the invention according to embodiment 1 of the present invention [Figure 7] Functional block diagram of the invention according to embodiment 2 of the present invention. [Figure 8] Screen display example of the invention according to embodiment 1 of the present invention: Response candidate [Figure 9] Screen display example of the invention according to the first embodiment of the present invention: route guidance [Figure 10] FIG. 11 is an operation flowchart of the invention according to the second embodiment of the present invention. [Figure 11] Hardware diagram of the invention according to the second embodiment of the present invention [Figure 12] Functional block diagram of the invention according to embodiment 3 of the present invention. [Figure 13] FIG. 11 is an operation flowchart of the invention according to the third embodiment of the present invention. [Figure 14] Hardware diagram of the invention according to the third embodiment of the present invention. [Figure 15] Functional block diagram of the invention according to embodiment 4 of the present invention. [Figure 16] FIG. 11 is an operation flowchart of the invention according to the fourth embodiment of the present invention. [Figure 17] Hardware diagram of the invention according to embodiment 4 of the present invention [Figure 18] Functional block diagram of the invention according to embodiment 5 of the present invention. [Figure 19] Example of a mobile terminal screen of an engineer of the invention according to embodiment 5 of the present invention: Schedule input [Figure 20] FIG. 11 is an operation flowchart of the invention according to the fifth embodiment of the present invention. [Figure 21] Hardware diagram of the invention according to the fifth embodiment of the present invention. [Figure 22]Functional block diagram of the invention according to embodiment 6 of the present invention. [Diagram 23] FIG. 13 is an operation flowchart of the invention according to the sixth embodiment of the present invention. [Figure 24] Hardware diagram of the invention according to the sixth embodiment of the present invention. [Diagram 25] A functional block diagram of the invention according to embodiment 7 of the present invention. [Figure 26] Screen of the invention according to embodiment 7 of the present invention: Engineer response history [Figure 27] FIG. 13 is an operation flowchart of the invention according to the seventh embodiment of the present invention. [Figure 28] Hardware diagram of the invention according to embodiment 7 of the present invention [Figure 29] Functional block diagram of the invention according to embodiment 8 of the present invention. [Diagram 30] Example of a screen display of the invention according to the eighth embodiment of the present invention: information on multiple anomalies caused by external wide-area factors [Diagram 31] Example of a screen display according to the eighth embodiment of the present invention: Anomaly information after elimination of external wide-area factors [Diagram 32] FIG. 13 is an operational flowchart of the invention according to the eighth embodiment of the present invention. [Diagram 33] Hardware diagram of the invention according to embodiment 8 of the present invention DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] <Prerequisites for the explanation of all embodiments> <Hardware that can constitute the present invention> The present invention is, in principle, an invention that utilizes a computer, but at least a part of it is realized by software, hardware, or a combination of software and hardware. In this case, the software uses hardware resources to perform various calculations and realizes various functions through the required data and information. It can be said that information processing by software is specifically realized using hardware resources.
[0019] Hardware that realizes all or part of the constituent elements of the present invention is composed of the basic components of a computer, such as a CPU, memory, a bus, an input / output device, various peripheral devices, a user interface, etc. The various peripheral devices may include a storage device, an internet interface, an internet device, a LAN device, a Wifi (registered trademark) device, a display, a display interface, a keyboard, a mouse, a speaker, a microphone, a camera, a video, a television, a CD device, a DVD device, a Blu-ray device, a USB memory, a USB memory interface, a removable hard disk, a general hard disk, a projector device, an SSD, a telephone, a fax, a copy machine, a printer, a movie editing device, various sensor devices, etc.
[0020] The system does not necessarily have to be made up of a single unit, but may be made up of multiple units connected by communication. The communication may be LAN, WAN, Wifi (registered trademark), Bluetooth (registered trademark), infrared communication, ultrasonic communication, or a mobile phone network, and may be partially installed across national borders.
[0021] <Fulfillment of the Laws of Nature in All Embodiments of the Present Invention>
[0022] The present invention functions in cooperation with a computer and software. In the present invention, abnormality information is obtained from high-voltage substation equipment via the Internet line or a dedicated line, and when abnormality information is obtained from multiple high-voltage substation equipment within a specified time, it is determined whether the abnormality information from the multiple high-voltage substation equipment is caused by a common external factor, and if it is determined that the abnormality information is caused by a non-external wide-area factor, individual processing is performed, and if it is determined that the abnormality information is caused by an external wide-area factor, exception processing is performed. Since it includes processing unique to ICT, such as exchanging the various information as data and searching on a computer, it is a so-called business model patent. From this perspective, if the present invention is judged based on the resources such as a computer in the claims and the specification and the technical common sense related to those matters, the present invention is one that utilizes a law of nature.
[0023] <Applicant's understanding of the significance of utilizing the laws of nature required by patent law>
[0024] The use of the law of nature required by the Patent Act is required to ensure that the invention can be used industrially and usefully, based on the purpose of the law, from the viewpoint that the invention must have industrial applicability and contribute to the development of industry. In other words, it is required that the invention be industrially useful, that is, the effect of the invention declared at the time of application can be reproduced with a certain degree of certainty by implementing the invention. From this perspective, the use of the law of nature is interpreted as the function of each of the invention-specific matters (invention constituent elements) that constitute the invention to achieve the effect of the invention being achieved by using the law of nature. Furthermore, the effect of the invention is sufficient if it can provide a certain usefulness to the user who uses the invention, and should not be viewed from the perspective of how the user feels or thinks about the usefulness. Therefore, even if the effect obtained by the owner of the high-voltage substation equipment, the engineer who responds to the abnormality of the high-voltage substation equipment, and the person involved in the management and operation of this system is a psychological effect (such as a sense of security), the effect itself is not subject to the judgment of the presence or absence of the required use of the law of nature.
[0025] <Hardware configuration>
[0026] The overall configuration of this device is shown in Figure 1. A server device (0151) on which the program of this system runs via an Internet line (0150) (or another commercial line or a dedicated line), a PC (0152) for managing and operating this system, high-voltage substation equipment A (0154A) used by consumer A to receive high-voltage power, and a high-voltage substation equipment monitoring device A (0153A) (the monitoring device may be integrated with the high-voltage substation equipment), a PC (0155A) used by consumer A, and consumer B are connected to the Internet line (0150) (or another commercial line or a dedicated line). A high-voltage substation equipment B (0154B) used by the consumer B when receiving and transforming high-voltage power, a high-voltage substation equipment monitoring device B (0153B) which is a monitoring device thereof, a PC (0155B) used by the consumer B, a mobile terminal (e.g., tablet PC) (0156A) of the engineer A, and a smartphone (0157B) of the engineer B are connected by wire or wirelessly (Wifi (registered trademark) or a mobile phone line network, etc.) (a tablet or notebook PC may be used instead of a smartphone). Although only one server device (0151) is shown in FIG. 1, it may be composed of multiple devices. In the example of FIG. 1, for example, an anomaly information acquisition unit (A) and an external / non-external factor determination unit (B) can be configured in the server device (0151), and the others can be configured in another server device A. Although not shown in the figure, a monitoring center can be provided to monitor the high-voltage substation equipment and respond to abnormalities in order to contact engineers and customers connected to the high-voltage substation equipment abnormality response system of the present invention and to exchange communications with the high-voltage substation equipment monitoring device, and information terminals (such as PCs) used by the monitoring center and operators who actually make contact and communicate at the monitoring center can also be connected.
[0027] Fig. 2 is a diagram showing an example of a hardware configuration constituting the high-voltage substation equipment abnormality response system in this embodiment 1. Taking a configuration similar to that of a PC as an example, the hardware configuration of the high-voltage substation equipment abnormality response system in this embodiment will be described with reference to Fig. 2. Note that when a server is used in this system, the server of the high-voltage substation equipment abnormality response system may also be configured similarly to a PC, and as this is similar to the following description of the hardware configuration, a description thereof will be omitted.
[0028] As shown in this figure, the computer is composed of a chipset, a CPU, a non-volatile memory, a main memory, various buses, a BIOS (or UEFI), various peripheral devices such as USB and LAN, interfaces for connecting to communication lines, a real-time clock, etc., and expansion cards such as a graphic card, which are configured on a motherboard. These operate in cooperation with an operating system, device drivers (for various interfaces such as USB, cameras, microphones, speakers or headphones, displays, etc. for incorporating various devices), various programs, etc. The various programs and various data constituting the present invention are configured to efficiently utilize these hardware resources to execute various processes using input signals such as a keyboard and mouse connected via a USB terminal (or PS / 2 port). The computer is connected to an Internet line through a LAN terminal or the like. The computer may be connected to the Internet line using WiFi (registered trademark) or via a mobile phone line network.
[0029] The following describes examples of main components constituting a computer as hardware, although the present invention is not limited to these examples. Chipset
[0030] A "chipset" is a set of large-scale integrated circuits (LSIs) that are mounted on the motherboard of a computer and integrate a communication function between the external bus of the CPU and a standard bus that connects non-volatile memory and peripheral devices mounted on the motherboard, that is, a bridge function. In the past, it was a two-chip configuration consisting of a north bridge that was connected to the CPU and performed processing that required high speed, such as between the main memory and a graphics card equipped with a chip (GPU) for graphics processing, and a south bridge that was connected to the north bridge and performed processing between a relatively slow interface. In recent years, the north bridge function has been integrated into the CPU, and only the previous south bridge remains, but it is still called a chipset. In this specification, we will explain the single-chip configuration of only the south bridge with the north bridge function built into the CPU. The effects of the present invention will not change whether it is a two-chip configuration of a north bridge and a south bridge as described above, or if there is no chipset with the south bridge function integrated into the CPU.
[0031] (South Bridge) When the chipset is a single chip configuration, the south bridge is responsible for I / O functions such as PCI Express interface (slot), SATA (Serial ATA) or eSATA interface, USB interface, LAN (Ethernet) interface, real-time clock, and sound functions. When the chipset is a single chip configuration, it is the chip that controls interfaces such as displays, external connections such as USB / LAN terminals, SATA for connecting to HDDs and SSDs, and PCI Express, and is connected to the CPU via a point-to-point hardware interface (for example, DMI: Direct Media Interface). Some chips support RAID (Redundant Arrays of Inexpensive Disks: a technology that recognizes and displays multiple HDDs as a single drive) for non-volatile memory (such as HDDs). In addition, to support devices that are rarely used in recent years and where high-speed operation is not required or possible, such as PS / 2 ports, floppy disk drives, serial ports such as RS-232C, parallel ports such as IEEE1284 for printers, and ISA buses, a separate LSI called a super I / O chip is used, which connects to the south bridge via a low pin count bus.
[0032] <Bus> There are parallel buses and serial buses. A parallel bus prepares signal lines for the number of bits and transmits data in synchronization with a clock. A dedicated line for the clock signal is set up in parallel with the data line, and synchronizes data demodulation on the receiving side. A serial bus transfers data one bit at a time. A bus is used to connect peripheral devices and various control units on the motherboard to the CPU (MPU). The internal bus connects the CPU core to cache memory and other internal memory, while the external bus connects the CPU to memory outside the CPU. The external bus that connects the memory controller built into the CPU to the main memory is a 64-bit parallel bus in the case of a DDR4 standard that uses DDR4-SDRAM (Double-Data-Rate4 Synchronous Dynamic Random Access Memory). For example, if the DDR4-3200 memory standard is supported, the bandwidth is 3200MHz maximum memory operating frequency x 64 (bit) bus width ÷ 8 (bit → byte conversion) = 25.6 (GB / s). The connection between the CPU and the south bridge is a point-to-point connection such as DMI (Direct Media Interface) as mentioned above. External expansion buses such as PCI Express and SATA are connected by chipsets. Parallel buses include GPIB, IDE / (parallel)ATA, SCSI, PCI, etc. A serial bus transfers data one bit at a time. Because there is a limit to how fast it can be, the improved version of PCI, PCI Express, uses point-to-point wiring and a serial transfer method. USB and SATA also transfer data serially.
[0033] CPU
[0034] The CPU reads a sequence of instructions called a program in main memory in order, interprets and executes them, and outputs information consisting of signals to the main memory. The CPU functions as the center of calculations within a computer. The CPU is composed of the CPU core, which is the center of calculations, and its peripheral parts, and includes registers, cache memory (primary, secondary, tertiary), an internal bus that connects the cache memory to the CPU core, a memory controller, a timer, and an interface with the connection bus to the south bridge. If the CPU has an integrated graphics function (GPU), it also includes a graphics interface and an internal bus that connects to the CPU core. If an external graphics board is used with a CPU with a built-in GPU, it is connected to the graphics interface (PCI Express, etc.) built into the CPU. Note that a single CPU (chip) may have multiple CPU cores. The embodiment is described as a two-core type, but is not limited to this. Also, a configuration may be provided with multiple CPU chips. A program may also be built into the CPU.
[0035] <Non-volatile memory>
[0036] (HDD)
[0037] The basic structure of a hard disk drive consists of a magnetic disk, a magnetic head, and an arm on which the magnetic head is mounted. External interfaces include SATA (previously ATA) and SAS (Serial Attached SCSI, previously SCSI). HDD interfaces are broadly divided into the ATA and SCSI types mentioned above. The ATA type is a method of sending data unilaterally to the physically connected device, and since it relies on the BIOS (or UEFI) on the motherboard, it constantly requires CPU processing time. The SCSI type is a method of sending data accurately while checking the status of the connected device, and since the HDD has a control system inside, the load on the CPU can be reduced. The ATA type is inexpensive and has a large capacity, but the SCSI type evolved from a system for servers, and is excellent in terms of speed and expandability, and since it can process SCSI commands in multithreading, it is highly reliable even under high-load environments. HDDs have an excellent cost per unit of capacity, but as mentioned above, they contain moving parts which take time to access and there is the risk of mechanical failure. Therefore, for server equipment that requires high reliability, RAID can be used to distribute reading and writing to multiple HDDs simultaneously, or the same file can be written to multiple HDDs.
[0038] (Flash memory) Currently, two types of flash memory are commonly used: NAND flash memory and NOR flash memory. Although there are pros and cons regarding read / write speed, NAND flash memory is more advantageous for high integration and is used for data storage. Compared to hard disk drives, it is small because it has no moving parts and does not generate vibration or noise during operation. However, the cost per capacity has not yet fallen to the point where it can replace hard disk drives. Although it is more expensive than hard disk drives, it has the advantage of being compact and resistant to shocks. Smartphones and mobile information terminals usually have a memory capacity of around 64GB to 256GB for data storage purposes, so flash memory is used to make them smaller and lighter. In PCs and other devices, solid-state drives (SSDs) made of flash memory are beginning to be used for frequently accessed drives that store the OS and application software.
[0039] <Main memory>
[0040] The CPU directly accesses and executes various programs in main memory. Main memory is a volatile memory that uses DRAM. Programs in main memory are expanded from non-volatile memory to main memory upon receiving a program start command. The CPU then executes the program according to various execution commands and execution procedures within the program.
[0041] Operating System (OS)
[0042] An operating system is used to manage the resources available to applications on a computer, to manage various device drivers, and to manage the computer itself (the hardware). In small computers, firmware may be used as the operating system.
[0043] ≪UEFI≫
[0044] In recent years, UEFI (Unified Extensible Firmware Interface), which plays a similar role as an evolved successor to the previously used BIOS, has been used. UEFI is also stored in a flash ROM and installed on the motherboard, just like BIOS. A flash ROM chip containing UEFI causes the CPU to execute procedures to start up the computer hardware and run the operating system, and is most typically the hardware that the CPU reads first when it receives a computer startup command. This contains the addresses of the operating system stored on the disk (non-volatile memory), and the operating system is sequentially loaded into main memory by the UEFI loaded into the CPU and becomes operational. UEFI also has a check function that checks the presence or absence of various devices connected to the bus. The check results are stored in main memory and are made available to the operating system as appropriate. UEFI may also be configured to check external devices, etc.
[0045] As shown in the figure, the present invention can basically be configured with a general-purpose computer program and various devices. The computer basically operates in a form in which a program recorded in a non-volatile memory is loaded into the main memory, and processing is executed by the main memory, the CPU, and various devices. Communication with the devices is performed via an interface connected to a bus line. Possible interfaces include a display interface, USB, a LAN terminal, a PCI Express interface, and a communication buffer.
[0046] Furthermore, examples of hardware constituting the high voltage receiving and transforming facility of the present invention include power demand and supply instrument transformers, disconnecting switches, high voltage circuit breakers, transformers, instrument current transformers, instrument voltage transformers, current transformers, high voltage load switches, high voltage cutouts, transformers, reactors, capacitors, molded-case circuit breakers, ammeters, voltmeters, oil gauges such as transformers, Fourier transform devices (computers), lightning arresters, lightning rods, leading-phase capacitors, series reactors, cameras (which may be ones that capture still images, ones that capture moving images, ones that capture both, infrared cameras, or thermography cameras), microphones (sound collectors, ones with a wide sound collection band, for example, ones that can collect sounds up to the ultrasonic range, ones that can collect minute sounds, Any of the above may be used to collect a sound, for example, the sound of rust peeling off.), temperature sensors (including infrared sensors, infrared cameras, thermoelectric modules, and other various detectors and parts that sense temperature), odor meters (which may be gas detectors), vibration meters (including instruments that apply ultrasonic vibrations and detect the vibrations themselves), tendon hammers, dust sensors, grounding devices, prime movers, starting devices, generators, exciters, telephones, infrared cameras, rectifiers, neutral resistors, optical sensors, clamp meters for measuring current, Fourier transformers, network interfaces, communication equipment, smartphones, PCs, tablet terminals, and the like. These are used in appropriate combinations to achieve the technical effects of the present specification.
[0047] Each of the functional blocks constituting the high-voltage substation equipment abnormality response system described below can be realized by hardware, software, or both hardware and software. Specifically, in the case of those that use a computer, examples of such hardware components include a CPU, main memory, GPU, image memory, graphics board, bus, or secondary storage device (non-volatile memory such as a hard disk or flash memory, storage media such as CDs or DVDs, and drives for reading these media), input devices such as operation buttons used to input information, a mouse, a touch panel, an electronic pen used solely for the purpose of touching a touch panel, a joystick or a joystick-like pointer position input device, and other external peripheral devices, as well as interfaces for such external peripheral devices, communication interfaces such as a LAN terminal, a GPS receiving interface, a GPS calculation unit, a gyro sensor, an acceleration sensor, a rotation detection sensor, processing devices for signals from these sensors, a camera, an image file processing circuit, a speaker, a microphone, an audio file processing circuit, communication interfaces, a barcode reader, an electronic card reader, a POS terminal, biometric authentication devices such as a face authentication device, an encryption device, a fingerprint authentication device, a palm print authentication device, and a retina authentication device, as well as driver programs and other application programs for controlling such hardware. In particular, it utilizes smartphones, tablet devices, mobile phones, smart watches, personal computers, data center server equipment, wired and wireless networks and interfaces.
[0048] The CPU performs arithmetic processing according to the program deployed on the main memory, and processes and stores data input from input devices and other interfaces and held in the memory or hardware, and generates commands for controlling the hardware and software. The above programs may be realized as multiple modularized programs, or may be realized as a single program by combining two or more programs.
[0049] The present invention can also be partially configured as software. Furthermore, storage media on which such software is recorded are naturally included within the technical scope of the present invention (this is not limited to this embodiment, but is the same throughout this specification).
[0050] <Terminology used in the present invention>
[0051] "Identification information" refers to symbols, letters, codes, etc. that are used to identify something. However, there may be cases where the identification information itself is the information that is being identified. For example, the identification information that identifies character string record A may be character string record A itself. Therefore, the meaning of the high-voltage substation equipment identification information may be simply a symbol, letter, or code, or it may simultaneously be the model name of the high-voltage substation equipment identified by that symbol, letter, code, etc., or the address or name of the building or facility in which it is installed.
[0052] The term "association" is used in this specification to mean not only a case where two or more pieces of information are directly associated with each other, but also a case where two or more pieces of information are indirectly associated with each other via one or more other pieces of information. An indirect association is not necessarily limited to an association within one device (a device having a single housing), but also includes a case where the association is made across multiple devices.
[0053] "Engineer" refers to a Chief Electrical Engineer in charge of safety inspections of high-voltage substation equipment, or includes a corporation that employs a Chief Electrical Engineer. Furthermore, when construction is required to deal with an abnormality in high-voltage substation equipment, it can also include an electrician in charge of repairs, renovations, etc. of high-voltage substation equipment, or a corporation that employs an electrician.
[0054] "Response" refers to an engineer "responding" to a response notice issued to an engineer to be dispatched to deal with an abnormality in high-voltage substation equipment that has issued abnormality information.
[0055] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0056] <Overview of embodiment 1> Mainly claims 1, 9, and 17 The high-voltage substation equipment abnormality response system of embodiment 1 is configured to acquire abnormality information transmitted from a high-voltage substation equipment, and perform exception processing when abnormality information is acquired from multiple high-voltage substation equipment within a specified time period and it is determined that the abnormality information has been transmitted due to an external wide-area factor.
[0057] <Functional configuration of embodiment 1> 3 shows a functional block diagram of the high-voltage substation equipment abnormality response system of embodiment 1. The high-voltage substation equipment abnormality response system (0300) of embodiment 1 has an abnormality information acquisition unit (A) (0301), an external / non-external cause determination unit (B) (0302), an individual processing unit (C) (0303), and an exception processing unit (D) (0304).
[0058] The above functional blocks are merely an example for implementing the present invention, and functions may be omitted or new functions may be added as appropriate within the scope that does not contradict the problems to be overcome by the present invention and its effects. The same applies to the following description of the first embodiment and subsequent embodiments.
[0059] <Description of the configuration of embodiment 1> <Embodiment 1: Anomaly information acquisition unit (A) (0301)> The "abnormality information acquisition unit (A)" (0301) is configured to acquire abnormality information including high-voltage substation equipment identification information, which is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment. It is desirable to configure the abnormality information to be output without delay from the occurrence of an abnormality to within one second or at most within several seconds.
[0060] "High-voltage substation equipment" refers to high-voltage substation equipment that steps down the voltage from 6600V to 100V or 200V and distributes the power so that buildings, etc. can receive power from the transmission line and supply it to the building. It is a substation equipment consisting of one or more of the following: substation equipment, storage equipment, power generation equipment, distribution equipment, and load equipment, including service facilities and equipment, and is available in cubicle and open types. High-voltage substation equipment includes each of the above-mentioned facilities, and each facility further includes equipment. Examples of equipment include section switches, service lines and supports, cables, disconnectors, circuit breakers / high-voltage load switches, power fuses, instrument transformers, transformers, lightning arresters, leading-phase capacitors / series reactors, substation / control circuits, installation lines, distribution lines and distribution circuit breakers / earth leakage circuit breakers / knife switches, distribution boards, emergency generators, storage batteries, power receiving rooms and buildings, or metal outer casings of cubicle-type substation equipment.
[0061] The "monitoring device" is an object that is installed in high-voltage substation equipment as an add-on or integrated with the high-voltage substation equipment during manufacturing in order to monitor the status of the high-voltage substation equipment. In this specification, the term "high-voltage substation equipment" refers not only to high-voltage substation equipment alone, but also to monitoring devices that are installed in high-voltage substation equipment as an add-on to monitor the status of high-voltage substation equipment. The monitoring device monitors power outages, leakage currents, temperature abnormalities, etc. of the high-voltage substation equipment. This is because transformers can experience temperature abnormalities due to excessive use of electricity or deterioration of transformer oil (insulating oil), and frequent abnormalities can lead to breakdowns or accidents of the entire high-voltage substation equipment. It is preferable to configure the equipment to monitor the following types of abnormalities without being limited to these abnormalities.
[0062] <Embodiment 1 Monitoring device: purpose of monitoring> For high-voltage substation equipment to properly receive high-voltage power, transform it into low-voltage power, and distribute it, it must be able to supply power without interruption at a specified voltage, with a specified current capacity, and with a specified waveform (without waveform distortion or frequency disturbance). Monitoring devices monitor various phenomena to ensure the normal operation of this high-voltage substation equipment. Direct monitoring involves the voltage, current, and voltage waveform of the low-voltage power, which corresponds to the outlet side, but simply monitoring these at the outlet side only detects the occurrence of an abnormality and makes it difficult to detect signs of an abnormality. For this reason, monitoring is also carried out within the high-voltage substation equipment itself.
[0063] <Embodiment 1 Monitoring device: configuration> The monitoring device is preferably configured to have the following units in order to monitor the high-voltage receiving and transforming equipment. The monitoring device includes various sensor units (the breakdown of the various sensor units will be described later) each consisting of various detection units and an output unit that outputs various acquired information, an abnormality determination unit that determines whether the high-voltage receiving and transforming equipment to be monitored is in a normal state or an abnormal state based on various information acquired from the various sensors, a high-voltage receiving and transforming equipment identification information storage unit that stores high-voltage receiving and transforming equipment identification information that identifies the high-voltage receiving and transforming equipment to be monitored, a determination result output unit that outputs the determination result, and an emergency power supply unit that has a power source (e.g., a storage battery, a generator) for continuing to operate the monitoring device during a power outage. If the abnormality determination unit determines that an abnormality exists based on the various information acquired from the various sensor units, the determination result output unit outputs abnormality information including the high-voltage receiving and transforming equipment identification information (e.g., output to an Internet line via a mobile phone network). If it determines that the equipment is normal, it outputs normal information. The abnormality information and normal information may be configured to be output by including status identification information indicating the status in each piece of information as identification information that differs between abnormality and normality.
[0064] <Embodiment 1 Monitoring device: Configuration: Various sensor units> The various sensor units in the high-voltage substation equipment monitor "sound," "temperature," "humidity," "odor," "images (still images and / or videos)," "vibration," "dust," and "electricity-related." In addition, "motion detection," "water leakage detection," and "smoke detection" (which may be substituted with dust monitoring) can be added as necessary.
[0065] <Embodiment 1 Monitoring device: Configuration: Sound sensor unit> The sound sensor unit is composed of a sound detection section having one or more sound collecting microphones that detect sound, and a sound information output section that outputs sound information that is information on the collected sound.
[0066] <Embodiment 1 Monitoring device: Configuration: Sound sensor unit: Sound detection section> To monitor "sound", a sound collecting microphone is installed as a sound detection unit. It is preferable to include not only the audible range but also ultrasonic waves. A stereo microphone is installed, or the results of collecting sound from multiple identifiable sound collecting microphones (sound and microphone installation positions) can be used to narrow down the approximate location of the sound source (multiple stereo microphones may be installed). Instead of identifying the location of sound generation from the positions of multiple microphones, for example, one sound collecting microphone may be assigned to one device, or one sound collecting microphone may be responsible for multiple devices that make up a high-voltage substation facility, or multiple microphones may be installed for one device. When multiple sound collecting microphones are installed, it is preferable to attach sound collecting microphone identification information that identifies the sound collecting microphone, store it in association with the installation position of the sound collecting microphone, and configure it as sound information that associates the sound collecting microphone identification information with the collected sound.
[0067] If the microphone is not in the way of the equipment, it is better to install it inside the equipment or devices that make up the high-voltage substation. For example, in the case of a cubicle type, the equipment is stored in a metal outer box, so if it is installed on the outside, the metal plate of the metal outer box will be between the equipment and the microphone, reducing the efficiency of sound collection. Sound collection itself is performed continuously for 24 hours. Regarding the storage of collected sound data, it can be configured to continuously collect sound and store a specified amount of sound, and if no abnormality occurs, it can be configured to erase the oldest sound in order and store the newest sound. It can also be configured to compare it with the sound under normal conditions and store the sound just before the abnormal sound if an abnormal sound is detected.
[0068] <Embodiment 1 Monitoring device: Configuration: Sound sensor unit: Sound information output unit> The sound information output unit outputs sound information, which is information on the sound collected by the sound detection unit. The output sound information is acquired by the abnormality determination unit of the monitoring device, and the acquired sound information alone or in combination with information output from the output units of other sensor units is used by the abnormality determination unit to determine whether the high-voltage substation equipment being monitored is in a normal or abnormal state. In order to identify the sound information, the sound information is output in association with information indicating the date and time when the sound information was generated and sound collection microphone identification information that identifies the sound collection microphone that collected the sound.
[0069] The collected sound can be passed through a bandpass filter to remove unnecessary frequency bands, and sound information can be generated from only the necessary frequency bands. By using multiple bandpass filters to generate sound information of only various frequency bands, it is possible to process information so that even subtle abnormal sounds stand out. With this configuration, it is possible to store a history in which a specific abnormality mode and an abnormal sound of a specific frequency are paired. Therefore, it is possible to acquire the association between a specific abnormality mode and an abnormal sound, so that it becomes easier to predict what type of abnormality is when an abnormal sound is confirmed in which frequency band and to what extent, and it becomes possible to improve the accuracy of abnormality detection. In addition, the sound information may be configured to output the result of Fourier expansion of the voice. By performing Fourier expansion, it becomes possible to identify multiple sound sources collected from one sound collection microphone, and it becomes easy to identify which device or part in the high-voltage substation facility has an abnormality. This expansion may be configured to be performed by the abnormality determination unit.
[0070] Since the frequency of vibration noise during operation of the device may change from the initial stage due to aging of the device and changes in the environment, a predetermined frequency threshold is stored as one of the abnormality judgments, and when the frequency crosses the threshold, it can be configured to judge an abnormality in combination with information from other sensor units. Frequency fluctuations are caused by deterioration of insulation, loosening of fixation, accumulation of dust, wear, etc.
[0071] <Embodiment 1 Monitoring device: Configuration: Temperature sensor unit> The temperature sensor unit is composed of a temperature measurement section having one or more temperature sensors for measuring temperature, and a temperature information output section for outputting temperature information which is information on the measured temperature.
[0072] <Embodiment 1 Monitoring device: Configuration: Temperature sensor unit: Temperature measurement section> To monitor "temperature," temperature sensors are placed in contact with or near the receiving and transforming equipment (section switches, disconnecting switches, power fuses, circuit breakers, high-voltage load switches, busbars, instrument transformers, transformers, phase-advancing capacitors, series reactors, receiving and distribution panels, control circuits, etc.), distribution equipment (distribution lines, wiring circuit breakers, earth leakage circuit breakers, knife switches, etc.), and generators and storage batteries, if equipped. Then, the presence or absence of overheating in each part is grasped and the temperature is measured. When multiple temperature sensors are placed for one high-voltage receiving and transforming equipment, it is advisable to attach temperature sensor identification information to identify the temperature sensor and store it in association with the information on the installation location. Temperature monitoring may be performed by acquiring thermography, which also serves as image monitoring, as described later. Temperature monitoring of high-voltage receiving and transforming equipment is for monitoring abnormalities in transformers, etc. Transformers can sometimes experience temperature abnormalities due to excessive use of electricity or deterioration of transformer oil (insulating oil), and if these abnormalities occur frequently, it can lead to breakdowns or accidents in the entire high-voltage substation equipment.
[0073] When the temperature of the circuit inside the high-voltage substation equipment rises due to an overcurrent, the scale of the abnormality must expand to a certain extent in order for the abnormality to be confirmed outside the equipment, so placing the temperature sensor inside the equipment increases the accuracy of temperature measurement. Temperature measurement may be performed by measuring the specific temperature inside the high-voltage substation equipment, but it may also be configured to obtain only the rise and fall values of specific parts. It may also be configured to measure the acceleration of the rise and fall changes so that it is possible to determine whether the change is sudden or over time. For example, the temperature outside generally rises gradually from around 6:00 a.m. to 3:00 p.m., and gradually drops from around 6:00 p.m., so even if there is no abnormality, the temperature of various equipment and devices inside the high-voltage substation equipment also changes according to the change in the temperature of the outside air. Therefore, by observing the acceleration of the temperature change, it is possible to determine whether the rise is abnormal or within the normal range.
[0074] <Embodiment 1 Monitoring device: Configuration: Temperature sensor unit: Temperature information output unit> It is preferable to configure the temperature measured by the temperature sensor so that it is passed to the anomaly determination unit as temperature information associated with temperature sensor identification information (associated with the temperature sensor placement position) that identifies the temperature sensor. When outputting temperature information, in order to identify the temperature information, it is output in association with information indicating the date and time when the temperature information was acquired and the temperature sensor identification information of the temperature sensor that detected the temperature. The output temperature information is acquired by the anomaly determination unit of the monitoring device, and is used by the anomaly determination unit to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state, based on the acquired temperature information alone or in combination with information output from the output unit of another sensor unit. It is preferable to configure the temperature information to be output in real time 24 hours a day so that anomaly detection can be performed without delay, but it is also acceptable to configure the temperature information to be output in a certain amount at intervals that are acceptable as delays in anomaly detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0075] <Embodiment 1 Monitoring device: Configuration: Humidity sensor unit> The humidity sensor unit is composed of a humidity measuring section having a humidity sensor for measuring humidity, and a humidity information output section for outputting humidity information, which is information on humidity.
[0076] <Embodiment 1 Monitoring device: Configuration: Humidity sensor unit: Humidity measurement section> A humidity sensor is provided to monitor "humidity." For areas enclosed by sheet metal or the like, it is better to provide humidity sensors both inside and outside, since the humidity inside may differ from the outside. However, if the high-voltage substation equipment is of the open type, or installed in a single enclosure or room, one humidity sensor may be sufficient. When installing multiple humidity sensors, it is advisable to configure them to hold humidity sensor identification information, which is information that identifies the humidity sensor, in association with the installation location.
[0077] <Embodiment 1 Monitoring device: Configuration: Humidity sensor unit: Humidity information output unit> It is preferable to configure the humidity measured by the humidity sensor so that it is passed to the anomaly determination unit as humidity information associated with humidity sensor identification information (associated with the humidity sensor placement position) that identifies the humidity sensor. When outputting humidity information, in order to identify the humidity information, it is output in association with information indicating the date and time when the humidity information was acquired and the humidity sensor identification information of the humidity sensor that detected the humidity. The output humidity information is acquired by the anomaly determination unit of the monitoring device, and is used by the anomaly determination unit to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state, based on the acquired humidity information alone or in combination with information output from the output unit of another sensor unit. It is preferable to configure the humidity information to be output in real time 24 hours a day so that anomaly detection can be performed without delay, but it is also acceptable to configure the humidity information to be output in a certain amount at intervals that are acceptable as delays in anomaly detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0078] <Embodiment 1 Monitoring device: Configuration: Odor sensor unit> The odor sensor unit is composed of an odor detection section having an odor sensor that detects odors, and an odor information output section that outputs odor information, which is information about odors.
[0079] <Embodiment 1 Monitoring device: Configuration: Odor sensor unit: Odor detection section> The odor detection unit is configured to have an odor sensor that detects odors in the high-voltage substation equipment. It is preferable to configure the system so that multiple odor sensors are installed and odor sensor identification information, which is information for identifying the odor sensor, is associated with the installation position and stored. The odor sensor is intended to detect odors generated from equipment and devices such as disconnectors, circuit breakers, high-voltage load switches, busbars, transformers, leading-phase capacitors, series reactors, distribution lines, molded-case circuit breakers, earth leakage circuit breakers, knife switches, grounding devices, and low-voltage equipment, which are equipment and devices that are subject to abnormal odor inspections during normal safety inspections of high-voltage substation equipment.
[0080] The odor sensor may be placed in contact with or in close proximity to these facilities and equipment, or may be placed at regular intervals or in the four corners of a room in which a high-voltage substation is installed, so as to detect odors over a wide area without specifying a target. If the function of the equipment is not hindered, the odor sensor may be placed inside the facilities and equipment that make up the high-voltage substation. In the case of combustion caused by an overcurrent in a circuit within the equipment, it takes a certain amount of time and scale to leak out of the equipment, so placing the odor sensor inside the equipment increases the accuracy of odor detection. In addition, in order to strengthen the odor at the site where the odor is expected to occur as a precursor, a material that generates an odor due to heat, which is the cause of the odor, may be placed or applied. For example, organic matter that evaporates due to heat. Furthermore, it is possible to configure the device to place multiple types of organic matter that evaporates due to heat according to their volatilization temperatures, so that the state of the odor source can be known by the type of volatilized organic gas.
[0081] It is preferable to configure the system so that, when multiple odor sensors are installed, the measured value of the detected odor is associated with odor sensor identification information that identifies the odor sensor and transmitted to the odor information output unit. Odor detection by the odor detection unit continues 24 hours a day. For example, it is possible to configure the system so that, when no abnormal odor is occurring, the odor information is not stored as data, but is simply checked in real time, and storage begins when an abnormal odor is detected.
[0082] <Embodiment 1 Monitoring device: Configuration: Odor sensor unit: Odor information output unit> The odor information output unit is configured to output odor information, which is information on the detected odor. It is preferable to configure the odor information output unit to pass the odor information associated with odor sensor identification information (associated with the odor sensor placement position) that identifies the odor sensor that detected the odor to the abnormality determination unit. When outputting the odor information, in order to identify the odor information, the odor information is output in association with information indicating the date and time when the odor information was acquired and the odor sensor identification information of the odor sensor that detected the odor. For example, it is possible to burn a substance used in the high-voltage receiving and transforming equipment, collect odor data in advance, and record the distribution of the odor data in advance. Then, by comparing whether or not the characteristic points of the odor data distribution match, it is possible to determine whether or not an abnormal odor is occurring. Furthermore, when an object that has entered from the outside is burned, it is possible to confirm the distribution of odor data that is not included in the odor data recorded in advance. Therefore, when odor data that does not match either the odor data under normal conditions or the odor data in the high-voltage receiving and transforming equipment is confirmed, it is inferred that an object that has entered from the outside has been burned.
[0083] The output odor information is acquired by the abnormality judgment unit of the monitoring device, and the acquired odor information alone or together with information output from the output units of other sensor units is used by the abnormality judgment unit to judge whether the monitored high-voltage substation equipment is in a normal or abnormal state. It is preferable that the odor information is output in real time 24 hours a day so that abnormalities can be detected without delay, but it is also acceptable to configure it so that a certain amount of odor information is output at intervals that are acceptable as delays in abnormality detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0084] <Embodiment 1 Monitoring device: Configuration: Image sensor unit> The image sensor unit is composed of an image acquisition section having an image sensor for acquiring images of the high-voltage substation equipment, and an image information output section for outputting image information, which is information on the acquired images. In particular, items that can be visually confirmed, such as deformation, cracks, damage, corrosion, rust, stains, oil volume, liquid volume, discoloration, smoke, and fire, are monitored. In addition, a thermograph having an infrared sensor may be included to acquire temperature information from the image information.
[0085] <Embodiment 1 Monitoring device: Configuration: Image sensor unit: Image acquisition section> The image acquisition unit is configured to have an image sensor that acquires images of the high-voltage receiving and transforming equipment. Images of equipment and devices (section switches, disconnecting switches, power fuses, circuit breakers, high-voltage load switches, busbars, instrument transformers, transformers, phase-advancing capacitors, series reactors, receiving and distribution panels, control circuits, grounding wires, protective tubes, etc., receiving room buildings, metal outer boxes in the case of cubicle-type receiving and transforming equipment, distribution lines, wiring circuit breakers, earth leakage circuit breakers, knife switches, distribution panels, prime movers, starting devices, auxiliary devices, generators, excitation devices, grounding devices, storage battery bodies, auxiliary devices, etc. in the case of normal / emergency power generation equipment) arranged inside the high-voltage receiving and transforming equipment are acquired. The image acquisition unit may be configured to acquire not only images of equipment and devices inside the high-voltage receiving and transforming equipment, but also images of the outside and surroundings of the high-voltage receiving and transforming equipment.
[0086] As the image sensor, a device having an imaging function, such as a camera, a video camera, an infrared camera, a thermo camera, an endoscope (for example, for observing inside a pipe, observing inside a device, observing a gap), or a high-speed camera, is used. These may be configured to be arranged in a plurality of units in contact with or in close proximity to each facility or device shown in the above specific example so as to monitor each facility or device specifically, or may be arranged to acquire internal images over a wide area without specifying a target, such as at regular intervals or in the four corners of a cabinet in a room. If the function of the device is not hindered, the device may be arranged inside the facility or device constituting the high-voltage receiving and transforming equipment. If an abnormality inside the facility can be directly acquired as image information, an abnormality inside the facility can be found earlier. When multiple image sensors are installed, images (video and / or still images) from the image sensors are acquired in association with image sensor identification information that identifies the image sensor. It is preferable that the image sensor identification information is associated with the installation position within the high-voltage receiving and transforming equipment.
[0087] The images are acquired continuously for 24 hours. For example, when no cracks or deformations are found, the images acquired by the image sensor are simply checked in real time without storing the image information, which is information associated with the date and time of image acquisition and the image sensor identification information, and the image information is stored, and when cracks or deformations are detected, the images can be acquired by a thermal camera, in which case the intrusion of animals can also be detected.
[0088] <Embodiment 1 Monitoring device: Configuration: Image sensor unit: Image information output section> The image information output unit is configured to output image information, which is information on an image. The image information is information in which an image acquired by an image sensor is associated with the date and time when the image was acquired and image sensor identification information. The output image information is acquired by an abnormality determination unit of the monitoring device, and is used by the abnormality determination unit to determine whether the monitored high-voltage substation equipment is in a normal state or an abnormal state, based on the acquired image information alone or in combination with information output from the output unit of another sensor unit.
[0089] It is preferable that the image information is output in real time 24 hours a day so that anomaly detection can be performed without delay, but it is also acceptable to configure the system to output a certain amount of image information at intervals that are tolerable as delays in anomaly detection, such as every 1 second, every 3 seconds, or every 5 seconds. The image information may be configured to hold image information under normal conditions and output image information only when a difference occurs between that image and the image information.
[0090] <Embodiment 1 Monitoring device: Configuration: Vibration sensor unit> The vibration sensor unit is composed of a vibration acquisition section that acquires vibrations within the high-voltage substation equipment, and a vibration information output section that outputs vibration information that is information on the acquired vibrations.
[0091] <Embodiment 1 Monitoring device: Configuration: Vibration sensor unit: Vibration acquisition section> The vibration acquisition unit is disposed inside the high-voltage substation equipment and acquires vibrations. The vibration sensor detects vibrations and swaying (e.g., vibrations from facilities and equipment such as a phase-leading capacitor, a series reactor, and in the case of shaking of normal / emergency power generation facilities, a generator, an exciter, and a grounding device). Types of vibration sensors include mechanical vibrometers, electromagnetic vibrometers, piezoelectric vibrometers, optical vibrometers, and electromagnetic wave vibrometers. When multiple vibration sensors are installed, vibration information from the vibration sensors is acquired in association with vibration sensor identification information that identifies the vibration sensor. It is preferable that the vibration sensor identification information is stored in association with the installation position within the high-voltage substation equipment.
[0092] The vibration acquisition unit is configured to be arranged in a plurality of units in contact with or in close proximity to the equipment and devices that constitute the high-voltage substation equipment. If it does not impede the function of the equipment, it may be arranged inside the equipment and devices that constitute the high-voltage substation equipment. The accuracy of vibration acquisition is increased when the vibration acquisition unit is arranged inside the equipment and devices, for example, when motor noise or micro-vibrations of parts caused by loosening of fasteners are detected. The vibration acquisition unit acquires vibrations continuously for 24 hours. For example, it is conceivable to configure the system so that when no findings such as vibration have occurred, the vibration information is not stored as data but is simply checked in real time, and storage is started when a finding of vibration is detected.
[0093] <Embodiment 1 Monitoring device: Configuration: Vibration sensor unit: Vibration information output unit> The vibration information output unit is configured to output the acquired vibration information. The vibration information is information in which the vibration acquired by the vibration sensor is associated with the date and time when the vibration was detected and the vibration sensor identification information. The output vibration information is acquired by an abnormality determination unit of the monitoring device, and is used by the abnormality determination unit to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state, using the acquired vibration information alone or in combination with information output from the output unit of another sensor unit. It is preferable that the vibration information is output in real time 24 hours a day so that abnormality detection can be performed without delay, but it is also acceptable to configure the output of vibration information to be output in a certain amount at intervals that are acceptable as delays in abnormality detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0094] In order to distinguish between vibrations caused by equipment inside the cubicle and vibrations that occur depending on the environment in which the cubicle is located, a differential vibrometer may be used in which a vibration sensor is also placed outside the cubicle and the difference between the measured values is regarded as the vibration specific to the cubicle.
[0095] <Embodiment 1 Monitoring device: Configuration: Dust sensor unit> The dust sensor unit is made up of a dust amount measuring section that measures the amount of dust in the air within the high-voltage substation equipment, and a dust amount information output section that outputs dust amount information that indicates the measured dust amount.
[0096] <Embodiment 1 Monitoring device: Configuration: Dust sensor unit: Dust amount measuring section> The dust amount measuring unit is configured to measure the amount of dust in the air inside the high-voltage substation equipment. The dust sensor that measures the amount of dust is mainly used for checking dirt and clearance distances, the open / closed status of openings and closings, water inlets for wind and rain, and the operating status of ventilation equipment.
[0097] Examples of causes of dust detection include possible damage to the contact between the receiver and blade of the disconnector of the power receiving equipment, possible contamination of the disconnector, possible contamination of the instrument transformer or transformer, possible contamination of the lightning arrester, possible contamination of the phase-leading capacitor and series reactor, possible abnormality in the operation of the receiving / distribution board control circuit, changeover switch, etc., possible contamination of the grounding wire, protective tube, etc. in the case of grounding work, possible water ingress holes, small animal ingress holes, ventilation openings, operation of the ventilation fan, or damage to the lock and key of the metal outer box of the power receiving room building or cubicle-type power receiving / transforming equipment, etc., possible corrosion, damage, and peeling of the paint of the equipment. These can be detected by the dust amount measurement unit.
[0098] The dust amount measuring unit measures the amount of dust using a dust sensor. In addition to being placed near a specific piece of equipment, the dust sensors may be placed at regular intervals to observe the entire inside of the high-voltage substation equipment. If the function of the equipment is not hindered, the dust sensors may be placed inside the equipment or devices that make up the high-voltage substation equipment. Dust caused by motor noise or slight vibrations of parts due to loosening of fasteners is more accurately detected when placed inside the equipment or devices. Dust is also detected when dust, dirt, sand, peeling paint from equipment or devices in the high-voltage substation equipment, rust, or other fine powder, such as cedar pollen, is blown into the high-voltage substation equipment from the outside, and when dust that has already accumulated in the high-voltage substation equipment is blown up again.
[0099] When multiple dust sensors are installed, dust amount information from the dust sensors is acquired in association with dust sensor identification information that identifies the dust sensor. The dust sensor identification information is preferably stored in association with the installation position within the high-voltage substation equipment. In order to distinguish between dust generated due to equipment within the high-voltage substation equipment and dust generated due to the environment in which the high-voltage substation equipment is installed, a differential dust meter may be adopted in which dust sensors are also installed outside the high-voltage substation equipment and the difference between the dust amounts is regarded as dust specific to the high-voltage substation equipment.
[0100] The dust amount measuring unit continues to acquire dust amount information 24 hours a day. For example, if there is no indication of dust generation, the dust amount information is not stored as data, but is simply checked in real time, and storage can be started when any indication of dust intrusion, generation, or airborne particles is detected.
[0101] <Embodiment 1 Monitoring device: Configuration: Dust sensor unit: Dust amount information output unit> The dust amount information output unit is configured to output dust amount information, which is information on the measured dust amount. The dust amount information is information in which the dust amount acquired by the dust sensor is associated with the date and time when the dust amount was measured and dust sensor identification information. The output dust amount information is acquired by an abnormality determination unit of the monitoring device, and is used by the abnormality determination unit to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state, using the acquired dust amount information alone or in combination with information output from the output unit of another sensor unit. It is preferable that the dust amount information is output in real time 24 hours a day so that abnormality detection can be performed without delay, but it is also acceptable to configure the output of dust amount information to be output in a certain amount at intervals that are acceptable as delays in abnormality detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0102] <Embodiment 1 Monitoring device: Configuration: Electrical related unit> The electricity-related unit is composed of an electricity-related measurement section that acquires various electricity-related values in the high-voltage substation equipment, and an electricity-related value information output section that outputs electricity-related value information that is information indicating the measured electricity-related values.Specifically, the electricity-related values acquired by the electricity-related measurement section include the measured values of the ammeter and voltmeter, and various numerical values such as potential difference, current difference, leakage current value, phase difference, voltage value, current value, frequency, insulation resistance value, resistance value, power value, and their time history and time fluctuation, which are acquired by calculation based on the measured values.
[0103] <Embodiment 1 Monitoring device: Configuration: Electricity-related unit: Electricity-related measuring section> The electricity-related measuring unit is configured to acquire various electricity-related values in the high-voltage substation equipment. The electricity-related values to be acquired are the values exemplified above, and these values are particularly used for monitoring currents, voltages, cables, transformers, etc. in the cubicle, such as ground faults, short circuits, leakage currents, and overcurrents. The electricity-related measuring unit is acquired from all the equipment, devices, wires, and wiring that constitute the high-voltage substation equipment. If it does not impede the function of the equipment, it may be arranged inside the equipment or equipment that constitutes the high-voltage substation equipment. Anomalies in the current and voltage values in the equipment can be detected earlier. When multiple electricity-related value measuring units are installed in the high-voltage substation equipment, the electricity-related value information from the electricity-related value measuring unit is acquired in association with electricity-related value measuring unit identification information that identifies the electricity-related value measuring unit. It is preferable that the electricity-related value measuring unit identification information is stored in association with the arrangement position in the high-voltage substation equipment.
[0104] Specific types of electrical value measuring units include voltmeters, ammeters, multi-meters, CT meters, frequency measuring devices, spectrum analyzers, oscilloscopes, resistance meters, electromagnetic wave meters, electric field meters, and charge level meters.
[0105] The electricity-related value measurement unit continues to acquire electricity-related values 24 hours a day. For example, if no findings such as a voltage drop or an increase in current value have occurred, the electricity-related values may be simply checked in real time without being stored as data, and may be configured to start storing data when findings such as a voltage drop or an increase in current value are detected. Not only power outages but also momentary voltage drops, disturbances in the voltage and current waveforms, and frequency deviations are also monitored, and if there is a deviation from the normal state, it is a phenomenon that can be determined as an abnormality by the abnormality determination unit described below.
[0106] It is desirable to configure the electricity-related value measurement unit not only to detect abnormalities inside the high-voltage substation equipment, but also to obtain values related to electricity from the power receiving unit of the high-voltage power supplied to the high-voltage substation equipment, and the power supply and distribution unit that transforms the voltage in the high-voltage substation equipment and outputs low-voltage power such as 100V or 200V for use by consumers. If it is not confirmed that low-voltage power of normal specifications is being output from the power supply and distribution unit, which is the outlet, even if the high-voltage substation equipment is normal inside, it will not be output normally if the outlet is disconnected or has noise. In addition, if it is measured whether the high-voltage power of the power receiving unit, which is the inlet side, is being received normally, it is easy to determine whether a power outage is caused by the high-voltage power side or is caused by an abnormality in the high-voltage substation equipment itself without any abnormality on the high-voltage power side. In addition, when there is an abnormality in the frequency or waveform of the low-voltage power of the power supply and distribution unit on the outlet side, or when there is a momentary power outage or momentary voltage drop lasting less than a few seconds, it becomes easy to distinguish whether there is an abnormality in the received high-voltage power or a problem with the high-voltage substation equipment. For example, if the high voltage power being supplied experiences a power outage, the abnormality determination unit of the monitoring device described below can determine that the power outage may be due to an external wide-area factor, and the determination result output unit of the monitoring device can be configured to output abnormality information including abnormality identification information corresponding to the power outage that may be caused by an external wide-area factor. If abnormality information accompanied by information that the high voltage power to be supplied has experienced a power outage is transmitted, this can be used as one of the materials by which the external / non-external factor determination unit (B) described below determines that the abnormality information acquired by the abnormality information acquisition unit (A) of this system was transmitted due to an external wide-area factor.
[0107] <Embodiment 1 Monitoring device: Configuration: Electricity-related unit: Electricity-related information output section> The electricity-related value information output unit is configured to output electricity-related value information that is information indicating the acquired electricity-related value. The electricity-related value information is information in which the electricity-related value acquired by the electricity-related value measurement unit is associated with the date and time when the electricity-related value was measured and electricity-related value measurement unit identification information. The output electricity-related value information is acquired by an abnormality determination unit of the monitoring device, and is used by the abnormality determination unit to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state, using the acquired electricity-related value information alone or in combination with information output from the output unit of another sensor unit. It is preferable that the electricity-related value information is output in real time 24 hours a day so that abnormality detection can be performed without delay, but it is also acceptable to configure the output of electricity-related value information to be output in a certain amount at intervals that are acceptable as delays in abnormality detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0108] <Embodiment 1 Monitoring device: Configuration: Other sensors> As another sensor, for example, a water leakage sensor can be installed. In particular, in business establishments and facilities that have high-voltage substation equipment installed in the basement of a building, it is preferable to install a water leakage sensor because there is a possibility of flooding during heavy rain. Since the water level usually rises from the bottom to the top, the water leakage sensor is installed at a position lower than the lowest of the electrical circuits of the equipment and devices that make up the high-voltage substation equipment. The water leakage sensor is configured so that it is not directly exposed to rainwater or leaked water. It is preferable to install two or more water leakage sensors at different heights, so that the presence or absence of water leakage and the progress of the water leakage can be grasped. If the high-voltage substation equipment is exposed to water or flooded, not only will it cause a power outage or breakdown, but it is also dangerous because there is a risk of electric shock if the equipment comes into contact with water. It also becomes an obstacle during recovery work. It is preferable to install a water leakage sensor in a place where it can detect the case where the leakage progresses to a point where there is a concern that the high-voltage substation equipment will come into direct contact with water, and if the sensor detects water leakage, the switch (including the sectional switch) will stop receiving high-voltage power.
[0109] Other detection units may be configured to include an airborne particle counter, a radiation detection unit, an ultraviolet detection unit, a ground / floor / underfloor potential measurement unit, an air pressure measurement unit, a unit for monitoring the operation of each unit, an electromagnetic wave measurement unit, an illuminance measurement unit, a piezoelectric actuator unit (by applying vibrations to the equipment and detecting the reflected vibrations, it is possible to detect loosening, rattling, rust, etc. of the equipment. The reflected vibrations can also be acquired by a piezoelectric actuator, or may be acquired by a microphone, etc.), etc. Each of these units is configured to have a detection section and an information output section.
[0110] <Embodiment 1 Monitoring device: Configuration: Other sensor-related configuration examples> This can be achieved by having in the high-voltage substation equipment (including its monitoring device) a per-sensor abnormal state identification information holding unit that holds per-sensor abnormal state identification information, which is information identifying abnormal states that each sensor may detect (unanticipated abnormalities are assigned identification information as other abnormalities), in association with sensor identification information, which is information identifying each sensor; a per-sensor monitoring result information acquisition unit that acquires per-sensor monitoring result information, which is the result of each sensor monitoring the monitored object, in association with the sensor identification information; a per-sensor monitoring result information holding unit that holds the acquired per-sensor monitoring result information; a per-sensor monitoring result information determination unit that determines whether the acquired per-sensor monitoring result information is normal or abnormal; and an abnormality information output unit that, when it is determined that the per-sensor monitoring result information is abnormal, outputs abnormality information, which is information that associates the sensor identification information of the sensor determined to be abnormal, the per-sensor abnormal state identification information, and the per-sensor monitoring result information.
[0111] The configuration may be such that each sensor determines whether the sensor itself is normal or abnormal based on the result of monitoring the monitored object. In that case, the configuration may be achieved by providing a sensor-by-sensor abnormal state determination result acquisition unit that acquires sensor-by-sensor abnormal state identification information, which is the result of each sensor determining whether the sensor itself is normal or abnormal based on the result of monitoring the monitored object, in association with the sensor identification information, instead of the sensor-by-sensor monitoring result information determination unit. In addition, for example, a video camera that is periodically started and stopped in normal times may be temporarily started when a motion sensor detects a motion, or an operator at a monitoring center may remotely start the video camera to check the appearance of the high-voltage receiving and transforming equipment. The configuration may also be such that an operator at a monitoring center temporarily starts each sensor by remote control, obtains the current detection results of each sensor and the measurement results of a measuring instrument at the time the operator wants to check, or obtains the history if the high-voltage receiving and transforming equipment or its monitoring device holds the results of detection and / or measurement in the past.
[0112] <Embodiment 1 Monitoring device: Configuration: Abnormality determination unit> The anomaly determination unit is configured to determine whether the high-voltage substation equipment to be monitored is in a normal state or an abnormal state based on various information acquired from the various sensor units. Anomaly determination may be made using only information acquired from the various sensor units, or a plurality of pieces of information may be used to determine whether anomaly is present or not. It is preferable that the anomaly determination is made in real time 24 hours a day so that anomaly detection can be performed without delay, but the determination may also be made every time a certain amount of various information is acquired from the various sensor units at intervals that are acceptable for delays in anomaly detection, such as every 1 second, every 3 seconds, or every 5 seconds.
[0113] The abnormality determination unit can be further configured to have a sensor information normal state holding means for holding information of various information output from various sensor units in a normal state as a reference example. By holding the normal state and comparing it with various information acquired at appropriate times, it is possible to determine whether the information is abnormal or normal. If the abnormality determination unit determines that the information is normal, the information in the normal state that was held and was used as the basis for the determination can be updated to information determined to be normal. This is because, when the information in the normal state changes little by little due to aging of the high-voltage receiving and transforming equipment, even if the deviation is within the allowable range if it is a short-term change over time, it may be determined to be abnormal when comparing information over a long period of time, such as the initial period and information nearing the end of its useful life.
[0114] In addition, when the normal state changes depending on the time of day, weather conditions, season, etc. (for example, daytime and nighttime temperatures, or summer and winter temperatures), the system can be configured to retain information on the corresponding normal states.
[0115] The anomaly determination unit normally only determines whether the equipment is normal or whether there is an anomaly in itself, and does not determine whether the anomaly is due to an external wide-area factor. However, when the vibration sensor detects vibrations above a predetermined range that are sufficiently larger than the vibrations expected to occur when the high-voltage receiving and transforming equipment itself is abnormal, it may be configured to determine that the anomaly is due to an external wide-area factor, since there is a possibility that a major disaster such as an earthquake, land subsidence, building collapse, or landslide has occurred. When the determination result output unit described later is configured to include anomaly identification information for identifying the type of anomaly when outputting the anomaly information, it is preferable to output the anomaly information including anomaly identification information that indicates an anomaly due to an external wide-area factor such as an earthquake. The anomaly information acquired by the anomaly information acquisition unit (A) of this system can be used as material for an external / non-external factor determination unit (B) described later to determine whether the anomaly information was transmitted due to an external wide-area factor.
[0116] <Embodiment 1 Monitoring device: Configuration: High-voltage substation equipment identification information storage unit> The high-voltage substation equipment identification information storage unit is configured to store high-voltage substation equipment identification information for identifying the high-voltage substation equipment to be monitored. The high-voltage substation equipment identification information is stored to be included in the determination result output unit (described later) when outputting the determination result.
[0117] <Embodiment 1 Monitoring device: Configuration: Determination result output unit> The judgment result output unit is configured to output the result judged by the anomaly judgment unit. If the result is normal, it transmits the result together with status identification information indicating that it is normal (or not abnormal). If the result is abnormal, it transmits the result together with status identification information indicating that it is abnormal (anomaly information). The judgment result is configured to be output together with the high-voltage substation equipment identification information of the high-voltage substation equipment to be monitored. Considering the occurrence of an accident such as a disaster or fire, it is preferable that the judgment result is output from the monitoring device of the high-voltage substation equipment via a wireless internet line via a mobile phone network, rather than via a wired optical fiber or telephone line.
[0118] The judgment result is output at time intervals of 1 to 10 seconds, preferably 1 to 5 seconds. If the judgment result of normality continues, it may be configured to transmit at time intervals of 1 to 5 minutes, which is longer than the time interval when an abnormality occurs. If the judgment result of normality continues, it is preferable to output at a longer interval, such as 1 to 5 minutes, which is longer than the 5 seconds when an abnormality occurs. However, if the judgment result is abnormal and the result is output (output of abnormality information), the output is made promptly after the judgment, and the judgment result that the abnormality is detected is output as abnormality information at a short interval of 5 seconds or less, preferably 3 seconds or less, while the abnormality continues from immediately after the occurrence of the abnormal state. Note that if the abnormal state continues for one hour or more, the abnormal state may continue for several hours, half a day, or a day, so that the period for outputting the abnormality information may be longer than that immediately after the occurrence of the abnormal state, such as 1 to 10 minutes (more preferably 1 to 5 minutes), in order to maintain the power supply of the emergency power supply unit described later for a long time.
[0119] In the unlikely event that the abnormal state continues for more than half a day, the output of the abnormal state may be spaced slightly apart, so that it is output at intervals of minutes (including the case where the judgment results are output all at once). This is to maintain the emergency power supply, which will be described later. If the judgment that there is an abnormality continues and then changes to a judgment that there is normality, the judgment result is output immediately after the judgment that there is normality (end of abnormality). If the judgment that there is normality is obtained multiple times, for example three times at one-second intervals, it may be configured to output the first judgment that there is normality after the abnormality has continued, assuming that there has been a return to the normal state.
[0120] It is preferable that the judgment result output unit is configured to output a judgment result including the high-voltage substation equipment identification information if the abnormality judgment unit judges that the system is normal, and to output the judgment result including the high-voltage substation equipment identification information as abnormality information if the abnormality judgment unit judges that the system is abnormal, and to continue outputting the judgment result at a frequency equal to or shorter than the period for outputting a judgment result in response to a normality judgment result as long as the abnormality judgment result continues.
[0121] <Embodiment 1 Monitoring device: Configuration: Emergency power supply unit> The emergency power supply unit is configured to have a power source (e.g., a storage battery, a generator) for continuing to operate the monitoring device during a power outage. It is a power source for continuing to operate the various sensor units (detection unit and output unit), the abnormality determination unit, the high-voltage substation equipment identification information storage unit, and the determination result output unit that constitute the monitoring device, and for continuing to monitor the continuation or termination of an abnormal state (return to normal state) and to continue to output the results. For this reason, it is preferable to provide it as a system separate from the emergency power supply for consumers who use the high-voltage substation equipment. This is because if it is combined with the emergency power supply for consumers, the power supply may run out quickly due to the power demand required by the consumers.
[0122] Even when a generator is provided as an emergency power source, it is desirable to use a storage battery in combination. This is because, in the event of a power outage, there is a time lag between when the emergency generator starts up and when power supply is resumed, which delays the output of abnormality information. When a storage battery is provided as an emergency power source, it can be configured so that it is always charged when the high-voltage substation equipment is operating normally. This is because if the battery is only charged to, for example, half of its chargeable capacity when a power outage occurs, it will not be possible to monitor the high-voltage substation equipment (acquire various data) and output abnormality information (or the determination that the equipment has returned to normal) if the abnormal state continues for a long period of time.
[0123] <Embodiment 1: Anomaly Information Acquisition Unit (A): High-Voltage Substation Equipment Identification Information> "High-voltage substation equipment identification information" is information for identifying high-voltage substation equipment, and may be a simple character string or symbol, such as numbers assigned in the order registered in this system or a random character string that does not overlap with any high-voltage substation equipment already registered, or may be information that includes characters with some meaning, such as a combination of the first letters of a place name or building name in English and numbers, or a notation that includes the model name of the high-voltage substation equipment. From the perspective of ease of search, it is good to include the building name or part of the address (or the first letters, etc.).
[0124] <Embodiment 1: Anomaly information acquisition unit (A): High-voltage substation equipment identification information: Business establishment identification information> The high-voltage substation equipment identification information may be configured to be associated with workplace identification information, which is information identifying the workplace where the high-voltage substation equipment is installed. A workplace refers to a group of operations that are continuously performed by related organizations in a certain location, such as a factory, mine, office, store, etc. (Quoted from the Notice of the Vice Minister of Labor (No. 91 issued on September 18, 1972), Section 3, Scope of Workplaces). In particular, when multiple high-voltage substation equipment is installed in one workplace, the high-voltage substation equipment identification information may be created by combining the workplace identification information with information identifying the high-voltage substation equipment installed in the workplace identified by the workplace identification information (e.g., consecutive numbers, etc.).
[0125] <Embodiment 1: Anomaly information acquisition unit (A): High-voltage substation equipment identification information: High-voltage substation equipment attribute information> In association with the high-voltage substation equipment identification information, it is preferable to configure the unit to hold high-voltage substation equipment attribute information, which is information indicating the high-voltage substation equipment manufacturer, model name, model year, serial number, installation date, owner, manager, responsible electrical engineer, name of the building in which it is installed, address where it is installed, longitude and latitude where it is installed (e.g. GPS information), name of the business operator of the business premises where it is installed (or / and owner of the business premises), information identifying the power transmission network from which the high-voltage substation equipment receives power, past safety inspection history, repair history, period of use and useful life of the high-voltage substation equipment, period of use and useful life of each of the facilities, devices and parts that make up the high-voltage substation equipment, etc. (high-voltage substation equipment information holding unit (G) in embodiment 2 described below).
[0126] <Embodiment 1: Anomaly Information Acquisition Unit (A): Anomaly Information> The "abnormality information" is information including high-voltage substation equipment identification information, and is preferably configured to include information indicating an abnormal state of the high-voltage substation equipment. Examples of abnormal states include power outages (including momentary power outages), leakage current, temperature abnormalities, momentary voltage drops, disturbances in voltage and current waveforms, and frequency deviations. The information indicating an abnormal state may be the name of the abnormal state itself, an explanation of the abnormality, data information indicating abnormal values of various sensors of the monitoring device, or abnormal state identification information (such as an error code) that is identification information indicating an abnormal state. It is preferable to include time information indicating the time when the abnormality occurred. When multiple abnormalities occur, it is preferable to configure the multiple abnormality information so that information indicating the abnormality and time information on the occurrence of the abnormality can be included. The abnormality information may be configured to be transmitted only within a predetermined time (e.g., 1 minute) after the abnormality occurs, but it is preferable to configure the information to be continuously transmitted every predetermined time (e.g., 1 second, 3 seconds, 5 seconds, etc., but this does not prevent continuous oscillation) when the abnormality continues. If the abnormality is caused by an external wide-area factor and not an abnormality within the device itself, the abnormality may be resolved over time. Therefore, in order to inform the user whether the abnormality is continuing or not, it is preferable to configure the device to transmit abnormality information at specified time intervals while the abnormality is continuing.
[0127] The abnormality information is acquired by the abnormality information acquisition unit (A) of this system via an Internet line or the like. Since it is expected that the high-voltage substation equipment is not receiving power when the abnormality information is issued from the high-voltage substation equipment, it is preferable to configure the transmission of the abnormality information to be performed by connecting to the Internet line via a mobile phone line network while being battery-powered. Note that the abnormality information may be notified from the high-voltage substation equipment (or a monitoring device installed in the high-voltage substation equipment) to another device in the workplace, including high-voltage substation equipment identification information, indicating that an abnormal state has occurred, and the abnormality information may be issued from the device.
[0128] When a power outage occurs as an abnormality, possible causes of the power outage include abnormalities in the high-voltage power being received, deterioration of the high-voltage substation equipment over time, and other factors, as well as power outages caused by short circuits in the insulation or ground faults caused by the intrusion of small animals such as centipedes and other insects, crows and other birds, and snakes and geckos and other reptiles. If a small animal invades the housing of the high-voltage substation equipment, it may come into contact with the power supply part connected to the high-voltage power, causing a short circuit or ground fault.
[0129] Of the above abnormal conditions, the most urgent abnormality is a power outage. When a building or facility loses power, the lights, air conditioning, water pumps, elevators, and other internal equipment stop working and become unusable, causing significant inconvenience to the people inside. During a power outage, the system switches to a disaster prevention power source to keep the disaster prevention equipment running, and while this will likely be maintained for two hours under the Fire Service Act, operation beyond that varies depending on the building or facility, so power restoration should be done as soon as possible.
[0130] The main abnormal conditions of high-voltage substation equipment are power outages, electrical leakage, and temperature abnormalities as mentioned above, but other abnormal conditions include momentary voltage drops and interruptions (power outages that occur for a very short period of time, instantaneously), water leakage (due to rainwater leaks when high-voltage substation equipment is installed outdoors or at a high altitude outdoors, lightning strikes, and water intrusion from below when installed underground indoors or on the ground outdoors). The abnormality information preferably includes the type of abnormal condition. It can also be configured to include information on the location or component where the abnormality occurred. The type of abnormality and the information on the location or component where the abnormality occurred may be the name of the item itself, or may be identification information for identifying the item (such as component identification information).
[0131] <Embodiment 1 Anomaly Information Acquisition Unit (A): Anomaly Information: High-Voltage Substation Equipment Operation Status Information> The monitoring device can be further configured to have a high-voltage substation equipment operation status information storage unit that, upon acquiring normal information or abnormal information transmitted from the judgment result output unit of the monitoring device, associates and stores high-voltage substation equipment identification information included in the acquired information with high-voltage substation equipment operation status information, which is information indicating whether the operation of the high-voltage substation equipment identified by the identification information is normal or abnormal. In other words, the high-voltage substation equipment operation status information storage unit is a high-voltage substation equipment operation status database, and is, for example, like a table in which high-voltage substation equipment (or its high-voltage substation equipment identification information) is arranged vertically and the corresponding operation status information (normal, abnormal) is written in the adjacent column.
[0132] <Embodiment 1: External / Non-External Factor Determination Unit (B) (0302)> The "external / non-external factor determination unit (B)" (0302) is configured to determine, when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor.
[0133] "External non-wide-area factors" are not attributable to the high-voltage substation equipment that emitted the abnormality information, but are factors common to the abnormal conditions of multiple high-voltage substation equipment in an area larger than a single workplace, spanning multiple different workplaces that emitted the abnormality information.
[0134] For example, a power outage occurs when the reception of power is halted due to an abnormality in the upstream part of the power transmission, such as a high-voltage transmission line that transmits power from a power plant being broken due to the collapse of a high-voltage tower supporting the line (due to an earthquake or landslide at the installation site, etc.), a high-voltage transmission line being broken due to a fire near the high-voltage transmission line or high-voltage tower, a fire at a substation, or a failure of the power transmission network or substation due to a disaster such as an earthquake, flood, or tsunami. Widespread damage can also be expected for the high-voltage receiving and transforming equipment itself, such as damage or breakage due to an earthquake, or flooding due to a levee breaking due to heavy rain. Other possible causes include temperature abnormalities due to extreme heat or a widespread fire, or abnormalities in multiple high-voltage receiving and transforming equipment due to frequent lightning strikes on multiple surrounding buildings.
[0135] In addition, when an accident at a high-voltage substation facility shuts down a power company's distribution line, depending on the area the distribution line supplies power to, hundreds or even thousands of buildings receiving power from the same distribution line may also experience a power outage. Therefore, power outages caused by external wide-area factors will be a wide-area power outage that affects the entire area including the business that issued the abnormality information due to the power outage (hereinafter referred to as a wide-area power outage).
[0136] "Non-external wide-area factors" do not occur due to abnormalities in the upstream part of the power transmission as mentioned above, but mainly due to abnormalities in individual high-voltage substation equipment. Examples of abnormalities include power leakage, temperature abnormalities, and power outages caused by short circuits or ground faults in individual high-voltage substation equipment. As another example, if an abnormality occurs in a nearby high-voltage substation equipment that receives power from the same distribution line of the same system and is caught up in the problem, it may not be determined to be an external wide-area factor if the scope of the impact is only two or three (or the high-voltage substation equipment of two or three nearby business establishments).
[0137] In order to determine whether or not the cause is an external wide-area factor, it is preferable to configure the system to acquire information on power outages provided by electric power companies in order to obtain information on power outages that may be caused by external wide-area factors. It is preferable to configure the system to acquire information on power outages posted on the electric power company's website, to acquire information on the power transmission line network provided by the electric power company, and in particular to acquire information from a power outage information database in which the latest information is posted individually under a contract with the electric power company. In addition to information on power outages, it is preferable to enter into a contract with the electric power company to acquire information on the voltage state, waveform, and frequency specification fluctuations of the transmitted high-voltage power. In addition, it is preferable to obtain lightning and rainfall data, typhoon information, AMeDAS information, weather-related advisory and warning information, and earthquake information from the website of the Japan Meteorological Agency and private weather companies, and information such as flood hazard maps, rainfall during heavy rain, whether floods have occurred, evacuation recommendations and evacuation instructions, and other information from local governments (prefectural offices, city and town offices, etc.), information such as river water level monitoring cameras, traffic situation monitoring cameras, and live camera images from various locations installed by the Ministry of Land, Infrastructure, Transport and Tourism and other organizations, information on road conditions during disasters from the police, and information on the occurrence of fires from fire departments. Alternatively, artificial intelligence can be used to search online posts (such as Twitter (registered trademark)) to collect information on power outages and other disasters (earthquakes, floods, etc.).
[0138] The external / non-external factor judgment unit (B) can be further configured to have an external wide-area factor information acquisition means for acquiring external wide-area factor information, which is information about external wide-area factors, from the electric power companies, the Meteorological Agency, weather companies, local governments, government agencies, police, and fire departments, or for searching for information posted by ordinary people on Internet bulletin boards, etc. about external wide-area factors (power outages and other disasters) to acquire external wide-area factor information.
[0139] For example, in the case where high-voltage substation equipment of a consumer using this system that exists within a specified geographical range (such as the same town in the same city, or the same address in the same town, or within a circle with a diameter of 10 km) is abnormal at almost the same time, the probability that the abnormality occurred due to a specific cause for each is extremely small, as described above, so it can be configured to determine that the abnormality occurred due to a common external factor.As another example, when information is transmitted indicating that multiple high-voltage substation equipment that have the same transmission network identification information associated with the high-voltage substation equipment identification information are abnormal at the same time, it can be configured to determine that the abnormality is in the transmission network.
[0140] When acquiring anomaly information, not only does the system obtain the above information, but also, in order to determine whether the external wide-area factor has ended or is still continuing to be transmitted even after it has been determined that the anomaly information was transmitted due to an external wide-area factor, the system obtains information on power outages and other high-voltage power supplies, information on the status of the power grid (whether or not the power transmission section that had been out of power has been restored, etc.), weather-related information, information on flooded areas and water levels in the case of a flood, and aftershock information and damage status in the case of an earthquake, directly from each organization or corporation or via the Internet. It can also be configured to determine whether the external wide-area factor has ended or not based on the obtained information.
[0141] External wide-area factors may not be caused by a single factor, but by the overlap of multiple factors. Or, external wide-area factors may cause non-external wide-area factors. For example, power outages caused by external wide-area factors include a power transmission line being broken when a high-voltage power transmission tower in a mountainous area collapses due to a landslide caused by heavy rain, or a substation being flooded due to a river's levee breaking due to heavy rain, causing a power outage, and multiple high-voltage substation facilities in a certain area that receive power from the above-mentioned transmission lines or substations also break their levees due to rising water levels caused by heavy rain, causing a power outage (or being flooded after the power outage, but the high-voltage substation facilities continue to be abnormal even after power is restored, causing the power outage). In addition to the power outage of the high-voltage power supply, the high-voltage substation facilities themselves are flooded and abnormal due to the external wide-area factor of flooding, so the abnormality of the high-voltage substation facilities will not end even if the power grid is restored and the water subsides (even if the external wide-area factor of flooding ends). As described above, based on information collected from electric power companies, the Japan Meteorological Agency, weather companies, local governments, etc., it is determined whether the external wide-area factors have subsided, and for multiple high-voltage substation equipment that continues to transmit abnormal information even after the external wide-area factors have subsided, it is determined that the transmission is due to a non-external wide-area factor, and the processing is shifted to perform individual processing.
[0142] <Embodiment 1 Individual Processing Unit (C) (0303)> The "individual processing unit (C)" (0303) is configured to perform individual processing, which is processing for responding to the abnormality of the high-voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information has been transmitted due to a non-external wide-area factor that is not an external wide-area factor.
[0143] "Individual processing" is processing to respond to abnormalities in high-voltage substation equipment when the abnormality is not due to external wide-area factors, and includes processing of contacting an engineer and having them go to the location of the high-voltage substation equipment to confirm and inspect the abnormality, as well as processing of contacting an individual electrician or the corporation to which the electrician belongs (or has an employment relationship with) and having them go to the location of the high-voltage substation equipment if an abnormality is discovered during inspection and it is determined that repairs or construction are necessary to restore the abnormality, and obtaining a report of the repairs completion when the repairs are completed, and, if necessary, contacting the client of the high-voltage substation equipment or the manager of the building etc. in which the high-voltage substation equipment is installed.
[0144] As described below, individual processing can include processing for selecting a technician to contact to confirm or inspect the abnormality, processing for selecting and contacting a replacement technician if the contacted technician is unable to respond to the abnormality, processing for guiding a route to the installation location as part of the processing for heading to the location of the high-voltage substation equipment, processing for selecting an electrician or the corporation to which the electrician belongs to be contacted when an electrician is needed to repair the abnormality, and processing for guiding the electrician or the corporation to which the electrician belongs to a route to the location of the high-voltage substation equipment.
[0145] <Embodiment 1 Exception Processing Unit (D) (0304)> The 'exception processing unit (D)' (0304) is configured to perform exception processing, which is processing different from the individual processing, when it is determined that the abnormality information is generated due to an external wide-area factor.
[0146] "Exception processing" is processing carried out when abnormality information of the high-voltage substation equipment is issued due to an external wide-area factor, and basically, unlike individual processing, processing to respond to the abnormality of the high-voltage substation equipment (e.g. processing to send an engineer to the location of the high-voltage substation equipment) is not carried out while the external wide-area factor is not resolved. It may include processing to notify the engineer who normally works in charge of the high-voltage substation equipment that abnormality information due to an external wide-area factor has been received and that no response will be made while the external wide-area factor is ongoing. If it is determined that the external wide-area factor has been resolved, the engineer may be further notified that the problem has been resolved.
[0147] The exception processing may include a process of monitoring whether the external wide-area factor continues or has ended while the external wide-area factor continues, as in embodiment 8 described later. In addition to obtaining information from various places as described above as a criterion for determining the end of the external wide-area factor, the system may be configured to determine that the external wide-area factor has ended when a predetermined number or more (or a certain percentage or more) of high-voltage substation equipment within a predetermined geographical area where the initial abnormality information was issued have returned to a normal state.
[0148] Alternatively, as an exceptional process, once the engineer who normally handles the high-voltage receiving and transforming equipment has been notified that anomaly information due to an external wide-area factor has been received and that no action will be taken while the external wide-area factor is continuing, the process may shift to acquiring anomaly information, and regarding the end of the external wide-area factor, it may be determined that the external wide-area factor has ended when the external / non-external factor determination unit (B) determines that the continuously transmitted anomaly information is not due to an external wide-area factor but at a certain point in time that it is due to a non-external wide-area factor. In that case, individual processing is performed by the individual processing unit (C).
[0149] <Embodiment 1: High-voltage substation equipment abnormality response system (0300)> The "high voltage substation equipment abnormality response system" (0300) has an abnormality information acquisition unit (A) (0301), an external / non-external cause determination unit (B) (0302), an individual processing unit (C) (0303), and an exception processing unit (D) (0304), and is configured to acquire abnormality information from the high voltage substation equipment, determine whether it has been caused by an external wide-area cause, perform individual processing if it is determined to be a non-external wide-area cause, and perform exception processing if it is determined to be an external wide-area cause.
[0150] In addition, the "high voltage substation equipment abnormality response system" of the present invention can also be composed of a monitoring device that monitors the high voltage substation equipment, a monitoring center that performs different processing depending on the result of determining whether the abnormality information transmitted from the monitoring device was transmitted due to an external wide-area factor, and a mobile terminal that allows engineers to connect to the system.
[0151] <Embodiment 1: Example of use of the high-voltage substation equipment abnormality response system> An example of the use of the system for responding to abnormalities in high-voltage substation equipment according to the first embodiment will be described with reference to FIG. 4. The abnormality information shown in FIG. 4 will be described with reference to a power outage as an example, but the same applies to abnormalities other than power outages (such as electrical leakage and temperature abnormalities). FIG. 4 is an example of a screen of a PC terminal connected to the system, used by an operator at the monitoring center of the system. The PC terminal is connected to the system via a LAN line or an Internet line. Communications are exchanged via a mobile phone network or directly via an Internet line from a monitoring device (which may be configured integrally with the high-voltage substation equipment) of the high-voltage substation equipment installed in the facility (including a store, building, business site, etc.) of a customer using the system. The monitoring device transmits the operating status of the high-voltage substation equipment and detection results of various installed sensors. The monitoring center or an engineer in charge of security of the high-voltage substation equipment transmits instructions to transmit detection results, instructions to perform temporary measurements, and instructions to change the field of view if a camera is installed and the field of view can be changed (such as by swivel of the camera).
[0152] <Embodiment 1: Example of using this system: Receiving anomaly information> Figure 4 is an example of a PC terminal screen used by an operator at the monitoring center, showing the state in which anomaly information is received from high-voltage substation equipment identification information S-12345678, which is the high-voltage substation equipment (or its monitoring device) installed in the Sato Building, a user of this system. In this example of using the system, we will explain the case where there is a high-voltage substation equipment operation status information storage unit that stores operation status information indicating whether the operation of each high-voltage substation equipment is normal or abnormal, in association with the high-voltage substation equipment identification information. The high-voltage substation equipment operation status information is obtained by acquiring the judgment results (including abnormality information) periodically output by the judgment result output unit of the monitoring device that monitors the high-voltage substation equipment, and each time it is acquired, if the result is normal, it is updated to operation status information of normal, and if the result is abnormal, it is updated to operation status information of abnormal, and then stored. By acquiring the abnormality information from the high-voltage substation equipment (S-12345678) in the Sato Building, the operation status information of the Sato Building stored in the high-voltage substation equipment operation status information storage unit was changed from normal to abnormal. Operation status information indicating an abnormality may be further divided into two categories based on whether the abnormality is due to an external wide-area factor or a non-external wide-area factor.
[0153] In the example PC terminal screen shown in Figure 4, "power outage" is displayed on the left side as the type of abnormality information, along with the high-voltage substation equipment identification information, the name of the installation location (Sato Building), its address, and the time of the power outage. Below that, in response to the abnormality information about the power outage, an investigation is conducted using the power outage information webpage of the power company that supplies power to the Sato Building and an Internet search to see if it was due to an external wide-area factor, and the result is that it was not due to an external wide-area factor but was a power outage only in the Sato Building. If the high-voltage power supplied to the high-voltage substation equipment is normal, but the measurement results output from the monitoring device along with the abnormality information indicate that there is a power outage in the low-voltage power inside the high-voltage substation equipment or on the transformed outlet side, then it can be said that there is a high possibility that there is an abnormality only in the high-voltage substation equipment in the Sato Building.
[0154] <Embodiment 1: Example of using this system: Receiving abnormality information: Displaying the sender> In the center of the screen in Figure 4, when anomaly information is received, the retained high-voltage substation equipment attribute information is obtained based on the high-voltage substation equipment identification information included in the anomaly information, and attribute information such as the address of the installation location of the target high-voltage substation equipment, the facility name (Sato Building in this example), the chief electrical engineer in charge, and the model name is displayed on the screen in Figure 4. The name and address of the Sato Building where the anomaly information was sent are displayed on the left side of the screen as shown above, and in the center of the screen an enlarged map of the area around the Sato Building is displayed based on the map information obtained from the address.
[0155] <Embodiment 1: Example of use of this system: Receiving abnormality information: Determining whether it is due to an external factor> After receiving the abnormality information from the high-voltage substation equipment (or its monitoring device) of the Sato Building, the external / non-external factor judgment unit (B) of this system checks whether the abnormality reported by the abnormality information (power outage in this example) is also transmitted from multiple high-voltage substation equipment other than the Sato Building within a specified time. Since this example explains a case where the abnormality information (power outage) is transmitted only from the Sato Building, it is confirmed that there is no abnormality information from other equipment within the specified time, and it is determined that it is an isolated occurrence and is not transmitted due to an external wide-area factor. Therefore, individual processing is performed. In addition to checking whether or not there is an abnormality information transmitted from other equipment within a specified time, it is also possible to investigate whether or not there is power outage information by searching the power outage information web page of the power company or the Internet. If the monitoring device outputs a measurement result indicating that the high-voltage power supplied to the high-voltage substation equipment is normal, but that the low-voltage power inside the high-voltage substation equipment or on the transformed outlet side is out of power, together with the abnormality information, it may be determined that there is a high possibility that there is an abnormality only in the high-voltage substation equipment of the Sato Building and that it is not due to an external wide-area factor.
[0156] <Embodiment 1: Example of using this system: Receiving abnormality information: When there is no external factor> If the cause is not an external wide-area factor, individual processing is carried out to respond to the abnormality in the high-voltage substation equipment that sent the abnormality information. The main individual processing is to select candidates for engineers to be sent to respond to the abnormality, select a responder from the candidates, and dispatch them to the abnormally high-voltage substation equipment.
[0157] <Embodiment 1: Example of use of this system: Receiving abnormality information: Non-external factors: Individual processing> When performing individual processing, a process is performed to select candidates for engineers to be dispatched to the abnormally high voltage substation equipment, to request the candidate engineers to respond, to obtain replies regarding whether they can respond, and to determine who will respond if there are multiple candidates who can respond. Individual processing can also include a process to guide the responder to the site, a process to obtain the response results from the responder, a process to notify the consumer who is the user of the abnormally high voltage substation equipment or the administrator who manages the equipment that a responder will be dispatched, and a process to notify when the response to the abnormality is completed.
[0158] <Embodiment 1: Example of use of this system: Receiving abnormality information: Non-external factors: Selection of engineer candidates> After determining that the acquired anomaly information was caused by a non-external wide-area factor, the operator at the monitoring center presses the "Select" button in the upper right corner of the screen in Figure 4. The rules for selecting a technician when the button is pressed can be configured to be selectable via a pull-down menu, or the rules to be used can be set in advance. It is also possible to specify that multiple rules be used in combination. Figure 8 shows an example of technician candidates displayed on the right side of the screen using a rule that the shorter the straight-line distance from the Sato Building, the higher the priority.
[0159] In the example of Fig. 8, the information on the current location of the engineer is based on the planned location described in the schedule that the engineer has registered in advance in this system, or on location information obtained from a satellite positioning system or a positioning system using a mobile phone network mounted on the engineer's mobile phone or the mobile terminal that the engineer uses to connect to this system. Alternatively, if the car that the engineer uses for transportation is equipped with a car navigation system, it is preferable to configure the system to obtain location information from the satellite positioning system and / or the inertial positioning system mounted on the car navigation system. This is because while it is sufficient if the high-voltage substation equipment is installed outdoors or on the roof, if it is installed underground, there is a high possibility that the location information of the mobile phone or mobile terminal of the engineer during the safety inspection cannot be obtained.
[0160] It is preferable that the position information of the engineer is configured to be transmitted to the system periodically or periodically. Alternatively, when the current location of the engineer is to be confirmed, such as when abnormality information is acquired, the system can be configured to transmit the location information to the system by the monitoring center's operation to transmit the location information to each mobile terminal or the car navigation system of the car used by the engineer for transportation. For this reason, the system can be further configured to have a positioning system engineer position information acquisition unit that periodically or temporarily acquires the position information of the engineer from a satellite positioning system and / or other positioning systems (mobile phone network, inertial positioning system). The positioning system engineer position information acquisition unit temporarily acquires the position information of the engineer from a satellite positioning system or the like installed in the mobile terminal used by the engineer to connect to the system when requested by the system. The system may be configured to automatically acquire the position information when the abnormality information acquisition unit (A) acquires abnormality information, or may be configured to perform the acquisition as a process included in an individual process.
[0161] <Embodiment 1: Example of using this system: Receiving abnormality information: Non-external factors: Contacting engineer candidates> The operator at the monitoring center may call each of the engineers displayed on the right side of Fig. 8 one by one to confirm whether they are available to respond. However, since this requires time and effort, it is preferable to send a response inquiry to all selected candidates at once. If all engineers using this system have a mobile terminal (e.g., tablet PC) to connect to this system, a push notification may be sent to notify the type of abnormal high-voltage substation equipment, the content of the abnormality, the date and time of occurrence, the location of the equipment, and that the occurrence was due to a non-external wide-area factor, and to request a reply to the response request to accept or reject it. It is advisable to make a prior arrangement known to all the engineers regarding the simultaneous communication of the response inquiry, such as assuming that if there is no reply within, for example, five minutes after receiving it, it is rejected. This may also be included in the push notification message.
[0162] The mobile terminal can receive a push notification if it is in a sleep or standby state, and can display a message inquiring whether or not the technician can respond by popping up in the center of the screen or from one of the edges of the display screen (it is more preferable to notify the technician of the incoming call with a ringtone and / or vibration at the same time as displaying the message). It is preferable to provide two buttons, "Accept" or "Reject," to indicate whether or not the technician can respond by selecting either button, so that the technician who receives the push notification can easily reply. When accepting is selected, it is preferable to be able to simply input the number of minutes after which the technician can begin moving, for example by dialing.
[0163] <Embodiment 1 Example of use of this system: Receiving abnormality information: Non-external factors: Determining who should respond> If the candidates are checked one by one in order of priority to see if they can respond, the first engineer who is available to respond will be selected as the responder. If all candidates are checked at the same time, the candidate with the highest priority among those who respond within the response deadline will be selected as the responder. Once the responder has been selected, more detailed information about the high-voltage substation equipment attributes related to the abnormally high-voltage substation equipment will be sent. This information includes various monitoring data obtained before, when, and after the abnormality occurred, the results of the most recent safety inspection (monthly, annual), and the remaining useful life of the equipment and parts. The operator at the monitoring center will also send the route to the abnormally high-voltage substation equipment to the responder's mobile device. They may also be guided to the site.
[0164] <Embodiment 1: Example of using this system: Receiving abnormality information: When it is due to an external factor> In the above example, it was an isolated incident (power outage) at the Sato Building's high-voltage substation equipment, but if abnormality information is received from multiple nearby high-voltage substations within the same city within a specified period of time (for example, within 5 minutes), if power outage information is received from the power company for the relevant area (the area including the location of the high-voltage substation equipment where the abnormality information was transmitted), if flooding or inundation is predicted based on a weather forecast of heavy rain, actual precipitation data, and a hazard map obtained from the local government, if lightning information from the power company or weather company indicates that there are frequent lightning strikes in the surrounding area, etc., it will be determined that the abnormality was due to an external wide-area factor. Exception processing will be performed if it is determined that the abnormality information was transmitted due to an external wide-area factor.
[0165] In regions with different power transmission networks (regions with large geographical distances, such as Tokyo, Hokkaido, Kansai, Shikoku, and Kyushu), when one or two high-voltage substation facilities in each region issue abnormality information within a specified period of time, and multiple abnormality information is obtained, it is possible that this is a coincidence, so the power outage information webpage of the power company or an Internet search for power outage information may also be used in combination to investigate and confirm whether the cause is an external wide-area factor, and then a judgment may be made. In this case, it is preferable to configure the external / non-external factor judgment unit to further have an Internet anomaly search means for searching whether an abnormality has occurred in general via the Internet. If it is determined that the cause is an external wide-area factor, an exception process is performed.
[0166] <Embodiment 1: Example of using this system: Receiving abnormality information: Exception processing in case of external factors> If the external / non-external factor determination unit (B) determines that the abnormality information transmission is due to an external wide-area factor, the exception processing unit (D) performs exception processing. For example, if the abnormality information is a power outage, if the power outage is due to an external wide-area factor, it is considered that the entire neighboring area including the location of the high-voltage substation equipment (or its monitoring device) that transmitted the abnormality information is in the same abnormal state (power outage).
[0167] <Embodiment 1: Example of using this system: Receiving abnormality information: Contents of exception processing> If a power outage occurs due to an external wide-area factor, a process is performed in which a responder is selected and sent to the site to respond to the abnormality. If a power outage occurs due to an external wide-area factor, even if the high-voltage receiving and transforming equipment that issued the abnormality information is inspected, the fault location cannot be found, and until the external wide-area factor that caused the power outage is resolved, it is unclear whether the abnormality (power outage) of the high-voltage receiving and transforming equipment indicated in the abnormality information will be resolved, so dispatching a responder would be a waste. If the high-voltage power supply to the high-voltage receiving and transforming equipment is stopped, it is not possible to measure and check the voltage signals of each part, and if no abnormality is found in the equipment itself, it is not possible to turn on the equipment to check its operating status. In the first place, even if a malfunction that does not involve an external abnormality occurs in the high-voltage receiving and transforming equipment, the abnormality cannot be detected as an abnormality. For this reason, an exceptional process is performed in which a responder is not selected and sent to inspect the high-voltage receiving and transforming equipment that issued the abnormality information determined to be due to an external wide-area factor.
[0168] <Embodiment 1: Example of using this system: Receiving abnormality information: Contents of exception processing: Notification to technician> As an exception process, for example, a process is performed in which no notification is given to an engineer who is a candidate for responding to the abnormality information or an electrical engineer who is in charge of the safety inspection of the equipment in question in normal times, that the abnormality information has been acquired. In the case of an external wide-area factor, the surrounding area may be in chaos unlike normal times, making it difficult to ensure safety, and if a notification is given, the engineer in charge of the equipment in question in normal times will likely go to the site to check it out. Another example of the exception process is a process of notifying that abnormality information due to an external wide-area factor has been received, the attribute information of the corresponding high-voltage substation equipment, and that no response will be made while the external wide-area factor is continuing. In the latter example, a push notification is sent to the mobile device used by the engineer in charge in normal times to notify that there has been abnormality information from the high-voltage substation equipment in his / her charge, the type of abnormality, that the abnormality is due to an external wide-area factor, and that no response will be made until the external wide-area factor has ended. When a notification is given that the abnormality information has been acquired, a process of further notifying that the external wide-area factor has ended may be performed after it is determined that the external wide-area factor has ended.
[0169] <Embodiment 1: Example of use of this system: When external wide-area factors cease: Notification to engineers> For example, when a combination of external wide-area factors occurs, when the external wide-area factors subside, multiple high-voltage substations that transmit abnormal information due to non-external wide-area factors may remain. Examples of such power outages include a power outage caused by a landslide that caused a high-voltage power transmission tower in a mountainous area to collapse due to a heavy rain, causing a power line to break, or a power outage caused by a river's levee collapsing due to rising water levels due to heavy rain and flooding a substation, causing a power outage. In addition, multiple high-voltage substations in some areas that receive power from the above-mentioned transmission lines and substations also collapsed due to rising water levels due to heavy rain, causing a power outage (or being flooded after the power outage, but the high-voltage substations' abnormality continues even after power is restored), etc. The high-voltage substations themselves became abnormal when flooded due to an external wide-area factor caused by flooding, so the abnormality in the high-voltage substations does not subside even when the water subsides (even when the external wide-area factor of flooding subsides). As described above, the system is configured to determine whether the external wide-area factor has ended based on information collected from the electric power company, the Meteorological Agency, meteorological companies, local governments, etc., and to shift processing to individual processing for high-voltage substation equipment that is emitting abnormality information even though the external wide-area factor has ended. As with the individual processing, a responder is determined and the abnormality is dealt with.
[0170] <Processing flow of embodiment 1> 5 is a flowchart of the operation method of the high-voltage substation equipment abnormality response system of embodiment 1. As shown in this figure, the high-voltage substation equipment abnormality response system of embodiment 1 has an abnormality information acquisition step (a) (S0501), an external / non-external cause determination step (b) (S0502), an individual processing step (c) (S0503), and an exception processing step (d) (S0504).
[0171] The operation method of the high voltage substation equipment abnormality response system, which is a computer, is as follows: The anomaly information acquisition step (a) (S0501) performs a process of acquiring anomaly information including high-voltage substation equipment identification information, which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; The external / non-external factor determination step (b) (S0502) performs a process of determining whether the abnormality information from the plurality of high-voltage substation facilities is caused by an external wide-area factor, which is a wide-area external factor, or a non-external wide-area factor, which is not an external wide-area factor, when the abnormality information is acquired from the plurality of high-voltage substation facilities within a predetermined time, and When the result of the judgment in the external / non-external factor judgment step (b) (S0502) is that the abnormal information was issued due to a non-external wide-area factor that is not an external wide-area factor, In an individual processing step (c) (S0503), individual processing is performed to deal with the abnormality of the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information. When the result of the judgment in the external / non-external factor judgment step (b) (S0502) is that the abnormal information was issued due to an external wide-area factor, The exception processing step (d) (S0504) performs exception processing which is different from the individual processing. This is an operating method for causing a high-voltage substation equipment abnormality response system, which is a computer, to execute such a series of processes.
[0172] <Description of Hardware in First Embodiment>
[0173] The hardware configuration of the high-voltage substation equipment abnormality response system in this embodiment will be described with reference to FIG.
[0174] <Hardware configuration of embodiment 1> 6 is a diagram showing the hardware configuration of the high-voltage substation equipment abnormality response system in this embodiment 1. As shown in this diagram, the high-voltage substation equipment abnormality response system in this embodiment includes a "CPU (Central Processing Unit)" that performs various arithmetic processing, a "chipset", a "main memory", a "non-volatile memory" that stores various programs and data (information), an "I / O controller", "USB, SATA, LAN terminal, etc.", "BIOS (UEFI)", "PCI Express slot", "real-time clock", and a "graphics card" as an expansion board. These are then interconnected by a data communication path such as a "system bus" to transmit and receive information and perform processing.
[0175] The various programs and data (information) stored in the non-volatile memory are expanded into the main memory when the system is started up, and upon receiving an execution command, the CPU sequentially executes the programs to perform calculations using the data.
[0176] When this system starts up, the various programs and data (information) stored in the "non-volatile memory" are read, expanded, and stored in the "main memory," which also provides a work area for those programs. By receiving execution commands, the "CPU" sequentially executes the programs using the data to perform calculations. Note that multiple addresses are assigned to this "main memory" and "non-volatile memory," and programs executed by the "CPU" can identify and access these addresses to exchange data with each other and perform processing. In this embodiment, the programs stored in the "main memory" are an anomaly information acquisition program (a), an external / non-external factor determination program (b), an individual processing program (c), and an exception processing program (d). In addition, the "main memory" and the "non-volatile memory" store anomaly information and high-voltage substation equipment identification information.
[0177] The "CPU" performs the following processes: An abnormality information acquisition program (a) stored in the "main memory" is executed to acquire abnormality information including high-voltage substation equipment identification information, which is information that is sent from the high-voltage substation equipment via the Internet line through "USB, SATA, LAN terminal, etc." and identifies the high-voltage substation equipment. Then, an external / non-external factor judgment program (b) stored in the "main memory" is executed to judge whether, when abnormality information is acquired from multiple high-voltage substation equipment within a specified time, the abnormality information from the multiple high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether it is caused by a non-external wide-area factor that is not an external wide-area factor. If it is determined that the abnormality information was transmitted due to a non-external wide-area factor that is not an external wide-area factor, an individual processing program (c) stored in the "main memory" is executed to perform individual processing, which is processing to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information. Or, if it is determined that the abnormality information has been generated due to an external wide-area factor, an exception handling program (d) stored in the "main memory" is executed to perform exception handling, which is a process separate from the individual processes.
[0178] According to this embodiment, when the high-voltage substation equipment anomaly response system of the present invention acquires anomaly information from the high-voltage substation equipment, if the anomaly information acquired from multiple high-voltage substation equipment within a specified time is determined to be due to an external wide-area cause, exceptional processing is performed in which an engineer is not dispatched to respond to the anomaly. This eliminates the need to wastefully dispatch an engineer to respond to the anomaly.
[0179] <Overview of embodiment 2> Mainly claims 2, 10, and 18 The high-voltage substation equipment abnormality response system of embodiment 2, when it determines that abnormality information has been transmitted from the high-voltage substation equipment due to a non-external wide-area factor, performs processing including a response notification to an engineer to be dispatched to respond to the abnormality in the high-voltage substation equipment that transmitted the abnormality information, instructing the engineer to head to the high-voltage substation equipment, and performs processing other than the response notification if it determines that the abnormality information has been transmitted due to an external wide-area factor.
[0180] <Functional configuration of embodiment 2> 7 shows a functional block diagram of the high-voltage substation equipment abnormality response system of embodiment 2. The high-voltage substation equipment abnormality response system (0700) of embodiment 2 is configured to have an abnormality information acquisition unit (A) (0701), an external / non-external cause determination unit (B) (0702), an engineer notification processing unit (E) (0705), an exception processing unit (D) (0704), and a high-voltage substation equipment information storage unit (G) (0707). The abnormality information acquisition unit (A) (0701) is the same as that of embodiment 1, so a description thereof will be omitted.
[0181] <Description of the configuration of embodiment 2> <Second embodiment: External / non-external factor determination unit (B) (0702)> The "external / non-external factor determination unit (B)" (0702) is configured to determine, when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor.
[0182] The external / non-external factor determination unit (B) (0702) of the second embodiment can be configured to make a determination based on high-voltage substation equipment attribute information associated with high-voltage substation equipment information stored in the high-voltage substation equipment information storage unit (G) described later, in addition to the description of the external / non-external factor determination unit (B) in the first embodiment. For example, if the high-voltage substation equipment attribute information is stored as repair or safety inspection history, the number of years of use or useful life of the high-voltage substation equipment, or the number of years of use or useful life of the equipment or devices constituting the high-voltage substation equipment, the external / non-external factor determination unit (B) can be configured to check the useful life or / and repair history or safety inspection history of the high-voltage substation equipment or the equipment or devices constituting the high-voltage substation equipment, and if it is used beyond its useful life or is nearing its useful life, it is highly likely that the abnormality occurred due to the high-voltage substation equipment that transmitted the abnormality information, and use this as a basis for increasing the possibility of transmission due to a non-external wide-area factor.
[0183] Since it cannot be determined solely based on the years of use or the useful life, if the information from the monitoring device also includes information indicating an abnormality in equipment that has exceeded its useful life or is nearing the end of its useful life, it is determined that there is a high possibility that the abnormality information was transmitted due to a non-external wide-area factor. If the information is not as described above (information indicating an abnormality in equipment that has exceeded its useful life or is nearing the end of its useful life), but rather indicates that the useful life is still sufficient (e.g., more than half) remaining, it is determined that there is a high possibility that the abnormality information was transmitted due to a non-external wide-area factor. In either case, it is finally determined whether the abnormality information was transmitted due to an external wide-area factor or a non-external wide-area factor by confirming that no external wide-area factors (abnormalities in power transmission lines, meteorological disasters (heavy rain, floods, strong winds, etc.), disasters such as earthquakes, wide-area fires, etc.) have occurred from information obtained from electric power companies, weather companies, local governments, etc.
[0184] Alternatively, the system can be configured to first check the repair and safety inspection history that has been retained, and if high-voltage substation equipment that has just been repaired or inspected transmits abnormality information, it is deemed that it is unlikely that the abnormality was caused by the high-voltage substation equipment that transmitted the abnormality information, and that it is more likely that the abnormality information was transmitted due to external wide-area factors, and then start obtaining information about external wide-area factors from electric power companies, meteorological companies, local governments, etc.
[0185] In order to achieve the above, it is preferable that the following configuration be further provided. The high-voltage substation equipment information holding unit (G) may further include a high-voltage substation equipment component parts information holding means for holding high-voltage substation equipment component parts information, which is information on the useful life and / or years of use of the high-voltage substation equipment and the equipment, devices and parts that constitute the said equipment, in association with the high-voltage substation equipment identification information. Also, the high-voltage substation equipment information holding unit (G) may further include a high-voltage substation equipment repair and inspection history information holding means for holding high-voltage substation equipment repair and inspection history information, which is information showing the history of repairs (including replacement of parts and devices) and / or safety inspections of the high-voltage substation equipment.
[0186] <Embodiment 2: Engineer notification processing unit (E) (0705)> The 'engineer notification processing unit (E)' (0705) is configured to perform processing including a response notification, which is a notification to dispatch an engineer (regardless of whether it is an individual, a corporation, or an organization; the same applies below) to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information has been transmitted due to a non-external wide-area factor other than an external wide-area factor, instructing the engineer to head to the abnormal high voltage substation equipment.
[0187] <Embodiment 2 Engineer notification processing unit (E) (0705): Engineer> The "engineer to be dispatched" should preferably be a chief electrical engineer in charge of safety inspections who is in charge of the high-voltage substation equipment in question under normal circumstances. If repairs are necessary to respond to an abnormality, an electrician should also be requested. It is best to select an electrician who has worked on the high-voltage substation equipment in the past as the engineer to respond. If the chief electrical engineer in charge under normal circumstances is unable to respond when abnormality information is received from the equipment (dealing with another matter, in a remote location, on a holiday, etc.), a substitute chief electrical engineer can be selected as the engineer to be dispatched to the abnormality and process the process including a response notification. Similarly, if an electrician (or corporation) who has worked on construction in the past is unable to respond, an alternative person to respond (individual or corporation) should be selected.
[0188] <Embodiment 2 Engineer notification processing unit (E) (0705): Response notification> The "response notification" is a notification to encourage a candidate for an engineer to be dispatched to the high-voltage substation equipment that is the source of the acquired anomaly information to respond to the high-voltage substation equipment in order to deal with the anomaly. It can be configured to include anomaly information (including high-voltage substation equipment identification information) acquired from the high-voltage substation equipment, the type of anomaly, information on the time when the anomaly occurred, high-voltage substation equipment attribute information of the high-voltage substation equipment (information on the location, model, etc.). In addition, it can include information on the number of years of use and useful life of the equipment and the equipment and devices that make up the equipment, the most recent safety inspection results (monthly, annual), route information to the abnormally high-voltage substation equipment, etc.
[0189] <Embodiment 2 Engineer notification processing unit (E) (0705): Processing including response notification> The "processing including response notification" includes processing before the notification and processing for the notification itself, and may also include processing for obtaining response results or reports, and processing for paying remuneration and expenses to responders.
[0190] <Embodiment 2 Engineer notification processing unit (E) (0705): Processing including response notification: Processing before notification> "Processing before sending a notification" can include processing to convert the information on the abnormal state of the high-voltage substation equipment and the information on the location of the high-voltage substation equipment obtained in order to send the notification into a format for notifying the engineer (such as text format, CSV format, PDF format, audio data, or a data format dedicated to this system), processing to associate the name and contact information (telephone number, email address, etc.) of the engineer to whom the notification is to be sent with engineer identification information that identifies the engineer and to store it in advance, and processing to search for and narrow down candidates for engineers to send the notification to.
[0191] The process of searching for and narrowing down candidate engineers to whom notifications should be sent can include a process of prioritizing the multiple candidates searched for and selected based on specified criteria (geographical distance and / or temporal distance (travel time) from the high-voltage substation equipment, the number of times they have responded to response requests in the past, including requests to respond to abnormalities in other high-voltage substation equipment, and the number of times they have responded to the type of abnormality information (e.g., power outages, leakage currents, abnormal equipment temperature, etc.)).
[0192] <Embodiment 2 Engineer notification processing unit (E) (0705): Processing including response notification: Processing for performing notification itself> The "process of issuing the notification itself" may include a process of issuing notifications to candidates all at once or individually, or a process of contacting the notified candidates and determining them as the responders. Alternatively, it may include a process of contacting the candidates prioritized as described above in order of priority to confirm whether they can respond, and determining the engineers who are available as the recipients of the response notification.
[0193] Furthermore, the process including the response notification may include a process of receiving and responding to an interim report or completion report from the responder after the response notification to the engineer. Also, the process may include a process of determining a responder and notifying a customer who receives power using the high-voltage substation equipment or a manager of the high-voltage substation equipment that a response to the abnormality has started.
[0194] <Embodiment 2 Exception Processing Unit (D) (0704)> The exception processing unit (D) (0704) is configured to perform exception processing, which is processing other than the processing including the response notification, when it is determined that the abnormality information is generated due to an external wide-area factor.
[0195] The "exception processing" is processing performed when abnormality information of the high-voltage receiving and transforming equipment is generated due to an external wide-area factor, and basically, processing including response notification in the engineer notification processing unit (E) is not performed while the external wide-area factor has not ended, that is, processing to respond to the abnormality of the high-voltage receiving and transforming equipment (e.g., sending an engineer to the installation site of the high-voltage receiving and transforming equipment) is not performed. It may include processing to notify the engineer in charge of the high-voltage receiving and transforming equipment in normal times that abnormality information due to an external wide-area factor has been received and not to respond while the external wide-area factor is continuing. When it is determined that the external wide-area factor has ended, the engineer may be notified that it has ended. The exception processing may also include processing to monitor whether the external wide-area factor is continuing or has ended while the external wide-area factor is continuing.
[0196] The criterion for determining the end of an external wide-area factor may be configured to determine that the external wide-area factor has ended when a predetermined number or more (or a certain percentage or more) of high-voltage substation equipment within a predetermined geographical area where the initial anomaly information was issued have returned to a normal state. The exception processing may include a process of determining that the anomaly of the high-voltage substation equipment is caused by a non-external wide-area factor that is not an external wide-area factor and transferring the processing to an engineer notification processing unit (E) to perform processing including a response notification, if there is a high-voltage substation equipment in which an abnormal state continues among the high-voltage substation equipment that issued the anomaly information even after it is determined that the external wide-area factor has ended.
[0197] <Embodiment 2: High-voltage substation equipment information storage unit (G) (0707)> The “high voltage substation equipment information storage unit (G)” (0707) is configured to store high voltage substation equipment information that associates high voltage substation equipment identification information with high voltage substation equipment attribute information including high voltage substation equipment location information, which is information indicating the geographical location of the high voltage substation equipment.
[0198] A "geographical location" is a location on a map, and is information that combines information indicating a horizontal location, such as latitude and longitude, and information indicating a vertical location (e.g. altitude, above sea level, depth, floor number, etc.). It can be configured to include information such as roads to the location and possible routes for each other means of transportation (public transportation such as trains and buses, and other means of transportation such as bicycles and walking).
[0199] "High-voltage substation equipment location information" is information that indicates the geographical location of high-voltage substation equipment. Information that indicates the geographical location of high-voltage substation equipment is the address of the business establishment where the high-voltage substation equipment is installed, the name of the business establishment, address information and latitude and longitude information of the site of the building or facility where the equipment is installed, route information by road or other means of transportation, and information (such as text, layout diagram, or premises diagram) regarding the location of the high-voltage substation equipment within the site of the building, facility, or business establishment.
[0200] It is preferable that the location of high-voltage substation equipment on a site be determined by information that includes horizontal location information, literally where on the site it is located, as well as vertical location information, such as whether it is underground, on the roof of a building, or on an intermediate floor of a building. The high-voltage substation equipment location information may include, in addition to information regarding the layout of the location where the target high-voltage substation equipment is installed, route information from the entrance of the business premises where the equipment is installed (a service entrance (including entrance reception, etc.) for outside contractors to enter) to the installation location, the name and contact information (e.g., telephone number) of the person in the business premises who should be contacted in advance when heading to the installation location, information regarding the type of keys and ID cards required for passage along the way and information regarding how to obtain (or borrow) them, tools (including protective equipment) and signs (e.g., signs for working at height, one-way traffic, etc.) that are particularly necessary when working at the installation location, and information regarding the type of traffic restrictions that may be required when working. Regarding route information to the high-voltage substation equipment, if the installation location is inside a building (including basement floors) or on the roof of a building, it is preferable to have route information from the building entrance to the equipment, and it is even more preferable to have a route that can be traveled during a power outage or disaster within the building.
[0201] The "high-voltage substation equipment attribute information" is information on the attributes of the high-voltage substation equipment, and an example has been described in the first embodiment. It will be repeated. The "high-voltage substation equipment attribute information" is information indicating the attributes of the high-voltage substation equipment, such as the manufacturer of the high-voltage substation equipment, the model name, the year, the serial number, the installation date, the owner, the manager, the responsible electrical engineer, the name of the building where the equipment is installed, the address where the equipment is installed, the longitude and latitude where the equipment is installed (such as the position information of the satellite positioning system), the name of the business operator of the business site where the equipment is installed (or / and the owner of the business site), information identifying the power transmission network from which the high-voltage substation equipment receives power, past safety inspection history, repair history, the period of use and service life of the high-voltage substation equipment, the period of use and service life of each of the equipment, devices, and parts that constitute the high-voltage substation equipment, and the like. Furthermore, information such as the structure and inspection method of the high-voltage substation equipment, and how to open and close each part may be included, and an instruction manual, an installation manual, and an inspection and repair manual for the high-voltage substation equipment may be included. The safety inspection history or repair history preferably includes the name of the technician who was responsible, as identified by the technician identification information.
[0202] The system can be further configured to have a high-voltage substation equipment registration unit that registers high-voltage substation equipment attribute information, and a high-voltage substation equipment attribute information editing unit that edits (adds, deletes, modifies) the retained high-voltage substation equipment attribute information. This can be used when a consumer intends to use this system wishes to register new high-voltage substation equipment. Not only new consumers, but also consumers who are already using this system can edit the high-voltage substation equipment attribute information when they add or update high-voltage substation equipment. The system may be configured so that the consumer can edit it themselves, or so that the consumer can request the administrator of the system to register it on their behalf.
[0203] <Embodiment 2: Example of use of the high-voltage substation equipment abnormality response system> In the first embodiment, it has been described that abnormality information is received, whether the abnormality information is due to an external wide-area factor is judged, and either a process including a response notification or an exception process is performed depending on the judgment result. Similarly, in the description of the second embodiment, in the example of the Sato Building in FIG. 4, it is assumed that the abnormality information is judged to have been sent due to a non-external wide-area factor, and a process including a response notification is performed. Using FIG. 4, FIG. 8, and FIG. 9, an example of use of the high-voltage substation equipment abnormality response system of the second embodiment when performing a process including a response notification (a process including a response notification that notifies an engineer dispatched to respond to the abnormality of the high-voltage substation equipment that sent the abnormality information to head to the corresponding high-voltage substation equipment) will be described. As above, FIG. 4, FIG. 8, and FIG. 9 are examples of screens of a PC terminal connected to this system, used by an operator at the monitoring center of this system.
[0204] <Embodiment 2 Example of use of this system: Display of response candidates: Selection of candidates> The monitoring center of this system that has acquired the abnormality information (see FIG. 4) determines that the transmission of the abnormality information is not due to an external wide-area factor, and therefore selects an engineer to be dispatched. The "Select" button in the upper right corner of the screen in FIG. 4 is pressed. It can also be configured so that the rule to be used for selection can be selected when the selection button is pressed (e.g., rules based on the distance between the engineer and the abnormal high voltage receiving and transforming equipment, travel time, the engineer's schedule, response history, etc., and combinations of the above rules. Weighting when combining rules). Searching and selecting candidates to respond to the abnormality in the Sato Building from the list of engineers can be included in the process including the response notification, as described above. Examples of rules for selection will be described in the following embodiments 3 to 7. To select an engineer, location information indicating the location of the engineer, schedule information indicating the engineer's schedule, and high voltage receiving and transforming equipment information including high voltage receiving and transforming equipment location information indicating the location of the abnormal high voltage receiving and transforming equipment that transmitted the abnormality information are used.
[0205] <Embodiment 2 Example of use of this system: Display of response candidates: Prioritization method> In the example shown in FIG. 8, a rule is used to prioritize the response candidates, that is, the engineers, in the order of their closest straight-line distance to the Sato Building. Possible methods for prioritizing response candidates include prioritizing in order of proximity to the high-voltage substation equipment (or its monitoring device) that emitted the anomaly information (straight-line distance, distance on the route, time distance taking into consideration means of transportation, etc.), prioritizing engineers who are in charge of the high-voltage substation equipment that emitted the anomaly information in normal times as first priority (second place and below are used in combination with other prioritization), prioritizing engineers who are in charge of equipment of the same type as the high-voltage substation equipment that emitted the anomaly information in normal times in order of proximity (straight-line distance, distance on the route, time distance taking into consideration means of transportation, etc.), giving a high priority to engineers who are available within their schedules, prioritizing in order of the number of times they have responded to incidents in the past, including other equipment, prioritizing in order of the number of years of experience as a chief electrical engineer in charge of safety inspections of high-voltage substation equipment, and a combination of these methods (determining the order in which rules are applied between rules and applying them to prioritize, assigning points depending on the order of each rule and prioritizing based on the total score, weighting the points assigned based on the rules, etc.).
[0206] <Embodiment 2 Example of use of this system: Display of responsive candidates: Display of prioritized candidates> The PC screen shown in Figure 8 is an example that displays the positions of response candidate engineers on a map in the center of the screen, based on the straight-line distance from the Sato Building, where the high-voltage substation equipment that sent the anomaly information is installed. The map in the center of the screen displays multiple concentric circles indicating distance, with the Sato Building at the center, and response candidates are displayed with numbers in circles in order of closest distance. The response candidates represented by the numbers in circles are displayed on the right side of the screen in the order corresponding to the numbers.
[0207] The system can be configured to select a first predetermined number of people, such as 10 people, in order of linear distance and display them on the screen. Candidate engineers may be selected and displayed up to a distance that can be traveled by car in two hours. The requirement that the chief electrical engineer must arrive at the site within two hours is based on Article 53, Paragraph 2, Item 6 of the Enforcement Regulations for the Electricity Business Act, which states, "The main contact point of the other party to the contract (or the safety engineer in the case where the other party to the contract meets the requirements of Item 2 of the previous article) must be in a place that can be reached without delay to the workplace," as stated in the interpretation and operation (internal regulations) of the Chief Engineer System by the Ministry of Economy, Trade and Industry: "'Reaching without delay' means that the person must reach the workplace within two hours."
[0208] The current location of the engineer may be obtained from the contact information or action schedule (planned location by hour) registered in advance in this system, or may be obtained and used from location information (location information from a satellite positioning system or location information from a mobile phone) from a mobile terminal or mobile phone that can connect to this system carried by the engineer, or from a positioning system (satellite positioning system, inertial positioning system, etc.) used by a car navigation system installed in the car used by the engineer to travel. Furthermore, as in the embodiment described below, the action schedule of the engineer may be input and stored in this system, and candidates may be displayed excluding those who are on vacation or compensatory leave when an abnormality occurs, or those who are difficult to respond because it is outside business hours.
[0209] The system may be further configured to have a positioning system engineer position information acquisition unit that periodically or temporarily acquires the position information of the engineer from a satellite positioning system and / or other positioning systems (mobile phone network, inertial positioning system). The positioning system engineer position information acquisition unit temporarily acquires the position information of the engineer from a satellite positioning system or the like installed in a mobile terminal used by the engineer to connect to the system when requested by the system. The system may be configured to automatically acquire the abnormality information when the abnormality information acquisition unit (A) acquires the abnormality information, or may be configured to perform the acquisition as a process included in a process including a response notification to the engineer.
[0210] <Embodiment 2 Example of use of this system: Display of response candidates: Response notification to candidates> The selected candidates are notified of the need to go to the corresponding high-voltage substation equipment by a process that includes a response notification. The response notification is, for example, sent to all selected candidates by sending emails (including short message service (SMS)) or push notifications at once, or by making an automatic call to each candidate divided into groups according to the number of available telephone lines (fixed line or mobile phone). Alternatively, the monitoring center operator may directly call each candidate in the order of priority assigned to the candidates based on a predetermined rule to request a response. When sending emails or push notifications at once to all candidates or making an automatic call, it is preferable that the contents of the emails or push notifications or the contents of the automatically sent voice include attribute information (model, installation location, etc.) of the high-voltage substation equipment identified by the high-voltage substation equipment identification information included in the anomaly information, the type of anomaly (power outage in the example of FIG. 4), the details, and the date and time of the anomaly occurrence, as well as a message that a response is required and that, if a response is possible, the monitoring center should respond as soon as possible to the availability of the response. Regarding mass communications (including push notifications) to inquire about the availability of a response, it is a good idea to make a prior agreement known, such as that if there is no reply within, say, five minutes after receipt, it will be considered a refusal.
[0211] When a push notification is sent to a mobile device used by a technician, if the mobile device is in a sleep or standby state, it can be configured to display a message inquiring whether or not the technician can respond by popping up in the center of the screen or from one of the edges of the display screen when the push notification is received (it is more preferable to notify the technician of the incoming call with a ringtone and / or vibration at the same time as displaying the message). Regarding whether or not the technician can respond, it is preferable to provide two buttons, "Accept" or "Reject," in the push notification so that the technician who receives the notification can easily reply by selecting either one. When accepting is selected, it is preferable to be able to easily answer by dialing in the number of minutes after which the technician can begin moving.
[0212] Even when calling the candidate engineers one by one in order, the contents to be included in the automatic e-mail or telephone call are configured to be transmitted to the engineers.
[0213] <Embodiment 2 Example of use of this system: Display of response candidates: Determination of responder> If the candidates are checked one by one in order of priority to see if they can respond, the first engineer who is available to respond will be selected as the responder. If all candidates are checked at the same time, the candidate with the highest priority among those who respond within the response deadline will be selected as the responder. Once the responder has been selected, more detailed information about the high-voltage substation equipment attributes related to the abnormally high-voltage substation equipment will be sent. This information includes various monitoring data obtained before, when, and after the abnormality occurred, the results of the most recent safety inspection (monthly, annual), and the remaining useful life of the equipment and parts. The operator at the monitoring center will also send the route to the abnormally high-voltage substation equipment to the responder's mobile device. They may also be guided to the site.
[0214] <Embodiment 2: Example of using this system: Receiving abnormality information: When it is due to an external factor> In the above example, the case was a single occurrence (power outage) at the high-voltage substation equipment of the Sato Building. However, if abnormality information is acquired from multiple high-voltage substation equipment in the same city or other nearby areas within a specified time (e.g., within 5 minutes), if the service life of the abnormally high-voltage substation equipment included in the high-voltage substation equipment attribute information associated with the high-voltage substation equipment information identified by the high-voltage substation equipment identification information included in the acquired abnormality information is still sufficient, or if the abnormally high-voltage substation equipment has just recently undergone repair or safety inspection, or if power outage information is acquired from a power company for the relevant area (the area including the high-voltage substation equipment installation location from which the abnormality information was transmitted), the system may be configured to determine that the abnormality is due to an external wide-area factor. If it is determined that the abnormality information was transmitted due to an external wide-area factor, exception processing is performed. The following example of exception processing is the same as that of embodiment 1, so a description thereof will be omitted.
[0215] <Processing flow of embodiment 2> 10 is a flowchart of the operation process of the high-voltage substation equipment abnormality response system, which is a computer of embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system of embodiment 2 has a high-voltage substation equipment information holding step (g) (S1001), an abnormality information acquisition step (a) (S1002), an external / non-external cause determination step (b) (S1003), an engineer notification processing step (e) (S1004), and an exception processing step (d) (S1005).
[0216] The operation method of the high voltage substation equipment abnormality response system, which is a computer, is as follows: The high-voltage substation equipment information storage step (g) (S1001) performs a process of storing high-voltage substation equipment information in which high-voltage substation equipment identification information is associated with high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment; The anomaly information acquisition step (a) (S1002) includes a process of acquiring anomaly information including high-voltage substation equipment identification information, which is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; In the external / non-external factor determination step (b) (S1003), when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, a process is performed to determine whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor; If the result of the judgment in the external / non-external factor judgment step (b) (S1003) is that the abnormal information is generated due to a non-external wide-area factor, The engineer notification processing step (e) (S1004) performs processing including a response notification to a dispatched engineer (whether an individual, a corporation, or an organization; the same applies below) to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, to notify the dispatched engineer that he / she should head to the abnormal high voltage substation equipment, If the result of the judgment in the external / non-external factor judgment step (b) (S1003) is that the abnormal information was issued due to an external wide-area factor, The exception processing step (d) (S1005) performs exception processing which is different from the processing including the response notification. This is an operating method for causing a high-voltage substation equipment abnormality response system, which is a computer, to execute such a series of processes.
[0217] <Embodiment 2: Description of Hardware>
[0218] The hardware configuration of the high-voltage substation equipment abnormality response system in the second embodiment will be described with reference to FIG.
[0219] <Hardware configuration of embodiment 2> 11 is a diagram showing the hardware configuration of the high-voltage substation equipment abnormality response system in this embodiment 2. As shown in this diagram, the high-voltage substation equipment abnormality response system in this embodiment includes a "CPU (Central Processing Unit)" that performs various arithmetic processing, a "chipset", a "main memory", a "non-volatile memory" that stores various programs and data (information), an "I / O controller", "USB, SATA, LAN terminal, etc.", "BIOS (UEFI)", "PCI Express slot", "real-time clock", and a "graphics card" as an expansion board. These are then interconnected by a data communication path such as a "system bus" to transmit and receive information and perform processing.
[0220] The various programs and data (information) stored in the non-volatile memory are expanded into the main memory when the system is started up, and upon receiving an execution command, the CPU sequentially executes the programs to perform calculations using the data.
[0221] When this system starts up, the various programs and data (information) stored in the "non-volatile memory" are read, expanded, and stored in the "main memory," which also provides a work area for those programs. By receiving execution commands, the "CPU" sequentially executes the programs using the data to perform calculations. Note that multiple addresses are assigned to this "main memory" and "non-volatile memory," and programs executed by the "CPU" can identify and access these addresses to exchange data with each other and perform processing. In this embodiment, the programs stored in the "main memory" are an anomaly information acquisition program (a), an external / non-external factor determination program (b), an exception processing program (d), an engineer notification processing program (e), and a high-voltage substation equipment information retention program (g). The "main memory" and "non-volatile memory" also store anomaly information, high-voltage substation equipment identification information, high-voltage substation equipment attribute information, and high-voltage substation equipment information.
[0222] The "CPU" performs the following processes: A high-voltage substation equipment information retention program (g) stored in the "main memory" is executed to retain high-voltage substation equipment information that associates high-voltage substation equipment identification information with high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment. Then, the abnormality information acquisition program (a) stored in the "main memory" is executed to acquire abnormality information including high-voltage substation equipment identification information, which is information that is transmitted from the high-voltage substation equipment via the Internet line through "USB, SATA, LAN terminal, etc." and identifies the high-voltage substation equipment. Then, an external / non-external factor judgment program (b) stored in the "main memory" is executed to judge whether, when abnormality information is acquired from multiple high-voltage substation equipment within a specified time, the abnormality information from the multiple high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether it is caused by a non-external wide-area factor that is not an external wide-area factor. If it is determined that the abnormality information was sent due to a non-external wide-area factor that is not an external wide-area factor, the engineer notification processing program (e) stored in the "main memory" is executed to perform processing including a response notification, which is a notification to a technician (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormally high voltage substation equipment, which is the high voltage substation equipment that sent the abnormality information, to head to the abnormally high voltage substation equipment. Or, if it is determined that the abnormality information has been generated due to an external wide-area factor, an exception processing program (d) stored in the "main memory" is executed to perform exception processing which is different from the processing including the response notification.
[0223] According to this embodiment, when the acquired abnormality information is transmitted due to a non-external wide-area factor, processing is performed that includes a response notification, which is a notification to an engineer that he or she should head to the abnormally high voltage substation equipment in response to the abnormality that has occurred in the high voltage substation equipment, and when the abnormality information is transmitted due to an external wide-area factor, exception processing, which is processing different from the processing including the response notification, can be performed.
[0224] <Overview of embodiment 3> Mainly claims 3, 11, and 19 The high-voltage substation equipment abnormality response system of embodiment 3 is based on embodiment 2, and the engineer notification processing unit (E) is configured to have a location-dependent response notification processing means (K1) that determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, and the retained engineer location-dependent response decision rule, and performs processing including response notification.
[0225] <Functional configuration of embodiment 3> Fig. 12 shows a functional block diagram of a high-voltage substation equipment abnormality response system of embodiment 3 based on embodiment 2. The high-voltage substation equipment abnormality response system (1200) of embodiment 3 further includes an engineer location information storage unit (H1) (1208), an engineer location-dependent responder decision rule storage unit (J1) (1211), and a location-dependent response notification processing means (K1) (1216) in the engineer notification processing unit (E) (1205) in addition to the configuration of embodiment 2. Therefore, only the engineer location information storage unit (H1) (1208), the engineer location-dependent responder decision rule storage unit (J1) (1211), and the location-dependent response notification processing means (K1) (1216) that are not described in embodiment 2 will be described below.
[0226] <Description of the configuration of embodiment 3> <Third embodiment: Engineer location information storage unit (H1) (1208)> The 'storage unit for engineer location information (H1)' (1208) is configured to store engineer identification information, which is information for identifying an engineer, and engineer location information, which is information indicating the location of the engineer, in association with each other.
[0227] "Engineer identification information" is information for identifying an engineer. The engineer identification information may be the engineer's name, the engineer's initials, or simply a string of numbers and letters, as long as it is information that can uniquely identify the engineer. If the engineer is a corporation, the engineer identification information may be a combination of identification information indicating the corporation so as to identify an individual who belongs to (or is employed by) the corporation, and identification information identifying an individual who belongs to the corporation.
[0228] The engineer identification information can also be configured to be stored in association with attribute information indicating the attributes of the engineer, such as the engineer's address or the location (or planned location) when a candidate to be notified is being selected, contact information, the engineer's qualifications, skills, and career history indicating the experience, past history of responding to response notifications including those for other high-voltage receiving and transforming equipment, tools and equipment possessed, means of transportation, etc. The engineer attribute information may also include information useful for dealing with the case in which the engineer suffers secondary damage when dispatched to respond to a high-voltage receiving and transforming equipment where an abnormality has occurred, such as the engineer's blood type, medical history, chronic illness, and emergency contact information.
[0229] "Engineer location information" is information indicating the location of an engineer, such as the engineer's home address and the planned geographical location of the engineer for each schedule. The planned geographical location for each schedule is information on where the engineer is geographically, such as, for example, performing inspections in Building A on Monday morning and desk work at the home / office in the afternoon, inspecting Building B on Tuesday morning and inspecting Hospital C in the afternoon. If the location changes depending on the time of day, not just morning and afternoon, the information associates time information indicating the geographical location for each time period with information indicating the geographical location. Engineers may also register the date, time, and planned location in this system in advance.
[0230] A configuration in which the system acquires location information (location information from a satellite positioning system or a mobile phone network) from a positioning system installed in a mobile phone (including a smartphone) carried by the technician or a mobile terminal for using the system, or location information (location information from a satellite positioning system or an inertial positioning system) from a car navigation system installed in a car used by the technician for transportation. Alternatively, the system may be configured so that when moving from one location to another to perform work, the location is registered and the end of the work (start of movement) is registered in the system. Alternatively, a combination of one or more of the above examples may be used. The most preferred configuration is one in which the system acquires location information from a positioning system, allowing the technician to obtain the latest location information of the technician in real time.
[0231] The system may be further configured to have a positioning system engineer position information acquisition unit that periodically or temporarily acquires the position information of the engineer from a satellite positioning system and / or other positioning systems (mobile phone network, inertial positioning system). The positioning system engineer position information acquisition unit temporarily acquires the position information of the engineer from a satellite positioning system or the like installed in a mobile terminal used by the engineer to connect to the system when requested by the system. The system may be configured to automatically acquire the abnormality information when the abnormality information acquisition unit (A) acquires the abnormality information, or may be configured to perform the acquisition as a process included in a process including a response notification to the engineer.
[0232] <Third embodiment: Engineer location dependent responder decision rule storage unit (J1) (1211)> The 'storage unit for engineer location-dependent responder determination rules (J1)' (1211) is configured to store engineer location-dependent responder determination rules, which are rules for determining a responder, as described below, based on engineer location information.
[0233] Examples of "rules for determining the responder depending on the engineer's location" include rules for determining the engineer who is closest in a straight line to the high-voltage substation equipment that has transmitted anomaly information due to a non-external wide-area factor as the responder without checking whether he or she can respond; rules for determining the engineer who is closest in distance on a route rather than in a straight line as the responder without checking whether he or she can respond; rules for prioritizing engineers according to closest straight-line distance and determining the highest-priority engineer who can respond as the responder; and rules for prioritizing engineers according to closest distance on a route rather than in a straight line and determining the highest-priority engineer who can respond as the responder.
[0234] The distance on the route is, for example, the distance of the route that the engineer takes to reach the high-voltage substation equipment (e.g., the shortest route even if toll means such as toll roads are used, or the shortest route that can be used cheaply without using toll means as much as possible). For example, in a location where roads are arranged in a grid pattern, if the high-voltage substation equipment and the engineer are located at diagonal corners of a rectangle formed by the roads, even if the straight-line distance is 1 km, in order to actually get there, they will have to travel a distance along the roads equivalent to the length of two sides of the rectangle, so the distance on the route will be greater than 1 km.
[0235] Alternatively, the rules may be such that first priority is given to engineers located in the local government administrative division where the high-voltage substation equipment that transmitted the abnormality information is installed, second priority is given to engineers located in adjacent areas that are directly adjacent to the local government administrative division (e.g., Chuo Ward in relation to Chiyoda Ward in Tokyo), and third priority is given to indirectly adjacent areas that are not directly adjacent to the local government administrative division but are directly adjacent to adjacent areas (e.g., Koto Ward and Sumida Ward in relation to Chiyoda Ward in Tokyo), and the engineer with the highest priority who is able to respond may be determined to be the one to respond.
[0236] Furthermore, the rule may be such that the engineer in charge of the high-voltage substation equipment during normal times is first checked for availability, and if the engineer is unable to respond, a candidate engineer who will take over the response may be selected according to the rules exemplified above to determine the responder. Alternatively, the rule may be such that a response availability inquiry is sent to high-priority response candidates (e.g., within the top 10, within 1 km, within 10 km, etc.) via a mass email (or a push notification, etc.) and the engineer who responds the earliest to say that he or she can respond is determined to be the responder. The rule may be such that the engineers in charge of the high-voltage substation equipment during normal times are added regardless of their priority, and a response availability inquiry is sent to high-priority response candidates (e.g., within the top 10, within 1 km, within 10 km, etc.) based on the engineer location information to a mass email (or a push notification, etc.) and the engineer with the highest priority among those who respond to say that they can respond is determined to be the responder.
[0237] <Embodiment 3: Engineer location dependent responder decision rule storage unit (J1): Application of multiple rules> In this embodiment, the rule for determining the responder is based on the location information of the engineer, but as in the embodiment described later, there may be a rule based on the travel time from the location of the engineer, a rule based on the schedule of the engineer, a rule based on the location and schedule of the engineer, or a rule based on the history of the engineer's past response. In addition, there may be a rule that gives the first priority to the engineer who is in charge of the abnormal high voltage substation equipment in peacetime, a rule that determines the responder from among the engineers who are in charge of the same type of high voltage substation equipment as the abnormal high voltage substation equipment in peacetime, a rule that determines the responder from among the engineers who have responded to the same type of high voltage substation equipment as the abnormal high voltage substation equipment, or a rule that determines the responder by prioritizing the number of years of experience as a chief electrical engineer in charge of safety inspection of the high voltage substation equipment. Furthermore, a rule that determines the responder by combining multiple rules may be considered.
[0238] The application of multiple rules may occur in the following cases: (1) The rules are applied in order. For example, priorities are assigned to engineers based on proximity (in terms of distance or travel time) (the closer the location, the higher the priority), and, for example, the top 20 engineers are extracted. Next, engineers are ranked based on whether they are available during certain time periods based on their schedules, and the more likely they are to be available, the higher the priority. Engineers are queried in order of priority to see if they are available, and among the 20 engineers, all engineers with the highest priorities based on their schedules (for example, the top 10) are asked whether they are available, using a push notification or other method. In this way, two rules are applied in order. Note that this is not limited to two rules, and three or more rules may be applied in order. The order in which multiple rules are applied can also be a rule.
[0239] (2) Points are given according to priority, and an overall ranking is determined by the total score for each rule. For example, points are given in the order of the location of the engineers closest to the location. The closest engineer is ranked first. The first-ranked engineer may be configured to get the highest score, or conversely, to get the lowest score. If the first-ranked engineer gets the highest score, the overall ranking is determined in the order of the highest total score, and if the first-ranked engineer gets the lowest score, the overall ranking is determined in the order of the lowest total score. For example, the first-ranked engineer is given 20 points, and each time a rank is dropped, a point is dropped (second-ranked engineer gets 19 points). From 21st place on down, 0 points are given and no points are given (it is possible to increase the score of the first-ranked engineer and increase the number of people to whom points are given as appropriate). Next, the schedules of the engineers are prioritized so that the more likely they are to be available, the higher the ranking and the higher the score. Again, 20 points are given to the first-ranked engineer, and 0 points are given to those 21st and below. The overall ranking of engineers is determined in the order of the highest score by adding up the scores obtained by applying the two rules. Engineers can be asked in order of overall ranking whether they are available to respond, or a push notification can be sent to the engineer with the highest overall ranking (e.g. 20th place) to inquire whether they are available to respond.
[0240] In the case of (2) above, three or more rules may be applied instead of two. When two or more rules are applied, weighting may be applied to each rule. Weighting can be done by increasing or decreasing the points given for each rule by a certain percentage. For example, if location takes priority over schedule, and speed of arrival at the location is given priority, the points given to the closest location can be doubled (giving double the points, 40 points, to the first place), or the points given to the most likely to be accommodated in terms of schedule can be halved (giving half the points, 10 points, to the first place), and the higher the total points, the higher the overall ranking.
[0241] It is preferable to configure the system so that the order of combination of the multiple rules in the above case (1) and the type and weighting of the combination of the multiple rules in the above case (2) are stored as the responder determination rules. It is preferable to configure the system so that the system further has a multiple responder determination rule application rule storage unit that stores the multiple responder determination rule application rule, which is a rule when applying multiple responder determination rules.
[0242] <Third embodiment: Location-dependent response notification processing means (K1) (1216)> The "location-dependent response notification processing means (K1)" (1216) is configured within the engineer notification processing unit (E) (1205) to determine the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, and the retained engineer location-dependent response decision rule, and to perform processing including response notification.
[0243] "Determining the engineer to be notified" refers to prioritizing engineers, for example, as shown in the following example. Based on high-voltage substation equipment attribute information including high-voltage substation equipment location information indicating the geographical location of the high-voltage substation equipment that has transmitted anomaly information due to a non-external wide-area factor, engineer location information indicating the location of the engineer, and engineer location-dependent response decision rules, the engineer to be notified is determined based on the geographical relationship between the high-voltage substation equipment and the location of the engineer. For example, as described above, the engineers who are response candidates are prioritized according to the straight-line distance between the high-voltage substation equipment and the engineer, the distance on the route, and the location area, and the engineer to be notified is determined.
[0244] "Processing including response notification" refers to, for example, processing such as the following, inquiring of engineers as to whether they are available to respond and determining the responder based on the result of the inquiry. The response availability of each engineer is checked in order of priority, or response availability inquiries are sent (e.g., email, SMS, push notification, automated voice call, etc.) to engineers from the highest priority up to a specified rank or to engineers who are close enough to reach the target high-voltage substation equipment within a specified travel time (e.g., within 2 hours), and the highest priority engineer who responds that he or she is available to respond is determined. Furthermore, a time limit may be set so that the highest priority engineer who responds within a specified waiting time after the simultaneous response availability inquiries are sent is determined to be the responder.
[0245] An example of using this system to select engineers and determine who will respond will be explained below with reference to the drawings.
[0246] <Embodiment 3 Example of use of this system: responder> Figure 8 is an example of a PC terminal screen for determining who can respond to this anomaly information from among the response candidates. The response candidates on the right side are listed in order of closest straight-line distance to the Sato Building. The map in the center is displayed at a lower magnification than the map in Figure 4, and is scaled so that up to the sixth place, Watanabe Rikka, who is about 2.0 km away from the Sato Building, can be displayed. The map in the center can be manually enlarged or reduced as needed by the operator, but it can be configured so that the scale automatically changes while the Sato Building is displayed according to the response candidate to be contacted. In this explanatory example, the location information of each technician is obtained by instructing the positioning system of the mobile terminal used by the technician to connect to this system, or the car navigation system of the car used by the technician to transmit the location information.
[0247] In Figure 8, the locations of potential response engineers within a distance of 2 km from the location of the high-voltage substation equipment that transmitted the anomaly information are displayed in concentric circles in 500-m increments, but the locations of potential response engineers may be displayed in larger ranges such as 5 km, 10 km, or 20 km. This is because in areas with a small number of engineers, there is not necessarily an engineer in the immediate vicinity of the location where the anomaly information was transmitted. The chief electrical engineer, who is the engineer in charge of safety inspections, needs to be able to arrive at the high-voltage substation equipment, which is his / her own structure, within two hours, but there are also cases where a response request is made to an engineer located 20 or 30 km away, provided that he / she can arrive within two hours.
[0248] In FIG. 8, the map in the center of the screen displays multiple concentric circles at 500m intervals from the Sato Building, 500m, 1.0km, 1.5km, and 2.0km. However, for example, it may be configured to display only the 500m circle first, and if there is no response candidate within the circle, the 500m circle is erased and the 1.0km circle is displayed next. Alternatively, it may be configured to display circles of a specified radius that include the nearest candidate. In FIG. 8, two engineers, Mr. Sato and Mr. Suzuki, are located within the 1.0km circle. When only the 1.0km circle is displayed and the two engineers are asked whether they can respond, and both of them respond that they cannot respond, the 1.0km circle is erased and the 1.5km circle is displayed next, and three engineers located within the range of 1.0km to 1.5km are asked whether they can respond, and the range is expanded sequentially to perform processing including response notification.
[0249] The inquiry about the availability of response can be sent by email to all the engineers who are candidates for response within the range as described above, or by telephone using an automated voice call. If the application for this system running on the mobile device carried by each engineer is connected to the server device of this system, the availability of response can be inquired about by text or voice call via the application.
[0250] <Embodiment 3 Example of using this system: Selection of responders Example 1: Sequential contact> The engineer closest to the Sato Building is Sato Hajime, who is 800m away in a straight line. The second is Suzuki Kenji, who is 1.0km away in a straight line. Suzuki's name is underlined to indicate that he is the engineer in charge of the Sato Building's high-voltage substation equipment in peacetime. "Peacetime" refers to a time when no abnormality information is being transmitted and the high-voltage substation equipment in question is thought to be operating normally, and the engineer in charge in peacetime is the chief electrical engineer who is appointed as the electrician in charge of safety inspections of the said equipment, which is a privately owned structure, in peacetime.
[0251] In this example, Suzuki is selected as the highest priority candidate because Suzuki is the normal-time engineer for the equipment and is located 1.0 km from the site, which is not significantly different from Sato, who has the first priority. It is also possible to simply determine the distance without prioritizing the normal-time engineer. Suzuki's location is displayed on the map in the upper right corner as a circle with the number 2. When the operator clicks on the phone icon on the right side of Suzuki's column on the right side of the screen, a call can be made to Suzuki's mobile phone. If the operator can confirm that Suzuki is available after the call, Suzuki is selected as the person to respond. If Suzuki is unable to respond, the mobile phones of each engineer are called in order of proximity, starting with Sato, who has the highest priority based on straight-line distance (excluding Suzuki), to confirm whether they can respond. In the screen in Figure 8, 11 people are displayed, but if there are more than 11 candidates to respond to, scroll down and check the availability of each candidate more than 11 in order.
[0252] <Embodiment 3 Example of using this system: Selection of responders Example 2: Mass communication> In the above example, the operator at the monitoring center calls each of the response candidates to confirm whether they are available to respond, but if there are multiple response candidates within a certain distance, an email (or a push notification) to confirm whether they are available to respond can be sent to all of the candidates at once, and a response candidate can be selected from among those who reply that they are available to respond. If none of the candidates to whom the email was initially sent reply that they are available to respond, or if there is no reply at all, the email to confirm whether they are available to respond is sent again with a longer distance than the previous one. The selection can be repeated by gradually increasing the distance until a response that they are available to respond is obtained. Compared to the above example of making a phone call, the time it takes to decide on a response candidate can be shortened because multiple candidates can be confirmed at once.
[0253] <Embodiment 3: Example of using this system: Guiding responders> FIG. 9 is an example of a screen display in which a monitoring center operator guides Mr. Kenji Suzuki, who has been selected as the responder to respond to the response, to the Sato Building where the abnormality information was issued. The route from Mr. Suzuki's current location, who is traveling by car, to the nearest parking lot of the Sato Building is shown in bold. This information may be sent to a mobile terminal or mobile phone (preferably a smartphone) that Mr. Suzuki uses to connect to this system, or may be displayed on Mr. Suzuki's mobile terminal via this system to guide him at any time. If there is no parking lot available at the local Sato Building, it is preferable to guide the user to the nearest parking lot with "empty cars" rather than to the actual location. If the responder travels by bicycle, moped, or motorcycle, the user is guided to the corresponding location where the bicycle can be parked. If the responder travels on foot, guidance to the actual location may be sufficient. If the entrance is at a fixed location within the building or premises, it is preferable to guide the user to that entrance.
[0254] <Processing flow of embodiment 3> Fig. 13 is a flowchart of the operation process of the high-voltage substation equipment abnormality response system, which is a computer of embodiment 3 based on embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system of embodiment 3 has a high-voltage substation equipment information storage step (g) (S1301), an engineer location-dependent response person decision rule storage step (j1) (S1302), an engineer location information storage step (h1) (S1303), an abnormality information acquisition step (a) (S1304), an external / non-external factor judgment step (b) (S1305), an engineer notification processing step (e) (S1306), a location-dependent response notification processing substep (k1) (S1307) in the engineer notification processing step (e) (S1306), and an exception processing step (d) (S1308).
[0255] The operation method of the high voltage substation equipment abnormality response system, which is a computer, is as follows: The high-voltage substation equipment information holding step (g) (S1301) performs a process of holding high-voltage substation equipment information in which high-voltage substation equipment identification information is associated with high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment; The engineer location dependent responder determination rule storage step (j1) (S1302) performs a process of storing an engineer location dependent responder determination rule, which is a rule for determining a responder to be described later based on engineer location information; The engineer location information storage step (h1) (S1303) performs a process of storing engineer identification information, which is information for identifying an engineer, and engineer location information, which is information indicating the location of the engineer, in association with each other; The anomaly information acquisition step (a) (S1304) includes a process of acquiring anomaly information including high-voltage substation equipment identification information, which is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; In the external / non-external factor determination step (b) (S1305), when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, a process is performed to determine whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor; When the result of the judgment in the external / non-external factor judgment step (b) (S1305) is that the abnormal information is generated due to an external wide-area factor, In the engineer notification processing step (e) (S1306), in order to process the abnormality information, an engineer (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, is notified that he or she should head to the abnormal high voltage substation equipment. A location-dependent response notification processing sub-step (k1) (S1307) in the engineer notification processing step (e) (S1306) determines an engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer location information, and the retained engineer location-dependent response decision rule, and performs processing including a response notification. When the result of the judgment in the external / non-external factor judgment step (b) (S1305) is that the abnormal information was issued due to an external wide-area factor, In the exception processing step (d) (S1308), when it is determined that the abnormality information is generated due to an external wide-area cause, an exception processing step different from the processing including the response notification is performed. This is an operating method for causing a high-voltage substation equipment abnormality response system, which is a computer, to execute such a series of processes.
[0256] <Embodiment 3: Description of Hardware>
[0257] The hardware configuration of a system for responding to an abnormality in high-voltage substation equipment in the third embodiment based on the second embodiment will be described with reference to FIG.
[0258] <Hardware configuration of embodiment 3> Fig. 14 is a diagram showing the hardware configuration of a system for responding to an abnormality in high-voltage substation equipment in the present embodiment 3 based on the embodiment 2. As shown in this diagram, the system for responding to an abnormality in high-voltage substation equipment in the present embodiment includes a "CPU (Central Processing Unit)" that performs various calculation processes, a "chipset", a "main memory", a "non-volatile memory" that stores various programs and data (information), an "I / O controller", "USB, SATA, LAN terminal, etc.", "BIOS (UEFI)", "PCI Express slot", "real-time clock", and a "graphics card" as an expansion board. These are then interconnected by a data communication path such as a "system bus" to transmit and receive information and perform processing.
[0259] The various programs and data (information) stored in the non-volatile memory are expanded into the main memory when the system is started up, and upon receiving an execution command, the CPU sequentially executes the programs to perform calculations using the data.
[0260] When this system starts up, the various programs and data (information) stored in the "non-volatile memory" are read, expanded, and stored in the "main memory," which also provides a work area for those programs. By receiving execution commands, the "CPU" sequentially executes the programs using the data to perform calculations. Note that multiple addresses are assigned to this "main memory" and "non-volatile memory," and programs executed by the "CPU" can identify and access these addresses to exchange data with each other and perform processing. In this embodiment, the programs stored in the "main memory" are an anomaly information acquisition program (a), an external / non-external factor judgment program (b), an exception processing program (d), an engineer notification processing program (e), a high-voltage substation equipment information storage program (g), an engineer location information storage program (h1), an engineer location-dependent response person determination rule storage program (j1), and a location-dependent response notification processing subprogram (k1). In addition, the "main memory" and the "non-volatile memory" store anomaly information, high-voltage substation equipment identification information, high-voltage substation equipment attribute information, high-voltage substation equipment information, engineer identification information, engineer location information, and engineer location-dependent response person determination rules.
[0261] The "CPU" performs the following processes: A high-voltage substation equipment information holding program (g) stored in the "main memory" is executed to hold high-voltage substation equipment information associated with high-voltage substation equipment attribute information including substation equipment location information. Then, the engineer location dependent responder determination rule storage program (j1) stored in the "main memory" is executed to store the engineer location dependent responder determination rules, which are rules for determining responders based on engineer location information, as described below. Then, the technician location information storage program (h1) stored in the "main memory" is executed to store technician identification information, which is information for identifying a technician, and technician location information, which is information indicating the technician's location, in association with each other. Alternatively, the technician location information storage program (h1) stored in the "main memory" may be executed to obtain technician location information sent from a mobile phone or mobile terminal carried by a technician via an Internet line through "USB, SATA, LAN terminal, etc.", and store the technician location information in association with the technician identification information. Then, the abnormality information acquisition program (a) stored in the "main memory" is executed to acquire abnormality information including high-voltage substation equipment identification information, which is information that is transmitted from the high-voltage substation equipment via the Internet line through "USB, SATA, LAN terminal, etc." and identifies the high-voltage substation equipment. Then, an external / non-external factor judgment program (b) stored in the "main memory" is executed to judge whether, when abnormality information is acquired from multiple high-voltage substation equipment within a specified time, the abnormality information from the multiple high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether it is caused by a non-external wide-area factor that is not an external wide-area factor. If it is determined that the abnormality information was sent due to a non-external wide-area factor that is not an external wide-area factor, then an engineer notification processing program (e) stored in the "main memory" is executed to perform processing including a response notification, which is a notification to a technician (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormally high voltage substation equipment, which is the high voltage substation equipment that sent the abnormality information, to head to the abnormally high voltage substation equipment, and a location-dependent response notification processing subprogram (k1) stored in the "main memory" is further executed to determine the technician to be notified based on the retained high voltage substation equipment attribute information, the retained technician location information, and the retained technician location-dependent response decision rule, and perform processing including a response notification. Or, if it is determined that the abnormality information has been generated due to an external wide-area factor, an exception processing program (d) stored in the "main memory" is executed to perform exception processing which is different from the processing including the response notification.
[0262] According to this embodiment, based on the high-voltage substation equipment attribute information, the engineer location-dependent response decision rule, and the engineer location information, it is possible to determine which engineer should be dispatched to respond to an abnormality in the high-voltage substation equipment for which abnormality information has been obtained, and to determine the responder.
[0263] <Overview of embodiment 4> Mainly claims 4, 12, and 20 In embodiment 4, which is based on either embodiment 2 or 3, the engineer notification processing unit (E) is configured to have a travel time dependent response notification processing means (K2) that determines the engineer to be notified based on the retained high voltage substation equipment attribute information, the retained engineer location information, and the retained travel time dependent response decision rule, and performs processing including response notification.
[0264] <Functional Configuration of Fourth Embodiment> Fig. 15 shows a functional block diagram of a high-voltage substation equipment abnormality response system of embodiment 4 based on embodiment 2. The high-voltage substation equipment abnormality response system (1500) of embodiment 4 further includes an engineer location information storage unit (H1) (1508), a travel time dependent responder decision rule storage unit (J2) (1512), and a travel time dependent response notification processing means (K2) (1517) in the engineer notification processing unit (E) (1505) in addition to the configuration of embodiment 2. Therefore, only the travel time dependent responder decision rule storage unit (J2) (1512) and the travel time dependent response notification processing means (K2) (1517) that are not described in the above embodiment will be described below. The same effect can be obtained even if embodiment 3 is used as a base.
[0265] <Description of the Configuration of the Fourth Embodiment> <Embodiment 4: Travel Time Dependent Responder Determination Rule Storage Unit (J2) (1512)> The “travel time dependent responder determination rule storage unit (J2)” (1512) is configured to store travel time dependent responder determination rules, which are rules for determining a responder, as described below, based on the travel time to an abnormally high voltage substation equipment calculated from engineer location information.
[0266] Examples of "rules for determining responders depending on travel time" include rules that determine the responder to be the engineer with the shortest travel time, rather than the distance to the high-voltage substation that has transmitted anomaly information due to a non-external wide-area factor, without checking whether they can respond; rules that prioritize engineers in order of shortest travel time and determine the highest-priority engineer who can respond as the responder; and rules that prioritize engineers in order of shortest travel time (e.g., walking, bicycle, motorcycle, car, bus, train, whether or not toll roads are used for cars, and whether or not express trains are used for trains) and determine the highest-priority engineer who can respond as the responder.
[0267] It is advisable to limit the time it takes for an engineer to travel to the said high-voltage substation equipment to a maximum of two hours, because the chief electrical engineer in charge of safety inspections must be able to arrive at the said high-voltage substation equipment, which is a private structure, within two hours.
[0268] Even if an engineer is close to the high-voltage substation that sent the abnormality information, the engineer who is far away may have a shorter travel time depending on the means of transportation. For example, if there is a bicycle engineer who is 5 km away and a car engineer who is 10 km away, the car engineer will have a shorter travel time if the road is clear. Conversely, if the road is congested, the bicycle or motorcycle engineer who can move beside the congested cars can reach the destination in a shorter time. In addition, for engineers who travel by car, the travel time varies depending on the time difference between using general roads and using expressways, the speed restrictions on the travel route, information on the number of lanes, traffic restrictions and congestion information due to construction or accidents, natural congestion, and the presence or absence of expressways. For example, if the maximum speed on an expressway is restricted due to weather or an accident, it will take longer than usual.
[0269] Therefore, in order to determine a responder based on the travel time dependent responder determination rule in the travel time dependent response notification processing means (K2) described later, a traffic information acquisition unit that acquires traffic information such as speed regulation information indicating the speed regulation (the legal maximum speed on ordinary roads and expressways) for automobiles (including two-wheeled motor vehicles) traveling on roads, standard speed information for each means of transportation indicating the standard speed for various means of transportation other than automobiles (walking, bicycles, motorized bicycles, trains, limited express trains, Shinkansen trains, diesel railcars, buses, trams, etc.), road traffic information indicating road traffic regulations (one-way streets, use of chains, number of lanes), congestion on roads due to accidents, natural congestion, etc., and train operation status information; an engineer travel time calculation unit that calculates a travel route and its travel time based on engineer travel means information, which is information indicating the engineer's travel means, engineer location information, high-voltage substation equipment attribute information, and travel time calculation rules for calculating the travel time; It is preferable that the system further comprises:
[0270] When deciding who will respond, the rule may be to first check with the engineer in charge of the high-voltage substation equipment in normal times whether he / she can respond, and if he / she cannot respond, to select and decide an engineer who will take over the response according to the rule exemplified above. Alternatively, the rule may be to send a mass email (or a push notification) to the response candidates who have a short travel time and a high priority (e.g., within 5 minutes, within 10 minutes, within 2 hours, etc.) to inquire about whether they can respond, and to decide the engineer who replies that he / she can respond the earliest as the responder. The rule may be to give first priority to the engineer in charge of the high-voltage substation equipment in normal times, and send a mass email (or a push notification) to the response candidates who have a short travel time from the engineer location information and a high priority (e.g., within 5 minutes, within 10 minutes, within 2 hours, etc.) to inquire about whether they can respond.
[0271] <Embodiment 4: Travel time dependent response notification processing means (K2) (1517)> The “travel time dependent response notification processing means (K2)” (1517) is configured within the engineer notification processing unit (E) (1505) to determine the engineer to be notified based on the retained high voltage substation equipment attribute information, the retained engineer location information, and the retained travel time dependent response decision rule, and to perform processing including response notification.
[0272] "Determining the engineer to be notified" refers to prioritizing engineers, for example, as shown in the following example. Based on high-voltage substation equipment attribute information including high-voltage substation equipment location information indicating the geographical location of the high-voltage substation equipment that has emitted anomaly information due to a non-external wide-area factor, engineer location information indicating the location of the engineer, and travel time dependent responder determination rules, the travel time from the location of the engineer to the high-voltage substation equipment is calculated, and the engineer to be notified is determined. For example, as described above, the engineers who are response candidates are prioritized based on the travel time from the engineer's location to the high-voltage substation equipment and the travel time for each means of travel (the shorter the travel time, the higher the priority), and the engineer to be notified is determined.
[0273] "Processing including response notification" refers to, for example, processing as shown below, inquiring of engineers as to whether they are available to respond and determining the responder based on the result of the inquiry. The responder is selected by checking whether each engineer is available to respond according to the priority, or by sending simultaneous response inquiries (e.g., email, SMS, push notification, automated voice call, etc.) to engineers with the highest priority, starting from the engineers with the highest priority, up to engineers in a specified rank or engineers located within a specified distance or area. Furthermore, it may be configured to determine the engineer with the highest priority who replies that he or she is available to respond within a specified waiting time after sending the simultaneous response inquiries.
[0274] The process including the response notification can also include a process for calculating and paying the response fee to the engineer who responded. To this end, the system further includes a response fee calculation rule storage unit that stores a response fee calculation rule for calculating the response fee to the responder, a response fee calculation unit that calculates the response fee based on the anomaly information, the high-voltage substation equipment information associated with the high-voltage substation equipment identification information included in the anomaly information, and the response fee calculation rule, and a response fee payment processing unit that performs a process for paying the response fee to the responder.
[0275] When a technician who uses a car as a means of transportation uses a toll road such as an expressway or uses a train or limited express train to respond to arrive at the installation site of the abnormal high voltage substation equipment as quickly as possible, the cost of gasoline, toll road tolls or expressway tolls, train fare, limited express tolls, etc. can be paid as necessary expenses in addition to the compensation for the response. To achieve this, the system further includes a responder transportation means information registration unit that registers responder transportation means information, which is information indicating the responder's transportation means, a response route information registration unit that registers information indicating the location of the responder before the response and the route to the location of the abnormal high voltage substation equipment, and a response travel cost calculation unit that calculates the cost of travel during the response based on the responder's transportation means and the response route, and the response compensation payment processing unit further includes a response travel cost payment processing unit that performs processing to pay the response travel cost to the responder.
[0276] Regarding response route information, the system may be configured to automatically acquire and register travel route information based on the responder's location before response, the high-voltage substation equipment information of the abnormally high-voltage substation equipment (high-voltage substation equipment location information included in the high-voltage substation equipment information), and the responder's travel means information.
[0277] Since fuel efficiency varies greatly depending on the automobile used by the responder for transportation and the gasoline unit price fluctuates daily, it is preferable to configure the responder transportation information registration unit so that fuel efficiency and gasoline unit price can be registered when registering the response transportation means, or to further include a standard fuel efficiency information holding means for holding standard fuel efficiency information showing standard fuel efficiency for each vehicle model in the response transportation means information registration unit, and to further include a gasoline unit price acquisition means for acquiring gasoline unit price information. Alternatively, it is preferable to configure the responder transportation means information registration unit to include a response transportation means information editing means for editing the registered response transportation means information.
[0278] <Embodiment 4> An example of using this system to select engineers and determine who will respond will be explained below with reference to the drawings.
[0279] <Embodiment 4 Example of use of this system: responder> Figure 8 is an example of a PC terminal screen for determining which of the response candidates, the engineer who can respond to this anomaly information, is able to respond to the anomaly information. The response candidates on the right are listed in order of the shortest travel time to the Sato Building (in the example of Figure 8, the straight-line distance and the estimated travel time are shown together). The map in the center shows up to No. 6 Watanabe Rikka, who is about 2.0 km away from the Sato Building. Since the travel time of someone who has a faster means of transportation, even if it is farther away, is shorter than that of someone who has a slower means of transportation, it is difficult to visually express the length of travel time on a map. Therefore, the map in Figure 8 shows concentric circles of straight-line distance for reference. The map in the center can be enlarged or reduced as needed, but it can be configured so that the scale automatically changes while the Sato Building is included in the display according to the response candidate who is trying to be contacted. It should be noted that the center part of the PC screen shown in Figure 8 can be separately configured so that, without displaying the map, the candidate engineers are displayed using the direction of each engineer and the length of travel time, with the Sato Building (abnormally high-voltage substation equipment) at the center.
[0280] In Figure 8, the locations of potential response engineers within a distance of 2 km from the location of the high-voltage substation equipment that issued the anomaly information are displayed in concentric circles at 500 m intervals, but it would also be possible to display the locations of potential response engineers over a larger range, such as 5 km, 10 km, or 20 km. This is because in areas with a small number of engineers, there are not necessarily engineers in the immediate vicinity of the location where the anomaly information was issued. The chief electrical engineer, who is the engineer in charge of safety inspections, only needs to arrive at the high-voltage substation equipment, which is his / her own work, within two hours, so he / she may request a response from an engineer located 20 or 30 km away.
[0281] In FIG. 8, two engineers, Mr. Sato and Mr. Suzuki, are located within a circle with a straight-line distance of 1.0 km, with a travel time of 10 minutes and 11 minutes, respectively. When the two engineers are asked if they can respond while only the 1.0 km circle is displayed, and if both of them reply that they cannot respond, the 1.0 km circle is erased and the 1.5 km circle is displayed next, and three engineers (travel time 15 to 17 minutes) located within a range of 1.0 km to 1.5 km are asked if they can respond, and the range is expanded in sequence to perform processing including a response notification. However, it is preferable to configure the selection of engineers with a maximum travel time of 2 hours and to determine the person to respond. This is because, as described above, the chief electrical engineer in charge of the safety inspection must be able to arrive at the target high-voltage substation equipment within 2 hours. The inquiry on whether they can respond can be made by sending an email or a push notification to all engineers who are candidates for response within the travel time range, as in the above embodiment, or by calling them by an automated voice call. If an app for this system running on a mobile device carried by each engineer is connected to the server device of this system, the engineer may inquire via the app whether or not a response is possible by push notification or voice call.
[0282] <Embodiment 4 Example of using this system: Selection of responders Example 1: Sequential contact> In the example of Figure 8, the engineer who takes the shortest time to travel to the Sato Building is Sato Hajime, and looking at the route, it is expected that he will be able to arrive there in 10 minutes. The second, Suzuki Kenji, is located at a location that takes 11 minutes to travel. Suzuki's name is underlined, indicating that he is the engineer in charge of the Sato Building's high-voltage substation equipment in normal times. Normal times refer to a state in which no abnormality information is being transmitted and the high-voltage substation equipment in question is thought to be operating normally, and the engineer in charge in normal times is the chief electrical engineer who is appointed as the electrician in charge of safety inspections of the said equipment, which is a privately owned structure, in normal times.
[0283] Suzuki is selected as the candidate because he is the engineer in charge of the equipment under normal circumstances and can arrive from the site in 11 minutes by travel time. On the map, he is displayed as a circled number 2 in the top right corner. When the operator clicks on the phone icon to the right of the 11 minutes notation, a call can be made to Suzuki's mobile phone. If the operator can confirm through the call that Suzuki is available, Suzuki is selected as the person to respond. If Suzuki is not available, calls are made to the mobile phones of each engineer in order of shortest travel time to confirm availability. Eleven people are displayed on the screen in Figure 8, but if there are more than 11 candidates to respond to the call, the screen scrolls down to confirm availability of each candidate above 11.
[0284] <Embodiment 4 Example of using this system: Selection of responders Example 2: Mass communication> In the above example, the operator at the monitoring center calls each of the response candidates to confirm whether they are available to respond, but if there are multiple response candidates within a certain distance, an email to confirm whether they are available to respond can be sent to all of the candidates at once, and a response candidate can be selected from among those who reply that they are available to respond. If none of the candidates to whom the email was sent initially reply that they are available to respond, or if there is no reply at all, the response candidate email is sent again with a longer distance than the previous one. The selection can be repeated by gradually increasing the distance until a response that they are available to respond is received. Compared to the above example of making a phone call, the time required to decide on a response candidate can be reduced because multiple candidates can be confirmed at once.
[0285] After the responder has been decided, the responder can be guided to the location of the abnormally high voltage substation equipment that has transmitted the anomaly information, as described in the third embodiment.
[0286] In the fourth embodiment, the engineer to be dispatched to respond to an abnormality in the abnormal high voltage substation equipment is determined based on the travel time from the engineer's location to the abnormal high voltage substation equipment, but the system can also be configured to determine the engineer to be dispatched based on both the distance from the engineer's location to the abnormal high voltage substation equipment (e.g., straight line distance, distance on a route) and the travel time. In that case, for example, when multiple engineers are in different locations at the same distance from the abnormal high voltage substation equipment, a response decision rule can be considered in which the engineer with the shortest travel time is given higher priority.
[0287] <Processing flow of embodiment 4> Fig. 16 is a flowchart of the operation process of the high-voltage substation equipment abnormality response system, which is a computer of embodiment 4 based on embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system of embodiment 4 has a high-voltage substation equipment information storage step (g) (S1601), a travel time dependent response person decision rule storage step (j2) (S1602), an engineer location information storage step (h1) (S1603), an abnormality information acquisition step (a) (S1604), an external / non-external factor judgment step (b) (S1605), an engineer notification processing step (e) (S1606), a travel time dependent response notification processing substep (k2) (S1607) in the engineer notification processing step (e) (S1606), and an exception processing step (d) (S1608). The same effect can be obtained even if embodiment 3 is used as a base.
[0288] The operation method of the high voltage substation equipment abnormality response system, which is a computer, is as follows: The high-voltage substation equipment information holding step (g) (S1601) performs a process of holding high-voltage substation equipment information in which high-voltage substation equipment identification information is associated with high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment; The travel time dependent responder determination rule storage step (j2) (S1602) performs a process of storing a travel time dependent responder determination rule, which is a rule for determining a responder to be described later, based on the travel time to the abnormal high voltage substation equipment calculated from the engineer location information; The engineer location information storage step (h1) (S1603) performs a process of storing engineer identification information, which is information for identifying an engineer, and engineer location information, which is information indicating the location of the engineer, in association with each other; The anomaly information acquisition step (a) (S1604) includes a process of acquiring anomaly information including high-voltage substation equipment identification information, which is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; In the external / non-external factor determination step (b) (S1605), when abnormality information is acquired from a plurality of high-voltage substation equipment within a predetermined time, a process is performed to determine whether the abnormality information from the plurality of high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor; When the result of the judgment in the external / non-external factor judgment step (b) (S1605) is that the abnormal information is generated due to an external wide-area factor, In the engineer notification processing step (e) (S1606), in order to process the abnormality information, an engineer (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that has transmitted the abnormality information, is notified that he or she should head to the abnormal high voltage substation equipment. A travel time dependent response notification processing sub-step (k2) (S1607) in the engineer notification processing step (e) (S1606) determines an engineer to be notified based on the retained high voltage substation equipment attribute information, the retained engineer location information, and the retained travel time dependent response decision rule, and performs processing including a response notification. When the result of the judgment in the external / non-external factor judgment step (b) (S1605) is that the abnormal information was issued due to an external wide-area factor, In the exception processing step (d) (S1608), when it is determined that the abnormality information is generated due to an external wide-area cause, an exception processing step different from the processing including the response notification is performed. This is an operating method for causing a high-voltage substation equipment abnormality response system, which is a computer, to execute such a series of processes.
[0289] <Embodiment 4: Description of Hardware>
[0290] A hardware configuration of a system for responding to an abnormality in high-voltage substation equipment in the fourth embodiment based on either the second or third embodiment will be described with reference to FIG.
[0291] <Fourth embodiment: Hardware configuration> FIG. 17 is a diagram showing the hardware configuration of a high-voltage substation equipment abnormality response system in the present embodiment 4 based on the embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system in this embodiment includes a "CPU (Central Processing Unit)" that performs various arithmetic processing, a "chipset", a "main memory", a "non-volatile memory" that holds various programs and data (information), an "I / O controller", "USB, SATA, LAN terminal, etc.", "BIOS (UEFI)", "PCI Express slot", "real-time clock", and a "graphics card" as an expansion board. These are connected to each other by a data communication path such as a "system bus" to transmit and receive information and perform processing. The same effect can be obtained even if the embodiment 3 is used as a base.
[0292] The various programs and data (information) stored in the non-volatile memory are expanded into the main memory when the system is started up, and upon receiving an execution command, the CPU sequentially executes the programs to perform calculations using the data.
[0293] When this system starts up, the various programs and data (information) stored in the "non-volatile memory" are read, expanded, and stored in the "main memory," which also provides a work area for those programs. By receiving execution commands, the "CPU" sequentially executes the programs using the data to perform calculations. Note that multiple addresses are assigned to this "main memory" and "non-volatile memory," and programs executed by the "CPU" can identify and access these addresses to exchange data with each other and perform processing. In this embodiment, the programs stored in the "main memory" are anomaly information acquisition program (a), an external / non-external factor judgment program (b), an exception processing program (d), an engineer notification processing program (e), a high-voltage substation equipment information storage program (g), an engineer location information storage program (h1), a travel time dependent responder decision rule storage program (j2), and a travel time dependent response notification processing subprogram (k2). In addition, the "main memory" and the "non-volatile memory" store anomaly information, high-voltage substation equipment identification information, high-voltage substation equipment attribute information, high-voltage substation equipment information, engineer identification information, engineer location information, and travel time dependent responder decision rules.
[0294] The "CPU" performs the following processes: A high-voltage substation equipment information holding program (g) stored in the "main memory" is executed to hold high-voltage substation equipment information associated with high-voltage substation equipment attribute information including substation equipment location information. Then, the travel time dependent responder determination rule storage program (j2) stored in the "main memory" is executed to store the travel time dependent responder determination rule, which is a rule for determining a responder to be described later based on the travel time to the abnormally high voltage substation equipment calculated from the engineer location information. Then, the technician location information storage program (h1) stored in the "main memory" is executed to store technician identification information, which is information for identifying a technician, and technician location information, which is information indicating the technician's location, in association with each other. Alternatively, the technician location information storage program (h1) stored in the "main memory" may be executed to obtain technician location information sent from a mobile phone or mobile terminal carried by a technician via an Internet line through "USB, SATA, LAN terminal, etc.", and store the technician location information in association with the technician identification information. Then, the abnormality information acquisition program (a) stored in the "main memory" is executed to acquire abnormality information including high-voltage substation equipment identification information, which is information that is transmitted from the high-voltage substation equipment via the Internet line through "USB, SATA, LAN terminal, etc." and identifies the high-voltage substation equipment. Then, an external / non-external factor judgment program (b) stored in the "main memory" is executed to judge whether, when abnormality information is acquired from multiple high-voltage substation equipment within a specified time, the abnormality information from the multiple high-voltage substation equipment is caused by an external wide-area factor, which is a wide-area external factor, or whether it is caused by a non-external wide-area factor that is not an external wide-area factor. If it is determined that the abnormality information was transmitted due to a non-external wide-area factor that is not an external wide-area factor, then an engineer notification processing program (e) stored in the "main memory" is executed to perform processing including a response notification, which is a notification to a technician (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormally high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, to head to the abnormally high voltage substation equipment, and a travel time dependent response notification processing subprogram (k2) stored in the "main memory" is further executed to determine the technician to be notified based on the retained high voltage substation equipment attribute information, the retained technician location information, and the retained travel time dependent response person determination rule, and to perform processing including a response notification. Or, if it is determined that the abnormality information has been generated due to an external wide-area factor, an exception processing program (d) stored in the "main memory" is executed to perform exception processing which is different from the processing including the response notification.
[0295] In this embodiment, based on high-voltage substation equipment attribute information, travel time-dependent responder determination rules, and engineer location information, it is possible to determine which engineer should be dispatched to respond to an abnormality in the high-voltage substation equipment for which abnormality information has been obtained based on travel time, and to determine the responder.
[0296] <Overview of embodiment 5> Mainly claims 5, 13, and 21 In embodiment 5 based on any one of embodiments 2 to 4, the engineer notification processing unit (E) is configured to have a schedule-dependent response notification processing means (K3) that determines the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer schedule information, and the retained schedule-dependent response person determination rule, and performs processing including response notification.
[0297] <Functional configuration of embodiment 5> Fig. 18 shows a functional block diagram of a high-voltage substation equipment abnormality response system of embodiment 5 based on embodiment 2. The high-voltage substation equipment abnormality response system (1800) of embodiment 5 further includes an engineer schedule information storage unit (H2) (1809), a schedule-dependent responder decision rule storage unit (J3) (1813), and a schedule-dependent response notification processing means (K3) (1818) in the engineer notification processing unit (E) (1805) in addition to the configuration of embodiment 2. Therefore, only the engineer schedule information storage unit (H2) (1809), the schedule-dependent responder decision rule storage unit (J3) (1813), and the schedule-dependent response notification processing means (K3) (1818), which are not described in the above embodiments, will be described below. The same effect can be obtained even if either embodiment 3 or 4 is used as a base.
[0298] <Description of the configuration of embodiment 5> <Fifth embodiment: Engineer schedule information storage unit (H2) (1809)> The 'storage unit for engineer schedule information (H2)' (1809) is configured to store engineer identification information, which is information for identifying an engineer, and engineer schedule information, which is information showing the schedule of the engineer, in association with each other.
[0299] The "engineer schedule information" is information used when searching and selecting candidates for engineers who will issue a response notification, and is information showing the planned location in terms of time so that the time periods when the candidates can respond at the time of selection can be understood. For example, the schedule of a certain engineer may be such that on Monday morning, he is in building A and cannot respond due to inspection, in the afternoon he is able to respond due to desk work at his home / office, on Tuesday morning he will be inspecting building B, in the afternoon he will be inspecting hospital C and cannot respond all day, and on Wednesday and Thursday he is a regular holiday and cannot respond. Furthermore, it is possible to set schedules such as being unable to respond from a certain date to a certain date due to vacation, being unable to respond during the late night hours from 10pm to 5am, or being unable to respond on weekends as in the above example. Of course, since this information is used to select and decide on an engineer to be dispatched to respond to an emergency, it is also possible to configure the system so that registration applications are made not only for the time periods when he is unable to respond, but also for late night hours and availability on weekends.
[0300] When a technician uses a mobile terminal (e.g., tablet, notebook PC, etc.) to connect to this system, it is preferable to configure the system so that the technician can write down his / her peacetime safety inspection work schedule and leisure plans as a schedule and register them in this system. This can be achieved by configuring the system to have an technician schedule information registration unit that allows the technician or a person acting on his / her behalf to register technician schedule information in association with technician identification information. The technician information registered in this system by the technician schedule information registration unit is stored in the technician schedule information storage unit (H2).
[0301] Figure 19 shows an example of an engineer entering his or her own schedule using a mobile device that can be connected to this system. Figure 19 shows the schedule for the third week of July 2023 for Suzuki Kenji, a chief electrical engineer in charge of safety inspections of high-voltage substation equipment. The light gray schedule is the annual inspection, and the dark gray schedule is the monthly inspection. Monthly inspections of high-voltage substation equipment are usually performed without stopping the equipment while it is in operation, to check for the presence or absence of leakage, the temperature and appearance of the equipment, etc., and the inspection itself takes a short time. Annual inspections involve cutting off power to the entire workplace, facility, or building, and conducting detailed inspections of the insulation of the high-voltage parts, the operation of the high-voltage breakers, and each piece of equipment, and take a long time to complete from the start of the power outage until it is restored.
[0302] The annual inspection of the Sato Building is on Tuesday, July 11th, and as it is a small building, it is scheduled to be completed in one day. The annual inspection of the Bokuto Manufacturing Plant is on Friday, July 14th to Saturday, July 15th, and as the plant is larger than the Sato Building and has more inspection points, it is scheduled to take more than 24 hours to complete. In addition, after 3pm on Saturday, July 15th and the following day, the plant is closed on the 16th. Schedules for inspection work, etc. may be entered including travel time, or travel time may be entered in a separate box as travel time before and after inspection work. In the example shown in Figure 19, travel time is entered as part of the inspection work.
[0303] The engineer schedule information showing Mr. Suzuki's schedule shown in Figure 19 is registered in the engineer schedule information registration section of this system via a mobile terminal, and is stored in the engineer schedule information storage section (H2) in association with Mr. Suzuki's engineer identification information.
[0304] From Mr. Suzuki's schedule shown in Figure 19, if this system obtains abnormality information, Mr. Suzuki will be selected as a response candidate during the time periods that are not monthly or annual inspections at each workplace, and are not holidays (from 3pm on July 15th to the entire day of July 16th). For example, the time periods during which he can respond to receiving abnormality information are after 4pm on July 10th, after 12pm on the 12th, after 12pm on the 13th, and from 12pm to 2pm on the 15th. In addition, office work hours may also be designated as time periods during which he can respond, depending on the schedule-dependent responder decision rules.
[0305] Although not shown in Fig. 19, it is preferable to configure the system so that unavailable time periods, unavailable days of the week, and unavailable days can be registered separately. For example, it is possible to register the late night hours from 10pm to 5am the following day as unavailable time periods, Saturdays, Sundays, or regular holidays as unavailable days of the week, and specific days such as the end of each month, the New Year's holidays, and Obon as unavailable days.
[0306] <Embodiment 5: Schedule-Dependent Responder Determination Rule Storage Unit (J3) (1813)> The schedule-dependent responder determination rule storage unit (J3) (1813) is configured to store schedule-dependent responder determination rules, which are rules for determining responders based on engineer schedule information, as described below.
[0307] The "schedule-dependent responder decision rule" is a rule for prioritizing based on engineer schedule information when selecting candidates for engineers to be notified to respond to an anomaly in a high-voltage substation facility that has issued anomaly information due to a non-external wide-area factor. It is preferable to configure the anomaly information to include information indicating the content of the anomaly (or information identifying the anomaly), estimate a standard response time required to respond to the anomaly, and select as candidates engineers who have available time to respond that is equal to or longer than the estimated response time. Examples of priorities are, in descending order, daytime hours (e.g., from 9:00 to 17:00) that are not specified or unavailable, desk work time in the office, travel time to return to the office after inspecting other business locations, and time from the end of evening inspection work or desk work to the unavailable time period. As another example, in the case of an anomaly with high urgency, the time period marked "off" may be added to the bottom of the priority order.
[0308] Taking Mr. Suzuki's schedule shown in Figure 19 as an example, if Mr. Suzuki is unavailable from 7 pm to 8 am the following morning, and has set Sundays as unavailable days, then the highest priority would be 4 pm-7 pm on July 10, 6 pm-7 pm on July 11, 6 pm-7 pm on July 12, 6 pm-7 pm on July 13, 6 pm-7 pm on July 14, followed by 12 pm-6 pm on July 12, 12 pm-6 pm on July 13, and 1 pm-3 pm on July 15. In the case of a highly urgent abnormality, 3 pm-7 pm on July 15 could also be a candidate.
[0309] When deciding who will respond, the rule may be to first check whether the engineer in charge of the high-voltage substation equipment is available during normal times, and if the engineer is unavailable, an engineer who will take over the response may be selected according to the rules exemplified above, and the response availability may be confirmed and decided in order of priority. Alternatively, the rule may be to send a mass email (or push notification, etc.) to high-priority response candidates to inquire about their availability, and the engineer who replies that they are available first may be decided as the responder. The rule may be to give first priority to the engineer in charge of the high-voltage substation equipment during normal times, and send a mass email (or push notification, etc.) to high-priority response candidates from the engineer schedule information to inquire about their availability.
[0310] <Embodiment 5: Schedule-dependent response notification processing means (K3) (1818)> The "schedule-dependent response notification processing means (K3)" (1818) is configured within the engineer notification processing unit (E) (1805) so as to determine the engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer schedule information, and the retained schedule-dependent response person determination rules, and to perform processing including response notification.
[0311] "Determining the engineer to be notified" refers to prioritizing the engineers, for example, as shown in the following example. Based on high-voltage substation equipment attribute information including high-voltage substation equipment location information indicating the geographical location of the high-voltage substation equipment that has emitted anomaly information due to a non-external wide-area factor, engineer schedule information which is information indicating the engineer's schedule, and schedule-dependent responder determination rules, engineers who are considered to be available to respond based on the engineer's schedule are selected as candidates and prioritized, and the engineer to be notified is determined.
[0312] The "processing including a response notification" is, for example, a process of inquiring whether an engineer can respond and determining the responder as a result of the inquiry, as shown below. The responder is selected by confirming whether the engineer can respond one by one according to the priority, or by sending a response availability inquiry (e.g., email, SMS, push notification, automated voice call, etc.) to all engineers from the highest priority up to a specified rank or to engineers located within a specified distance or area at once. Furthermore, it may be configured so that the highest priority engineer among the engineers who reply that they can respond within a specified waiting time after sending the response availability inquiry at once is selected as the responder. The responder can be selected according to the priority, as in the third or fourth embodiment.
[0313] When selecting candidate engineers, it is possible to configure the system to use both engineer location information and engineer schedule information as in the sixth embodiment described below. It is possible to select an engineer who is available in terms of the engineer's schedule and can arrive at the site as soon as possible.
[0314] <Processing flow of embodiment 5> Fig. 20 is a flowchart of the operation process of the high-voltage substation equipment abnormality response system, which is a computer of embodiment 5 based on embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system of embodiment 5 has a high-voltage substation equipment information storage step (g) (S2001), a schedule-dependent action decision rule storage step (j3) (S2002), an engineer schedule information storage step (h2) (S2003), an abnormality information acquisition step (a) (S2004), an external / non-external factor judgment step (b) (S2005), an engineer notification processing step (e) (S2006), a schedule-dependent action notification processing substep (k3) (S2007) in the engineer notification processing step (e) (S2006), and an exception processing step (d) (S2008). The same effect can be obtained even if either embodiment 3 or 4 is used as a base.
[0315] The operation method of the high voltage substation equipment abnormality response system, which is a computer, is as follows: The high-voltage substation equipment information holding step (g) (S2001) performs a process of holding high-voltage substation equipment information in which high-voltage substation equipment identification information is associated with high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment; The schedule-dependent responder determination rule storage step (j3) (S2002) performs a process of storing schedule-dependent responder determination rules, which are rules for determining responders based on engineer schedule information, as described below. The engineer schedule information storage step (h2) (S2003) performs a process of storing engineer identification information, which is information for identifying an engineer, and engineer schedule information, which is information showing the schedule of the engineer, in association with each other. The anomaly information acquisition step (a) (S2004) includes a process of acquiring anomaly information including high-voltage substation equipment identification information, which is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; In the external / non-external factor determination step (b) (S2005), when abnormality information is acquired from a plurality of high-voltage substation facilities within a predetermined time, a process is performed to determine whether the abnormality information from the plurality of high-voltage substation facilities is caused by an external wide-area factor, which is a wide-area external factor, or whether the abnormality information is caused by a non-external wide-area factor, which is not an external wide-area factor; If the result of the judgment in the external / non-external factor judgment step (b) (S2005) is that the abnormal information was issued due to an external wide-area factor, In the engineer notification processing step (e) (S2006), in order to process the abnormality information, an engineer (whether an individual, a corporation, or an organization; the same applies below) to be dispatched to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that has transmitted the abnormality information, is notified that he or she should head to the abnormal high voltage substation equipment. A schedule-dependent response notification processing sub-step (k3) (S2007) in the engineer notification processing step (e) (S2006) determines an engineer to be notified based on the retained high-voltage substation equipment attribute information, the retained engineer schedule information, and the retained schedule-dependent response decision rule, and performs processing including a response notification. When the result of the judgment in the external / non-external factor judgment step (b) (S2005) is that the abnormal information was issued due to an external wide-area factor, In the exception processing step (d) (S2008), when it is determined that the abnormality information is generated due to an external wide-area cause, an exception processing step different from the processing including the response notification is performed. This is an operating method for causing a high-voltage substation equipment abnormality response system, which is a computer, to execute such a series of processes.
[0316] <Embodiment 5: Description of Hardware>
[0317] A hardware configuration of a system for responding to an abnormality in high-voltage substation equipment in the fifth embodiment based on any one of the second to fourth embodiments will be described with reference to FIG.
[0318] <Fifth embodiment: Hardware configuration> FIG. 21 is a diagram showing the hardware configuration of the high-voltage substation equipment abnormality response system in the present embodiment 5 based on the embodiment 2. As shown in this figure, the high-voltage substation equipment abnormality response system in this embodiment includes a "CPU (Central Processing Unit)" that performs various arithmetic processing, a "chipset", a "main memory", a "non-volatile memory" that holds various programs and data (information), an "I / O controller", "USB, SATA, LAN terminal, etc.", "BIOS (UEFI)", "PCI Express slot", "real-time clock", and a "graphics card" as an expansion board. These are connected to each other by a data communication path such as a "system bus", and perform transmission and reception of information and processing. The same effect can be obtained based on the embodiment 3. The same effect can be obtained based on either the embodiment 3 or the embodiment 4.
[0319] The various programs and data (information) stored in the non-volatile memory are expanded into the main memory when the system is started up, and upon receiving an execution command, the CPU sequentially executes the programs to perform calculations using the data.
[0320] When this system s...
Claims
1. An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a specified time period, whether the abnormality information from the plurality of high-voltage substation equipment has been generated due to an external / wide-area factor that is a wide-area external factor, or whether the abnormality information has been generated due to a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing unit (C) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that has transmitted the abnormality information, when it is determined that the abnormality information has been transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the individual process (dispatching an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information) shall be carried out. An exception processing unit (D) that performs exception processing, which includes processing of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; A system for responding to abnormalities in high-voltage substation equipment.
2. An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a specified time period, whether the abnormality information from the plurality of high-voltage substation equipment has been generated due to an external / wide-area factor that is a wide-area external factor, or whether the abnormality information has been generated due to a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; When it is determined that the abnormality information was generated due to a non-external wide-area factor, the engineer (whether an individual, a corporation, or an organization) who is dispatched to respond to the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that generated the abnormality information. an engineer notification processing unit (E) that performs processing including a response notification that notifies the engineer (hereinafter the same) that the engineer should head to the abnormal high voltage receiving and transforming equipment; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the process including the response notification is carried out (dispatching an engineer (whether an individual, a corporation, or an organization) to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that issued the abnormality information). An exception processing unit (D) that performs exception processing, which includes processing of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; a high-voltage substation equipment information storage unit (G) that stores high-voltage substation equipment information that associates high-voltage substation equipment identification information with high-voltage substation equipment attribute information including high-voltage substation equipment location information that is information indicating the geographical location of the high-voltage substation equipment; A system for responding to abnormalities in high-voltage substation equipment.
3. An abnormality information acquisition unit (A) that acquires abnormality information including high-voltage substation equipment identification information that is information transmitted from the high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination unit (B) for determining, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a specified time period, whether the abnormality information from the plurality of high-voltage substation equipment has been generated due to an external / wide-area factor that is a wide-area external factor, or whether the abnormality information has been generated due to a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing unit (C) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that has transmitted the abnormality information, when it is determined that the abnormality information has been transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, an exception process that is different from the individual process is carried out (the dispatch of an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality in the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information). An exception processing unit (D) that performs a process of not notifying the abnormality information acquired from the abnormal high voltage receiving and transforming equipment to the abnormal high voltage receiving and transforming equipment (hereinafter the same), An external wide-area factor termination determination unit (L) for determining whether an external wide-area factor has terminated; A system for responding to abnormalities in high-voltage substation equipment.
4. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing step (c) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the individual process (dispatching an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information) shall be carried out. and (d) an exception processing step (including a process of not notifying the abnormality information of the abnormal high voltage receiving and transforming equipment to the abnormal high voltage receiving and transforming equipment (hereinafter the same), A method for operating a high-voltage substation equipment abnormality response system that is a computer.
5. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; When it is determined that the abnormality information was generated due to a non-external wide-area factor, the engineer (whether an individual, a corporation, or an organization) who is dispatched to respond to the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that generated the abnormality information. a notification processing step (e) of performing a process including a response notification to the abnormal high voltage receiving and transforming equipment, the notification being a notification that the abnormal high voltage receiving and transforming equipment should head to the abnormal high voltage receiving and transforming equipment; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the process including the response notification is carried out (dispatching an engineer (whether an individual, a corporation, or an organization) to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that issued the abnormality information). an exception processing step (d) of performing an exception processing, which includes a process of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; and (g) a high-voltage substation equipment information holding step for holding high-voltage substation equipment information in which high-voltage substation equipment identification information and high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment, are associated with each other. A method for operating a high-voltage substation equipment abnormality response system that is a computer.
6. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing step (c) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the individual process (dispatching an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information) shall be carried out. An exception processing step (d) of performing an exception processing, which includes a process of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; and an external wide-area factor termination determination step (l) of determining whether the external wide-area factor has terminated.
7. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing step (c) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the individual process (dispatching an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information) shall be carried out. and an exception processing step (d) of performing an exception processing, which includes a process of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment, A program to be executed by the high-voltage substation equipment abnormality response system, which is a computer.
8. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; When it is determined that the abnormality information was generated due to a non-external wide-area factor, the engineer (whether an individual, a corporation, or an organization) who is dispatched to respond to the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that generated the abnormality information. a notification processing step (e) of performing a process including a response notification to the abnormal high voltage receiving and transforming equipment, the notification being a notification that the abnormal high voltage receiving and transforming equipment should head to the abnormal high voltage receiving and transforming equipment; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the process including the response notification is carried out (dispatching an engineer (whether an individual, a corporation, or an organization) to respond to the abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that issued the abnormality information). An exception processing step (d) of performing an exception processing, which includes a process of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; a high-voltage substation equipment information holding step (g) for holding high-voltage substation equipment information in which high-voltage substation equipment identification information and high-voltage substation equipment attribute information including high-voltage substation equipment location information, which is information indicating the geographical location of the high-voltage substation equipment, are associated with each other; A program to be executed by the high-voltage substation equipment abnormality response system, which is a computer.
9. An abnormality information acquisition step (a) of acquiring abnormality information including high-voltage substation equipment identification information which is information transmitted from a high-voltage substation equipment and identifies the high-voltage substation equipment; an external / non-external factor determination step (b) for determining whether, when abnormality information is acquired from a plurality of nearby high-voltage substation equipment within a predetermined time period, the abnormality information from the plurality of high-voltage substation equipment is caused by an external / wide-area factor that is a wide-area external factor, or whether the abnormality information is caused by a non-external / wide-area factor such as an electric leakage, temperature abnormality, power outage due to a short circuit or ground fault of an individual high-voltage substation equipment that is not an external / wide-area factor, or being caught up in an abnormality in a nearby high-voltage substation equipment that receives power from a distribution line of the same system; an individual processing step (c) for performing individual processing, which is processing for responding to an abnormality in the abnormal high voltage substation equipment, which is the high voltage substation equipment that transmitted the abnormality information, when it is determined that the abnormality information is transmitted due to a non-external wide-area factor that is not an external wide-area factor; If it is determined that the abnormality information was issued due to an external wide-area factor, a process other than the individual process (dispatching an engineer (whether an individual, a corporation, or an organization) to deal with the abnormality of the abnormal high-voltage substation equipment, which is the high-voltage substation equipment that issued the abnormality information) shall be carried out. an exception processing step (d) of performing an exception processing, which includes a process of not notifying the abnormality information acquisition unit (hereinafter the same) of the abnormal high voltage receiving and transforming equipment; An external wide-area factor termination judgment step (l) for judging whether the external wide-area factor has terminated; A program to be executed by the high-voltage substation equipment abnormality response system, which is a computer.
Citation Information
Patent Citations
Automatic machine monitoring system
JP2009015785A
Energy management system
JP2015184832A
Responder allocation system
JP2018045416A
Security device, security system, message transmission method, and program
JP2019003431A
Recovery support method of elevator recovery support system and elevator recovery support system
JP2021179714A