Information processing device, terminal device, system, method and program for supporting the creation of carbon credits
The information processing device simplifies the creation of carbon credits for small-scale farms by estimating greenhouse gas absorption and revenue, addressing the economic challenges faced by these farms in obtaining certification.
Patent Information
- Application Number
- JP2024500665
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-07-12
- Filing Date
- 2023-07-12
- Publication Date
- 2024-11-20
- Estimated Expiration
- 2043-07-12
AI Technical Summary
Small-scale farms face difficulties in generating carbon credits due to the high costs associated with obtaining certification and the small amount of greenhouse gas absorption, making it economically unfeasible to profit from selling carbon credits.
An information processing device and system that supports the creation of carbon credits by estimating greenhouse gas absorption in multiple fields, calculating potential revenue, and displaying estimated profits, thereby simplifying the certification process for small-scale farms.
Facilitates the creation of carbon credits for small-scale farms by providing accurate estimates of greenhouse gas absorption and potential revenue, reducing the complexity and cost of certification, and enabling profitable participation in carbon credit projects.
Smart Images

Figure 0007587098000001 
Figure 0007587098000002 
Figure 0007587098000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, a terminal device, a system, a method, and a program for performing processing related to the creation of carbon credits. [Background technology]
[0002] Carbon offsetting is the act of offsetting greenhouse gas emissions such as carbon dioxide that are unavoidable in daily life and economic activities. For example, it includes the act of offsetting greenhouse gas emissions by investing in greenhouse gas reduction activities (energy saving activities, reforestation activities, etc.) that are commensurate with the amount of greenhouse gas emissions. Carbon credits are financial products that represent the amount of greenhouse gas reduction or absorption that can be bought and sold, with the amount of greenhouse gas reduction or absorption certified by the government or an independent certification organization for projects that reduce or absorb greenhouse gas emissions. By purchasing certified carbon credits, one can carbon offset the greenhouse gases that one has emitted. Summary of the Invention [Problem to be solved by the invention]
[0003] The amount of greenhouse gas (mainly carbon dioxide) absorbed by crops grown in a field can be certified as carbon credits. In this case, data on the area of the field, the type of crop, the cultivation environment, etc. must be provided to a certification body, and the effectiveness of the amount of absorption must be subject to rigorous screening. In other words, to receive carbon credit certification, various costly procedures must be followed, such as measuring various data, creating a project plan, and going through procedures at the certification body. In the case of small-scale fields with a small amount of greenhouse gas absorption, the amount of carbon credits sold is small compared to the large costs incurred to receive carbon credit certification, so profits from sales cannot be expected. Therefore, there is a problem that it is difficult to generate carbon credits for small-scale fields.
[0004] The present invention has been made in consideration of the above circumstances, and its purpose is to provide an information processing device, terminal device, system, method, and program that can support the creation of carbon credits that can be sold at a profit even in small-scale farm fields. [Means for solving the problem]
[0005] A first aspect of the present invention is an information processing device that supports the creation of carbon credits, the information processing device having a first processing unit and a first memory unit that stores instructions to be executed by the first processing unit, the carbon credits being created based on a project to absorb greenhouse gases by crops cultivated in a plurality of fields, and a process performed by the first processing unit in accordance with the instructions includes receiving field information related to one of the fields from a related party device that is a terminal device operated by a related party of the one of the fields, the field information including geographical area information related to the geographical area of the one of the fields, and calculating the geographical area of the one of the fields based on the field information received about the one of the fields. obtaining a first estimated value of an amount of greenhouse gas absorbed by crops in the field within a predetermined period; obtaining a first expected amount of revenue to be allocated to the field when carbon credits are sold, based on the first estimated value of absorption obtained for the field, an expected amount of greenhouse gas absorbed in the project within a predetermined period, and an expected sales amount of carbon credits equivalent to the expected amount of absorption; and displaying at least one of the first estimated value of absorption obtained for the field and the first expected amount of revenue obtained for the field on a device of a person involved in the field. obtaining the first estimated amount includes calculating an amount obtained by subtracting a predetermined expense from the estimated sales amount as a first estimated revenue for the project, and calculating the first estimated amount such that a ratio of the first estimate to the assumed absorption amount is equal to a ratio of the first estimated amount to the first estimated revenue; It is an information processing device.
[0006] A second aspect of the present invention is an information processing device that supports the creation of carbon credits, the carbon credits being created based on a project to absorb greenhouse gases by crops cultivated in a plurality of fields, the information processing device including: means for receiving field information relating to one of the fields from a related party device that is a terminal device operated by a related party of the one of the fields, the field information including geographical area information relating to the geographical area of the one of the fields; and means for calculating, based on the field information received about the one of the fields, greenhouse gases absorbed by the crops in the one of the fields within a predetermined period of time. a means for acquiring a first estimated value of the amount of absorption for one of the farm fields, a means for acquiring a first expected amount of revenue to be allocated to the one of the farm fields when the carbon credits are sold, based on the first estimated value of the amount of absorption for the one of the farm fields, an expected amount of greenhouse gas absorption for a predetermined period in the project, and an expected sales amount of the carbon credits equivalent to the expected amount of absorption, and a means for displaying at least one of the first estimated value of the amount of absorption for the one of the farm fields and the first expected amount of revenue acquired for the one of the farm fields, on a device of a person involved in the one of the farm fields. the means for acquiring the first estimated amount calculates an amount obtained by subtracting a predetermined expense from the estimated sales amount as a first estimated profit of the project, and calculates the first estimated amount such that a ratio of the first estimate to the assumed absorption amount is equal to a ratio of the first estimated amount to the first estimated profit; It is an information processing device.
[0007] A third aspect of the present invention is a method performed by an information processing device that supports the creation of carbon credits, the carbon credits being created based on a project to absorb greenhouse gases by crops cultivated in a plurality of fields, the information processing device receiving field information relating to one of the fields from a stakeholder device that is a terminal device operated by a stakeholder of the one of the fields, the field information including geographical area information relating to the geographical area of the one of the fields, and calculating, based on the field information received about the one of the fields, the greenhouse gases absorbed by the crops in the one of the fields within a predetermined period of time, the information processing device calculating the greenhouse gases absorbed by the crops in the one of the fields within a predetermined period of time, the information processing device calculating, based on the field information received about the one of the fields, ... and acquiring a first estimated value of an absorption amount of greenhouse gas from the one field, the information processing device acquiring a first expected amount of revenue to be allocated to the one field when the carbon credits are sold based on the first estimated value of absorption amount acquired for the one field, an expected amount of greenhouse gas absorption within a predetermined period in the project, and an expected sales amount of carbon credits equivalent to the expected absorption amount, and the information processing device displaying at least one of the first estimated value of absorption amount acquired for the one field and the first expected amount of revenue acquired for the one field on a device of a person involved in the one field. obtaining the first estimated amount includes calculating an amount obtained by subtracting a predetermined expense from the estimated sales amount as a first estimated revenue for the project, and calculating the first estimated amount such that a ratio of the first estimate to the assumed absorption amount is equal to a ratio of the first estimated amount to the first estimated revenue; This is the method.
[0008] A fourth aspect of the present invention is a program including instructions for causing an information processing device to perform a process for supporting the creation of carbon credits, the carbon credits being created based on a project for absorbing greenhouse gases by crops cultivated in a plurality of fields, and the process performed by the information processing device in accordance with the instructions includes receiving field information relating to one of the fields, the field information including geographical area information relating to the geographical area of the one of the fields, from a related party device which is a terminal device operated by a related party of the one of the fields, and calculating the amount of carbon credits for the crops in the one of the fields based on the field information received about the one of the fields. acquiring a first estimated value of the amount of greenhouse gas absorbed by the one field within a predetermined period; acquiring a first expected amount of revenue to be allocated to the one field when the carbon credits are sold based on the first estimated value of the amount of absorption acquired for the one field, an expected amount of greenhouse gas absorbed in the project within a predetermined period, and an expected sales amount of carbon credits equivalent to the expected amount of absorption; and displaying at least one of the first estimated value of the amount of absorption acquired for the one field and the first expected amount of revenue acquired for the one field on a device of a person involved in the one field. obtaining the first estimated amount includes calculating an amount obtained by subtracting a predetermined expense from the estimated sales amount as a first estimated revenue for the project, and calculating the first estimated amount such that a ratio of the first estimate to the assumed absorption amount is equal to a ratio of the first estimated amount to the first estimated revenue; It is a program.
[0009] A fifth aspect of the present invention is a computer-readable recording medium having the program according to the fourth aspect recorded thereon. Effect of the Invention
[0010] According to the present invention, it is possible to provide an information processing device, a terminal device, a system, a method and a program that can support the creation of carbon credits that can be sold to easily generate profits even in small-scale farm fields. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a system according to the present embodiment. [Diagram 2] 2A, 2B, and 2C are diagrams for explaining information included in the related party information, project management information, and farm field management information, respectively. [Diagram 3] 3A, 3B, and 3C are diagrams for explaining information contained in the overlap relationship information, the credit management information, and the revenue distribution management information, respectively. [Figure 4] FIG. 4 is a diagram showing an example of the configuration of the related party device according to this embodiment. [Diagram 5] FIG. 5 is a flowchart illustrating an example of processing in the system according to this embodiment. [Figure 6] FIG. 6 is a flowchart illustrating an example of processing in the system according to this embodiment. [Figure 7] FIG. 7 is a flowchart for explaining an example of processing in the system according to this embodiment. [Figure 8] FIG. 8 is a flowchart for explaining an example of processing in the information processing device according to the present embodiment. [Figure 9] FIG. 9 is a flowchart for explaining an example of processing in the information processing device according to the present embodiment. [Figure 10] FIG. 10 is a flowchart for explaining an example of processing in the information processing device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Fig. 1 is a diagram showing an example of the configuration of a system according to this embodiment. The system shown in the example of Fig. 1 includes an information processing device 1 capable of communicating via a communication network 9 such as the Internet, a related person device 3, an operator device 4, a business operator server 5, and a credit registration server 8. The information processing device 1 is an example of an information processing device of the present invention. The participant device 3 is an example of a participant device of the present invention. The operator device 4 is an example of the operator device of the present invention.
[0013] The system shown in Figure 1 performs processes to support the creation of carbon credits based on a project to absorb greenhouse gases using crops (such as moringa) grown in multiple fields. That is, the system performs processes such as recruiting small-scale fields to participate in the project, presenting the expected amount of revenue from the sale of carbon credits to those involved in the fields who are considering applying for the project, and calculating the revenue to be distributed to each field when the carbon credits are sold.
[0014] [Information processing device 1] The information processing device 1 is a device that manages a project to absorb greenhouse gases by crops cultivated in multiple fields. The information processing device 1 communicates with multiple related party devices 3 operated by related parties (owners, managers, etc.) of the fields, and performs activities such as inviting fields to participate in the project, presenting expected amounts of revenue from the sale of carbon credits, accepting applications for the project, and distributing revenue obtained from the sale of carbon credits. For example, the information processing device 1 includes one or more computers connected to a communication network 9. The information processing device 1 shown in the example of FIG. 1 has a first communication unit 11, a first storage unit 12, and a first processing unit 13.
[0015] The first communication unit 11 communicates with other devices (such as the related person device 3, the operator device 4, the business server 5, and the credit registration server 8) via the communication network 9. The first communication unit 11 includes a device (such as a network interface card) that communicates in accordance with a predetermined communication standard such as Ethernet (registered trademark) or wireless LAN.
[0016] The first storage unit 12 stores one or more programs 121 including instructions executed by the first processing unit 13, data temporarily stored during processing by the first processing unit 13, data used in processing by the first processing unit 13, data obtained as a result of processing by the first processing unit 13, and the like. The first storage unit 12 may include, for example, a main storage device (RAM, ROM, etc.) and an auxiliary storage device (flash memory, SSD, hard disk, memory card, optical disk, etc.). The first storage unit 12 may be composed of one storage device or may be composed of multiple storage devices. When the first storage unit 12 is composed of multiple storage devices, each storage device is connected to the first processing unit 13 via a computer bus or any other communication means.
[0017] The first processing unit 13 generally controls the overall operation of the information processing device 1 and executes predetermined information processing. The first processing unit 13 includes, for example, one or more processors (such as a central processing unit (CPU), a micro-processing unit (MPU), or a digital signal processor (DSP)) that perform processing according to instructions of one or more programs 121 stored in the first storage unit 12. The first processing unit 13 operates as a computer by the one or more processors executing instructions of one or more programs 121 stored in the first storage unit 12.
[0018] The first processing unit 13 may include one or more dedicated hardware (such as an application specific integrated circuit (ASIC) or a field-programmable gate array (FPGA)) configured to realize a specific function. In this case, the first processing unit 13 may execute all of the processes described in this embodiment in a computer, or may execute at least a part of the processes in dedicated hardware.
[0019] The program 121 may be recorded, for example, in a computer-readable recording medium (optical disk, memory card, USB memory, or other non-transitory tangible medium). The first processing unit 13 may read at least a part of the one or more programs 121 recorded in such a recording medium by a recording medium reading device (optical disk device, etc.) or an interface device (USB interface, etc.) not shown, and write the one or more programs 121 in the first storage unit 12. Alternatively, the first processing unit 13 may download at least a part of the one or more programs 121 from another device connected to the communication network 9 by the first communication unit 11, and write the one or more programs 121 in the first storage unit 12. The one or more programs 121 include an instruction to cause the first processing unit 13 to perform at least a part of the processing according to the present embodiment described later.
[0020] [Storage device 2] The storage device 2 stores various information used in the processing of the information processing device 1. The information processing device 1 and the storage device 2 can communicate with each other via any communication path (such as a LAN, a dedicated line network, or the Internet). For example, the storage device 2 may be included in one or more file servers or database servers that accept access from a plurality of devices, or may be one or more dedicated storage devices that can be accessed only by the information processing device 1. In the example of FIG. 1, the storage device 2 stores a related party database 21, a project management database 22, a farm field management database 23, a duplicate relationship database 24, a credit management database 25, and a revenue distribution management database 26. In the following description, database may be abbreviated to "DB".
[0021] The related party DB21 includes a plurality of pieces of field management information corresponding to a plurality of related parties (field owners, managers, etc.). Each piece of field management information includes information related to one related party. For example, as shown in FIG. 2A, each piece of field management information includes at least a part of the following information: Participant identification information (participant ID) that identifies a single participant Name of the person involved Address of the person involved Email address of the person involved Contact details of relevant parties (e.g. telephone numbers) · Organizations to which the relevant parties belong (e.g. business names)
[0022] The project management DB 22 includes a plurality of pieces of project management information corresponding to a plurality of projects. Each piece of project management information includes information related to one project. For example, as shown in FIG. 2B, each piece of project management information includes at least a part of the following information: -Project identification information (project ID) that identifies a single project -Project recruitment period Project application period - Amount of greenhouse gases expected to be absorbed by the project (estimated absorption amount) -Type of crops grown in the field - The expected validity period of the carbon credits in the project (expected credit period) Information about the status of the project (status information) Identification information for the carbon credits generated by the project (credit ID) Information on the status of carbon credit transactions (transaction information) Carbon credit sales amount
[0023] The field management DB 23 includes a plurality of pieces of field management information corresponding to a plurality of fields. Each piece of field management information includes information related to a single field. For example, as shown in FIG. 2C, each piece of field management information includes at least a part of the following information: - Field identification information (field ID) that identifies a field -ID of the person in charge of the field Field information -Information about the projects in which the field participated (Participating Project Information) Duplicate relationship identification information (duplicate relationship ID) indicating one duplicate relationship
[0024] Here, the "field information" includes, for example, geographical range information, crop type information, planting interval information, and harvest frequency information, as shown in FIG. 2C. The geographical range information is information about the geographical range of the field, and includes, for example, the geographical positions (latitude, longitude) of the boundary lines of the field. The crop type information is information about the type of crop cultivated in the field. The crop interval information is information regarding the crop interval of the crops grown in the field. The harvest frequency information is information about the frequency of harvesting of crops grown in a farm field, and includes, for example, the number of harvests per year.
[0025] The "participating project information" includes information regarding projects in which the field participated, such as a project ID indicating the project in which the field participated, approval status information indicating whether or not the participation has been approved by the project manager, and contract status information indicating whether or not a contract has been concluded with the manager.
[0026] The "overlapping relationship information" is information contained in the overlapping relationship DB 24, which will be described later, and the "overlapping relationship ID" is identification information assigned to each "overlapping relationship information."
[0027] The overlap relationship DB 24 includes overlap relationship information indicating a group of fields whose geographical ranges overlap. The overlap relationship information includes, for example, as shown in Fig. 3A, identification information (overlap relationship ID) for identifying each piece of overlap relationship information and the field IDs of the group of fields whose geographical ranges overlap.
[0028] The credit management DB 25 includes credit management information related to carbon credits certified by a predetermined certification body. Each piece of credit management information includes information related to one carbon credit. The credit management information includes at least a part of the following information, for example, as shown in FIG. 3B: -Identification information (credit ID) to identify each individual credit management information Certified carbon credits represent the amount of greenhouse gas absorbed -Absorption sold Carbon credit validity period
[0029] The revenue distribution management DB26 includes a plurality of pieces of revenue distribution management information corresponding to a plurality of projects. One piece of revenue distribution management information includes information on revenue to be allocated to one field from the revenue generated by the sale of carbon credits generated in one project. One piece of revenue distribution management information includes at least a part of the following information, for example, as shown in FIG. 3C: Project ID Field ID The amount of greenhouse gas absorbed by a single field included in the carbon credit (individual absorption amount) The amount of revenue from the sale of carbon credits allocated to each field (allocation amount) - Status of payment of revenue to the parties involved in a field (payment status)
[0030] [Participant device 3] The related party device 3 is a terminal device operated by a related party of the farm field (such as an owner or manager), and is, for example, a device equipped with an information and communication function such as a personal computer, a tablet, a smartphone, etc. The system illustrated in Fig. 1 has a plurality of related party devices 3 corresponding to a plurality of related parties.
[0031] Fig. 4 is a diagram showing an example of the configuration of the related party device 3. In the example of Fig. 4, the related party device 3 includes a second communication unit 31, a second memory unit 32, and a second processing unit 33 similar to the first communication unit 11, the first memory unit 12, and the first processing unit 13 of the information processing device 1 described above, as well as an input unit 34 and a display unit 35. The input unit 34 is a device for inputting a user's instruction to the second processing unit 33, and includes input devices such as a touch panel, a mouse, and a keyboard. The display unit 35 is a device for displaying an image corresponding to the image data generated in the second processing unit 33, and includes a display device such as a liquid crystal display, an organic EL display, and a projector.
[0032] The stakeholder device 3 accesses the information processing device 1 to provide field information to the information processing device 1, display the expected amount of revenue to be allocated from the sale of carbon credits, apply for projects, display information on certified carbon credits, and display the confirmed amount of revenue to be allocated.
[0033] [Administrator Device 4] The manager device 4 is a terminal device operated by the manager of the project, and is, for example, a device equipped with information and communication functions, such as a personal computer, tablet, or smartphone. The manager device 4 has a configuration similar to that of the related party device 3 shown in Fig. 4. The manager device 4 accesses the information processing device 1 to register new projects, give instructions to start recruitment, confirm application information, approve participation in projects, give instructions to start projects, register carbon credit information, register carbon credit trading status, register carbon credit sales amounts, and the like.
[0034] [Business Server 5] The business server 5 is a device operated by a certification agent 6 that applies for carbon credit certification to a certification body 7. The certification agent 6 measures various data necessary for calculating the amount of greenhouse gas absorption in each field participating in the project (such as measuring the geographical range of the field by satellite, etc.), and calculates an estimate (second estimate) of the absorption amount of each field based on the measurement data. The certification agent 6 also prepares an application document that clarifies the calculated estimate (second estimate) of the absorption amount and the theory on which the calculation is based, and submits it to the certification body 7. The business server 5 stores various information necessary for estimating the absorption amount of each field based on the field information (FIG. 2C), and provides the stored information to the operator device 4 in response to a request from the operator device 4. The business entity server 5 also stores the measurement data acquired for application for certification to the certification body 7 and the calculated estimated value of the absorption amount of each field (second estimated value), and provides the stored measurement data and estimated value to the manager device 4 in response to a request from the manager device 4. Note that the business entity server 5 may provide the stored information, etc. to the information processing device 1 in response to a request from the information processing device 1.
[0035] [Credit card registration server 8] The credit registration server 8 is a device that registers and manages carbon credits certified by the certification body 7. The operator device 4 and the information processing device 1 can access the credit registration server 8 to obtain information on carbon credits related to the project (such as the amount of greenhouse gas absorption and the validity period).
[0036] Here, the operation of the system having the above-mentioned configuration shown in FIG. 1 will be described. 5 to 7 are flowcharts illustrating an example of processing in the system shown in FIG.
[0037] First, the manager device 4 sets a new project in the information processing device 1 (ST100). For example, the manager device 4 inputs project management information as shown in Fig. 2B and transmits it to the information processing device 1. At this time, the manager device 4 leaves information that has not yet been determined in the project management information (project recruitment period, credit ID, transaction information, sales amount information, etc.) blank, and does not need to be included in the project management information. The information processing device 1 registers the project management information received from the manager device 4 in the project management DB 22 (ST105).
[0038] The manager device 4 transmits an instruction to the information processing device 1 to start soliciting fields for the project registered in the project management DB 22 (ST110). When the information processing device 1 receives an instruction from the manager device 4 to start soliciting for a project, it registers status information indicating that the project is in a soliciting status in the project management information of the project (ST115). The information processing device 1 also publishes a solicitation notice soliciting fields for the project (ST115), and causes the solicitation notice to be displayed on the related party device 3 that has accessed the information processing device 1 (ST120).
[0039] The stakeholder device 3, through the operation of a stakeholder who has viewed the project recruitment information, inputs field information (Figure 2C) required to obtain the expected revenue amount (first expected amount) for one field, and transmits the information to the information processing device 1 (ST125).
[0040] For example, the related party device 3 displays a map on the screen of the display unit 35, and receives a predetermined operation by the user (related party) to specify the range of the field on the map (such as an operation to specify vertices of a polygon that forms the boundary of the field, or an operation to trace the boundary line of the field). The related party device 3 specifies the range on the map specified by the user in response to this predetermined operation, and inputs geographical range information corresponding to the specified range on the map.
[0041] The involved party device 3 may also input farm field information (such as crop type information, planting interval information, and harvest frequency information) using a means for inputting information in a dialogue format using text or voice (such as a chatbot).
[0042] When the information processing device 1 receives the field information of a certain field transmitted from the related party device 3, it registers the field management information including the received field information in the field management DB 23 (ST130). The process of the information processing device 1 when the field information is received will be described later with reference to the flowchart in FIG.
[0043] The information processing device 1 acquires an estimate (first estimate) of the amount of greenhouse gas absorbed by crops in one field within a predetermined period based on the field information received for the one field (FIG. 2C) (ST135).
[0044] For example, the information processing device 1 acquires cultivation environment information related to at least one of the temperature, rainfall, and sunshine hours of the region where the field is located, based on the geographical range information included in the field information. In this case, the information processing device 1 may acquire the cultivation environment information based on information such as the temperature, rainfall, and sunshine hours of each region stored in the business entity server 5. The information processing device 1 acquires a first estimated value of the amount of greenhouse gas absorption based on the area of the field indicated by the geographical range information included in the received field information, the acquired cultivation environment information, and at least one of the crop type information, planting interval information, and harvest frequency information included in the received field information.
[0045] The information processing device 1 may use a trained model trained by a predetermined machine learning algorithm to obtain a first estimated value of the amount of greenhouse gas absorption in the field. In this case, the first storage unit 12 stores a trained model generated to estimate the amount of greenhouse gas absorption in the field from the area of the field, the cultivation environment information, and at least one of the crop type information, the crop interval information, and the harvest frequency information. The information processing device 1 obtains the first estimated value of the absorption amount by applying the trained model to the area of the field indicated by the geographical range information included in the received field information, the acquired cultivation environment information, and at least one of the crop type information, the crop interval information, and the harvest frequency information included in the received field information.
[0046] Any machine learning algorithm may be used to generate the trained model, and known algorithms such as linear regression, logistic regression, support vector machine, decision tree, random forest, gradient boosting, and neural network may be used.
[0047] The information processing device 1 may use means other than the trained model described above (such as an approximation function or a theoretical formula that converts given input variables into a first estimated value) to obtain a first estimated value of the amount of greenhouse gas absorption in the field.
[0048] Next, the information processing device 1 acquires an expected amount of revenue (first expected amount) to be allocated to the one field when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one field, the expected amount of greenhouse gas absorption in a predetermined period in the project (FIG. 2B), and the expected sales price of the carbon credits corresponding to the expected absorption amount (ST140). The expected sales price of the carbon credits corresponding to the expected absorption amount may be set based on, for example, the average sales price per unit absorption amount in the carbon credit market, the price fluctuation range in the most recent market price, or the like.
[0049] For example, the information processing device 1 calculates the total revenue as the expected sales amount minus specified expenses (such as fees paid to the authentication agency 6), and calculates the first expected amount so that the ratio of the first estimated value to the expected absorption amount is equal to the ratio of the first expected amount to the total revenue.
[0050] The information processing device 1 generates display information including the first estimated value of the absorption amount acquired for the one field in step ST135 and the first expected amount of revenue acquired for the one field in step ST140, and transmits the display information to the related party device 3 of the one field. In response to the received display information, the related party device 3 displays the first estimated value of the absorption amount in the one field and the first expected amount of revenue to be allocated to the one field on the display unit 35 (ST145).
[0051] In this manner, in this embodiment, the first estimated value of the amount of greenhouse gas absorption and the first expected amount of revenue to be distributed by the sale of carbon credits are displayed to the person concerned of the farm field who is considering participating in the project. This allows the person concerned to obtain specific information about the carbon credits to be created by participating in the project and the revenue to be distributed when the credits are sold, making it easier for the person concerned to decide to participate in the project. Therefore, it is possible to effectively support the creation of carbon credits that are easy to profit from when sold, even for small-scale farm fields.
[0052] When an application screen is selected by a field stakeholder who has decided to apply for the project and the instruction is transmitted to the information processing device 1 (ST150), the information processing device 1 generates display information for displaying the application screen including the predetermined consent items and transmits the display information to the field stakeholder device 3 (ST155). The field stakeholder device 3 displays the application screen including the predetermined consent items on the display unit 35 in accordance with the display information received from the information processing device 1. The predetermined consent items are items that the field stakeholder must agree to in order to participate in the project, and specifically include consent to measuring the field by a predetermined measuring means (e.g., measuring the geographical area by images taken from a satellite), consent to confidentiality, etc.
[0053] The related party device 3 inputs application information for applying for one field to participate in one project through an operation of a user (related party) on an application screen including predetermined consent items, and transmits the input application information to the information processing device 1 (ST165). The application information includes, for example, the field ID of the field for which application is made for participation in the project, and information on documents proving that the person is the owner or manager of the field (information on documents related to real estate registration, information on title deed proving ownership or leasehold of the land, etc.).
[0054] The information processing device 1 receives project application information from the related person device 3 that displays the application screen including the predetermined consent items (ST170). This makes it clear that the related person has agreed to the predetermined consent items when applying for the project, so that the procedure for confirming agreement to the consent items (such as the exchange of contract documents) can be omitted.
[0055] When the information processing device 1 receives application information for an application for a field to participate in a project, the information processing device 1 performs a process for confirming the participation status of the field in other projects. If the confirmation process determines that the field is eligible to participate in the project, the information processing device 1 registers participation project information indicating that the field will participate in the project in the field management information (FIG. 2C). The process of the information processing device 1 will be described later with reference to the flowcharts of FIGS. 9 and 10.
[0056] When the participation project information indicating that a field will participate in a project is registered in the field management information (FIG. 2C), the information processing device 1 causes the manager device 4 to display the application information received from the related party device 3 (ST175). The manager of the project checks the application information displayed on the manager device 4 and judges whether to approve the application for project participation related to the application information. That is, the manager checks the information on the document proving that the manager related to the application information is the owner or manager of the field, and if the manager judges that the document is genuine, approves the application for project participation related to the application information. When the manager device 4 approves the field's participation in a project, it registers approval status information indicating that the manager has approved the participation, for the participation project information included in the field management information of the field.
[0057] The information processing device 1 acquires, for a project currently soliciting applications, an estimate of the total area of multiple fields participating in the project and / or an estimate of the total amount of greenhouse gas absorbed by crops in the multiple fields participating in the project within a specified period of time (ST200).
[0058] For example, the information processing device 1 extracts field management information (FIG. 2C) including participation project information indicating participation in one project currently soliciting applications, in which approval status information indicating that the participation has been approved by the operator is registered, from the field management DB 23. The information processing device 1 calculates the area of each field based on geographical range information included in the field information of the field management information of each extracted field, and calculates the total area by adding up the calculated areas of each field. The information processing device 1 also acquires a first estimate of the absorption amount of each field in a manner similar to step ST135 based on the field information of the field management information similarly extracted, and calculates an estimate of the total absorption amount by adding up the acquired first estimates of each field.
[0059] The information processing device 1 determines whether the project initiation condition is met based on at least one of the total area of the fields and the estimated value of the total absorption of greenhouse gases acquired in step ST200 (ST205). For example, the information processing device 1 may determine that the project initiation condition is met when the total area of the fields reaches a predetermined target value (e.g., 10,000 hectares), or may determine that the project initiation condition is met when the estimated value of the total absorption of greenhouse gases reaches the assumed absorption amount (FIG. 2B). Alternatively, the information processing device 1 may determine that the project initiation condition is met when the total area of the fields reaches a predetermined target value and the estimated value of the total absorption of greenhouse gases reaches the assumed absorption amount. The information processing device 1 causes the operator device 4 to display the determination result of step ST205 (ST210).
[0060] In this way, by using the total area of farmland and the total amount of greenhouse gas absorption as the criteria for project activation, it is possible to set a certain level of greenhouse gas absorption certified as carbon credits, and the selling price of carbon credits can also be set at a certain level. Therefore, it is possible to effectively support the creation of carbon credits that are easy to sell and profitable, even for small farmland.
[0061] The information processing device 1 may display the determination result in step ST205 on the involved party device 3. This makes it easier for the involved party of the farm field to grasp the progress of the project in which they have applied to participate.
[0062] When a related person inputs an instruction (project initiation instruction) to start work to receive carbon credit certification for a project registered in the project management DB22, the operator device 4 transmits the instruction to the information processing device 1 (ST215). When the information processing device 1 receives an instruction to initiate a project from the operator device 4, it registers status information indicating that the project is in an initiation state in the project management information of the project (ST220). The information processing device 1 also causes the related person device 3 to display a notice indicating that the recruitment of fields for the project has ended (ST235).
[0063] When the project is launched, the operator provides the field information of each field participating in the project to a certification agent 6 and requests an application for carbon credit certification from a certification body 7. Upon receiving the request, the certification agent 6 measures the data required for the carbon credit application for each field participating in the project (such as measuring the geographical area by satellite).
[0064] The data required for applying for carbon credits is measured at the certification agency 6, and the certification agency 6 calculates an estimate (second estimate) of the amount of greenhouse gas absorption in each field based on the measurement results. The data is then uploaded to the business operator server 5. For example, the operator device 4 accesses the business operator server 5 to obtain the second estimate of the amount of absorption in each field by the certification agency 6 from the business operator server 5, and transmits the obtained data to the information processing device 1 (ST230). Alternatively, the information processing device 1 may directly access the business operator server 5 to obtain the second estimate of the amount of absorption in each field by the certification agency 6.
[0065] When the information processing device 1 receives the second estimated value of the absorption amount of each field from the operator device 4 (or the business operator server 5), the information processing device 1 acquires the expected amount of revenue (second expected amount) to be allocated to each field when the carbon credits are sold based on the received second estimated value of the absorption amount of each field (ST235). For example, the information processing device 1 calculates an estimate of the total absorption amount of greenhouse gases in all fields of the project by adding up the second estimated values of the absorption amount of each field, and calculates the expected sales amount of the carbon credits from the estimated value of the total absorption amount. This expected sales amount can be calculated based on, for example, the average sales amount per unit absorption amount in the carbon credit market, the fluctuation range of the price in the most recent market price, etc. The information processing device 1 calculates the amount obtained by subtracting a predetermined expense (such as the cost paid to the certification agent 6) from the expected sales amount as the total revenue, and calculates the second expected amount so that the ratio of the second estimated value to the estimated value of the total absorption amount is equal to the ratio of the second expected amount to the total revenue.
[0066] When the information processing device 1 acquires the second estimated value of absorption amount and the second expected amount of revenue for each field, it causes the acquired second estimated value and second expected amount for each field to be displayed on the stakeholder device 3 of each field (ST240, ST245).
[0067] For example, the information processing device 1 generates display information for a contract screen including contract terms to be exchanged between the stakeholders of the fields and the project manager before submitting an application for carbon credit certification to the certification body 7 based on the measurement results of each field by the certification agent 6 (ST240), and displays this on the stakeholders device 3 (ST245). The information processing device 1 may display a second estimated value of the absorption amount and a second expected amount of revenue on this contract screen.
[0068] The contract screen may include, for example, contract terms regarding the ownership of carbon credits and the distribution of revenues from the sale of carbon credits. In this contract, the ownership of carbon credits is transferred to, for example, the project operator. The revenues from the sale of carbon credits are divided into amounts proportional to the amount of greenhouse gas absorbed by each field and distributed to each field.
[0069] The related party device 3 inputs contract information indicating that the related party agrees to the contract terms on the displayed contract screen, and transmits it to the information processing device 1 (ST250). For example, the related party device 3 generates an electronic signature of the related party for the contract data provided by the information processing device 1, and transmits the contract data to which the generated electronic signature and electronic certificate are attached to the information processing device 1 as contract information. The information processing device 1 stores the contract information received from the related party device 3 in the storage device 2. The information processing device 1 also searches the field management information (FIG. 2C) of one field related to the received contract information in the field management DB 23, and updates the contract status information included in the participation project information of the field management information to indicate that the contract has been concluded (ST255).
[0070] The operator device 4 inquires of the information processing device 1 about the contract conclusion status of each field for the project for which contract information is being input (ST260). The information processing device 1 extracts the field management information including the project ID of the inquired project from the field management DB 23, and checks whether or not each field has a contract based on the contract status information included in the participation project information of the extracted field management information (ST205). The information processing device 1 displays on the operator device 4, for example, a list showing whether or not each field has a contract (ST270). The operator can pick out the parties of the fields that have not been contracted in this list, and send them a message (email, etc.) encouraging them to conclude a contract. When a predetermined contract implementation period has passed, the operator selects only the contracted fields as regular fields of the project, and instructs the certification agent 6 to apply for certification to the certification body 7 for the selected fields.
[0071] In this manner, in this embodiment, before submitting an application for certification to the certification body 7, it is not necessary to exchange documents to exchange contract terms with each field participating in the project, and it is sufficient to simply transmit contract information from the involved party device 3 to the information processing device 1. Therefore, the workload required for receiving carbon credit certification can be effectively reduced. In addition, the second estimated value of the absorption amount of the field and the second expected amount of revenue are displayed on the involved party device 3, so that specific information that can be used as a reference for the decision can be provided to the involved party who decides whether to conclude the contract.
[0072] When the carbon credit is authenticated by the authentication authority 7 and the carbon credit information is registered in the credit registration server 8, the administrator device 4 acquires the carbon credit information registered in the credit registration server 8 and transmits the acquired carbon credit information to the information processing device 1 (ST300). Alternatively, the information processing device 1 may directly access the credit registration server 8 to acquire the authenticated carbon credit information.
[0073] When the information processing device 1 receives carbon credit information from the operator device 4 (or the credit registration server 8), it generates credit management information (FIG. 3B) based on the received carbon credit information and registers it in the credit management DB 25 (ST305).
[0074] The information processing device 1 also acquires information on the greenhouse gas absorption amount (individual absorption amount) of each field from the operator device 4 as information on the certified carbon credit. The individual absorption amount of each field may be acquired from the operator device 4 (or the credit registration server 8) that is registered in the credit registration server 8, for example, or may be acquired from the operator device 4 (or the operator server 5) that is registered in the business entity server 5 as information on application documents to the certification authority 7. The information processing device 1 registers the acquired information on the individual absorption amount of each field in the revenue distribution management information (FIG. 3C) of the revenue distribution management DB 26 (ST305).
[0075] When the information processing device 1 acquires information on certified carbon credits for a project, it updates the status information included in the project management information (FIG. 2B) of the project to indicate that the carbon credits have been certified. The information processing device 1 also registers the credit ID (FIG. 3B) of the carbon credit in the project management information.
[0076] The information processing device 1 generates display information for a screen notifying information on the certified carbon credits (ST310), and displays it on the related party device 3 (ST315). The related party device 3 of one of the fields displays the individual absorption amount of the one of the fields on this screen. This allows the related party of the one of the fields to easily understand the individual absorption amount of the one of the fields that is directly related to them in the project.
[0077] The certified carbon credits are put up for sale, for example, in a credit market or to individual businesses. The operator device 4 transmits the status of the carbon credit transaction (sales progress, sales history, etc.) entered by the operator to the information processing device 1 as transaction information (ST320), and the information processing device 1 registers the received transaction information in the project management information (FIG. 2B) (ST325). The information processing device 1 generates display information for a screen notifying the status of the carbon credit transaction based on this transaction information (ST330), and displays it on the related party device 3 (ST335). The related party device 3 of one field displays the carbon credit transaction status of the project in which the one field participates on this screen. This allows the related party of one field to easily grasp the status of the carbon credit transaction related to the project in which the field participates.
[0078] When a part or all of the carbon credits are sold, the operator device 4 transmits information on the sales amount of the carbon credits (sales amount information) input by the operator to the information processing device 1 (ST340). The sales amount information includes, for example, the amount of greenhouse gas absorption indicated by the carbon credits that was sold and the sales amount. When the information processing device 1 receives the sales amount information from the operator device 4, it calculates the revenue to be allocated to each field based on the sales amount information and the individual absorption amount of each field (ST345).
[0079] For example, the information processing device 1 searches the credit management information (FIG. 3B) of the carbon credit indicated by the sales amount information in the credit management DB 25, and adds the absorption amount for sale indicated by the sales amount information to the absorption amount already sold and registered in the credit management information. The information processing device 1 also searches the project management information (FIG. 2B) related to the carbon credit indicated by the sales amount information in the project management DB 22, and adds the sales amount indicated by the sales amount information to the sales amount registered in the project management information.
[0080] The information processing device 1 extracts revenue distribution management information (Figure 3C) related to a project indicated by the sales amount information in the revenue distribution management DB 26, and calculates the amount of revenue to be allocated to each field (allocation amount) based on the individual absorption volume of each field contained in the extracted revenue distribution management information and the sales amount of the project management information (Figure 2B) updated according to the sales amount information.
[0081] For example, when the information processing device 1 calculates the allocation amount of a field in a project indicated by the sales amount information, the information processing device 1 calculates the total profit obtained from the sale by subtracting a predetermined expense (such as the cost paid to the certification agency 6) from the sales amount of the project management information (FIG. 2B) related to the project. The information processing device 1 also acquires the absorption amount before the sale of the credit management information (FIG. 3B) related to the project, and acquires the individual absorption amount of the revenue allocation management information (FIG. 3C) related to the project and the field. The information processing device 1 then calculates the allocation amount of the field so that the ratio of the individual absorption amount to the absorption amount before the sale is equal to the ratio of the allocation amount to the total profit. The information processing device 1 adds this calculated allocation amount to the allocation amount registered in the revenue allocation management information (FIG. 3C) related to the project and the field. As a result, the distribution amount registered in the revenue distribution management information will be the cumulative amount of revenue distributed to a field according to the sales amount each time a portion of the carbon credits is sold.
[0082] The information processing device 1 displays the revenue allocation amount calculated for one field on the device 3 of the person involved in that field (ST355, ST360). That is, the information processing device 1 displays the revenue allocation amount on the device 3 of the person involved in each field. The information processing device 1 also performs a process of paying the calculated revenue allocation amount for each field to the person involved in each field (ST365). For example, the information processing device 1 performs the payment process of the allocation amount using any remittance means such as bank transfer. In this way, the person involved in each field who participated in the project can receive a share of the revenue obtained from the sale of carbon credits. When the information processing device 1 pays revenue (allocation amount) to a field in a project, it updates the payment status of the revenue distribution management information (FIG. 3C) related to the project and the field. For example, the payment status of the revenue distribution management information (FIG. 3C) registers the total amount of revenue paid up to that point (payment amount). When the information processing device 1 performs payment processing in step ST365, it adds the revenue (allocation amount) paid by the payment processing to the payment amount (payment status) registered in the revenue distribution management information. As a result, the payment amount (payment status) registered in the revenue distribution management information becomes the sum of the revenue (allocation amount) paid by the sale of carbon credits each time the revenue (allocation amount) is paid.
[0083] FIG. 8 is a flowchart for explaining an example of the process of the information processing device 1 when the farm field information is received in step ST130 (FIG. 5).
[0084] When the information processing device 1 receives field information from the related party device 3 of one field (ST400), it searches the field management DB 23 for field management information (FIG. 2C) including geographical range information whose geographical range overlaps with the geographical range information of the received field information (ST405). If the search results in the discovery of an identical registered field with the same geographical range and related party ID (Yes in ST410), the information processing device 1 notifies the related party device 3 that an already registered field exists and cancels the registration of the new field (ST415).
[0085] If no other overlapping fields are found as a result of the search in step ST405 (No in ST420), the information processing device 1 registers new field management information including the field information received in step ST400 in the field management DB 23 (ST425).
[0086] On the other hand, when the information processing device 1 finds another overlapping field (Yes in ST420), it registers in the overlapping relationship DB 24 overlapping relationship information (FIG. 3A) indicating that the one field related to the received field information and the other field found by the search are in an overlapping relationship (ST430). If the field management information of the other field contains an overlapping relationship ID, the information processing device 1 adds the field ID of the one field to the overlapping relationship information of this overlapping relationship ID. If the field management information of the other field does not contain an overlapping relationship ID, the information processing device 1 newly generates overlapping relationship information (FIG. 3A) including the field ID of the one field and the field ID of the other field, and registers it in the overlapping relationship DB 24. In this case, the information processing device 1 registers the overlapping relationship ID of the newly generated overlapping relationship information in the field management information of the other field (ST435). Then, the information processing device 1 newly generates field management information for the one field and registers it in the field management DB 23 (ST440). At this time, if the field management information of the other field contains an overlapping relationship ID, the information processing device 1 registers the overlapping relationship ID in the field management information of the one field, and if the field management information of the other field does not contain an overlapping relationship ID, the information processing device 1 registers the overlapping relationship ID of the newly generated overlapping relationship information in the field management information of the one field.
[0087] In this way, according to this embodiment, a group of fields that are not identical but have overlapping geographical ranges can be identified based on the field information provided by the interested party. Therefore, the interested party can register multiple fields with different geographical ranges from the fields he owns (or manages) for participation in the project. Furthermore, even if the interested party mistakenly registers someone else's field, it is possible to accurately understand the situation.
[0088] 9 and 10 are flowcharts for explaining an example of the process of the information processing device 1 when application information is received in step ST170 (FIG. 5).
[0089] When the information processing device 1 receives application information for a field to apply to participate in a project from the related party device 3 (ST500), it judges whether the field management information (FIG. 2C) of the field includes participating project information (i.e., whether the field has participated in another project) (ST505). If the field does not include participating project information (No in ST505), the information processing device 1 proceeds to step ST530 described later.
[0090] If the field management information of a field related to the application information includes participating project information (Yes in ST505), the information processing device 1 searches the credit management DB 25 for project management information (FIG. 2B) of the project corresponding to this participating project information. The information processing device 1 then determines whether the status information included in this project management information indicates a status in which credits are being accepted or a status in which an action is being taken (ST510). If the status information indicates a status in which credits are being accepted or a status in which an action is being taken (Yes in ST510), the information processing device 1 transmits a notice to the related party device 3 of the field that the application for the project based on the received application information is not accepted (ST515). This makes it possible to prevent one field from participating in multiple projects that are in a status of accepting credits or a status in which an action is being taken.
[0091] If the status information included in the project management information of a project indicated by the participating project information does not indicate a status of soliciting or being activated (No in ST510), the information processing device 1 checks the validity period of the carbon credits related to the project in the credit management information (FIG. 3B) (ST520). If the validity period of the carbon credits has already expired (No in ST520), the information processing device 1 proceeds to step ST530, which will be described later.
[0092] If the validity period of the carbon credits related to the project in the participation project information has not yet ended (Yes in ST520), the information processing device 1 determines whether the validity period of the carbon credits overlaps with the expected credit period (FIG. 2B) of the project related to the application information (ST525). If the validity period of the carbon credits does not overlap with the expected credit period (No in ST525), the information processing device 1 proceeds to step ST530, which will be described later. If the validity period of the carbon credits overlaps with the expected credit period (Yes in ST525), the information processing device 1 transmits a notice to the related party device 3 that the application for the project based on the received application information is not accepted (ST515). This makes it possible to prevent one farm field from participating in multiple projects with overlapping credit validity periods.
[0093] When the information processing device 1 proceeds to step ST530, it determines whether the field management information of the one field related to the received application information includes an overlapping relationship ID (whether there is another field whose geographical range overlaps with that one field). If the field management information of the one field does not include an overlapping relationship ID (No in ST530), the information processing device 1 registers participation project information indicating that the one field will participate in the project related to the application information in the field management information of the one field (ST535).
[0094] If it is determined in step ST530 that the field management information of one field related to the application information includes an overlapping relationship ID (Yes in ST530), the information processing device 1 determines whether the field management information of another field (FIG. 2C) identified by the overlapping relationship information indicated by the overlapping relationship ID includes participating project information (i.e., whether the field has participated in another project) (ST605). If it does not include participating project information (No in ST605), the information processing device 1 proceeds to step ST635 described later.
[0095] If the field management information of another field identified by the overlapping relationship information includes participating project information (No in ST605), the information processing device 1 searches the credit management DB 25 for project management information (FIG. 2B) of the project corresponding to this participating project information. The information processing device 1 then determines whether the status information included in this project management information indicates a status in which applications are being accepted or a status in which applications are being implemented (ST610). If the status information indicates a status in which applications are being accepted or a status in which applications are being implemented (Yes in ST610), the information processing device 1 transmits a notice to the related party device 3 of the one field that the application for the project based on the received application information is not accepted (ST515). This makes it possible to prevent a group of fields with overlapping geographical ranges from participating in multiple projects that are in a status in which applications are being accepted or a status in which applications are being implemented.
[0096] If the status information included in the project management information of a project indicated by the participating project information does not indicate a status of soliciting or being activated (No in ST610), the information processing device 1 checks the validity period of the carbon credits related to that project in the credit management information (FIG. 3B) (ST620). If the validity period of the carbon credits has already expired (No in ST620), the information processing device 1 proceeds to step ST635, which will be described later.
[0097] If the validity period of the carbon credits related to the project in the participation project information has not yet ended (Yes in ST620), the information processing device 1 judges whether the validity period of the carbon credits overlaps with the expected credit period (FIG. 2B) of the project related to the application information (ST625). If the validity period of the carbon credits does not overlap with the expected credit period (No in ST625), the information processing device 1 proceeds to step ST635 described later. If the validity period of the carbon credits overlaps with the expected credit period (Yes in ST625), the information processing device 1 transmits a notice to the related party device 3 that the application for the project based on the received application information is not accepted (ST615). This makes it possible to prevent a group of fields with overlapping geographical ranges from participating in multiple projects with overlapping credit validity periods.
[0098] When the information processing device 1 proceeds to step ST635, it registers participation project information indicating that the one field related to the received application information will participate in the project related to the application information, in the field management information of the one field.
[0099] The present invention is not limited to the above-described embodiment, but includes various variations. Those skilled in the art can make various modifications and substitutions to the components of the above-described embodiment within the technical scope of the present invention or its equivalent. The following is a summary of the contents of the claims as originally filed in this application. [1] An information processing device that supports the creation of carbon credits, A first processing unit; a first storage unit that stores an instruction to be executed by the first processing unit; The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the first processing unit in accordance with the command is receiving field information relating to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information relating to the geographical range of the one of the farm fields; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; obtaining a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the amount of removal obtained for the one of the farm fields, an expected amount of greenhouse gas removal in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected amount of removal; and displaying, on the party device of one of the farm fields, at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the revenue acquired for the one of the farm fields. Information processing device. [2] The farm field information includes at least one of crop type information regarding the type of crop to be cultivated, crop interval information regarding the crop interval, and harvest frequency information regarding the frequency of harvesting, Obtaining the first estimate of the amount of absorption acquiring cultivation environment information related to at least one of a temperature, a rainfall, and a sunshine duration in a region where the field is located based on the geographical range information included in the field information; obtaining the first estimated value of the absorption amount based on an area of the field indicated by the geographical range information included in the field information, the cultivation environment information, and at least one of the crop type information, the planting interval information, and the harvest frequency information included in the field information; [1] An information processing device according to the present invention. [3] the first storage unit stores a trained model generated to estimate the absorption amount of the field from an area of the field, the cultivation environment information, and at least one of the crop type information, the cropping interval information, and the harvest frequency information; obtaining the first estimated value of the absorption amount includes applying an area of the field indicated by the geographical range information included in the field information, the cultivation environment information, and at least one of the crop type information, the planting interval information, and the harvest frequency information included in the field information to the trained model to obtain the first estimated value of the absorption amount. [2] An information processing device according to the present invention. [4] The process performed by the first processing unit in accordance with the command is receiving a plurality of application information from a plurality of said stakeholder devices, each of said application information being for one of said fields to participate in said project; acquiring at least one of a total area of the plurality of fields and an estimated value of a total amount of greenhouse gas absorbed by crops in the plurality of fields within a predetermined period based on the field information of the plurality of fields related to the received application information; determining whether a condition for initiating the project has been met based on at least one of the total area and the estimated total absorption amount; and displaying at least one of the total area, the estimated total absorption amount, and the determination result of the activation condition on at least one of the related party device and an operator device which is a terminal device operated by the operator of the project. [1] An information processing device according to the present invention. [5] The process performed by the first processing unit in accordance with the command is Displaying, on the related person device, an application screen including terms of agreement that the related person of the field should agree to in order to participate in the project, the application screen including, as the terms of agreement, consent to measuring the field by a predetermined measuring means. Including, Receiving the application information from the related party device includes receiving the application information from the related party device that displays the application screen. [4] An information processing device according to the present invention. [6] The process performed by the first processing unit in accordance with the command is displaying, on the relevant party device, a contract screen including contract terms to be exchanged between the relevant party of the field and the operator of the project before an application for certification of the carbon credits is made to a specified certification body based on the measurement results of each of the fields by the specified measurement means, the contract screen including contract terms regarding the ownership of the carbon credits and the distribution of profits obtained by selling the carbon credits; receiving contract information indicating consent to the contract terms from the related party device on which the contract screen is displayed; [5] An information processing device according to the present invention. [7] The process performed by the first processing unit in accordance with the command is obtaining a second expected amount of revenue to be allocated to each of the farm fields when the carbon credits are sold, based on a second estimated value of the amount of greenhouse gas absorption in each of the farm fields estimated based on the measurement results by the predetermined measuring means; and displaying, on the related party device of one of the farm fields, at least one of the second estimated value of the absorption amount acquired for the one of the farm fields and the second expected amount of the revenue acquired for the one of the farm fields. [5] An information processing device according to the present invention. [8] The process performed by the first processing unit in accordance with the command is Obtaining information regarding the individual greenhouse gas absorption amount of each of the farm fields included in the carbon credits certified by a predetermined certification body; and displaying the acquired information on the individual absorption amount of the one of the farm fields on the related party device of the one of the farm fields. [1] An information processing device according to the present invention. [9] The process performed by the first processing unit in accordance with the command is obtaining transaction information regarding the status of the certified carbon credit transactions; and displaying the acquired transaction information on the related party device. [8] An information processing device according to the present invention.
[10] The process performed by the first processing unit in accordance with the command is Obtaining sales amount information regarding the certified sales amount of the carbon credits; Calculating the profit to be allocated to each of the farm fields based on the acquired information on the individual absorption amount of each of the farm fields and the acquired sales amount information; and displaying the calculated revenue for each of the farm fields on the stakeholder device of each of the farm fields. [8] An information processing device according to the present invention.
[11] the first storage unit is capable of accessing a storage device; The storage device includes: a plurality of pieces of project management information each including information relating to one of the projects; A plurality of pieces of farm field management information each including information on one of the farm fields; Remember, the project management information for one of the projects includes status information for a status of the project; The field management information for one of the fields includes: The farm field information received from the stakeholder device for the one farm field; and when the field participates in one of the projects, participating project information indicating the one of the projects, The process performed by the first processing unit in accordance with the command is when receiving an instruction to start soliciting the fields for one of the projects from an operator device which is a terminal device operated by a manager of the project, registering the status information indicating that the one of the projects is in a soliciting status in the project management information of the one of the projects; When receiving an instruction from the operator device to start work to receive certification of the carbon credit for one of the projects, registering the status information indicating that the one project is in an active state in the project management information of the one project; receiving a plurality of application information from a plurality of said stakeholder devices, each of said application information being for one of said fields to participate in said project; when the field information related to one of the fields is received from the related person device, storing the field management information including the received field information in the storage device; when the application information for applying for one of the fields to participate in one of the projects is received from the related party device, and if the field management information of the one of the fields does not include the participating project information, registering the participating project information indicating the one of the projects in the field management information; when the application information for one of the fields to apply to participate in one of the projects is received from the related party device, if the field management information of the one of the fields includes the participating project information and if the status information included in the project management information of the project corresponding to the participating project information indicates the status of soliciting or the status of being activated, transmitting a notice to the related party device that the application by the one of the fields is rejected; [1] An information processing device according to the present invention.
[12] The process performed by the first processing unit in accordance with the command is when the field information on one of the fields is received from the related person device, searching in the storage device for the field management information of the other of the fields that includes geographical range information whose geographical range overlaps with the geographical range information of the received field information; when the field management information relating to the other field is found by the search, storing overlap relationship information indicating that the one field and the other field are in an overlapping relationship in the storage device; when the application information for one of the fields to apply to participate in one of the projects is received from the related party device, if there is another field that is indicated to be in the overlapping relationship with the one of the fields by the overlapping relationship information and if the field management information of the other field does not include the participating project information, registering the participating project information indicating the one of the projects in the field management information of the other field; when the application information for one of the fields applying to participate in one of the projects is received from the related party device, if there is another field indicated to be in the overlapping relationship with the one of the fields by the overlapping relationship information, the field management information of the other field includes the participating project information, and the status information included in the project management information of the project corresponding to the participating project information indicates the invitation status or the activated status, sending a notification to the related party device that the application by the one of the fields is rejected.
[11] An information processing device according to the present invention.
[13] A terminal device that supports the creation of carbon credits, A second processing unit; a second storage unit that stores instructions to be executed by the second processing unit; The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the second processing unit in accordance with the command is inputting field information relating to one of the fields, the field information including geographical range information relating to a geographical range of the one of the fields, and transmitting the input field information to an information processing device; receiving display information from the information processing device, the display information including at least one of an estimated value of an amount of greenhouse gas absorbed by crops in the one field within a specified period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected amount of greenhouse gas absorption in the project within the specified period and an estimated value of the sales amount of the carbon credits equivalent to the estimated amount of absorption, and displaying at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information; Terminal device.
[14] A system to support the creation of carbon credits, An information processing device; a plurality of party devices each of which is a terminal device operated by a party involved in the farm field; The carbon credits are generated based on a project to absorb greenhouse gases by crops grown in a plurality of the fields; The related person device operated by the related person of one of the farm fields inputs field information related to the one of the farm fields, the field information including geographical range information related to the geographical range of the one of the farm fields, and transmits the input field information to the information processing device. the information processing device acquires a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; the information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gases in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected absorption amount; the information processing device generates display information including at least one of the first estimated value of the absorption amount acquired for one farm field and the first expected amount of the revenue acquired for the one farm field, and transmits the generated display information to the related party device of the one farm field; The related party device of one of the farm fields displays at least one of the estimated absorption amount and the first expected amount of the profit in response to the display information received from the information processing device. system.
[15] A method for supporting the creation of carbon credits, the method being performed by an information processing device, The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The information processing device receives field information related to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information related to a geographical range of the one of the farm fields; The information processing device acquires a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; The information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gases in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected absorption amount; the information processing device causes the stakeholder device of one of the farm fields to display at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the profit acquired for the one of the farm fields; The method according to claim 1,
[16] A method for supporting the creation of carbon credits, the method being performed by a terminal device, comprising: The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; the terminal device inputs field information related to one of the fields, the field information including geographical range information related to a geographical range of the one of the fields, and transmits the input field information to an information processing device; the terminal device receives display information from the information processing device, the display information including at least one of an estimated value of an amount of greenhouse gas absorbed by crops in the one field within a predetermined period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected amount of greenhouse gas absorption in the project within the predetermined period and an estimated value of the sales amount of the carbon credits equivalent to the estimated amount of absorption, and displays at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information. method.
[17] A method for a system to support the creation of carbon credits, comprising: The system comprises: An information processing device; A plurality of related party devices, each of which is a terminal device operated by a related party in one field; having The carbon credits are generated based on a project to absorb greenhouse gases by crops grown in a plurality of the fields; the related person device operated by the related person of one of the farm fields inputs field information related to the one of the farm fields, the field information including geographical range information related to the geographical range of the one of the farm fields, and transmits the input field information to the information processing device; The information processing device acquires a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; The information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gases in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected absorption amount; the information processing device generates display information including at least one of the first estimated value of the absorption amount acquired for one farm field and the first expected amount of the profit acquired for the one farm field, and transmits the generated display information to the related party device of the one farm field; The related party device of one of the farm fields displays at least one of the estimated absorption amount and the first expected amount of the profit in response to the display information received from the information processing device. The method according to claim 1,
[18] A program including instructions for causing an information processing device to perform a process for supporting the creation of carbon credits, The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the information processing device in accordance with the command is receiving field information relating to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information relating to the geographical range of the one of the farm fields; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; obtaining a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the amount of removal obtained for the one of the farm fields, an expected amount of greenhouse gas removal in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected amount of removal; and displaying, on the party device of one of the farm fields, at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the revenue acquired for the one of the farm fields. program.
[19] A program including instructions for causing a terminal device to perform a process for supporting the creation of carbon credits, The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the terminal device in accordance with the command is inputting field information relating to one of the fields, the field information including geographical range information relating to a geographical range of the one of the fields, and transmitting the input field information to an information processing device; receiving display information from the information processing device, the display information including at least one of an estimated value of an amount of greenhouse gas absorbed by crops in the one field within a specified period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected amount of greenhouse gas absorption in the project within the specified period and an estimated value of the sales amount of the carbon credits equivalent to the estimated amount of absorption, and displaying at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information; program. [Explanation of symbols]
[0100] 1...information processing device, 11...first communication unit, 12...first memory unit, 121...program, 13...first processing unit, 2...storage device, 21...stakeholder DB, 22...project management DB, 23...field management DB, 24...overlap relationship DB, 25...credit management DB, 26...revenue distribution management DB, 3...stakeholder device, 31...second communication unit, 32...second memory unit, 321...program, 33...second processing unit, 34...input unit, 35...display unit, 4...operator device, 5...business operator server, 6...certification agent, 7...certification authority, 8...credit registration server, 9...communication network
Claims
1. An information processing device that supports the creation of carbon credits, A first processing unit; a first storage unit that stores an instruction to be executed by the first processing unit; The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the first processing unit in accordance with the command is receiving field information relating to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information relating to the geographical range of the one of the farm fields; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; obtaining a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount obtained for the one of the farm fields, an expected amount of greenhouse gas absorption in the project within the specified period, and an expected selling price of the carbon credits corresponding to the expected absorption amount; and displaying, on the related party device of one of the farm fields, at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the profit acquired for the one of the farm fields; Obtaining the first expected amount includes: calculating a first expected revenue for the project by subtracting a predetermined expense from the expected sales amount; Calculating the first expected amount such that a ratio of the first estimated value to the expected absorption amount is equal to a ratio of the first expected amount to the first expected profit; Information processing device.
2. The farm field information includes at least one of crop type information relating to the type of crop to be cultivated, crop interval information relating to the crop interval, and harvest frequency information relating to the frequency of harvesting, Obtaining the first estimate of the absorption acquiring cultivation environment information related to at least one of a temperature, a rainfall, and a sunshine duration in a region where the field is located based on the geographical range information included in the field information; obtaining the first estimated value of the absorption amount based on an area of the field indicated by the geographical range information included in the field information, the cultivation environment information, and at least one of the crop type information, the planting interval information, and the harvest frequency information included in the field information; The information processing device according to claim 1 .
3. the first storage unit stores a trained model generated to estimate the absorption amount of the field from an area of the field, the cultivation environment information, and at least one of the crop type information, the cropping interval information, and the harvest frequency information; obtaining the first estimated value of the absorption amount includes applying an area of the field indicated by the geographical range information included in the field information, the cultivation environment information, and at least one of the crop type information, the planting interval information, and the harvest frequency information included in the field information to the trained model, thereby obtaining the first estimated value of the absorption amount. The information processing device according to claim 2 .
4. The process performed by the first processing unit in accordance with the command is receiving a plurality of application information from a plurality of said stakeholder devices, each of said application information being for one of said fields to participate in said project; acquiring at least one of a total area of the plurality of fields and an estimated value of a total amount of greenhouse gas absorbed by crops in the plurality of fields within a predetermined period based on the field information of the plurality of fields related to the received application information; determining whether a condition for initiating the project has been met based on at least one of the total area and the estimated total absorption amount; and displaying at least one of the total area, the estimated total absorption amount, and the determination result of the activation condition on at least one of the related party device and an operator device which is a terminal device operated by an operator of the project. The information processing device according to claim 1 .
5. The process performed by the first processing unit in accordance with the command is Displaying, on the related person device, an application screen including terms of agreement that the related person of the field should agree to in order to participate in the project, the application screen including, as the terms of agreement, consent to measuring the field by a predetermined measuring means. Including, Receiving the application information from the related party device includes receiving the application information from the related party device that displays the application screen. The information processing device according to claim 4.
6. The process performed by the first processing unit in accordance with the command is displaying, on the stakeholder device, a contract screen including contract terms to be exchanged between the stakeholders of the fields and the operator of the project before an application for certification of the carbon credits is made to a specified certification body based on the measurement results of each of the fields by the specified measurement means, the contract screen including terms related to the ownership of the carbon credits and terms related to the distribution of profits obtained by selling the carbon credits; receiving contract information indicating consent to the contract terms from the related party device on which the contract screen is displayed; The information processing device according to claim 5 .
7. The process performed by the first processing unit in accordance with the command is obtaining a second expected amount of revenue to be allocated to each of the farm fields when the carbon credits are sold, based on a second estimated value of the amount of greenhouse gas absorption in each of the farm fields estimated based on the measurement results by the predetermined measurement means; and displaying, on the related party device of one of the farm fields, at least one of the second estimated value of the absorption amount acquired for the one of the farm fields and the second expected amount of the revenue acquired for the one of the farm fields; Obtaining the second expected amount includes: calculating an estimate of a total greenhouse gas uptake for all of the fields in the project by summing the second estimates of greenhouse gas uptake for each of the fields; Calculating a second expected sales amount, which is an estimate of a sales amount of the carbon credits, from the estimate of the total absorption amount; Calculating a second expected revenue for the project by subtracting a predetermined expense from the second expected sales amount; Calculating the second expected amount such that a ratio of the second estimated value to the estimated total absorption amount is equal to a ratio of the second expected amount to the second expected revenue. The information processing device according to claim 5 .
8. The process performed by the first processing unit in accordance with the command is Obtaining information regarding the individual greenhouse gas absorption amount of each of the farm fields included in the carbon credits certified by a predetermined certification body; and displaying the acquired information on the individual absorption amount of the one of the farm fields on the related party device of the one of the farm fields. The information processing device according to claim 1 .
9. The process performed by the first processing unit in accordance with the command is Obtaining transaction information regarding the status of the certified carbon credit transactions; and displaying the acquired transaction information on the related party device. The information processing device according to claim 8.
10. The process performed by the first processing unit in accordance with the command is Obtaining sales amount information regarding the certified sales amount of the carbon credits; Calculating the profit to be allocated to each of the farm fields based on the acquired information on the individual absorption amount of each of the farm fields and the acquired sales amount information; and displaying the calculated revenue for each of the farm fields on the stakeholder device of each of the farm fields. The information processing device according to claim 8.
11. the first storage unit is capable of accessing a storage device; The storage device includes: a plurality of pieces of project management information each including information relating to one of the projects; A plurality of pieces of farm field management information each including information on one of the farm fields; Remember, the project management information for one of the projects includes status information for a status of the project; The field management information for one of the fields includes: The farm field information received from the stakeholder device for the one farm field; and when the field participates in one of the projects, participating project information indicating the one of the projects, The process performed by the first processing unit in accordance with the command is when receiving an instruction to start soliciting the fields for one of the projects from an operator device which is a terminal device operated by a manager of the project, registering the status information indicating that the one of the projects is in a soliciting status in the project management information of the one of the projects; When an instruction to start work to receive certification of the carbon credit for one of the projects is received from the manager device, registering the status information indicating that the one of the projects is in an active status in the project management information of the one of the projects; receiving a plurality of application information from a plurality of said stakeholder devices, each of said application information being for one of said fields to participate in said project; when the field information related to one of the fields is received from the related person device, storing the field management information including the received field information in the storage device; when the application information for applying for one of the fields to participate in one of the projects is received from the related party device, and if the field management information of the one of the fields does not include the participating project information, registering the participating project information indicating the one of the projects in the field management information; when the application information for one of the fields to apply to participate in one of the projects is received from the related party device, if the field management information of the one of the fields includes the participating project information and if the status information included in the project management information of the project corresponding to the participating project information indicates the status of soliciting or the status of being activated, transmitting a notice to the related party device that the application by the one of the fields is rejected; The information processing device according to claim 1 .
12. The process performed by the first processing unit in accordance with the command is when the field information on one of the fields is received from the related person device, searching in the storage device for the field management information of the other of the fields that includes geographical range information whose geographical range overlaps with the geographical range information of the received field information; when the field management information relating to the other field is found by the search, storing overlap relationship information indicating that the one field and the other field are in an overlapping relationship in the storage device; when the application information for one of the fields to apply to participate in one of the projects is received from the related party device, if there is another field that is indicated to be in the overlapping relationship with the one of the fields by the overlapping relationship information and if the field management information of the other field does not include the participating project information, registering the participating project information indicating the one of the projects in the field management information of the other field; when the application information for one of the fields applying to participate in one of the projects is received from the related party device, if there is another field indicated to be in the overlapping relationship with the one of the fields by the overlapping relationship information, the field management information of the other field includes the participating project information, and the status information included in the project management information of the project corresponding to the participating project information indicates the invitation status or the activated status, sending a notification to the related party device that the application by the one of the fields is rejected. The information processing device according to claim 11.
13. A terminal device that supports the creation of carbon credits, A second processing unit; a second storage unit that stores an instruction to be executed by the second processing unit; The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the second processing unit in accordance with the command is inputting field information relating to one of the fields, the field information including geographical range information relating to a geographical range of the one of the fields, and transmitting the input field information to an information processing device; receiving display information from the information processing device, the display information including at least one of an estimated value of an amount of greenhouse gas absorbed by crops in the one field within a specified period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected sales amount that is an estimated value of an expected amount of greenhouse gas absorption in the project within the specified period and a sales amount of the carbon credits equivalent to the estimated amount of absorption, and displaying at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information; The amount obtained by subtracting certain expenses from the expected sales amount is called the first expected revenue of the project, The first expected amount is an amount calculated so that a ratio of the estimated value of the absorption amount to the assumed absorption amount is equal to a ratio of the first expected amount to the first expected profit. Terminal device.
14. A system for supporting the creation of carbon credits, comprising: An information processing device; a plurality of party devices each of which is a terminal device operated by a party involved in the farm field; The carbon credits are generated based on a project to absorb greenhouse gases by crops grown in a plurality of the fields; The related person device operated by the related person of one of the farm fields inputs field information related to the one of the farm fields, the field information including geographical range information related to the geographical range of the one of the farm fields, and transmits the input field information to the information processing device. the information processing device acquires a first estimate of an amount of greenhouse gas absorbed by crops in one of the farm fields within a predetermined period of time based on the farm field information received for the one of the farm fields; the information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gas within the specified period in the project, and an expected selling price of the carbon credits corresponding to the expected absorption amount; the information processing device generates display information including at least one of the first estimated value of the absorption amount acquired for one farm field and the first expected amount of the profit acquired for the one farm field, and transmits the generated display information to the related party device of the one farm field; The related party device of one of the farm fields displays at least one of the estimated absorption amount and the first expected amount of the revenue in response to the display information received from the information processing device; In the process of acquiring the first expected amount, the information processing device Calculate a first expected revenue for the project by subtracting certain expenses from the expected sales amount; Calculating the first expected amount so that a ratio of the first estimated value to the assumed absorption amount is equal to a ratio of the first expected amount to the first expected profit; system.
15. A method for supporting the creation of carbon credits, the method comprising: The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The information processing device receives field information related to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information related to a geographical range of the one of the farm fields; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the farm fields within a predetermined period of time based on the farm field information received by the information processing device for the one of the farm fields; The information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gases in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected absorption amount; the information processing device causes the stakeholder device of one of the farm fields to display at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the revenue acquired for the one of the farm fields; Obtaining the first expected amount includes: calculating a first expected revenue for the project by subtracting a predetermined expense from the expected sales amount; Calculating the first expected amount such that a ratio of the first estimated value to the expected absorption amount is equal to a ratio of the first expected amount to the first expected profit; method.
16. A method for supporting the creation of carbon credits, the method comprising: The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; the terminal device inputs field information related to one of the fields, the field information including geographical range information related to a geographical range of the one of the fields, and transmits the input field information to an information processing device; the terminal device receives display information from the information processing device, the display information including at least one of an estimated value of an absorption amount of greenhouse gas absorbed by crops in the one field within a specified period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected sales amount that is an estimated value of the sales amount of the carbon credits equivalent to the estimated amount of absorption, and displaying at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information, The amount obtained by subtracting certain expenses from the expected sales amount is called the first expected revenue of the project, The first expected amount is an amount calculated so that a ratio of the estimated value of the absorption amount to the assumed absorption amount is equal to a ratio of the first expected amount to the first expected profit. method.
17. A method for a system for supporting the creation of carbon credits, comprising: The system comprises: An information processing device; A plurality of related party devices, each of which is a terminal device operated by a related party in one field; having The carbon credits are generated based on a project to absorb greenhouse gases by crops grown in a plurality of the fields; the related person device operated by the related person of one of the farm fields inputs field information related to the one of the farm fields, the field information including geographical range information related to the geographical range of the one of the farm fields, and transmits the input field information to the information processing device; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the farm fields within a predetermined period of time based on the farm field information received by the information processing device for the one of the farm fields; The information processing device acquires a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount acquired for the one of the farm fields, an expected absorption amount of greenhouse gases in the project within the specified period, and an expected selling price of the carbon credits equivalent to the expected absorption amount; the information processing device generates display information including at least one of the first estimated value of the absorption amount acquired for one farm field and the first expected amount of the profit acquired for the one farm field, and transmits the generated display information to the related party device of the one farm field; and the related party device of one of the farm fields displays at least one of the estimated value of the absorption amount and the first expected amount of the revenue in response to the display information received from the information processing device, The information processing device acquires the first expected amount, calculating a first expected revenue for the project by subtracting a predetermined expense from the expected sales amount; Calculating the first expected amount such that a ratio of the first estimated value to the expected absorption amount is equal to a ratio of the first expected amount to the first expected profit; method.
18. A program including instructions for causing an information processing device to perform a process for supporting the creation of carbon credits, The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the information processing device in accordance with the command is receiving field information relating to one of the farm fields from a related party device which is a terminal device operated by a related party of the one of the farm fields, the field information including geographical range information relating to the geographical range of the one of the farm fields; obtaining a first estimate of an amount of greenhouse gas absorbed by crops in one of the fields within a predetermined period of time based on the field information received for the one of the fields; obtaining a first expected amount of revenue to be allocated to one of the farm fields when the carbon credits are sold, based on the first estimated value of the absorption amount obtained for the one of the farm fields, an expected amount of greenhouse gas absorption in the project within the specified period, and an expected selling price of the carbon credits corresponding to the expected absorption amount; and displaying, on the related party device of one of the farm fields, at least one of the first estimated value of the absorption amount acquired for the one of the farm fields and the first expected amount of the profit acquired for the one of the farm fields; Obtaining the first expected amount includes: calculating a first expected revenue for the project by subtracting a predetermined expense from the expected sales amount; Calculating the first expected amount such that a ratio of the first estimated value to the expected absorption amount is equal to a ratio of the first expected amount to the first expected profit; program.
19. A program including an instruction for causing a terminal device to perform a process for supporting the creation of carbon credits, The carbon credits are generated based on a project to absorb greenhouse gases through crops grown in multiple fields; The process performed by the terminal device in accordance with the command is inputting field information relating to one of the fields, the field information including geographical range information relating to a geographical range of the one of the fields, and transmitting the input field information to an information processing device; receiving display information from the information processing device, the display information including at least one of an estimated value of an amount of greenhouse gas absorbed by crops in the one field within a specified period, the estimated value of the absorption amount being obtained based on the transmitted field information, and a first expected amount of revenue to be allocated to the one field when the carbon credits are sold, the first expected amount being obtained based on the estimated value of the absorption amount and an expected sales amount that is an estimated value of an expected amount of greenhouse gas absorption in the project within the specified period and a sales amount of the carbon credits equivalent to the estimated amount of absorption, and displaying at least one of the estimated value of the absorption amount and the first expected amount of revenue in accordance with the received display information; The amount obtained by subtracting certain expenses from the expected sales amount is called the first expected revenue of the project, The first expected amount is an amount calculated so that a ratio of the estimated value of the absorption amount to the assumed absorption amount is equal to a ratio of the first expected amount to the first expected profit. program.
Citation Information
Patent Citations
Method and system for supporting trading of co2 emission right
JP2010266988A
Carbon dioxide absorption estimation system and method
JP2022056168A
Method for creating emission right by integrating production activities and preservation of producing area
WO2013161343A1
