Inspection device, inspection method, and inspection program

The inspection device and method accurately calculate Ior values in each phase of a three-phase delta electric line by detecting leakage currents and voltages, addressing the challenge of identifying insulation issues and preventing accidents.

JP7587214B2Active Publication Date: 2024-11-20SO BRAIN CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2020207146
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-14
Publication Date
2024-11-20
Estimated Expiration
2040-12-14

AI Technical Summary

Technical Problem

Existing methods struggle to accurately determine the leakage current due to insulation resistance (Ior) in two phases of a three-phase delta electric line, making it difficult to identify problem areas, causes, and changes over time, which are crucial for preventing electric shocks and fires.

Method used

An inspection device and method that calculates the leakage current in each phase by detecting the leakage current and voltage, determining phase angles, and calculating capacitive and resistance component leakage currents, allowing for the determination of reference values and changes in these currents over time.

Benefits of technology

Enables precise monitoring and inspection of electrical lines by calculating the Ior values in each phase, facilitating early detection of insulation issues and preventing accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007587214000001
    Figure 0007587214000001
  • Figure 0007587214000002
    Figure 0007587214000002
  • Figure 0007587214000003
    Figure 0007587214000003
Patent Text Reader

Abstract

To provide an inspection device with which it is possible to calculate, assuming an Ioc change, an Ior value having occurred to each of two phases in Ior measurement result and inspect or monitor the delta-wired electric line to be measured, including a chronological change.SOLUTION: The inspection device comprises: a leak current detection unit 11 for detecting a leak current flowing in the delta-wired electric line to be measured; a voltage detection unit 12 for detecting the voltage being applied to the electric line to be measured; a phase angle detection unit 13 for detecting a phase angle on the basis of the leak current and the voltage; a first calculation unit 14 for calculating a range that a capacitance component leak current can take, on the basis of the leak current and the phase angle; a determination unit 15 for determining a reference capacitance component leak current; a second calculation unit 16 for calculating a first resistance component leak current at a first measurement time; a third calculation unit 17 for calculating a second resistance component leak current at a second measurement time; and a change amount calculation unit 18 for comparing the first and the second resistance component leak currents and calculating a change amount.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an inspection device, an inspection method, and an inspection program for inspecting or monitoring a three-phase delta electric line. [Background technology]

[0002] The insulation performance of an electrical system, including the load equipment of electrical equipment, is extremely important in preventing electric shock, fire, etc., but the insulation performance can be impaired due to aging deterioration of electrical equipment or construction work, etc., and leakage current (hereinafter referred to as "Io") can occur in the electric line. It is important to predict the occurrence of Io or detect Io that is actually occurring, and prevent accidents before they occur, or at an early stage.

[0003] For this reason, a test device for testing Io is provided on the earth wire of the secondary circuit of the receiving transformer. Here, Io includes leakage current due to capacitance to earth (hereinafter referred to as "Ioc") and leakage current due to insulation resistance to earth, which is directly related to insulation resistance (hereinafter referred to as "Ior").

[0004] For example, Patent Document 1 discloses a zero-phase current detection means for detecting a zero-phase current in a three-phase electric circuit, a voltage detection means for detecting the voltage of the electric circuit, a specified frequency component extraction means for extracting first and second frequency components from the zero-phase current and voltage, the first frequency component being a harmonic component other than a fundamental wave or a harmonic component of an integer multiple of the third order, and the second frequency component being a harmonic component other than a harmonic component of an integer multiple of the third order and different from the first frequency component, and a specified frequency component extraction means for converting the second frequency component in the zero-phase current into a specified correction current and converting the extracted zero-phase current into a specified correction current. The present invention discloses an insulation monitoring device that includes a leakage current calculation means for calculating the leakage current due to the earth insulation resistance of two of the three phases based on a first frequency component in the zero-phase current, a correction current, the phase difference between the first and second frequency components in the zero-phase current and the reference voltage, the voltage of any one of the three phases being used as a reference voltage, and the frequencies of the first and second frequency components in the zero-phase current, where the predetermined correction current is a current obtained by converting the second frequency component in the zero-phase current to a value when the second frequency component in the voltage is equal to the first frequency component in the voltage. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2004-317466 A Summary of the Invention [Problem to be solved by the invention]

[0006] Here, Ior is expressed as the scalar sum of the two phases. However, if it is not known what percentage of Ior occurs in the two phases, it is difficult to identify the problem area of ​​Ior (such as the location where Ior is occurring), the cause of occurrence, and changes during regular inspections. The two phases are the R phase and the T phase, the T phase and the S phase, or the S phase and the R phase. There is also a demand to be able to also observe changes over time when inspecting or monitoring the electric line under test.

[0007] The present disclosure aims to provide an inspection device, an inspection method, and an inspection program that can calculate the Ior values ​​occurring in each of two phases in the Ior measurement results, assuming changes in Ioc, and can also inspect or monitor a Δ-connected electric line under test, including changes over time. [Means for solving the problem]

[0008] In order to achieve the above object, the present invention is configured as follows. (1) A leakage current detection unit that detects a leakage current flowing in a measured electric line having a first phase, a second phase, and a third phase connected in a delta connection; a voltage detection unit that detects a voltage applied to the measured electric line; a phase angle detection unit that detects a phase angle based on the leakage current detected by the leakage current detection unit and the voltage detected by the voltage detection unit; a first calculation unit that calculates a possible range of a capacitive component leakage current caused by a capacitance to earth included in the leakage current flowing in the measured electric line based on the leakage current detected by the leakage current detection unit and the phase angle detected by the phase angle detection unit; a determination unit that determines a reference capacitive component leakage current as a reference within the possible range of the capacitive component leakage current calculated by the first calculation unit; a second calculation unit that calculates a first resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the electric line under test, based on the first phase angle detected by the phase angle detection unit and the first leakage current detected by the leakage current detection unit; a third calculation unit that calculates a second resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current identified by the determination unit, the second phase angle detected by the phase angle detection unit, and the second leakage current detected by the leakage current detection unit, at a second measurement time that is a predetermined time after the first measurement time; and a change amount calculation unit that compares the first resistance component leakage current calculated by the second calculation unit with the second resistance component leakage current calculated by the third calculation unit, to calculate an amount of change. (2) The inspection device according to (1), wherein the determination unit is configured to determine a median value within a range of possible values ​​of the capacitive component leakage current calculated by the first calculation unit as the reference capacitive component leakage current. (3) The inspection device according to (1), wherein the determination unit is configured to determine an arbitrary value as the reference capacitive component leakage current within a possible range of the capacitive component leakage current calculated by the first calculation unit. (4) The inspection device according to any one of (1) to (3), wherein the third calculation unit is configured to extend the predetermined interval and perform a next measurement when there is no difference in the amount of change calculated by the change amount calculation unit in the previous measurement or when the difference is equal to or less than a predetermined difference. (5) A leakage current detection step of detecting a leakage current flowing in a measured electric line having a first phase, a second phase, and a third phase connected in a delta connection; a voltage detection step of detecting a voltage applied to the measured electric line; a phase angle detection step of detecting a phase angle based on the leakage current detected by the leakage current detection step and the voltage detected by the voltage detection step; a first calculation step of calculating a possible range of a capacitive component leakage current caused by a capacitance to earth included in the leakage current flowing in the measured electric line based on the leakage current detected by the leakage current detection step and the phase angle detected by the phase angle detection step; a determination step of determining a reference capacitive component leakage current as a reference within the possible range of the capacitive component leakage current calculated by the first calculation step; a second calculation step of calculating a first resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the electric line under test based on the first phase angle detected in the phase angle detection step and the first leakage current detected in the leakage current detection step; a third calculation step of calculating a second resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the electric line under test based on the reference capacitive component leakage current identified in the determination step, the second phase angle detected in the phase angle detection step, and the second leakage current detected in the leakage current detection step, at a second measurement time a predetermined time after the first measurement time; and a change amount calculation step of comparing the first resistance component leakage current calculated in the second calculation step with the second resistance component leakage current calculated in the third calculation step to calculate an amount of change. (6) A computer includes a leakage current detection step of detecting a leakage current flowing in a test electric line having a first phase, a second phase, and a third phase connected in a delta connection; a voltage detection step of detecting a voltage applied to the test electric line; a phase angle detection step of detecting a phase angle based on the leakage current detected by the leakage current detection step and the voltage detected by the voltage detection step; a first calculation step of calculating a possible range of a capacitive component leakage current caused by a capacitance to earth included in the leakage current flowing in the test electric line based on the leakage current detected by the leakage current detection step and the phase angle detected by the phase angle detection step; a determination step of determining a reference capacitive component leakage current as a reference within the possible range of the capacitive component leakage current calculated by the first calculation step; a second calculation step of calculating a first resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the measured electric line based on the first phase angle detected by the phase angle detection step and the first leakage current detected by the leakage current detection step; a third calculation step of calculating a second resistance component leakage current caused by ground insulation resistance included in the leakage current flowing through the measured electric line based on the reference capacitive component leakage current identified by the determination step, the second phase angle detected by the phase angle detection step, and the second leakage current detected by the leakage current detection step, at a second measurement time a predetermined time after the first measurement time; and a change amount calculation step of comparing the first resistance component leakage current calculated by the second calculation step with the second resistance component leakage current calculated by the third calculation step to calculate an amount of change. Effect of the Invention

[0009] According to the present invention, the Ior values ​​occurring in each of the two phases in the Ior measurement results can be calculated assuming changes in Ioc, and the Δ-connected electric line under test can be inspected or monitored, including changes over time. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a diagram showing the configuration of an inspection device. [Diagram 2] FIG. 2 is a diagram illustrating the possible range of Ioc. [Diagram 3] FIG. 3 is a diagram showing a schematic diagram of the timing of measurement. [Figure 4] FIG. 4 is a diagram showing a schematic diagram of Ior(r), Ior(t), and Ior(rt) calculated at t1, and Ior(r), Ior(t), and Ior(rt) calculated at t2. [Diagram 5] FIG. 5 is a diagram that illustrates a vector diagram when the expected value of Ioc is set to the median value (Ioc(rt)CEN). [Figure 6] FIG. 6 is a flowchart illustrating the procedure of the inspection method. [Figure 7] FIG. 7 is a block diagram showing a first configuration example of a computer. [Figure 8] FIG. 8 is a block diagram showing a second configuration example of the computer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] The present embodiment will be described below. Note that the present embodiment described below does not unduly limit the contents of the present invention described in the claims. Furthermore, not all of the configurations described in the present embodiment are necessarily essential components of the present invention.

[0012] 1 is a diagram showing the configuration of an inspection device 1. The inspection device 1 includes a leakage current detection unit 11, a voltage detection unit 12, a phase angle (phase) detection unit 13, a first calculation unit 14, a determination unit 15, a second calculation unit 16, a third calculation unit 17, and a change amount calculation unit 18.

[0013] The leakage current detection unit 11 detects the leakage current flowing in the electric line under test in which the first, second, and third phases are connected in a delta (Δ) configuration. In the following, the first phase is referred to as the R phase, the second phase is referred to as the T phase, and the third phase is referred to as the S phase, but the names are not limited to these. In the following, the leakage current measured by the leakage current detection unit 11 is referred to as "Io", but the names are not limited to these.

[0014] Further, the inspection device 1 will be described as having the S phase of the three phases (R phase, S phase, T phase) grounded, but the ground phase may be the R phase or the T phase.

[0015] A zero-phase current transformer (ZCT) 10 is connected to the leakage current detection unit 11. The zero-phase current transformer 10 is configured to clamp the electric line collectively. For example, the zero-phase current transformer 10 is configured as a handy split-type through-hole type zero-phase current transformer, so that a worker can easily install it on the electric line at the site.

[0016] The leakage current detector 11 detects (calculates) Io flowing through the electric line under test from the signal measured by the zero-phase-sequence current transformer 10.

[0017] The voltage detection unit 12 detects the voltage applied to the electric line under test.

[0018] The phase angle detection unit 13 detects a phase angle (θ) based on the leakage current (Io) detected by the leakage current detection unit 11 and the voltage detected by the voltage detection unit 12. Specifically, the phase angle detection unit 13 detects the effective value of the leakage current (Io) detected by the leakage current detection unit 11 and the voltage detected by the voltage detection unit 12 (for example, a reference voltage V T-R For example, the phase angle detector 13 detects a phase angle (θ) based on the effective value of the reference voltage V T-R Based on the zero crossing point of the leakage current (Io), the reference voltage V T-R and the phase angle (θ) of the leakage current (Io).

[0019] The first calculation unit 14 calculates the possible range of the capacitive leakage current (hereinafter referred to as Ioc) caused by the earth capacitance contained in the leakage current flowing through the measured electric line, based on the leakage current (Io) detected by the leakage current detection unit 11 and the phase angle (θ) detected by the phase angle detection unit 13.

[0020] Here, the possible range of Ioc will be explained. Figure 2 is a diagram for explaining the possible range of Ioc.

[0021] When the voltage detection unit 12 detects the voltage between the R phase and the T phase and determines the reference point from the detected voltage, the R phase axis is at a position of 60° from the reference point and the T phase axis is at a position of 120° from the reference point, as shown in Fig. 2. Furthermore, since the phase difference between the R phase Ior (hereinafter referred to as Ior(r)) and the reference point is 60°, Ior(r) occurs on the R phase axis. Since the phase difference between the T phase Ior (hereinafter referred to as Ior(t)) and the reference point is 120°, Ior(t) occurs on the T phase axis.

[0022] Moreover, Ior (hereinafter referred to as Ior(rt)), which is the vector synthesis of Ior(r) and Ior(t), occurs between the R-phase axis and the T-phase axis (in the range of 60° to 120° from the reference point).

[0023] Furthermore, the R-phase Ioc (hereinafter referred to as Ioc(r)) occurs at a position 90° from the R-phase axis. The T-phase Ioc (hereinafter referred to as Ioc(t)) occurs at a position 90° from the T-phase axis. When Ioc(r) and Ioc(t) are in equilibrium, the combined (vector combined) Ioc of Ioc(r) and Ioc(t) (hereinafter referred to as Ioc(rt)) occurs in the 180° direction of the reference axis (the "-X" direction in FIG. 2).

[0024] Io is a combination (vector combination) of Ior(rt) and Ioc(rt). If Io detected by leakage current detection unit 11 is at the position shown in Fig. 2, Ior(rt) will occur on line L (parallel to the reference point line) to which end point P1 of Io belongs, within a range of 60° to 120° from the reference point (R1 in Fig. 2).

[0025] Furthermore, if a perpendicular line is dropped from the end point P1 of Io to the line on which Ioc(rt) occurs and the intersection point is "P2", then the point P3 from the origin 0 is the maximum value of Ioc(rt) (hereinafter referred to as Ioc(rt)MAX). The angle between points P1, P3, and P2 is 60°. The point P4 from the origin 0 is the minimum value of Ioc(rt) (hereinafter referred to as Ioc(rt)MIN). The angle between points P1, P4, and P2 is 60°.

[0026] Note that Ioc(rt)MAX and Ioc(rt)MIN occur in the 180° direction (−X direction) of the reference axis, but are shown in different positions in FIG. 2 for the sake of explanation.

[0027] When Ioc(rt) is MIN, "Ior(rt) = Ior(t)" (Ior(r) = 0). When Ioc(rt) is MAX, "Ior(rt) = Ior(r)" (Ior(t) = 0).

[0028] Therefore, the first calculation unit 14 calculates Ioc(rt)MIN and Ioc(rt)MAX based on Io detected by the leakage current detection unit 11 and the phase angle (θ) detected by the phase angle detection unit 13. The range of Ioc(rt) is the range sandwiched between Ioc(rt)MIN and Ioc(rt)MAX (R2 in FIG. 2).

[0029] The determining unit 15 determines a reference capacitive component leakage current (hereinafter referred to as reference Ioc) that serves as a reference within the possible range of Ioc calculated by the first calculating unit .

[0030] Specifically, the determination unit 15 may be configured to determine the median value within the possible range of Ioc calculated by the first calculation unit 14 as the reference Ioc.

[0031] Furthermore, the determination unit 15 may be configured to determine an arbitrary value as the reference Ioc within the possible range of the Ioc calculated by the first calculation unit 14. For example, the inspection device 1 includes a display unit that displays information and an operation unit that accepts operations by a user. The user selects an arbitrary value from the range of Ioc displayed on the display unit and inputs it by operating the operation unit.

[0032] The second calculation unit 16 calculates a first resistance component leakage current caused by the ground insulation resistance contained in the leakage current flowing through the measured electric line based on the reference Ioc identified by the determination unit 15, the first phase angle detected by the phase angle detection unit 13, and the first leakage current detected by the leakage current detection unit 11 during the first measurement.

[0033] The first resistive component leakage currents are Ior(r), Ior(t), and Ior(rt) that are calculated based on the reference Ioc, the first phase angle, and the first leakage current.

[0034] The third calculation unit 17 calculates a second resistance component leakage current caused by the ground insulation resistance contained in the leakage current flowing through the measured electric line based on the reference Ioc identified by the determination unit 15, the second phase angle detected by the phase angle detection unit 13, and the second leakage current detected by the leakage current detection unit 11 at the second measurement time which is a predetermined time after the first measurement time.

[0035] The second resistive component leakage currents are Ior(r), Ior(t), and Ior(rt) that are calculated based on the reference Ioc, the second phase angle, and the second leakage current.

[0036] The change amount calculation section 18 compares the first resistance component leakage current calculated by the second calculation section 16 with the second resistance component leakage current calculated by the third calculation section 17 to calculate the amount of change.

[0037] Here, the operations of the second calculation unit 16, the third calculation unit 17, and the change amount calculation unit 18 will be described. FIG. 3 is a diagram showing the timing of measurement. In FIG. 3, four timings of measurement, t1, t2, t3, and t4, are shown, but are not limited to four. FIG. 4 is a diagram showing Ior(r), Ior(t), and Ior(rt) (hereinafter, sometimes referred to as various Ior) calculated at t1 and various Ior calculated at t2. In FIG. 4, various Ior calculated at t3 and t4 are not shown.

[0038] At t1 (first measurement time), the second calculation unit 16 calculates Ior1(r), Ior1(t), and Ior1(rt) based on the reference Ioc (Ioc(rt)CEN) and the first phase angle (θ1) and first leakage current (Io1) measured at t1.

[0039] At t2 (second measurement time), the third calculation unit 17 calculates Ior2(r), Ior2(t), and Ior2(rt) based on the reference Ioc (Ioc(rt)CEN) and the second phase angle (θ2) and second leakage current (Io2) measured at t2.

[0040] The change amount calculation section 18 calculates the difference between Ior1(r) and Ior2(r), the difference between Ior1(t) and Ior2(t), and the difference between Ior1(rt) and Ior2(rt).

[0041] Also, at t3, the second calculation unit 16 calculates Ior3(r), Ior3(t), and Ior3(rt) based on the reference Ioc (Ioc(rt)CEN) and the third phase angle (θ3) and third leakage current (Io3) measured at t3.

[0042] The change amount calculation unit 18 uses Ior2(r), Ior2(t), and Ior2(rt) calculated by the third calculation unit 17 at t2 to calculate the difference between Ior2(r) and Ior3(r), the difference between Ior2(t) and Ior3(t), and the difference between Ior2(rt) and Ior3(rt).

[0043] Also, at t4, the third calculation unit 17 calculates Ior4(r), Ior4(t), and Ior4(rt) based on the reference Ioc (Ioc(rt)CEN) and the fourth phase angle (θ4) and fourth leakage current (Io4) measured at t4.

[0044] The change amount calculation unit 18 uses Ior3(r), Ior3(t), and Ior3(rt) calculated by the second calculation unit 16 at t3 to calculate the difference between Ior3(r) and Ior4(r), the difference between Ior3(t) and Ior4(t), and the difference between Ior3(rt) and Ior4(rt).

[0045] The inspection device 1 repeats the same process as described above after t4. The reference Ioc is fixed and not changed in each measurement. This is based on the premise that Ioc does not change much. The reference Ioc does not have to be fixed, and may be changed periodically.

[0046] In this way, the inspection device 1 calculates the possible range of Ioc and determines a reference Ioc, calculates various Iors using this reference Ioc, calculates the amount of change between the various Iors calculated last time and the various Iors calculated this time, and can use this amount of change to inspect or monitor the Δ-connected electric line under test.

[0047] In the above description, the intervals (predetermined time) for performing measurements are equal, but they do not have to be equal. Specifically, the third calculation unit 17 may be configured to extend the timing for performing the next measurement beyond the predetermined interval when there is no difference in the amount of change calculated by the change amount calculation unit 18 in the previous measurement or the difference is equal to or less than the predetermined difference. With this configuration, the inspection device 1 can extend the timing for performing measurements when there is no difference or is small between the first resistance component leakage current and the second resistance component leakage current, thereby reducing the processing load on the second calculation unit 16, the third calculation unit 17, and the change amount calculation unit 18.

[0048] (About the calculation formula) Next, a specific procedure for calculating Ior(r), Ior(t), and Ior(rt) in the second calculation unit 16 and the third calculation unit 17 will be described. Note that the formulas for calculating Ior(r), Ior(t), and Ior(rt) are not limited to the following.

[0049] In this embodiment, by assuming an Ioc value within the possible range of Ioc calculated by the first calculation unit 14, the composite vector of Ior (Ior(rt)) is determined, and Ior(r) and Ior(t), which are elements of Ior(rt), can be calculated.

[0050] Specifically, for a delta-connected circuit, Ior(rt) can be calculated using (1). Ior(rt)=Io×sin(θ) / cos30° ···(1)

[0051] Ior(t) can be calculated using equation (2). Ior(t)=Ior(rt)-Ioc-(Io×sin(120°-θ / cos30°) ···(2)

[0052] In addition, Ior(r) can be calculated using equation (3). Ior(r)=Ior(rt)-Ior(t) ···(3)

[0053] For example, a case will be described in which the leakage current (Io) detected by the leakage current detection unit 11 is "50.00 (mA)" and the phase angle (θ) detected by the phase angle detection unit 13 is "110°." Here, Ior in a delta-connected electric circuit can be calculated using equation (1).

[0054] Substitute Io and θ into equation (1) to calculate Ior. Ior(rt) = 50 × 10 -3 ×sin110° / cos30°=54.253(mA)

[0055] In addition, when "Io = 50.00 (mA)" and "θ = 110°", the minimum value of Ioc(rt) (Ioc(rt)MIN) is "-10.026 (mA)", the maximum value of Ioc(rt) (Ioc(rt)MAX) is "44.228 (mA)", and the median value of Ioc(rt) (Ioc(rt)CEN) is "((-10.026 + 44.228) / 2 =) 17.101 (mA)".

[0056] If Ioc(rt) is a negative value, Ioc(rt)MIN is set to "0 (mA)."

[0057] Next, the case where the expected value of Ioc is set to the median value (Ioc(rt)CEN) will be considered. FIG. 5 is a diagram that shows a schematic vector diagram when the expected value of Ioc is set to the median value (Ioc(rt)CEN). As mentioned above, Ioc(rt)CEN is "17.101 (mA)".

[0058] Ior(t) is calculated from equation (2) as follows: Ior(t)=27.13 (mA)

[0059] In addition, Ior(r) is calculated from equation (3) as follows: Ior(r)=27.13 (mA)

[0060] (Inspection method) Here, a description will be given of an inspection method using the inspection device 1. Fig. 6 is a flowchart illustrating the procedure of the inspection method.

[0061] In step ST1, the leakage current detection unit 11 detects a leakage current flowing in a measured electric line in which the first, second and third phases are delta-connected (leakage current detection step).

[0062] In step ST2, the voltage detection unit 12 detects the voltage applied to the electric line under test (voltage detection step).

[0063] In step ST3, the phase angle detection unit 13 detects a phase angle based on the leakage current detected in the leakage current detection step and the voltage detected in the voltage detection step (phase angle detection step).

[0064] In step ST4, the first calculation unit 14 calculates a possible range of the capacitive component leakage current caused by the earth capacitance contained in the leakage current flowing through the measured electric line based on the leakage current detected by the leakage current detection process and the phase angle detected by the phase angle detection process (first calculation process).

[0065] In step ST5, the determining section 15 determines a reference capacitive component leakage current that serves as a reference within the possible range of the capacitive component leakage current calculated in the first calculation step (determining step).

[0066] In step ST6, the second calculation unit 16 calculates a first resistive component leakage current caused by the earth insulation resistance contained in the leakage current flowing through the measured electric line based on the reference capacitive component leakage current identified in the determination process, the first phase angle detected in the phase angle detection process, and the first leakage current detected in the leakage current detection process during the first measurement (second calculation process).

[0067] In step ST7, the third calculation unit 17 calculates a second resistive component leakage current caused by the earth insulation resistance contained in the leakage current flowing through the measured electric line at the second measurement time which is a predetermined time after the first measurement time, based on the reference capacitive component leakage current identified in the determination process, the second phase angle detected in the phase angle detection process, and the second leakage current detected in the leakage current detection process (third calculation process).

[0068] In step ST8, the change amount calculation section 18 compares the first resistance component leakage current calculated in the second calculation process with the second resistance component leakage current calculated in the third calculation process to calculate the amount of change (change amount calculation process).

[0069] In this way, the inspection method calculates the possible range of Ioc, determines a reference Ioc, calculates various Iors using this reference Ioc, calculates the amount of change between the various Iors calculated last time and the various Iors calculated this time, and uses this amount of change to inspect or monitor the delta-connected electric line under test.

[0070] (About the inspection program) An inspection program that calculates the possible range of Ioc, determines a reference Ioc, calculates various Iors using this reference Ioc, calculates the amount of change between the various Iors calculated last time and the various Iors calculated this time, and uses this amount of change to inspect or monitor a Δ-connected electric line under test is mainly composed of the following steps and is executed by computer 500 (hardware).

[0071] Step 1: Detecting leakage current flowing through the test line in which the first, second, and third phases are delta-connected (leakage current detection step). Step 2: Detect the voltage applied to the electric line under test (voltage detection step) Step 3: Detecting a phase angle based on the leakage current detected in the leakage current detection step and the voltage detected in the voltage detection step (phase angle detection step). Step 4: Based on the leakage current detected in the leakage current detection step and the phase angle detected in the phase angle detection step, a possible range of the capacitive leakage current caused by the earth capacitance included in the leakage current flowing through the electric line under test is calculated (first calculation step). Step 5: Within the possible range of the capacitive component leakage current calculated in the first calculation step, a reference capacitive component leakage current is determined (determination step). Step 6: At the time of the first measurement, a first resistive component leakage current caused by the insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, is calculated based on the reference capacitive component leakage current identified in the determination step, the first phase angle detected in the phase angle detection step, and the first leakage current detected in the leakage current detection step (second calculation step). Step 7: At the time of a second measurement that is a predetermined time after the time of the first measurement, a second resistance component leakage current caused by the insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, is calculated based on the reference capacitive component leakage current identified in the determination step, the second phase angle detected in the phase angle detection step, and the second leakage current detected in the leakage current detection step (third calculation step). Step 8: The first resistance component leakage current calculated in the second calculation step is compared with the second resistance component leakage current calculated in the third calculation step to calculate the amount of change (amount of change calculation step).

[0072] Here, the configuration and operation of the computer 500 will be described with reference to the drawings. As shown in Fig. 7, the computer 500 is configured by connecting a processor 501, a memory 502, a storage 503, an input / output I / F 504, and a communication I / F 505 on a bus A, and these components work together to realize the functions and / or methods described in this disclosure.

[0073] To the input / output I / F 504, for example, a display that displays various information and a touch panel that accepts user operations are connected. The touch panel is disposed in front of the display. Thus, the user can perform intuitive operations by touching icons displayed on the display with his / her finger. The touch panel does not have to be disposed in front of the display. Also, instead of or together with the touch panel, a keyboard and a pointing device such as a mouse may be connected to the input / output I / F 504. Also, a speaker that outputs sound to the outside and a microphone that inputs sound from the outside may be connected to the input / output I / F 504.

[0074] The display is configured with a liquid crystal display or an organic EL (Electro Luminescence) display, and displays various information under the control of the processor 501.

[0075] The memory 502 is configured with a RAM (Random Access Memory). The RAM is configured with a volatile memory or a non-volatile memory.

[0076] The storage 503 is composed of a ROM (Read Only Memory). The ROM is composed of a non-volatile memory, and is realized, for example, by a HDD (Hard Disc Drive) or an SSD (Solid State Drive). The storage 503 stores various programs such as the inspection programs realized in the above-mentioned steps 1 to 8.

[0077] For example, the processor 501 controls the overall operation of the computer 500. The processor 501 is an arithmetic device that loads an operating system and various programs that realize various functions from a storage 503 into a memory 502 and executes instructions included in the loaded programs.

[0078] Specifically, when processor 501 receives a user's operation, it reads out a program (e.g., an inspection program) stored in storage 503, expands the read program in memory 502, and executes the program. Furthermore, by processor 501 executing the inspection program, the functions of leakage current detection unit 11, voltage detection unit 12, phase angle detection unit 13, first calculation unit 14, decision unit 15, second calculation unit 16, third calculation unit 17, and change amount calculation unit 18 are realized.

[0079] Here, a description will be given of the configuration of the processor 501. The processor 501 is realized by, for example, a central processing unit (CPU), a micro processing unit (MPU), a graphics processing unit (GPU), various other arithmetic devices, or a combination of these.

[0080] Furthermore, in order to realize the functions and / or methods described in the present disclosure, some or all of the functions of the processor 501, memory 502, storage 503, etc. may be configured in a processing circuit 601, which is dedicated hardware, as shown in Fig. 8. The processing circuit 601 is, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination of these.

[0081] In addition, although the processor 501 has been described as a single component, the present invention is not limited to this and may be configured as a set of multiple physically separate processors. In this specification, a program or instructions included in the program described as being executed by the processor 501 may be executed by a single processor 501, or may be distributed and executed by multiple processors. In addition, a program or instructions included in the program executed by the processor 501 may be executed by multiple virtual processors.

[0082] The communication I / F 505 is an interface that complies with a predetermined communication standard, and communicates with external devices via wired or wireless communication.

[0083] In this way, the inspection program is executed by the computer 500 to calculate the possible range of Ioc, determine a reference Ioc, calculate various Iors using this reference Ioc, calculate the amount of change between the various Iors calculated last time and the various Iors calculated this time, and use this amount of change to inspect or monitor the Δ-connected electric line under test. [Explanation of symbols]

[0084] 1. Inspection equipment 10 Zero phase current transformer 11 Leakage current detection section 12 Voltage detection section 13 Phase angle detector 14 First Calculation Section 15 Decision Section 16 Second Calculation Section 17 Third Calculation Section 18. Change amount calculation section

Claims

1. a leakage current detection unit for detecting a leakage current flowing through a test electric line having a first phase, a second phase, and a third phase connected in a delta configuration; A voltage detection unit that detects a voltage applied to the electric line under test; a phase angle detection unit that detects a phase angle based on the leakage current detected by the leakage current detection unit and the voltage detected by the voltage detection unit; a first calculation unit that calculates a possible range of a capacitive leakage current caused by an earth capacitance included in the leakage current flowing through the electric line under test, based on the leakage current detected by the leakage current detection unit and the phase angle detected by the phase angle detection unit; a determination unit that determines a reference capacitive component leakage current as a reference within a possible range of the capacitive component leakage current calculated by the first calculation unit; a second calculation unit that calculates a first resistance component leakage current caused by an insulation resistance to ground, which is included in the leakage current flowing through the electric line under measurement, based on the reference capacitive component leakage current specified by the determination unit, the first phase angle detected by the phase angle detection unit, and the first leakage current detected by the leakage current detection unit during a first measurement; a third calculation unit that calculates a second resistance component leakage current caused by an insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current identified by the determination unit, the second phase angle detected by the phase angle detection unit, and the second leakage current detected by the leakage current detection unit, at a second measurement time that is a predetermined time after the first measurement time; a change amount calculation unit that calculates a change amount by comparing the first resistance component leakage current calculated by the second calculation unit with the second resistance component leakage current calculated by the third calculation unit, The inspection device, wherein the determination unit is configured to determine a median value within a range of possible values ​​of the capacitive component leakage current calculated by the first calculation unit as the reference capacitive component leakage current.

2. 2. The inspection device according to claim 1, wherein the determination unit is configured to determine an arbitrary value within a possible range of the capacitive component leakage current calculated by the first calculation unit as the reference capacitive component leakage current.

3. 3. The inspection device according to claim 1, wherein the third calculation unit is configured to extend the predetermined time and perform a next measurement when there is no difference in the amount of change calculated by the change amount calculation unit in the previous measurement or when the difference is equal to or smaller than a predetermined difference.

4. a leakage current detection step of detecting a leakage current flowing in a test electric line in which a first phase, a second phase, and a third phase are delta-connected; a voltage detection step of detecting a voltage applied to the electric line to be measured; a phase angle detection step of detecting a phase angle based on the leakage current detected by the leakage current detection step and the voltage detected by the voltage detection step; a first calculation step of calculating a possible range of a capacitive leakage current caused by an earth capacitance included in the leakage current flowing through the electric line under test, based on the leakage current detected in the leakage current detection step and the phase angle detected in the phase angle detection step; a determination step of determining a median value of a reference capacitive component leakage current as a reference within a range of possible values ​​of the capacitive component leakage current calculated in the first calculation step; a second calculation step of calculating a first resistance component leakage current caused by an insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current determined in the determination step, the first phase angle detected in the phase angle detection step, and the first leakage current detected in the leakage current detection step during the first measurement; a third calculation step of calculating a second resistance component leakage current caused by insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current determined in the determination step, the second phase angle detected in the phase angle detection step, and the second leakage current detected in the leakage current detection step, at a second measurement time that is a predetermined time after the first measurement time; An inspection method comprising: a change amount calculation process for comparing the first resistance component leakage current calculated in the second calculation process with the second resistance component leakage current calculated in the third calculation process to calculate an amount of change.

5. On the computer, a leakage current detection step of detecting a leakage current flowing in a test electric line in which a first phase, a second phase, and a third phase are delta-connected; a voltage detection step of detecting a voltage applied to the electric line to be measured; a phase angle detection step of detecting a phase angle based on the leakage current detected by the leakage current detection step and the voltage detected by the voltage detection step; a first calculation step of calculating a possible range of a capacitive leakage current caused by an earth capacitance included in the leakage current flowing through the electric line under test, based on the leakage current detected in the leakage current detection step and the phase angle detected in the phase angle detection step; a determination step of determining a median value of a reference capacitive component leakage current as a reference within a range of possible values ​​of the capacitive component leakage current calculated in the first calculation step; a second calculation step of calculating a first resistance component leakage current caused by an insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current determined in the determination step, the first phase angle detected in the phase angle detection step, and the first leakage current detected in the leakage current detection step during the first measurement; a third calculation step of calculating a second resistance component leakage current caused by insulation resistance to ground, which is included in the leakage current flowing through the electric line under test, based on the reference capacitive component leakage current determined in the determination step, the second phase angle detected in the phase angle detection step, and the second leakage current detected in the leakage current detection step, at a second measurement time that is a predetermined time after the first measurement time; and a change amount calculation process for calculating a change amount by comparing the first resistance component leakage current calculated by the second calculation process with the second resistance component leakage current calculated by the third calculation process.

Citation Information

Patent Citations

  • Insulation monitor

    JP2004317466A

  • Insulation monitoring device

    JP2012042418A

  • Ior ground point current detection soft integrated ground current inhibition system

    JP2018189557A

  • Detection device, method, and program

    JP2019207176A

  • Ground electrostatic capacitance measurement device and ground electrostatic capacitance measurement method

    JP2020076671A