Soil aeration, infiltration and drainage system and soil aeration, infiltration and drainage construction method
The soil aeration and infiltration drainage system addresses the neglect of air flow in conventional systems by using a Shigarami structure with hollow members and carbide fillers to enhance permeability and circulation, improving soil health and preventing landform collapse.
Patent Information
- Application Number
- JP2021090362
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-05-29
- Filing Date
- 2021-05-28
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2041-05-28
AI Technical Summary
Conventional soil drainage systems focus primarily on water permeability and retention, neglecting air flow, which leads to decreased air permeability, compaction, and the accumulation of organic gases, harming plant growth and causing landform collapse due to stagnant air and water.
A soil aeration and infiltration drainage system utilizing a Shigarami structure with irregularly shaped hollow members and carbide fillers to enhance air and water permeability, promoting plant growth and preventing landform collapse by ensuring consistent circulation of air and water.
The system improves air and water permeability, regenerates rainwater infiltration functions, and prevents landform collapse by maintaining a consistent flow of air and water, promoting healthy plant growth and ecosystem functionality.
Smart Images

Figure 0007587835000001 
Figure 0007587835000002 
Figure 0007587835000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a soil aeration, infiltration, and drainage system and a soil aeration, infiltration, and drainage construction method, which improve the flow of air and water in the soil, improve the function of the entire basin from the downstream to the upstream of the air and water flow in the system target area (or the system target basin), provide uses such as infiltration basins, culvert drainage pipes, and open culvert drainage channels, improve the environment for vegetation to grow thick, and restore the rainwater infiltration function throughout the soil environment of the earth and prevent the collapse of the terrain. [Background technology]
[0002] In the past, it was considered important to improve soil permeability and water retention, etc., and to improve fertilizer as a source of plant nutrition, in order to reduce flood damage caused by rainwater, prevent global warming, and improve soil to make it suitable for plant growth.
[0003] Known water improvement techniques include the placement of culvert drainage pipes, infiltration pits, and open-ditch drainage channels in the soil to adjust the moisture in the soil, as well as soil improvement construction techniques such as spreading fertilizer suitable for plant growth and replacing soil with nutrient-rich soil. The technology for adjusting soil moisture using open drainage channels, underdrain drainage pipes, and infiltration pits that utilize permeability involves placing permeable filler such as crushed stone or sand around a perforated pipe placed in the soil, and collecting and discharging moisture in the soil around the underdrain drainage pipe or infiltration pit from the permeable filler into the perforated pipe or permeable open drainage channel.
[0004] However, in the past, improvements have been made to water and fertilizers to make the soil suitable for plant growth, but no consideration has been given to the air flow in the soil. Generally, plants do not die immediately even without water, and when a large amount of organic gases due to decay in the soil accumulates, the roots may directly absorb the organic gas and become damaged. However, when water is mixed in, the organic gas dissolves in the water, and when the roots of the plant absorb this water, the leaves may wilt and die in an instant.
[0005] On the other hand, conventional soil drainage technologies using permeable open channel drainage, underdrain drainage pipes, and seepage pits are mostly aimed at draining water from the soil. After a certain period of time, mud and decayed plant organic matter accumulate in the gaps of the permeable filler materials such as crushed stone and sand that are filled around the periphery of permeable open channel drainage, underdrain drainage pipes, and seepage pits, causing clogging of the soil around the underdrain drainage pipes and seepage pits, as well as the passages of the filler materials and underdrain drains, resulting in problems such as reduced permeability.
[0006] In addition, the weight of permeable open drainage channels, underdrain drainage pipes, infiltration pits, and permeable filler materials compacts the soil surrounding the underdrain drainage pipes and infiltration pits, reducing the air permeability and permeability of the soil. The reduced air permeability and permeability of soil causes the decay of organic matter due to stagnation of air and water in the soil, and this decay generates harmful gases, which deteriorates the environment for plant growth.
[0007] When the environment for plant growth deteriorates, plant roots disappear from the soil, creating a vicious cycle in which the soil's air permeability and permeability become even worse. The soil becomes dry and compacted, and air and water stagnate in parts, making the soil even less suitable for plant growth.
[0008] For this reason, the present inventor invented and proposed a soil aeration and drainage system as shown in Patent Document 1. According to this technology, by placing a filler material containing carbonized material obtained by dry distillation around a hollow member that is placed in underground soil and has passages around its periphery to ensure air and water permeability, it is proposed to smoothly remove air from the surrounding soil in the construction area (i.e., to allow aeration), remove sludge and organic gases from within the soil, promote the growth of plants, and encourage the spread of plant roots in the soil, thereby creating a virtuous cycle that further improves the air and water permeability of the soil.
[0009] According to the technology of Patent Document 1, the carbonized material retains the ability to purify water and air for a long period of time, so that it is expected to be a soil aeration and drainage system that maintains its function for a long period of time, and the water and air collected in the hollow member are collected in a purified state, making post-processing easy. Furthermore, it is possible to prevent clogging of the passages due to the intrusion of mud into the gaps in the filler, and to provide a soil aeration and drainage system that can withstand long-term use. Furthermore, by configuring the hollow member as a perforated pipe with many large and small holes formed on the outer periphery, air is allowed to flow into the hollow member through the large holes, and water is allowed to flow in through the small holes and discharged, which is expected to improve the air permeability and water permeability of the soil.
[0010] This was an excellent system that could be used as an infiltration pit, etc., by arranging the hollow members so that they face vertically in the underground soil, and as a culvert drainage pipe, by arranging the hollow members so that they face horizontally in the soil. [Patent Document 1] JP 2006-288354 A DISCLOSURE OF THEINVENTION [Problem to be solved by the invention]
[0011] As mentioned above, the technology of Patent Document 1 is an extremely excellent soil aeration and drainage system, but there was a demand for an improved soil aeration and drainage system that could restore the rainwater infiltration function throughout the entire soil environment of the earth and prevent topographical collapse. The inventor then conducted extensive research and noticed that previous systems based on the ratio between the volume of the water collecting pipe and the volume of the manhole that collects the collected water had been designed taking into account structures that conformed to the ratios of existing materials. He researched a more efficient and durable system and developed the present invention.
[0012] In other words, in previous soil drainage systems and construction, the issue was whether the movement of water on the surface ground would stagnate or be eroded, and therefore it was considered sufficient to deal with stagnation, and to deal with erosion, measures were taken to weaken the erosive force or to cover the area. However, the inventor found that the circulation functions of the natural world are the circulation functions of aeration / water passage and water retention / air retention accompanying a constant flow of air and water, and found that these circulation functions are nothing but equal pressure function-uniform acceleration motion.The inventor then found that when this state (hereinafter referred to as "rest state" in this specification) is maintained, a circulation type soil aeration / infiltration drainage system and its construction can be solved, and confirmed that it is essential to make daily improvements to the air / water veins of the surface 5 cm (actually, depending on the terrain, about 5 cm to 20 cm) in order to solve the above problems, based on the experience that has been solved by field demonstration law by maintaining the circulation function of a small earth layer of less than 5 cm on the surface of the ground (actually, depending on the terrain, about 5 cm to 20 cm).
[0013] Therefore, we focused on the Shigarami structure, which is a structure that changes the direction of the water flow and suppresses water pressure by driving piles into the river and inserting crosspieces into it. In order to restore the rainwater infiltration function throughout the soil environment of the earth and prevent the collapse of the terrain, we used the Shigarami structure not only in the river but also in the soil of a specified area, and reconsidered the perspective of linear drainage and exhaust for water and air, and invented a soil aeration, infiltration and drainage system that incorporates a variety of irregular shapes caused by vortex currents, such as streamlined, ripple, and spiral structures.
[0014] The inventors have noticed that with regard to the flow of air and water within soil in a specified area, it is possible to improve the function of the entire watershed from the downstream area to the upstream area, and to provide uses such as infiltration basins, culvert drainage pipes, and open drainage, while at the same time noting that improvements made with the conventional linear flow of water and air tend to be accelerating, with the flow movement gradually increasing in pressure.
[0015] The object of the present invention is to construct a system capable of handling water flow and air flow at a constant speed, improving the environment for vegetation, restoring the rainwater infiltration function over the entire soil environment of the earth, preventing the collapse of the terrain, and maintaining the soil for a long period of time. Maintains functionality The present invention aims to provide a soil aeration, infiltration and drainage system and a soil aeration, infiltration and drainage construction method that can achieve the above object.
[0016] In this specification, the term "motion of uniform acceleration" refers to a motion with a constant acceleration and a motion that is subjected to a force of a constant magnitude and direction. Since gravity is considered to be approximately uniform and constant on the surface of the earth, the motion of an object near the surface of the earth refers to a motion of uniform acceleration. Generally, in a motion of uniform acceleration, if the initial velocity of an object is zero degrees or the angle between the direction of acceleration and the direction of initial velocity is 0 degrees or 180 degrees, the object moves in a straight line. On the other hand, if the angle between the direction of initial velocity and the direction of acceleration is other than 0 degrees or 180 degrees, the trajectory of the movement will be a parabola. Furthermore, there are no straight lines in the natural world, and the motion takes the form of a spiral or a spiral vortex. The spiral shape is the original form of fluid energy that creates order from chaos. Furthermore, in this specification, "soil infiltration air-water veins" refers to the flow line, structure, or context in which air and water move in pairs, and "eddy current" refers to a state in which the soil infiltration air-water veins are not in a linear acceleration state. In addition, in this specification, the term "random structure" refers to a structure that follows the vortex moment of air and water, and is a composite structure that is streamlined, ripple-like, spiral, etc., and that does not lose balance even when the thicknesses of the materials that make up the structure are uneven, and that expresses a calculated disorder even when the assembly method appears to be random at first glance. Furthermore, the term "hole" as used herein is not limited to circular holes, but includes hole-like gaps created by a binding structure. [Means for solving the problem]
[0017] The problem is solved by the soil aeration, infiltration and drainage system of the present invention, in a target area to which a soil aeration, infiltration and drainage system used for ground improvement is applied, a predetermined area of soil in the target area is A little At least one created pit, and / or The above A long groove formed over the target area, and the vertical hole and / or The above For long grooves Placed Wire-wrap structure ensures air and water permeability A hollow member having is arranged, and the binding structure A hollow member having teeth, Straight or curved shapes of different lengths and widths At least one of The members are arranged irregularly and have irregular walls formed with irregular gaps formed between the members. This problem is solved by:
[0018] In this way, the soil in the target area In a given area of soil in the target area At least one formed pit, and / or The above A long groove formed over the target area, and the vertical hole and / or The above Long groove Placed in Wire-wrap structure ensures air and water permeability A hollow member having is arranged, and the binding structure A hollow member having teeth, Straight or curved shapes of different lengths and widths At least one of The members are arranged irregularly and have irregular walls formed with irregular gaps formed between the members. Therefore, it is made of a twisted structure. Hollow Member This means that, unlike in the past, which placed importance on regularity, it is now possible for soil to be aerated, infiltrated, and drained in a state that is in harmony with the irregular environment of the natural world, thereby restoring the rainwater infiltration function throughout the entire soil environment of the earth and preventing the collapse of the terrain.
[0019] Also The hollow member is formed in a predetermined area. Longitudinal grooves and the hollow member outer wall A gap is formed in the gap, and the gap is Materials and The area ratio of the gap is Material Total area ≦ Total area of gaps Therefore, unlike standard structures, it does not get in the way of the water and air infiltration into the soil, conforming to natural conditions, and allows the circulating infiltration drainage to flow smoothly as a vortex in the soil infiltration air-water veins.
[0020] Also The hollow member is disposed in a lateral long groove formed in a predetermined region, and the hollow member outer wall A gap is formed in the gap, and the gap is Materials and The area ratio of the gap is Material Total area ≦ Total area of gaps It is preferable that the above-mentioned configuration is adopted.
[0021] In this way, the gap is formed Materials and The area ratio of the gap is calculated by MaterialSince the total area is less than or equal to the total area of the gaps, the area of the holes and gaps (opening surfaces) through which water and air flow is larger, allowing the water and air to pass through smoothly as vortexes while also allowing the gaps to be filled with water. Material Since the total area is less than or equal to the total area of the gaps, water and air can pass through the gaps, infiltrate, and drain. Material There is little clogging caused by soil and gravel, and maintenance is easy.
[0022] At this time, a hollow member disposed in the vertical hole; Said long groove The hollow member arranged in the long trench is connected to the hollow member arranged in the long trench, and the hollow member arranged in the long trench is arranged over a certain area in the soil of the long trench in the target area to which the soil aeration infiltration drainage system is applied, and the hollow member The exterior wall of teeth, Straight or curved shapes of different lengths and widths At least one component are irregularly arranged, and irregular shapes are formed between the members. gap It is preferable that the insulating film is formed so as to include the following components.
[0023] In addition, the hollow member arranged in the vertical hole and the hollow member arranged in the long groove are connected to each other in such a manner that the tip of the hollow member arranged in the long groove is connected downward to the hollow member arranged in the vertical hole at a position deviated from the center of the hollow member arranged in the vertical hole. And This is preferable.
[0024] Furthermore, the connection between the hollow members placed in the vertical holes and the hollow members placed in the long grooves is preferably configured such that two hollow members placed in the long grooves are connected to one of the hollow members placed in the vertical holes, and the two hollow members placed in the long grooves have different connection positions on the outer surface and height position of the hollow member placed in the vertical holes.
[0025] The pit and / or The above A grating cover is provided on the upper surface of the hollow member disposed in the long groove to cover the hollow member, and the grating cover has a plurality of types of gaps. It is preferable that the frame be made of an irregular fence-like frame having the following features: It is preferable to have a three-dimensional structure with the grating frame underneath the grating cover in a lattice structure, which allows wind pressure to be adjusted.
[0026] The grating cover is In a fence frame It is preferable that a slit is formed. If a slit is formed in this way, when pressure of water, air, earth and sand or the like is applied to the frame above a certain level, the frame will deform due to the slit, making it possible to release the pressure above the certain level, preventing the destruction of the grating cover and enabling the pressure of water, air, earth and sand to be smoothly avoided. As described above, by using a grating cover, surface drainage can be performed using the grating cover, and by taking advantage of the property of the hollow member allowing wind to easily pass through, it is possible to alleviate the wind load (wind pressure). and, The fence-like structure can be applied under the grating cover to adjust wind pressure in a three-dimensional structure with the grating frame.
[0027] In this case, it is preferable to place a filler containing a carbonized material obtained by dry distillation around the hollow member placed in the vertical hole and / or long trench in the target area to which the soil aeration infiltration drainage system is applied. 。 child As described above, the water and air purification ability of the carbonized material obtained by dry distillation and its affinity for the soil environment improve the environment for plant growth in the soil surrounding the filler, which has air and water permeability, promoting plant growth and allowing plant roots to spread throughout the soil, further improving the air and water permeability of the soil.
[0028] In addition, the carbonized material obtained by dry distillation retains its ability to purify water and air for a long period of time, making it possible to create a soil aeration and drainage system that maintains its function for a long period of time. Furthermore, since the water and air collected in the hollow member are collected in a purified state, post-processing is simplified. In this way, by arranging the hollow members vertically or horizontally, they can be used as open drainage channels, infiltration basins, underdrain drainage, etc.
[0029] It is preferable to arrange a mud intrusion prevention material around the filler, the mud intrusion prevention material having a mud filtering function that prevents the intrusion of mud while ensuring air and water permeability. By using the mud intrusion prevention material in this manner, it is possible to prevent the intrusion of mud into the gaps in the filler and the hollow member from becoming clogged, and to provide a soil aeration and drainage system that can withstand long-term use. Material The area of the openings through which water and air flow is larger than the total area, so although the hollow members themselves are less likely to become clogged, it is possible to prevent the air and water permeability between the hollow members and the soil where they are placed from being hindered. The material is It will have a relative pressure resistance function.
[0030] Also It is preferable to arrange at least one of the following support materials in the lower, upper and surrounding areas of the hollow member: stone-based materials including basal concrete, stonework, crushed stone and gravel; wood-based organic materials including piles, plantings and timber frame supports; and other metal pins and piles, so as to diversify the support function of the hollow member by using a bracing structure. If the support of the hollow members is too strong, the movement of air and water through the gaps in the system and construction will decrease, and the function of the system and construction method will decrease. Therefore, by adjusting the degree of this adjustment, a system can be constructed that takes into account the actual conditions such as the earth pressure on the hollow members, the pore pressure on the surrounding gaps, and the topographical pressure on the soil and topography in the target area.
[0031] The above problem is solved by the soil aeration, infiltration and drainage construction method of the present invention, which is a soil aeration, infiltration and drainage construction method used for ground improvement, and includes a step of forming at least one vertical hole at a predetermined position in a target area to which a soil aeration, infiltration and drainage system is applied, and a step of forming a vertical hole in the soil of the vertical hole formed in the step of forming a vertical hole in the soil. Plane or three-dimensional structure consisting of irregular outer walls Wire-wrap structure Formed having This problem is solved by comprising the steps of: a hollow member placing step of placing a hollow member; a filler placing step of placing a filler containing a carbonized material obtained by dry distillation around the hollow member placed in the hollow member placing step; a mud intrusion prevention material placing step of placing, after the filler placing step, a mud intrusion prevention material around the filler that prevents the intrusion of mud while ensuring air permeability and water permeability; a backfilling and leveling step of backfilling the vertical hole formed in the vertical hole forming step and then leveling the ground; and finally, a soil formation step of forming soil in the target area to which the soil aeration, infiltration and drainage system is applied so that at least plants and ground cover can be placed.
[0032] The above-mentioned problem is solved by the soil aeration, infiltration and drainage construction method of the present invention, which is a soil aeration, infiltration and drainage construction method used for ground improvement, comprising: Pitfall This is formed Pitfall a vertical hole and long groove forming step of forming a long groove extending in a predetermined direction from the vertical hole and long groove formed in the vertical hole and long groove forming step, It is formed with a planar or three-dimensional structure consisting of an irregular outer wall that ensures ventilation and ventilation. A hollow member is disposed, and the vertical hole and The above a hollow member arranging and connecting step for connecting hollow members arranged in a long groove; a filler arranging step for arranging a filler containing a carbide obtained by dry distillation around the hollow members; a mud intrusion prevention material arranging step for arranging a mud intrusion prevention material that prevents the intrusion of mud while ensuring air and water permeability around the filler after the filler arranging step; The above This problem is solved by including a backfilling and leveling process, in which the long trench is backfilled and leveled while ensuring aeration and permeability, and a soil formation process, in which the target area to which the soil aeration and infiltration drainage system is to be applied is leveled, and soil is formed while ensuring aeration and permeability so that a ground cover including at least plants can be placed.
[0033] In this way, according to the soil aeration, infiltration and drainage construction method of the present invention, it is possible to effectively utilize the wrinkle structure, restore the rainwater infiltration function throughout the soil environment of the earth and prevent topographical collapse, and construct a soil aeration, infiltration and drainage system that can maintain its function for a long period of time. Effect of the Invention
[0034] The soil aeration, infiltration and drainage system of the present invention is Has a twisted structure Hollow Member However, since the present invention uses a planar or three-dimensional hollow member having an irregular outer wall formed by irregularly arranging at least one or more linear or curved members having different lengths and widths and having irregular gaps formed between the members, The hollow components themselves respect regularity thing Unlike the conventional method, it enables aeration, infiltration and drainage in soil in a state that is in harmony with the irregular environment of the natural world, thereby restoring the rainwater infiltration function throughout the soil environment of the earth and preventing the collapse of the terrain.
[0035] and, The hollow member of the present invention Used by the surroundings Each materialIt is possible to create a circulating water and air retention effect by maintaining a relatively constant amount of air and water within the material itself and its gaps. And then, This makes it possible to achieve one element of the functional restoration of the earth's environment.
[0036] In addition, since the hollow members are of a twisted structure, unlike standard structures, they do not interfere with the flow, infiltration, and drainage of water and air in accordance with natural conditions, making it possible to facilitate the flow, infiltration, and drainage. Material The area of the openings through which the water and air pass, that is, the space, is set equal to or greater than the total area, so water and air can pass through smoothly, there is little clogging due to soil and small stones, and maintenance is easy. In addition, because it has a swirling structure, when the amount of air or water is a specified amount, the air and water form a vortex and can easily escape. Structure In this way, another element of the regeneration of the terrestrial environment can be achieved.
[0037] In addition, a large number of voids are formed around the periphery of the hollow member, through which water and air can pass, infiltrate and drain. Materials and The area ratio of the gap is Material Since the total area is less than or equal to the total area of the gaps, Material There is little clogging caused by soil, gravel, or leaves due to the area, making maintenance easy. The hollow member placed in the vertical hole and the hollow member placed in the long trench are connected and placed over a certain area in the soil of the target area to which the soil aeration, infiltration and drainage system is applied, and an irregular structure that ensures aeration, infiltration and drainage against rainwater, etc. in the target area to which the soil aeration, infiltration and drainage system is applied is created. outer wall The hollow member equipped with this structure ensures sufficient soil aeration, infiltration and drainage.
[0038] And the shigarami structure The outer wall of the hollow member However, because each structure has an irregular shape, unlike an artificial structure, it can be adapted to the natural processes of soil aeration, infiltration, and drainage. As a result of the vortex current generated by theIt can be further specified. This specification The term "Yatara structure" refers to a structure that lacks discipline, order, and restraint and is in a chaotic state, yet which, as a whole, blends in with the natural world. Also, It is composed of an irregular fence-like frame with multiple types of gaps. By using a grating cover, surface drainage can be performed using the grating cover, and the wind's tendency to easily pass through the hollow component can be utilized to adjust and alleviate wind pressure, thus promoting wind flow along the water vein line. Furthermore, if the grating cover has slits in the fence-like frame, when the pressure on the frame is large, the grating cover will deform to adjust the wind pressure. Also, the grating frame can be made into a three-dimensional structure, as shown in Figure 79 (at the time of filing) as "three-dimensional structure of woven mesh."
[0039] In addition, since the filler containing the carbonized material obtained by dry distillation is placed around the hollow member, the water and air purification ability of the carbonized material obtained by dry distillation and its affinity with the soil environment improve the environment for plant growth in the soil around the filler, which has aeration and water permeability, promotes plant growth, and relatively activates the water vein function in the soil as the plant roots spread in the soil. Furthermore, since the carbonized material obtained by dry distillation retains its water and air purification ability for a long period of time, it can be used as a soil aeration, infiltration, and drainage system that maintains its function for a long period of time. Furthermore, since the water and air collected in the hollow member are collected in a purified state, post-processing is simplified and the natural ecosystem function is relatively activated.
[0040] The use of the mud intrusion prevention material can prevent the intrusion of mud into the gaps in the filler, causing clogging of the filler and the hollow member, thereby providing a soil aeration, infiltration and drainage system that can withstand long-term use. Material Since the area of the openings through which water and air flow is larger than the total area, clogging of the hollow member itself is unlikely, but obstruction of air and water permeability between the hollow member and the soil at the placement position can be prevented. [Brief description of the drawings]
[0041] [Figure 1] 1 is a schematic cross-sectional view illustrating a portion of an embodiment according to the present invention. [Diagram 2]1A and 1B are schematic diagrams illustrating an example of a portion of an embodiment of the present invention, where (a) is a cross-sectional view from the side and (b) is a cross-sectional view from above. [Diagram 3] FIG. 2 is a schematic enlarged view illustrating a portion W in FIG. [Figure 4] 1(a) to 1(f) are diagrams illustrating schematic cross sections and the like for explaining an example of a hollow member. [Diagram 5] 13(a) and 13(b) are explanatory views showing an example of a hollow member disposed in a long groove. [Figure 6] 1A and 1B are schematic perspective views illustrating an outline of a hollow member placed in a vertical hole, and FIG. 1B is a schematic perspective view illustrating the connection of the hollow members placed in the vertical hole and the long groove. [Figure 7] FIG. 1 is a diagram showing a vertical hole and a long trench for a soil aeration, infiltration and drainage construction method. [Figure 8] This is an explanatory diagram of laying sand or the like in the vertical hole and long groove and placing the hollow member. [Figure 9] This is an explanatory diagram of placing a hollow member in a vertical hole and a long groove, and placing a grating cover. [Figure 10] 13 is an explanatory diagram of a state in which a hollow member is placed in a long groove and fixed. FIG. [Figure 11] This is an explanatory diagram showing the state in which mud intrusion prevention material is placed and a grating cover is placed after the filling material placement process. [Figure 12] FIG. 11 is an explanatory diagram of a mud intrusion prevention material placement process. [Figure 13] FIG. [Figure 14] FIG. 2 is an explanatory diagram of a soil formation process. [Figure 15] 1A and 1B are schematic diagrams illustrating the state in which a hollow member is exposed to the ground surface through a point hole in a long trench, where (a) is an explanatory diagram before a lid is attached and (b) is an explanatory diagram after the lid is attached. [Figure 16] FIG. 1 is an image illustrating a partial cross-section of a soil aeration infiltration drainage system. [Figure 17] FIG. 13 is an explanatory diagram showing a schematic cross section of a hollow member placed alone in a vertical hole. [Figure 18]FIG. 18 is an explanatory diagram of the backfilling step in FIG. 17. [Figure 19] FIG. 18 is an explanatory diagram of the soil formation step in FIG. 17. [Figure 20] FIG. 1 is an explanatory diagram showing an example of application of a soil aeration infiltration drainage system. [Figure 21] FIG. 21 is a schematic cross-sectional view of an example of a soil aeration infiltration drainage system, taken along the line II of FIG. 20. [Figure 22] FIG. 20 is an explanatory diagram showing an example in which the soil aeration and infiltration drainage system shown in FIGS. 17 to 19 is applied. [Figure 23] FIG. 20 is an explanatory diagram showing another example to which the soil aeration and infiltration drainage system shown in FIGS. 17 to 19 is applied. [Figure 24] FIG. 1 is an explanatory diagram showing how to make points. [Diagram 25] This is an explanatory diagram of how to move the three arrows. [Figure 26] This is an explanatory diagram of how to dig a water vein trench. [Figure 27] This is an explanatory diagram of how to insert a branch into a water vein. [Figure 28] FIG. 11 is an explanatory diagram showing an example of water flow control. [Figure 29] (a) to (f) are explanatory diagrams of examples of backfilling of water veins. [Diagram 30] (a)~(f) are diagrams explaining the holes made around trees and their construction. [Diagram 31] (a)~(c) are diagrams explaining the maintenance of artificial forests from an aerial perspective. [Diagram 32] (a)~(g) are explanatory diagrams of how to wrap ground cover, charcoal, and charcoal chips. [Diagram 33] (a)~(f) are explanatory diagrams of construction examples related to natural streams. [Diagram 34] (a) to (c) are explanatory diagrams of the draining of ruts. [Diagram 35] 11(a) to 11(c) are explanatory diagrams of resistance fences on a straight-sloped work road. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0042] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 and Fig. 2 are schematic cross-sectional views illustrating a part of an embodiment of a soil aeration, infiltration and drainage system, Fig. 3 is a schematic enlarged view illustrating the position of W in Fig. 1, Figs. 4(a) to (f) are schematic views illustrating the hollow members, grating covers, etc. A schematic cross-sectional view of an example of the5(a) and (b) are explanatory diagrams showing an example of a hollow member placed in a long trench. FIG. 6 is a schematic diagram of a hollow member placed in a vertical hole, where (a) is a single member and (b) is a schematic oblique view explaining the connection with a hollow member placed in a long trench. FIG. 7 is a diagram showing the vertical hole formation process and the long trench formation process of the soil aeration, infiltration and drainage construction method. FIG. 8 is an explanatory diagram of laying charcoal or the like in the vertical hole and the long trench and placing a hollow member. FIG. 9 is an explanatory diagram of placing a hollow member in the vertical hole and the long trench and placing a grating cover. FIG. 10 is an explanatory diagram of the state when the hollow member is placed in the long trench and fixed. FIG. 11 is an explanatory diagram showing the state in which a mud intrusion prevention material is placed and a grating cover is placed after the filling material placement process. FIG. 12 is an explanatory diagram of the mud intrusion prevention material placement process. FIG. 13 is an explanatory diagram of the backfilling process. FIG. 14 is an explanatory diagram of the soil formation process. FIG. 15 is a schematic explanatory diagram of the hollow member brought out of the point hole of the long trench on the ground surface, (a) is an explanatory diagram before the lid is attached, and (b) is an explanatory diagram after the lid is attached. FIG. 16 is an image diagram explaining a partial cross-section of the soil aeration infiltration drainage system. FIG. 17 is an explanatory diagram showing a schematic cross-section of a hollow member placed alone in a vertical hole. FIG. 18 is an explanatory diagram of the backfilling process of FIG. 17. FIG. 19 is an explanatory diagram of the soil formation process of FIG. 17. FIG. 20 is an explanatory diagram showing an example of application of the soil aeration infiltration drainage system. FIG. 21 is a schematic cross-section of an example of application of the soil aeration infiltration drainage system, and is an explanatory diagram showing the I-I cross section of FIG. 20. FIGS. 22 and 23 are explanatory diagrams showing an example of application of the soil aeration infiltration drainage system shown in FIGS. 17 to 19. 24 to 37 are diagrams supplementing the present invention. Fig. 24 is an explanatory diagram showing how to make hole pits, Fig. 25 is an explanatory diagram of how to move the three rivulets, Fig. 26 is an explanatory diagram of how to dig a water vein trench, Fig. 27 is an explanatory diagram of how to insert branches into a water vein, Fig. 28 is an explanatory diagram showing an example of water flow control, Fig. 29(a) to (f) are explanatory diagrams of an example of backfilling a water vein, Fig. 30(a) to (f) are explanatory diagrams of hole pits around trees and their construction, Fig. 31(a) to (c) are explanatory diagrams of maintaining artificial forests from an aerial perspective, Fig. 32(a) to (g) are explanatory diagrams of ground cover and how to roll charcoal and charcoal chips, Fig. 33(a) to (f) are explanatory diagrams of an example of construction related to a natural stream, Fig. 34(a) to (c) are explanatory diagrams of draining ruts, and Fig. 35(a) to (c) are explanatory diagrams of resistance fences on a work road with a straight slope.
[0043] The components in the following embodiments can be configured to produce a more synergistic clogging elimination function by considering the diversity of the original properties of the shape, quality, and weight of the materials that make up the components. In other words, a set of diversity (e.g., three or more types) can be used. Use This creates a synergistic effect that exceeds what would be achieved if each component were placed individually.
[0044] The explanation of Shigarami structure (definition here) is: * A structure created as a result of the synthesis of rotational and reciprocating motions caused by the pressure of the air and water flow due to vortex energy, which can be said to be one type of cosmic energy, among amorphous structures; * A structure created by the three-dimensional meandering motion of the ripple-like, spiral air and water fluid energy up and down and left and right. Therefore, to a certain extent, the structural conditions of the material can be specified.
[0045] (Three types) Three types of materials: (1) shape, (2) quality, (3) weight The three types of combinations will be put to practical use through empirical methods, based on diversity. The scale of this system will be determined by taking into consideration the amount of water collected, including the natural water volume of the target area, and the soil pressure at the site, including human land use. Three types of target areas (fields): (1) Topography, quality, and weight (earth pressure) *Includes human land use, which is an artificial condition.
[0046] The twisted structure in this invention is a structure that is produced as a result of the synthesis of rotational and reciprocating motions caused by the pressure of the air and water flow due to vortex energy, which can be considered a type of cosmic energy, among other amorphous structures. It is also a structure that is produced by the three-dimensional meandering motion of the ripple-like and spiral air and water fluid energy in the up and down and left and right directions. Therefore, it is possible to identify certain structural conditions of the material. To create a Shigarami structure, diversity is necessary, not unity, and this diversity can be achieved by combining three types and three ways. First, combine the materials in three ways based on the three types of shape, quality, and weight. For example, the three types of shape are large, medium, and small, and the three types of weight are light to heavy. These three types and three different combinations will be put into practical use through empirical methods, based on diversity. The scale of this system will be determined while paying attention to three factors: the topography, quality, and weight (earth pressure) of the target area (field), taking into account the natural state of the target area, including the amount of water collected, and the local earth pressure, including human land use, which are man-made conditions.
[0047] In general, the soil aeration, infiltration and drainage system of the present invention is applied to sites where the water permeability and air permeability of the soil have decreased due to land development or the construction of large artificial structures, and the environment for vegetation has deteriorated, or sites where the environment for vegetation is currently good, such as parks and green spaces, for the purpose of improving the water retention and air retention of the soil, and improving and maintaining the air permeability and water permeability. By recharging groundwater, it is possible to reduce flood damage and prevent global warming, and rainwater can be effectively used as a resource.
[0048] FIG. 1 shows a vertical pit in a target area where the soil aeration, infiltration and drainage system S of the present invention is applied. (Vertical hole) 1 shows a state in which a hollow member 10 disposed at H is connected to a long hollow member P disposed in a long groove M (horizontal direction). In a target area (e.g., FIG. 20) where a soil aeration, infiltration and drainage system S is to be applied for ground improvement, vertical holes are drilled at predetermined positions and intervals in the soil D. (Vertical hole) Drill H. Pit (Vertical hole) The diameter, depth, intervals and topography of H are selected according to the soil environment, such as the degree of deterioration of the soil D's water permeability, air permeability, pressure resistance, water and air retention, and mud straining functions.
[0049] At this time, the hole (Vertical hole) Continuing from H, a long trench (passage) M in which a long hollow member P (see Fig. 5(a)(b)) will be placed is excavated (see Fig. 7). This long trench (passage) M is excavated by so-called random digging so that the bottom surface is not flat, but wedge-shaped unevenness is formed alternately on the left and right. doIt is preferable to excavate the trench so that it forms a gentle meandering curve, but if it is excavated to a certain width, the long hollow member P can be arranged in a non-linear manner within this width, so the trench may be linear. Long hollow member P The exterior wall of The structure is made of a slat that ensures air and water ventilation. Have In this example, the peripheral surface of a member such as a corrugated pipe has at least one of vertical, horizontal, and diagonal straight lines or curves. Material An amorphous form consisting of Wall The present invention is flexible and configured to include the above components.
[0050] In the example in Figure 1, (Vertical hole) The hollow member 10 placed in the center of the hole is connected to the long hollow member P, and the long trench M is excavated with a gradient that takes into account the long hollow member P so that water flows smoothly through the hollow member 10 at a relatively constant speed - a flow speed at that time (constant speed) according to the water volume, water pressure, and earth pressure. At this time, the depth of the long trench M is determined so that there is no backflow, and as shown in Figure 21, the vertical hole is formed so that the layer that can drain is thick. (Vertical hole) The hollow member 10 is placed in such a way that the bottom of the long hollow member P is positioned at a position higher than the water surface inside the hollow member 10.
[0051] In this example, a long member (pipe-shaped) such as a corrugated pipe with an unspecified outer surface is used as the long hollow member P. The diameter of the long member (pipe-shaped) is 80 to 100 mm, and more functionally, it has a mesh structure made up of a combination of spiral curves, and is configured so that it can be bent when installed.
[0052] In this example, as shown in Fig. 2(b), when the hollow member 10 and the hollow member P are connected to face each other at a position off the center of the hollow member 10, the flow from the hollow member P becomes a vortex-like flow inside the hollow member 10 and circulates smoothly. In addition, as shown in Fig. 2(a), the connection positions of the hollow member 10 and the hollow member P in the vertical direction are such that the hollow member P on the higher position side is connected at a higher position of the hollow member 10, and the hollow member P on the lower position side is connected at a lower position of the hollow member 10.
[0053] Figure 3 is a schematic enlarged view explaining the position of W in Figure 1, and a cross-sectional view showing the leveling and ground cover parts. This is an example of the ground cover G, which is made of layers G1 and G2 of "chips and charcoal" (coarse leaf mold, charcoal) on top of the soil (the very top surface) excavated 5 cm to 20 cm deep. Under this ground cover G, there is a layer G3 where loosened soil is piled up.
[0054] Also, as shown in Figure 1, (Vertical hole) At the bottom of H, a layer of lightweight permeable sand 20, gravel, crushed stone, and plant branches and leaves is placed to prevent mud from seeping in. A filler 60 is placed at the bottom of the pit H where the bedding sand 20 has been placed. The bedding sand 20 is made of light, water-permeable sand to prevent mud from seeping in, and the filler 60 is placed next to the bedding sand 20. This filler 60 is made of a mixture of charcoal, pumice, sand, etc. Then, a mud intrusion prevention material 70 is placed on top of the filling material 60. This mud intrusion prevention material 70 is made of felled tree branches, brushwood, etc. ,moreover A plurality of sacrificial concrete blocks 30 are placed. Before the sacrificial concrete 30 hardens, the hollow member 10, whose outer periphery is secured to be water-permeable and breathable, is installed so that its lower end is fixed by the sacrificial concrete 30 or other supporting members through appropriate hardening. The diameter of the hollow member 10 is smaller than the diameter of the vertical hole H, and is preferably within a range of about half or two-thirds (as a relative selection). The reference numeral 80 denotes backfill soil, and the reference numeral 90 denotes planting such as grass.
[0055] The material of the hollow member 10 (hollow member P) may be any material such as concrete, resin, metal, etc., but organic materials, such as natural materials such as wood, are preferable, and a lightweight, pressure-resistant material that does not compact the surrounding soil due to the weight of the hollow member 10 is desirable. The hollow member 10 (hollow member P) has an irregular surface that ensures ventilation and ventilation, as shown in (a) to (f) of FIG. Frame 12 It is made up of multiple joined pieces and is formed as a braided structure.
[0056] The twisted structure of the present embodiment is as follows: The above Irregular fence frame material 12 With The irregular fence-like frame members 12 are drawn in plan in (a) to (f) of FIG. 4, but are arranged three-dimensionally. As an irregular exterior wall In addition, the lattice structure can be applied under the grating cover to form a three-dimensional structure with the grating frame. Reference numeral 13 denotes an opening formed by the frame material 12. The frame material 12 is also formed with slits 14 at predetermined positions, so that when pressure is applied to the frame material 12, Transformed, It's designed to flow smoothly.
[0057] In this example, the hollow member 10 (hollow member P) is formed Material (frame material) The area of the opening surface (opening between the frame members 12: gap) 13 through which water and air flow is equal to or greater than the total area of 12. In other words, the area ratio of the fence-like frame body (frame member) 12 constituting the gap 13 to the gap 13 is Material The total area is less than or equal to the total area of the gaps, and water and air flow through the gaps 13 as soil infiltration air-water veins with uniform acceleration, forming vortexes.
[0058] Then, the bottom of the hollow member 10 (hollow member P) and the annular space between the vertical hole H and the hollow member 10 are filled with a filler 60 having high air permeability and water permeability. The filler 60 having high air permeability and water permeability is made by mixing pumice, sand, crushed carbide, or the like with charcoal obtained by dry distillation as the main material, thereby reducing the overall weight of the structure including the filler 60 and preventing the soil from being consolidated by its weight. Examples of charcoal obtained by dry distillation include charcoal and bamboo charcoal. The charcoal obtained by dry distillation has a porous structure with pores of various sizes, so that its surface area is very large and its water and air purification capacity is very large. Furthermore, its ventilation, water permeability, air retention, and water retention functions in a consolidated state are very high.
[0059] Therefore, even if air containing organic gases or water containing harmful substances from the surrounding soil flows into the filler 60, the carbonized material has the function of absorbing and purifying the organic gases and harmful substances, preventing the organic gases and harmful substances from accumulating in the filler 60 and maintaining air permeability and water permeability for a medium to long period of time. When the air and water in the pores of the carbonized material obtained by dry distillation circulates appropriately, bacteria that decompose organic gases and harmful substances are naturally generated, and the effect is further enhanced. If these bacteria are attached in advance, the effect can be expected to be synergistic. In addition to the above filler, it is also effective to use the soil itself in the area where the aggregate structure is maintained.
[0060] When infiltrating rainwater seeps into the area around the hollow member 10 (hollow member P), air is pushed out from within the soil before the rainwater moves. If this air does not move smoothly into and around the hollow member 10 when it is pushed out by the water pressure of the rainwater, the rainwater being pushed out afterwards will encounter air resistance and collection will be weakened. Therefore, by ensuring an opening surface with multiple gaps (holes) of varying sizes, it becomes possible to release air pressure associated with various water pressures.
[0061] As shown in Figure 1, Vertical hole A flexible, long hollow member (pipe-shaped) P with ensured water permeability and air permeability is connected to the hollow member 10 placed in the soil D, and this long hollow member P is placed in a passage (long groove M) formed in the soil D. If the long hollow member P can withstand the pressure of the surrounding soil D (it will not collapse under pressure), it is not a mesh cylinder, but is formed in a structure that follows the vortex moment of the air and water, and has a composite structure such as a streamlined, ripple, or spiral shape. In other words, it is possible to form a random structure, i.e., a structure that is not based on a fixed rule, but on no specific structure, so that the long hollow member P itself does not become clogged, and has excellent air permeability and water permeability.
[0062] In the above embodiment, the hollow member 10 has been described as having a wrinkled structure. However, the hollow member 10 may have an irregular shape that is air-permeable and water-permeable, i.e., has air-permeable, permeable, and drainable properties. outer wall The hollow member 10 is provided with an outer surface that forms an outer shape, and the outer surface has different lengths and widths. By material There are vertical, horizontal and diagonal Straight or curved At least one of By material Irregularly embedded irregular shapes Embedded materials Using 10a, Embedded materials 10a and the gap 13 formed between the first and second electrodes 10a. Material (built-in material 10a) The area ratio of the gap 13 to the Material (built-in material 10a) It is preferable that the total area of the gaps 13 is equal to or less than the total area of the gaps 13.
[0063] The upper surface of the hollow member 10, which is an irregular three-dimensional structure placed in the vertical hole, is an open surface, and a grating lid 40 is disposed so as to cover this open upper surface. The grating cover 40 is made of the same material as the hollow member 10 (hollow member P) described above, and its shape, as shown in Figures 4(a) to (f), is a structure that follows the vortex of air and water in the hollow member 10, and is made up of a composite structure such as a streamlined, rippled, or spiral shape, the above-mentioned twisted structure, or a so-called tangled structure. The material of the grating cover 40 may be iron (galvanized), stainless steel, aluminum, FRP, or natural materials such as wood.
[0064] In other words, the planar shape of the grating cover 40 varies from an indefinite shape having different lengths as shown in Figs. 4(a) to (f). Material A combination of different lengths Material A combination of different lengths from the outer perimeter Material These are combined to form an ellipse, an isosceles triangle, or a scalene triangle, and are configured to have a polyhedral structure, such as one formed to match the shape of the open surface on the top of the hollow member 10. In addition, Material The corners 15 are formed in a streamlined shape so that water, air, and other fluids that may impede the flow of water are not caught therein. Furthermore, although not shown in the figure, the outer circumference has different lengths. Materials for each frame It is also possible to use a combination of the above to form a scalene pentagon in accordance with the shape of the upper surface of the hollow member 10.
[0065] In general, in order to efficiently infiltrate rainwater from the surface into the soil, the bottom of the basin is made of gravel or other soil that allows water to easily infiltrate into the soil, and the rainwater that falls on the surface is temporarily stored in the basin and gradually infiltrates into the ground. The installation of the basin allows rainwater to reach unsaturated strata and aquifers, and a sufficient amount of water is supplied, which leads to the revival of springs. Furthermore, since rainwater that has soaked into the soil slowly reaches rivers over a long period of time, it has the effect of mitigating urban flood damage caused by a large amount of water flowing in all at once. In other words, it is important to configure facilities that mimic the infiltration and dispersion function of natural water veins. Here, as an indirect response, in order to regenerate and improve the function of the watershed, it is important to aim for soil aggregation, equalization of soil layers, regeneration and stabilization of plant root layers, regeneration of the water retention and air retention function of the soil layers as aeration and water permeability functions of the soil layers, regeneration of the soil layers' pressure resistance function, and regeneration of meteorological functions.
[0066] Therefore, the hollow member 10 according to the present invention can be used as a rainwater infiltration basin (a facility that allows rainwater that falls in residential areas to infiltrate into the ground) to slow down the rate of infiltration, so each facility does not need to be huge. It is most effective when it is installed widely and dispersed so that small amounts of rainwater can be infiltrated and treated in many places. For this reason, the rainwater infiltration basin is small, inexpensive, and easy to install and manage, making it suitable for use in individual homes.
[0067] The upper surface of the hollow member 10 is covered with a grating cover 40, but the vertical hole and the upper part of the long trench are basically not backfilled, and if unavoidable, they need to be removed so that the blocked function can be substituted elsewhere. Furthermore, relatively equal distribution is performed. Furthermore, filler 60, etc. are placed so that the target area to which the soil aeration infiltration drainage system is applied can be leveled and plants can be placed. In this case, as in the above case, soil 80 is formed without basically backfilling. In addition, as the above-mentioned highly breathable and water-permeable filler 60, a mixture of pumice, sand, etc. with charcoal obtained by dry distillation as the main material, natural materials, etc. is used to reduce the overall weight, prevent the soil from being consolidated by its weight, and ensure the mutual ventilation and water permeability of each joint. As the charcoal obtained by dry distillation, charcoal, bamboo charcoal, etc. are preferably used, and the above-mentioned random structure is preferably made of at least two or more materials.
[0068] The filler 60 arranged around the hollow member 10 is provided with a mud infiltration prevention material 70 that prevents the infiltration of mud while ensuring air and water permeability. The mud infiltration prevention material 70 may be branches of felled trees or brushwood. The mud infiltration prevention material 70 is appropriately selected depending on the amount of mud components contained in the surrounding soil. By arranging the mud infiltration prevention material 70 around the filler 60, mud does not infiltrate into the gaps in the filler 60, so clogging of the openings of the filler 60 and the hollow member 10 can be prevented, and this can be ensured by configuring the above-mentioned structure. In short, for the hollow member 10 and the vertical hole H filled with the filling material 60, a thin layer of soil can be formed on the upper part of these annular spaces without backfilling, and grass or the like can be grown to filter the topsoil with the roots of living plants.
[0069] The carbonized material obtained by dry distillation has excellent environmental compatibility with the soil, so even if the carbonized material becomes powdered coal after long-term use, it improves the environment for vegetation in the surrounding soil. As plants grow in the surrounding soil, the plant roots spread throughout the soil, further improving the air and water permeability of the soil. At this time, since the above-mentioned structure on the water vein line is prone to clogging, a top hole structure is provided at certain intervals to release air pressure to the above-ground part. As described above, the gap between the hollow member 10 and the groove M is filled with a filler 60 with high air and water permeability.
[0070] Although the hollow member 10 has been described above, the same construction can also be applied to long hollow members (pipe-shaped). When the hollow member P is arranged horizontally along the long trench M, it can be used as a culvert drainage system. At this time, the hollow member 10 and the long hollow member P can be joined at a predetermined interval, and when joining the long hollow member P, the hollow members 10 larger than the long hollow member P are arranged at a predetermined interval and position, so that it is possible to handle a relatively large amount of rainwater, and it can also be configured to handle a large amount of rainwater in a short period of time, such as in a sudden downpour.
[0071] In this example, the approximate size of the hollow member 10 placed in the vertical hole is as shown in Fig. 6(a), with the diameter at the top end being 250mm to 300mm, the diameter at the bottom end (bottom side) being 100mm to 150mm, and the depth (height) being 250mm to 350mm. In other words, it is configured so that the ratio of the diameter at the top end: the depth (height): the diameter at the bottom end (bottom side) = 3:3:2. In addition, it is preferable to partially structure the frame at the top end of the hollow member 10 and the parts around the hollow member 10 with a lattice, a tangle, a tie, or the like.
[0072] To connect the hollow member 10 placed in the vertical hole and the hollow member P placed in the long groove, the mesh of the hollow member 10 placed in the vertical hole is cut (severed) at a position off-center of the hollow member 10 to form a connecting hole 15. In this example, two connecting holes 15 are formed: at a position slightly higher than the lower end side (bottom side) of the hollow member and off-center of the hollow member 10, and at a position at the center in the height direction and off-center of the diameter in the width direction of the hollow member 10. This is done by inserting the hollow member P placed in the long groove into this connecting hole 15. At this time, the end of the long hollow member P placed in the long groove is connected downward to the hollow member 10 placed in the vertical hole. As a result, when the water and air flow from the long hollow member P arranged in the long groove enters the hollow member 10 arranged in the vertical hole, it becomes a vortex flow and circulates smoothly.
[0073] Next, the soil aeration, infiltration and drainage construction method used for ground improvement will be explained with reference to the drawings. Figures 7 to 21 show each step. Fig. 7 is a diagram showing the vertical hole forming step and the long trench forming step of the soil aeration, infiltration and drainage construction method, and shows an example in which the vertical hole forming step and the long trench forming step are formed so as to be connected. A vertical hole forming step is performed to form at least one vertical hole H at a predetermined position in the target area. At the same time, or separately, a long trench forming step is performed to form a long trench in a predetermined area of the target area. The long trench M (passage) can be excavated with a groove of a specified width, but in this case, the width of the long trench M allows the long hollow member P to be arranged in a somewhat serpentine manner rather than in a straight line. As shown in FIG. 10, the hollow member P is configured so that the end side of the hollow member P can be pierced and fixed into the soil at the bottom of the long trench M by a fixing member 17 (for example, a fastener composed of a long pin, etc.). The hollow member P is bent three-dimensionally, and the fixing members 17 are driven in a staggered pattern at both ends of the width direction (radial direction) of the hollow member P. At this time, the fixing members 17 are attached and fixed at an angle as shown in the figure so as not to obstruct the air, water, etc. flowing through the hollow member P. The fixing members 17 are fixed alternately to the left and right of the hollow member P at predetermined intervals of the hollow member P. In this example, a long pin is used as the fixing member 17, but the material of the hollow member 10 (hollow member P) can also be used. In addition, a bracing structure made of branches, etc. is arranged around the hollow member P to perform a relative pressure-resistant function. In this example, the vertical holes H are connected to the long grooves M (passages) extending in a predetermined direction, but the vertical hole forming process and the long groove forming process can be performed separately, and each can be formed independently.
[0074] Figures 8 and 9 show the process of placing hollow members 10 and hollow members P. Figure 8 shows the process of laying charcoal or the like in the vertical hole and long trench, and placing hollow members 10 and hollow members P in the soil (it is advisable to devise a method of fixing them in this case so that the plant roots penetrate into the soil while applying tension to the soil in each area). Figure 9 is an explanatory diagram of placing hollow members 10 and P in the vertical hole and long trench, and placing grating cover 40. Figure 10 is an explanatory diagram of the state when the hollow members are placed in the long trench and fixed.
[0075] 11 is an explanatory diagram showing the state in which the mud intrusion prevention material is arranged and the grating lid is arranged after the filling material arrangement step. That is, this is the state in which the hollow members 10 and P are arranged in the vertical holes and the long grooves, the grating lid 40 is arranged, the mud intrusion prevention material is arranged, and the grating lid is arranged. Fig. 12 is an explanatory diagram of the mud intrusion prevention material arrangement step, in which a filler 60 containing carbide is arranged after the process of Fig. 11. This state is shown. The mud intrusion prevention material is arranged in a streamlined fence structure, and the direction of the water and air flow is opposite to the direction of the branch stab. This allows the mud to be filtered.
[0076] Figure 13 is an explanatory diagram of the backfilling process. As shown in this figure, the backfilling process also involves applying force in a streamlined, rotational, ripple, or spiral shape along the vortex flow direction, leveling the ground, and then backfilling.
[0077] Figure 14 is an explanatory diagram of the soil formation process. From the state shown in Figure 13, the surface layer is formed as shown in Figure 14. A surface layer of 5 cm of soil is formed.
[0078] Figure 15 is a schematic explanatory diagram of the state in which the hollow member is exposed to the ground surface from the point hole of the long trench, (a) is an explanatory diagram before the lid is attached, and (b) is an explanatory diagram after the lid is attached. In this figure, the hollow member (pipe-shaped) P with a binding structure is exposed to the ground from the point hole, and the upper surface of this hollow member P is covered with a cage-shaped lid with a cage structure. thing It is.
[0079] Figure 16 is an image diagram explaining a partial cross section of the soil aeration infiltration drainage system. Around the hollow member P, there is a binding structure of plantings or ground cover, and the binding structure as a pressure-resistant function of these large and medium-sized branches, etc., requires not only binding between materials but also a binding state with the ground (earth).
[0080] Fig. 17 is an explanatory diagram showing a schematic cross section of a hollow member 10 placed alone in a vertical hole. The same members and arrangements as those in Fig. 1 are given the same reference numerals and their explanations are omitted, but it differs from Fig. 1 in that the hollow member P is not connected, etc. Figure 18 is an explanatory diagram of the backfilling process in Figure 17. There is a 5 cm layer of soil on the surface, and the water vein function is essential. In addition, the hollow member 10 has a pressure-resistant function to ensure stable repose function. Figure 19 is an explanatory diagram of the soil formation process in Figure 18.
[0081] FIG. 20 is an explanatory diagram showing an example of application of the soil aeration infiltration drainage system, and is a schematic illustration of an image in which each of the components described above is formed in a specified area.
[0082] FIG. 21 is a schematic cross-sectional view of an example of the application of the soil aeration infiltration drainage system, and is an explanatory diagram of the II cross-section of FIG. 20.
[0083] FIG. 22 is an explanatory diagram showing an example in which the soil aeration / permeation drainage system shown in FIGS. 17 to 19 is applied.
[0084] FIG. 23 is an explanatory diagram showing another example of application of the soil aeration and infiltration drainage system shown in FIGS. 17 to 19, and shows the state where it is formed on the ground near a building.
[0085] For reference, the present invention is further described below. Having healthy earth and having "all living things" regain their health based on that is necessary for the revival of all industries, and there has never been a time when the "regeneration of the earth" has been more necessary than now. It starts with restoring healthy air and water flow, and it is important to work in tandem with living things, especially plants, and make the most of their power.
[0086] Here, as shown below: From the perspective of regaining perspective, 1) Earth fatigue, its signs and solutions, 2) Using what is available, 3) Don't overdo it - veins dislike straight lines and right angles, 4) The difference a small drain can make, 5) Making a fire, 6) The benefits of charcoal and using branches and leaves as filters, 7) Maintenance and wind weeding From the perspective of improving air circulation above ground, 1) Create airflow, and cut the grass to achieve that. 2) Wind mowing 1 (high mowing and smooth mowing that use the grass as an ally) 3) Wind mowing 2 (Create a wind passage and make the grass into a block or kamaboko shape) 4) Wind mowing 3 (How to use an engine cutter) 5) Vines, silver grass 6) Wind pruning of low shrubs 7) Tree felling methods 8) Placement of felled branches and other items From the perspective of drainage and water veins 1) Improved drainage of the surface 2) Corrugated pipes and organic materials 3) Backfilling and leveling 4) Ground cover - watering and wind spraying 5) Point hole 6) Water Vein Maintenance 7) Resistance fence (how to drive the stakes) 8) Management of waterways and streams 9) Management of artificial waterways 10) Processing of U-shaped gutters 2-7 Blower and watering (a) Blower cleaning, b) Watering) 2-8 How to use heavy machinery We will explain about the following.
[0087] Regaining perspective Earth exhaustion: signs and solutions Modern civil engineering concrete and asphalt have stopped the movement of air underground, causing poor drainage and soil rot, making it difficult for plants to grow. With the priority being placed on convenience, ponds, wetlands, and earthen and stone-built waterways that maintained the flow of air and water and enriched the biological environment and served as purification facilities have been filled in, turned into culverts, or replaced by waterways lined with concrete on three sides, disappearing. As a result, on rainy days, rainwater does not soak into the ground and puddles form. The formation of puddles is a sign that the ground is clogged. Mud pools form at the bottom, and when they dry, they raise dust. If the mud pools pile up thickly repeatedly, they turn into sludge and emit organic gases. This sewer-like smell is not only unpleasant for people, but also weakens the surrounding plants. The formation of overgrowth is a sign of exhaustion for the earth and plants.
[0088] If the plant becomes weak, its roots will not be able to produce fine roots, and the plant's ability to circulate air through the ground will be further weakened. This negative spiral is now occurring in many areas of the world, from cities to the countryside. Of course, groundwater Not being replenished, This means that only overflow water (containing a large amount of muddy water) during heavy rains flows into rivers and lakes. Global warming is not only caused by the increase in CO2 and the heat island effect. Blockages caused by modern civil engineering structures and the clogging of underground air and water flow caused by muddy water also play a major role. Frequent floods are also caused not only by abnormally heavy rainfall, but also by the weakening of the infiltration function of the entire watershed.
[0089] Puddles form when the air holes in the ground are blocked by a layer of mud. Simply scratch the top 5cm with a transplant trowel and direct the water from the puddles into the drainage ditch. Water not only moves but also seeps vertically. Then grass will grow on bare ground. The reason seeds do not germinate even though there are seeds underground is because the air in the soil is not moving. When the mud scum disappears, the ground becomes brighter and the atmosphere changes. Grass grows and the color of moss improves. The way to "regenerate the earth" is to put charcoal and branches and leaves in the ditch and finish off the surrounding area with a ground cover of coarse leaf mold and chips.
[0090] In places that have already been converted to concrete structures, we will make modern arrangements to restore the same functions. It is not that concrete is bad, but that modern civil engineering does not have an air perspective and that the structures are used in a closed manner (new concrete structures need to be developed). Modern satoyama are overflowing with organic materials, and the materials can be easily obtained by simply maintaining ventilation. Just pruning the plants around the house will result in a lot of branches and leaves. Pruning improves ventilation (ventilation above the water veins is particularly important), but at the same time, organic materials used to maintain the water veins in "regenerating the earth" are easily obtained. Also, because abandoned artificial forests of cedar and cypress are widespread, long logs are easy to obtain, especially in collapsed areas, and are good materials for stakes and earth retaining fences.
[0091] Convenient lifestyles and modern civil engineering have taken away the ability to seep water, and most rainwater is now collected in culverts and U-shaped gutters and flows directly into rivers. Without seep water, the amount of spring water in rivers and lakes would decrease dramatically, the water would not be purified, it would stagnate, and mud would stain the stones. Abandoned farmland and forests also clog water veins, and harmful gases are released from the soil that has become gleyed (※1). If we improve and overcome this with "earth regeneration," the roots of plants will start to cultivate the earth and become an ally in the regeneration work. The plant's appearance will also grow more gradual, plants will start to separate their habitats from each other, becoming more compact, and natural ventilation will be restored.
[0092] Most of the plant spaces we see today are in fact the death throes of exhausted plants. However, if we cut them off from the roots and prioritize appearance, the ventilation and sunlight will change drastically, and the plants will frantically grow strong roots again, and the cycle will repeat. For example, the abundance of blackflies and bush mosquitoes is evidence that the earth is clogged, and because it is clogged, the bamboo grass is in pain and grows roots, which then become violent and turn into bushes. By partially cutting the grass, we can create a gentle wind path, and dig and connect trenches that allow the water to flow at a constant speed and are easy to penetrate. If the wind or water flows too fast, we can create a buffer zone. This protects the earth, starts the air in the soil that was clogged, activates microbial activity, and enriches the base that is the core of agriculture, forestry, and fisheries. Not only that, it also makes buildings less susceptible to weathering, and protects people's health. On the other hand, if the flow of water and air becomes poor or stagnant, plants will be damaged, and it can even lead to disasters such as landslides.
[0093] Our great responsibility to our children's future is to quickly create a safe and productive environment in the watershed through "regenerating the land." *1 Gleyed soil: A type of soil that becomes clayey and emits gases with a putrid (sewage-like) smell caused by methane and hydrogen sulfide as a result of the lack of oxygen underground and the resulting reduction conditions.
[0094] Use what's available Current civil engineering work has been a repeated scrap-and-build process. Even at disaster sites, collapsed soil and driftwood are removed en masse in an attempt to build the same civil engineering structures as before, but in a stronger form (which means more air is clogged). Disasters should be seen as the earth moving to relieve blockages and exhaustion, and the form after release is, so to speak, a new answer and shape for the earth. If that is the case, civil engineering work should be reconstructed to make use of the terrain, and especially for the initial temporary restoration, we should make maximum use of local materials such as stones, soil, logs, and branches from the disaster. When renovating a garden, we try to create a certain atmosphere by using what is available as much as possible. This approach is likely to become mainstream in modern times (and will continue to do so in the future), and it reduces transportation and disposal costs, which is appreciated not only by the client but also by the local community.
[0095] Don't overdo it. Veins dislike straight lines and right angles. When you want to regenerate abandoned farmland, you don't need to cut down all the bushes thoroughly. Start by opening up some breezeways. Moderately To keep the flow going, weeds in the fields are cut to waist height. The bottom of the stone walls are neatly cut, and if there is a waterway, the wind is allowed to flow over it. Think about how the wind will pass through as a whole, and always work modestly and do not go too far. Think about how much energy you can put into the work today, and the amount of work, and connect it evenly so as not to upset the overall balance. Don't spend too much time on one place.
[0096] So far, volunteers who have been involved in Satoyama development have teeth, We have repeatedly mowed the grass thoroughly in parts, but when the wind passes by, the regenerating plants start to grow wild again. It's a never-ending game of cat and mouse. It is much more efficient to save on labor by simply opening a few wind paths. By adding water vein maintenance to this, the air underground starts to move, and the plants put out fine roots, gradually transforming into a more compact shape. In other words, the plants are creating their own space, which in turn encourages them to grow. So that It becomes.
[0097] When designing the flow of wind and water, try to avoid straight lines and right angles, and aim for meandering and streamlined shapes. This allows the wind and water to naturally create eddies as they move. When eddies are created, dust and mud are less likely to accumulate, and soil aggregates occur. When soil aggregates occur, dust does not rise and air can easily pass through. Originally, "tree roots and stones create resistance, so Create, flow The idea is to make the flow of water smoother, but linear man-made structures disrupt this rhythm and cause blockages. This is why maintenance is necessary around modern structures.
[0098] The difference a small drainer can make Earth pressure is applied to the transition points of a slope. The same is true for places that are blocked by structures that are impermeable. Therefore, it is effective to dig a water vein trench (aeration and infiltration water vein) at the junction to vent the air. If felled branches or other materials are inserted into the trench so that they interlock, the trench will not collapse and it will also become a habitat for microorganisms and fungi. It is even more effective to insert a perforated pipe (a polypropylene "golgate pipe") as an auxiliary. If slightly larger triangular pyramid holes (point holes) are dotted around the bends and junctions of the trench, air will move vertically as well, making it easier for the soil to seep underground. When creating acupuncture points on a water vein groove, the point should be slightly closer to the groove. Large and deep It is made by placing bamboo and branches in a radial pattern, with charcoal placed in the holes, forming a fence structure that is made up of water and air. It is a so-called fence structure, but it is not simply formed in a radial pattern. Then, cover it with grass clippings or leaves, or put branches and leaves together to form a fence. Then, lightly backfill the surrounding area to complete the work. When erecting the corrugated pipe, it is recommended to use bamboo stakes or similar to provide support.
[0099] If the small drain is a capillary, then this water vein groove can be called an artery. The veins then connect to streams, rivers, and the sea. These changes that started with the small drain have the power to move the wind and water of the surrounding mountains and ridges. This is because wind and water are one, like holding hands. It is easy to understand if you think of it as the water 100 meters away moving instantly when you release the end of a filled hose. Even when there is no water, the small drainage grooves are constantly moving as air pushed by atmospheric pressure passes through them. They continue to affect the air underground and the wind on the surface. When the wind changes, you can see the plants change. The space becomes fresh and bright. And birds and insects gather as if celebrating, and fly around happily.
[0100] The benefits of charcoal and leaf filters In order to allow air to pass through the ground, it is important to have organic matter in the ground, as well as to eliminate any obstructions caused by structures. In other words, the most useful are the fine roots of living plants, but if the area is bare ground with no plants, it is effective to sift through organic matter such as branches and leaves, and then cover the surface with organic matter such as wood chips or coarse leaf compost as a ground cover. However, these release organic gases during the decomposition process, and decomposition underground in particular traps these gases, so we combine them with "charcoal" to adsorb, decompose, and release the gases.
[0101] Any kind of tree can be used as charcoal, and of course bamboo can be used as well. When making charcoal, the type of tree or bamboo and the time of cutting are not important. You can use green trees, green bamboo, and dead bamboo. Also, you don't need high-quality charcoal that is burned in a specialized kiln; embers from a campfire can be used just as well. Charcoal has a porous structure, which allows beneficial microorganisms such as fungi and bacteria to live and multiply, promoting the decomposition of organic matter in the soil, promoting soil granulation, and improving water retention and permeability. Furthermore, charcoal itself contains a wealth of minerals, which has a soil improving effect. However, the tiny holes in charcoal are easily clogged with mud. For this reason, the branches and leaves of felled plants are used as a mud strainer. In other words, charcoal and branches and leaves mutually support each other by "absorbing organic gases" and "straining mud with charcoal."
[0102] Maintenance and wind mowing When the underground leaves and branches decompose and the mud-filtering effect of the charcoal weakens, plants begin to grow on the surface, and the roots of the plants spread throughout the ground allow air to circulate. At that time, the water channels and holes that were constructed may be clogged with mud, so it is important to maintain the structure regularly. And when grass starts to grow, it will be necessary to manage it with "wind mowing and selection". What is the purpose of mowing? It is not to make the site look nice. It is to control the wind on the ground by "wind mowing." Mowing creates a space for the wind to flow evenly across the site. In particular, the areas above the water veins need to be kept open at all times as wind openings. When the water veins and wind flow work together, air moves throughout the surrounding ground, organic gases are released, and the plants become healthy and begin to send out fine roots. Then, as the plants' growth settles down and the trees become strong, the tree roots begin to act as infiltrating water veins and resistance fences, and with the help of natural rain and wind, maintenance thereafter becomes much easier.
[0103] Improved ventilation above ground Create wind flow by cutting grass If the air does not circulate, organic gases stagnate and the plant weakens. If the air circulation is good, the plant will become calm and the branches will become compact. If you cut back the long flower buds, the side buds that appear later will produce beautiful flowers.
[0104] Wind mowing 1 (high mowing and smooth mowing that uses grass as an ally) Mow where the grass sways and bends in the wind. This is called "high mowing or smooth mowing." When the grass regrows, it branches out a lot and fine roots develop underground. The grass also regrows slower, so the amount of work is much less than if you mow it at ground level. The tool used is a sawtooth or nylon cord brush cutter, which cuts the grass by tearing it off (this will cause it to regrow more slowly than with a sharp cut, so nutrients will be more likely to be directed to side shoots and third growths).
[0105] Wind mowing 2 (Create a wind passage and make the grass into a block or kamaboko shape) In addition to cutting the grass high and evenly, create several wind passages by dividing the grass into blocks (only cut the blocks from the ground up). Also, trim the sides to a kamaboko shape to allow the wind to flow smoothly and evenly, making it easier for the wind to get into the grass. Cut the grass low (to about ankle height) only around the base of trees, in furrows, and on farm and work roads. Prune any drooping lower branches that are touching the grass to improve ventilation.
[0106] Drainage and water veins Improved drainage of surface layer The basic idea is to dig a trench in the puddle and let the water flow through it. This is also to improve the clogging of the water path. Aim for soft areas and make the ditch slightly meandering, maintaining a constant rhythm of "not running" and "not stagnating". Running destroys the terrain and releases mud scum, and stagnating causes underground clogging and generates organic gas. The scum also disappears vertically, so creating a dispersed and constant-speed water flow promotes infiltration. The trench should be about 5 cm deep. In the case of ground with stones and grass growing, the drainage will be somewhat large, so three-hole or kara-hole tools will be used. In this case, instead of simply digging a smooth U-shaped trench, digging a V-shape alternately left and right to create a flow that is easy to infiltrate and creates a vortex. The aboveground part above the water vein should be mowed to ensure adequate ventilation. When the mud scum disappears, the boardwalk will no longer be slippery. The refreshing green will also recover (for example, liverwort will change to Polytrichum japonicum).
[0107] Corrugated pipes and organic materials To explain how to dig a water vein trench, in the case of a water vein where a corrugated pipe will be placed, digging is done with a breaker from heavy machinery, and then the trench (about 20 to 30 cm deep) is finished with a shovel, but even then, rather than digging a smooth U-shaped trench, it is dug in a V shape, alternating left and right. When placing a corrugated pipe in a water vein, it is placed so that it meanders slightly within the groove. Artificial flow paths tend to be straight lines and right angles, but by adding moderate irregularities and bends, the air and water move in eddies, improving purification and infiltration functions. Rather than creating a twisting and turning pipe, the pipe is placed in a curve that naturally occurs in accordance with the movement of the corrugated pipe. This creates a relatively streamlined shape for the parts and the whole. The corrugated pipe is fixed to the ground at regular intervals using formwork separators or bamboo skewers, but the center of the pipe is avoided so as not to interfere with the flow path, and the pipe is fixed in a staggered pattern. Add organic materials such as branches and split bamboo on top of that, but don't just throw them in, but weave and interlock them (this is called "shigarami") and press down well from above. Add large branches, medium branches and small twigs in a balanced way. Don't let large branches gather in one place or have only small twigs. The ratio should follow the way the trunk and branches of a natural tree are attached.
[0108] When this type of binding structure is constructed, the functions of the water vein - its strength, its ability to guide the water vein, the way whirlpools form, and the growth of microorganisms - are all completely different, so great care must be taken. Then, put in charcoal, fallen leaves, and branches with leaves. Just putting in leaves has a significant mud-straining effect on the "space of the entanglement, the holes in the corrugated pipe, and the charcoal", but putting in too many will cause clogging. If the ratio of branches and leaves attached to natural trees is within the total, clogging will not occur.
[0109] Backfilling and leveling A delicate touch is required to maintain the connection between water and air in the center of the ditch, rather than simply filling the water veins. When using a three-pile sieve, instead of raking down into the ditch, lift it up and let the stones fall first (knocking up keeps the fine soil from falling, and only the stones roll down). The stones get in between the branches and the slope of the soil, supporting the soil pressure (push them in with the three-pile sieve). Small stones are placed in the gap, and finally soil covers it. This creates a hierarchical structure, which creates a mud-straining effect and makes the corrugated pipe less likely to become clogged.
[0110] Ground cover - Watering and wind spraying Spread charcoal or coarse leaf mold (chips) on the ground around water veins as a finishing ground cover. Winnowing basket There are two ways to spread materials by "wind spreading", which scatters the materials like the wind, and "water spreading", which spreads the materials like water falls. The former is used for ground cover, and the latter is used for dropping materials into water veins or backfilling.
[0111] dot hole Figure 24 is an explanatory diagram showing how to make point holes. At the point where the water vein changes, dig holes called "point holes" about 30 to 40 cm deep (the depth varies depending on the condition of the soil). These allow air and water to pass vertically, and when it rains they become muddy. Point holes are made every few meters in the water vein. Even if the water vein continues in a straight line, point holes should be made every few meters. The diagram on the top left is a cross section, and the one in the middle of the top row is shaped like an octopus pot. *It does not necessarily have to be marked with an X, and this shape is possible depending on the condition of the soil (if it is hard, for example). The image on the top right shows the corrugated pipe when it is set up, and in this case it is supported by bamboo stakes. The bottom is a top view, and when making a water vein groove, make it slightly larger and deeper than the groove. And make it so that the water vein and air current go diagonally down and up. As shown in the center of the bottom row, it is a wooden structure with a fence structure that allows water and air to be trapped. (1) Charcoal is placed in the hole and bamboo and branches are placed radially. (2) Cut grass and leaves are rolled up inside. (3) The surrounding area is lightly backfilled. Grooves are formed radially to retain soil and to guide the flow of water and air. Digging is done in an inverted cone shape with a diameter slightly larger than the width of the water vein, and charcoal is placed inside. Branches and bamboo are placed radially to form a binding structure to retain soil and guide the flow of water and air. To enhance the effect, short cut corrugated pipes are sometimes set up. Horizontally scraping to create a streamlined shape with a kamaboko-shaped topography. After digging the trench, the excavated soil is leveled and formed into a kamaboko shape, creating a streamlined shape. Large stones and organic plant material from the soil (roots, branches, grass, etc.) fall off first, so clogging is unlikely to occur. In orchards on sloping land, it is effective to create a water vein on the mountain side of the work road and dig holes on the valley side. It is also good to make small holes around the roots of weak trees. Holes filled with charcoal are highly effective against pine wilt and oak wilt.
[0112] Water Vein Maintenance Water veins that have become buried over time are dug up using a three-hole digger and maintained. Figure 25 explains how to move the three-claw digger. On a slope, you dig from bottom to top, putting your feet into the trench. Instead of simply digging a trench in a straight line, you dig in the soft areas of the soil where you can (it's okay to zigzag a little). When you dig and find branches, you press them down with the tip of the three-claw digger to stabilize them. It's not enough to just dig. You have to carry out the complex tasks of digging, opening, pushing... all at the same time. This is the same task that wild boars do. Wind Spinning: Swing the ball horizontally or vertically with both hands at a high angle to send it flying through the air. Sprinkle water on the surface and spray as if you were spraying water. This will be a larger amount than spraying air. When soil is compressed, it becomes clogged and air cannot pass through. Coarse humus / chips Charcoal is top △ Coarse humus / chips 〇 If there is no charcoal, level the ground so that air can pass through vertically. Charcoal gets clogged with mud, so if you use coarse leaf compost or chips as a set, it will act as a mud strainer (sometimes mixed in).
[0113] Resistance fence (how to drive stakes) In places where rainwater rushes down a slope, obstacles called "resistance fences" are created to slow down the flow, disperse and stagnate the water, and promote infiltration. The resistance fences are placed at a slight angle to the flow, following the meandering of a natural river. If there are logs, branches, bamboo, etc. nearby, there is no need to bring in materials from outside, just use them creatively. If you fasten them with stakes, you can create a resistance fence that guides the flow. When doing this, do not drive two stakes into the same side, but into alternate sides. This way, just like the roots of plants, they will work in all directions. And don't drive them in too hard. Drive them in with just the right amount of hardness. Plant roots don't go completely into the ground, there will always be gaps. Don't tighten them too much against the ground, a little looseness is good. Grass and stones are placed in the gaps between the horizontal bars to fill them, and the stakes are tied with wire. The excess stakes are then cut off with a saw. The construction is completed with a natural look that allows wind and rain to pass through and stabilize the ground. "Rain hardens the ground"... Finally, the rain levels the ground.
[0114] Management of artificial waterways For waterways that have already been concreted on three sides, do not shovel out all the soil and fallen leaves, but leave a moderate pile of fallen leaves and leaf mold. Use a hoe to create a meandering path. Then add organic matter such as branches and leaves to both sides and cover with stones to weight them down and stop them from moving. In other words, create a new natural waterway like a "nested" one inside the concrete waterway. Outside the waterway, dig a little at the boundary between the concrete and the ground, and make holes here and there. Water will flow through this ditch when it rains, so if possible, chip off the top of the concrete wall somewhere downstream so that it falls into the waterway. When doing so, try not to make any sharp edges on the "top." It's important to create a curve that allows air and water to pass through smoothly, giving the impression that nature has done the work.
[0115] Treatment of U-shaped gutters The concrete U-shaped gutters should be removed and replaced with stone masonry channels or new structures that allow ventilation and water to pass through. If this is not possible, the bottom should be temporarily sewn with 1 to 1.5m pitch. in, It is a good idea to make a hole with a breaker. This will allow the water to seep into the ground and remove the air from the ground. If there is constant water flow, make the hole small to prevent excess moisture. If there is no water in a U-shaped gutter, spread charcoal, lay bamboo branches and leaves, and place stone weights on it to increase the effectiveness of mud straining and seepage.
[0116] Blower Cleaning After arranging and tidying up your belongings, use a blower to clean all the spaces you have tidied up. The wind Pervasive mosquito, You can see the results. It is also an important job that gives the space its final finishing touch. The tools used are the three-handle raking tool, the cleaning tool, the rake (to shape the surface), the rake, the bamboo broom, the hand broom (to level the surface), and finally the blower for cleaning. All of these tools use energy according to the depth of the work, following the example of water and wind, and it is important to always feel the response of each tool. If used well, the blower can work three times faster than doing it by hand, and the result is much cleaner. At the site, find areas where mud has accumulated in layers and blow the dust away. Find areas where the "dots" of dirt have spread to form "lines." You don't have to do everything, just quickly make the dimensions uniform without spending too much time. That alone will make the work on site go smoothly and won't damage the place.
[0117] Watering Watering is the same as a blower; the water must be evenly distributed and seep into the ground, and if it doesn't, you can find the problem there. Watering is the act of passing wind and water through the soil, and there are two types of watering: "breathable watering" and "suffocating watering." Watering is the most important prescription for treating plants. Water is also sprayed over structures such as sleepers, not just haphazardly, but with tension, as if to drop mud into the valley. Because air passes through the valley, the mud that falls into the valley breaks into granules. Apply water softly to weak trees (to prevent muddy water from coming out). Always be aware of the range in which you can spray water at your own distance. To allow air to circulate around the edges of curbs, hold a screwdriver in one hand and stab it into the ground, leaving gaps as you spray. It is best to use a nozzle that can spray water evenly, but once you get used to it, you can also place your thumb directly on the hose and adjust the spray amount.
[0118] Figure 26 is an explanatory diagram of how to dig a water vein trench. Corrugated pipes and organic materials In the case of a water vein where a corrugated pipe will be placed, digging is done using a breaker from heavy machinery, and then a trench (about 20 to 30 cm deep) is finished with a sword shovel. However, even in this case, rather than digging a smooth U-shaped trench, a V-shape is dug alternating left and right. How to dig a water vein trench: A water vein trench cannot be made straight with a vertical wall or a bottom as shown by the × in Figure 26, and it is not sufficient to dig it in a state where it is not partially streamlined as shown by the △. As shown by the ◯, the part and the whole will be relatively streamlined. Dig it so that it becomes a vortex excavation like a top or a boar. Once the water vein trench is dug, the charcoal is placed in. Next, the corrugated pipe is inserted, but rather than simply stretching it out in a straight line, it is placed so that it meanders slightly within the trench. Artificial flow paths tend to be straight or at right angles, but adding moderate irregularities and bends allows the air, water, and vortexes to move, improving the purification and penetration functions. Rather than creating a twisting and turning pipe with your mind, you fit it into a natural curve that matches the movement of the corrugated pipe. The corrugated pipes are fixed to the ground at regular intervals using formwork separators or bamboo skewers, but the pipes are staggered and the center of the pipe is avoided so as not to interfere with the flow path.
[0119] Figure 27 is an explanatory diagram of how to insert branches into the water vein. Regardless of whether or not a corrugated pipe is used, the branches should not just be placed, but inserted so that they are woven and interlocked (this is called "entanglement"), and should be firmly pressed down from above (not the x in the diagram, but partially △, preferably ◯). Insert large branches, medium branches, and small branches in a balanced manner. Do not concentrate large branches in one place, or have only small branches. The ratio should conform to the way the trunk and branches are attached in a natural tree. When this type of binding structure is constructed, the functions of the water vein - its strength, its ability to guide the water vein, the way whirlpools form, the growth of microorganisms, etc. - are all completely different, so great care must be taken. To further explain how to insert the branches into the water vein, insert the branches in the same way whether there is a corrugated pipe or not. As shown in Figure 27, intertwine the branches alternately to make a "tangle" and step on them from above. Cut off any branches sticking out at the top and insert them back in. Then, put in charcoal, fallen leaves, and branches with leaves. Just putting in leaves has a significant mud-straining effect on the "space of the entanglement, the holes in the corrugated pipe, and the charcoal", but putting in too many leaves will cause clogging. If the ratio of branches and leaves attached to natural trees is within the total, clogging will not occur.
[0120] Figure 28 is an explanatory diagram showing an example of water flow control, which uses thin and thick stakes (square timber or small logs are also fine). In other words, first, the wire is passed under the crosspiece to allow the water flow. Next, it is twisted and tightened with a chisel. Then, the excess stake head and wire are cut off. This allows the water flow to be controlled, the gap in the ground to be adjusted, and the force and flow rate of the water to be adjusted.
[0121] Figure 29 (a) to (f) are explanatory diagrams of examples of backfilling of water veins. Backfilling of water veins: Backfilling and leveling are carried out so that rain and wind can use their eddy currents to move soil, stones, and leaves. (a) shows the condition before construction, and (b) shows that backfilling directly into the trench is not acceptable because soil will fall in first and cause clogging (compacting with foot traffic is also not acceptable). During construction, as shown in (c), the ground is leveled by a back-and-forth motion using a sideways shovel. This allows large stones and branches to fall off first. Next, as shown in (d), the back of the hoe is used to strike the sides along the way to tighten them (depending on the amount of water used). Furthermore, as shown in (e), after construction, the structure (from top to bottom) has a semi-cylindrical streamlined shape, allowing circulation of rising air (light air) and falling air (heavy air), resulting in a hierarchical structure that is less likely to clog the water veins, as shown in the cross-sectional view in (f).
[0122] Figure 30 (a) to (f) are explanatory diagrams of the holes to be made around trees and their construction. As shown in the cross-sectional view of (a), loosen the tree, add a handful of charcoal and coarse branches, and work for 1 to 2 minutes at a time. As shown in the cross-sectional view of (b), around the tree, in a clockwise direction, remove the hard layer made of surface water and muddy water that has seeped through the surface of the tree, and new roots will begin to grow. There is a U-shaped ditch near the curb next to the tree, and this U-shaped ditch is formed above the concrete slab by the auger excavation method (digging with a hand auger) as shown in Figure (e). Then, as shown in the cross-sectional view (c), a trench of 20 to 30 cm is dug, and branches and leaves (10 to 12 cm), soil, Charcoal (handful of charcoal), etc. Introduced will be done. This groove is formed by breaking through the hard pan layer.
[0123] Figures 31(a) to (c) are explanatory diagrams of artificial forest maintenance from an aerial perspective. Maintenance of artificial forests from an atmospheric perspective: Examining the common practice of "cutting and thinning" in artificial cedar and cypress forests from the perspective of "regeneration of the earth." Fig. 31(a) The answer is no. Cedar and cypress plantations where thinning is delayed have almost no understory plantings, and they are washed away. To retain soil (and because they look good), the cut and thinned timber is Fig. 31(a) As shown here, it has become common practice (even in forestry cooperatives and other operations) to lay logs parallel to contour lines. It is. Fig. 31(b) This operation (laying trees flat along contour lines) requires unnecessary labor such as pruning, cutting, moving, and setting, but the understory vegetation does not recover (it is constricted from above, and air does not circulate easily both on the surface and underground). Fig. 31(c) The answer is YES. By randomly placing the thinned wood at an angle (stacking it), air and water can move. Branching and bucking can be kept to a minimum (work and Pedestrian As a result, the understory vegetation recovers faster and the topsoil is protected. Planted trees also develop fine roots and become more stable.
[0124] Figure 32 (a) to (g) are explanatory diagrams of how to wrap ground cover, charcoal, and charcoal chips. Ground Cover and Charcoal: Fig. 32(a) When soil is compressed, it becomes clogged and air cannot pass through. This is an explanation of the matter. Fig. 32(b) Use coarse leaf mold and chips, and if there is no charcoal, roughly level the ground to allow air to flow vertically. Fig. 32(c) As shown above, charcoal has small holes in it that allow air to pass through even when compressed. Fig. 32(d) As shown above, when charcoal is placed on top of coarse leaf mold and chips, the result is △. Fig. 32(e)As shown above, if the charcoal is placed below the coarse humus and chips, it is a good choice. Charcoal will get clogged with mud, so if you use organic matter such as coarse humus and chips in combination, it will act as a mud strainer (you can mix charcoal and coarse humus and chips depending on the situation). How to spread charcoal or chips: Fig. 32(f) Wind Maki Diagram of The idea is to float it in the air, and from a slightly higher position, use both hands to swing it sideways and vertically, scattering it around in the air. Fig. 32(g) Watering Diagram of The idea is to imagine the water flowing onto the ground, and spray it vertically from a slightly low position so that the water flows down (this will produce more water than if you spray it in the wind).
[0125] Figures 33(a) to (f) are explanatory diagrams of examples of construction work on natural streams. Natural Stream (Part 1) Fig. 33(a) shows the condition before construction, with a strong, straight current and a shallow riverbed filled with sediment and gravel. Fig. 33(b) After construction Indicates the status of It dredges up mud and sediment, creating an S-shaped meandering current. Natural Stream (Part 2) Fig. 33(c) Before construction Indicates the status of , Fig. 33(d) After construction Indicates the status of Remove driftwood, fallen leaves, etc., and move stones to equalize the flow of water. Fig. 33(e) and Fig. 33(f) Before construction, mud and scum accumulated on the riverbed. After construction, the grass was cut so that the wind could flow over the river surface, which made the flow uniform, and the mud and scum disappeared, returning the river to a clear stream.
[0126] Figures 34(a) to (c) show FIG. 13 is an explanatory diagram of the removal of water from ruts. Draining the ruts Fig. 34(a) is before construction, and in the order shown in the figure ( Figure 34(a)-(c) ) there is grass, dirt and rocks, some concrete, ruts, rainwater flow, grass, fences, and depressions in the concrete pavement. Fig. 34(b) teeth, In orderThe fence is dug out and the holes are filled with the excavated soil. Figure 34(c) The photo shows the state after construction, with branches, charcoal, and dead leaves being placed on top.
[0127] Figure 35(a)-(c) This is an explanatory diagram of a resistance fence on a straight slope work road. Fig. 35(a) is before construction, Figure From left to right: tilt, poor growth (overgrowth), etc. A simplified cross-sectional view is shown on the right side of FIG. 35(a). Fig. 35(b) is under construction and shows the initial movement of rainwater. Fig. 35(c) This is after construction, when the overgrowth has subsided and the trees have begun to grow. A simplified cross-sectional view is shown on the right side of FIG. 34(c). Fig. 35(d) indicates the installation state of 2x4 lumber (cross-sectional size of 2x4 lumber = 38 x 89 mm) using full threads and bolts. Fig. 35(e) teeth Figure 35(d) This is a cross-sectional diagram of the construction site, showing the relationship between the charcoal, twigs, and dead grass. [Explanation of symbols]
[0128] 10 Hollow member 10a Built-in parts 11 Irregularly shaped components 12 Fence-shaped frame (frame material) 13 Opening surface (gap) 14 Break 15 Corner 16 Connection hole 17 Fixing member (long pin) 20 Bedding sand 30 Waste concrete 40 Grating Cover 50 Backfill soil 60 Filling material 70 Mud infiltration prevention material 80 Backfill soil 90 Planting grass etc. S Soil aeration and infiltration drainage system H standing hole P Long hollow member (pipe-shaped) M Long groove (passage) D. Soil
Claims
1. In a target area to which a soil aeration, infiltration and drainage system for ground improvement is applied, at least one vertical hole is formed in a predetermined area of the soil of the target area, and / or a long groove is formed across the target area, and a hollow member having a binding structure that ensures air and water ventilation and is placed in the vertical hole and / or the long groove is placed, The hollow member having the twisted structure is a soil aeration, infiltration and drainage system characterized in that it has an irregular wall surface formed by irregularly arranging at least one or more straight or curved materials of different lengths and widths, and having irregular gaps formed between the materials.
2. The soil aeration, infiltration and drainage system described in claim 1, characterized in that the hollow member is arranged in a vertical groove formed in a predetermined area, a gap is formed in the outer wall of the hollow member, and the area ratio of the material constituting the gap to the gap is such that the total area of the material constituting the gap is less than or equal to the total area of the gap.
3. The soil aeration, infiltration and drainage system described in claim 1, characterized in that the hollow member is arranged in a long horizontal groove formed in a predetermined area, a gap is formed in the outer wall of the hollow member, and the area ratio of the material constituting the gap to the gap is such that the total area of the material constituting the gap is less than or equal to the total area of the gap.
4. A soil aeration, infiltration and drainage system as described in any one of claims 1 to 3, characterized in that a hollow member placed in the vertical hole and a hollow member placed in the long trench are connected, the hollow member placed in the long trench is placed over a certain area in the soil of the long trench in the target area to which the soil aeration, infiltration and drainage system is applied, and the outer wall of the hollow member is formed with at least one or more straight or curved members of different lengths and widths arranged irregularly, with irregular gaps formed between the members.
5. A soil aeration, infiltration and drainage system as described in claim 4, characterized in that the connection between the hollow member placed in the vertical hole and the hollow member placed in the long groove is at a position offset from the center of the hollow member placed in the vertical hole, and the tip of the hollow member placed in the long groove is connected downwardly to the hollow member placed in the vertical hole.
6. A soil aeration, infiltration and drainage system as described in claim 4 or 5, characterized in that the connection between the hollow members placed in the vertical holes and the hollow members placed in the long grooves is such that two hollow members placed in the long grooves are connected to one of the hollow members placed in the vertical holes, and the two hollow members placed in the long grooves have different connection positions on the outer surface and height position of the hollow member placed in the vertical holes.
7. A soil aeration, infiltration and drainage system as described in any one of claims 1 to 3, characterized in that a grating cover covering the hollow member is arranged on the upper surface of the hollow member placed in the vertical hole and / or the long trench, and the grating cover is composed of an irregular fence-like frame having multiple types of gaps.
8. The soil aeration and infiltration drainage system according to claim 7, characterized in that the grating cover has slits formed in the fence-like frame.
9. A soil aeration, infiltration and drainage system as described in any one of claims 1 to 3, characterized in that a filler containing a carbonized material obtained by dry distillation is placed around the hollow member placed in a vertical hole and / or a long trench in the target area to which the soil aeration, infiltration and drainage system is applied.
10. The soil aeration, infiltration and drainage system according to claim 9, characterized in that a mud intrusion prevention material having a mud filtering function that prevents the intrusion of mud while ensuring air permeability and water permeability is arranged around the filling material.
11. A soil aeration, infiltration and drainage system as described in any one of claims 1 to 3, characterized in that at least one of the following support materials is arranged in the lower, upper and surrounding areas of the hollow member: stone-based materials including basal concrete, stonework, crushed stone and gravel; wood-based organic materials including piles, plantings and timber frame supports; and other metal pins and piles, thereby diversifying the support function of the hollow member as a tie-down structure.
12. A soil aeration, infiltration and drainage construction method used for ground improvement, comprising: A step of forming at least one vertical hole at a predetermined position in a target area to which the soil aeration infiltration drainage system is to be applied; A hollow member arrangement process in which a hollow member having a planar or three-dimensional structure composed of an irregular outer wall with sufficient ventilation is arranged in the soil of the vertical hole formed in the vertical hole formation process; a filler arranging step of arranging a filler containing a carbide obtained by dry distillation around the hollow member arranged in the hollow member arranging step; A mud intrusion prevention material arrangement process for arranging a mud intrusion prevention material around the filler material to prevent the intrusion of mud while ensuring air permeability and water permeability after the filler arrangement process; A backfilling and leveling process for backfilling the vertical hole formed in the vertical hole forming process and then leveling the ground; Finally, a soil formation process is performed to form soil so that at least plants and ground cover can be placed in the target area to which the soil aeration infiltration drainage system is applied. A soil aeration, infiltration and drainage construction method.
13. A soil aeration, infiltration and drainage construction method used for ground improvement, comprising: A step of forming a predetermined number of vertical holes at predetermined positions in a target area to which the soil aeration, infiltration and drainage system is to be applied, and forming long grooves extending in a predetermined direction from the vertical holes; a hollow member arranging and connecting step in which a hollow member formed with a planar or three-dimensional braided structure having an irregular outer wall and ensuring ventilation is arranged in the vertical hole and the long groove formed in the vertical hole and long groove forming step, and the hollow member arranged in the vertical hole and the long groove is connected; a filler arrangement step of arranging a filler containing a carbide obtained by dry distillation around the hollow member; After the filler placement step, a mud intrusion prevention material is placed around the filler to prevent the intrusion of mud while ensuring air permeability and water permeability; A backfilling and leveling process for backfilling and leveling the vertical hole and the long groove while ensuring air permeability; A soil formation process of leveling a target area to which the soil aeration, infiltration and drainage system is to be applied and forming soil while ensuring aeration and permeability so that a ground cover including at least plants can be placed; A soil aeration, infiltration and drainage construction method.
Citation Information
Patent Citations
Sheet for specific civil construction work
JP1988312423A
Slope vegetation method by use of stepped metal mesh and earth-retaining material
JP1998140577A
Soil aeration drainage system
JP2006288354A
Natural vegetation inducing net, and natural vegetation inducing structure for slope
JP2009062758A