Manufacturing method and manufacturing device for glass plate package

The method and apparatus address pallet misalignment issues by using a measuring device and control system to correct glass plate placement on pallets, enhancing efficiency and precision in glass plate packaging.

JP7590698B2Active Publication Date: 2024-11-27NIPPON ELECTRIC GLASS CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021550628
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-10-11
Filing Date
2020-09-18
Publication Date
2024-11-27
Estimated Expiration
2040-09-18

AI Technical Summary

Technical Problem

Conventional methods for manufacturing glass plate packages face inefficiencies due to pallet misalignment, requiring manual correction and reducing productivity, as glass plates cannot be loaded with high precision when pallets are displaced from their intended positions.

Method used

A method and apparatus that utilize a measuring device to determine the position of the pallet and a control device to adjust the loading device, ensuring accurate placement of glass plates on the pallet by correcting their position based on measured data, eliminating the need for manual intervention.

Benefits of technology

Enables efficient and accurate loading of glass plates onto pallets, improving manufacturing efficiency by avoiding manual corrections and ensuring precise alignment, thus enhancing productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590698000001
    Figure 0007590698000001
  • Figure 0007590698000002
    Figure 0007590698000002
  • Figure 0007590698000003
    Figure 0007590698000003
Patent Text Reader

Abstract

This method for manufacturing a glass plate package PB is provided with: a position measurement step for measuring the position of a pallet P by a measurement device 25; and a correction step for controlling, on the basis of information about the position of the pallet P measured in the position measurement step, a loading device 8 by a control device 9 so as to correct the loading position of a glass plate G with respect to the pallet P.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method and an apparatus for producing a glass sheet package in which glass sheets are loaded onto a pallet. [Background technology]

[0002] As is well known, when storing or transporting glass plates, glass plate laminates formed by alternately laminating protective sheets and glass plates may be loaded onto a pallet in a vertical position (approximately vertical position) or a horizontal position (approximately horizontal position) to form a glass plate package, and this operation is automated by a packaging device.

[0003] For example, Patent Document 1 discloses a packaging device including a glass plate supplying device having a supply station, a transfer device for transferring the glass plate to a loading station, a protective sheet supplying device for supplying a protective sheet to the loading station, a loading device for loading the glass plate and the protective sheet, and a packaging pallet device having a loading station on which a pallet is placed.

[0004] In the method for manufacturing a glass sheet package by this packaging device, first, a glass sheet supplied to a supply station by a glass sheet supply device is transferred to a loading station by a transfer device, and a protective sheet is superimposed on the glass sheet at the loading station. Then, the glass sheet and the protective sheet are loaded from the loading station onto a pallet at the loading station by a loading device. In this way, a glass sheet package is formed in which a plurality of glass sheets and a plurality of protective sheets are alternately stacked on the pallet.

[0005] The glass sheet package is then removed from the loading station and a new empty pallet is placed in its place. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2010-93022 A Summary of the Invention [Problem to be solved by the invention]

[0007] In a conventional method for manufacturing a glass sheet package, when an empty pallet is placed in a loading station, the pallet may be slightly misaligned from a predetermined position. If the pallet is misaligned, the glass sheets cannot be loaded onto the pallet with high accuracy, and the glass sheets are loaded onto the pallet in a misaligned state. In this case, the commercial value of the glass sheets is significantly reduced, so the glass sheets must be removed from the pallet and reloaded onto the pallet. As a result, the manufacturing efficiency is significantly reduced.

[0008] For this reason, in the past, a worker had to visually check whether the glass plate initially placed on the pallet was in the correct position. If the glass plate was misaligned, the worker had to correct the loading position of the glass plate by the loading device and the position of the pallet. These operations required the packaging device to be stopped, which reduced productivity.

[0009] The present invention has been made in view of the above circumstances, and has as its technical object to load glass sheets onto a pallet efficiently and accurately. [Means for solving the problem]

[0010] The present invention is intended to solve the above-mentioned problems, and is characterized in that it provides a method for manufacturing a glass plate package by loading glass plates onto a pallet using a loading device, comprising: a position measurement process for measuring the position of the pallet using a measuring device; and a correction process for controlling the loading device using a control device to correct the loading position of the glass plate relative to the pallet based on position information of the pallet measured in the position measurement process.

[0011] According to this configuration, in the position measurement step, the position of the pallet is measured by the measuring device, so that the position of the pallet can be accurately identified even if the pallet is placed displaced from the intended position (reference position). In addition, in the correction step, the control device controls the loading device so as to correct the loading position of the glass plate relative to the pallet based on the position information of the pallet measured in the position measurement step, so that the glass plate can be loaded at an optimal position set for the pallet even if the pallet is placed displaced from the intended position. This eliminates the need for a worker to check and correct the positions of the glass plate and the pallet while the loading device is stopped, as in the conventional method. As described above, according to this method, it is possible to load the glass plate efficiently and accurately onto the pallet.

[0012] The loading device may include a holding portion for holding the glass plate, and the measuring device may be attached to the holding portion. By integrating the measuring device with the holding portion of the loading device, it is possible to simplify the equipment.

[0013] The holding unit may include a rectangular main body including a first side and a second side forming a predetermined angle with respect to the first side, and the measuring device may include a first measuring unit and a second measuring unit arranged corresponding to the first side, and a third measuring unit arranged corresponding to the second side. This makes it possible to accurately measure position information such as the position of the pallet in the horizontal direction and the levelness of the pallet.

[0014] The measuring device may include a fourth measuring unit disposed in correspondence with the second side, thereby enabling the position of the pallet to be measured efficiently.

[0015] In the method, the pallet may be configured to support the glass sheet in a vertical position, the pallet may have a bottom surface that supports a lower end of the glass sheet, and the measuring device may have a measuring unit that measures the position of the bottom surface. By measuring the position of the bottom surface of the pallet with the measuring unit of the measuring device, it becomes possible to efficiently and accurately place the glass sheet on the bottom surface.

[0016] The present invention is intended to solve the above-mentioned problems, and is characterized in that an apparatus for manufacturing a glass plate package by loading glass plates onto a pallet comprises a measuring device for measuring the position of the pallet, a loading device for loading the glass plates onto the pallet, and a control device for controlling the loading device to correct the loading position of the glass plates relative to the pallet based on position information of the pallet measured by the measuring device.

[0017] According to this configuration, by measuring the position of the pallet with the measuring device, the position of the pallet can be accurately identified even if the pallet is placed displaced from the intended position (reference position). Furthermore, by controlling the loading device with the control device so as to correct the loading position of the glass plate relative to the pallet based on the position information of the pallet measured by the measuring device, the glass plate can be loaded at an optimal position set for the pallet even if the pallet is placed displaced from the intended position. This eliminates the need for a worker to check and correct the positions of the glass plate and the pallet while the loading device is stopped, as in the conventional case. As described above, according to this device, it is possible to efficiently and accurately load the glass plate onto the pallet. Effect of the Invention

[0018] According to the present invention, glass plates can be loaded onto a pallet efficiently and accurately. [Brief description of the drawings]

[0019] [Figure 1] FIG. 2 is a plan view of the manufacturing apparatus for a glass plate package in the first embodiment. [Diagram 2] FIG. 2 is a side view of a manufacturing apparatus for a glass plate package. [Diagram 3] FIG. 4 is a plan view of a holding portion of the loading device. [Figure 4] FIG. 2 is a functional block diagram of a control device. [Diagram 5]1 is a flowchart showing a method for manufacturing a glass plate package. [Figure 6] FIG. 11 is a side view of the transfer device in a transfer process. [Figure 7] FIG. 11 is a perspective view of a glass plate and a protective sheet in a transfer process. [Figure 8] FIG. 11 is a side view of the loading device in a position measuring step of the loading process. [Figure 9] FIG. 13 is a plan view of the loading device in a position measuring step of the loading process. [Figure 10] FIG. 13 is a plan view of the loading device in a position measuring step of the loading process. [Figure 11] FIG. 13 is a plan view of the loading device in a position measuring step of the loading process. [Figure 12] FIG. [Figure 13] FIG. 11 is a perspective view of a measuring device according to a second embodiment. [Figure 14] FIG. 11 is a side view of a loading device and a pallet according to a third embodiment. [Figure 15] FIG. 2 is a front view of the loading device and the pallet. [Figure 16] FIG. 11 is a front view of the loading device and the pallet in a position measuring step of the loading process. [Figure 17] FIG. 11 is a front view of the loading device and the pallet in a position measuring step of the loading process. [Figure 18] FIG. 13 is a front view of the loading device and the pallet in a position measuring step of the loading process. [Figure 19] FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Figures 1 to 12 show a first embodiment of a method and apparatus for producing a glass plate package according to the present invention.

[0021] The manufacturing apparatus according to the present invention forms a glass plate package PB by alternately stacking a plurality of glass plates G and protective sheets PS on a pallet P. The glass plates G to be packaged are rectangular, but the shape of the glass plates G is not limited to this embodiment. The glass plates G have a first main surface Ga and a second main surface Gb, which are in a front-back relationship, and an end surface Gc connecting the first main surface Ga and the second main surface Gb.

[0022] The pallet P is configured to have a rectangular shape (e.g., a rectangular shape) in a plan view. The pallet P includes a first side Pa, a second side Pb and a third side Pc that are perpendicular to the first side Pa, and a fourth side Pd that is parallel to the first side Pa. The pallet P also includes a metal base BA and a cushioning member BM provided on an upper surface of the base BA.

[0023] As shown in Figures 1 and 2, the manufacturing apparatus 1 includes a conveying line 2 for conveying a glass plate G, and a packaging line 3 for loading the glass plate G conveyed by the conveying line 2 onto a pallet P to form a glass plate package PB.

[0024] The transfer line 2 includes a conveyor 4 for transferring the glass sheet G. The conveyor 4 includes a supply station 5 from which the glass sheet G can be removed.

[0025] The conveyor 4 is composed of various conveyors such as a floating conveyor, a roller conveyor, and the like. The floating conveyor has a floating part such as an air float that floats the glass sheet G by blowing air, and a feeding part such as a roller that contacts the edge of the glass sheet G to feed the glass sheet G. The conveyor 4 aligns a plurality of glass sheets G in a line and conveys them.

[0026] On the conveyor line 2, an inspection is carried out on the glass sheets G. The inspected glass sheets G are loaded onto pallets P on the packaging line 3.

[0027] The packaging line 3 includes a transfer device 6 that removes the glass plate G from the conveying line 2, a protective sheet supplying device 7 that supplies the protective sheet PS, a loading device 8 that loads the glass plate G and the protective sheet PS onto a pallet P, and a control device 9 that controls each of the devices 6 to 8.

[0028] The transfer device 6 includes a base 10, a guide rail 11 that guides the base 10 so that the base 10 can move back and forth in a straight line, and a robot arm 12 disposed on the base 10.

[0029] The robot arm 12 has an articulated structure and is equipped with a holding section 13 at its tip for holding a glass plate G. The holding section 13 is equipped with a main body section 14 and a plurality of suction pads 15 provided on the main body section 14. The main body section 14 is equipped with a plurality of columnar sections 16 arranged in parallel with a gap between them. The columnar sections 16 are hollow and each equipped with a plurality of suction pads 15.

[0030] The robot arm 12 transfers the glass sheet G held by the holding portion 13 from the supply station 5 of the conveyor line 2 to a supply position of the protective sheet PS in the protective sheet supply device 7. At that time, the robot arm 12 can perform an operation of reversing the up-down orientation of the first main surface Ga and the second main surface Gb of the glass sheet G (inversion operation) and an operation of changing the orientation of the glass sheet G (rotation operation). Note that the supply station 5 has a structure that allows the suction pad 15 and the columnar portion 16 of the transfer device 6 to be inserted below the glass sheet G, as shown in FIG. 2.

[0031] The protective sheet supplying device 7 pulls out a strip-shaped sheet from the original roll R and cuts the strip-shaped sheet to a predetermined size to form a single-leaf protective sheet PS. The protective sheet supplying device 7 includes a loading station 17 which serves as a supply position for the protective sheet PS and also as a loading position for the glass plate G transferred by the transfer device 6, and a cutter (e.g., a rotary cutter or a guillotine cutter) which cuts the strip-shaped sheet. Note that, for example, glass interleaving paper is used as the protective sheet PS, but the material and structure of the protective sheet PS are not limited to those of this embodiment.

[0032] 1 and 2, the loading device 8 includes a base 18, a guide rail 19 that guides the base 18 so that it can move back and forth in a straight line, and a robot arm 20 that is disposed on the base 18. The robot arm 20 has a multi-joint structure, and includes a holding portion 21 at its tip for holding both the glass plate G and the protective sheet PS.

[0033] 1 to 3, the holder 21 includes a rectangular main body 22. The main body 22 is configured as a frame having a lattice shape. The main body 22 includes a first side 22a, a second side 22b and a third side 22c that form a predetermined angle (e.g., 90°) with respect to the first side 22a, and a fourth side 22d that is parallel to the first side 22a.

[0034] The main body 22 includes a plurality of suction pads 23 for holding the glass plate G, a clamp unit 24 for holding the protective sheet PS, and a measuring device 25 for measuring the position of the pallet P.

[0035] The suction pads 23 are provided at predetermined intervals on one surface of the main body 22, and are adsorbed to a surface (e.g., a second main surface Gb) of the glass plate G placed on the protective sheet PS. The clamp unit 24 holds the protective sheet PS by gripping an edge of the protective sheet PS placed on the placement station 17. The clamp unit 24 is supported by a support frame 26 fixed to the main body 22.

[0036] As shown in Figures 2 and 3, the measuring device 25 is attached to the main body 22 and includes a first measuring unit 25a and a second measuring unit 25b that are arranged corresponding to the first side 22a of the main body 22, and a third measuring unit 25c and a fourth measuring unit 25d that are arranged corresponding to the second side 22b of the main body 22.

[0037] The first measuring unit 25a and the second measuring unit 25b are arranged at a predetermined interval along the first side 22a of the main body 22. The third measuring unit 25c and the fourth measuring unit 25d are arranged at a predetermined interval along the second side 22b of the main body 22. Each of the measuring units 25a to 25d is configured with a laser sensor, but is not limited to this configuration and may be configured with a camera or other devices.

[0038] The control device 9 includes a computer (control panel, PC, etc.) that implements various hardware such as a CPU, ROM, RAM, HDD, monitor, input / output interface, etc. As shown in Fig. 4, the control device 9 includes a calculation processing unit 27 that executes various calculations, a memory unit 28 that stores various data, and a communication unit 29 that executes communication with the transfer device 6, the protective sheet supply device 7, the loading device 8, etc. These components 27 to 29 are connected to each other by a bus.

[0039] The calculation processing unit 27 executes calculation processing related to the control of the transfer operation of the glass plate G by the transfer device 6, the supply operation of the protective sheet PS by the protective sheet supply device 7, the loading operation of the glass plate G by the loading device 8, and the position measurement of the pallet P by the measuring device 25.

[0040] The memory unit 28 stores data and programs necessary for control by the calculation processing unit 27. For example, the memory unit 28 stores control programs related to the transfer device 6, the protective sheet supply device 7, and the loading device 8, position data of the pallet P measured by the measuring device 25, data related to the reference position of the pallet P, etc. The memory unit 28 stores coordinate data of a three-dimensional coordinate system (XYZ Cartesian coordinate system) related to the operation of the robot arm 12 of the transfer device 6 and the robot arm 20 of the loading device 8. The reference position of the pallet P stored in the memory unit 28 is set in this three-dimensional coordinate system.

[0041] The communication unit 29 is communicatively connected to the transfer device 6, the protective sheet supply device 7, and the loading device 8. The communication unit 29 transmits control signals processed by the arithmetic processing unit 27 to each of the devices 6 to 8. The communication unit 29 is communicatively connected to the robot arm 20 of the loading device 8 and the measuring device 25.

[0042] Hereinafter, a method for producing the glass plate package PB using the production apparatus 1 having the above-mentioned configuration will be described.

[0043] As shown in FIG. 5, the method includes a glass sheet transporting step S1, a transfer step S2, a loading step S3, and a package transporting step S4.

[0044] In the glass sheet transport step S1, the glass sheet G undergoes a predetermined inspection while being transported by the conveyor 4 of the transport line 2. In this embodiment, the first main surface Ga of the glass sheet G is a quality assurance surface (product surface), and in the glass sheet transport step S1, the glass sheet G is transported with the first main surface Ga facing upward.

[0045] The positions and number of defects on the surface (first main surface Ga) and inside of the glass sheet G are detected in the process of being transported by the conveyor 4. In the glass sheet transport step S1, the conveyor 4 places the inspected glass sheet G in a supply station 5.

[0046] In the transfer step S2, the protective sheet PS is supplied to the loading station 17 of the protective sheet supply device 7. Thereafter, the transfer device 6 holds the glass plate G arranged in the supply station 5 with the holding part 13 and transfers it to the loading station 17.

[0047] 6, the transfer device 6 places the holder 13 below the glass plate G placed in the supply station 5, and adsorbs the lower surface (second main surface Gb) of the glass plate G with the suction pad 15 of the holder 13. Thereafter, the transfer device 6 operates the robot arm 12 to invert the glass plate G, changes the orientation of the glass plate G, and moves it to the placement station 17.

[0048] 1 and 7, the glass sheet G transported by the conveyor 4 is placed in the supply station 5 with its long side aligned along the transport direction, but when transferred to the placement station 17, it is placed so that its long side is aligned along a direction perpendicular to the transport direction. In addition, the glass sheet G placed on the placement station 17 is placed in a state in which the second main surface Gb faces upward and the first main surface Ga faces downward due to the inversion operation of the robot arm 12 in the transfer step S2. Therefore, the glass sheet G superimposed on the protective sheet PS in the placement station 17 is placed in a state in which the first main surface Ga is in contact with the protective sheet PS.

[0049] In the loading step S3, before loading the glass sheet G on the pallet P, a preparation step is performed to measure the position of the pallet P and adjust the position of the glass sheet G to be placed on the pallet P. The preparation step includes a position measurement step of measuring the position of the pallet P, and a correction step of correcting the loading position of the glass sheet G with respect to the pallet P based on the position of the pallet P measured in the position measurement step.

[0050] 8, in the position measurement step, the control device 9 drives the robot arm 20 of the loading device 8 to move the main body 22 to the pallet P. The main body 22 is placed at a measurement reference position above the pallet P in a state in which it does not hold the glass plate G and the protective sheet PS. With the main body 22 placed at the measurement reference position, the measuring units 25a to 25d of the measuring device 25 are located inside a rectangle defined by the first side Pa to the fourth side Pd of the pallet P in a plan view.

[0051] When the main body 22 reaches the measurement reference position, the control device 9 controls the robot arm 20 to move the main body 22 from the measurement reference position, and the measurement device 25 starts measuring the position of the pallet P.

[0052] In the position measurement process, the robot arm 20 moves the main body 22 up and down, and each measuring unit 25a to 25d of the measuring device 25 measures the change in distance in the vertical direction (Z-axis direction) to the top surface of the pallet P (top surface of the buffer material BM) (see Figure 8).

[0053] As shown in FIGS. 9 and 10, in the position measuring step, the robot arm 20 moves the main body 22 in the horizontal direction from the measurement reference position, and measures the position of the pallet P in the horizontal direction.

[0054] 9, as the main body 22 moves in the horizontal direction (X-axis direction), the first measuring unit 25a and the second measuring unit 25b move, in a plan view, from the inside to the outside of a rectangle formed by the sides Pa to Pd of the pallet P. At this time, the first measuring unit 25a and the second measuring unit 25b pass above the first side Pa of the pallet P and detect the first side Pa.

[0055] 10, as the main body 22 moves in the horizontal direction (Y-axis direction), the third measurement unit 25c and the fourth measurement unit 25d move, in a plan view, from the inside to the outside of a rectangle formed by the sides Pa to Pd of the pallet P. At this time, the third measurement unit 25c and the fourth measurement unit 25d pass above the second side Pb of the pallet P and detect the second side Pb.

[0056] 11, the robot arm 20 rotates the main body 22, which is at the measurement reference position, around a rotation axis O along the vertical direction (Z-axis direction) by operating the wrist joint. As a result, the second measurement unit 25b and the third measurement unit 25c detect the positions of the first side Pa and the second side Pb of the pallet P related to the rotation operation around the rotation axis O.

[0057] Each of the measuring units 25a to 25d transmits position information (measurement data) of the measured pallet P to the control device 9. When the communication unit 29 of the control device 9 receives the measurement data from the measuring units 25a to 25d, the calculation processing unit 27 starts a correction process.

[0058] In the correction step, the calculation processing unit 27 of the control device 9 calculates the inclination angle (levelness) of the upper surface with respect to the horizontal direction from data related to the distance between each of the measuring units 25a-25d in the vertical direction and the upper surface of the pallet P. The calculation processing unit 27 calculates the amount of deviation from the reference position of the pallet P based on position information (movement distance of each of the measuring units 25a-25d) of the first side Pa and the second side Pb of the pallet P when each of the measuring units 25a-25d moves in the horizontal direction and when it rotates around the rotation axis O, and based on the reference position data stored in the memory unit .

[0059] That is, the arithmetic processing unit 27 can calculate the amount of horizontal positional deviation of the pallet P from the reference position from the difference between a measurement value when the main body 22 (measuring device 25) is moved in the horizontal direction and a value related to the reference position. Also, the arithmetic processing unit 27 can calculate the amount of positional deviation (amount of tilt deviation) of the pallet P about the rotation axis O from the difference between a measurement value when the main body 22 (measuring device 25) is rotated about the rotation axis O and a value related to the reference position stored in the memory unit 28.

[0060] The calculation processing unit 27 corrects data on the loading position of the glass sheet G with respect to the pallet P, based on the calculated positional deviation amount of the pallet P. The control device 9 transmits a control signal to the robot arm 20 so that the glass sheet G is transported to the corrected loading position.

[0061] Thereafter, as shown in FIG. 12, the loading device 8 holds the glass plate G and the protective sheet PS placed on the placement station 17 by the holding portion 21 of the robot arm 20, and transfers them to the loading station 30.

[0062] Specifically, the loading device 8 positions the holding unit 21 above the loading station 17 by the operation of the robot arm 20, and then lowers the holding unit 21 to adsorb the second main surface Gb of the glass plate G with the suction pad 23. Furthermore, the loading device 8 causes the clamp unit 24 of the holding unit 21 to grip the edge of the protective sheet PS. As a result, the glass plate G and the protective sheet PS overlapped on the loading station 17 are held by the holding unit 21.

[0063] Thereafter, the loading device 8 drives the robot arm 20 to move the holding unit 21 to the loading station 30. At this time, the robot arm 20 changes the orientation of the glass plate G and the protective sheet PS held by the holding unit 21 by the operation of its wrist joint, etc. As shown by the two-dot chain line in FIG. 12, the loading device 8 places the holding unit 21 above the pallet P. At this time, the robot arm 20 places the main body unit 22 based on the corrected position information received from the control device 9. Thereafter, the robot arm 20 lowers the holding unit 21 to bring it closer to the pallet P.

[0064] Thereafter, the loading device 8 releases the suction of the glass plate G by the suction pads 23 of the holding units 21 and the grip of the protective sheet PS by the clamp units 24. As a result, the first glass plate G is placed on the upper surface of the buffer member BM of the pallet P together with the protective sheet PS.

[0065] The glass sheet G placed on the pallet P is in a state where its orientation is rotated by 90° in a plan view compared to when it was placed on the placement station 17.

[0066] Thereafter, the robot arm 20 holds the second glass plate G and the protective sheet PS placed on the placement station 17, and places this second glass plate G on the first glass plate G placed on the pallet P. When a predetermined number of glass plates G have been loaded onto the pallet P, the loading step S3 ends, and a glass plate package PB is formed in which a plurality of glass plates G and protective sheets PS are alternately stacked on the pallet P.

[0067] In the package transport step S4, the glass sheet package PB is transported to the outside through a package transport path (not shown) by using a transport means such as a hand lifter, a forklift, or an automatic guided vehicle (AGV).

[0068] A new empty pallet P is carried into the loading station 30 from which the glass plate package PB has been carried out (pallet supplying step). The new empty pallet P supplied to the loading station 30 is measured by the measuring device 25 in the next position measuring step.

[0069] According to the manufacturing apparatus 1 and manufacturing method for the glass plate package PB of this embodiment described above, by measuring the position of the pallet P using the measuring device 25 in the position measurement process of the loading process S3, the position of the pallet P can be accurately identified even if the pallet P is positioned offset from the reference position.

[0070] Furthermore, in a correction step related to the loading step S3, the control device 9 controls the loading device 8 so as to correct the loading position of the glass sheet G relative to the pallet P based on the position information of the pallet P measured in the position measurement step (measuring device 25). Therefore, even if the pallet P is placed deviated from the reference position, the glass sheet G can be loaded at an optimal position set for the pallet P. This eliminates the need for a worker to check and correct the position of the pallet P with the loading device 8 stopped, as in the conventional case. Therefore, according to the present invention, it is possible to load the glass sheet G onto the pallet P efficiently and accurately.

[0071] 13 shows a second embodiment of the manufacturing method and device for a glass plate package according to the present invention. In this embodiment, the aspects of the measuring device and the loading step are different from those in the first embodiment.

[0072] In the manufacturing apparatus for a glass sheet package according to this embodiment, the measuring device 25 is not provided in the holding unit 21 of the loading device 8. In this embodiment, the measuring device 25 is provided in a loading station 30 independent of the loading device 8. Except for the configuration of the measuring device 25, the manufacturing apparatus according to the second embodiment includes the conveying line 2 and the packing line 3, similarly to the first embodiment.

[0073] As shown in Fig. 13, the measuring device 25 includes a first measuring unit 25a, a second measuring unit 25b, and a third measuring unit 25c. Each measuring unit 25a-25c is configured to be movable three-dimensionally by a moving mechanism. Each measuring unit 25a-25c can move between a standby position (position indicated by a two-dot chain line) away from the pallet P and a measuring position (position indicated by a solid line) where the position of the pallet P can be measured. Each measuring unit 25a-25c is configured by a camera, but may be configured by a laser sensor or other device. Each measuring unit 25a-25c is connected to the control device 9 so as to be able to communicate with each other.

[0074] The first measurement unit 25a, at its measurement position, takes an image of a first side Pa of the pallet P. The second measurement unit 25b, at its measurement position, takes an image of a second side Pb of the pallet P. The third measurement unit 25c, at its measurement position, takes an image of a fourth side Pd of the pallet P.

[0075] In the manufacturing method of the glass plate packaged body PB according to this embodiment, in the loading step S3, each of the measuring units 25a to 25c receives a control signal from the control device 9 and moves from a standby position to a measurement position. Each of the measuring units 25a to 25c measures (images) the position of the pallet P (the positions of the first side Pa, the second side Pb, and the fourth side Pd) at the measurement position. Image data captured by each of the measuring units 25a to 25c is transmitted to the control device 9. When the measurement is completed, each of the measuring units 25a to 25c moves from the measurement position to a standby position.

[0076] The calculation processing unit 27 of the control device 9 performs image processing on the image data received from each of the measurement units 25a to 25c to identify the position of the pallet P. The calculation processing unit 27 compares the measured position information of the pallet P with a value related to a reference position, and calculates the amount of positional deviation of the pallet P from the reference position.

[0077] The control device 9 corrects data on the loading position of the glass plate G by the robot arm 20 of the loading device 8, based on the amount of deviation of the pallet P from the reference position. The control device 9 transmits a control signal related to the corrected position data to the robot arm 20. The robot arm 20 loads the held glass plate G and protective sheet PS onto the pallet P, based on the corrected position data received from the control device 9.

[0078] 14 to 19 show a third embodiment of the manufacturing method and device for manufacturing a glass plate package according to the present invention. In this embodiment, the aspects of the pallet, the measuring device, and the loading step are different from those in the first embodiment.

[0079] The glass sheet package according to this embodiment is manufactured by loading glass sheets G in a vertical position on a pallet P. The pallet P has side surfaces SS supporting the surfaces (first main surfaces Ga) of the glass sheets G in the vertical position, and bottom surfaces BS1 and BS2 supporting the lower ends of the glass sheets G.

[0080] As shown in Fig. 14, the side surface SS of the pallet P is inclined at a predetermined angle (e.g., 1° to 60°) with respect to the vertical direction (Z-axis direction). As shown in Fig. 15, the side surface SS is configured, for example, in a rectangular shape, but is not limited to this shape. The side surface SS has a first side SSa, a second side SSb and a third side SSc that are perpendicular to the first side SSa, and a fourth side SSd that is approximately parallel to the first side SSa.

[0081] The bottom surfaces BS1 and BS2 of the pallet P are inclined at a predetermined angle with respect to the horizontal direction (Y-axis direction). The bottom surfaces BS1 and BS2 include a first bottom surface BS1 and a second bottom surface BS2 that are provided at a predetermined interval. The angle between each of the bottom surfaces BS1 and BS2 and the side surface SS is approximately 90°, but is not limited to this.

[0082] The measuring device 25 of the loading device 8 includes a first measuring unit 25a to a fourth measuring unit 25d that measure the positions of the side surfaces SS of the pallet P, and a fifth measuring unit 25e that measures the positions of the bottom surfaces BS1, BS2 of the pallet P. The configurations of the first measuring unit 25a to the fourth measuring unit 25d are the same as those in the first embodiment.

[0083] The fifth measuring unit 25e is configured by, for example, a laser sensor, but is not limited to this configuration. The fifth measuring unit 25e is configured by two measuring units so as to measure the position of the first bottom surface BS1 and the position of the second bottom surface BS2, but the number of the fifth measuring units 25e is not limited to this embodiment. The fifth measuring unit 25e is fixed to the lower part of the support frame 26 related to the holding unit 21. Without being limited thereto, the fifth measuring unit 25e may be fixed to, for example, the third side 22c of the main body unit 22 related to the holding unit 21.

[0084] Hereinafter, the loading step S3 in the manufacturing method of the glass plate package according to this embodiment will be described. In the position measurement step of the preparation step, the control device 9 controls the robot arm 20 to place the holding part 21 not holding the glass plate G at the first measurement reference position shown in Fig. 14 and Fig. 15. In this case, the third measurement part 25c and the fourth measurement part 25d of the measuring device 25 are located above the second side SSb of the side surface SS of the pallet P. Also, as shown in Fig. 14, the holding part 21 at the first measurement reference position is inclined at the same angle as the inclination angle of the side surface SS so as to be parallel to the side surface SS.

[0085] Next, the control device 9 controls the robot arm 20 to move the holding unit 21 from the first measurement reference position, and starts measuring the position of the pallet P by the measuring device 25. As shown in FIG. 16, the main body 22 of the holding unit 21 moves from the first measurement reference position (position indicated by a two-dot chain line) to a second measurement reference position (position indicated by a solid line) that is set below the first measurement reference position. The holding unit 21 moves downward along a direction approximately parallel to the inclination direction of the side surface SS of the pallet P. In other words, the holding unit 21 moves downward along a direction approximately perpendicular to the bottom surfaces BS1 and BS2 of the pallet P.

[0086] While the holder 21 moves, the third measuring unit 25c and the fourth measuring unit 25d of the measuring device 25 detect the second side SSb of the side surface SS of the pallet P. During this movement, the measuring device 25 also performs measurement of the positions of the bottom surfaces BS1 and BS2 by the fifth measuring unit 25e. The two fifth measuring units 25e measure the change in the distance to the first bottom surface BS1 and the change in the distance to the second bottom surface BS2. Accordingly, the two fifth measuring units 25e can measure the heights (positions in the Z-axis direction) of the bottom surfaces BS1 and BS2 of the pallet P. In addition, the inclination of the bottom surfaces BS1 and BS2 with respect to the X-axis direction (the difference between the height of the first bottom surface BS1 and the height of the second bottom surface BS2) can be measured.

[0087] As shown in FIG. 17, when the holder 21 is placed at the second measurement reference position, the robot arm 20 moves the holder 21 in the horizontal direction (X-axis direction). The first measurement unit 25a and the second measurement unit 25b of the measuring device 25 move from the inside to the outside of a rectangle formed by the sides SSa to SSd of the side surface SS of the pallet P in a front view. At this time, the first measurement unit 25a and the second measurement unit 25b detect the first side SSa of the side surface SS. In addition, the fifth measurement unit 25e detects the horizontal (X-axis) positions of the bottom surfaces BS1 and BS2 of the pallet P. Thereafter, the robot arm 20 moves the holder 21 to the second measurement reference position.

[0088] 18, the robot arm 20 may rotate the main body 22, which is located at the second measurement reference position, about the rotation axis O by operating the wrist joint. This rotation allows the second measurement unit 25b and the third measurement unit 25c of the measuring device 25 to detect the first side SSa and the second side SSb of the side surface SS of the pallet P.

[0089] Furthermore, the robot arm 20 may move (approach or move away) the holding unit 21 (main body 22) located at the second reference position along a direction (Y-axis direction) substantially perpendicular to the side surface SS of the pallet P. Due to this movement of the holding unit 21, the first measurement unit 25a to the fourth measurement unit 25d of the measuring device 25 measure the change in the distance to the side surface SS. During this movement, the fifth measurement unit 25e may detect the position of the bottom surfaces BS1, BS2 of the pallet P in the substantially perpendicular direction (Y-axis direction), and may measure the inclination of the bottom surfaces BS1, BS2 with respect to the substantially perpendicular direction (Y-axis direction).

[0090] Each of the measuring units 25a to 25e transmits position information (measurement data) of the measured pallet P (side surface SS and bottom surfaces BS1, BS2) to the control device 9. When the communication unit 29 of the control device 9 receives the measurement data from the measuring units 25a to 25e, the calculation processing unit 27 starts a correction process.

[0091] In the correction process, the calculation processing unit 27 calculates the inclination angle of the side surface SS from data relating to the distances between the first measuring unit 25a to the fourth measuring unit 25d and the side surface SS of the pallet P. The calculation processing unit 27 also calculates the amount of deviation from the reference position of the pallet P based on the measured position information of the first side SSa and second side SSb of the side surface SS and the data of the reference position stored in the memory unit 28.

[0092] The calculation processing unit 27 calculates the amount of deviation from the reference position of the pallet P based on data relating to the position information (position and inclination in the X-axis direction to the Z-axis direction) of the bottom surfaces BS1, BS2 of the pallet P detected by the fifth measurement unit 25e and the reference position data stored in the memory unit 28.

[0093] The calculation processing unit 27 calculates the amount of positional deviation of the side surface SS around the rotation axis O by the difference between the measurement value when the main body 22 (measuring device 25) is rotated around the rotation axis O and the value related to the reference position stored in the memory unit 28.

[0094] The calculation processing unit 27 corrects data on the loading position of the glass sheet G with respect to the pallet P, based on the calculated positional deviation amount of the pallet P. The control device 9 transmits a control signal to the robot arm 20 so that the glass sheet G is transported to the corrected loading position.

[0095] Thereafter, the loading device 8 holds the glass plate G and protective sheet PS placed in the placement station 17 by the holding portion 21 of the robot arm 20, and transfers them to the loading station 30. As shown by the two-dot chain line in Fig. 19, the robot arm 20 places the glass plate G and protective sheet PS held by the holding portion 21 on the pallet P. In this case, the first main surface Ga of the glass plate G is supported by the side surface SS of the pallet P. In addition, the lower end portion of the glass plate G is supported by the bottom surfaces BS1 and BS2. Thereafter, the loading device 8 loads the second and subsequent glass plates G together with the protective sheets PS onto the pallet P.

[0096] The present invention is not limited to the configuration of the above embodiment, nor is it limited to the above-mentioned effects and advantages. Various modifications of the present invention are possible without departing from the spirit and scope of the present invention.

[0097] The loading device 8 according to the first embodiment includes the measuring device 25 including the first measuring unit 25a to the fourth measuring unit 25d, but the present invention is not limited to this configuration. For example, the measuring device 25 may be configured by omitting one of the measuring units among the first measuring unit 25a to the fourth measuring unit 25d.

[0098] Further, additional measurement units may be provided in the measurement device 25, and a measurement device 25 having more measurement units (five or more) than in the first embodiment or more measurement units (four or more) than in the second embodiment may be used.

[0099] In the correction step of the first embodiment, the arithmetic processing unit 27 of the control device 9 calculates the inclination angle (levelness) from data related to the distance between each of the measuring units 25a to 25d and the top surface of the pallet P in the vertical direction, calculates the horizontal positional deviation of the pallet P from the reference position from the difference between the measured value when the main body unit 22 (measuring device 25) is moved in the horizontal direction and the value related to the reference position, and calculates the positional deviation (inclination deviation) of the pallet P about the rotation axis O from the difference between the measured value when the main body unit 22 (measuring device 25) is rotated around the rotation axis O and the value related to the reference position stored in the storage unit 28, but the present invention is not limited to this configuration. For example, the calculation and / or correction of the inclination angle (levelness) and the positional deviation (inclination deviation) of the pallet P about the rotation axis O may be omitted. Moreover, the measurement while rotating main body 22 (measuring device 25) around rotation axis O may be omitted, and the positional deviation (tilt deviation) of pallet P around rotation axis O may be calculated from the measurement value when main body 22 (measuring device 25) is moved horizontally. The tilt angle (levelness) may be calculated from the result of having each measuring unit 25a-25d of measuring device 25 measure the distance in the vertical direction (Z-axis direction) to the top surface of pallet P (top surface of buffer material BM) without moving main body 22 up and down.

[0100] In the first and second embodiments, the loading device 8 loads the glass plate G and the protective sheet PS simultaneously onto the pallet P, but the present invention is not limited to this configuration. For example, the loading device 8 may load the glass plate G and the protective sheet PS in that order onto the pallet P. Alternatively, the loading device 8 may include a first loading device for loading the glass plate G and a second loading device for loading the protective sheet PS.

[0101] In the third embodiment, the amount of misalignment of the side surface SS and bottom surfaces BS1, BS2 of the pallet P is calculated, but only one of them may be calculated. The amount of misalignment of the bottom surfaces BS1, BS2 may be measured by appropriately selecting from the positions in the X-axis direction to the Z-axis direction, and the inclinations with respect to the X-axis direction and the Y-axis direction, in other words, some of the measurements may be omitted. For example, if a certain degree of misalignment of the glass plate in the Y-axis direction is allowed, the measurements of the position in the Y-axis direction and the inclination with respect to the Y-axis direction may be omitted. [Explanation of symbols]

[0102] 1. Glass sheet packaging manufacturing equipment 8 Loading device 9. Control Device 21 Holding part 22 Main body 22a First side of main body 22b Second side of main body 25 Measuring Equipment 25a First measuring section 25b Second measuring section 25c Third measurement section 25d Fourth measuring section 25e Fifth measuring section BS1 first bottom BS2 second bottom G Glass plate P Palette PB Glass Sheet Packaging

Claims

1. A method for producing a glass sheet package by loading glass sheets onto a pallet using a loading device, comprising: a position measuring step of measuring the position of the pallet by a measuring device; A correction process of controlling the loading device by a control device so as to correct the loading position of the glass plate relative to the pallet based on the position information of the pallet measured in the position measurement process, The pallet includes a support surface that supports a main surface of the glass sheet, a first side that is an end side of the support surface, and a second side that intersects with the first side, A method for manufacturing a glass plate package, characterized in that in the position measuring process, the measuring device measures the position of the support surface of the pallet, the position of the first edge of the pallet, and the position of the second edge of the pallet.

2. The loading device includes a holding portion for holding the glass plate, The method for manufacturing a glass plate package according to claim 1 , wherein the measuring device is attached to the holding portion.

3. The holding portion includes a rectangular body portion, The main body portion includes a first side and a second side that forms a predetermined angle with respect to the first side, the measuring device includes a first measuring unit and a second measuring unit arranged corresponding to the first side of the main body portion, and a third measuring unit arranged corresponding to the second side of the main body portion; The first measuring unit and the second measuring unit measure the position of the first side of the pallet, The method for manufacturing a glass plate package according to claim 2 , wherein the third measuring section measures a position of the second side of the pallet.

4. The method for manufacturing a glass plate package according to claim 3 , wherein the measuring device includes a fourth measuring unit disposed in correspondence with the second side.

5. The pallet is configured to support the glass sheet in a vertical position; The pallet has a bottom surface that supports a lower end of the glass sheet, The method for manufacturing a glass plate package according to claim 1 , wherein the measuring device includes a measuring unit for measuring a position of the bottom surface.

6. An apparatus for manufacturing a glass sheet package by loading glass sheets onto a pallet, a measuring device for measuring the position of the pallet; A loading device for loading the glass plates onto the pallet; A control device that controls the loading device so as to correct the loading position of the glass plate relative to the pallet based on position information of the pallet measured by the measuring device, The pallet includes a support surface that supports a main surface of the glass sheet, a first side that is an end side of the support surface, and a second side that intersects with the first side, A manufacturing apparatus for a glass plate package, characterized in that the measuring device measures the position of the support surface of the pallet, the position of the first side of the pallet, and the position of the second side of the pallet.

7. A method for producing a glass sheet package by loading glass sheets onto a pallet by a loading device, comprising: a position measuring step of measuring the position of the pallet by a measuring device; A correction process of controlling the loading device by a control device so as to correct the loading position of the glass plate relative to the pallet based on the position information of the pallet measured in the position measurement process, The loading device includes a holding portion for holding the glass plate, The measuring device is attached to the holding part, The holding portion includes a rectangular body portion, The main body portion includes a first side and a second side that forms a predetermined angle with respect to the first side, A method for manufacturing a plate packaging body, characterized in that the measuring device has a first measuring section and a second measuring section arranged corresponding to the first side, and a third measuring section and a fourth measuring section arranged corresponding to the second side.

Citation Information

Patent Citations

  • Loading location correcting method to pallet and device thereof

    JP1998181872A

  • Method and apparatus of loading pallet with glass plate

    JP2007000940A

  • Plate-like work transfer installation and method

    JP2010030744A

  • Glass substrate packaging apparatus and glass substrate packaging method

    JP2010093022A