Absorption chiller
By strategically managing refrigerant and absorption liquid mixing through controlled valve and pump operations, the absorption refrigerator addresses capacity loss and restart delays, ensuring rapid restarts and freezing prevention during extended shutdowns.
Patent Information
- Application Number
- JP2021124399
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-07-29
- Publication Date
- 2024-11-27
- Estimated Expiration
- 2041-07-29
AI Technical Summary
Absorption refrigerators face issues with refrigerating capacity decrease and prolonged restart times due to mixing refrigerant and absorption liquid during long-term shutdowns, necessitating lengthy discharge processes.
The absorption refrigerator incorporates control valves and pumps to manage the mixing of refrigerant and absorption liquid, allowing for controlled mixing and reduction of refrigerant in the evaporator before and during shutdowns to prevent freezing and expedite restarts.
This approach effectively lowers the freezing point of the evaporator liquid, reducing the amount of mixed liquid, thereby shortening the time required for restart and preventing freezing during long-term shutdowns.
Smart Images

Figure 0007590938000001 
Figure 0007590938000002 
Figure 0007590938000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an absorption chiller. [Background technology]
[0002] Conventionally, there is known an absorption chiller that supplies an absorbing liquid to an evaporator during operation (see Patent Document 1). According to this absorption chiller, by supplying an absorbing liquid having a lower freezing point than a refrigerant (e.g., water) to the evaporator, the possibility of freezing in the evaporator is reduced, and the evaporator is controlled at a lower temperature, making it possible to operate the evaporator at, for example, a sub-zero temperature. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2003-4330 A Summary of the Invention [Problem to be solved by the invention]
[0004] The absorption chiller described in Patent Document 1 supplies an absorbing liquid to an evaporator during operation. Here, the inventors of the present invention have studied how to prevent freezing during a long period of shutdown by mixing the refrigerant and the absorbing liquid while the operation of the absorption chiller is stopped.
[0005] However, if an absorption chiller is operated with the refrigerant and the absorbing liquid still mixed in the evaporator, the refrigeration capacity will decrease. Therefore, when restarting an absorption chiller after a long stop, it is necessary to drain the absorbing liquid, and if the time required for this drainage is long, restarting the chiller will take a long time.
[0006] The present invention has been made to solve such problems, and an object of the present invention is to provide an absorption chiller that can prevent freezing during long-term shutdown and can replace the refrigerant with the absorbing liquid in a short time when restarting the machine. [Means for solving the problem]
[0007] The absorption chiller of the present invention comprises a refrigeration cycle section having a regenerator, a condenser, an evaporator, and an absorber, a first supply flow path for supplying absorbing liquid in the absorber into the evaporator, a first control valve for opening and closing the first supply flow path, a first pump for generating power for supplying the absorbing liquid in the absorber into the evaporator, and a control means for controlling opening and closing of the first control valve and operation of the first pump, wherein the control means mixes the refrigerant in the evaporator with the absorbing liquid by opening the first control valve and operating the first pump after operation is stopped, and comprises a second supply flow path for supplying the liquid in the evaporator into the absorber, a second control valve for opening and closing the second supply flow path, and a second pump for generating power for supplying the liquid in the evaporator into the absorber, and the control means opens the second control valve and operates the second pump before opening the first control valve and operating the first pump after operation is stopped. Effect of the Invention
[0008] According to the present invention, the refrigerant in the evaporator is mixed with the absorbing liquid by opening the first control valve and operating the first pump after the operation is stopped, so that the refrigerant and the absorbing liquid are mixed and the freezing point is lowered, and the liquid in the evaporator is less likely to freeze. Furthermore, after the operation is stopped, the second control valve is opened and the second pump is operated before the first control valve is opened and the first pump is operated, so that the amount of refrigerant in the evaporator is first reduced. As a result, it is possible to reduce the amount of absorbing liquid to be mixed with the refrigerant in the evaporator, and at the time of restarting, it is only necessary to discharge the absorbing liquid from the relatively small amount of mixed liquid in the evaporator, and the time required for restarting can be shortened. Therefore, freezing during a long stop can be prevented, and at the time of restarting, the refrigerant can be replaced with the absorbing liquid in a shorter time. [Brief description of the drawings]
[0009] [Figure 1]1 is a configuration diagram showing an absorption chiller according to an embodiment of the present invention. [Diagram 2] 4 is a flowchart showing the operation of the absorption chiller according to the present embodiment. [Diagram 3] FIG. 4 is a state diagram showing a first stage of the anti-freeze operation of the absorption chiller according to the present embodiment. [Figure 4] FIG. 4 is a state diagram showing a second stage of the antifreeze operation of the absorption chiller according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] The present invention will be described below along with preferred embodiments. Note that the present invention is not limited to the embodiments shown below, and can be modified as appropriate within the scope of the present invention. In addition, in the embodiments shown below, some configurations are omitted from illustration and description, but it goes without saying that publicly known or well-known technologies are appropriately applied to the details of the omitted technologies within the scope of no contradiction with the contents described below.
[0011] Fig. 1 is a configuration diagram showing an absorption chiller according to this embodiment. As shown in Fig. 1, the absorption chiller 1 includes a refrigeration cycle unit 10, various pipes L1 to L8, pumps P1 to P3, a heat exchanger 20, a control device (control means) 30, and an outside air temperature sensor T.
[0012] The refrigeration cycle unit 10 includes a regenerator 11, a condenser 12, an evaporator 13, and an absorber 14. The absorption chiller 1 obtains cold water through a refrigeration cycle of the regenerator 11, the condenser 12, the evaporator 13, and the absorber 14.
[0013] The regenerator 11 heats a dilute solution (a solution with a low concentration of absorbing liquid) in which, for example, water serving as a refrigerant (hereinafter, a vaporized refrigerant is referred to as a vapor refrigerant, and a liquefied refrigerant is referred to as a liquid refrigerant) is mixed with lithium bromide (LiBr) serving as an absorbing liquid. In this embodiment, a heat medium pipe L1 through which a high-temperature heat medium flows is inserted inside the regenerator 11. The regenerator 11 heats the dilute solution using the high-temperature heat medium flowing through the heat medium pipe L1. This heating separates the dilute solution into a concentrated solution and a vapor refrigerant. The concentrated solution accumulates in the lower part of the regenerator 11, and the vapor refrigerant is supplied to a condenser 12 connected to the regenerator 11.
[0014] The condenser 12 liquefies the vapor refrigerant supplied from the regenerator 11. A first cooling water pipe L2 is inserted into the condenser 12. Cooling water from a cooling tower (not shown) flows through the first cooling water pipe L2 using a cooling water pump (not shown) as power. Thus, the vapor refrigerant obtained by evaporation in the regenerator 11 is cooled and liquefied by the cooling water in the first cooling water pipe L2. Furthermore, the liquid refrigerant obtained by liquefaction in the condenser 12 is supplied to the evaporator 13 through the refrigerant pipe L3.
[0015] The evaporator 13 evaporates the liquid refrigerant. Inside the evaporator 13, there are provided a cold water pipe L4 connected to an external device such as an indoor unit, and a refrigerant distributor 13a that receives the liquid refrigerant from the condenser 12. The cold water pipe L4 is connected to, for example, an indoor unit, and cold water from the indoor unit flows through it. The inside of the evaporator 13 is in a vacuum state. Therefore, the evaporation temperature of water, which is the liquid refrigerant, is about 5°C. Therefore, the liquid refrigerant sprayed onto the cold water pipe L4 by the refrigerant distributor 13a is evaporated by the temperature of the cold water pipe L4. The cold water in the cold water pipe L4 loses its temperature due to the evaporation of the liquid refrigerant. As a result, the cold water in the cold water pipe L4 is supplied to the indoor unit in a state where the temperature has been reduced, and the indoor unit uses the cold water to supply cold air into the room.
[0016] The absorber 14 absorbs the refrigerant (vapor refrigerant) evaporated in the evaporator 13. A strong solution distributor 14a that receives the strong solution from the regenerator 11 is provided in the absorber 14. The strong solution is sprayed from the strong solution distributor 14a into the absorber 14. As a result, the vapor refrigerant obtained by evaporation in the evaporator 13 is absorbed by the sprayed strong solution, and a dilute solution is generated. In addition, a second cooling water pipe L5 is inserted into the absorber 14. Cooling water from a cooling tower (not shown) flows in the second cooling water pipe L5 using a cooling water pump (not shown) as a power source, and the absorption heat generated by the refrigerant absorption of the strong solution is removed by the cooling water in the second cooling water pipe L5. The outlet side of the second cooling water pipe L5 is connected to the inlet side of the first cooling water pipe L2.
[0017] The lower part of the regenerator 11 is connected to the upper part of the absorber 14 through a strong solution pipe L6 and a strong solution storage section 21 of the heat exchanger 20. The strong solution in the lower part of the regenerator 11 is pumped to the upper part of the absorber 14 by the power of a strong solution pump P1. In addition, the lower part of the absorber 14 is connected to the upper part of the regenerator 11 through a dilute solution pipe L7 and a dilute solution storage section 22 of the heat exchanger 20. The dilute solution in the lower part of the absorber 14 is pumped to the upper part of the regenerator 11 by the power of a dilute solution pump (first pump) P2.
[0018] The strong solution from the regenerator 11 and the dilute solution from the absorber 14 are introduced into the heat exchanger 20 and heat exchanged. That is, the strong solution from the regenerator 11 is supplied to the upper part of the absorber 14 in a state where the temperature of the strong solution is lowered by heating the dilute solution. On the other hand, the dilute solution from the absorber 14 is supplied to the upper part of the regenerator 11 after receiving heat from the strong solution and increasing in temperature.
[0019] Furthermore, the evaporator 13 is provided with a circulation pipe L8 that connects the lower part and the upper part of the evaporator 13. A refrigerant pump (second pump) P3 is provided on the circulation pipe L8. Therefore, the liquid refrigerant in the lower part of the evaporator 13 is supplied to the refrigerant distributor 13a through the circulation pipe L8 by the power of the refrigerant pump P3. Therefore, the liquid refrigerant that does not contribute to evaporation in the evaporator 13 is sprayed again from the refrigerant distributor 13a.
[0020] The control device 30 controls the entire absorption chiller 1, for example, the operation of the pumps P1 to P3 and the introduction of the heat medium to the regenerator 11. The outside air temperature sensor T outputs a signal according to the outside air temperature to the control device 30. The control device 30 judges the outside air temperature based on the signal from the outside air temperature sensor T. The control device 30 also has a timer function as shown in a flow chart described later.
[0021] Furthermore, the absorption chiller 1 according to this embodiment includes a first branch pipe (first supply flow path) L9 and a solution switching valve (first control valve) V1. The first branch pipe L9 is a pipe having one end connected to the dilute solution pipe L7 between the dilute solution pump P2 and the heat exchanger 20, and the other end connected to the refrigerant distributor 13a. The solution switching valve V1 is provided on the first branch pipe L9 to open and close the flow path.
[0022] In this embodiment, the control device 30 executes control to send the absorbing liquid in the absorber 14 into the evaporator 13 in order to prevent the liquid refrigerant from freezing when the absorption chiller 1 is stopped for a long period of time, such as in winter. That is, the control device 30 opens the solution switching valve V1 and operates the dilute solution pump P2. At this time, the control device 30 also operates the concentrated solution pump P1. As a result, the control device 30 circulates the absorbing liquid between the regenerator 11 and the absorber 14, while sending a part of the absorbing liquid into the evaporator 13.
[0023] Here, the freezing point of the absorbing liquid is lower than that of the liquid refrigerant. Therefore, by sending the absorbing liquid in the absorber 14 into the evaporator 13 and mixing the absorbing liquid with the liquid refrigerant, the freezing point of the liquid is lowered, and it is possible to prevent the refrigerant from freezing during long-term shutdowns in winter, etc.
[0024] However, if the absorption liquid in the absorber 14 is sent into the evaporator 13 to prevent freezing, it is necessary to drain the absorption liquid when restarting the absorption chiller 1 from the viewpoint of absorption refrigeration efficiency. If the time required for this drainage is long, the restart will take a long time.
[0025] Therefore, the absorption chiller 1 according to this embodiment includes a second branch pipe (second supply flow path) L10 and a refrigerant switching valve (second control valve) V2. The second branch pipe L10 is a pipe having one end connected to the downstream side of the refrigerant pump P3 in the circulation pipe L8 and the other end connected to a lower part of the absorber 14. Note that the other end of the second branch pipe L10 is not limited to being connected to the lower part of the absorber 14, and may be connected to an upper part, etc. The refrigerant switching valve V2 is provided on the second branch pipe L10 and opens and closes the flow path.
[0026] In this embodiment, the control device 30 executes control to send the liquid refrigerant in the evaporator 13 to the absorber 14 before executing control to send the absorbing liquid in the absorber 14 into the evaporator 13 to prevent the liquid refrigerant from freezing. That is, the control device 30 opens the refrigerant switching valve V2 and operates the refrigerant pump P3. As a result, the amount of liquid refrigerant in the evaporator 13 is reduced before sending the absorbing liquid to the evaporator 13. As a result, the amount of absorbing liquid sent into the evaporator 13 may be reduced, and the time required to discharge the absorbing liquid in the evaporator 13 is also shortened.
[0027] Fig. 2 is a flowchart showing the operation of the absorption chiller 1 according to this embodiment. Fig. 3 and Fig. 4 are state diagrams showing the first and second stages of the freeze prevention operation of the absorption chiller 1 according to this embodiment.
[0028] After stopping operation, the control device 30 executes the process shown in Fig. 2. That is, first, the control device 30 judges whether the anti-freezing control signal is ON (S1). The anti-freezing control signal is judged to be ON when, for example, a user, an operator, etc. has set in advance that anti-freezing control is to be performed when the operation is stopped, or when an instruction to perform anti-freezing control is given through an operation by a user, an operator, etc.
[0029] If the anti-freeze control signal is ON (S1: YES), the process proceeds to step S4. If the anti-freeze control signal is not ON (S1: NO), the controller 30 judges whether a predetermined time has elapsed since the operation of the absorption chiller 1 was stopped (S2). If the predetermined time has not elapsed (S2: NO), this process is repeated until it is judged that the predetermined time has elapsed.
[0030] If the predetermined time has elapsed (S2: YES), the control device 30 determines whether the outside air temperature is equal to or lower than a predetermined temperature based on a signal from the outside air temperature sensor T (S3). If the outside air temperature is not equal to or lower than the predetermined temperature (S3: NO), the process proceeds to step S2.
[0031] On the other hand, if the outside air temperature is equal to or lower than the predetermined temperature (S3: YES), the controller 30 turns on the refrigerant pump P3 and opens the refrigerant switching valve V2 (S4), as shown in Fig. 3. As a result, the liquid refrigerant in the evaporator 13 is first transferred to the absorber 14, and the water level decreases, as shown in Fig. 3.
[0032] Referring again to Fig. 2, the control device 30 turns on the refrigerant pump P3 and opens the refrigerant switching valve V2 (after S4), and then determines whether a first specified time has elapsed since the start of operation of the refrigerant pump P3 (S5). If the first specified time has not elapsed (S5: NO), this process is repeated until it is determined that the first specified time has elapsed.
[0033] On the other hand, if the first specified time has elapsed (S5: YES), the controller 30 turns on the strong solution pump P1 and the dilute solution pump P2, and opens the solution switching valve V1 (S6), as shown in Fig. 4. This causes the controller 30 to send the absorbing liquid in the absorber 14 into the evaporator 13, thereby preventing freezing. Even during the process in which the absorbing liquid is sent into the evaporator 13, the refrigerant pump P3 is turned on and the refrigerant switching valve V2 is in an open state, so the amount of liquid in the evaporator 13 remains relatively small.
[0034] Thereafter, the control device 30 judges whether a second specified time has elapsed since the start of operation of the concentrated solution pump P1 and the dilute solution pump P2 (S7). If the second specified time has not elapsed (S7: NO), this process is repeated until it is judged that the second specified time has elapsed.
[0035] On the other hand, if the second specified time has elapsed (S7: YES), the controller 30 stops all the pumps P1 to P3 and closes all the switching valves V1, V2 (S8), after which the process shown in FIG.
[0036] In this way, according to the absorption chiller 1 of this embodiment, the liquid refrigerant in the evaporator 13 is mixed with the absorbing liquid by opening the solution switching valve V1 and operating the dilute solution pump P2 (and further the concentrated solution pump P1) after the operation is stopped. Therefore, the liquid refrigerant and the absorbing liquid are mixed, and the freezing point of the liquid is lowered, so that the liquid in the evaporator 13 is less likely to freeze. Furthermore, after the operation is stopped, the refrigerant switching valve V2 is opened and the refrigerant pump P3 is operated before opening the solution switching valve V1 and operating the dilute solution pump P2, so that the amount of refrigerant in the evaporator 13 is first reduced. As a result, it is possible to reduce the amount of absorbing liquid to be mixed with the liquid refrigerant in the evaporator 13, and at the time of restarting, it is only necessary to replace a small amount of the mixed liquid in the evaporator 13 with the liquid refrigerant, and the time required for restarting can be shortened. Therefore, freezing during a long-term stop is prevented, and the refrigerant can be replaced with the liquid refrigerant in a shorter time at the time of restarting.
[0037] Although the present invention has been described above based on the embodiments, the present invention is not limited to the above embodiments, and may be modified without departing from the spirit of the present invention, and other techniques may be appropriately combined to the extent possible. Furthermore, known or well-known techniques may be combined to the extent possible.
[0038] For example, in the above embodiment, a separate control valve may be provided at a position downstream of the portion of the circulation pipe L8 to which the second branch pipe L10 is connected, and this control valve may be closed in the process of step S4 shown in FIG.
[0039] Also, a water level sensor may be provided in the evaporator 13, and when the water level falls below a predetermined level in the process of step S5 shown in FIG. 2, the process may proceed to step S6 shown in FIG.
[0040] Furthermore, the water level detected by the water level sensor may be controlled to be lower as the outside air temperature decreases based on the signal from the outside air temperature sensor T. In other words, the first specified time in step S5 may be lengthened as the outside air temperature decreases.
[0041] In this embodiment, the regenerator 11 heats the dilute solution with a heat medium. However, the present invention is not limited to this, and the regenerator 11 may heat the dilute solution with a gas burner using a flammable gas as fuel or a pellet burner using wood pellets as fuel, or may further heat the dilute solution by using high-temperature exhaust gas or the like.
[0042] Furthermore, the absorption chiller 1 according to this embodiment includes the heat exchanger 20 for exchanging heat between the dilute solution and the concentrated solution, but is not limited to this, and the heat exchanger 20 may not be included.
[0043] In addition, in this embodiment, an absorption chiller 1 that supplies cold water to an indoor unit, etc. is described as an example, but the present invention is not limited to this and may be applied to an absorption chiller / heater that can supply hot water to an indoor unit, etc. [Explanation of symbols]
[0044] 1: Absorption chiller 10: Refrigeration cycle section 11:Regenerator 12: Condenser 13: Evaporator 14: Absorber 30: Control device (control means) L9: First branch pipe (first supply flow path) L10: Second branch pipe (second supply flow path) P2: Dilute solution pump (first pump) P3: Refrigerant pump (second pump) V1: Solution switching valve (first control valve) V2: Refrigerant switching valve (second control valve)
Claims
[Claim 1] an absorption chiller comprising: a refrigeration cycle section having a regenerator, a condenser, an evaporator, and an absorber; a first supply flow path for supplying an absorbing liquid in the absorber to the evaporator; a first control valve for opening and closing the first supply flow path; a first pump for generating power for supplying the absorbing liquid in the absorber to the evaporator; and control means for controlling opening and closing of the first control valve and operation of the first pump, wherein the control means opens the first control valve and operates the first pump after operation has been stopped, thereby mixing the refrigerant in the evaporator with the absorbing liquid, a second supply passage for supplying the liquid in the evaporator into the absorber; a second control valve that opens and closes the second supply passage; a second pump that generates power to supply the liquid in the evaporator into the absorber, The control means, after the operation is stopped, opens the second control valve and operates the second pump before opening the first control valve and operating the first pump. An absorption chiller characterized by the above.
Citation Information
Patent Citations
Absorption freezer
JP1994347126A
Absorption cold / Hot water supply device and absorption air-conditioner using the device
JP1996296918A
Exhaust heat recovery air conditioner
JP2003004330A