Retrofit power outage prevention kit

The retrofit power outage countermeasure set provides a cost-effective and easy-to-install solution for emergency power supply using a portable storage battery and solar panel, addressing the limitations of existing measures by enabling power during outages and versatile use.

JP7591330B1Active Publication Date: 2024-11-28AI-COMMUNICATIONS INC

Patent Information

Application Number
JP2024094042
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-06-10
Publication Date
2024-11-28
Estimated Expiration
2044-06-10

AI Technical Summary

Technical Problem

Existing emergency power supply measures for homes during disasters are costly, time-consuming, and require installation during new construction, limiting their widespread adoption.

Method used

A retrofit power outage countermeasure set that includes a portable storage battery, solar power generation panel, and switch box, which can be installed on an existing distribution board to provide power during outages, allowing for easy and cost-effective installation.

Benefits of technology

Enables power supply during outages using a portable storage battery, reduces hardware costs, and allows the battery to be used outdoors for leisure, extending power availability and reducing outage duration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007591330000001_ABST
    Figure 0007591330000001_ABST
Patent Text Reader

Abstract

To provide an emergency power supply facility which is low-cost and easy to use, and enables a person to take measures against an emergency power supply later even in a house in which he or she is currently living. [Solution] The retrofit power outage countermeasure set, which is retrofitted to an existing distribution board 8, comprises a first main wiring 41 connecting a target branch switch 81 and a switch box 1, a second main wiring 42 connecting the switch box 1 and a specific load 9, and a portable storage battery 2 and a solar power generation panel 3 attached to the switch box 1. The portable storage battery 2, which is stored with power supplied from the target branch switch 81 when there is no power outage, supplies power to the specific load 9 when there is a power outage. The portable storage battery 2 can also store power with power generated by the solar power generation panel 3, which is connected in parallel with the target branch switch 81 on the input side of the portable storage battery 2, and when power is supplied to the portable storage battery 2 from the solar power generation panel 3 when there is no power outage, power supply from the target branch switch 81 to the specific load 9 is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a retrofit power outage countermeasure kit that provides retrofit measures against power outages that may be caused by large-scale disasters. [Background technology]

[0002] In recent years, there have been frequent cases of natural disasters such as major earthquakes and floods causing severe damage to local lifelines, making it an urgent task to take thorough measures against these disasters. In particular, there have been many cases of large-scale blackouts caused by the destruction of power plants and damage to the power transmission and distribution grid, and the importance of taking measures against these situations is being emphasized. When a power outage occurs due to a disaster, it rarely takes a long time for power to be restored, but in many cases it takes several days. During that time, people are forced to live an inconvenient life without electricity. Many people evacuate to evacuation shelters equipped with emergency power supply equipment, but many hesitate to do so for privacy reasons and end up staying in their homes without electricity. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-154257 A Summary of the Invention [Problem to be solved by the invention]

[0004] In consideration of the above problems, measures are being taken to install emergency power supply equipment in ordinary homes in preparation for power outages during disasters. However, the installation must be done when the home is newly built, and there is a problem that it costs several million yen. Emergency power supply equipment for residential use generally includes solar panels and storage batteries. During normal times (non-power outages), the storage battery is charged with grid power (power supplied by the power company) and sunlight, and during disasters (power outages), the battery's power is used. In addition, there are cases where so-called V2H (Vehicle to Home) is installed, and equipment is installed so that electric vehicles or plug-in hybrid vehicles can be used as storage batteries. In any case, these conventional emergency power supply measures are very costly, require long construction periods, and are installed when a new house is built, so the reality is that they have not become widespread. The present invention was made with the issues of emergency power supply measures in the event of a disaster such as those described above in mind for ordinary homes, and aims to provide a low-cost, easy-to-use emergency power supply facility, as well as to enable emergency power supply measures to be implemented even after construction of a home (even if the home is currently occupied). [Means for solving the problem]

[0005] In order to solve the above problems, this specification discloses an invention for a retrofit power outage countermeasure set. The retrofit power outage countermeasure set according to the disclosed invention is a retrofit power outage countermeasure set that is retrofitted to an existing distribution board, and is a power outage countermeasure set that is installed between a target branch switch, which is one of the branch switches in the distribution board, and a specific load in a house in a state in which power is supplied from the target branch switch to the specific load when there is no power outage. This set includes: a first main wiring connected to the target branch switch; a second main wiring connected to the specific load; a portable storage battery that is charged with power supplied from the target branch switch via a first main wiring when there is no power outage and is removable from the first main wiring; Solar panels and It is equipped with: The portable storage battery is connected to the second main wiring in a state in which it is capable of supplying power to a specific load via the second main wiring during a power outage. The photovoltaic power generation panel is connected in parallel with the target branch switch on the input side of the portable storage battery. The portable storage battery is capable of storing electricity using power from both the target branch switch and the solar power generation panel, which are connected in parallel, and is provided with a panel switch that switches whether the portable storage battery is powered by power from the target branch switch or by power from the solar power generation panel. This retrofit power outage countermeasure kit is configured to ensure power supply from the target branch switch to the specific load when the portable storage battery is powered by electricity from the solar power generation panel during non-power outages. In order to solve the above problems, the retrofit power outage countermeasure set according to the disclosed invention comprises: The portable battery has a pass-through function. the portable storage battery is connected in series with the specific load to the first main wiring and is connected upstream of the specific load; The configuration may include a disconnection switch that short-circuits the target branch switch and the specific load when the portable storage battery is disconnected from the first main wiring. In order to solve the above problems, the retrofit power outage countermeasure set according to the disclosed invention comprises: A panel switch is provided to switch whether the portable battery is powered by the target branch switch or by the solar panel. The configuration may include a bypass line that connects the target branch switch and the specific load when the panel switch is set to a state in which power is supplied to the portable storage battery using power from the solar power generation panel. In order to solve the above problems, the retrofit power outage countermeasure set according to the disclosed invention comprises: a portable battery is connected in parallel with the specific load to the first main wiring; A power outage switch is provided to disconnect the specific load from the first main wiring during a power outage and connect the portable battery to the specific load via the second main wiring to supply power. It may have the following configuration. In order to solve the above problem, in the retrofit power outage preparation set according to the disclosed invention, the solar power generation panel may be portable. Effect of the Invention

[0006] As described below, according to the retrofit power outage countermeasure kit of the disclosed invention, the portable storage battery that stores electricity during normal times (non-power outages) supplies power to the specific load during a power outage, so electricity can be used by the specific load until the stored power in the portable storage battery becomes zero. This makes it possible to use the minimum amount of electricity necessary during a disaster, etc. In addition, construction can be completed cheaply and in a short period of time, and the cost of the hardware can be significantly reduced. This makes it possible to implement power outage countermeasures at low cost in the event of a disaster. And since the portable battery can be removed and used outdoors for leisure activities, it kills two birds with one stone. There is another reason why the battery is portable: in the event of a power outage, it can be taken to another location indoors and used as needed. Furthermore, since it is equipped with a solar power generation panel and can store electricity in a portable storage battery, it is possible to extend the time until the portable storage battery runs out of power during a power outage, which is particularly suitable for long-term power outages.

[0007] In addition, according to a configuration in which the portable storage battery has a pass-through function, the portable storage battery is connected in series with the specific load to the first main wiring and is connected upstream of the specific load, and a disconnection switch is provided which short-circuits the target branch switch and the specific load when the portable storage battery is removed from the first main wiring, power supply to the specific load is maintained even when the portable storage battery is removed, and no problems arise with power usage in the specific load.

[0008] In addition, in a configuration in which the portable storage battery is connected in parallel with the specific load to the first main wiring, and a power outage switch is provided which disconnects the specific load from the first main wiring during a power outage and connects the portable storage battery to the specific load via the second main wiring to supply power, power supply to the specific load is maintained even when the portable storage battery is removed, thereby achieving the effect of preventing problems with power usage at the specific load, and enabling the portable storage battery to supply power to the specific load during a power outage. Furthermore, if the solar power generation panel is portable, retrofitting is extremely easy, and the solar power generation panel can also be used for leisure activities and other outings. [Brief description of the drawings]

[0009] [Figure 1] 1 is a schematic diagram of a retrofit power outage countermeasure set according to a first embodiment. [Diagram 2] 11 is a schematic diagram showing the wiring state when the portable storage battery is removed. FIG. [Diagram 3] FIG. 11 is a schematic diagram of a retrofit power outage countermeasure set according to a second embodiment. [Figure 4] 1 is a schematic diagram showing an example of a configuration in which power is stored in a portable storage battery using both grid power from a target branch switch and a solar power generation panel. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Next, a description will be given of a mode for carrying out the present invention (hereinafter, referred to as an embodiment) Fig. 1 is a schematic diagram of a retrofit power outage countermeasure set according to a first embodiment. The retrofit power outage countermeasure set shown in FIG. 1 is a set that retrofits a function to secure a power source using a storage battery when a power outage occurs. "Retrofit" means that it can be added after construction is completed, not when a building is newly constructed. As shown in FIG. 1, this retrofit power outage countermeasure set (hereinafter, abbreviated as retrofit set) is composed of a switch box 1, a portable storage battery 2, a solar power generation panel 3, main wiring 41, 42, etc. The switch box 1 is provided with a main line terminal 100 and a load terminal 101. The retrofit set of the embodiment described below is assumed to be for residential use such as a detached house or an apartment, but may also be used in non-residential buildings such as offices and public offices.

[0011] As shown in Fig. 1, this retrofit set is attached to one branch switch 81 in an existing distribution board 8 installed in a house. The retrofit set is installed in a manner that it is interposed between the one branch switch 81 and a specific load 9 to which power is supplied from the one branch switch 81. Therefore, during installation, the power feed line to the specific load 9 is removed from the one branch switch 81, one end of the first main wiring 41 is connected to the branch switch 81, and the other end of the first main wiring 41 is connected to a main line terminal 100 on the switch box 1. In addition, one end of the second main wiring 42 is connected to a load terminal 101 on the switch box 1, and the other end is connected to the specific load 9.

[0012] In the following description, the branch switch 81 to which the retrofit set is attached is referred to as the target branch switch. The specific load 9 to which the target branch switch 81 supplies power is a load to which power is supplied by the portable storage battery 2 during a power outage. In a house, power is distributed to each room by a distribution board 8, and as the specific load 9, a room that has a high priority for power supply during a power outage (for example, the living room) is selected. In other words, the target branch switch 81 that supplies power to a room that has a high priority for power supply during a power outage is disconnected and the retrofit set is installed.

[0013] As shown in Fig. 1, the retrofit set of the first embodiment is basically configured such that the portable storage battery 2 is interposed in series between the target branch switch 81 and the specific load 9. That is, the input terminal 21 of the portable storage battery 2 is connected to the target branch switch 81 by the first main wiring 41, and the output terminal 22 of the portable storage battery 2 is connected to the specific load 9 by the second main wiring 42. Therefore, the portable storage battery 2 and the specific load 9 are in series, with the portable storage battery 2 on the upstream side. The portable storage battery 2 used is one that has an input terminal for AC 100V and an output terminal for AC 100V and has a pass-through function. It has a configuration similar to that of a so-called uninterruptible power supply. For example, DELTA2 sold by EcoFlow Technology Japan Co., Ltd. can be used as the portable storage battery 2 in the embodiment.

[0014] Two switches 11, 12 are disposed inside the switch box 1. One is a switch 11 (hereinafter referred to as a disconnection switch) for ensuring power supply to the specific load 9 when the portable storage battery 2 is removed. The other is a switch (hereinafter referred to as a panel switch) 12 for selecting whether or not to use power from the solar power generation panel 3 to store electricity in the portable storage battery 2.

[0015] The removal switch 11 will be described in more detail with reference to Figures 1 and 2. Figure 2 is a schematic diagram showing the wire connection state when the portable storage battery 2 is removed. 1, the switch box 1 is provided with a power storage input connection terminal 103 for connecting an input line (hereinafter, battery input line) 23 of the portable storage battery 2, and a power storage output connection terminal 104 for connecting an output line (hereinafter, battery output line) 24 of the portable storage battery 2. The battery input line 23 and the battery output line 24 are bundled together as a cable with a dedicated socket 25 at one end.

[0016] 1 and 2, a line from the first main wiring 41 branches into an in-box main line 411, which is short-circuited to the power storage input terminal 103, and a first bypass line 412, within the switch box 1. The in-box main line 411 is connected to the power storage input connection terminal 103 via the panel switch 102. As described above, the switch box 1 is provided with a load terminal 101 to which the second main wiring 42 is connected, and the first bypass line 412 is connected to the load terminal 101 via the disconnection switch 11.

[0017] As shown in Fig. 1, when the portable storage battery 2 is attached to the switch box 1, the detachment switch 11 opens the first bypass line 412 from the load terminal 101. And, as shown in Fig. 2, when the portable storage battery 2 is removed, the detachment switch 11 shorts the first bypass line 412 to the load terminal 101. For convenience of explanation, the detachment switch 11 will be referred to as ON when the first bypass line 412 is shorted to the load terminal 101 and OFF when it is open.

[0018] The removal switch 11 may be a manual switch such as a push button switch, but is preferably an automatic switch that operates automatically when the portable storage battery 2 is removed. For example, a spring member may be provided for the removal switch 11, and when the portable storage battery 2 is removed, the spring action shifts the shorting plate to short-circuit (turn on) the first bypass line 412 to the load terminal 101. When attaching the portable storage battery 2, the removal switch 11 is pressed in against the elasticity of the spring member to disconnect (turn off) the first bypass line 412 from the load terminal 101.

[0019] Next, the panel switch 12 will be described. 1, the switch box 1 is provided with a panel terminal 102. In this embodiment, an inverter 31 is attached to the solar power generation panel 3, and the inverter 31 is provided on a power supply line from the solar power generation panel 3. The output of the inverter 31 is connected to the panel terminal 102, and the DC voltage from the solar power generation panel 3 is converted to AC 100V and supplied to the panel terminal 102.

[0020] The panel switch 12 switches between a state in which the power storage input connection terminal 103 is shorted to the main wires 411 inside the box and a state in which it is shorted to the panel terminal 102. For convenience of explanation, the panel switch 12 will be referred to as ON when the power storage input connection terminal 103 is disconnected from the main wires 411 inside the box and shorted to the panel terminal 102, and OFF when the power storage input connection terminal 103 is disconnected from the panel terminal 102 and shorted to the main wires 411 inside the box. A manual rotary switch is used as the panel switch 12. However, a socket-shaped device into which a cable extending from the inverter 31 is inserted may be used as the panel terminal, and an automatic switch that automatically turns on when the cable is connected may be used as the panel switch 12.

[0021] 1, a second bypass line 43 is provided as a line branching off from a line connected to the first main wiring 41 within the switch box 1. The second bypass line 43 bypasses the portable storage battery 2 and the removal switch 11 and is connected to the second main wiring 42, and an interlocking switch 13 is provided on the second bypass line 43. The interlocking switch 13 is a switch that is interlocked with the panel switch 12 and is normally off (open), but is interlocked and turned on (short circuit) when the panel switch 12 is turned on.

[0022] The operation of the retrofit set according to the first embodiment will be described below. The retrofit set is installed as described above in a residence that is currently occupied. The portable storage battery 2 is attached to the switch box 1, and the removal switch is turned off. The portable storage battery 2 is connected to the specific load 9 by the second main wiring 42. Also, the panel switch 12 is turned off, and the solar power generation panel 3 is not connected to the portable storage battery 2. In this wiring state, power is stored in the portable storage battery 2 while power is supplied to the specific load 9. Since the portable storage battery 2 has a pass-through function, when it is fully charged, power from the target branch switch 81 is supplied to the specific load 9 by passing through the portable storage battery 2.

[0023] In this state, if a power outage occurs due to a large-scale disaster or the like, the power supply from the grid power to the distribution board 8 is cut off, and power supply from the target branch switch 81 ceases. The portable storage battery 2 detects this and starts supplying power through its internal circuit. That is, power from the portable storage battery 2 is supplied to the specific load 9, and power supply to the specific load 9 (e.g., the living room) continues. When the power outage is resolved, the internal circuit of the portable storage battery 2 detects the restoration of power and returns to a state in which it stores power and shorts out the specific load 9.

[0024] When the portable storage battery 2 is removed for outdoor use, the detachment switch 11 operates to short-circuit the first main wiring 41 and the second main wiring 42. This allows power supply to the specific load 9 to continue. Furthermore, when storing power in the portable storage battery 2 using the photovoltaic power generation panel 3 during sunny daytime hours, the power supply line extending from the inverter 31 is connected to the panel terminal 102 of the switch box 1, and the panel switch 12 is turned on. This turns off the power supply from the target branch switch 81, and instead turns on the power supply from the photovoltaic power generation panel 3. At this time, the interlock switch 13 operates and turns on, and power supply from the target branch switch 81 to the specific load 9 is ensured by the bypassing second bypass line 43. If it is sunny during the daytime when a power outage occurs, the panel switch 12 is turned on to concurrently store electricity in the portable storage battery 2. This extends the time until the remaining power in the portable storage battery 2 becomes zero.

[0025] According to the retrofit set of this embodiment, the portable storage battery 2 that has stored electricity during normal times (when there is no power outage) supplies power to the specific load 9 during a power outage, so electricity can be used by the specific load 9 until the amount of electricity stored in the portable storage battery 2 becomes zero. This makes it possible to use the minimum amount of electricity necessary during a disaster. And, since the construction can be completed just by attaching the switch box 1, to which the portable storage battery 2 and the solar power generation panel 3 are connected, to the target branch switch 81 by the first main wiring 41, the construction can be completed very cheaply and in a short time. And, since it is a set combining the switch box 1, which has a relatively simple structure, with the portable storage battery 2 and the solar power generation panel 3, which are inexpensively available, the cost of the hardware can also be significantly reduced. Therefore, power outage countermeasures during disasters can be implemented at low cost.

[0026] In addition, the portable storage battery 2 can be removed and used outdoors for leisure activities, so it kills two birds with one stone. There is another reason why the storage battery is portable; it has the advantage that it can be taken to another location indoors during a power outage and used as needed. For example, if the toilet can only be flushed electrically and the power cable is plugged into an outlet, you can take the portable storage battery 2 to the toilet, connect the power cable to the portable storage battery 2, and flush the toilet. In other words, it kills three birds with one stone.

[0027] Furthermore, since the retrofit set of the embodiment is equipped with a solar power generation panel 3 and is capable of storing electricity in the portable storage battery 2, it is possible to extend the time until the remaining charge in the portable storage battery 2 becomes zero during a power outage, which is particularly suitable for cases where the power outage lasts for a long period of time. In the first embodiment, if the detachment switch 11 is configured to operate in conjunction with the panel switch 12, the second bypass line 43 and the interlocking switch 13 are not necessary. However, if the detachment switch 11 is configured to operate in conjunction with the removal of the portable charger 2, two interlocking operations are required, which is disadvantageous in that the structure becomes complicated.

[0028] Next, a retrofit power outage countermeasure set according to the second embodiment will be described with reference to Fig. 3, which is a schematic diagram of the retrofit power outage countermeasure set according to the second embodiment. The retrofit set of the second embodiment is also a set that is retrofitted and connected to a target branch switch 81 in a distribution board 8 of a house or the like, and includes a switch box 1, a portable storage battery 2, and a solar power generation panel 3. The retrofit set of the second embodiment differs from the first embodiment in that the portable storage battery 2 is connected in parallel to a specific load 9.

[0029] 3, in the second embodiment, a box-interior main line 411 and a power storage branch wiring 44 are provided in a form in which a line connected to a first main wiring 41 branches off. Similarly, a panel terminal 102 is provided in the switch box 1, and a panel switch 12 is also provided. The panel switch 12 switches whether the power storage input connection terminal 103 is short-circuited to the power storage branch wiring 44 or to the panel terminal 102. Similarly, when the photovoltaic power generation panel 3 is used, the panel switch 12 is turned on, and the panel terminal 102 is short-circuited to the power storage input connection terminal 103.

[0030] The main wire 411 in the box extends from the branch point and is connected to the load terminal 101 via the power failure switch 14. The power failure switch 14 is also connected to the load terminal 101 via the power failure switch 14. The power failure switch 14 is a switch that shorts the main wire 411 in the box and the load terminal 101 (off state) during normal times (when there is no power failure), and when a power failure occurs, it disconnects the main wire 411 in the box from the load terminal 101 and shorts the power storage output connection terminal 104 to the load terminal 101 (on state). The power failure switch 14 is a manual switch such as a rotary switch, but may be a switch that is provided with a sensor that detects a power failure and is automatically turned on and off by a signal from the sensor.

[0031] In the second embodiment, the portable storage battery 2 also supplies power to the specific load 9 during a power outage, and by using the solar power generation panel 3 in combination, the time until the remaining charge becomes zero can be extended, making this an ideal power outage countermeasure for disasters, etc. Furthermore, the portable storage battery 2 can be used for leisure activities, etc., or can be taken to a necessary location for use during a power outage.

[0032] In the second embodiment as well, during normal times (when there is no power outage), the portable storage battery 2 is energized and stores electricity via the power storage branch wiring 44. During a power outage, the voltage through the power storage branch wiring 44 becomes zero, and an output voltage is generated at the output terminal by the internal circuit of the portable storage battery 2. In this state, when the power outage switch 14 is turned on, the power storage output connection terminal 104 connected to the output terminal of the portable storage battery 2 is connected to the load terminal 101, and the portable storage battery 2 supplies power to the specific load 9.

[0033] In the second embodiment, since the portable storage battery 2 is connected in parallel to the specific load 9, power supply to the specific load 9 during non-power outages continues without hindrance even when the portable storage battery 2 is removed. Therefore, the removal switch 11 is not provided. Instead, a power outage switch 14 is provided, which must be operated during a power outage. In the first embodiment, since the portable storage battery 2 is connected in series to the specific load 9, power is automatically supplied by the portable storage battery 2 during a power outage, and there is no particular need to operate the switch. However, if the power outage switch 14 is set to an automatic switch in the second embodiment as described above, it is possible to automatically start power supply to the specific load 9 from the portable storage battery 2 when a power outage occurs.

[0034] In each of the above embodiments, the solar power generation panel 3 is preferably a portable type. There are several reasons for this, including that retrofitting is extremely easy and that it can be easily installed in collective housing such as an apartment building if there is a balcony. Another advantage is that it is easy to obtain low-cost solar power generation panels. Furthermore, it can be used for outdoor purposes depending on the output voltage of the solar power generation panel 3. For example, if the inverter 31 is used as is, it can be used with AC 100V, and if the inverter 31 can be removed and used with DC voltage, it can be used for appropriate purposes depending on the output voltage, such as charging a smartphone. Furthermore, if the portable storage battery 2 has a DC input terminal that is compatible with the DC output voltage of the solar power generation panel 3, when the portable storage battery 2 is taken out for leisure, etc., the solar power generation panel 3 can also be taken out and used together with the portable storage battery 2, so that the portable storage battery 2 can be used outdoors while storing electricity. As such a portable solar power generation panel 3, for example, the EcoFlow 110W solar panel sold by EcoFlow Technology Japan Co., Ltd. can be used.

[0035] In each of the above embodiments, the panel switch 12 selects whether the portable storage battery 3 is charged with the grid power from the target branch switch 81 or the solar power generation panel 3, but it is also possible to charge the portable storage battery 3 using both at the same time. An example of this configuration is shown in Fig. 4. Fig. 4 is a schematic diagram showing an example of a configuration in which the portable storage battery 3 is charged with both the grid power from the target branch switch 81 and the solar power generation panel. 4 is an example in which a dual-use configuration is adopted in the first embodiment. In this example, the portable storage battery 2 is provided with a DC input terminal 26. The solar power generation panel 3 is not provided with an inverter, and the output of the solar power generation panel 3 is a DC output that is compatible with the DC input terminal 26.

[0036] As shown in Fig. 4, in this configuration example, a panel switch is not provided. Therefore, an interlocking switch that is interlocked with the panel switch and a second bypass line that is opened and closed by the interlocking switch are not provided. The switch box 1 is provided with a panel DC input terminal 105 to which the DC cable 32 of the photovoltaic power generation panel 3 is connected, and a panel DC output terminal 106 that is connected to the DC input terminal 26 of the portable storage battery 2. In Fig. 4, when the photovoltaic power generation panel 3 is connected to the panel DC input terminal 105 via the DC cable 32, the photovoltaic power generation panel 3 is connected to the DC input terminal 62 of the portable storage battery 2, and if it is sunny in the daytime, the portable storage battery 3 is charged with both the power from the target branch switch 81 and the power from the photovoltaic power generation panel 3.

[0037] In this example, when a power outage occurs, as described above, an output voltage is generated by the internal circuit of the portable storage battery 2, and power is supplied to the specific load 9 through the second main wiring 42. In this case, if the DC cable 32 is left connected, the portable storage battery 2 is automatically charged with power from the solar power generation panel 3 during sunny days in the daytime, automatically achieving the effect of postponing the use up of the power in the portable storage battery 2. Note that in the example of Fig. 4, simply connecting the DC cable 32 does not allow the portable storage battery 2 to charge with the solar power generation panel 3, and a separate panel switch that is operated may be further provided. Such a panel switch is provided in the switch box 1, but the portable storage battery 2 may also be provided with such a switch. Furthermore, in the first and second embodiments, there may be cases where the portable storage battery 2 is provided with a switch equivalent to the panel switch 12, and the switch box 1 is not provided with the panel switch 12. However, in this case, as with the first embodiment, it is necessary to configure the interlocking switch 13 to be interlocked with the switch on the portable storage battery 2, which has the disadvantage of making the configuration somewhat complicated.

[0038] The configuration in which the portable storage battery 3 stores the power from both the target branch switch 81 and the solar panel 3 can be similarly adopted in the second embodiment. In this case, the panel switch 12 can be omitted. In addition, the configuration in which the portable storage battery 2 is charged with both the power from the target branch switch 81 and the power from the solar power generation panel 3 can also be achieved by a configuration in which the output of the solar power generation panel 3 is converted to AC by the inverter 31. For example, a configuration in which a circuit for superimposing two AC powers is provided in the switch box 1 can be adopted.

[0039] The retrofit sets of the above embodiments can be suitably used not only in ordinary homes, but also in offices and public offices. For example, public offices that act as a command center for responding to disasters need to ensure the minimum necessary power supply (such as a power supply for contacting relevant parties) even during a power outage. For this purpose, the retrofit sets of the above embodiments can be used. [Explanation of symbols]

[0040] 1 Switch box 101 Load terminal 102 Panel terminal 103 Storage input connection terminal 104 Storage output connection terminal 11 Exit switch 12 Panel Switch 13 Interlocking switch 14 Power outage switch 2 Portable battery 3. Solar panels 31 Inverter 41 First main wiring 411 Box Main Line 412 First Bypass Line 42 Second main wiring 43 Second bypass line 44 Branch wiring for power storage 8 Distribution Board 81 Target branch switch 9 Specific load

Claims

1. A retrofit power outage countermeasure set that can be retrofitted to an existing distribution board, the power outage countermeasure set being installed between a target branch switch, which is one of the branch switches in the distribution board, and a specific load in a house in a state in which power is supplied from the target branch switch to the specific load when there is no power outage, a first main wiring connected to the target branch switch; a second main wiring connected to the specific load; a portable storage battery that is charged with power supplied from the target branch switch via a first main wiring when there is no power outage and is removable from the first main wiring; Solar panels and Equipped with the portable storage battery is connected to the second main wiring in a state capable of supplying power to a specific load via the second main wiring during a power outage; The solar power generation panel is connected in parallel with the target branch switch on the input side of the portable storage battery, The portable storage battery is capable of storing electricity using the power of both the target branch switch and the solar power generation panel connected in parallel, or is provided with a panel switch that switches whether the power supply to the portable storage battery is from the power from the target branch switch or from the solar power generation panel, A retrofit power outage prevention kit characterized by ensuring power supply to specific loads from a target branch switch when a portable storage battery is powered by electricity from a solar power generation panel during non-power outages.

2. The portable battery has a pass-through function, the portable storage battery is connected in series with the specific load to the first main wiring and is connected to an upstream side of the specific load; The retrofit power outage prevention set according to claim 1, characterized in that a disconnection switch is provided to short-circuit the target branch switch and the specific load when the portable storage battery is removed from the first main wiring.

3. a panel switch is provided for switching whether power supply to the portable storage battery is from the target branch switch or from the solar power generation panel; The retrofit power outage prevention set according to claim 2, characterized in that a bypass line is provided to connect the target branch switch and the specific load when the panel switch is set to a state in which power is supplied to the portable storage battery by power from the solar power generation panel.

4. the portable storage battery is connected in parallel with the specific load to the first main wiring, 2. The retrofit power outage prevention set according to claim 1, further comprising a power outage switch which disconnects the specific load from the first main wiring during a power outage and connects the portable storage battery to the specific load via the second main wiring to supply power.

5. 5. The retrofit power outage countermeasure set according to claim 1, wherein the solar power generation panel is a portable type.

Citation Information

Patent Citations

  • Power supply system

    JP2023154257A

Cited By

  • Power outage prevention kit

    JP7777376B1

  • Power outage prevention method, power outage prevention set, and portable battery switch device

    JP7805058B1

  • Portable battery switch box

    JP7849771B1

  • Power outage countermeasures

    JP7911803B1