Power management system, power management method, and power management program
The power management system addresses power generation deviations by adjusting control methods based on actual power generation, effectively managing fluctuations and maintaining balance through temporary adjustments.
Patent Information
- Application Number
- JP2023532078
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-07-02
- Filing Date
- 2022-06-30
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-06-30
AI Technical Summary
Existing power management systems struggle to maintain balance between generated power and load power when actual power generation deviates from expected power due to fluctuations, leading to potential mismanagement and inefficiencies.
A power management system that includes a control unit to adjust power generation equipment based on actual power generation, temporarily changing control methods when deviations exceed a predetermined threshold, using a detection unit to monitor solar panel obstacles and account for events affecting power generation.
The system effectively manages power fluctuations by temporarily adjusting control methods to actual power generation, preventing prolonged inefficiencies and abnormalities, ensuring stable power management.
Smart Images

Figure 0007593497000001 
Figure 0007593497000002 
Figure 0007593497000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power management system, a power management method, and a power management program. [Background technology]
[0002] Patent Document 1 discloses a system for power management in a microgrid, which outputs the power that a power generation facility is expected to be able to output as projected generated power, and adjusts the load power based on this projected generated power. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2020 / 203993 Summary of the Invention [Problem to be solved by the invention]
[0004] Since photovoltaic power generation and other power generation facilities are almost always installed outdoors, the power generated by the power generation facilities may deviate from the expected power generated due to some reason other than a malfunction. In such a case, the method described in Patent Document 1 may not be able to appropriately manage the balance between the generated power and the load power, although the power generation operation continues.
[0005] The present disclosure has been made in consideration of the above, and describes a technology that enables power management that takes into account fluctuations when the actual power generated in a power generation facility deviates from the expected state. [Means for solving the problem]
[0006] In order to achieve the above-mentioned object, a power management system according to one embodiment of the present disclosure is a power management system that controls a power generation equipment including a solar power generation device, and includes: a control unit that controls the power generation equipment based on the predicted power generation power, assuming that the predicted power generation power by the power generation equipment is based on the power generation capacity of the power generation equipment; and a power generation information acquisition unit that acquires actual power generation power by the power generation equipment, and when the control unit detects that the difference between the predicted power generation power and the actual power generation power is greater than a predetermined value, temporarily changes a control method of the power generation equipment. Effect of the Invention
[0007] According to the present disclosure, a technique is provided that, when the actual power generated in a power generation facility varies from an expected state, enables power management that takes the variation into consideration. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a diagram illustrating a schematic configuration of a microgrid according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing the functional configuration of the EMS. [Diagram 3] FIG. 3 is a flow diagram illustrating a power management method. [Figure 4] FIG. 4 is a diagram illustrating an example of a hardware configuration of the EMS. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] A power management system according to one embodiment of the present disclosure is a power management system that controls a power generation equipment including a solar power generation device, and includes a control unit that controls the power generation equipment based on the predicted power generation, assuming that the predicted power generation by the power generation equipment is based on the power generation capacity of the power generation equipment, and a power generation information acquisition unit that acquires actual power generation by the power generation equipment, and when the control unit detects that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, temporarily changes a control method of the power generation equipment.
[0010] In addition, a power management method according to one embodiment of the present disclosure is a power management method for controlling a power generation facility including a solar power generation device, and includes controlling the power generation facility based on the predicted power generation, assuming that the power generation facility is a predicted power generation based on the power generation capacity of the power generation facility, and acquiring actual power generation by the power generation facility, and when it is detected in the control that a difference between the predicted power generation and the actual power generation is greater than a predetermined value, a control method of the power generation facility is temporarily changed.
[0011] In addition, a power management program according to one embodiment of the present disclosure is a power management program that causes a computer to control a power generation equipment including a solar power generation device, and causes the computer to control the power generation equipment based on the predicted power generation, assuming that the power generation by the power generation equipment is a predicted power generation based on the power generation capacity of the power generation equipment, and to obtain actual power generation by the power generation equipment, and in the controlling, if it is detected that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the control method of the power generation equipment is temporarily changed.
[0012] According to the above-mentioned power management system, power management method, and power management program, when it is detected that the difference between the predicted power generation power and the actual power generation power is greater than a predetermined value, the control method of the power generation equipment is temporarily changed by the control unit. Therefore, when the actual power generation power by the power generation equipment deviates from the predicted power generation power, it is possible to prevent the continuation of control assuming that the power generation power by the power generation equipment is the predicted power generation power. Furthermore, by making the above-mentioned change in the control method a temporary change, it is possible to prevent problems caused by continuing the change in the control method for a long period of time.
[0013] When the control unit detects that the difference is greater than a predetermined value, the control unit may temporarily change the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by the load device connected to the power generation equipment, from the predicted generated power to the actual generated power.
[0014] As described above, when it is detected that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the control unit changes the power generation by the power generation facility that is used as a reference in controlling the load power from the predicted power generation to the actual power generation, thereby making it possible to perform control according to fluctuations in the actual power generation. In other words, when the actual power generation in the power generation facility fluctuates from the expected state, it becomes possible to perform power management that takes the fluctuations into consideration.
[0015] The control unit may be configured to change the generated power by the power generation equipment that serves as a reference in controlling the load power from the actual generated power to the predicted generated power when the difference becomes smaller than a predetermined value.
[0016] By configuring the system to return to control based on the predicted power generation when the difference becomes smaller than a predetermined value, it is possible to quickly return to control based on the predicted power generation when control based on the actual power generation is no longer necessary.
[0017] The control unit may be configured to change the generated power by the power generation facility that serves as a reference in controlling the load power from the actual generated power to the predicted generated power when the difference is expected to become small.
[0018] By configuring the system to return to control based on the predicted power generation when the difference is expected to become small, it is possible to quickly return to control based on the predicted power generation when control based on the actual power generation is no longer necessary.
[0019] The control unit may be configured to temporarily change the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted generated power to the actual generated power when it detects that the difference is greater than a predetermined value and when the power generation equipment is not performing any operation that would cause the difference to become greater.
[0020] The difference between the expected power generation and the actual power generation may become large not because of some change in the power generation capacity of the power generation equipment, but because of a control operation within the range of normal operation, such as a forced shutdown of some equipment for the purpose of adjusting the power generation, etc. In response to this, as described above, by configuring the power generation equipment to change to a control in which the actual power generation is set to the power generated by the power generation equipment after confirming that no operation that would cause the difference between the expected power generation and the actual power generation to be large, it is possible to prevent a change triggered by the occurrence of a difference derived from normal operation, for example.
[0021] When the control unit detects that the difference is greater than a predetermined value and an event occurs that causes the actual generated power to be reduced, the control unit may be configured to temporarily change the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted generated power to the actual generated power.
[0022] The difference between the expected power generation and the actual power generation may become large not because an event that causes a decrease in the power generation capacity of the power generation equipment has occurred, but because of another event such as a failure in the power generation equipment or its peripheral devices. In response to this, by configuring the system to change the control so that the actual power generation is the power generated by the power generation equipment after confirming that an event that causes the actual power generation to decrease has occurred in the power generation equipment as described above, it is possible to prevent a change triggered by the occurrence of an abnormality due to, for example, a failure.
[0023] The solar power generation device may further include a detection unit that detects the presence or absence of an obstacle to the light receiving surface of a solar panel included in the solar power generation device, and the control unit may determine that an event has occurred that causes the actual power generation to become smaller when the detection unit detects an obstacle to the light receiving surface.
[0024] One possible event that can cause a decrease in the power generation capacity of a power generation facility is the occurrence of an obstacle, such as snow accumulation, that blocks a part of the light receiving surface of the solar panel. Therefore, as described above, by configuring the system to determine that an event that causes the actual power generation to decrease has occurred when the detection unit that detects the presence or absence of an obstacle on the light receiving surface of the solar panel detects an obstacle, the control unit can reliably determine the event that has occurred in the solar power generation device. Furthermore, based on this result, the control unit can appropriately temporarily change the control to one based on the actual power generation.
[0025] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings. In the description of the drawings, the same elements are given the same reference numerals and duplicated description will be omitted.
[0026] [Microgrid] The energy management system (hereinafter also referred to as "EMS" (Energy Management System)), the power management method, and the power management program according to the present embodiment are used in a microgrid.
[0027] A microgrid will be described with reference to Fig. 1. Fig. 1 is a diagram that shows a schematic configuration of a microgrid according to one embodiment. The microgrid 1 includes a power generation facility 2, a load device 3, a power storage device 4, a power regulating device 5, a power transmission network 6 that connects these devices, and an EMS 10 (power management system) that controls these devices. In the microgrid 1, the load device 3 consumes the generated power output by the power generation facility 2.
[0028] The microgrid 1 is ideally operated so that the generated power generated by the power generation facility 2 and the load power consumed by the load device 3 are equal. That is, the EMS 10 adjusts the generated power and the load power. The EMS 10 basically adjusts the generated power and the load power so that the generated power does not exceed the load power. The EMS 10 may also adjust the charging and discharging of the storage battery in the power storage device 4 as a buffer between the generated power and the load power. In the following embodiment, the "control of the load power" will be described, but the control target in this case includes at least the load power consumed by the load device 3. In addition, since the storage battery in the power storage device 4 can also be changed in conjunction with the load power as described above, the control target may also include the charging and discharging of the storage battery described above.
[0029] The microgrid 1 may be connected to a power grid 90 as necessary. In this case, the microgrid 1 can receive power shortages from the power grid 90. On the other hand, the outflow of power from the microgrid 1 to the power grid 90 (so-called reverse power flow) affects the balance between power demand and supply in the power grid 90. Therefore, in the microgrid managed by the EMS 10 according to this embodiment, reverse power flow is basically not allowed to occur.
[0030] The operation mode of the microgrid 1 may be flexibly changed. The microgrid 1 may provide all of the required power by the power generation equipment 2, or may receive a part of the required power from the power grid 90. Furthermore, the microgrid 1 may consume all of the power generated internally by the load devices 3.
[0031] The power generation facility 2 is a facility that generates power using renewable energy. In this embodiment, the power generation facility 2 is a photovoltaic (PV) power generation device, and includes a plurality of solar panels 2a and a plurality of PCSs 2b (Power Conditioning Systems: power conditioners). The power generation facility 2 may be configured to include at least a solar power generation device, but may be configured in combination with other types of renewable energy power generation devices. FIG. 1 shows, as an example, two PCSs 2b used in a solar power generation device. The PCSs 2b are power conversion devices that convert power generated by the solar panels 2a. A plurality of PCSs 2b may be provided in the power generation facility 2 and may be connected to one or more solar panels 2a. The PCSs 2b convert DC power from the solar panels 2a into AC power and output it to the power grid 6.
[0032] In the power generation facility 2, the amount of power generation can be varied by controlling the number of PCSs 2b to be operated and changing the number of solar panels 2a. When all of the multiple PCSs 2b included in the power generation facility 2 are operated, the amount of power generated by the solar panels 2a connected to the PCSs 2b (amount of power transmitted to the power transmission network 6) is maximized. On the other hand, when the operation of some of the PCSs 2b is stopped, the power generated by the solar panels 2a is not transmitted to the power transmission network 6, so the amount of power generated by the power generation facility 2 decreases. Also, it may take a certain amount of time (for example, several tens of seconds to several minutes) from when the PCSs 2b are started until the amount of power transmitted (electricity) to the power transmission network 6 corresponds to the actual capacity. This is an expected phenomenon in the power generation facility 2 in which the PCSs 2b are used.
[0033] The power generation facility 2 may be provided with a power generation capacity index calculation unit 21 that calculates an index related to the power generation capacity of the facility itself, and a panel monitoring unit 22 that monitors the state of the solar panel 2a of the power generation facility 2.
[0034] The power generation capability index calculation unit 21 has a function of predicting the amount of power generation in the power generation facility 2 and calculating it as an index. The predicted amount of power generation (predicted power generation) is a prediction of the amount of power generation in the power generation facility 2 that may vary depending on weather conditions, etc. For example, when each solar panel 2a can operate normally, and the weather is fine and the amount of sunlight irradiated onto the solar panels 2a is sufficient, power generation equivalent to the maximum amount of power generation expected in the power generation facility 2 can be performed. Therefore, under such conditions, the predicted amount of power generation is large, while when the amount of power generation is not maximum due to the amount of sunlight irradiated onto the solar panels 2a, such as in the case of cloudy weather, the maximum amount of power generation is not achievable, and the predicted power generation may be based on the amount of sunlight. In this way, the amount of power generation in the power generation facility 2 may vary mainly depending on weather conditions. The power generation capability index calculation unit 21 may be configured to calculate the predicted amount of power generation on the assumption that all the PCSs 2b are operating, and output this as a power generation capability index to the EMS 10.
[0035] The power generation capability index calculation unit 21 may, for example, prepare a sample panel simulating the solar panel 2a, and calculate the power generation capability index based on the amount of power generated by the sample panel. Alternatively, a light sensor may be used to detect the amount of sunlight, and the amount of power that can be generated based on the amount of light may be calculated as the power generation capability index. Alternatively, the power generation capability index calculation unit 21 may be configured by combining several of these methods. Note that, while FIG. 1 shows an example in which the power generation capability index calculation unit 21 is provided in the power generation facility 2, a part of the function of the power generation capability index calculation unit 21 may be provided in, for example, the EMS 10. For example, a configuration may be adopted in which parameters required for calculating the power generation capability index (for example, acquisition of information on the amount of sunlight) are obtained in the power generation facility 2 or its vicinity, and the actual calculation of the capability index is performed in the EMS 10.
[0036] In addition, when some of the PCSs 2b in the power generation facility 2 are not in operation, even if sunlight is irradiated onto the solar panels 2a, power is not transmitted by the PCSs 2b, and therefore the amount of power generated by the power generation facility 2 cannot be included. Therefore, the power generation capability index calculation unit 21 may be configured to predict the future expected power generation in the power generation facility 2 based on the operating status of the PCSs 2b as well. When calculating the expected power generation based on the operating status of the PCSs 2b, the expected power generation corresponding to the operating PCSs 2b can be obtained by multiplying the power generation capability index (total number of units) by the ratio of the number of operating PCSs 2b to the total number of PCSs 2b.
[0037] However, in this embodiment, the power generation capability index calculated by the power generation capability index calculation unit 21 is described as an expected power generation power calculated on the premise that all PCSs 2b are operating. In other words, the "power generation capability index" described below is treated as an expected power generation power calculated under the condition that all PCSs 2b are operating.
[0038] The panel monitoring unit 22 monitors the status of the solar panel 2a, and in particular monitors whether there is an obstacle to the light receiving surface of the solar panel 2a. For example, if a part of the light receiving surface of the solar panel 2a is covered with an object that can block light, such as fallen leaves or snow, even if the solar panel 2a is sufficiently irradiated with sunlight, the amount of light received by the solar panel 2a may be reduced, and as a result, the amount of power generation may decrease. As described above, the panel monitoring unit 22 has a function of monitoring whether there is an event that can interfere with the irradiation of sunlight to the solar panel 2a, and in particular, monitoring whether there is an obstacle. As a monitoring method, for example, a configuration in which the light receiving surface of the solar panel 2a is imaged by a camera may be used. In addition, a sensor that can detect the same type of condition when snow, fallen leaves, etc. occur on the solar panel 2a may be used, for example, a snowfall sensor may be used. For example, a sample panel similar to the solar panel 2a may be prepared, and the presence or absence of an obstacle blocking a part of the surface of the sample panel may be determined as the presence or absence of an obstacle to the solar panel 2a. The panel monitoring unit 22 may be configured to operate constantly, or may be configured to perform monitoring in response to an instruction from the EMS 10, for example.
[0039] Furthermore, the power generation facility 2 is provided with an actual power generation amount measuring unit 23 for measuring the actual power generation amount in the facility itself. The actual power generation amount measuring unit 23 may be configured to measure the actual power generation amount in the power generation facility 2 by measuring the power output from the power generation facility 2 to the power grid 6. However, the method of measuring the actual power generation amount is not limited to the above method.
[0040] The load device 3 is connected to the power generation facility 2, the power storage device 4, and the power grid 90 via a power transmission network 6. The load device 3 consumes the power generated by the power generation facility 2 and the power supplied from the power grid 90 to perform a desired operation. Note that the load device 3 may be configured to operate in cooperation with a load device or the like provided outside the microgrid 1.
[0041] The power storage device 4 stores energy associated with the power generated by the power generation facility 2. In this embodiment, the power storage device 4 charges and discharges the power generated by the power generation facility 2. The power storage device 4 outputs a constant amount of output power to the load device 3, for example. Note that, instead of the power storage device 4, the microgrid 1 may include a device that produces an energy carrier other than electricity (for example, hydrogen or ammonia) to store or supply the generated power generated by the power generation facility 2.
[0042] The power conditioning device 5 is connected to, for example, the power generation facility 2, the load device 3, the power storage device 4, and the power system 90, and outputs a predetermined power, which is a combination of the power generated from the power generation facility 2, the output power from the power storage device 4, and the power supplied from the power system 90, to the load device 3 under the control of the EMS 10. For example, the power conditioning device 5 outputs a certain amount of output power output from the power storage device 4 and a part of the power generated by the power generation facility 2 to the load device 3. The part of the generated power output by the power conditioning device 5 to the load device 3 is power equivalent to a shortage of the output power from the power storage device 4 relative to the load power. When the power generated by the power generation facility 2 and the output power from the power storage device 4 alone are insufficient to meet the load power, the power conditioning device 5 may make up for the shortage with the supply power purchased from the power system 90. The power conditioning device 5 may always output the supply power from the power system 90 to the load device 3. These operations related to the distribution of power by the power conditioning device 5 are performed under the control of the EMS 10 as described above.
[0043] [EMS] The EMS 10 manages the power generated by the power generation facility 2, the load power by the load device 3, the output power by the power storage device 4, and the power supplied from the power grid 90. Fig. 2 is a diagram showing the functional configuration of the EMS. The EMS 10 controls the power generation facility 2, the load device 3, the power storage device 4, and the power regulating device 5. The EMS 10 controls the PCS 2b of the power generation facility 2.
[0044] 2, the EMS 10 includes, as functional units, a power generation capacity index acquisition unit 11, an actual power generation amount information acquisition unit 12 (power generation information acquisition unit), a related information acquisition unit 13, a control unit 14, and a control information storage unit 15. The control unit 14 has a control content determination unit 16 and a control content command unit 17. These functional units may be integrated into one computer, or may be distributed across multiple computers.
[0045] The power generation capability index acquiring unit 11 has a function of acquiring the power generation capability index calculated by the power generation capability index calculating unit 21. The power generation capability index acquiring unit 11 acquires the power generation capability index from the power generation capability index calculating unit 21, for example, at a predetermined interval. The acquired power generation capability index is used by the control content determining unit 16 in the control unit 14. Note that, as described above, in a configuration in which the power generation capability index is calculated by the EMS 10 instead of the power generation capability index calculating unit 21, for example, the power generation capability index acquiring unit 11 may acquire information required for calculating the power generation capability index (information on the amount of sunlight, etc.) and the power generation capability index acquiring unit 11 may calculate the power generation capability index.
[0046] The actual power generation amount information acquiring unit 12 has a function of acquiring the actual power generation amount measured by the actual power generation amount measuring unit 23. The actual power generation amount information acquiring unit 12 acquires the actual power generation amount, for example, at a predetermined interval, from the actual power generation amount measuring unit 23. The acquired actual power generation amount is used by the control content determining unit 16 in the control unit 14.
[0047] The related information acquisition unit 13 has a function of acquiring information (related information) that may affect the determination of the control content in the control content determination unit 16 of the control unit 14. As will be described later in detail, the control unit 14 may change the calculation method of the load power in the load device 3 as the control content, taking into account the difference between the power generation capacity index and the actual power generation amount. At that time, the control unit 14 may use the related information acquired by the related information acquisition unit 13 to determine whether to change the calculation method of the load power in the load device 3. The related information used at this time is information indicating the presence or absence of a cause that may cause the actual power generation amount to vary, and one example is the monitoring result of the panel monitoring unit 22 regarding the state of the light receiving surface of the solar panel 2a. As another example, weather information in the vicinity of the microgrid 1 (particularly the power generation facility 2) may be used as the related information. This information is used to check whether an event that contributes to a change in the power generation capacity of the power generation facility 2 has occurred when the actual power generation amount in the power generation facility 2 deviates from the predicted power generation based on the power generation capacity index.
[0048] The control unit 14 may determine an operation policy for power in the microgrid 1 based on the information acquired by the power generation capability index acquisition unit 11, the actual power generation amount information acquisition unit 12, and the related information acquisition unit 13, and may determine the control content of each part of the microgrid 1. The control unit 14 may also control each part of the microgrid 1 based on the determined control content.
[0049] The control content determination unit 16 has a function of determining the control content of each unit of the microgrid 1. Specifically, the control content determination unit 16 determines the load power of the load device 3 according to the power generated in the power generation facility 2. Then, the control content determination unit 16 determines the output power of the power storage device 4 and the power supply from the power grid 90. When the control content determination unit 16 determines the control content, information other than that acquired by the power generation capacity index acquisition unit 11, the actual power generation amount information acquisition unit 12, and the related information acquisition unit 13 may also be utilized.
[0050] The control content command unit 17 has a function of issuing commands to each part of the microgrid 1 and controlling each part based on the control content determined by the control content determination unit 16. Specifically, the control content command unit 17 can issue commands to the power generation equipment 2, the load device 3, and the power regulating device 5 to control each part.
[0051] The control information holding unit 15 has a function of holding various information used for the above control. For example, logic for determining the control content in the control content decision unit 16 may be held in the control information holding unit 15. The determined control content may also be held for a predetermined period of time in the control information holding unit 15. Furthermore, the control information holding unit 15 may have a function of holding information acquired by the power generation capacity index acquisition unit 11, the actual power generation amount information acquisition unit 12, and the related information acquisition unit 13.
[0052] [Power management method] The power management method by the EMS 10 will be described with reference to Fig. 3. Fig. 3 is a flow diagram illustrating the power management method.
[0053] As a premise, during normal operation, the EMS 10 calculates the load power of the load device 3 based on the power generation capability index calculated by the power generation capability index calculation unit 21, and controls each unit of the microgrid 1. The control unit 14 of the EMS 10 adjusts the load power of the load device 3 so that the generated power can be utilized, on the premise that the amount of power generated indicated by the power generation capability index acquired by the power generation capability index acquisition unit 11 is transmitted from the power generation facility 2 to the power transmission network 6.
[0054] Meanwhile, the EMS 10 measures the power actually sent from the power generation facility 2 to the power grid 6 in the actual power generation measuring unit 23, and acquires the result in the actual power generation information acquiring unit 12. With this configuration, the EMS 10 can grasp the occurrence of a discrepancy between the power generation capability index and the actual power generation amount. Therefore, the EMS 10 periodically (for example, every few minutes to every few hours) evaluates the difference between the power generation capability index and the actual power generation amount. The flow diagram shown in FIG. 3 shows the operation procedure of the EMS 10 when, as described above, during normal operation, the EMS 10 performs control based on the power generation capability index and monitors the difference between the power generation capability index and the actual power generation amount.
[0055] First, the control content determination unit 16 of the EMS 10 determines whether the difference between the power generation capacity index and the actual power generation amount (actual power generation amount) is equal to or greater than a threshold (step S01). The threshold may be set to be sufficiently larger than the difference that may occur during normal operation. Even during normal operation, there may be times when the difference between the power generation capacity index and the actual power generation amount becomes large due to the operation settings of each unit, etc. The threshold may be set taking into consideration such power fluctuations that occur during normal operation.
[0056] If the result of the determination is that the difference between the power generation capacity index and the actual power generation amount (actual power generation amount) is less than the threshold (S01-NO), the control content determination unit 16 of the EMS 10 determines to continue normal operation and continues control. On the other hand, if the difference between the power generation capacity index and the actual power generation amount (actual power generation amount) is equal to or greater than the threshold (S01-YES), the control content determination unit 16 checks whether there is a history of forcibly stopping the operation of the PCS 2b included in the power generation facility 2 as the cause of the difference between the power generation capacity index and the actual power generation amount being equal to or greater than the threshold (step S02).
[0057] The forced stop of the operation of the PCS 2b, which is the judgment criterion in step S02, is a control content that may occur even during normal operation of the microgrid 1. As an example, when a reverse power flow from the microgrid 1 to the power system 90 may occur due to a small load power of the load device 3, the EMS 10 may suppress the power generation amount by forcibly stopping the PCS 2b in the power generation equipment 2 to prevent the reverse power flow. When the PCS 2b is stopped, a deviation from the power generation capacity index that assumes that all the PCSs 2b are in operation inevitably occurs. The forced stop of the PCS 2b to suppress the reverse power flow may be released at the stage when the possibility of reverse power flow is eliminated (the PCS 2b may be restarted). The forced stop and restart may be repeated in terms of the possibility of reverse power flow. Therefore, the forced stop of the PCS 2b may be repeated in a short period of time, and the forced stop state may continue for a certain amount of time.
[0058] Furthermore, when attempting to start the PCS 2b from a stopped state, as described above, a certain amount of time (e.g., several tens of seconds to several minutes) is required until the amount of transmitted power (electricity) returns to a state corresponding to the actual capacity. Thus, if there is a history of forcibly stopping the operation of the PCS 2b included in the power generation facility 2, it is possible that the reduced amount of power generation is due to the forcible stopping of the PCS 2b. Therefore, in step S02, by determining whether or not there is such a history, it is determined whether or not the difference is due to the control by the EMS 10 during normal operation.
[0059] In the microgrid 1, it is not assumed that the PCS 2b of the power generation equipment 2 will be stopped for a long period of time, and even if the PCS 2b is stopped, it is controlled to start it again in a short period of time (several minutes to several tens of minutes). Therefore, the period for determining whether or not there is a history of a forced stop is set longer than a certain period of time (for example, several minutes) required for the PCS 2b to return from being started. In addition, the duration of the stoppage of the PCS 2b that can be assumed in normal operation in the microgrid 1 may be set as the upper limit. If there is no history of any of the PCSs 2b of the power generation equipment 2 being forced to stop by control by the EMS 10 or manual operation within the determination period set under the above conditions, it is determined that there is no history of the operation of the PCS 2b included in the power generation equipment 2 being forced to stop (S02-NO).
[0060] On the other hand, when it is determined that any of the PCSs 2b of the power generation facility 2 has a history of being forcibly stopped by the control of the EMS 10 or by manual operation (S02-YES), it is determined whether there is a discrepancy between the expected power generation calculated based on the number of PCSs 2b in operation and the actual power generation amount (step S03). If there is a PCS 2b that continues to be stopped after being forcibly stopped, or if there is a PCS 2b that has been started but has not returned to an operating state, it is not possible to generate power corresponding to the power generation capacity index, so it is natural that there will be a discrepancy between the power generation capacity index and the actual power generation amount. Therefore, by using the number of PCSs 2b in operation, the expected power generation when all the PCSs 2b actually operating demonstrate their power generation capacity without any problems is calculated by calculating "power generation capacity index x (number of PCSs in operation / total number of PCSs)". Then, it is determined whether there is a discrepancy between the expected power generation and the actual power generation amount in the power generation facility 2. When determining whether there is a discrepancy, a threshold value may be set as in step S01. If it is determined that there is no deviation (S03-NO), the control content is not changed and normal operation control is continued. On the other hand, if it is determined that there is a deviation (S03-YES), it is determined whether an event affecting power generation has occurred for the solar panel 2a, in the same way as if it was determined that there is no history of forced shutdown (S02-NO).
[0061] Specifically, the presence or absence of information on an event that affects the actual power generation amount is determined based on the related information acquired by the related information acquisition unit 13 (step S04). Specifically, the determination is based on whether the monitoring result related to the state of the light receiving surface of the solar panel 2a by the panel monitoring unit 22 and meteorological information (information on snowfall), etc. acquired by the related information acquisition unit 13 include information indicating a state in which the light receiving surface of the solar panel 2a cannot properly receive sunlight. If it is determined that there is information on an event that affects the actual power generation amount (S04-YES), the control content determination unit 16 of the EMS 10 determines that the situation is such that power generation corresponding to the power generation capacity index cannot be performed due to the event that affects the actual power generation amount. Therefore, the control content determination unit 16 changes the method of determining the load power of the load device 3 by the EMS 10 from a method using the power generation capacity index to a method using the actual power generation amount (step S05). As a result, the load power is calculated based on the actual power generation amount, and the control content command unit 17 issues a command to each unit to control the load power of the load device 3.
[0062] When the control of the load power based on the actual power generation amount is started, the EMS 10 may monitor the number of PCSs 2b in operation. During normal operation, when a difference occurs between the power generation capacity index and the actual power generation amount, the EMS 10 increases the load power of the load device 3 to start the stopped PCS 2b. On the other hand, when the control of the load power based on the actual power generation amount is started as described above, it is assumed that the comparison with the power generation capacity index will not be made and there will be no opportunity to control to start the stopped PCS 2b. Therefore, the EMS 10 may monitor the number of operating PCSs 2b, and when there is a PCS 2b that continues to be stopped, control to increase the load power of the load device 3 so that the PCS 2b is started.
[0063] On the other hand, if it is determined that there is no information on an event that affects the actual power generation amount (S04-NO), it is determined that the power generation corresponding to the power generation capacity index cannot be performed due to a cause other than an event that affects the actual power generation amount, such as snowfall. As a result, the control content decision unit 16 of the EMS 10 decides not to change the control content itself from the normal operation. However, an error notification is output to notify the manager of the EMS 10 of the possibility of some problem (step S06). A possible cause of not being able to generate power corresponding to the power generation capacity index is, for example, a failure of a part of the device that is not related to events such as snow accumulation and fallen leaves. In this case, repair or replacement of the failed part is required. In addition, it is possible that the power generation capacity during normal times decreases due to long-term use of the solar panel 2a or PCS 2b of the power generation facility 2. In this case, it is required to correct the power generation capacity index itself to correspond to the actual power generation capacity of the power generation facility 2. In either case, the manager is notified of some problem by an error notification.
[0064] When the method of determining the load power in the load device 3 by the EMS 10 is changed to a method using the actual power generation amount (step S05), the method of determining the load power is returned to the original method using the power generation capacity index at some timing. The control unit 14 (control content determination unit 16, control content command unit 17) of the EMS 10 also performs control related to changing the method of determining the load power to a method using the power generation capacity index. There is no particular limitation on the method of setting the timing at which the EMS 10 returns the method of determining the load power to the method using the power generation capacity index. As an example, the control unit 14 of the EMS 10 may monitor the difference between the power generation capacity index (estimated power generation calculated according to the number of operating PCSs 2b in the case where a stopped PCS 2b exists) and the actual power generation amount, and may return to the method using the power generation capacity index when the difference falls within a threshold value.
[0065] In addition, when information is obtained as a result of monitoring by the panel monitoring unit 22 acquired by the related information acquisition unit 13, which indicates that an obstacle such as snow has been removed from the light receiving surface of the solar panel 2a, this may be used as a trigger for the change. Specifically, when it is confirmed that there is no snow in the image captured by the camera, this may be used as a trigger for the change in control. This information can be said to be information that specifies that an obstacle related to power generation in the solar panel 2a has been removed. In addition, when information is obtained from the snowfall sensor that indicates that snow has melted, this information may be used as a trigger for the change in control. Furthermore, when it is determined that, for example, snow has melted based on meteorological information, the acquisition of this information may be used as a trigger for the change to control based on the power generation capacity index. Such information may be said to be information that indicates that the removal of an obstacle is expected. Or, it may be said to be information that indicates that the removal of an obstacle is expected.
[0066] It is also possible to use a method in which the load power determination method is changed to a method using the power generation capacity index after a predetermined time has elapsed after changing the load power determination method to a method using the actual power generation amount, or the like. It is also considered that the possible response will change depending on events that are thought to affect the reception of light on the light receiving surface of the solar panel 2a. Therefore, a method of returning the load power determination method to its original state may be set based on the installation location of the power generation facility 2 and events that are thought to affect the reception of light on the light receiving surface of the solar panel 2a.
[0067] [Hardware configuration] The hardware configuration of the EMS 10 will be described with reference to Fig. 4. Fig. 4 is a diagram showing an example of the hardware configuration of the EMS 10. The EMS 10 includes one or more computers 100. The computer 100 has a CPU (Central Processing Unit) 101, a main memory unit 102, an auxiliary memory unit 103, a communication control unit 104, an input device 105, and an output device 106. The EMS 10 is configured by one or more computers 100 configured by this hardware and software such as programs.
[0068] When the EMS 10 is composed of multiple computers 100, these computers 100 may be connected locally or via a communication network such as the Internet or an intranet. This connection logically constitutes one EMS 10.
[0069] The CPU 101 executes an operating system, application programs, and the like. The main memory unit 102 is composed of a ROM (Read Only Memory) and a RAM (Random Access Memory). The auxiliary memory unit 103 is a storage medium composed of a hard disk, a flash memory, and the like. The auxiliary memory unit 103 generally stores a larger amount of data than the main memory unit 102. At least a part of each unit constituting the EMS 10 is realized by the auxiliary memory unit 103. The communication control unit 104 is composed of a network card or a wireless communication module. At least a part of each unit constituting the EMS 10 may be realized by the communication control unit 104. The input device 105 is composed of a keyboard, a mouse, a touch panel, a microphone for voice input, and the like. The output device 106 is composed of a display, a printer, and the like. For example, the EMS 10 may display command contents, etc. from the control content command unit 17 on a display, etc.
[0070] The auxiliary storage unit 103 stores the program 110 and data necessary for processing in advance. The program 110 causes the computer 100 to execute each functional element of the EMS 10. The program 110 causes the computer 100 to execute, for example, the processing related to the above-mentioned steps S01 to S06. For example, the program 110 is read by the CPU 101 or the main storage unit 102, and causes at least one of the CPU 101, the main storage unit 102, the auxiliary storage unit 103, the communication control unit 104, the input device 105, and the output device 106 to operate. For example, the program 110 reads and writes data in the main storage unit 102 and the auxiliary storage unit 103.
[0071] The program 110 may be provided in a state recorded on a tangible recording medium such as a CD-ROM, a DVD-ROM, a semiconductor memory, etc. The program 110 may be provided as a data signal via a communication network.
[0072] Specifically, the program 110 is a power management program that causes a computer to adjust the load power consumed by a load device 3 connected to a power generation facility including a solar power generation facility, and causes the computer to control the load power based on the predicted power generation, assuming that the power generation by the power generation facility 2 is the predicted power generation based on the power generation capacity of the power generation facility, and to acquire the actual power generation by the power generation facility 2. In this case, when it is detected in the control that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the power generation by the power generation facility that is used as a reference in the control of the load power is temporarily changed from the predicted power generation to the actual power generation.
[0073] [Effect] According to the above-described power management system (EMS10), power management method, and power management program, when it is detected that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the control unit 14 temporarily changes the control method for the power generation facility 2. Therefore, when the actual power generation by the power generation facility 2 deviates from the predicted power generation, the continuation of control assuming that the power generation by the power generation facility 2 is the predicted power generation is prevented.
[0074] Furthermore, as a temporary change in the control method of the power generation equipment 2, the control unit 14 changes the power generated by the power generation equipment 2, which is used as a reference in controlling the load power consumed by the load device 3 connected to the power generation equipment 2, from the predicted power generation to the actual power generation. Therefore, when the actual power generation by the power generation equipment 2 deviates from the predicted power generation, it is possible to prevent the continuation of control under the assumption that the power generation by the power generation equipment 2 is the predicted power generation. In other words, when the actual power generation by the power generation equipment fluctuates from the expected state, it becomes possible to perform power management that takes the fluctuation into consideration.
[0075] In addition, the control in the state where the predicted power generation is changed to the actual power generation is configured to be temporary. This configuration can prevent problems caused by continuing the control of the load power based on the actual power generation for a long period of time. The EMS 10, which is designed on the premise that the load power is calculated based on the predicted power generation, may include control using the difference between the predicted power generation and the actual power generation. Therefore, if the load power is calculated using the actual power generation for a long period of time, it becomes impossible to perform control using the difference between the predicted power generation and the actual power generation, which is assumed during normal operation, and unexpected problems may occur. In response to this, the control related to the calculation of the load power based on the actual power generation is configured to be temporary, thereby preventing the occurrence of the above-mentioned events.
[0076] Furthermore, when the control unit 14 of the EMS 10 detects that the difference is greater than a predetermined value and the power generation equipment 2 is not performing an operation that would cause the difference to become large, the power generation equipment 2 may change the power generation by the power generation equipment 2, which is the reference for the control of the load power, from the predicted power generation to the actual power generation. The difference between the predicted power generation and the actual power generation may become large not because of some change in the power generation capacity of the power generation equipment 2, but because of a control operation within the range of normal operation, such as a forced stop of some equipment for the purpose of adjusting the power generation, etc. Specifically, a forced stop to prevent reverse power flow, as described in the above embodiment, is assumed. In response to this, by configuring the control to change to the power generation by the power generation equipment 2 as the actual power generation after confirming that the power generation equipment 2 is not performing an operation that would cause the difference between the predicted power generation and the actual power generation to become large, it is possible to prevent a change triggered by the occurrence of a difference derived from normal operation, for example.
[0077] Furthermore, when the control unit 14 of the EMS 10 detects that the difference is greater than a predetermined value and an event that causes the actual power generation power to be reduced occurs, the power generation by the power generation equipment 2, which is the reference in the control of the load power, may be changed from the predicted power generation to the actual power generation. The difference between the predicted power generation and the actual power generation may become large due to another event such as a failure in the power generation equipment or its peripheral devices. In such a case, if the power generation by the power generation equipment 2, which is the reference in the control of the load power, is changed from the predicted power generation to the actual power generation, it may be difficult to find the occurrence of a failure or the like early on. Therefore, as described above, by configuring the control so that the actual power generation is changed to the power generation by the power generation equipment after confirming that an event that causes the actual power generation power to be reduced occurs in the power generation equipment 2, it is possible to prevent a change triggered by the occurrence of an abnormality caused by, for example, a failure.
[0078] In order to realize the above configuration, the solar power generation device may further include a panel monitoring unit 22 as a detection unit that detects the presence or absence of an obstacle to the light receiving surface of the solar panel 2a included in the solar power generation device. Furthermore, when the panel monitoring unit 22 as a detection unit detects an obstacle to the light receiving surface, the control unit 14 may determine that an event that causes the actual power generation to decrease has occurred. With the above configuration, the control unit 14 can reliably determine the event that has occurred in the solar power generation device. Furthermore, based on this result, the control unit 14 can appropriately temporarily change the control to one based on the actual power generation.
[0079] Furthermore, when the difference becomes smaller than a predetermined value, the control unit 14 of the EMS 10 may change the power generated by the power generation facility 2, which is used as a reference in the control of the load power, from the actual power generation power to the predicted power generation power. With this configuration, when the control based on the actual power generation power becomes unnecessary, it is possible to quickly return to the control based on the predicted power generation power.
[0080] Furthermore, when the difference is expected to become small, the control unit 14 of the EMS 10 may change the power generated by the power generation facility 2, which is used as a reference in the control of the load power, from the actual power generation to the predicted power generation. With this configuration, when the control based on the actual power generation becomes unnecessary, it is possible to quickly return to the control based on the predicted power generation.
[0081] [Variations] As described above, the present disclosure is not necessarily limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present disclosure.
[0082] For example, the order of the determinations (S01 to S04) shown in the flow (FIG. 3) for determining whether to change the load power calculation method described in the above embodiment may be changed. In addition, determinations other than the determination (S01) of whether the difference is equal to or greater than a threshold value may be omitted. Depending on the configuration of the microgrid 1 and the operation logic during normal operation by the EMS 10, it is assumed that each determination may not be necessary. Therefore, the contents of the determinations may be changed as appropriate, taking into account the operating environment, etc.
[0083] In addition, in the above embodiment, a case has been described in which the power generation capacity index acquisition unit 11 acquires a power generation capacity index (estimated power generation on the assumption that all PCSs 2b are operating) from the power generation capacity index calculation unit 21, but the expected power generation may also be calculated by the EMS 10.
[0084] [others] This disclosure can contribute to the spread and expansion of renewable energy. Therefore, this disclosure can contribute to, for example, Goal 7 of the Sustainable Development Goals (SDGs) "Ensure access to affordable, reliable, sustainable and modern energy for all."
[0085] [Note] The present disclosure includes the following configurations. [1] A power management system for controlling a power generation facility including a solar power generation device, A control unit that controls the power generation facility based on an expected power generation amount, the expected power generation amount being based on a power generation capacity of the power generation facility; a power generation information acquisition unit that acquires actual power generation by the power generation facility, The control unit temporarily changes a control method of the power generation facility when detecting that a difference between the predicted power generation power and the actual power generation power is greater than a predetermined value. [2] The power management system described in [1], wherein when the control unit detects that the difference is greater than a predetermined value, the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, is temporarily changed from the predicted generated power to the actual generated power. [3] The power management system described in [2], wherein the control unit changes the generated power by the power generation equipment, which is used as a reference for controlling the load power, from the actual generated power to the predicted generated power when the difference becomes smaller than a predetermined value. [4] The power management system described in [2], wherein the control unit changes the generated power by the power generation equipment, which is used as a reference for controlling the load power, from the actual generated power to the predicted generated power when the difference is expected to become small. [5] The power management system according to any one of [1] to [4], wherein when the control unit detects that the difference is greater than a predetermined value and when the power generation equipment is not performing an operation that would cause the difference to become greater, the control unit temporarily changes the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted generated power to the actual generated power. [6] The power management system according to any one of [1] to [5], wherein when the control unit detects that the difference is greater than a predetermined value and an event occurs that causes the actual power generation power to become smaller, the power generation power by the power generation equipment that is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment is temporarily changed from the predicted power generation power to the actual power generation power. [7] The solar power generation device further includes a detection unit that detects the presence or absence of an obstacle to a light receiving surface of a solar panel included in the solar power generation device, The power management system described in [6], wherein the control unit determines that an event has occurred that causes the actual generated power to decrease when the detection unit detects an obstacle to the light receiving surface. [8] A power management method for controlling a power generation facility including a solar power generation device, comprising: controlling the power generation facility based on a predicted power generation amount assuming that the power generation amount by the power generation facility is a predicted power generation amount based on a power generation capacity of the power generation facility; acquiring actual power generated by the power generation facility; The power management method includes temporarily changing a control method for the power generation facility when it is detected that a difference between the predicted generated power and the actual generated power is greater than a predetermined value during the controlling. [9] A power management program that causes a computer to control a power generation facility including a solar power generation device, controlling the power generation facility based on a predicted power generation amount assuming that the power generation amount by the power generation facility is a predicted power generation amount based on a power generation capacity of the power generation facility; acquiring an actual power generated by the power generation facility; a power management program for temporarily changing a control method for the power generation facility when it is detected that a difference between the predicted power generation power and the actual power generation power is greater than a predetermined value during the control; [Explanation of symbols]
[0086] 1. Microgrid 2. Power generation facilities 2a Solar Panel 2b PCS 3 Load device 4. Energy storage device 5 Power regulator 6. Power grid 10 EMS (Electricity Management System) 11 Power Generation Capacity Index Acquisition Department 12 Actual power generation information acquisition unit (power generation information acquisition unit) 13 Related Information Acquisition Department 14 Control section 15 Control information storage unit 16 Control content determination unit 17 Control Content Command Section 21 Power generation capacity index calculation section 22 Panel monitoring unit (detection unit) 23 Actual power generation measurement section 90 Power system 100 Computers
Claims
1. A power management system for controlling a power generation facility including a solar power generation device, A control unit that controls the power generation facility based on an expected power generation amount, assuming that the power generation amount by the power generation facility is an expected power generation amount based on a power generation capacity of the power generation facility; a power generation information acquisition unit that acquires actual power generation by the power generation facility, When the control unit detects that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the control unit temporarily changes the power generation by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted power generation to the actual power generation.
2. 2. The power management system according to claim 1, wherein when the difference becomes smaller than a predetermined value, the control unit changes the generated power by the power generation equipment that serves as a reference in controlling the load power from the actual generated power to the predicted generated power.
3. 2. The power management system according to claim 1, wherein the control unit changes the generated power by the power generation equipment that serves as a reference in controlling the load power from the actual generated power to the predicted generated power when the difference is expected to become small.
4. 2. The power management system according to claim 1, wherein when the control unit detects that the difference is greater than a predetermined value and when the power generation equipment is not performing an operation that would cause the difference to become greater, the control unit temporarily changes the generated power by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted generated power to the actual generated power.
5. 2. The power management system according to claim 1, wherein when the control unit detects that the difference is greater than a predetermined value and an event occurs that causes the actual generated power to be reduced, the control unit temporarily changes the generated power by the power generation equipment that is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment from the predicted generated power to the actual generated power.
6. The solar power generation device further includes a detection unit that detects the presence or absence of an obstacle to a light receiving surface of a solar panel included in the solar power generation device, The power management system according to claim 5 , wherein the control unit determines that an event causing a decrease in the actual generated power has occurred when the detection unit detects an obstacle to the light receiving surface.
7. A power management method for controlling a power generation facility including a solar power generation device, comprising: controlling the power generation facility based on a predicted power generation amount assuming that the power generation amount by the power generation facility is a predicted power generation amount based on a power generation capacity of the power generation facility; acquiring actual power generated by the power generation facility; A power management method in which, when it is detected in the control that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, the power generation by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, is temporarily changed from the predicted power generation to the actual power generation.
8. A power management program that causes a computer to control a power generation facility including a solar power generation device, controlling the power generation facility based on a predicted power generation amount assuming that the power generation amount by the power generation facility is a predicted power generation amount based on a power generation capacity of the power generation facility; acquiring an actual power generated by the power generation facility; A power management program that, when it is detected during the control that the difference between the predicted power generation and the actual power generation is greater than a predetermined value, temporarily changes the power generation by the power generation equipment, which is used as a reference for controlling the load power consumed by a load device connected to the power generation equipment, from the predicted power generation to the actual power generation.
Citation Information
Patent Citations
Premise power management system
JP2014117003A
Fuel cell controller, fuel cell control system, fuel cell control method and computer program
JP2016126983A
Power management system
WO2020203993A1