Work management support method, information processing device, and computer program
The system addresses the challenge of acquiring accurate work progress data by using site devices and AI to create and present work plans, reducing worker and manager burdens through efficient staff allocation and real-time adjustments.
Patent Information
- Application Number
- JP2024110120
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-02-18
AI Technical Summary
Conventional work management systems face challenges in accurately acquiring information about work progress at the site, leading to increased worker burden and inadequate staff allocation plans, which fail to provide effective improvement plans to managers.
A work management support method and service that utilizes an information processing device to create and present work plans and personnel allocation plans based on real-time data from the site, reducing worker input burden by using devices like microphones and cameras to collect data and AI for optimization.
Enables efficient creation of improvement plans that reduce manager burden by accurately reflecting work progress and staff allocation, allowing for timely adjustments to meet production demands without overburdening workers.
Smart Images

Figure 0007595316000001 
Figure 0007595316000002 
Figure 0007595316000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a work management support method and a work management support service providing method, in which an information processing device performs processing to support management operations at a production site that produces a predetermined product through a plurality of operations. [Background technology]
[0002] 2. Description of the Related Art In recent years, work management support systems that support the work of managers who manage work processes and personnel allocation in order to appropriately produce products have become widespread in production bases such as food factories.
[0003] In such a work management support system, sudden changes may occur on the day with respect to the worker's work plan (work shift) or the product production plan (e.g. order quantity). For example, the order quantity may change on the day due to factors such as weather. In addition, delays in the progress of work may occur due to various causes. Furthermore, a worker may be absent on the day due to factors such as illness or accident. In this case, if work proceeds according to the current work plan, the production of the product will not be in time for the delivery date.
[0004] In view of this, a technique is known in the past in which a worker performs an input operation related to the progress of work, thereby acquiring information on the current progress of the work, and issuing necessary instructions to eliminate the delay in the work (see Patent Document 1).In addition, a technique is known in a system for managing the work of workers, in which the movement of the worker is detected, and the work schedule is changed according to the work status of the worker (see Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2014-235495 A [Patent Document 2] Patent No. 4884256 Summary of the Invention [Problem to be solved by the invention]
[0006] However, in the conventional technology disclosed in Patent Document 1, since information on the actual progress of work at the work site is acquired through input operations by the worker, there is a problem that the burden on the worker increases when attempting to acquire more information on the actual progress of work at the work site. Also, in the conventional technology disclosed in Patent Document 2, the work process plan (work schedule) is changed, but the personnel allocation plan is not changed, so there is a problem that a sufficiently effective improvement proposal cannot be presented to the manager, and the manager's burden cannot be sufficiently reduced.
[0007] Therefore, the main object of the present invention is to provide a work management support method and a work management support service providing method that can present appropriate improvement proposals to a manager without placing a heavy burden on workers, thereby reducing the manager's burden. [Means for solving the problem]
[0008] The work management support method of the present invention is a work management support method in which an information processing device performs processing to support management operations at a production base that produces a specified end product through a plurality of tasks, in which a processor of the information processing device creates a work plan including a work process plan and a personnel allocation plan based on information relating to the production plan of the end product and the work plans of workers, performs output processing to present information about the work plan to a manager, obtains current status information based on information collected using an information collection device arranged at a work site and information relating to changes to the production plan and changes to the work plan, creates an improvement plan for at least one of the work process plan and the personnel allocation plan included in the work plan based on the current status information and the current work plan, and performs output processing to present information about the improvement plan to a manager.
[0009] In addition, the work management support service providing method of the present invention is a work management support service providing method for providing a work management support service based on the work management support method, wherein the information processing device is a server device connected via a network to the information collection device disposed at each of a plurality of production bases, and a base ID is assigned to each of the plurality of production bases, and the work management support service is provided to the plurality of production bases. Effect of the Invention
[0010] According to the present invention, since the current status information on the implementation status of the work is acquired based on the information collected by the information collecting device arranged at the work site, even if the necessary information is acquired by the input operation of the worker, a large burden is not imposed on the worker. In addition, since the appropriate improvement proposal for the work plan including the work process plan and the personnel allocation plan can be presented to the manager, the burden on the manager can be reduced. [Brief description of the drawings]
[0011] [Figure 1] Overall configuration of a work management support system according to the present embodiment. [Diagram 2] An explanatory diagram showing an example of a work process for producing a deliverable at a production site. [Diagram 3] FIG. 1 is an explanatory diagram showing an overview of process management and personnel management performed by the server 1. [Figure 4] FIG. 1 is an explanatory diagram showing the skill information for each worker managed by the server 1. [Diagram 5] An explanatory diagram showing the process management and personnel management procedures performed by the server 1. [Figure 6] An explanatory diagram showing a work process plan created by the server 1. [Figure 7] An explanatory diagram showing a work plan created by Server 1 [Figure 8] An explanatory diagram showing a pop-up screen displayed on the administrator terminal 2. [Figure 9] FIG. 1 is an explanatory diagram showing an overview of a process for personnel allocation in the event of a personnel shortage, which is performed by the server 1; [Figure 10] FIG. 1 is an explanatory diagram showing an overview of a work performance information acquisition process performed by the server 1. [Figure 11] A block diagram showing the schematic configuration of the server 1. [Figure 12] Sequence diagram showing the operation procedure of Server 1 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] The first invention made to solve the above problems is a work management support method in which an information processing device performs processing to support management operations at a production base that produces a specified end product through a plurality of tasks, in which a processor of the information processing device creates a work plan including a work process plan and a personnel allocation plan based on information relating to the production plan of the end product and the work plan of workers, performs output processing to present information about the work plan to a manager, acquires current status information based on information collected using an information collection device arranged at a work site and information about changes to the production plan and changes to the work plan, creates an improvement plan for at least one of the work process plan and the personnel allocation plan included in the work plan based on the current status information and the current work plan, and performs output processing to present information about the improvement plan to a manager.
[0013] According to this, since the current status information on the work implementation status is obtained based on the information collected by the information collecting device arranged at the work site, even if the necessary information is obtained by the worker's input operation, a large burden is not imposed on the worker. Also, since the system can present the manager with appropriate improvement proposals for the work plan including the work process plan and the personnel allocation plan, the burden on the manager can be reduced.
[0014] In addition, in a second invention, the processor is configured to acquire, as the current status information, work performance information on the working status of the worker at the current time, work performance information on the implementation status of the work at the current time, and production change information on changes in conditions that affect the production of the deliverable at the current time.
[0015] This allows appropriate current status information to be obtained and appropriate improvement proposals to be created.
[0016] In addition, the third invention is configured such that the processor creates the work plan including the personnel allocation plan regarding the allocation of a plurality of workers capable of engaging in a plurality of tasks based on information relating to the work plan, creates a proposed change to the personnel allocation plan as the improvement proposal, and performs output processing to present information regarding the proposed change to the personnel allocation plan to a manager.
[0017] According to this, since the work plan is changed based on the proposed changes to the personnel deployment plan, the work plan can be changed more appropriately.
[0018] In a fourth aspect of the present invention, the processor creates the personnel allocation plan and a proposed change thereto based on skill information for each worker.
[0019] This makes it possible to appropriately create personnel deployment plans and proposed changes thereto, taking into account the skills of each worker.
[0020] In addition, a fifth invention is configured such that the processor creates the work plan based on standard man-hours for each of a plurality of tasks, obtains work performance information representing the implementation status of each of the plurality of tasks as the current status information, reviews the standard man-hours for each of the plurality of tasks based on the work performance information, and creates a review proposal for the standard man-hours as the improvement proposal.
[0021] This makes it possible to appropriately review the standard man-hours for each of a plurality of tasks based on the task performance information that indicates the implementation status of each of the plurality of tasks.
[0022] In addition, a sixth invention is configured such that the processor performs an event detection process to detect a specific event related to the status of work implementation based on information collected using the information collection device, and a person detection process to detect a person who is the subject of the detected event, and acquires the current status information based on information regarding the detected event and person.
[0023] This makes it possible to efficiently obtain highly accurate current status information.
[0024] In addition, a seventh invention is configured such that the processor acquires detection information from a sensor serving as the information collecting device, and performs at least one of the event detection process and the person detection process based on the detection information.
[0025] This makes it possible to obtain current status information based on information detected by the sensor.
[0026] In addition, an eighth aspect of the present invention is configured such that the processor acquires operation information from a worker terminal serving as the information collection device, and performs at least one of the event detection process and the person detection process based on the operation information.
[0027] This makes it possible to obtain current status information based on operation information of the worker terminal 3.
[0028] In a ninth aspect of the present invention, the processor is configured to edit information collected using the information collecting device to acquire the current status information.
[0029] According to this, by editing the information collected by the information collection device, it is possible to efficiently and accurately create improvement plans for work plans. Also, the current status information can be presented to workers and managers in a state where they can easily grasp the progress of the work.
[0030] In addition, a tenth invention is configured such that the processor determines whether or not it is necessary to propose the improvement plan based on information related to the progress of work, and if it determines that it is necessary to propose the improvement plan, performs output processing to present information related to the improvement plan to a manager.
[0031] This makes it possible to propose improvement plans to managers when a change in plans is necessary.
[0032] In addition, an eleventh invention is configured such that the processor performs an output process to inquire of a manager as to whether or not to adopt the improvement proposal, and when the manager inputs an operation to adopt the improvement proposal, the processor changes the work plan based on the improvement proposal.
[0033] According to this, when the manager decides to adopt the improvement plan, the work plan is changed based on the improvement plan, which makes it possible to avoid making unnecessary changes to the work plan.
[0034] In a twelfth aspect of the present invention, the processor estimates an effect that the improvement plan may have, and performs an output process for presenting information on the effect to a manager.
[0035] This allows the manager to recognize the effects (impact) of the improvement plan. In addition, by having the manager recognize the effects of the improvement plan and then decide whether to adopt the improvement plan, the manager can make more appropriate changes to the work plan based on the improvement plan.
[0036] In addition, a thirteenth aspect of the present invention is configured such that, when an increase in the number of workers is proposed as the improvement plan, the processor performs processing to inquire of a manager who is a source of personnel transfer whether or not the transfer of personnel is possible.
[0037] This allows shortfalls in personnel to be replenished quickly.
[0038] Further, a fourteenth invention is a work management support service providing method for providing a work management support service based on the work management support method, wherein the information processing device is a server device connected via a network to the information collection device disposed at each of a plurality of production bases, and a base ID is assigned to each of the plurality of production bases, and the work management support service is provided for the plurality of production bases.
[0039] This makes it possible to efficiently provide work management support services to multiple production bases.
[0040] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0041] FIG. 1 is a diagram showing the overall configuration of a work management support system according to this embodiment.
[0042] This work management support system manages multiple tasks organized for the production of a specified end product and the personnel engaged in those tasks at a production site (office, workshop) such as a food factory, and is equipped with a server 1 (information processing device, server device), an administrator terminal 2 (administrator device), a worker terminal 3 (worker device), an information collection device 4 (detection device, input device), and an information presentation device 5 (output device).
[0043] The server 1 of the work management support system provides a work management support service that supports the work of a manager who manages work. This server 1 creates a work plan including a work process plan and a personnel deployment plan, and presents the work plan to the manager and workers. The server 1 also obtains current status information, that is, information on events that will affect the implementation of the work plan at the current time, and presents the current status information to the manager and workers. The server 1 also creates an improvement proposal for the current work plan based on the current status information, and presents the improvement proposal to the manager.
[0044] In this embodiment, a work management support service is provided for a plurality of production bases (business establishments, workshops). A manager terminal 2, a worker terminal 3, an information collection device 4, and an information presentation device 5 are disposed at each of the plurality of production bases. A server 1 of the work management support system can communicate with the manager terminal 2, the worker terminal 3, the information collection device 4, and the information presentation device 5 disposed at each production base via a network such as the Internet (e.g., VPN) or an intranet.
[0045] In this embodiment, a base ID is assigned to each of the multiple production bases, and the work management support service for each of the multiple production bases is managed based on this base ID. This makes it possible to efficiently provide the work management support service for multiple production bases.
[0046] In this embodiment, the work management support service is provided for a plurality of production bases, but the work management support service may be provided for only one production base.
[0047] Furthermore, the server 1 of the work management support system can communicate with the server 11 of the production management system and the server 12 of the attendance management system via the network. The server 1 of the work management support system obtains information on the production plan (including production changes) of the deliverable from the server 11 of the production management system. The server 1 of the work management support system also obtains information on the work plan of the worker from the server 12 of the attendance management system.
[0048] The administrator terminal 2 is operated by an administrator who performs management tasks at a production site. The administrator terminal 2 is a PC, a tablet terminal, or the like. The administrator terminal 2 displays a management screen of the work management support system. In addition, the administrator terminal 2 is used to perform operations to instruct the execution of processes.
[0049] The worker terminal 3 is operated by a worker (staff member) engaged in work at the production base. The worker terminal 3 is a smartphone, tablet terminal, or the like. On the worker terminal 3, the worker operates to register the date and time when the worker is available to work (desired work shift). The worker terminal 3 also displays the confirmed work shift, allowing the worker to check the confirmed work shift. On the worker terminal 3, the worker also operates to input information related to the progress of work. For this reason, the worker terminal 3 also has the same functions as the information collection device 4.
[0050] The information collection device 4 collects information related to the status of work being performed by workers at the site from the site. The information collection device 4 is a microphone, a camera, etc. The information collection device 4 collects information related to the current status of work being performed.
[0051] The information presentation device 5 presents required information to workers and managers at the site. This information presentation device 5 is a monitor, a speaker, or the like. When the information presentation device 5 is a monitor, the required information is notified to the workers and managers by displaying it on a screen. When the information presentation device 5 is a speaker, the required information is notified to the workers and managers as an internal broadcast. Specifically, information on the latest work plan (reschedule information), information on the progress of work in the entire production base and at each process, information on the completion time of the work in the previous process, information on the results of productivity analysis (such as a comparison of standard labor hours by process), and the like are presented.
[0052] In addition, in this embodiment, the system resources (personnel, information, etc.) can be shared among multiple production bases (multi-tenant system). This allows personnel to be supplemented at production bases where there is a personnel shortage. In other words, when a personnel shortage occurs at a production base, workers who normally work at another production base can be engaged in work at the production base where there is a personnel shortage.
[0053] In this embodiment, personnel can be replenished by using a personnel dispatching service. That is, workers registered with the personnel dispatching service are dispatched to a production base where a personnel shortage occurs. The server 1 of the work management support system can communicate with the server 13 of the personnel dispatching system that provides the personnel dispatching service via a network. As a result, information for personnel dispatch is exchanged between the server 1 of the work management support system and the server 13 of the personnel dispatching system.
[0054] Next, a work process for producing a product at a production site will be described with reference to Fig. 2.
[0055] At production sites, deliverables are produced through multiple organized tasks. Figure 2 shows an example of a bento factory. In this example, bentos are produced through the steps of picking ingredients, pre-processing (cutting ingredients and marinating), measuring seasonings, cooking and heating (steaming, boiling, frying, baking, etc.), cooling, plating, packaging, and sorting, and the produced bentos are shipped by the delivery date.
[0056] In the server 1, a work plan is created that specifies the schedule of multiple work processes based on the number of orders (production quantity) for lunch boxes (deliverables) and the delivery date. At this time, a standard man-hour, that is, the total time (person-hours) required for each task is set for each task, and the number of people to be assigned to each work process is determined based on the standard man-hour for each task. Furthermore, workers are assigned to each of the multiple work processes based on the work shifts for each worker.
[0057] Next, a process management process and personnel management process performed by the server 1 of the work management support system will be described. Fig. 3 is an explanatory diagram showing an overview of process management and personnel management.
[0058] The server 1 creates a work plan based on the worker's work plan (work shift) and the product production plan through process management processing and personnel management processing.
[0059] In process management, a work process plan is created based on the production plan for the deliverables produced at the production site. In this work process plan, information on the work time and number of workers according to the standard man-hours for each task, that is, information (schedule) on which process, when (from what time to what time), and how many workers will be involved, is registered.
[0060] In personnel management, a personnel allocation plan is created based on the work process plan obtained in process management and work shifts (worker work plans). Work shifts contain information about the available work dates and times for each worker, i.e., which worker will work when (from what time to what time). Based on these work shifts, workers are assigned to each work process in the work process plan.
[0061] In addition, although a worker is responsible for multiple work processes, the work processes that the worker can be involved in vary from person to person. Therefore, in this embodiment, the work processes that each worker can be involved in are registered and managed as skills. In personnel management, workers are assigned to each work process in the work process plan according to the skills of each worker.
[0062] In this embodiment, integrated management is performed by integrating process management and personnel management. In this integrated management, the management of work processes and the management of personnel allocation are integrated, and a work plan including a work process plan and a personnel allocation plan is created. In this work plan, information on which worker will be involved in which process, when (from what time to what time), and so on is registered. Specifically, this integrated management is configured with a combinatorial optimization engine that uses an AI (artificial intelligence) algorithm, and a work plan is created by optimization through simulation.
[0063] If appropriate personnel allocation is not possible, information to that effect is presented to the manager. In the example shown in Figure 3, there is a shortage of one person in process B. In this case, the work process plan is changed and the desired work shift is adjusted to a work shift that allows appropriate personnel allocation, and then the process of allocating workers to each work process in the work process plan is performed again.
[0064] Next, the skill management process performed by the server 1 of the work management support system will be described.
[0065] The server 1 manages skill information for each worker (skill management) and creates a personnel allocation plan and its proposed changes based on the skill information for each worker. Specifically, the server 1 assigns workers to each work process in the work process plan according to the skills of each worker.
[0066] Here, each worker has skills that enable him / her to engage in one or more tasks, but the tasks that the worker has the skills to engage in vary depending on the worker.
[0067] In this embodiment, a skill level (proficiency) for the work that can be performed is set for each worker. In the example shown in FIG. 4, five skill levels are set. A worker with a skill level of "5" is a worker who can perform the work alone in the standard man-hours and can also assist. An assistant is a worker who can help other workers. A worker with a skill level of "4" is a worker who can perform the work alone in the standard man-hours. A worker with a skill level of "3" is a worker who can perform the work alone but in more than the standard man-hours. A worker with a skill level of "2" is a worker who can perform the work with an assistant. A worker with a skill level of "1" is a worker who cannot perform the work. In this case, the worker can be engaged in the work by assigning a training officer.
[0068] In the personnel allocation plan, a priority order is set for allocating tasks to each worker based on the skill information (skill level) of each worker, so that the worker is assigned to the tasks that he or she is good at. In addition, when allocating a worker who requires assistance, the plan matches the worker who requires assistance with another worker who can provide assistance.
[0069] Next, a procedure for process management and personnel management performed by the server 1 of the work management support system will be described. Fig. 5 is an explanatory diagram showing the procedure for process management and personnel management.
[0070] One month in advance, desired work shifts are registered, a work process plan is created based on expected order information, the work process plan is edited by the manager, and a one-month work schedule is created based on the edited work process plan and the desired work shifts.
[0071] One week in advance, desired work shifts are registered, a work process plan is created based on expected order information, the work process plan is edited by the manager based on the edited work process plan from one month ago, the desired work shifts are reflected in the edited work process plan, work shifts are adjusted based on the reflected work process plan, and the work process plan is further edited based on the adjusted work shift. Note that, specifically, the process of reflecting the desired work shifts in the edited work process plan involves a process of assigning workers to each task in the work process plan based on the desired work shifts.
[0072] One day in advance, a work process plan is created based on expected order information, the work process plan is edited by the manager, the confirmed work shifts are reflected in the edited work process plan, the work shifts are adjusted based on the reflected work process plan, and the work process plan is further edited based on the adjusted work shifts.
[0073] Before the orders for that day are finalized, a work process plan is created based on tentative order information, the work process plan is edited by the manager, the finalized work shift is reflected in the edited work process plan, the work shift is adjusted based on the reflected work process plan, and the work process plan is further edited based on the adjusted work shift.
[0074] When the orders for the day are confirmed, a work process plan is created based on the confirmed order information, the work process plan is edited by the manager, the confirmed work shifts are reflected in the edited work process plan, the work shifts are adjusted based on the reflected work process plan, and the work process plan is further edited based on the adjusted work shifts.
[0075] After production for the day has begun, a work process plan is created based on actual performance information (work performance information, task performance information) and confirmed order information (production change information), the work process plan is edited by the manager, the confirmed work shifts are reflected in the edited work process plan, the work shifts are adjusted based on the reflected work process plan, and the work process plan is further edited based on the adjusted work shifts.
[0076] Now, regarding the work schedule of the workers (work shifts) and the production schedule of the deliverables (e.g. order quantity), sudden changes may occur on the day. For example, the order quantity may change on the day due to factors such as the weather. Also, delays in the progress of work may occur due to various causes. Also, a worker may be absent on the day. In this case, if the work proceeds according to the current work plan, the production of the deliverables will not be in time for the delivery date.
[0077] Therefore, in this embodiment, actual order information, which includes information such as changes in order quantities, actual work information, which includes information such as the progress of work, and actual work information, which includes information such as worker absences, are obtained as current status information, and proposed changes are made to the work process plan and personnel deployment plan included in the current work plan based on the current status information.
[0078] For example, if the order quantity increases or if there is a delay in the progress of work, a change proposal is made to the current personnel allocation plan to increase personnel or rearrange them in order to meet the delivery deadline for the production of the deliverables. Also, if the situation cannot be addressed by changing the personnel allocation plan alone, a change proposal (rescheduling proposal) is made to the current work process plan to rearrange the process schedule.
[0079] Next, a work plan created by the server 1 of the work management support system will be described. Fig. 6 is an explanatory diagram showing a work process plan created by the server 1. Fig. 7 is an explanatory diagram showing a work plan (including a work process plan and a personnel allocation plan) created by the server 1. Fig. 8 is an explanatory diagram showing a pop-up screen displayed on the manager terminal 2 regarding an unconfirmed personnel allocation plan.
[0080] As shown in Fig. 6, the server 1 creates a work process plan. This work process plan is created based on the production plan of the deliverable obtained from the server 11 of the production management system. This work process plan includes a schedule for performing each task required for the production of the deliverable (e.g., item A), i.e., information on the time and date for performing each task. For each task, the work time and number of workers according to the standard man-hours are set.
[0081] When a work process plan is created, the server 1 assigns personnel to the work process plan. Specifically, workers are assigned to each task in the work process plan. As a result, a work plan including a work process plan and a personnel assignment plan is created, as shown in FIG. 7. FIG. 7 shows that the personnel assignment is completed and finalized for all tasks in the work process plan. The required number of workers are assigned to each task in the finalized state.
[0082] For example, if there is an order for 300 units of Task A related to the production of Item A's deliverable, and three workers are available to work on Task A based on the work shift, and the standard man-hours for Task A are six man-hours, then two hours of work time will be required for Task A. On the other hand, if there are two workers available to work on Task A, three hours of work time will be required for Task A. However, if three hours of work time cannot be secured for Task A, it is possible to arrange personnel allocation so that two people work on Task A for two hours and one person works on Task A for one hour before moving on to another task.
[0083] Here, the work process plan shown in FIG. 6 and the work plan shown in FIG.
[0084] Furthermore, as shown in FIG. 8, when the personnel allocation is undetermined, a pop-up screen for specifying a worker is displayed on the manager terminal 2 for a task for which suitable personnel cannot be allocated. This pop-up screen displays an array of check boxes for each candidate worker to be engaged in the task. The manager can select a worker by operating the check boxes. This enables the manager to assign a suitable worker to a task for which there is a shortage of personnel.
[0085] Next, a process for personnel flexibility in the event of a personnel shortage, which is performed by the server 1 of the work management support system, will be described. Fig. 9 is an explanatory diagram showing an overview of the process for personnel flexibility.
[0086] In the case where there is a shortage of personnel in the personnel management of a certain production base and an increase in the number of workers is proposed as an improvement plan, the server 1 performs a process of inquiring the manager of the source of personnel transfer about the possibility of transferring personnel (request for support).
[0087] Here, as shown in Fig. 9(A), there are cases where personnel are shared between multiple production bases within a company, and as shown in Fig. 9(B), there are cases where personnel are supplemented from an external personnel dispatch service. When personnel are shared between multiple production bases within a company, it is recommended that, for each worker, in addition to the production base where the worker normally works, a production base that can support the worker is registered. When personnel are supplemented from an external personnel dispatch service, it is recommended that the workers that can be dispatched are registered as help personnel.
[0088] When inquiring of the manager of the lending source as to whether personnel can be transferred, a notification of the inquiry may be sent to the device of the lending source. Specifically, as shown in Fig. 9(A), when personnel are transferred between a plurality of production bases within a company, for example, an email inquiring as to whether personnel can be transferred is sent from the server 1 of the work management support system to the manager terminal 2 of the other production base within the company that is the lending source. Also, the server 1 of the work management support system may display a screen inquiring as to whether personnel can be transferred on the manager terminal 2 of the lending source production base.
[0089] 9(B), when personnel are supplemented from an external personnel dispatching service, for example, an email inquiring whether personnel can be provided is sent from the server 1 of the work management support system to the manager terminal 14 (such as a PC) of the personnel dispatching system from which the personnel are provided. Alternatively, the server 1 of the work management support system may send a message inquiring whether personnel can be provided to the server 13 of the personnel dispatching system from which the personnel are provided, and the server 13 of the source of the personnel may display a screen inquiring whether personnel can be provided on the manager terminal 14 used by the manager of the source of the personnel.
[0090] Note that, when sending the notification of the inquiry, the notification of the inquiry may be sent after confirming with the administrator whether the inquiry is acceptable or not.
[0091] Next, a work performance information acquisition process performed by the server 1 of the work management support system will be described below. Fig. 10 is an explanatory diagram showing an overview of the work performance information acquisition process.
[0092] The server 1 acquires information (work performance information) related to the current status of work execution using the information collection device 4. At this time, a predetermined event related to the status of work execution is detected based on the information collected using the information collection device 4, and information (event information) related to the detected event is generated (event detection process). The server 1 also detects a person who is the subject of the event detected in the event detection process, and generates information (person information) related to the detected person (person detection process).
[0093] In this embodiment, detection information is acquired from a sensor serving as the information collection device 4, and at least one of an event detection process and a person detection process is performed based on the detection information. The sensor serving as the information collection device 4 is specifically a microphone, a camera, or the like.
[0094] Here, when the sensor as the information collection device 4 is a microphone, the worker speaks a phrase that describes the progress of the work, and the microphone picks up the voice of the worker. Then, the server 1 converts the voice information picked up by the microphone into text information by voice recognition.
[0095] For example, when detecting the start and end of a specific task, the worker utters a phrase (standard phrase) declaring the start of the task, such as "I am about to start task XX," when starting the task. Also, the worker utters a predetermined standard phrase indicating the end of the task, such as "XX task has been completed," when completing the task. This makes it possible to obtain the start and end timings of the task. Note that in voice recognition, the recognition accuracy may be improved by using answerback.
[0096] Furthermore, if the sensor serving as the information collection device 4 is a camera, face recognition (face matching) is performed on the image captured by the camera to recognize the worker. At this time, by recognizing the worker who speaks to the camera at the timing of speech based on the voice picked up by the microphone, it is possible to identify the worker who spoke.
[0097] In addition, by using a microphone array to pick up voice and estimate the direction of the sound source, the position of the person who spoke can be obtained and the person present at that position can be identified using facial recognition of the image captured by the camera, making it possible to identify the worker who spoke.
[0098] Note that the motion of the worker may be detected by image recognition of the image captured by the camera serving as the information collection device 4, and a predetermined event indicating the work status of the worker may be detected based on the motion of the worker. For example, when the work starts, the worker may perform a motion that signals the start of the work, thereby making it possible to detect the event of the start of the work, and when the work ends, the worker may perform a motion that signals the end of the work, thereby making it possible to detect the event of the end of the work.
[0099] Furthermore, if the sensor serving as the information collection device 4 is configured as a wireless device, it will not hinder the worker's work when he or she moves around. If the sensor is configured as a wearable device, the worker will be hands-free, so the worker will not be hindered from moving his or her hands. Furthermore, if a pharyngeal microphone (bone conduction microphone) is used in a headset serving as a wearable device, clear voice can be picked up even when the worker is wearing a mask or in a noisy environment.
[0100] In addition, the event detection process and the person detection process can be performed simultaneously. For example, if the sensor serving as the information collection device 4 is a microphone, the worker may utter his / her name together with a phrase that indicates the status of the work, for example, a phrase announcing the start of the work. This makes it possible to identify the worker who has spoken, i.e., the worker who will be performing the work.
[0101] In this embodiment, operation information is acquired from the worker terminal 3 serving as the information collection device 4, and at least one of an event detection process and a person detection process is performed based on the operation information. The worker terminal 3 is a smartphone, a tablet terminal, or the like, and screen operations are performed on a touch panel display.
[0102] Specifically, by performing a predetermined operation at the start and end of a task, the start and end timings of a specific task can be acquired as current status information. For example, a worker performs a work start operation on worker terminal 3 when the task starts, and performs a work end operation on worker terminal 3 when the task ends. This allows server 1 to acquire the work start time and work end time as current status information based on the operation information received from worker terminal 3.
[0103] Furthermore, when the worker terminal 3 is exclusively used by a worker, the worker performing the work can be identified by acquiring the terminal ID from the worker terminal 3. Furthermore, when the worker terminal 3 is shared among multiple workers, the worker may input his / her own name and worker ID into the worker terminal 3 in advance.
[0104] In addition, if an arm mount is used to attach the terminal to the worker's arm, the worker terminal 3 such as a smartphone can be easily used.
[0105] Furthermore, the server 1 edits the information collected using the information collecting device 4 (collected information editing process) to obtain current status information regarding the implementation status of the work. At this time, the information collected using the information collecting device 4 is edited, such as merging, processing, and unification. Specifically, information collected by a plurality of information collecting devices 4 is integrated (merged) to generate current status information. For example, event information detected from the sound of a microphone and person information detected from an image captured by a camera are integrated to generate current status information. At this time, it is sufficient to associate the event information with the person information based on the detection timing, and time information of the detection timing is also added and integrated to the current status information.
[0106] Specifically, as event information, text information indicating what was said by the worker, for example, the name of the task and whether the task started or ended, is obtained, and as personal information, information identifying the worker who is the subject of the speech (speaker) is obtained. By combining the text information indicating the task content with the information identifying the worker and time information, it is possible to obtain, as current status information, information regarding which worker performed what task from what time to what time.
[0107] Next, a schematic configuration of the server 1 of the work management support system will be described below.
[0108] The server 1 includes a communication unit 21, a memory 22, and a processor 23.
[0109] The communication unit 21 communicates with the manager terminal 2, the worker terminal 3, the information collection device 4, and the information presentation device 5 disposed at each production base via a network such as the Internet (e.g., VPN) or an intranet. The communication unit 21 also communicates with the server 11 of the production management system and the server 12 of the attendance management system via the network.
[0110] The memory 22 stores programs executed by the processor 23 and the like.
[0111] The processor 23 executes various processes related to information collection by executing programs stored in the memory 22. In this embodiment, the processor 23 performs information input processing, information output processing, process management processing, personnel management processing, current status information acquisition processing, improvement plan creation processing, improvement plan proposal necessity determination processing, and work improvement plan confirmation processing, etc. The process management processing includes process plan processing and progress management processing. The personnel management processing includes work shift management processing, skill management processing, and personnel allocation processing. The current status information acquisition processing includes work performance information acquisition processing, work performance information acquisition processing, and production change information acquisition processing. The improvement plan creation processing includes work plan change proposal creation processing, effect estimation processing, and standard labor-hour setting processing.
[0112] In the information input process, the processor 23 collects required information at an appropriate timing from the worker terminal 3, the information collection device 4, the server 11 of the production management system, and the server 12 of the attendance management system. In addition, as necessary, the processor 23 obtains instruction information (operation information) from the manager terminal 2 in response to the manager's operation on the manager terminal 2.
[0113] In the information output process, the processor 23 performs output processing to present required information to the manager and on-site workers using the manager terminal 2, the worker terminal 3, and the information presentation device 5. In this embodiment, for example, output processing is performed to present a work plan including a work process plan and a personnel allocation plan to the manager. In addition, output processing is performed to present information regarding the progress of work in the entire production base and in each process, and information regarding the completion time of work in the previous process to the manager and on-site workers. In addition, output processing is performed to present improvement proposals for the current work plan to the manager.
[0114] In the process planning process, the processor 23 generates a work process plan based on information related to the production plan. The information related to the production plan is acquired from the server 11 of the production management system. In this embodiment, a work plan including a work process plan and a personnel allocation plan is generated by integrating the process planning process and the personnel allocation process.
[0115] Furthermore, when an instruction to adopt the improvement plan is received from the manager, the processor 23 changes the work process plan based on the improvement plan and creates a new work process plan (plan change processing). At this time, if the situation cannot be resolved by simply changing the personnel allocation plan, the work process is rescheduled in the process plan processing to change the work process plan (reschedule).
[0116] In the progress management process, the processor 23 manages the progress of the work based on the current status information acquired in the current status information acquisition process and the current work process plan. Specifically, by comparing the current status information with the current work process plan, it is determined whether the work is progressing without delay.
[0117] In the work shift management process, the processor 23 manages the work shifts for each worker. Information on the work plan of the worker is obtained from the server 12 of the attendance management system. Information on the work plan is obtained from the server 12 of the attendance management system.
[0118] In the skill management process, the processor 23 manages skill information for each worker. In this embodiment, a skill level (proficiency) related to the work that the worker can perform is set for each worker.
[0119] In the personnel allocation process, the processor 23 creates a personnel allocation plan based on the work process plan acquired in the process planning process and information on work shifts. In this embodiment, a work plan including a work process plan and a personnel allocation plan is generated by a process that integrates the process planning process and the personnel allocation process.
[0120] Furthermore, when an instruction to adopt the improvement plan is received from the manager, the processor 23 changes the personnel allocation plan based on the improvement plan and creates a new personnel allocation plan (plan change processing). At this time, if the situation is not able to be handled by changing the personnel allocation plan alone, the work process is rescheduled in the process plan processing to change the work process plan (reschedule).
[0121] In the work performance information acquisition process, the processor 23 acquires work performance information, i.e., information on the current work status of the worker, as current status information, i.e., information on the occurrence of events that affect the implementation of the work plan at the current time. Specifically, for example, information on the worker's arrival and departure from work, information on the worker's absence, etc. are acquired. This work performance information is acquired from the server 12 of the attendance management system.
[0122] In the work performance information acquisition process, the processor 23 acquires work performance information (work progress information), i.e., information on the current status of work, as current situation information. Specifically, for example, information on the status of the actual work performed by the worker on that day is acquired based on information from the information collection device 4 arranged at the work site, such as information detected by a microphone that picks up the voice of the worker (audio information) and information detected by a camera that captures the worker (image information), and operation information input by the worker to the worker terminal 3.
[0123] In the production change information acquisition process, the processor 23 acquires production change information, i.e., information on changes in conditions that affect the production of the deliverable at the current time, as current status information. Specifically, for example, information on additional orders, information on changes in delivery dates, etc. are acquired as production change information. This production change information is acquired from the server 11 of the production management system.
[0124] When the current status information is acquired in this manner, an output process is performed to present the current status information to the worker and the manager (current status information presentation process). Specifically, a screen showing the current status information is displayed on the information presentation device 5 and the worker terminal 3, and a voice showing the current status information is output. Also, a screen showing the current status information is displayed on the manager terminal 2. This allows the worker and the manager to easily grasp the current status of work implementation, etc.
[0125] In the work plan change proposal creation process, the processor 23 creates a change proposal for the work process plan and the personnel allocation plan included in the work plan as a short-term improvement proposal, i.e., a measure to meet the delivery deadline of the day, based on the current status information, i.e., the work performance information, the work performance information of the workers, and the production change information, and the current work plan. When the improvement proposal is created in this work plan change proposal creation process, an output process is performed to present information about the improvement proposal to the manager. In this embodiment, the information about the improvement proposal is displayed on the screen of the manager terminal 2.
[0126] The improvement proposals include a method of changing only the personnel allocation plan without changing the work process plan, i.e., a method of reviewing only personnel allocation without rearranging the work schedule, and a method of changing both the work process plan and the personnel allocation plan, i.e., a method of rearranging the work schedule and then redoing the personnel allocation. Which method is adopted depends on the worker's work plan (desired work shift, availability of overtime, etc.) and the production plan for the deliverables (order amount, etc.).
[0127] In the effect estimation process, the processor 23 estimates the effect (impact) that the improvement plan may have. Once the effect estimation process has estimated the effect, an output process is performed to present information related to the effect to the manager. Specifically, the information related to the effect is displayed on the manager terminal 2. For example, when there is a personnel shortage and the improvement plan proposes increasing the number of workers by recruiting workers from outside, the increase in labor costs is presented to the manager as a disadvantage (negative impact) associated with recruiting workers from outside. In addition, the fact that shipments can be made with plenty of time before the delivery date is presented to the manager as an advantage (positive impact) associated with recruiting workers from outside.
[0128] In the standard labor-hour setting process, the processor 23 reviews the standard labor hours for each of a plurality of tasks based on work performance information representing the implementation status of each of the plurality of tasks as a long-term improvement plan, and creates a review plan for the standard labor hours for each task.
[0129] If there is a significant discrepancy between the work plan and the actual work performance, it is predicted that there is an error in the preconditions for the work plan. In particular, the work plan is created based on the standard man-hours for each task, but if the standard man-hours for each task are inappropriate, the work plan will not proceed as planned. Specifically, if the standard man-hours are set too low, the progress of the work will frequently lag behind the work plan. In such cases, the standard man-hours for each task are reviewed and appropriate standard man-hours are set.
[0130] In this way, in this embodiment, the standard man-hours for each of a plurality of tasks can be appropriately reviewed based on the work performance information that indicates the implementation status of each of the plurality of tasks. Also, by reviewing the standard man-hours, it becomes possible to consider whether it would be more efficient to replace workers with robots.
[0131] In addition, when setting the standard man-hours, a known method such as MOST (Maynard Operation Sequence Technique) can be used. In addition, if the progress of work is frequently delayed from the work plan, and especially if the variation in work time between workers is significant, it is assumed that the cause is a lack of skills among some workers. In this case, as an improvement plan, it is proposed to provide guidance to the workers.
[0132] In the improvement proposal necessity determination process, the processor 23 determines whether an improvement proposal is necessary, i.e., whether a change to the work plan is necessary, based on information on the progress of the work acquired in the progress management process. Specifically, the scheduled shipping time (work end time) is predicted, and whether an improvement proposal is necessary is determined depending on whether the shipment will be in time for the delivery date. At this time, if there is a high possibility that the shipment will not be in time for the delivery date, it may be determined that an improvement proposal is necessary. Note that even if the shipment will be in time for the delivery date, if there is not enough time between the scheduled shipping time and the delivery date, it may be determined that a work improvement proposal is necessary, and if there is enough time between the scheduled shipping time and the delivery date, it may be determined that a work improvement proposal is not necessary.
[0133] If it is determined in this improvement plan proposal necessity determination process that a work improvement plan needs to be proposed, an output process is performed as information presentation process to present information on the work improvement plan to the manager. Specifically, information on the improvement plan is presented to the manager, and a screen is displayed on the manager terminal 2 to encourage adoption of the improvement plan, i.e., a change to the work plan. Depending on the urgency, an alert may be displayed on the screen to draw the manager's attention.
[0134] In the work improvement plan confirmation process, when it is determined in the improvement plan proposal necessity determination process that an improvement plan needs to be proposed and the processor 23 presents the improvement plan to the manager, the processor 23 performs a process of inquiring of the manager as to whether the proposed improvement plan is adopted, i.e., whether the work plan needs to be changed, and accepting the manager's operation regarding whether to adopt the improvement plan. Specifically, a screen is displayed on the manager terminal 2 that inquires of the manager as to whether to adopt the improvement plan and allows the manager to perform an operation regarding whether to adopt the improvement plan.
[0135] At this time, information on the effect (impact) of the improvement plan obtained in the effect estimation process is presented to the manager. This allows the manager to use the effect (impact) of the improvement plan as reference information and determine whether or not to adopt the improvement plan, i.e., whether or not the work plan needs to be changed.
[0136] Here, when the manager operates to adopt the improvement plan, the work plan is changed based on the improvement plan. Specifically, a new work plan is created by applying the improvement plan to the current work plan. That is, as necessary, a new work process plan is created by the process management process, and a new personnel allocation plan is created by the personnel management process.
[0137] On the other hand, if the manager does not adopt (approve) the improvement plan, he / she performs an operation to the effect that the improvement plan is not adopted on the manager terminal 2. In this case, the manager points out the items in the improvement plan that cannot be approved (items that have problems) and instructs that the improvement plan be reconsidered. For example, if there is a shortage of personnel with the skills for a specific task and the work schedule of the improvement plan is unreasonable, and the manager decides to deal with the problem by increasing the number of workers, the manager will not adopt the improvement plan and will instruct the creation of an improvement plan that increases the number of workers.
[0138] In this embodiment, the administrator is queried as to whether the improvement proposal should be adopted or not, and if the administrator adopts (approves) the improvement proposal, changes (rescheduling) are made to the work plan based on the improvement proposal; however, in cases where the level of urgency is high or there is a high possibility that the deadline will be missed, the step of inquiring of the administrator as to whether the improvement proposal should be adopted or not may be omitted, and the work plan may be changed in accordance with the improvement proposal without inquiring of the administrator as to whether the improvement proposal should be adopted or not.
[0139] Next, an operation procedure of the server 1 of the work management support system will be described below. Fig. 12 is a sequence diagram showing an operation procedure of the server 1 of the work management support system.
[0140] The server 1 of the work management support system acquires information about the production plan of the deliverable from the server 11 of the production management system. The server 1 also acquires information about the work plan of the workers from the server 12 of the attendance management system. Then, the server 1 creates a work plan including a work process plan and a personnel allocation plan based on the production plan of the deliverable and the work plan of the workers.
[0141] Next, the server 1 of the work management support system transmits information about the work plan to the manager terminal 2 and presents the work plan to the manager. The server 1 also transmits information about the work plan to the worker terminal 3 and the information presentation device 5 and presents the work plan to the worker.
[0142] Next, the server 1 of the work management support system acquires detection information from the information collecting device 4. The server 1 also acquires operation information from the worker terminal 3. The server 1 also acquires information regarding changes to the production plan of the deliverable from the server 11 of the production management system. The server 1 also acquires information regarding changes to the work plan of the worker from the server 12 of the attendance management system.
[0143] Next, the server 1 of the work management support system acquires current status information, i.e., information regarding the occurrence of events that affect the implementation of the work plan at the current time, based on the detection information of the information collection device 4, the operation information of the worker terminal 3, information regarding changes to the production plan for the deliverable, and information regarding changes to the worker's work plan.
[0144] Next, the server 1 of the work management support system acquires information on the progress of the work based on the current status information and the current work process plan. Next, the server 1 determines whether or not it is necessary to propose an improvement plan for the current work plan, i.e., whether or not the work plan needs to be changed, based on the information on the progress of the work. Then, when the server 1 determines that it is necessary to propose an improvement plan, it creates an improvement plan. The server 1 transmits the improvement plan to the manager terminal 2 and presents it to the manager. The server 1 also inquires of the manager about whether or not the proposed improvement plan should be adopted, i.e., whether or not the work plan should be changed, and acquires the manager's operation information on whether or not the improvement plan should be adopted.
[0145] Next, when the server 1 of the work management support system receives an instruction from the manager to adopt the improvement plan, it changes the work plan based on the improvement plan and creates a new work plan.
[0146] Next, the server 1 of the work management support system transmits information about the new work plan to the manager terminal 2 and presents the work plan to the manager. The server 1 also transmits information about the work plan to the worker terminal 3 and the information presentation device 5 and presents the work plan to the worker.
[0147] In this embodiment, an output process is performed to present an improvement proposal for the current work plan to the manager, but simply visualizing the progress of the work based on the current status information and presenting it to the manager allows the manager to check whether the work is proceeding properly. This allows the manager to determine whether there is a shortage or surplus of personnel and consider personnel allocation.
[0148] For example, when the start time and end time of each task are displayed on the manager terminal 2, the manager can grasp the progress of the tasks. If a task is not completed at the scheduled end time and the manager determines that a change in the plan is necessary, the manager performs an operation to instruct the plan change on the manager terminal 2. At this time, the manager can select whether the plan change should be applied to only one line or to the entire work site.
[0149] As described above, the embodiments have been described as examples of the technology disclosed in this application. However, the technology in this disclosure is not limited to these, and can be applied to embodiments in which modifications, substitutions, additions, omissions, etc. are made. In addition, it is also possible to combine the components described in the above embodiments to create new embodiments. [Industrial Applicability]
[0150] The work management support method and work management support service providing method of the present invention have the effect of reducing the burden on managers by presenting appropriate improvement proposals to them without placing a heavy burden on workers, and are useful as a work management support method and work management support service providing method that use an information processing device to perform processing to support the management operations of a production base that produces specified deliverables through multiple organized tasks. [Explanation of symbols]
[0151] 1. Work management support system server (information processing device, server device) 2. Administrator terminal 3. Worker terminal 4. Information gathering devices 5 Information presentation devices 11 Production management system server 12. Server of the attendance management system 13. Server of the personnel dispatch system 21 Communications Department 22 Memory 23 Processors
Claims
1. A processor of the information processing device creating a work plan including a work process plan and a personnel allocation plan based on information on the order volume and the worker's work schedule, and outputting information on the work plan; Acquire current status information based on information collected by an information collecting device arranged at a work site and information related to the change in the order quantity and the change in the work plan; Based on the current status information and the current work plan, a proposal for improving at least one of the work process plan and the personnel allocation plan included in the work plan is created; Estimating the effect that the proposed improvement may have on the day's work plan; and outputting information about the improvement plan and its effect.
2. The processor, 2. The work management support method according to claim 1, wherein the current status information includes work performance information relating to the current work status of the worker, work performance information relating to the current implementation status of the work, and current order quantity change information.
3. The processor, creating the work plan including the personnel allocation plan regarding the allocation of a plurality of workers capable of engaging in a plurality of tasks based on information regarding the work plan; 3. The work management support method according to claim 1, further comprising the steps of: preparing a proposed change to the personnel allocation plan as the improvement plan; and outputting information relating to the proposed change to the personnel allocation plan.
4. The processor, The work management support method according to claim 1 , further comprising the step of outputting, as the improvement proposal, a proposal for modifying the work process plan when it is estimated that the delivery date cannot be met by merely modifying a personnel deployment plan.
5. The processor, 4. The work management support method according to claim 3, further comprising the steps of: creating a personnel allocation plan for allocating workers in descending order of proficiency level, based on proficiency level information including a plurality of levels of proficiency for each worker; and creating a proposed change thereto.
6. The processor, Creating the work plan based on standard man-hours for each of a plurality of tasks; As the current status information, work performance information indicating the implementation status of each of a plurality of tasks is acquired; A work management support method according to any one of claims 1 to 5, further comprising the steps of: reviewing standard man-hours for each of a plurality of tasks based on the work performance information; and creating a revision proposal for the standard man-hours as an improvement proposal separate from the improvement proposal for the day's work plan.
7. The processor, performing an event detection process for detecting a predetermined event related to the implementation status of the work based on the information collected by the information collection device, and a person detection process for detecting a person who is a subject of the detected event; 7. The work management support method according to claim 1, further comprising acquiring the current status information based on information relating to detected events and people.
8. The processor, Acquire detection information from a sensor serving as the information collecting device; The work management support method according to claim 7 , further comprising the step of: performing at least one of the event detection process and the person detection process based on the detection information.
9. The processor, Acquire operation information from the worker terminal serving as the information collection device; The work management support method according to claim 7 , further comprising the step of: performing at least one of the event detection process and the person detection process based on the operation information.
10. The processor, acquiring the current status information from information collected using the information collection device; The work management support method according to any one of claims 1 to 9.
11. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; When an operation to adopt the improvement plan is input by the administrator, the operation based on the improvement plan is The work management support method according to claim 1 , further comprising changing a work plan.
12. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; 12. The work management support method according to claim 1, further comprising the step of: outputting an improvement plan different from the improvement plan proposed by the manager when the improvement plan proposed by the manager is not adopted and an operation for instructing reconsideration is input.
13. The work management support method according to claim 1 , wherein the effect includes information on merits and demerits.
14. The processor, The work management support method according to claim 1 , wherein when an increase in the number of workers is proposed as the improvement plan, a transmission process is performed to inquire of a manager terminal of a source of personnel transfer as to whether or not personnel transfer is possible.
15. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; The work management support method according to claim 1 , further comprising the step of: receiving an operation by a manager regarding whether or not the improvement plan is adopted.
16. A processor and a memory in which a program executed by the processor is stored, The processor acquires an order amount and a work plan, creates a work plan including a work process plan and a personnel allocation plan based on the order amount and the work plan, and outputs information about the work plan; Acquire current status information based on information collected by an information collecting device arranged at a work site and information related to the change in the order quantity and the change in the work plan; Based on the current status information and the current work plan, a proposal for improving at least one of the work process plan and the personnel allocation plan included in the work plan is created; Estimating the effect that the proposed improvement may have on the day's work plan; An information processing device that outputs information regarding the improvement plan and the effect.
17. The processor, The information processing apparatus according to claim 16 , wherein the current status information includes work performance information on the current working status of the worker, work performance information on the current implementation status of the work, and current order quantity change information.
18. The processor, creating the work plan including the personnel allocation plan regarding the allocation of a plurality of workers capable of engaging in a plurality of tasks based on information regarding the work plan; The information processing apparatus according to claim 16 or 17, further comprising: preparing a proposed change to the personnel allocation plan as the improvement plan; and outputting information relating to the proposed change to the personnel allocation plan.
19. The processor, As an improvement plan, if it is estimated that the delivery deadline cannot be met simply by changing the personnel allocation plan, The information processing apparatus according to claim 16 , further comprising: an information processing device that outputs a proposed change to the work process plan.
20. The processor, The information processing apparatus according to claim 18 , further comprising: a personnel allocation plan for allocating workers in descending order of proficiency level, the personnel allocation plan being prepared based on proficiency level information including a plurality of levels of proficiency for each worker; and a proposed change thereto.
21. The processor, Creating the work plan based on standard man-hours for each of a plurality of tasks; As the current status information, work performance information indicating the implementation status of each of a plurality of tasks is acquired; 21. The information processing device according to claim 16, further comprising: a processor that performs a process of reviewing standard man-hours for each of a plurality of tasks based on the task performance information, and creates a revision plan for the standard man-hours as an improvement plan separate from an improvement plan for the task plan for that day.
22. The processor, performing an event detection process for detecting a predetermined event related to the implementation status of the work based on the information collected by the information collection device, and a person detection process for detecting a person who is a subject of the detected event; The information processing apparatus according to claim 16 , wherein the current situation information is acquired based on information relating to detected events and people.
23. The processor, Acquire detection information from a sensor serving as the information collecting device; The information processing apparatus according to claim 22 , further comprising: a processor configured to execute at least one of the event detection process and the person detection process based on the detection information.
24. The processor, Acquire operation information from the worker terminal serving as the information collection device; The information processing apparatus according to claim 22 , further comprising: a processor configured to execute at least one of the event detection process and the person detection process based on the operation information.
25. The processor, acquiring the current status information from information collected using the information collection device; 25. The information processing device according to claim 16.
26. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; 26. The information processing apparatus according to claim 16, wherein, when an operation for adopting the improvement plan by an administrator is input, the work plan is changed based on the improvement plan.
27. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; 27. The information processing apparatus according to claim 16, further comprising: when the improvement plan proposed by an administrator is not adopted and an operation for instructing reconsideration is input, an improvement plan different from the improvement plan is output.
28. The information processing device according to claim 16 , wherein the effect includes information on merits and demerits.
29. The processor, The information processing apparatus according to claim 1 , wherein, when an increase in the number of workers is proposed as the improvement plan, a transmission process is performed to inquire of a manager terminal of a source of personnel transfer as to whether or not personnel transfer is possible.
30. The processor, Perform an output process to inquire of the administrator whether the improvement plan is adopted or not; The information processing apparatus according to claim 16 , further comprising a process for receiving an operation by an administrator regarding whether or not the improvement plan is adopted.
31. creating a work plan including a work process plan and a personnel allocation plan based on information on the order volume and the worker's work schedule, and outputting information on the work plan; Acquire current status information based on information collected by an information collecting device arranged at a work site and information related to the change in the order quantity and the change in the work plan; Based on the current status information and the current work plan, a proposal for improving at least one of the work process plan and the personnel allocation plan included in the work plan is created; Estimating the effect that the proposed improvement may have on the day's work plan; and outputting information about the improvement plan and the effect.
Citation Information
Patent Citations
JP1973084256A
Production management method
JP1994214996A
Production control method and production control apparatus
JP2004165216A
Process improvement support system
JP2006202255A
Efficient management method for process
JP2007188133A
