Railway system, passage time adjustment device, passage time adjustment method, and passage time adjustment program
The railway system adjusts passing times through stations by calculating and switching run curves using onboard devices, addressing the challenge of schedule changes and enhancing operational efficiency.
Patent Information
- Application Number
- JP2021052078
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-03-25
AI Technical Summary
Existing railway systems fail to adjust the scheduled passing time of trains through stations when changes occur, leading to potential delays and inefficiencies.
A railway system equipped with a calculation section, selection section, and switching information output section that calculates the predicted passage time and selects a corrected run curve to adjust the train's passage through stations based on changes in scheduled passing time, using onboard devices to switch to the appropriate run curve.
Enables precise adjustment of passing times, improving operational efficiency and on-site work efficiency by ensuring trains pass through stations at the correct times even when scheduled passing times change.
Smart Images

Figure 0007595499000002 
Figure 0007595499000003 
Figure 0007595499000004
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a railway system that can adjust the time at which a train that uses a run curve to control its running passes through a passing station, a passage time adjustment device, a passage time adjustment method, and a passage time adjustment program. [Background technology]
[0002] Conventionally, there is known a railway system in which trains run on a run curve that defines the running speed between stations. For example, Patent Document 1 discloses a technology in which, when it is predicted that the stop time at the next station of the train is longer than the stop time on the timetable, the train runs on a run curve that has a shorter running time between stations than the run curve currently being used in order to prevent a departure delay at the next station. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2014-144754 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the technology described in Patent Document 1 does not consider switching of run curves when the scheduled passing time, which is the time when a train is scheduled to pass through a passing station between stopping stations, is changed, and the time when the train actually passes through the passing station is not adjusted.
[0005] The present disclosure has been made in consideration of the above, and aims to provide a railway system that can adjust passing times when the scheduled passing times are changed. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, the railway system of the present disclosure includes a calculation unit, a selection unit, and a switching information output unit. When there is a change in a scheduled passing time, which is a time when a train, whose running is controlled according to a run curve that specifies the running speed between stop stations, is scheduled to pass a passing station between stop stations, the calculation unit calculates a predicted passing time, which is a time when the train is predicted to pass the passing station by switching the run curve used to control the running of the train. Based on the predicted passing time calculated by the calculation unit, the selection unit selects, as a corrected run curve, a run curve at which the train will pass the passing station at a time corresponding to the changed scheduled passing time. The switching information output unit outputs switching information for switching the run curve of the train to the corrected run curve to an on-board device of the train. Effect of the Invention
[0007] According to the present disclosure, it is possible to advantageously adjust the passage time when the scheduled passage time is changed. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a railway system according to a first embodiment. [Diagram 2] FIG. 1 is a diagram for explaining a time adjustment process executed in a railway system according to a first embodiment; [Diagram 3] FIG. 1 is a diagram showing an example of a configuration of a traffic management device according to a first embodiment. [Figure 4] FIG. 1 is a diagram showing an example of a configuration of a passage time adjustment device according to a first embodiment; [Diagram 5] FIG. 1 is a diagram showing an example of run curve information according to the first embodiment; [Figure 6] FIG. 1 is a diagram showing an example of a plurality of run curves according to the first embodiment; [Figure 7] FIG. 1 is a diagram showing an example of a run curve selected while a target train is stopped at a stop station according to the first embodiment; [Figure 8] FIG. 13 is a diagram showing an example of a second selection run curve candidate according to the first embodiment; [Figure 9]FIG. 9 is a diagram showing an example of a state in which one second selection run curve candidate from the second selection run curve candidates shown in FIG. 8 is determined as the run curve of the target train. [Figure 10] FIG. 13 is a diagram showing an example of a third selection run curve candidate according to the first embodiment; [Figure 11] FIG. 11 is a diagram showing an example of a state in which one of the third selection run curve candidates shown in FIG. 10 is determined as the run curve of the target train. [Figure 12] FIG. 1 is a diagram showing an example of a run curve selected while a target train according to the first embodiment is running between stations; [Figure 13] FIG. 13 is a diagram showing an example of a state in which one first selection run curve candidate from the first selection run curve candidates shown in FIG. 12 is determined as the run curve of a target train. [Figure 14] FIG. 1 is a diagram showing an example of a configuration of an on-board device of a train according to a first embodiment; [Figure 15] A flowchart showing an example of a process performed by a processing unit of the passage time adjustment device according to the first embodiment. [Figure 16] FIG. 1 is a diagram illustrating an example of a hardware configuration of a passage time adjustment device according to a first embodiment. [Figure 17] FIG. 13 is a diagram showing an example of the configuration of a passage time adjustment device according to a second embodiment; [Figure 18] FIG. 13 is a diagram showing an example of two run curves selected while a target train is stopped according to the second embodiment. [Figure 19] FIG. 13 is a diagram showing an example of a corrected run curve selected while a target train is running according to the second embodiment; [Figure 20] FIG. 13 is a diagram for explaining a method for adjusting a switching position of a corrected run curve according to a second embodiment; [Figure 21] FIG. 13 is a diagram showing an example of the configuration of a passage time adjustment device according to a third embodiment. [Figure 22] FIG. 13 is a diagram showing an example of a run curve selected while a target train according to a third embodiment is running between stations. [Diagram 23] FIG. 13 is a diagram showing an example of the configuration of a passage time adjustment device according to a fourth embodiment. [Figure 24]FIG. 13 is a diagram showing an example of first switching determination information stored in a storage unit of the passage time adjustment device according to the fourth embodiment; [Diagram 25] FIG. 13 is a diagram showing an example of second switching determination information stored in a storage unit of the passage time adjustment device according to the fourth embodiment; [Figure 26] FIG. 13 is a diagram showing an example of run curve information stored in a storage unit of the passage time adjustment device according to the fourth embodiment; [Figure 27] FIG. 13 is a diagram for explaining run curve information stored in a storage unit of a passage time adjustment device according to a fourth embodiment; [Figure 28] FIG. 13 is a diagram showing an example of a configuration of a railway system according to a fifth embodiment. [Figure 29] FIG. 13 is a diagram showing an example of the configuration of an on-board device according to a fifth embodiment. [Diagram 30] FIG. 13 is a diagram illustrating an example of the configuration of a passing time adjustment unit of an on-board device according to a fifth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, a railway system, a passage time adjustment device, a passage time adjustment method, and a passage time adjustment program according to embodiments will be described in detail with reference to the drawings.
[0010] Embodiment 1 FIG. 1 is a diagram illustrating an example of a configuration of a railway system according to a first embodiment. The railway system 1 according to the first embodiment includes a plurality of trains 2. 1 ~2 m The railway system 1 includes a plurality of radio devices 3, a ground control device 4, an interlocking control device 5, an operation management device 6, and a passage time adjustment device 7. m is an integer equal to or greater than 2. The railway system 1 is applied to, for example, high-density railway sections where the interval between trains in a train schedule is about several minutes, but the application of the railway system 1 is not limited to high-density railway sections.
[0011] The railway system 1, also known as CBTC (Communications Based Train Control), controls multiple trains 2 1 ~2 mUsing communication between the train and the ground equipment, 1 ~2 m This includes signaling and safety technology that operates and controls multiple trains. 1 ~2 m When referring to each of these trains without distinguishing them individually, they may be referred to as Train 2.
[0012] The multiple radio devices 3 and the ground control device 4 are communicatively connected to each other via a network 8. The ground control device 4, the interlocking control device 5, the traffic management device 6, and the passage time adjustment device 7 are communicatively connected to each other via a network 9. The networks 8 and 9 are intranets, but may be the Internet, or a network other than an intranet and the Internet.
[0013] The radio device 3 relays information transmitted and received between the on-board equipment 10 mounted on the train 2 and the ground control device 4. For example, the radio device 3 receives a radio signal transmitted from the on-board equipment 10 of the train 2, and transmits train status information contained in the radio signal to the ground control device 4. The train status information includes, for example, position information indicating the position of the train 2 and speed information indicating the speed of the train 2.
[0014] Furthermore, when the radio device 3 acquires train control information for the on-board equipment 10 of the train 2 that is within the wireless communication range of the radio device 3 from the ground control device 4, the radio device 3 transmits a radio signal including the acquired train control information to the on-board equipment 10. The train control information is information for safety purposes, and includes, for example, route information and stopping position information of the train 2.
[0015] The route information includes information for determining the route along which the train 2 will proceed. The stop position information includes information indicating the limit stop position at which the train 2 should stop, and the train 2 can proceed within the route up to the limit stop position. The limit stop position is set to the end of the route if there is no preceding train or other obstacles within the route. In addition, if the departure route or the in-yard route does not have a proceeding aspect, the limit stop position is set to a position just before the route.
[0016] The ground control device 4 acquires train status information from the radio device 3, and acquires position information indicating the current position of each train 2 based on the acquired train status information. In addition, the ground control device 4 generates train control information for each train 2, as will be described later. The ground control device 4 outputs train information including the train status information and train control information of each train 2 to the traffic management device 6.
[0017] The interlocking control device 5 receives route control information output from the traffic management device 6. Based on the received route control information, the interlocking control device 5 controls a point machine (not shown) to form a route for each train 2, generates signal information for each train 2, and outputs the generated signal information for each train 2 to the ground control device 4. Such signal information includes information indicating a proceeding aspect that displays a signal that gives permission to proceed along the route.
[0018] In addition, for routes for which route control information is not received from the traffic management device 6, the interlocking control device 5 generates signal information including information indicating a stop aspect that displays a signal that does not allow progression along the route, and outputs the signal information to the ground control device 4.
[0019] The ground control device 4 generates the above-mentioned train control information for each train 2 based on the signal information transmitted from the interlocking control device 5. The ground control device 4 generates route information indicating routes on which the train 2 can travel, based on the train status information and signal information of the train 2. The ground control device 4 also generates stop position information based on the preceding train and other obstacles present on the route, and can generate train control information by adding the generated stop position information to the route information and signal information.
[0020] The traffic management device 6 acquires train information for each train 2 from the ground control device 4. Based on the acquired train information for each train 2 and stored train schedule information, the traffic management device 6 generates route control information for each train 2 so that the train 2 travels along a route in accordance with the train schedule information at a time in accordance with the train schedule information. The route control information includes, for example, information on the train 2 and route information. The traffic management device 6 outputs the generated route control information for each train 2 to the interlocking control device 5.
[0021] In addition, the traffic management device 6 transmits setting information, switching information, and the like to the on-board device 10 via the ground control device 4 and the wireless device 3. The setting information and switching information include, for example, information on the running time between stops or a run curve ID.
[0022] The on-board device 10 of the train 2 stores run curve information, which is information on a plurality of run curves with different characteristics. The run curve information includes information on the run curve and information on the running time for each run curve. Each run curve specifies the running speed of the train 2 between stations.
[0023] The on-board equipment 10 selects a run curve to be used for traveling from among a plurality of run curves based on setting information or switching information notified from the traffic management device 6. When the control mode is set to the automatic operation mode, the on-board equipment 10 controls the traveling speed of the train 2 based on the selected run curve. In this way, the on-board equipment 10 can make the train 2 travel at a speed that conforms to the run curve.
[0024] Furthermore, when the control mode is set to the manual driving mode, the on-board device 10 can display the selected run curve on a display unit (not shown). The driver of the train 2 can control the running of the train 2 at a speed according to the run curve by operating the train 2 according to the run curve displayed on the display unit (not shown). Note that the on-board device 10 may be configured to be capable of executing only one of the control modes, the automatic driving mode and the manual driving mode.
[0025] When a train 2 is delayed for some reason, the railway system 1 according to the first embodiment performs a time adjustment process to adjust the arrival time of the train 2 at a stop station as well as the passing time, which is the time when the train passes through a passing station between the stop stations. The time adjustment process performed by the railway system 1 will be described below. Fig. 2 is a diagram for explaining the time adjustment process performed by the railway system according to the first embodiment.
[0026] In the example shown in Figure 2, train 21 is the target train for time adjustment processing, and train 2 1 The stops of train 2 are station A and station D, and the passing station between station A and station D is station B. A passing station is a station between the stops of train 2. 1 Train 2 passes through this station without stopping. 1 The on-board device 10 stores run curve information, which is information about the run curves C1, C2, and C3. 1 Before departing from station A, run curve C2 is selected. In the following, when run curves C1, C2, and C3 are not individually indicated, they may be referred to as run curves.
[0027] The operation control device 6 is a train 2 1 is stopped at station A or train 2 1 While traveling between stations A and B, train 2 1 When a delay occurs in the preceding train or when the delay of the preceding train is recovered, 1 Train 2 1 The time change process is for train 2 1 The traffic management device 6 changes the scheduled passing time of the train 2 based on the position information and the timetable information of each train 2, for example. 1 It is determined whether or not a time change process is required.
[0028] The traffic management device 6 transmits a time adjustment request including the changed scheduled time of passage through station B to the passage time adjustment device 7 (step S1). When the passage time adjustment device 7 receives the time adjustment request from the traffic management device 6, 1 Train 2 passes through stations at times according to the scheduled passing times of station B. 1 A run curve is determined (step S2).
[0029] When the scheduled passage time of station B is changed, the passage time adjustment device 7 stops train 2 at a time according to the changed scheduled passage time without switching the run curve. 1The time according to the scheduled passage time is a time whose difference from the scheduled passage time is within a preset threshold value, and includes not only the scheduled passage time but also a time that is within an allowable range from the scheduled passage time. The passage time adjustment device 7 determines whether train 2 can pass through station B at a time according to the changed scheduled passage time without switching the run curve. 1 If train 2 determines that it can pass through station B, 1 It is determined that there is no need to change the run curve until the train passes Station B.
[0030] The passage time adjustment device 7 causes train 2 to pass at a time according to the changed scheduled passage time without switching the run curve. 1 If train 2 determines that it cannot pass through station B, 1 Train 2 when the run curve is changed from run curve C2 to run curves C1 and C3 1 The passage time adjustment device 7 calculates the scheduled passage time of the train B by running simulation. 1 The run curve that is closest to the new scheduled passing time of station B is determined as the revised run curve. The run curve is switched by accelerating using a powering notch or by decelerating using braking.
[0031] In the example shown in Fig. 2, among runcurves C1, C2, and C3, the runcurve whose scheduled passage time is closest to the changed scheduled passage time is runcurve C1, and the passage time adjustment device 7 calculates the running time between Station A and Station D when the runcurve of the train 2 is switched from runcurve C2 to runcurve C1. This running time includes the running time from Station A to the runcurve switching position and the running time from the runcurve switching position to Station D. The switching position is the position where the switching of the runcurve begins, and can also be called the switching start position.
[0032] The running time from the runcurve switching position to Station D includes, for example, the running time of Train 2 from when the runcurve of Train 2 starts to switch from runcurve C2 to runcurve C1 until the switching is completed, and the running time of Train 2 from when the runcurve of Train 2 switches to runcurve C1 to Station D.
[0033] The passage time adjustment device 7 notifies the traffic management device 6 of notification information including the calculated travel time information and the information on the run curve switching position (step S3). 1 If the time lag until the start of the run curve switching is negligible, the run curve switching position is 1 When the time lag is not negligible, the run curve switching position is 1 Train 2 is on track with a time lag from its current position. 1 Train 2 assuming that 1 This is the location.
[0034] The traffic management device 6 notifies the train 2 at the switching position indicated by the notification information. 1 When train 2 arrives, the information on the running time included in the notification information is used as switching information. 1 The switching information output from the traffic management device 6 is transmitted to the on-board device 10 of the train 2 via the network 9, the ground control device 4, the network 8, and the wireless device 3. 1 The signal is received by the on-board device 10.
[0035] Train 2 1 The on-board device 10 selects a run curve that matches the running time included in the switching information from among a plurality of run curves included in the stored run curve information, and switches the train 2 to the selected run curve. 1 The run curve of train 2 is switched (step S4). 1 can pass through station B at a time according to the scheduled passing time.
[0036] The passage time adjustment device 7 can also include a run curve ID (IDentifier) in the notification information instead of the running time information and notify the traffic management device 6. In this case, the traffic management device 6 notifies the traffic management device 6 of the train 2 at the switching position indicated by the notification information. 1 When the train reaches the target, the train 2 1 The train 2 is output to the on-board device 10. 1 The on-board device 10 selects the run curve of the run curve ID included in the switching information, and switches the selected run curve to train 2. 1 Switch the run curve.
[0037] The following provides a more detailed explanation of the traffic management device 6, the passage time adjustment device 7, and the on-board device 10 in the railway system 1. Fig. 3 is a diagram showing an example of the configuration of the traffic management device according to the first embodiment.
[0038] As shown in Fig. 3, the traffic management device 6 according to the first embodiment includes a communication unit 11, a storage unit 12, and a processing unit 13. The communication unit 11 is communicatively connected to a network 9, and transmits and receives information between the ground control device 4, the interlocking control device 5, the passage time adjustment device 7, or the train 2. The communication unit 11 may be further connected to a network 8, and may transmit and receive information between the train 2 via a wireless device 3 without the intervention of the ground control device 4. The communication unit 11 may also be configured to transmit and receive information between the train 2 via a mobile communication network (not shown).
[0039] The memory unit 12 stores timetable information 30, train information 31, and the like. The timetable information 30 includes, for example, travel route information and stop station time information for each train ID. The travel route information is information indicating the travel route of the train 2. The stop station time information includes information indicating the scheduled arrival time of the train 2 at each stop station, information indicating the scheduled departure time of the train 2 from each stop station, and information indicating the scheduled passing time of each passing station of the train 2. The train information 31 includes train status information and train control information for each train 2. The train status information includes information indicating the running position of the train 2 and information indicating the running speed of the train 2.
[0040] The processing unit 13 includes an information acquisition unit 20, a route control unit 21, a setting information output unit 22, a change time calculation unit 23, a time adjustment request unit 24, and a switching information output unit 25. The information acquisition unit 20 acquires train information 31 of each train 2 via the ground control device 4, and stores the acquired train information 31 of each train 2 in the memory unit 12.
[0041] The route control unit 21 generates route control information for each train 2 based on the train information 31 and the timetable information 30 of each train 2 stored in the memory unit 12 so that each train 2 travels along a route in accordance with the timetable information 30 at a time in accordance with the timetable information 30. The route control unit 21 outputs the generated route control information for each train 2 to the interlocking control device 5 via the communication unit 11 and the network 9.
[0042] The setting information output unit 22 executes a process of generating setting information, which is information for causing the on-board device 10 of the train 2 located at a stop station to select a run curve, for example, for each stop station and for each train 2 before the train 2 departs from the stop station, based on the train information 31 and timetable information 30 of each train 2 stored in the memory unit 12.
[0043] The setting information is, for example, information on the running time between stop stations or a run curve ID, but is not limited to these, as long as the information allows the train 2 to select a run curve. The running time between stop stations is the time it takes for the train 2 to run between stop stations when the train 2 runs at a running speed specified by the run curve. The setting information output unit 22 outputs the generated setting information to the on-board equipment 10 of the train 2. The setting information transmitted from the traffic management device 6 is received by the on-board equipment 10 of the train 2 via the network 9, the ground control device 4, the network 8, and the wireless device 3.
[0044] The change time calculation unit 23 determines whether or not there is a target train, which is a train 2 that requires a change in the scheduled passage time and scheduled arrival time, based on the train information 31 and the timetable information 30 of each train 2 stored in the memory unit 12. When it is determined that there is a target train, the change time calculation unit 23 calculates the changed scheduled passage time and scheduled arrival time of the target train.
[0045] When the changed scheduled passage time and scheduled arrival time have been calculated by the change time calculation unit 23, the time adjustment request unit 24 transmits a time adjustment request to the passage time adjustment device 7 via the communication unit 11 and the network 9. The time adjustment request includes information on the changed scheduled passage time and scheduled arrival time of the target train calculated by the change time calculation unit 23 and information on the current position of the target train.
[0046] When notification information from the passage time adjustment device 7 is received by the communication unit 11 via the network 9, the switching information output unit 25 outputs the switching information to the on-board device 10 of the target train at the timing when the target train reaches the switching position indicated by the notification information. The switching information is information on the running time between stopping stations or a run curve ID.
[0047] Next, the passage time adjustment device 7 will be described. Fig. 4 is a diagram showing an example of the configuration of the passage time adjustment device according to the first embodiment. The passage time adjustment device 7 includes a communication unit 41, a storage unit 42, and a processing unit 43. The communication unit 41 is communicatively connected to the network 9, and transmits and receives information to and from the traffic management device 6.
[0048] The storage unit 42 stores run curve information 50. The run curve information 50 includes run curve information and information on the running time between the stop stations for each stop station. FIG. 5 is a diagram showing an example of run curve information according to the first embodiment. The run curve information 50 shown in FIG. 5 includes a "departure station", a "arrival station", a "direction", a "running time", a "run curve ID", and a "run curve", and these pieces of information are associated with each other.
[0049] "Departure station" is information indicating the departure station, which is a stop station for train 2 and the station from which train 2 departs. "Arrival station" is information indicating the arrival station, which is a stop station for train 2 and the next station where train 2 stops after departing from the departure station. "Direction" is information indicating the direction of travel of train 2, and is either up or down.
[0050] "Running time" is the running time of train 2 from the departure station to the arrival station when train 2 runs from the departure station to the arrival station according to the run curve, and is measured in seconds. "Run curve ID" is identification information unique to each run curve. "Run curve" includes run curve information. Run curve information is, for example, information that associates each position from the departure station to the arrival station with the speed.
[0051] Fig. 6 is a diagram showing an example of a plurality of run curves according to the first embodiment. In Fig. 6, the vertical axis indicates the speed of the train 2, and the horizontal axis indicates the position between the departure station and the arrival station. The departure station indicates the station from which the train 2 departs, and the arrival station indicates the next station at which the train 2 arrives after departing from the departure station.
[0052] In the example shown in Fig. 6, the departure station is Station A, the arrival station is Station D, and between Station A and Station D there are Station B and Station C as passing stations through which Train 2 passes. As shown in Fig. 6, run curves C1, C2, C3, and C4 are speed curves that define the change in the running speed of Train 2 between Station A and Station B.
[0053] Returning to Fig. 4, we will continue to explain the configuration of the passage time adjustment device 7. The processing unit 43 of the passage time adjustment device 7 selects a run curve to be used by the train 2 so that the target train passes through the passing station at a time corresponding to the scheduled passage time indicated in the time adjustment request, and arrives at the stop station at a time corresponding to the scheduled arrival time indicated in the time adjustment request.
[0054] The processing unit 43 includes an information acquisition unit 60, a calculation unit 61, a selection unit 62, and a notification information output unit 63. The information acquisition unit 60 acquires information on the scheduled passage time and scheduled arrival time of the target train, which are included in the time adjustment request transmitted from the traffic management device 6 and received by the communication unit 41, and information on the current position of the target train.
[0055] The calculation unit 61 uses a running simulation to calculate the running time of the target train for the section from the current position to the first passed station, the running time of the target train for the section between the passed stations, and the running time of the target train for the section from the last passed station to the stop station.
[0056] Based on the calculated running time and run curve information 50, the calculation unit 61 calculates a predicted passing time, which is the time when the target train is predicted to pass through a passing station, and a predicted arrival time, which is the time when the target train is predicted to arrive at a stop station.
[0057] The selection unit 62 selects a run curve for the section from the current location to the first passing station, a run curve for the section between the passing stations, and a run curve for the section from the last passing station to the stop station, based on the predicted passing time and the predicted arrival time calculated by the calculation unit 61.
[0058] The selection unit 62 selects the run curve for each section described above so that the target train passes through the passing station at a time corresponding to the scheduled passing time indicated in the time adjustment request, and arrives at the stop station at a time corresponding to the scheduled arrival time indicated in the time adjustment request. When the selection unit 62 selects a run curve different from that of the previous section, it determines the selected run curve as the corrected run curve.
[0059] When the corrected run curve is determined by the selection unit 62, the notification information output unit 63 transmits notification information including selection information for selecting the corrected run curve for the target train and switching position information indicating the switching position, which is the position of the target train where the corrected run curve is to be switched to, to the operation management device 6 via the communication unit 41 and the network 9.
[0060] The selection information is information on the running time between the stopping stations when the run curve of the target train is switched to the corrected run curve, or the run curve ID of the corrected run curve, but is not limited to these as long as the information allows the run curve to be selected as the switching target. The switching position information is, for example, the current position of the target train or the positions of the passing stations, but in the case where there is the above-mentioned time lag, it is the position of the target train when it is assumed that the target train will run from the current position of the target train by the time lag.
[0061] Fig. 7 is a diagram showing an example of a run curve selected while a target train according to the first embodiment is stopped at a stop station. Fig. 7 shows an example in which run curve C3 is selected while the target train is stopped at station A, and then a time adjustment request is received by the passage time adjustment device 7 while the target train is running between station A and station B according to run curve C3.
[0062] In the example shown in Figure 7, when the target train runs to Station D according to run curve C3, the scheduled passage time of Station B calculated by calculation unit 61 satisfies the scheduled passage time of Station B indicated in the time adjustment request, but the scheduled passage time of Station C calculated by calculation unit 61 does not satisfy the scheduled passage time of Station C indicated in the time adjustment request.
[0063] Here, an example of a method for calculating the scheduled passage time of station B and the scheduled passage time of station C by the calculation unit 61 will be described. When a time adjustment request is acquired by the information acquisition unit 60 while the target train is running between stations A and B, the calculation unit 61 uses a running simulation to calculate, as a first running time, the running time from the current position until the target train passes the next passing station when the target train runs on the run curve currently used by the target train.
[0064] Then, the calculation unit 61 adds the first running time to the current time to calculate the time at which the target train is predicted to pass through station B when the target train runs on the run curve currently used by the target train as the predicted passage time of station B. The selection unit 62 determines whether the predicted passage time of station B satisfies the scheduled passage time of station B indicated in the time adjustment request.
[0065] The predicted passage time of station B satisfying the scheduled passage time of station B means that the target train passes through the passing station at a time corresponding to the scheduled passage time of station B, and for example, the selection unit 62 determines that the predicted passage time of station B satisfies the scheduled passage time of station B when the difference between the predicted passage time of station B and the scheduled passage time of station B is within a preset threshold. The threshold is, for example, a value within 10 seconds. In the example shown in FIG. 7, the predicted passage time of station B satisfies the scheduled passage time of station B.
[0066] When the selection unit 62 determines that the predicted passage time of station B satisfies the scheduled passage time of station B, it determines the run curve currently used by the target train as the first selected run curve. In addition, the selection unit 62 determines the predicted passage time of station B calculated by the calculation unit 61 as the first predicted passage time.
[0067] If the predicted passing time of station B when the target train runs on the run curve currently used by the target train does not satisfy the scheduled passing time of station B, the calculation unit 61 determines a first selected run curve and determines whether or not to set the first selected run curve as a first corrected run curve. This process will be described later with reference to Figs. 12 and 13.
[0068] Next, the calculation unit 61 uses a running simulation to calculate the running time from Station B to Station C when the target train runs on the first selected run curve as a second running time. Then, the calculation unit 61 adds the second running time to the first predicted passage time to calculate the time at which the target train is predicted to pass Station C when the target train runs on the first selected run curve as the predicted passage time of Station C.
[0069] The selection unit 62 determines whether or not the predicted passage time of station C satisfies the scheduled passage time of station C indicated in the time adjustment request. If the selection unit 62 determines that the predicted passage time of station C satisfies the scheduled passage time of station C, it determines the run curve currently used by the target train as the second selected run curve, and determines the predicted passage time of station C as the second predicted passage time.
[0070] When the selection unit 62 determines that the predicted passing time at station C does not satisfy the scheduled passing time at station C, it determines second selected runcurve candidates that are selected runcurve candidates between stations B and C in order to search for a runcurve. For example, if the predicted passing time at station C is later than the scheduled passing time at station C, the selection unit 62 determines runcurves C1, C2, and runcurve C3, which have shorter running times than runcurve C3, as second selected runcurve candidates. In addition, if the predicted passing time at station C is earlier than the scheduled passing time at station C, the selection unit 62 determines runcurves C4 and runcurve C3, which have longer running times than runcurve C3, as second selected runcurve candidates.
[0071] Fig. 8 is a diagram showing an example of second selected run curve candidates according to the first embodiment. In the example shown in Fig. 7, since the predicted passage time at station C is later than the scheduled passage time at station C, the selection unit 62 determines run curves C1, C2, and C3 as second selected run curve candidates as shown in Fig. 8. In the example shown in Fig. 8, run curve C3 is candidate 1, run curve C2 is candidate 2, and run curve C1 is candidate 3. Candidates 1, 2, and 3 indicate that they are second selected run curve candidates.
[0072] The calculation unit 61 calculates, for each second selected run curve candidate, the second running time as the running time from when the target train passes through station B to when it passes through station C. In the example shown in Fig. 8, the calculation unit 61 calculates, when the run curve of the target train is switched to run curve C1 at station B, the running time from when the target train passes through station B to when it passes through station C, as the second running time of run curve C1.
[0073] The calculation unit 61 calculates the running time of the target train from station B to station C when the run curve of the target train is switched to run curve C2 at station B as the second running time of run curve C2. The calculation unit 61 calculates the running time of the target train from station B to station C when the run curve of the target train is maintained at run curve C3 as the second running time of run curve C3.
[0074] The selection unit 62 calculates the predicted passage time of Station C for each of the run curves C1, C2, and C3 by adding the second running time of each of the run curves C1, C2, and C3 to the first predicted passage time. The selection unit 62 determines, as the second selected run curve, the run curve corresponding to the predicted passage time of Station C that is closest to the scheduled passage time of Station C among the predicted passage times of Station C for each of the run curves C1, C2, and C3.
[0075] When the run curve corresponding to the predicted passage time of C station closest to the scheduled passage time of C station is run curve C3, the selection unit 62 does not determine the second selected run curve as the second corrected run curve. When the run curve corresponding to the predicted passage time of C station closest to the scheduled passage time of C station is either run curve C1 or C2, the selection unit 62 determines the predicted passage time of C station closest to the scheduled passage time of C station as the second predicted passage time, and determines the second selected run curve as the second corrected run curve.
[0076] Fig. 9 is a diagram showing an example of a state in which one second selected runcurve candidate is determined as the runcurve of a target train from the second selected runcurve candidates shown in Fig. 8. In the example shown in Fig. 9, the selection unit 62 determines the runcurve C2 from among the runcurves C1, C2, and C3 as the second selected runcurve.
[0077] Next, the calculation unit 61 calculates the running time from when the target train passes through station C to when it arrives at station D when the run curve of the target train is switched from run curve C3 to run curve C2 at station B as the third running time of run curve C2.
[0078] Then, by adding the third running time to the second predicted passing time, the calculation unit 61 calculates the predicted arrival time at Station D as the time at which the target train is predicted to arrive at Station D if the target train runs on the first selected run curve in the section between Station B and Station C, and on the second selected run curve in the section between Station C and Station D.
[0079] The selection unit 62 determines whether or not the predicted arrival time at station D satisfies the scheduled arrival time at station D indicated in the time adjustment request. If the selection unit 62 determines that the predicted arrival time at station D satisfies the scheduled arrival time at station D, it determines the run curve currently used by the target train as the third selected run curve.
[0080] The predicted arrival time at Station D satisfying the scheduled arrival time at Station D means that the target train arrives at the stop station at a time corresponding to the scheduled arrival time at Station D. For example, the selection unit 62 determines that the predicted arrival time at Station D satisfies the scheduled arrival time at Station D when the difference between the predicted arrival time at Station D and the scheduled arrival time at Station D is within a preset threshold. The threshold is, for example, a value within 10 seconds.
[0081] When the selection unit 62 determines that the predicted arrival time at station D does not satisfy the scheduled arrival time at station D, it determines a third selected runcurve candidate that is a selected runcurve candidate between station C and station D in order to search for a runcurve. For example, if the predicted arrival time at station D is later than the scheduled arrival time at station D, the selection unit 62 determines runcurves C1 and C2, which have shorter running times than runcurve C2, as the third selected runcurve candidates. Also, if the predicted arrival time at station D is earlier than the scheduled arrival time at station D, the selection unit 62 determines runcurves C3, C4, and C2, which have longer running times than runcurve C2, as the third selected runcurve candidates.
[0082] Fig. 10 is a diagram showing an example of third selected run curve candidates according to the first embodiment. In the example shown in Fig. 9, since the predicted arrival time at station D is earlier than the scheduled arrival time at station D, the selection unit 62 determines run curves C2, C3, and C4 as the third selected run curve candidates as shown in Fig. 10. In the example shown in Fig. 10, run curve C4 is candidate 1, run curve C3 is candidate 2, and run curve C2 is candidate 3. Candidates 1, 2, and 3 indicate that they are the third selected run curve candidates.
[0083] The calculation unit 61 calculates, for each third selected run curve candidate, the third running time as the running time from when the target train passes through station C to when it arrives at station D. In the example shown in Fig. 10, the calculation unit 61 calculates, if the run curve of the target train is maintained at run curve C2, the running time from when the target train passes through station C to when it arrives at station D, as the third running time of run curve C2.
[0084] Furthermore, the calculation unit 61 calculates the running time from when the target train passes through station C to when it arrives at station D when the run curve of the target train is switched to run curve C3 at station C as the third running time of run curve C3. The calculation unit 61 calculates the running time from when the target train passes through station C to when it arrives at station D when the run curve of the target train is switched to run curve C4 at station C as the third running time of run curve C4.
[0085] The selection unit 62 calculates the predicted arrival time at station D, which is the time when the target train is predicted to arrive at station D, for each run curve C2, C3, C4 by adding each of the third running times of run curves C2, C3, C4 to the second predicted passing time.
[0086] The selection unit 62 determines, among the run curves C2, C3, and C4, the run curve corresponding to the predicted arrival time at station D that is closest to the scheduled arrival time at station D as the third selected run curve. If the run curve corresponding to the predicted arrival time at station D that is closest to the scheduled arrival time at station D is run curve C2, the selection unit 62 does not determine the third selected run curve as the third revised run curve.
[0087] If the run curve corresponding to the predicted arrival time at Station D that is closest to the scheduled arrival time at Station D is either the run curve C3 or C4, the selection unit 62 determines the third selected run curve as the third revised run curve.
[0088] Fig. 11 is a diagram showing an example of a state in which one third selected runcurve candidate is determined as the runcurve of a target train from the third selected runcurve candidates shown in Fig. 10. In the example shown in Fig. 11, the selection unit 62 determines the runcurve C4 from among the runcurves C2, C3, and C4 as the third selected runcurve and the third revised runcurve.
[0089] 11, the notification information output from the notification information output unit 63 includes information on the second corrected runcurve and information on the third corrected runcurve. The information on the second corrected runcurve includes information for selecting runcurve C2 as the second corrected runcurve, and information indicating the position of station B as the switching position of the second corrected runcurve. The information on the third corrected runcurve includes information for selecting runcurve C4 as the third corrected runcurve, and information indicating the position of station C as the switching position of the third corrected runcurve.
[0090] The information for selecting runcurve C2 is information on the running time of the target train between stations A and D when the runcurve of the target train is switched from runcurve C3 to runcurve C2 at station B, or the runcurve ID of runcurve C2. The information for selecting runcurve C4 is information on the running time of the target train between stations A and D when the runcurve of the target train is switched from runcurve C3 to runcurve C2 at station B and from runcurve C2 to runcurve C4 at station C, or the runcurve ID of runcurve C4.
[0091] In this case, the switching information output unit 25 of the traffic management device 6 outputs information indicating run curve C2 as the second corrected run curve to the on-board equipment 10 of the target train when the target train reaches station B, and outputs information indicating run curve C4 as the third corrected run curve to the on-board equipment 10 of the target train when the target train reaches station C. As a result, the target train runs between stations A and D according to the run curve shown in Fig. 11.
[0092] In other words, the target train runs according to run curve C3 in the section between stations A and B, switches the run curve from run curve C3 to run curve C2 at station B and runs in the section between stations B and C, and switches the run curve from run curve C2 to run curve C4 at station C and runs in the section between stations C and D.
[0093] Here, a case will be described where the predicted passage time at station B does not satisfy the scheduled passage time at station B. Fig. 12 is a diagram showing an example of a run curve selected while a target train according to the first embodiment is running between stopping stations. Fig. 12 shows an example where run curve C3 is selected while the target train is stopping at station A, and a time adjustment request is received by the passage time adjustment device 7 while the target train is running between stations A and B according to run curve C3.
[0094] 12, when the target train runs to Station D according to run curve C3, the scheduled passage time of Station B calculated by the calculation unit 61 does not satisfy the scheduled passage time of Station B indicated in the time adjustment request. When the predicted passage time of Station B does not satisfy the scheduled passage time of Station B, the calculation unit 61 determines a first selected run curve candidate that is a selected run curve candidate up to Station B in order to search for a run curve.
[0095] For example, if the predicted passing time at Station B is later than the scheduled passing time at Station B, the selection unit 62 determines the run curve currently used by the target train and a run curve having a shorter running time than the run curve currently used by the target train as first selection run curve candidates.
[0096] In addition, if the predicted passing time at Station B is earlier than the scheduled passing time at Station B, the selection unit 62 determines the run curve currently used by the target train and a run curve having a longer running time than the run curve currently used by the target train as first selection run curve candidates.
[0097] In the example shown in Fig. 12, since the predicted passage time at Station B is later than the scheduled passage time at Station B, the selection unit 62 determines the runcurve C3 currently used by the target train and runcurves C1 and C2, which have shorter running times than runcurve C3, as first selected runcurve candidates. In the example shown in Fig. 12, runcurve C3 is candidate 1, runcurve C2 is candidate 2, and runcurve C1 is candidate 3. Candidates 1, 2, and 3 indicate that they are first selected runcurve candidates.
[0098] The calculation unit 61 uses a running simulation to calculate a second running time, which is the running time from the current position to the next passing station of the target train when the target train runs after switching from the run curve currently used by the target train to the run curves C1 and C2 at the current position. The calculation unit 61 then adds the second running time to the current time for each of the run curves C1 and C2, thereby calculating the predicted passing time of Station B for each of the run curves C1 and C2.
[0099] The selection unit 62 determines the first selected run curve candidate corresponding to the predicted passage time of station B closest to the scheduled passage time of station B among the predicted passage times of station B for each first selected run curve candidate as the first selected run curve, and determines the first selected run curve as the first revised run curve. The calculation unit 61 determines the predicted passage time of station B closest to the scheduled passage time of station B among the predicted passage times of station B for each first selected run curve candidate as the first predicted passage time.
[0100] Fig. 13 is a diagram showing an example of a state in which one first selected runcurve candidate is determined as the runcurve of a target train from among the first selected runcurve candidates shown in Fig. 12. In the example shown in Fig. 13, the selection unit 62 determines the runcurve C2 from among the runcurves C1, C2, and C3 as the second selected runcurve.
[0101] In the above example, the time adjustment request includes information on the scheduled passage times of multiple passing stations and information on the scheduled arrival times at the stop stations, but the scheduled passage time information included in the time adjustment request may only include information on the scheduled passage time of one of the multiple passing stations. In this case, a time adjustment request including information on each scheduled passage time after change is sequentially sent from the traffic management device 6 to the passage time adjustment device 7. In this case, the processing unit 43 selects the corrected run curve indicated in the time adjustment request each time it receives a time adjustment request.
[0102] In addition, the selection unit 62 can select a switching run curve based on the predicted arrival time of the target train calculated by the calculation unit 61, even if there are no passing stations between the stopping stations, if the scheduled arrival time is changed while the target train is traveling between the stopping stations.
[0103] In the above example, the selection unit 62 sets the selected run curve candidate corresponding to the predicted passage time closest to the scheduled passage time as the selected run curve, but the present invention is not limited to such an example. For example, when there is a condition that the target train should not pass earlier than the scheduled passage time, the selection unit 62 sets the selected run curve candidate corresponding to the predicted passage time closest to the scheduled passage time as the selected run curve from among the predicted passage times excluding the predicted passage times earlier than the scheduled passage time.
[0104] In addition, when there is a condition that the target train should not pass later than the scheduled passing time, the selection unit 62 selects the selected run curve candidate corresponding to the predicted passing time closest to the scheduled passing time from among the predicted passing times excluding the predicted passing times later than the scheduled passing time as the selected run curve.
[0105] When there is a condition that the target train should not arrive at the stop station earlier than the scheduled arrival time, the selection unit 62 selects the selected run curve candidate corresponding to the predicted arrival time closest to the scheduled arrival time from among the predicted arrival times excluding the predicted arrival times earlier than the scheduled arrival time as the selected run curve.
[0106] In addition, when there is a condition that the target train should not arrive at the stop station later than the scheduled arrival time, the selection unit 62 can select the selected run curve candidate corresponding to the predicted arrival time closest to the scheduled arrival time from among the predicted arrival times excluding the predicted arrival times later than the scheduled arrival time as the selected run curve.
[0107] Here, the configuration of the on-board equipment 10 possessed by the train 2 will be described. Fig. 14 is a diagram showing an example of the configuration of the on-board equipment possessed by the train according to the first embodiment. As shown in Fig. 14, the on-board equipment 10 includes a communication unit 71, a detection unit 72, a storage unit 73, a processing unit 74, a control unit 75, and a display unit 76.
[0108] The communication unit 71 is wirelessly connected to the radio device 3 so as to be able to communicate with the radio device 3, and transmits and receives information between the radio device 3 and the ground control device 4 or the traffic management device 6. The communication unit 71 receives, for example, train control information from the ground control device 4 via the radio device 3, and receives setting information or switching information from the traffic management device 6 via the ground control device 4 and the radio device 3.
[0109] The detection unit 72 detects the position and speed of the train 2. The detection unit 72 detects the position and speed of the train 2 based on the number of wheel rotations detected by a rotation detector (not shown) provided on the train 2, but can also detect the position and speed of the train 2 based on position information output from a GPS (Global Positioning System) receiver (not shown) provided on the train 2.
[0110] The detection unit 72 outputs train status information to the communication unit 71 based on the results of detecting the position and speed of the train 2. The train status information includes, for example, a train ID, position information indicating the position of the train 2, speed information indicating the speed of the train 2, and driving direction information indicating the traveling direction of the train 2. The communication unit 71 transmits the train status information output from the detection unit 72 to the ground control device 4 via the wireless device 3.
[0111] The storage unit 73 stores run curve information. The run curve information is the same as the run curve information 50 shown in FIG. 5. Based on the setting information received by the communication unit 71, the processing unit 74 selects a run curve corresponding to the setting information received by the communication unit 71 from among the multiple run curves stored in the storage unit 73. For example, when the setting information is information on a running time, the processing unit 74 selects a run curve that matches the running time indicated by the setting information from among the multiple run curves. Also, when the setting information is a run curve ID, the processing unit 74 selects a run curve with the run curve ID indicated by the setting information from among the multiple run curves.
[0112] Furthermore, when switching information is received by the communication unit 71, the processing unit 74 selects a run curve corresponding to the switching information received by the communication unit 71 from among the multiple run curves stored in the storage unit 73. For example, when the switching information is information on a running time, the processing unit 74 selects from among the multiple run curves a run curve that matches the running time indicated by the switching information. Furthermore, when the switching information is a run curve ID, the processing unit 74 selects from among the multiple run curves a run curve with the run curve ID indicated by the switching information.
[0113] When the control mode is set to the automatic operation mode, the control unit 75 controls the running speed of the train 2 based on the run curve selected by the processing unit 74. In this way, the control unit 75 can make the train 2 run at a speed according to the run curve.
[0114] Furthermore, when the control mode is set to the manual driving mode, the control unit 75 can display the run curve selected by the processing unit 74 on the display unit 76. The driver of the train 2 can operate the train 2 according to the run curve displayed on the display unit 76, thereby causing the train 2 to run at a speed according to the run curve. Note that the on-board device 10 may be configured to be capable of executing only one of the control modes, the automatic driving mode and the manual driving mode.
[0115] Next, a process performed by the processor 43 of the passage time adjustment device 7 will be described with reference to a flowchart. Fig. 15 is a flowchart showing an example of a process performed by the processor of the passage time adjustment device according to the first embodiment.
[0116] As shown in Fig. 15, the processing unit 43 of the passage time adjustment device 7 judges whether or not a time adjustment request from the traffic management device 6 has been received by the communication unit 41 (step S10). If the processing unit 43 judges that a time adjustment request has been received (step S10: Yes), it selects the next station after the selected station from among the unselected stations (step S11). For example, in the case of stations A, B, C, and D shown in Fig. 6, if none of the stations has been selected, station A is selected. Also, if the station selected last time was station A, station B is selected.
[0117] Next, the processor 43 determines whether the station selected in step S11 is the nearest station from the current position of the target train (step S12). If the processor 43 determines that the station selected in step S11 is not the nearest station from the current position of the target train (step S12: No), it determines the previous passing station as the run curve switching position (step S13).
[0118] If the processing unit 43 determines that the station selected in step S11 is the nearest station from the current position of the target train (step S12: Yes), it determines whether the target train is running (step S14). If the processing unit 43 determines that the target train is running (step S14: Yes), it determines the current position of the target train as the run curve switching position (step S15).
[0119] When the processing of step S13 is completed, or when the processing of step S15 is completed, the processing unit 43 determines the run curve of the predicted passage time or predicted arrival time that is closest to the scheduled passage time or scheduled arrival time as the corrected run curve (step S16).
[0120] Furthermore, when the processor 43 determines that the target train is not running (step S14: No), it selects the run curve of the predicted passage time or predicted arrival time that is closest to the scheduled passage time or scheduled arrival time (step S17). A case where the target train is not running and is the nearest station from the current position of the target train is, for example, a case where the target train is stopped at station A in the example shown in FIG.
[0121] Next, when the processing of step S16 is completed or when the processing of step S17 is completed, the processing unit 43 judges whether or not there is a station that has not been selected in step S11 (step S18). When the processing unit 43 judges that there is a station that has not been selected (step S18: Yes), the processing unit 43 shifts the processing to step S11. When the processing unit 43 judges that there is no station that has not been selected (step S18: No) or that a time adjustment request has not been received (step S10: No), the processing unit 43 judges whether or not it is time to end the operation (step S19). When the power supply (not shown) of the passage time adjustment device 7 is turned off or an operation to end the operation is performed on an operation unit (not shown), the processing unit 43 judges that it is time to end the operation.
[0122] If the processing unit 43 determines that it is not the time to end the operation (step S19: No), it transitions to step S10, and if it determines that it is the time to end the operation (step S19: Yes), it terminates the processing shown in FIG. 15.
[0123] 16 is a diagram illustrating an example of a hardware configuration of the passage time adjustment device according to the embodiment 1. As illustrated in FIG. 16, the passage time adjustment device 7 includes a computer including a processor 101, a memory 102, and a communication device 103.
[0124] The processor 101, memory 102, and communication device 103 can transmit and receive information to and from each other via, for example, a bus 104. The communication unit 41 is realized by the communication device 103. The storage unit 42 is realized by the memory 102. The processor 101 executes the functions of the processing unit 43 by reading and executing a program stored in the memory 102. The processor 101 is, for example, an example of a processing circuit, and includes one or more of a CPU (Central Processing Unit), a DSP (Digital Signal Processor), and a system LSI (Large Scale Integration).
[0125] The memory 102 includes one or more of a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable Read Only Memory), and an EEPROM (registered trademark) (Electrically Erasable Programmable Read Only Memory). The memory 102 also includes a recording medium on which a computer-readable program is recorded. Such a recording medium includes one or more of a non-volatile or volatile semiconductor memory, a magnetic disk, a flexible memory, an optical disk, a compact disk, and a DVD (Digital Versatile Disc). The passage time adjustment device 7 may include an integrated circuit such as an ASIC (Application Specific Integrated Circuit) and an FPGA (Field Programmable Gate Array).
[0126] The passage time adjustment device 7 may be configured as one device, or may be configured as two or more devices. When the passage time adjustment device 7 is configured as two or more devices, each of the two or more devices has, for example, the hardware configuration shown in FIG. 16. Communication between the two or more devices is performed via a communication device 103. The passage time adjustment device 7 may also be included in the traffic management device 6.
[0127] As described above, the railway system 1 according to the first embodiment includes the calculation unit 61, the selection unit 62, and the switching information output unit 25. When there is a change in the scheduled passing time, which is the scheduled time when the train 2, whose running is controlled according to a run curve that specifies the running speed between the stop stations, is scheduled to pass through a passing station between the stop stations, the calculation unit 61 calculates a predicted passing time, which is the time when the train 2 is predicted to pass through the passing station by switching the run curve used to control the running of the train 2. Based on the predicted passing time calculated by the calculation unit 61, the selection unit 62 selects, as a corrected run curve, a run curve at which the train 2 passes through the passing station at a time according to the changed scheduled passing time. The switching information output unit 25 outputs switching information for switching the run curve of the train 2 to the corrected run curve to the on-board device 10 of the train 2. This allows the railway system 1 to adjust the passing time when the scheduled passing time is changed, which can contribute to improving operation efficiency or work efficiency at the site, for example.
[0128] In addition, the calculation unit 61 calculates the predicted passage time when the scheduled passage time is changed while the train 2 is traveling between stations. This allows the railway system 1 to adjust the passage time when the scheduled passage time is changed while the train 2 is traveling between stations.
[0129] Furthermore, there are multiple passing stations between the stopping stations, and when there are changes to the scheduled passage times of multiple passing stations, the selection unit 62 selects a corrected run curve for each changed scheduled passage time. After the selection unit 62 determines the corrected run curve for each scheduled passage time, the switching information output unit 25 outputs switching information for each scheduled passage time to the on-board device 10 of the train 2. This allows the railway system 1 to adjust the passage times of each passing station at once when there are changes to multiple scheduled passage times.
[0130] In addition, there are multiple passing stations between the stopping stations, and the selection unit 62 selects a corrected run curve every time there is a change in the scheduled passing time of a passing station while the train 2 is traveling between the stopping stations. The switching information output unit 25 outputs switching information to the on-board device 10 of the train 2 every time the selection unit 62 selects a corrected run curve. This allows the railway system 1 to adjust the passing time every time there is a change in the scheduled passing time while the train 2 is traveling between the stopping stations.
[0131] Furthermore, when the estimated arrival time, which is the scheduled time that the train 2 is scheduled to arrive at a stop station, is changed while the train 2 is running between the stops, the calculation unit 61 calculates the estimated arrival time at which the train 2 is predicted to arrive at the stop station when the run curve used by the train 2 is switched. The selection unit 62 selects, as a corrected run curve, a run curve at which the train 2 arrives at the stop station at a time corresponding to the changed estimated arrival time, based on the estimated arrival time calculated by the calculation unit 61. This enables the railway system 1 to adjust the arrival time when the estimated arrival time is changed.
[0132] Furthermore, the calculation unit 61 calculates the running time between the stopping stations when the run curve used by the train 2 is switched to the corrected run curve. The switching information output unit 25 outputs the information on the running time between the stopping stations calculated by the calculation unit 61 to the on-board equipment 10 of the train. This enables the railway system 1 to adjust the passing time of the train 2 equipped with the on-board equipment 10 that selects a run curve based on the running time information.
[0133] Furthermore, the calculation unit 61 calculates the predicted passage times by running simulation, which enables the railway system 1 to adjust the passage times with high accuracy.
[0134] Embodiment 2 The passage time adjustment device of the railway system according to the second embodiment differs from the passage time adjustment device 7 of the railway system 1 according to the first embodiment in that the passage time adjustment device adjusts the switch position of the run curve when switching the run curve between stations. In the following, components having the same functions as those in the first embodiment are given the same reference numerals and their explanations are omitted, and the explanation will focus on the points that are different from the passage time adjustment device 7 of the first embodiment.
[0135] Fig. 17 is a diagram showing an example of the configuration of a passage time adjustment device according to embodiment 2. As shown in Fig. 17, the passage time adjustment device 7A according to embodiment 2 differs from the passage time adjustment device 7 in that it includes a processing unit 43A instead of the processing unit 43. The processing unit 43A differs from the processing unit 43 in that it includes a calculation unit 61A and a selection unit 62A instead of the calculation unit 61 and the selection unit 62.
[0136] When a time adjustment request is acquired by the information acquisition unit 60 while the train is stopped at a stop station, the selection unit 62A selects the first run curve and the second run curve. The first run curve is a run curve corresponding to a predicted passage time that is closest to the scheduled passage time among predicted passage times that are earlier than the scheduled passage time of the next station indicated in the time adjustment request. The second run curve is a run curve corresponding to a predicted passage time that is closest to the scheduled passage time among predicted passage times that are later than the scheduled passage time of the next station indicated in the time adjustment request.
[0137] Fig. 18 is a diagram showing an example of two run curves selected while a target train according to the second embodiment is stopped. In the example shown in Fig. 18, the selection unit 62A selects the run curve C2 as the first run curve and selects the run curve C3 as the second run curve.
[0138] The selection unit 62A selects one of the first and second run curves as a run curve to be used when the target train departs from a station where the target train is to stop. For example, when the target train is to run at an increased speed so as not to impede the following train from entering the station, the selection unit 62A selects the first run curve.
[0139] Next, the calculation unit 61A uses a running simulation to repeatedly calculate the predicted passage time while changing the switching position, which is the position of the train 2 where it switches from one run curve to the other run curve, and determines the switching position where the predicted passage time coincides with the scheduled passage time as the switching position of the corrected run curve. Note that since the target train runs at full acceleration for a certain section from the running start position, the calculation unit 61A calculates the predicted passage time by setting the train position after switching from full acceleration to constant speed running or coasting as the switching position. Note that coasting is running in a notch-off state.
[0140] Then, the notification information output unit 63 outputs notification information including first information including information on one run curve and information on the departure station which is the switching position to one run curve, and second information including information on the other run curve and information on the switching position to the other run curve, to the traffic management device 6. This allows the target train to pass through the passing station at the same time as the scheduled passing time.
[0141] Furthermore, when a time adjustment request is acquired by the information acquisition unit 60 while the target train is traveling between stations, the calculation unit 61A calculates the running time from the current position until the target train passes the next passing station if it travels on the run curve currently used by the target train, and calculates the predicted passing time of the next passing station based on the calculated running time. The selection unit 62A determines whether the predicted passing time of the next passing station satisfies the scheduled passing time of the next passing station indicated in the time adjustment request.
[0142] When the predicted passing time of the next passing station does not satisfy the scheduled passing time of the next passing station, the calculation unit 61A calculates the predicted passing time of the next passing station when the run curve of the target train is switched. When the predicted passing time of the next passing station when the target train runs on the run curve currently used is later than the scheduled passing time of the next passing station, the selection unit 62A determines, as the corrected run curve, the run curve corresponding to the predicted passing time that is earlier than the scheduled passing time of the next passing station and closest to the scheduled passing time of the next passing station among the predicted passing times of the next passing station when the run curve of the target train is switched.
[0143] Fig. 19 is a diagram showing an example of a corrected run curve selected while a target train according to the embodiment 2 is running. In the example shown in Fig. 19, the selection unit 62A selects, as the corrected run curve for the target train running according to the run curve C3, the run curve C2 corresponding to the predicted passage time of station B that is earlier than the scheduled passage time of station B and closest to the scheduled passage time of station B.
[0144] In addition, when the predicted passing time of the next passing station when the target train runs on the run curve currently being used is earlier than the scheduled passing time of the next passing station, the selection unit 62A determines as the corrected run curve the run curve corresponding to the predicted passing time of the next passing station when the run curve of the target train is switched that is later than the scheduled passing time of the next passing station and is closest to the scheduled passing time of the next passing station.
[0145] Next, the calculation unit 61A repeatedly calculates the predicted passage time while shifting the switching position, which is the position of train 2 where the run curve of the target train is switched to the corrected run curve, in the direction approaching the next passing station using a running simulation, and determines the switching position where the predicted passage time coincides with the scheduled passage time as the switching position of the corrected run curve.
[0146] Fig. 20 is a diagram for explaining a method for adjusting the switching position of the corrected run curve according to the second embodiment. In the example shown in Fig. 20, the calculation unit 61A repeatedly calculates the predicted passing time of station B while shifting the switching position at which run curve C3 is switched to run curve C2 in a direction approaching station B using a running simulation, and determines the switching position at which the predicted passing time of station B coincides with the scheduled passing time of station B as the switching position of run curve C2.
[0147] An example of a hardware configuration of the passage time adjustment device 7A according to the second embodiment is the same as the hardware configuration of the passage time adjustment device 7 shown in Fig. 16. The processor 101 can execute the functions of the processing unit 43A by reading and executing a program stored in the memory 102.
[0148] As described above, the calculation unit 61A of the railway system according to the second embodiment determines a switching position, which is a position of the train 2 where the run curve of the train 2 is switched to the corrected run curve. The switching information output unit 25 outputs switching information to the on-board device 10 of the train 2 so that the run curve of the train 2 is switched to the post-switched run curve at the switching position determined by the calculation unit 61A. This allows the railway system according to the second embodiment to accurately adjust the passage time when the scheduled passage time is changed.
[0149] In addition, the calculation unit 61A calculates the scheduled passage time while changing the switching position of the run curve of the train 2, and determines the switching position at which the predicted passage time coincides as the switching position of the corrected run curve. This allows the railway system according to the second embodiment to adjust the passage time with higher accuracy when the scheduled passage time is changed.
[0150] Embodiment 3 The railway system according to the third embodiment differs from the first and second embodiments in that it switches between run curves that decelerate by coasting. In the following, components having the same functions as those in the first embodiment are given the same reference numerals and their explanations are omitted, and the explanation will be centered on the points that differ from the passage time adjustment device 7 in the first embodiment.
[0151] Fig. 21 is a diagram showing an example of the configuration of a passage time adjustment device according to the third embodiment. As shown in Fig. 21, the passage time adjustment device 7B according to the third embodiment differs from the passage time adjustment device 7 in that it includes a processing unit 43B instead of the processing unit 43. The processing unit 43B differs from the processing unit 43 in that it includes a calculation unit 61B and a notification information output unit 63B instead of the calculation unit 61 and the notification information output unit 63.
[0152] The calculation unit 61B uses a running simulation to calculate the running time from the current position to the next passing station when the target train decelerates by coasting when switching its run curve, and calculates the predicted passing time at the next passing station based on the calculated running time.
[0153] In coasting, the train 2 decelerates due to air resistance, so that it is possible to decelerate without applying the brakes of the train 2. In addition, in coasting, the train accelerates on a downward gradient, so that it is possible to accelerate without switching to a powering notch. As described above, depending on the line, there are cases where the train decelerates and cases where the train accelerates due to coasting, so the calculation unit 61B determines whether or not it is possible to switch the run curve during coasting, based on the gradient of the line.
[0154] When the calculation unit 61B determines that the run curve can be switched by coasting, the calculation unit 61B calculates the predicted passage time when the target train decelerates by coasting when switching the run curve. The selection unit 62 determines the corrected run curve based on the predicted passage time calculated by the calculation unit 61B.
[0155] Fig. 22 is a diagram showing an example of a run curve selected while a target train according to the third embodiment is traveling between stations. In the example shown in Fig. 22, the selection unit 62 selects run curve C4 as a corrected run curve for the target train traveling according to run curve C3, and switching from run curve C3 to run curve C4 is performed by coasting.
[0156] In addition, when the calculation unit 61B determines that the run curve cannot be switched during coasting, it calculates the predicted passing time when the run curve is switched by accelerating using a powering notch or by decelerating using braking, as in the first and second embodiments.
[0157] Furthermore, even if the calculation unit 61B determines that the run curve can be switched during coasting, it can select an acceleration method or deceleration method that consumes less energy compared to acceleration using a powering notch or deceleration using braking, or select an acceleration method or deceleration method that produces a predicted passage time that is closer to the scheduled passage time.
[0158] Furthermore, when switching the run curve during coasting, the calculation unit 61B can adjust the run curve switching position as in the second embodiment without setting the current position of the target train as the run curve switching position.
[0159] The notification information output unit 63B transmits notification information including switching method information indicating the acceleration method or deceleration method in addition to the selection information and switching position information to the traffic management device 6 via the communication unit 41 and the network 9.
[0160] The switching information output unit 25 of the traffic management device 6 outputs the switching information to the on-board equipment 10 of the target train when the target train reaches the switching position indicated in the notification information. The switching information includes switching method information in addition to information on the running time between stopping stations or a run curve ID. The on-board equipment 10 of the target train switches the run curve during coasting based on the switching method information included in the switching information.
[0161] In addition, when the on-board device 10 automatically determines whether coasting is possible when switching run curves, and coasting is performed based on the result of such determination, there is no need to transmit switching method information from the operation management device 6 to the on-board device 10 of the target train.
[0162] An example of a hardware configuration of the passage time adjustment device 7B according to the third embodiment is the same as the hardware configuration of the passage time adjustment device 7 shown in Fig. 16. The processor 101 can execute the functions of the processing unit 43B by reading and executing a program stored in the memory 102.
[0163] As described above, in the railway system according to the third embodiment, the calculation unit 61B calculates, as the predicted passage time, the time at which the train 2 is predicted to pass through a passing station when the run curve used by the train 2 is switched by coasting. As a result, in the railway system according to the third embodiment, the section in which the train 2 does not use a powering notch becomes longer, so that it is possible to adjust the passage time while suppressing an increase in the energy consumption of the train 2.
[0164] Embodiment 4 The railway system according to the fourth embodiment differs from the railway systems according to the first to third embodiments in that it calculates a predicted passage time and a predicted arrival time without using a running simulation. In the following, components having the same functions as those in the first embodiment are given the same reference numerals and their explanations are omitted, and the explanation focuses on the points that are different from the passage time adjustment device 7 in the first embodiment, but the function of calculating a predicted passage time and a predicted arrival time without using a running simulation may be applied to the passage time adjustment devices 7A and 7B in the second and third embodiments.
[0165] Fig. 23 is a diagram showing an example of the configuration of a passage time adjustment device according to the fourth embodiment. As shown in Fig. 23, the passage time adjustment device 7C according to the fourth embodiment differs from the passage time adjustment device 7 in that it includes a storage unit 42C and a processing unit 43C instead of the storage unit 42 and the processing unit 43. The storage unit 42C differs from the storage unit 42 in that it stores run curve information 50C instead of the run curve information 50, and further stores first switching determination information 51 and second switching determination information 52. The processing unit 43C differs from the processing unit 43 in that it includes a calculation unit 61C instead of the calculation unit 61.
[0166] Fig. 24 is a diagram showing an example of first switching determination information stored in the storage unit of the passage time adjustment device according to the fourth embodiment. The first switching determination information 51 shown in Fig. 24 includes information on a switching required time, which is the time required to switch the runcurve, for a combination of a "runcurve ID before switching" and a "runcurve ID after switching".
[0167] The "runcurve ID before switching" is the runcurve ID of the runcurve before switching. The "runcurve ID after switching" is the runcurve ID of the runcurve after switching. The runcurve IDs of runcurves C1, C2, C3, and C4 are 1, 2, 3, and 4.
[0168] In the example shown in Fig. 24, it is shown that the time required for switching from runcurve C1 to runcurve C2 is 3 seconds, the time required for switching from runcurve C1 to runcurve C3 is 6 seconds, and the time required for switching from runcurve C2 to runcurve C1 is 3 seconds. Also, in the example shown in Fig. 24, it is shown that the time required for switching from runcurve C2 to runcurve C3 is 3 seconds, the time required for switching from runcurve C3 to runcurve C1 is 6 seconds, and the time required for switching from runcurve C3 to runcurve C2 is 3 seconds.
[0169] Fig. 25 is a diagram showing an example of second switching determination information stored in the storage unit of the passage time adjustment device according to the fourth embodiment. The second switching determination information 52 shown in Fig. 25 includes information on the distance traveled by the target train during the process of switching the run curve for a combination of a "run curve ID before switching" and a "run curve ID after switching".
[0170] In the example shown in Fig. 25, the distance traveled in the process of switching from runcurve C1 to runcurve C2 is 50 m, the distance traveled in the process of switching from runcurve C1 to runcurve C3 is 100 m, and the distance traveled in the process of switching from runcurve C2 to runcurve C1 is 50 m. Also, in the example shown in Fig. 25, the distance traveled in the process of switching from runcurve C2 to runcurve C3 is 50 m, the distance traveled in the process of switching from runcurve C3 to runcurve C1 is 100 m, and the distance traveled in the process of switching from runcurve C3 to runcurve C2 is 50 m.
[0171] Since the speed defined by the run curve may differ depending on the position between the stop stations, the time required for run curve switching and the distance traveled by the target train during the run curve switching process may differ depending on the position where the target train is traveling. Therefore, the first switching judgment information 51 and the second switching judgment information 52 may be stored in the storage unit 42C, for example, for each position or section between the stop stations. A section is a section obtained by dividing a section between the stop stations into multiple sections, and is, for example, a section in which the speed falls within a preset range.
[0172] In addition, if the first switching judgment information 51 and the second switching judgment information 52 cannot be stored in the memory unit 42C for each position or each section due to limitations in the memory capacity of the memory unit 42C, an arbitrary value such as the average, maximum, or minimum value of the switching required time may be set in the first switching judgment information 51, and an arbitrary value such as the average, maximum, or minimum value of the switching required time may be set in the second switching judgment information 52.
[0173] Fig. 26 is a diagram illustrating an example of run curve information stored in the storage unit of the passage time adjustment device according to the fourth embodiment. Run curve information 50C illustrated in Fig. 26 includes a "run curve ID," a "position," "B station," "C station," and "D station" for each "position."
[0174] "Run curve ID" is the run curve ID of the run curve. "Location" is information about the location after the run curve is switched, and is information indicating the distance from a stop station. The location after the run curve is switched is the location of train 2 immediately after switching to the corrected run curve. The distance from a stop station is expressed, for example, in kilometers. "Location" is information such as the location where the speed changes or the location of each station.
[0175] "Station B" is information about the travel time from the run curve switching position to Station B, "Station C" is information about the travel time from the run curve switching position to Station C, and "Station D" is information about the travel time from the run curve switching position to Station D.
[0176] In the example shown in Figure 26, when a target train running on run curve C2 switches run curves at a position 200 kilometers from the stop station, the travel time to Station B is 30 seconds, the travel time to Station C is 170 seconds, and the travel time to Station D is 300 seconds.
[0177] In addition, in the example shown in Figure 26, when a target train running on run curve C2 switches run curves at a position 500 kilometers from the stop station, the distance to Station B is 0 kilometers, the distance to Station C is 140 kilometers, and the distance to Station D is 270 kilometers.
[0178] The calculation unit 61C calculates the time required to switch the run curve and the position after the run curve is switched based on the first switching judgment information 51 and the second switching judgment information 52, and calculates the running time from the calculated position after the run curve is switched to a passing station or a stopping station based on the run curve information 50C.
[0179] Then, the calculation unit 61C calculates the predicted passing time or the predicted arrival time when the run curve is switched from the current position by adding up the time required for switching the run curve and the running time to the passing station or the stop station.
[0180] The "positions" included in the runcurve information 50C are discrete positions, and the position after the runcurve switching calculated by the calculation unit 61C may not match the "positions" included in the runcurve information 50C. Therefore, the calculation unit 61C calculates the traveling time from the position after the runcurve switching to the passing station or the stopping station by interpolating the traveling times of "Station B," "Station C," and "Station D" associated with two "positions" that are close to the position after the runcurve switching among the "positions" included in the runcurve information 50C.
[0181] Fig. 27 is a diagram for explaining run curve information stored in the storage unit of the passage time adjustment device according to the fourth embodiment. In the example shown in Fig. 27, the "position" of run curve information 50C is shown by a black circle on the run curve. The black circles are located at a position 200 kilometers from Station A, a position 500 kilometers from Station A, and positions at regular intervals within a range where the speed changes due to coasting.
[0182] 27 shows an example in which the run curve is switched from run curve C1 to run curve C2 in order to adjust the predicted passing time of station B. The calculation unit 61C acquires information on the closest "position" ahead of the target train from the position after the run curve is switched and information on the closest "position" behind the target train from the run curve information 50C.
[0183] The front of the target train is in the direction of travel of the target train, and the rear of the target train is in the opposite direction to the direction of travel of the target train. In the following, the closest "position" in front of the target train may be referred to as the front position, and the closest "position" in the rear of the target train may be referred to as the rear position.
[0184] The calculation unit 61C can calculate the running time from the position after the change in run curve to the passing station or the stopping station, for example, by the calculation of the following formula (1).
[0185]
number
[0186] In the above formula (1), "f" represents the kilometer distance of the forward position, "r" represents the kilometer distance of the rearward position, "x" represents the position after the change of the run curve, and "T f " indicates the travel time from the front position to the passing or stopping station, and "T r " indicates the time it takes to travel from the rear position to the station it passes through or stops at, and "T x " indicates the travel time from the position after the run curve change to the passing station or stopping station.
[0187] 26 and 27, when the position after the run curve switch is at a kilometer distance of "400", the forward position is at a kilometer distance of "500" and the backward position is at a kilometer distance of "200". In this case, the travel time from the position after the run curve switch to Station B is "10", the travel time from the position after the run curve switch to Station C is "150", and the travel time from the position after the run curve switch to Station D is "280".
[0188] An example of a hardware configuration of the passage time adjustment device 7C according to the fourth embodiment is the same as the hardware configuration of the passage time adjustment device 7 shown in Fig. 16. The storage unit 42C is realized by the memory 102. The processor 101 can execute the functions of the processing unit 43C by reading and executing a program stored in the memory 102.
[0189] As described above, the railway system according to the fourth embodiment includes a storage unit 42C that stores the first switching determination information 51 indicating the distance or time required to switch the run curve, and the second switching determination information 52 that is information on the running time of the train from each position between the stopping stations to the passing station. The calculation unit 61C calculates the predicted passage time based on the first switching determination information 51, the second switching determination information 52, and the position of the train 2. As a result, the railway system according to the fourth embodiment can calculate the predicted passage time without using a running simulation, so that the processing load can be reduced and processing can be performed by a device with low specifications.
[0190] Embodiment 5. The railway system according to the fifth embodiment differs from the railway systems according to the first to fourth embodiments in that the time adjustment process is performed by an on-board device instead of a passage time adjustment device. In the following, components having the same functions as those in the first embodiment are given the same reference numerals and their explanation is omitted, and the explanation will focus on the differences from the railway systems according to the first to fourth embodiments.
[0191] FIG. 28 is a diagram illustrating an example of a configuration of a railway system according to the fifth embodiment. The railway system 1D according to the fifth embodiment does not include a passage time adjustment device 7, and has a plurality of trains 2. 1 ~2 m Instead of multiple trains 2D 1 ~2D m The system differs from the railway system 1 in that it is equipped with a train 2D. m is an integer equal to or greater than 2. In the following, 1 ~2D m When referring to each of these without distinguishing them individually, they may be referred to as train 2D.
[0192] The train 2D differs from the train 2 in that it is equipped with an on-board device 10D instead of the on-board device 10. The on-board device 10D differs from the on-board device 10 in that it can perform the same processing as the time adjustment processing of any one of the passage time adjustment devices 7, 7A, 7B, and 7C of the first, second, third, and fourth embodiments.
[0193] Fig. 29 is a diagram showing an example of the configuration of an on-board device according to the fifth embodiment. As shown in Fig. 29, the on-board device 10D according to the fifth embodiment differs from the on-board device 10 in that it includes a passage time adjustment unit 77. The processing executed by the passage time adjustment unit 77 is an example of a passage time adjustment device, and includes the time adjustment processing of any of the passage time adjustment devices 7, 7A, 7B, and 7C. The passage time adjustment unit 77 is an example of a passage time adjustment device.
[0194] When a time adjustment request is received by the communication unit 71 from the operation management device 6, the passing time adjustment unit 77 selects a corrected run curve to be used by train 2D so that train 2D passes through the passing station at a time corresponding to the scheduled passing time indicated in the time adjustment request, and the target train arrives at the stop station at a time corresponding to the scheduled arrival time indicated in the time adjustment request.
[0195] The passing time adjustment unit 77 outputs switching information for switching the run curve of the train to the corrected run curve to the processing unit 74. The switching information is the running time of the corrected run curve or the run curve ID of the corrected run curve. The processing unit 74 selects a run curve corresponding to the switching information received by the communication unit 71 from among the multiple run curves stored in the storage unit 73 based on the switching information.
[0196] Fig. 30 is a diagram showing an example of the configuration of the passage time adjustment unit of the on-board device according to the fifth embodiment. As shown in Fig. 30, the passage time adjustment unit 77 includes a storage unit 80 and a processing unit 81. The storage unit 80 stores run curve information 82. The run curve information 82 is the same as the run curve information 50 or the run curve information 50C.
[0197] The processing unit 81 includes an information acquisition unit 83, a calculation unit 84, a selection unit 85, and a switching information output unit 86. The information acquisition unit 83 has the same function as the information acquisition unit 60. The calculation unit 84 has the same function as any of the calculation units 61, 61A, 61B, 61C. The selection unit 85 has the same function as any of the selection units 62, 62A. The switching information output unit 86 outputs switching information to the processing unit 74 at the timing when the target train reaches the switching position determined by the calculation unit 84.
[0198] An example of a hardware configuration of the passage time adjustment unit 77 according to the fifth embodiment is the same as the hardware configuration of the passage time adjustment device 7 shown in Fig. 16. The processor 101 can execute the functions of the processing unit 81 by reading and executing a program stored in the memory 102.
[0199] As a result, in the railway system 1D according to the fifth embodiment, it is possible to adjust the passing times without expanding the ground equipment.
[0200] In the railway systems according to the first to fifth embodiments, the passage time adjustment while the trains 2, 2D are running is performed in response to a time adjustment request from the traffic management device 6, but may also be performed without a time adjustment request. For example, if the trains 2, 2D deviate from running according to the run curve due to some influence, the scheduled passage time may not be met even if there is no change in the scheduled passage time. In such a case, the passage time adjustment devices 7, 7A, 7B, 7C perform the above-mentioned passage time adjustment to correct the passage delay due to some influence and ensure the passage time.
[0201] For example, when the calculation units 61, 61A, 61B, 61C, and 84 determine that the trains 2 and 2D have deviated from running according to the run curve, they calculate a predicted passing time, which is the time at which the train 2D is predicted to pass through a passing station if the run curve used by the trains 2 and 2D is switched. In this way, even if the train 2D deviates from running according to the run curve and cannot pass through the passing station at the scheduled passing time, the passing time can be maintained.
[0202] The configurations shown in the above embodiments are merely examples, and may be combined with other known technologies, or the embodiments may be combined with each other. Also, parts of the configurations may be omitted or modified without departing from the spirit of the invention. [Explanation of symbols]
[0203] 1,1D Railway System, 2,2 1 ~2 m ,2D,2D 1 ~2D m Train, 3 Radio equipment, 4 Ground control equipment, 5 Interlocking control equipment, 6 Traffic management equipment, 7, 7A, 7B, 7C Passing time adjustment equipment, 8, 9 Network, 10, 10D On-board equipment, 11, 41, 71 Communication unit, 12, 42, 42C, 73, 80 Memory unit, 13, 43, 43A, 43B, 43C, 74, 81 Processing unit, 20, 60, 83 Information acquisition unit, 21 Route control unit, 22 Setting information output unit, 23 Change time calculation unit, 24 Time adjustment request unit, 25, 86 Switching information output unit, 30 Diagram information, 31 Train information, 50, 50C, 82 Run curve information, 51 First switching judgment information, 52 Second switching judgment information, 61, 61A, 61B, 61C, 84 Calculation unit, 62, 62A, 85 Selection unit, 63, 63B notification information output unit, 72 detection unit, 75 control unit, 76 display unit, 77 passage time adjustment unit.
Claims
1. a calculation unit which calculates a predicted passing time, which is a time at which a train, the running of which is controlled according to a run curve that defines the running speed between stop stations, is predicted to pass a pass station between stop stations, by switching a run curve used to control the running of the train, when there is a change in a scheduled passing time, which is a time at which the train is predicted to pass the pass station between the stop stations; a selection unit that selects, as a modified run curve, a run curve along which the train passes through the passing station at a time corresponding to the changed scheduled passage time, based on the predicted passage time calculated by the calculation unit; a switching information output unit that outputs switching information for switching the run curve of the train to the corrected run curve to an on-board device of the train.
1. A railway system comprising:
2. The calculation unit is When the scheduled passage time is changed while the train is traveling between the stations, the predicted passage time is calculated.
2. The railway system according to claim 1 .
3. Between the above stations: There are multiple passing stations, The selection unit is When there is a change in the scheduled passage times of a plurality of the passing stations, the corrected run curve is selected for each of the changed scheduled passage times; The switching information output unit After the corrected run curve for each scheduled passage time is determined by the selection unit, the switching information for each scheduled passage time is output to an on-board device of the train.
3. The railway system according to claim 1 or 2.
4. Between the above stations: There are multiple passing stations, The selection unit is When the scheduled passing time of the passing station is changed while the train is running between the stopping stations, the corrected run curve is selected; The switching information output unit When the corrected run curve is selected by the selection unit, the switching information is output to an on-board device of the train.
3. The railway system according to claim 1 or 2.
5. The calculation unit is When a change occurs in a scheduled arrival time, which is a scheduled time when the train is to arrive at the stop station, while the train is running between the stop stations, a predicted arrival time at which the train is predicted to arrive at the stop station when a run curve used by the train is switched is calculated; The selection unit is A run curve in which the train arrives at the stop station at a time corresponding to the changed scheduled arrival time based on the predicted arrival time calculated by the calculation unit is selected as the corrected run curve.
5. A railway system according to claim 1, wherein the railway system comprises:
6. The selection unit is determining a switching position, which is a position of the train where the run curve of the train is switched to the corrected run curve; The switching information output unit The switching information is output to an on-board device of the train so that the run curve of the train is switched to the corrected run curve at the switching position determined by the selection unit.
6. A railway system according to claim 1, wherein the railway system comprises:
7. The calculation unit is The predicted passing time is calculated while changing a switch position of the run curve of the train, and the switch position at which the predicted passing time coincides is determined as the switch position of the corrected run curve.
7. The railway system according to claim 6 .
8. The calculation unit is calculating a running time between the stations when a run curve used by the train is switched to the corrected run curve; The switching information output unit The information on the travel time between the stations calculated by the calculation unit is output to an on-board device of the train.
8. A railway system according to claim 1, wherein the railway system comprises:
9. The calculation unit is A time when the train is predicted to pass the station when a run curve used by the train is switched by coasting is calculated as the predicted passing time.
9. A railway system according to claim 1, wherein the railway system comprises:
10. The calculation unit is Calculate the predicted passing time through a driving simulation 10. A railway system according to claim 1, wherein the railway system comprises:
11. a storage unit that stores first switching determination information indicating a distance or time required to switch the run curve and second switching determination information that is information on a running time of the train from each position between the stop stations to the passing station; The calculation unit is The predicted passing time is calculated based on the first switching determination information, the second switching determination information, and the position of the train.
11. A railway system according to claim 1, wherein the railway system comprises:
12. a calculation unit that calculates a predicted passing time, which is a time at which a train traveling according to a run curve that defines a traveling speed between stop stations is predicted to pass a passing station between the stop stations, by switching a run curve used to control the running of the train, when there is a change in a scheduled passing time, which is a scheduled time at which the train is predicted to pass the passing station between the stop stations; a selection unit that selects, as a corrected run curve, a run curve in which the train passes through the passing station at a time corresponding to the changed scheduled passage time, based on the predicted passage time calculated by the calculation unit. A passage time adjustment device characterized by the above.
13. a step of calculating a predicted passing time, which is a time at which a train, the running of which is controlled according to a run curve that defines the running speed between stop stations, is predicted to pass through a pass station between the stop stations, by switching the run curve used to control the running of the train, when there is a change in a scheduled passing time, which is a time at which the train is predicted to pass through the pass station between the stop stations; selecting, as a corrected run curve, a run curve along which the train passes through the passing station at a time corresponding to the changed scheduled passage time, based on the calculated predicted passage time; and outputting switching information for switching the run curve of the train to the corrected run curve to an on-board device of the train. A method for adjusting passage times.
14. a step of calculating a predicted passing time, which is a time at which a train, the running of which is controlled according to a run curve that defines the running speed between stop stations, is predicted to pass through a pass station between the stop stations, by switching the run curve used to control the running of the train, when there is a change in a scheduled passing time, which is a time at which the train is predicted to pass through the pass station between the stop stations; selecting, as a corrected run curve, a run curve in which the train passes through the passing station at a time corresponding to the changed scheduled passage time, based on the calculated predicted passage time. A passage time adjustment program comprising:
15. The computer further executes a step of outputting switching information for switching the run curve of the train to the corrected run curve to an on-board device of the train.
15. The passage time adjustment program according to claim 14.
Citation Information
Patent Citations
Speed curve preparation device for linear motor railway
JP1992252769A
Train operation management control device
JP1992283163A
Train control device
JP2013251953A
Railway train control system and automatic railway train driving device
JP2014144754A
Train operation support system
JP2017165237A