Fee calculation device, fee calculation method, and fee calculation program
The fee calculation device automates the determination of supply and demand adjustment fees by evaluating planned and actual values and unit prices, addressing manual settlement challenges and ensuring efficient fee computation, including imbalance charges.
Patent Information
- Application Number
- JP2021135980
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-08-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-08-24
AI Technical Summary
Power transmission and distribution companies face challenges in manually settling supply and demand adjustment fees, and existing technologies do not provide a comprehensive method for calculating these fees, especially in the context of supply and demand imbalances.
A fee calculation device that calculates supply and demand adjustment fees by determining the difference between planned and actual values, assessing activation of adjustment forces, and using unit prices to compute the fees for relevant time periods, incorporating imbalance charges if applicable.
Enables automated and efficient calculation of supply and demand adjustment fees, reducing manual errors and inconsistencies, while also allowing for integrated calculation of both supply and demand adjustment and imbalance fees.
Smart Images

Figure 0007595539000001 
Figure 0007595539000002 
Figure 0007595539000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a fee calculation device, a fee calculation method, and a fee calculation program that calculate a fee for electricity. [Background technology]
[0002] Power generation businesses and electricity retailers submit their respective supply plans (power generation plans) and demand plans to the electricity transmission and distribution business operators that manage the electricity transmission and distribution network, for example, via the Organization for Cross-regional Coordination of Transmission Operators (hereinafter referred to as the Organization). However, differences may occur between the planned values in each plan and the actual values. In order to achieve simultaneous equalization of electricity, the electricity transmission and distribution business operators make adjustments to eliminate these differences. For this reason, power generation businesses and electricity retailers pay an imbalance fee, which is a fee according to the difference between the planned values and the actual values. Various fees, including the imbalance fee, are exchanged between the electricity transmission and distribution business operators and the power generation businesses or electricity retailers.
[0003] For example, Patent Document 1 discloses a technology for calculating an imbalance charge for a retail electricity supplier based on the difference between the retail electricity supplier's planned demand value and the actual demand value, and for calculating an imbalance charge for a power generation supplier based on the difference between the planned value in the power generation plan of the power generation supplier and the actual power generation value. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-169093 A Summary of the Invention [Problem to be solved by the invention]
[0005] As described above, when an imbalance occurs, the electricity transmission and distribution business operator will make an adjustment to eliminate the imbalance. One method of adjustment to eliminate the imbalance is for the electricity transmission and distribution business operator to enter into a contract with a business operator, such as a power generation business operator or a retail electricity business operator, to adjust supply and demand, and when an imbalance occurs, to request the contracted business operator to adjust supply and demand. In addition, from this year, market trading has also been conducted for supply and demand adjustment capacity. For this reason, it is difficult for the electricity transmission and distribution business operator to manually settle the supply and demand adjustment fee for supply and demand adjustment, and automation is desirable, but Patent Document 1 does not disclose the calculation of the supply and demand adjustment fee.
[0006] The present disclosure has been made in consideration of the above, and has an object to provide a fee calculation device capable of calculating a supply and demand adjustment fee. [Means for solving the problem]
[0007] In order to solve the above-mentioned problems and achieve the object, the fee calculation device according to the present disclosure is a plan value in a supply and demand plan and a time period corresponding to the plan value. , was weighed A plan-actual difference calculation unit that calculates a difference between a planned and actual value; Secured by power transmission and distribution operators to ensure the simultaneous equalization of power Supply and demand adjustment during the time period for which the supply and demand adjustment fee, which is the compensation for the exercise of supply and demand adjustment power, is calculated. force Whether or not the activation , by determining whether a command to use supply and demand adjustment power has been issued during the time period in question. Determine and adjust supply and demand force a power amount calculation unit that calculates an adjustment power amount, which is the amount of power to be subject to the supply and demand adjustment fee based on the difference calculated by the planned and actual difference calculation unit when the supply and demand adjustment fee is activated; a supply and demand adjustment unit price acquisition unit that acquires a supply and demand adjustment unit price, which is the unit price of the supply and demand adjustment fee; , for settlement and a fee calculation unit that calculates a supply and demand adjustment fee. Effect of the Invention
[0008] According to the present disclosure, an effect is achieved in that a supply and demand adjustment fee can be calculated. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing a configuration example of a fee calculation device according to a first embodiment. [Diagram 2] A flowchart showing an example of a processing procedure in the fee calculation device according to the first embodiment. [Diagram 3] FIG. 13 is a diagram showing an example of an input screen for information on a group of settlement units according to the first embodiment. [Figure 4] FIG. 1 is a diagram showing a configuration example of a computer system that realizes a fee calculation device according to a first embodiment. [Diagram 5] FIG. 13 is a diagram showing an example of a utilization plan of the priority method in the second embodiment. [Figure 6] FIG. 13 is a diagram showing an example of a utilization plan of the ratio apportionment method in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a fee calculation device, a fee calculation method, and a fee calculation program according to embodiments will be described in detail with reference to the accompanying drawings.
[0011] Embodiment 1 FIG. 1 is a diagram showing a configuration example of a fee calculation device according to a first embodiment. The fee calculation device 1 of this embodiment includes a supply and demand plan acquisition unit 11, a result acquisition unit 12, a plan-result difference calculation unit 13, an activation result acquisition unit 14, an energy amount calculation unit 15, an imbalance unit price acquisition unit 16, a fee calculation unit 17, a supply and demand adjustment unit price acquisition unit 18, and a contract information storage unit 19. The fee calculation device 1 is, for example, a device that supports the settlement of a supply and demand adjustment fee and an imbalance fee in an electricity transmission and distribution business operator. In the following, an example in which the fee calculation device 1 calculates both the supply and demand adjustment fee and the imbalance fee will be described, but the fee calculation device 1 only needs to calculate the supply and demand adjustment fee and does not need to calculate the imbalance fee. In other words, the imbalance fee may be calculated by another device.
[0012] Supply and demand adjustment capacity is the ability to adjust to achieve simultaneous equalization of power when a difference occurs between the planned and actual values of power supply and demand. In order to adjust whether there is a shortage or surplus of power, the power transmission and distribution business operator secures both an upward adjustment capacity, which is the ability to adjust when a shortage occurs, and a downward adjustment capacity, which is the ability to adjust when a surplus occurs. On the other hand, even if the power transmission and distribution business operator secures supply and demand adjustment capacity, if there is no actual shortage or surplus of power, the secured supply and demand adjustment capacity is not used. When an actual shortage or surplus of power occurs, a management device (not shown) that manages the power system sends a command to adjust supply and demand to the equipment managed by the business operator that provides the supply and demand adjustment capacity, and the equipment managed by each business operator adjusts the power. This causes the supply and demand adjustment capacity of the business operator's equipment to be used. Hereinafter, the use of supply and demand adjustment capacity is also called the activation of adjustment capacity. A supply and demand adjustment market that handles supply and demand adjustment capacity has been opened since this year, and power transmission and distribution business operators can also procure supply and demand adjustment capacity from the supply and demand adjustment market.
[0013] The business operator providing the supply and demand adjustment power may be a power generation business operator with a generator, a retail electricity business operator, or a business operator called a VPP (Virtual Power Plant) or an aggregator that manages demand response. A VPP is a virtual power plant that bundles together multiple power generation facilities and storage facilities of consumers. The supply and demand adjustment power may be performed by adjusting the power generation amount of the generator, or may use VPP or demand response. When the adjustment power is activated, the power generation business operator increases the power generation amount from the planned value if the adjustment power is increased, and decreases the power generation amount from the planned value if the adjustment power is decreased. In addition, when the adjustment power is increased, the retail electricity business operator or the aggregator suppresses the demand amount of the consumer by a demand response (hereinafter abbreviated as DR) that reduces the demand amount, and when the adjustment power is decreased, the demand amount of the consumer is increased by a DR that increases the demand amount. In addition, when the adjustment power is decreased, the DR is increased. In addition, the execution of a DR by a contract is also called a negawatt trading.
[0014] The contract information storage unit 19 stores contract information indicating the contents of contracts with each business operator such as a power generation business operator, a retail electricity business operator, and an aggregator. The contract information may be input by an operator via an input unit not shown, or may be transmitted from another device. The contract information includes, for each group that is a unit of fee calculation, information on whether or not the group has concluded a regulation power provision contract to provide supply and demand regulation power with a business operator. The group that is a unit of fee calculation may be a facility managed by a business operator such as a power generation business operator, a retail electricity business operator, or an aggregator, may be a VPP defined by an aggregator, or may be a group of consumers bundled as a unit of DR. The power transmission and distribution business operator may procure supply and demand regulation power through public bidding or may procure it from a supply and demand adjustment market.
[0015] The supply and demand plan acquisition unit 11 acquires the supply and demand plan by receiving the supply and demand plans of businesses such as power generation businesses, electricity retail businesses, and balancing groups from the plan management device 2, and outputs the acquired supply and demand plan to the planned-actual difference calculation unit 13. The supply and demand plan indicates at least one of the plans for the demand and supply of electricity for a specified time unit within a specified period. A balancing group is, for example, made up of multiple businesses and is a unit for adjusting electricity. The imbalance fee is settled on a balancing group basis. Balancing groups include, for example, a power generation balancing group made up of power generation businesses and a demand balancing group made up of electricity retail businesses.
[0016] The plan management device 2 is, for example, a device operated by a cross-regional organization, and collects supply and demand plans from businesses such as power generation businesses, electricity retailers, and balancing groups. The supply and demand plans submitted by power generation businesses or power generation balancing groups are also called supply plans (power generation plans). In the following description, the set time unit is described as 30-minute units, but the set time unit is not limited to this.
[0017] The result acquisition unit 12 acquires the measurement value of the amount of electricity as a result value from the measurement value management device 3, and outputs the acquired result value to the planned result difference calculation unit 13. The measurement value is, for example, a value measured by a metering device called a smart meter for automatic meter reading, but the measurement value is not limited to this.
[0018] The plan / actual difference calculation unit 13 calculates the difference between the plan value in the supply and demand plan and the actual value in the time period corresponding to the plan value. Specifically, the plan / actual difference calculation unit 13 calculates the difference between the plan value indicated by the supply and demand plan received from the supply and demand plan acquisition unit 11 and the actual value acquired by the actual value acquisition unit 12 for each time period of a defined time unit, and outputs the calculated difference to the power amount calculation unit 15.
[0019] The activation record acquiring unit 14 acquires the record of activation of adjustment capacity. Specifically, when a command to use supply and demand adjustment capacity is sent, the activation record acquiring unit 14 acquires the command value as an actual value of activation of adjustment capacity, and outputs the acquired actual value of activation of adjustment capacity to the power amount calculating unit 15. The activation record acquiring unit 14 acquires the command value from, for example, a management device (not shown) that manages the power system.
[0020] The power amount calculation unit 15 determines whether or not supply and demand adjustment is to be performed in a time period for which a supply and demand adjustment fee, which is a compensation for the activation of the supply and demand adjustment capacity, is to be calculated, and calculates an adjustment power amount, which is an amount of power to be the subject of the settlement of the supply and demand adjustment fee, based on the difference calculated by the planned performance difference calculation unit 13, when supply and demand adjustment is not performed in the time period for which the supply and demand adjustment fee is to be calculated. Furthermore, the power amount calculation unit 15 calculates an imbalance amount, which is an amount of power to be the subject of the settlement of the imbalance fee, based on the difference calculated by the planned performance difference calculation unit 13, when supply and demand adjustment is not performed in the time period for which the supply and demand adjustment fee is to be calculated. Specifically, the power amount calculation unit 15 calculates an imbalance power amount and a supply and demand adjustment power amount using the difference received from the planned performance difference calculation unit 13, the actual value of the supply and demand adjustment received from the activation result acquisition unit 14, and the contract information read from the contract information storage unit 19. The power amount calculation unit 15 outputs the calculated imbalance power amount and the supply and demand adjustment power amount to the fee calculation unit 17.
[0021] The imbalance unit price acquisition unit 16 acquires the imbalance unit price, which is the unit price of the imbalance fee, and outputs the acquired imbalance unit price to the fee calculation unit 17. The imbalance unit price acquisition unit 16 acquires, for example, the market price (unit price) in the wholesale electricity market price from the electricity market system 4 that manages electricity market transactions, and acquires the imbalance unit price by calculating the imbalance unit price using the market price according to the following formula (1). α is an adjustment term according to the supply and demand situation of the entire system, and β is an adjustment term that reflects the market price difference between regions. α and β can be calculated by a general method, so details are omitted. Note that an incentive constant may be added or subtracted from the right-hand side of the following formula (1). Imbalance unit price = α × market price + β (1)
[0022] Furthermore, the imbalance unit price acquiring unit 16 may acquire the imbalance unit price by receiving the imbalance unit price itself calculated by another device from the other device.
[0023] The supply and demand adjustment unit price acquiring unit 18 acquires the supply and demand adjustment unit price, which is the unit price of the supply and demand adjustment fee, and outputs the acquired supply and demand adjustment unit price to the fee calculation unit 17. The supply and demand adjustment unit price acquiring unit 18 acquires the supply and demand adjustment unit price by, for example, receiving the supply and demand adjustment unit price registered in the supply and demand adjustment market from the electricity market system 4.
[0024] The fee calculation unit 17 calculates the supply and demand adjustment fee using the adjustment power amount and the supply and demand adjustment unit price. Furthermore, the fee calculation unit 17 calculates the imbalance fee using the imbalance amount and the imbalance unit price. In detail, the fee calculation unit 17 calculates the supply and demand adjustment fee and the imbalance fee for each business operator using the imbalance power amount and the supply and demand adjustment power amount received from the power amount calculation unit 15, the imbalance unit price received from the imbalance unit price acquisition unit 16, and the supply and demand adjustment unit price received from the supply and demand adjustment unit price acquisition unit 18.
[0025] Next, the operation of this embodiment will be described. FIG. 2 is a flowchart showing an example of a processing procedure in the fee calculation device 1 of this embodiment. In FIG. 2, the unit of adjustment for supply and demand adjustment capacity is set as the target group for fee calculation. This is because the unit of adjustment for imbalance is the same as the unit of adjustment for supply and demand adjustment capacity, or the unit of adjustment for supply and demand adjustment capacity is smaller than the unit of adjustment for imbalance. The supply source of supply and demand adjustment capacity includes a single generator with an entity, a VPP in which multiple generators are aggregated (aggregated), a VPP in which one or multiple consumers are aggregated, and a VPP in which one or multiple generators and one or multiple consumers are aggregated. Here, for convenience, the case where a single generator is the adjustment unit for supply and demand adjustment capacity and the case where a single consumer is the adjustment unit for supply and demand adjustment capacity are also called the target group (the target group for fee calculation).
[0026] It is assumed that the supply and demand plan corresponding to the calculation target period is acquired by the supply and demand plan acquisition unit 11 and input to the plan actual difference calculation unit 13, and the actual value corresponding to the calculation target period is acquired by the actual result acquisition unit 12 and input to the plan actual difference calculation unit 13. In the example shown below, it is assumed that a supply plan (power generation plan), which is an example of a plan, i.e., a supply and demand plan, is created for each generator. In addition, in the case of a VPP consisting of a single consumer, a baseline in the case where the demand of the consumer is not adjusted by DR is created as a plan, and in the case of a VPP consisting of multiple consumers, a baseline is created as a plan for each multiple consumers. In addition, in the case of a VPP bundling one or more generators and one or more consumers, a supply plan for each generator and a baseline for each multiple consumers are created as a plan. In addition, it is assumed that the actual value of the adjustment capacity activation corresponding to the period for which the charge is calculated is acquired by the activation actual result acquisition unit 14 and input to the power amount calculation unit 15. Also, it is assumed that the supply and demand adjustment unit price acquired by the supply and demand adjustment unit price acquisition unit 18 is input to the fee calculation unit 17 , and the imbalance unit price acquired by the imbalance unit price acquisition unit 16 is input to the fee calculation unit 17 .
[0027] First, the fee calculation device 1 sets a target group (step S1). The target group is a group that is a unit of fee calculation. As described above, the units of fee calculation are a generator with an entity, a VPP bundling multiple generators, a VPP bundling one or multiple consumers, and a VPP bundling one or multiple generators and one or multiple consumers, so the planned-actual difference calculation unit 13 sets a target group to be calculated from among these. The plan in the following process is a power generation plan in the case of a generator with an entity or a VPP bundling multiple generators, and is a baseline demand plan in the case of one or multiple consumers when demand adjustment by DR is not performed. In addition, in the case of a VPP bundling one or multiple generators and one or multiple consumers, the actual results of the generator and the actual results of the multiple consumers are respectively acquired.
[0028] Information on each group, which is a unit of the settlement target, is included in the contract information. Information on the group of the settlement unit may be input by the operator or may be transmitted from another device before the calculation shown in FIG. 2 is performed. FIG. 3 is a diagram showing an example of an input screen for information on the group of the settlement unit in this embodiment. As shown in FIG. 3, information on the group of the settlement unit includes various codes that are identification information on the generator, information for identifying the VPP, the contractor of the balancing group, and the adjustment power provider, which is a business that provides supply and demand adjustment power to each target group, and the like, and for example, these information are input by the operator in the input field 201. For example, the information shown in FIG. 3 is input by the operator for each group that is the calculation unit of the fee. Lists such as the supply point identification number list and the generator system code list correspond to lists of consumers or generators belonging to the VPP or balancing group. In the adjustment power provider field, information indicating that there is no contract is input when the corresponding group has not concluded a contract to provide adjustment power. It is to be noted that, as long as the information shown in FIG. 3 is input as necessary for each group, it is not necessary to input all items. For example, if the group that is the settlement unit is a generator business operator, information about the generator is input, but information about the VPP, consumers, etc. is not input. Furthermore, the input screen in FIG. 3 is only an example, and the specific layout and input method are not limited to the example shown in FIG. 3, and the content of the information about the group that is the settlement unit is not limited to the example shown in FIG. 3. Furthermore, as described above, this information is not limited to the example input by the operator, and may be transmitted from another device.
[0029] Next, the fee calculation device 1 sets the time period to be calculated (step S2). In detail, the planned-actual difference calculation unit 13 sets the time period to be calculated within the period to be calculated for the fee. This time period is, for example, the time unit in the planned value described above, for example, a time period in 30-minute units.
[0030] Next, the fee calculation device 1 calculates the difference between the plan and the actual (step S3). In detail, when the target group is a generator or a VPP bundling a plurality of generators, the plan-actual difference calculation unit 13 calculates the difference between the plan value for the time period set in step S2 in the supply plan received from the supply-demand plan acquisition unit 11 and the actual value for the time period set in step S2 among the actual values received from the actual result acquisition unit 12 for each generator, and outputs the calculated difference to the power amount calculation unit 15. When the target group is a VPP bundling one or a plurality of consumers, the plan-actual difference calculation unit 13 calculates the difference between the plan value in the baseline received from the supply-demand plan acquisition unit 11 and the actual value for the time period set in step S2 among the actual values received from the actual result acquisition unit 12, and outputs the calculated difference to the power amount calculation unit 15. When the target group is a VPP bundling one or a plurality of generators and one or a plurality of consumers, the difference between the plan value and the actual value is calculated in the same manner for the generator portion and the consumer portion separately.
[0031] Next, the fee calculation device 1 judges whether the target group is an adjustment capacity adjustment target (step S4). In detail, the power amount calculation unit 15 judges that the target group is an adjustment capacity adjustment target when all of the following conditions are satisfied. (A) The target group has a contract to provide adjustment capacity. (B) The target group has a contract to provide capacity only when an order to activate supply-demand adjustment capacity is issued, and an order to activate adjustment capacity was issued during the period covered by the calculation. (C) During the period covered by the calculation, the target group has not experienced any operational shutdowns due to trouble or maintenance, i.e., no situation has occurred in which it is not possible to provide adjustment power.
[0032] With regard to the above (A), the power amount calculation unit 15 refers to the contract information stored in the contract information storage unit 19, and judges whether or not there is an adjustment capacity provision contract based on whether or not an adjustment capacity provider corresponding to the target group is set. With regard to the above (B), the power amount calculation unit 15 makes a judgment using the actual value of adjustment capacity activation from the activation record acquisition unit 14. With regard to the above (C), the power amount calculation unit 15 makes a judgment using, for example, trouble information input by an operator or received from another device. The trouble information is information indicating which facility has had a trouble.
[0033] If the adjustment capacity is to be settled (step S4 Yes), the fee calculation device 1 judges whether or not there is a combined adjustment capacity and supply capacity contract (step S5). In detail, the power amount calculation unit 15 refers to the contract information stored in the contract information storage unit 19 and judges whether or not there is a combined adjustment capacity and supply capacity contract for the target group. The combined adjustment capacity and supply capacity contract is a contract that combines both a contract to "supply to retailers, etc." and a contract to "provide as adjustment capacity to general electricity transmission and distribution companies" the power virtually generated by the control (suppression and increase) of power usage capacity provided by consumers in the VPP. If there is a combined adjustment capacity and supply capacity contract, a combined supply capacity plan, which is a plan for supply capacity to retailers, etc. (a plan of a baseline and how much to vary as supply capacity from that), is submitted to the cross-regional organization, and at the time of adjustment capacity settlement, the remainder of the difference between the baseline and the actual value minus the planned amount of the combined supply capacity plan is settled as adjustment capacity. It is assumed that the contract information stores information indicating whether or not there is a combined adjustment capacity and supply capacity contract for each target group.
[0034] If there is an adjustment capacity / supply capacity combined contract (step S5 Yes), the fee calculation device 1 calculates the adjustment power amount by subtracting the planned value of the supply capacity combined plan from the difference between the plan and the actual result (step S6). In detail, the power amount calculation unit 15 calculates the adjustment power amount to be the subject of adjustment power fee settlement by subtracting the planned value for the time period to be calculated in the supply capacity combined plan from the difference received from the plan actual result difference calculation unit 13. The supply capacity combined plan may be acquired by the supply and demand plan acquisition unit 11, for example, and input to the power amount calculation unit 15 via the plan actual result difference calculation unit 13, or may be stored in the contract information storage unit 19.
[0035] Next, the fee calculation device 1 performs aggregation (step S7). In detail, for example, when the target group includes multiple generators, that is, when the target group is a VPP that bundles multiple generators, or a VPP that includes multiple generators and multiple consumers, the power amount calculation unit 15 aggregates the adjustment power amount for each generator for each target group. Specifically, the power amount calculation unit 15 calculates the total value of the adjustment power amount of each generator belonging to the target group, and sets the imbalance amount to 0. Note that, when the target group is a single generator, when the VPP does not include a generator, or when the VPP includes one generator, it is not necessary to aggregate the adjustment power amount for each generator. In addition, for a VPP that includes both generators and consumers, the adjustment power amount based on the difference between the plan and actual for the generator and the adjustment power amount based on the difference between the plan and actual for the consumer are calculated.
[0036] Next, the fee calculation device 1 calculates the supply and demand adjustment fee (step S8). In detail, the fee calculation unit 17 calculates the supply and demand adjustment fee by multiplying the adjustment power amount received from the power amount calculation unit 15 by the supply and demand adjustment unit price received from the supply and demand adjustment unit price acquisition unit 18. Note that in step S8, since the imbalance amount is 0, the imbalance fee is not calculated but the supply and demand adjustment fee is calculated.
[0037] Next, the fee calculation device 1 determines whether the calculation period has ended (step S13). In detail, the fee calculation unit 17 determines whether the fee calculation in step S7 or step S8 has been performed for the entire period for which the fee is to be calculated.
[0038] When the calculation period has ended (Yes in step S13), the fee calculation device 1 judges whether the calculation for all groups has been completed (step S14). In detail, the fee calculation unit 17 judges whether the fee calculation in step S7 or step S8 has been completed for all groups for which the fee is to be calculated.
[0039] If calculations for all groups have been completed (Yes in step S14), the fee calculation device 1 ends the fee calculation process. If calculations for all groups have not been completed, i.e., if there are groups for which fees have not been calculated (No in step S14), the fee calculation device 1 changes the target group (step S16) and repeats the process from step S2. If the calculation period has not ended (No in step S13), the fee calculation device 1 changes the time period to be calculated (step S15) and repeats the process from step S3.
[0040] Also, if the target group is not subject to adjustment capacity settlement (step S4 No), the fee calculation device 1 determines the difference between the plan and the actual as the imbalance amount (step S10). In detail, the power amount calculation unit 15 determines the difference received from the plan actual difference calculation unit 13 as the imbalance amount. Next, the fee calculation device 1 performs aggregation (step S11). In detail, for example, when the target group includes multiple generators, the power amount calculation unit 15 determines the total value of the imbalance amount of the generators for each target group as the imbalance amount, sets the adjustment power amount to 0, and outputs the imbalance amount and the adjustment power amount for each target group to the fee calculation unit 17. Note that, when the target group is a single generator, when the VPP does not include a generator, or when the VPP includes one generator, it is not necessary to aggregate the imbalance amount for each generator. Also, for a VPP that includes both generators and consumers, the imbalance amount based on the difference between the plan and the actual for the generator and the imbalance amount based on the difference between the plan and the actual for the consumer are calculated.
[0041] Next, the fee calculation device 1 calculates the imbalance fee (step S12) and proceeds to the process of step S13. In detail, in step S12, the fee calculation unit 17 calculates the imbalance fee by multiplying the imbalance amount received from the power amount calculation unit 15 by the imbalance unit price received from the imbalance unit price acquisition unit 16. Note that in step S12, since the adjustment power amount is 0, the supply and demand adjustment fee is not calculated, but the imbalance fee is calculated.
[0042] If there is no contract for both adjustment capacity and supply capacity (No in step S5), the fee calculation device 1 determines the difference between the plan and the actual result as the adjustment energy (step S9) and proceeds to the process of step S7. In detail, in step S9, the energy calculation unit 15 determines the difference received from the plan-actual difference calculation unit 13 as the adjustment energy.
[0043] The imbalance fee and the supply and demand adjustment fee are calculated for each target group by the above-mentioned process. When the settlement unit of the imbalance fee is different from the settlement unit of the supply and demand adjustment fee, that is, when the settlement unit of the imbalance fee is a plurality of target groups, the imbalance fee for the settlement unit of the imbalance fee can be calculated by obtaining the total value of the imbalance fee for each target group calculated by the above-mentioned process. In the above-mentioned example, the fee calculation device 1 calculates the supply and demand adjustment fee and the imbalance fee, but the fee calculation device 1 does not have to calculate the imbalance fee. For example, when the imbalance fee is calculated by another device, the fee calculation device 1 does not have to calculate the imbalance fee. In this case, when the result of the determination in step S4 is No, the fee calculation device 1 ends the fee calculation process. It is sufficient for the fee calculation device 1 to calculate the supply and demand adjustment fee, but since there is an overlap in the contents of the process between the calculation of the imbalance fee and the calculation of the supply and demand adjustment fee, it is preferable that both the supply and demand adjustment fee and the imbalance fee are calculated in the same process as shown in FIG. 2. In this way, it is possible to eliminate duplicated processing and realize efficient processing by calculating both the supply and demand adjustment fee and the imbalance fee in a unified manner within the same process shown in Figure 2. Furthermore, if the calculation process for each of the two fees is carried out separately, there is a possibility that mutual inconsistencies will occur due to the use of different parameters in parts that should be calculated using the same parameters, but by calculating the supply and demand adjustment fee and the imbalance fee in a unified manner, it is possible to prevent such inconsistencies.
[0044] Next, the hardware configuration of the fee calculation device 1 will be described. In the fee calculation device 1 of this embodiment, a program describing the processing in the fee calculation device 1 is executed on a computer system, so that the computer system functions as the fee calculation device 1. FIG. 4 is a diagram showing an example of the configuration of a computer system that realizes the fee calculation device 1 of this embodiment. As shown in FIG. 4, this computer system includes a control unit 101, an input unit 102, a storage unit 103, a display unit 104, a communication unit 105, and an output unit 106, which are connected via a system bus 107.
[0045] In FIG. 4, the control unit 101 is, for example, a processor such as a CPU (Central Processing Unit), and executes a program in which the processing in the fee calculation device 1 of this embodiment is described. The input unit 102 is, for example, composed of a keyboard, a mouse, and the like, and is used by the user of the computer system to input various information. The storage unit 103 includes various memories such as a RAM (Random Access Memory), a ROM (Read Only Memory), and a storage device such as a hard disk, and stores the program to be executed by the control unit 101, necessary data obtained in the process of processing, and the like. The storage unit 103 is also used as a temporary storage area for the program. The display unit 104 is composed of a display, an LCD (Liquid Crystal Display Panel), and the like, and displays various screens to the user of the computer system. The communication unit 105 is a receiver and a transmitter that perform communication processing. The output unit 106 is a printer, etc. Note that FIG. 4 is an example, and the configuration of the computer system is not limited to the example of FIG. 4.
[0046] Here, an example of the operation of the computer system until the program of this embodiment is in an executable state will be described. In the computer system having the above-mentioned configuration, for example, a program is installed in the storage unit 103 from a CD-ROM or DVD-ROM set in a CD (Compact Disc)-ROM drive or DVD (Digital Versatile Disc)-ROM drive (not shown). Then, when the program is executed, the program read from the storage unit 103 is stored in the main storage area of the storage unit 103. In this state, the control unit 101 executes the process as the fee calculation device 1 of this embodiment according to the program stored in the main storage area of the storage unit 103.
[0047] In the above explanation, a program describing the processing in the fee calculation device 1 is provided on a CD-ROM or DVD-ROM as a recording medium. However, this is not limited to this, and depending on the configuration of the computer system and the capacity of the program to be provided, for example, a program provided over a transmission medium such as the Internet via the communication unit 105 may be used.
[0048] The fee calculation program of this embodiment causes the computer system to execute, for example, the steps of calculating the difference between a planned value in a supply and demand plan and an actual value in a time period corresponding to the planned value, determining whether or not supply and demand adjustment is to be performed in a time period for which a supply and demand adjustment fee, which is compensation for the activation of supply and demand adjustment capacity, is to be calculated, and, if supply and demand adjustment is activated, calculating an adjustment amount of power, which is the amount of power subject to settlement of the supply and demand adjustment fee, based on the calculated difference. The fee calculation program also causes the computer system to execute the steps of acquiring a supply and demand adjustment unit price, which is the unit price of the supply and demand adjustment fee, and calculating the supply and demand adjustment fee using the adjustment amount of power and the supply and demand adjustment unit price.
[0049] Of the fee calculation device 1 shown in FIG. 1, the planned performance difference calculation unit 13, the power amount calculation unit 15, and the fee calculation unit 17 are realized by executing a program stored in the storage unit 103 shown in FIG. 4 by the control unit 101 shown in FIG. 4. The planned performance difference calculation unit 13, the power amount calculation unit 15, and the fee calculation unit 17 are realized by using the storage unit 103. The contract information storage unit 19 shown in FIG. 1 is a part of the storage unit 103 shown in FIG. 4. The supply and demand plan acquisition unit 11, the performance acquisition unit 12, the activation performance acquisition unit 14, the imbalance unit price acquisition unit 16, and the supply and demand adjustment unit price acquisition unit 18 shown in FIG. 1 are realized by the communication unit 105 shown in FIG. 4. The supply and demand plan acquisition unit 11, the performance acquisition unit 12, the activation performance acquisition unit 14, the imbalance unit price acquisition unit 16, and the supply and demand adjustment unit price acquisition unit 18 shown in FIG. 1 may be realized by using the input unit 102. The fee calculation device 1 may be realized by a plurality of computer systems.
[0050] As described above, the fee calculation device 1 of this embodiment uses the actual value of the activation of adjustment capacity to determine whether adjustment capacity has been activated, and if activated, calculates the supply and demand adjustment fee using the difference between the supply and demand plan and the actual value of supply and demand, and the supply and demand adjustment unit price. In this way, the fee calculation device 1 of this embodiment can calculate the supply and demand adjustment fee. Furthermore, the fee calculation device 1 of this embodiment also calculates the imbalance fee, thereby calculating both the supply and demand adjustment fee and the imbalance fee in a unified manner. This makes it possible to make the processing more efficient and prevent inconsistencies between the supply and demand adjustment fee and the imbalance fee.
[0051] Embodiment 2 Next, a second embodiment will be described. The configuration of the fee calculation device 1 of this embodiment is similar to that of the fee calculation device 1 of the first embodiment. Components having the same functions as those of the first embodiment will be described with the same reference numerals as those of the first embodiment. Below, differences from the first embodiment will be mainly described.
[0052] In the first embodiment, it is not assumed that the supply and demand adjustment capacity of one generator is provided by multiple businesses, but in the present embodiment, it is assumed that the supply and demand adjustment capacity of one generator is utilized by multiple businesses. In the present embodiment, the supply and demand adjustment capacity of one generator is provided by multiple businesses and used for supply and demand adjustment, so that when the electricity transmission and distribution company adjusts supply and demand by activating the supply and demand adjustment capacity of the generator, the electricity transmission and distribution company will pay supply and demand adjustment fees to the multiple businesses.
[0053] In such a case, the fee calculation device 1 receives a utilization plan indicating the utilization method of a plurality of businesses, and allocates the adjustment power amount by using the utilization plan. The utilization plan is indicated, for example, by one of two methods, a priority method or a ratio allocation method. The utilization plan may be stored in the contract information storage unit 19 as a part of the contract information, or may be acquired by the supply and demand plan acquisition unit 11 or another functional unit not shown. In the following description, the utilization plan is described as being stored in the contract information storage unit 19 as a part of the contract information, but the method of acquiring the utilization plan is not limited to this example.
[0054] In the priority order method, a priority order is determined among the above-mentioned multiple businesses, and the "pre-taken power amount" of the businesses is determined in order of priority. The "pre-taken power amount" is the amount of adjustment power amount used by the corresponding business. The "pre-taken power amount" may be fixed regardless of the time period, or may be determined for each time period. FIG. 5 is a diagram showing an example of a utilization plan of the priority order method in this embodiment. FIG. 5 shows an example of the "pre-taken power amount" of a business in which the "pre-taken power amount" of each business may be determined for each time period. The example shown in FIG. 5 shows an example of the "pre-taken power amount" of a business with a priority order of 1, that is, the business with the highest priority. Similarly, the "pre-taken power amount" of the business with each priority order is determined. When the supply and demand adjustment capacity is utilized by multiple businesses and the utilization plan is determined by the priority order method, the power amount calculation unit 15 uses the priority order of each of the multiple businesses and the "pre-taken power amount" of the adjustment power amount to sort the adjustment power amount for each business. That is, the power amount calculation unit 15 allocates the "preemptive power amount" of the operator with priority 1 among the calculated adjustment power amounts to the adjustment power amount of the operator, and if there is adjustment power amount remaining after subtracting the "preemptive power amount" of the operator with priority 1, allocates the "preemptive power amount" of the operator with priority 2 to the operator with priority 2. By repeating such processing, the adjustment power amount is sorted for each operator. The fee calculation unit 17 calculates the supply and demand adjustment fee for each operator using the sorting result and the supply and demand adjustment unit price.
[0055] In the ratio apportionment method, the apportionment ratio between the above-mentioned multiple businesses is determined as a utilization plan. The apportionment ratio may be fixed regardless of the time period, or may be determined for each time period. FIG. 6 is a diagram showing an example of a utilization plan of the ratio apportionment method in this embodiment. FIG. 6 shows an example of the "apportionment ratio" of businesses in which the "apportionment ratio" of each business may be determined for each time period. Similarly, the "apportionment ratio" of each business is determined. Note that, although the apportionment ratio of one business is shown in FIG. 6, the apportionment ratios of multiple businesses may be shown at once, such as the apportionment ratios of business A, business B, and business C being 2:1:1. In the ratio apportionment method, the power amount calculation unit 15 divides the adjustment power amount for each business by the "apportionment ratio" of each of the multiple businesses.
[0056] The utilization plan may be determined for each generator, or may be determined for each power generation business operator or power generation balancing group. When the utilization plan is determined for each generator, in this embodiment, the power amount calculation unit 15 calculates the adjustment power amount for each generator in step S6 shown in FIG. 2, and then allocates the adjustment power amount to each business operator based on the utilization plan, and outputs the allocated adjustment power amount to the fee calculation unit 17. Similarly, in step S9 shown in FIG. 2, the power amount calculation unit 15 calculates the adjustment power amount for each generator, and then allocates the adjustment power amount to each business operator based on the utilization plan, and outputs the allocated adjustment power amount to the fee calculation unit 17. In this embodiment, in the aggregation in step S7 shown in FIG. 2, the power amount calculation unit 15 aggregates the adjustment power amount for each generator on a power generation business operator or power generation balancing group basis using the results of the allocation to the business operators. This allows the fee calculation device 1 to calculate the supply and demand adjustment fee sorted for each business operator. In addition, in step S8 shown in FIG. 2, the fee calculation unit 17 calculates the supply and demand adjustment fee for each business operator. Except for the above, the operation of the fee calculation device 1 of this embodiment is the same as that of the first embodiment.
[0057] When a utilization plan is set for each power generation business operator or power generation balancing group, that is, when a utilization plan is set in the same unit as the target group for which the fee is calculated, in step S8 shown in Fig. 2, the fee calculation unit 17 allocates the aggregated adjustment power amount using the utilization plan, and calculates the supply and demand adjustment fee for each business operator using the allocated result. This allows the fee calculation device 1 to calculate the supply and demand adjustment fee sorted for each business operator. In this case, the operation of the fee calculation device 1 other than step S8 is the same as in embodiment 1.
[0058] As described above, the fee calculation device 1 of this embodiment is configured to calculate a supply and demand adjustment fee sorted for each business operator when the supply and demand adjustment capacity of a generator is utilized by multiple businesses. Therefore, the fee calculation device 1 of this embodiment has the same effect as the first embodiment, and can also calculate a supply and demand adjustment fee appropriately even when the supply and demand adjustment capacity of a generator is utilized by multiple businesses.
[0059] The configurations shown in the above embodiments are merely examples, and may be combined with other known technologies, or the embodiments may be combined with each other. Also, parts of the configurations may be omitted or modified without departing from the spirit of the invention. [Explanation of symbols]
[0060] 1 Fee calculation device, 2 Plan management device, 3 Measurement value management device, 4 Electricity market system, 11 Supply and demand plan acquisition unit, 12 Actual result acquisition unit, 13 Planned and actual result difference calculation unit, 14 Activation actual result acquisition unit, 15 Energy amount calculation unit, 16 Imbalance unit price acquisition unit, 17 Fee calculation unit, 18 Supply and demand adjustment unit price acquisition unit, 19 Contract information storage unit.
Claims
1. a planned-actual-difference calculation unit that calculates a difference between a planned value in a supply-demand plan and a measured actual value in a time period corresponding to the planned value; an energy amount calculation unit that determines whether or not a supply and demand adjustment capacity is activated during a time period that is the subject of calculation of a supply and demand adjustment fee, which is compensation for the activation of supply and demand adjustment capacity secured by an electricity transmission and distribution business operator to realize simultaneous balancing of electricity, by determining whether or not a command to use the supply and demand adjustment capacity has been sent during the time period, and calculates an adjustment energy amount, which is the amount of energy subject to settlement of the supply and demand adjustment fee, based on the difference calculated by the planned and actual difference calculation unit when the supply and demand adjustment capacity is activated; a supply and demand adjustment unit price acquisition unit that acquires a supply and demand adjustment unit price that is a unit price of a supply and demand adjustment fee; a fee calculation unit that calculates a supply and demand adjustment fee for settlement by using the adjustment power amount and the supply and demand adjustment unit price; A fee calculation device comprising:
2. an imbalance unit price acquisition unit that acquires an imbalance unit price that is a unit price of the imbalance fee; The power amount calculation unit calculates an imbalance amount, which is an amount of power to be subject to settlement of an imbalance fee, based on the difference calculated by the planned actual result difference calculation unit when there is no activation of supply and demand adjustment capacity in a time period for which a supply and demand adjustment fee is calculated, The fee calculation device according to claim 1 , wherein the fee calculation unit calculates the imbalance fee by using the imbalance amount and the imbalance unit price.
3. When supply and demand adjustment capabilities are utilized by a plurality of business operators, the power amount calculation unit classifies the adjustment power amount for each of the business operators using the priority order of each of the plurality of business operators and a pre-emptive power amount that is the utilization amount of the corresponding business operator among the adjustment power amounts; 3. The fee calculation device according to claim 1, wherein the fee calculation unit calculates the supply and demand adjustment fee for each business operator using the results sorted by the power amount calculation unit and the supply and demand adjustment unit price.
4. A plan-actual difference calculation unit that calculates a difference between a planned value in a supply-demand plan and an actual value in a time period corresponding to the planned value; an energy amount calculation unit that determines whether or not the supply and demand adjustment capacity is activated during a time period for which a supply and demand adjustment fee, which is compensation for the activation of the supply and demand adjustment capacity, is calculated by determining whether or not a command to use the supply and demand adjustment capacity has been sent during the time period, and calculates an adjustment energy amount, which is the amount of energy subject to settlement of the supply and demand adjustment fee, based on the difference calculated by the planned and actual result difference calculation unit when the supply and demand adjustment capacity is activated; a supply and demand adjustment unit price acquisition unit that acquires a supply and demand adjustment unit price that is a unit price of a supply and demand adjustment fee; a fee calculation unit that calculates a supply and demand adjustment fee using the adjustment power amount and the supply and demand adjustment unit price; Equipped with When a plurality of business operators utilize supply and demand adjustment capabilities, the power amount calculation unit divides the adjustment power amount for each of the business operators using an apportionment ratio for each of the plurality of business operators; The fee calculation unit calculates the supply and demand adjustment fee for each business operator using the results sorted by the power amount calculation unit and the supply and demand adjustment unit price.
5. A fee calculation method in a fee calculation device, comprising: A step of calculating a difference between a planned value in the supply and demand plan and a measured actual value in a time period corresponding to the planned value; a step of determining whether or not supply and demand adjustment capacity is activated during a time period for which a supply and demand adjustment fee, which is compensation for the activation of supply and demand adjustment capacity secured by an electricity transmission and distribution business operator to realize simultaneous equalization of electricity, is calculated by determining whether or not a command to use supply and demand adjustment capacity has been sent during the time period, and if supply and demand adjustment capacity is activated, calculating an adjustment amount of power, which is the amount of power subject to settlement of the supply and demand adjustment fee, based on the calculated difference; A step of acquiring a supply and demand adjustment unit price which is a unit price of the supply and demand adjustment fee; A step of calculating a supply and demand adjustment fee for settlement using the adjustment power amount and the supply and demand adjustment unit price; A fee calculation method comprising:
6. In the computer system, A step of calculating a difference between a planned value in the supply and demand plan and a measured actual value in a time period corresponding to the planned value; a step of determining whether or not supply and demand adjustment capacity is activated during a time period for which a supply and demand adjustment fee, which is compensation for the activation of supply and demand adjustment capacity secured by an electricity transmission and distribution business operator to realize simultaneous equalization of electricity, is calculated by determining whether or not a command to use supply and demand adjustment capacity has been sent during the time period, and if supply and demand adjustment capacity is activated, calculating an adjustment amount of power, which is the amount of power subject to settlement of the supply and demand adjustment fee, based on the calculated difference; A step of acquiring a supply and demand adjustment unit price which is a unit price of the supply and demand adjustment fee; A step of calculating a supply and demand adjustment fee for settlement using the adjustment power amount and the supply and demand adjustment unit price; A fee calculation program that causes the program to execute the above steps.
Citation Information
Patent Citations
Electric power customer estimation method, electric power customer estimation program, and electric power customer estimation device
JP2017041971A
Consignment fee calculation system, consignment fee calculation method and program
JP2019169093A
Demand adjustment device
JP2021026299A
Power supply demand control device, power supply demand control program, and power supply demand control method
JP2021027629A
Bid plan determination device and bid plan determination method
JP2021047519A