Battery management method

The battery management method addresses storage challenges by integrating batteries into a virtual power plant for efficient utilization and strategic reuse, optimizing space and cost-effectiveness through demand response evaluations.

JP7600806B2Active Publication Date: 2024-12-17TOYOTA JIDOSHA KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021048291
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-23
Publication Date
2024-12-17
Estimated Expiration
2041-03-23

AI Technical Summary

Technical Problem

The increasing number of used batteries from vehicles being replaced and the need for sustainable reuse poses challenges in storage space and effective utilization of storage periods, as batteries require large spaces and vary in deterioration levels based on their rank.

Method used

A battery management method using a server to charge and discharge batteries in response to demand response requests, evaluate their deterioration, and strategically select batteries for reuse based on rank, integrating them into a virtual power plant to optimize storage and power system balance.

Benefits of technology

This approach secures storage space efficiently by effectively utilizing battery storage time and money, reduces storage costs, and ensures batteries of varying ranks are managed, allowing for cost-effective reuse and space optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007600806000001
    Figure 0007600806000001
  • Figure 0007600806000002
    Figure 0007600806000002
  • Figure 0007600806000003
    Figure 0007600806000003
Patent Text Reader

Abstract

To secure a storage space for a battery while effectively using a storage term of the battery.SOLUTION: A management method of a battery comprises first to third steps. The first step is a step of a server charging and discharging a plurality of batteries stored in a storage unit 21, in accordance with a DR request from an electric power system 5. The second step is a step of the server selecting at least two batteries including a battery at a request rank of a first user site and a battery at a rank higher than that of the request rank of the first user site from among the plurality of batteries ranked in accordance with a deterioration degree. A third step is a step of the server selecting a battery in accordance with the request rank of a second user site from among the plurality of batteries ranked while using at least two selected batteries in the first user site and the two batteries.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a battery management method. [Background technology]

[0002] Japanese Patent Laid-Open Publication No. 2018-205873 (Patent Document 1) describes encouraging users of electric vehicles that have storage batteries that are compatible with a power storage system to replace the storage batteries. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-205873 A Summary of the Invention [Problem to be solved by the invention]

[0004] In recent years, the use of vehicles equipped with battery packs for driving has been rapidly increasing. As a result, the number of used batteries collected when these vehicles are replaced or dismantled is increasing. From the perspective of promoting the Sustainable Development Goals (SDGs), it is desirable to reuse used batteries by manufacturing new battery packs using collected used batteries. The inventors have noticed that the following problems may arise when reusing used batteries.

[0005] Batteries are stored at logistics centers and other locations while waiting to be used. Proper storage of batteries is costly. In addition, it may take a certain amount of time (storage period) from when the batteries are received until they are released for their next use. Therefore, it is desirable to make effective use of the battery storage period.

[0006] Generally, batteries for vehicle operation are large, and therefore require a large storage space. In particular, batteries are considered to be ranked according to the degree of deterioration, and the rank required for batteries varies depending on the application. Therefore, it is desirable to keep batteries of various ranks in stock. For this reason, a large storage space is required for storing batteries.

[0007] The present disclosure has been made to solve the above problems, and an object of the present disclosure is to ensure storage space for batteries while effectively utilizing the storage period of the batteries. [Means for solving the problem]

[0008] A battery management method according to an aspect of the present disclosure is a battery management method using a server, and includes first to third steps. The first step is a step in which the server charges and discharges a plurality of batteries stored in a warehouse in response to a demand response request from a power grid. The second step is a step in which the server selects at least two batteries, including a battery with a required rank for the first user location and a battery with a rank higher than the required rank for the first user location, from among a plurality of batteries ranked according to their degrees of deterioration. The third step is a step in which the server uses the at least two selected batteries at the first user location, and selects a battery according to the required rank for the second user location from among the ranked plurality of batteries and the at least two batteries.

[0009] In the above method, the deterioration levels of the multiple batteries are evaluated while the multiple batteries are stored in a storage facility (first and second steps). In other words, the evaluation of the deterioration level is completed during the storage period of the batteries, so that the time required for separately evaluating the deterioration level can be saved. Furthermore, the deterioration levels of the multiple batteries are evaluated by utilizing an opportunity to charge and discharge the multiple batteries in response to a demand response request from the power system. By responding to the demand response request, a consideration can be obtained from the manager of the power system (generally a power company). Thus, the storage period of the batteries can be effectively utilized in terms of time and money. Furthermore, in the above method, in addition to the storage facility, batteries of the required rank of the first user site and batteries of a higher rank than the required rank of the first user site are stored at the first user site (third step). This makes it easy to secure storage space for a large amount of batteries. Effect of the Invention

[0010] According to the present disclosure, it is possible to effectively utilize the storage period of the battery while securing storage space for the battery. [Brief description of the drawings]

[0011] [Figure 1] FIG. 2 is a diagram showing one aspect of logistics of a battery pack according to the present embodiment. [Diagram 2] FIG. 1 is a diagram showing an example of how used batteries are stored in a storage unit. [Diagram 3] 1 is a flowchart showing an overview of a process for reusing used batteries. [Figure 4] FIG. 2 is a conceptual diagram for explaining the manner of selling and shipping used batteries in the present embodiment. [Diagram 5] 4 is a flowchart showing a sales and shipping process in the present embodiment. [Figure 6] FIG. 2 is a system configuration diagram showing the electrical configuration of a battery cellar. [Figure 7] FIG. 4 is a diagram illustrating an example of a data structure of battery data. [Figure 8]FIG. 2 is a functional block diagram of a server related to deterioration evaluation of a used battery. [Figure 9] FIG. 2 is a functional block diagram of a server related to power adjustment between a battery cellar and a power grid. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] In the present disclosure and the embodiments, charging and discharging a battery means at least one of charging and discharging a battery. In other words, charging and discharging a battery is not limited to both charging and discharging a battery, but may be only charging a battery or only discharging a battery.

[0013] In the present disclosure and embodiments, the battery pack includes a plurality of modules (also called blocks or stacks). The plurality of modules may be connected in series or in parallel with each other. Each of the plurality of modules includes a plurality of cells (single cells).

[0014] Generally, the "reuse" of assembled batteries can be broadly divided into reuse, rebuilding, and material recycling. In the case of reuse, collected assembled batteries undergo the necessary shipping inspection and are shipped as-is as reused products. In the case of rebuilding, collected assembled batteries are first disassembled into modules. Then, from among the disassembled modules, usable modules (which may be usable after performance recovery) are combined to manufacture a new assembled battery. The newly manufactured assembled battery undergoes shipping inspection and is shipped as a rebuilt product. In contrast, in material recycling, recyclable materials (resources) are extracted from each cell. Collected assembled batteries are not used as other assembled batteries.

[0015] In the embodiment described below, a battery pack collected from a vehicle is once disassembled into modules. Various processes are then carried out on a module-by-module basis. In other words, in the following, a reusable used battery means a module that can be rebuilt. However, disassembly into modules is not essential. Depending on the configuration of the battery pack or the degree of deterioration of the battery pack, it may be possible to reuse the battery pack without disassembly into modules.

[0016] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference characters, and the description thereof will not be repeated.

[0017] [Embodiment Mode] <Battery logistics model> Fig. 1 is a diagram showing one aspect of logistics of a battery pack in this embodiment. Hereinafter, the aspect of logistics shown in Fig. 1 will be referred to as a "battery logistics model". The battery logistics model 100 includes a collector 1, a battery seller 2, a buyer 3, a recycling plant 4, a power grid 5, and a distributed energy resource (DER) 6.

[0018] The recovery company 1 recovers used battery packs (used batteries 9) from multiple vehicles. The recovery company 1 may be a vehicle dealer or a vehicle dismantler. In this example, identification information (battery ID) is assigned to each used battery 9 (see FIG. 7). Therefore, in the battery logistics model 100, it is possible to identify the used battery 9 using the ID, manage data of the used battery 9 (such as battery data described below), and track the distribution route of the used battery 9.

[0019] The battery cellar 2 is a facility for appropriately managing used batteries 9 collected by the collection company 1, similar to a wine cellar that stores wine bottles under temperature and humidity control. In the example shown in FIG. 1, the battery cellar 2 is installed at a logistics base near a port. The battery cellar 2 includes a server 20 that manages data related to the used batteries 9, and multiple storage units 21. Note that the storage units 21 correspond to the "storage facility" according to the present disclosure. The batteries stored in the battery cellar 2 are not limited to used batteries, and may include new batteries.

[0020] FIG. 2 is a diagram showing an example of how used batteries 9 are stored in a storage unit 21. As shown in FIG. 2, a plurality of storage units 21 are arranged inside the building of the battery cellar 2. Each of the plurality of storage units 21 is configured to store many used batteries 9. Although details will be described later, in this embodiment, the battery cellar 2 performs a deterioration evaluation test on each of the used batteries 9 stored in the storage unit 21. Then, based on the results of the deterioration evaluation test, the battery cellar 2 judges whether each used battery 9 is reusable or non-reusable (whether it is suitable or unsuitable for reuse).

[0021] Returning to Fig. 1, buyers 3 sell used batteries 9 that have been determined to be reusable by the battery seller 2. Buyers 3 may include dealers 31 that sell used batteries 9 for use in vehicles, and users 32 that use the batteries as stationary batteries in factories, buildings, etc. Buyers 3 may also include dealers 33 that sell used batteries 9 as supplies (replacement parts for maintenance and repair).

[0022] The recycling factory 4 performs material recycling on the used batteries 9 that have been determined by the battery seller 2 to be non-reusable, in order to regenerate them as raw materials for other products.

[0023] The power system 5 is a power network constructed by power plants, power transmission and distribution facilities, etc. In this embodiment, the power company serves as both the power generation business operator and the power transmission and distribution business operator. The power company corresponds to a general power transmission and distribution business operator and also corresponds to the manager of the power system 5, and maintains and manages the power system 5. The power system 5 is provided with a business operator server 50. The business operator server 50 belongs to the power company and manages the power supply and demand of the power system 5. The server 20 and the business operator server 50 are configured to be capable of two-way communication.

[0024] The DER 6 is a relatively small-scale power facility that is installed at the logistics base (or the surrounding area) where the battery cellar 2 is installed and is capable of receiving and sending power to and from the battery cellar 2. The DER 6 includes, for example, a power generation type DER and a power storage type DER.

[0025] The power generation type DER may include a variable natural power source and a generator. The variable natural power source is a power generation facility whose power output varies depending on weather conditions. Although a solar power generation facility (solar panels) is illustrated in FIG. 1, the variable natural power source may include a wind power generation facility instead of or in addition to the solar power generation facility. On the other hand, the generator is a power generation facility that is not dependent on weather conditions. The generator may include a steam turbine generator, a gas turbine generator, a diesel engine generator, a gas engine generator, a biomass generator, a stationary fuel cell, and the like. The generator may include a cogeneration system that utilizes heat generated during power generation.

[0026] The energy storage type DER may include a power storage system and a heat storage system. The power storage system is a stationary energy storage device that stores electricity generated by natural variable power sources. The power storage system may be a power-to-gas device that uses electricity to produce gaseous fuels (hydrogen, methane, etc.). The heat storage system includes a heat storage tank installed between the heat source and the load, and is configured to temporarily store the liquid medium in the heat storage tank in a warm state. By using the heat storage system, the generation and consumption of heat can be shifted in time. Therefore, for example, it is possible to store the heat generated by consuming electricity to operate a heat source machine at night in the heat storage tank, and consume the heat during the day for air conditioning.

[0027] In this way, the used batteries 9 collected by the collector 1 are stored in the battery cellar 2 while waiting to be shipped to the buyer 3 or recycling factory 4. However, proper storage of the used batteries 9 using the battery cellar 2 requires maintenance costs (running costs). Furthermore, it may take a certain amount of time from when the collected used batteries 9 are received until they are shipped to the buyer 3 or recycling factory 4. Therefore, it is desirable to make effective use of the storage period of the used batteries 9 in the battery cellar 2.

[0028] Therefore, in this embodiment, a configuration is adopted in which the battery cellar 2 functions not only as a storage location for used batteries 9 but also as a virtual power plant (VPP). As a result, the opportunity to charge and discharge used batteries 9 serves both as a degradation evaluation of used batteries 9 to determine a reuse mode for used batteries 9, and as an adjustment of the power supply and demand balance of the power system 5 using the used batteries 9. As a result, in the battery cellar 2, storage of used batteries 9, degradation evaluation of used batteries 9, and adjustment of the power supply and demand balance using used batteries 9 are performed in a "trinity."

[0029] <Recycling process for used batteries> 3 is a flow chart showing an outline of the work process for reusing used batteries 9. First, used batteries 9 collected by a collection company 1 are delivered to a battery seller 2 (S1).

[0030] In this embodiment, the server 20 performs a deterioration evaluation test (performance inspection) on each of the used batteries 9 while they are stored in the storage unit 21 (S2). The server 20 evaluates the degree of deterioration of each used battery 9 based on electrical characteristics such as full charge capacity and internal resistance (e.g., AC impedance). Then, the server 20 determines whether each used battery 9 is reusable or non-reusable according to the results of the deterioration evaluation test (S3).

[0031] In this embodiment, used batteries 9 are ranked according to the results of the degradation evaluation test (more specifically, the measurement results of the full charge capacity). For example, as shown in FIG. 2, used batteries 9 that can be rebuilt are ranked into four stages, S rank, A rank, B rank, and C rank, in descending order of full charge capacity. This makes it possible to set the buying and selling price of used batteries 9 in association with the rank, and to guarantee the quality of used batteries 9 according to the rank. Therefore, used batteries 9 that have passed through the battery seller 2 can be smoothly distributed in the market. Note that used batteries 9 whose full charge capacity is below a specified value are ranked lower than C rank (denoted as Re) and are sent for material recycling.

[0032] If it is determined that the used battery 9 can be reused (YES in S3), the work process proceeds to a performance recovery process (S4). In the performance recovery process, a process (performance recovery process) is carried out to recover the performance of the used battery 9. For example, the full charge capacity of the used battery 9 can be recovered by overcharging the used battery 9. However, the performance recovery process may be omitted. Also, while the performance recovery process may be carried out on used batteries 9 that have a large degree of degradation (largely degraded performance) as a result of the degradation evaluation test, the performance recovery process may not be carried out on used batteries 9 that have a small degree of degradation (not much performance degradation).

[0033] Next, a new assembled battery is manufactured (rebuilt) using the used batteries 9 whose performance has been restored by the performance recovery process (S5). The used batteries 9 used to rebuild the assembled battery are basically used batteries 9 whose performance has been restored by the performance recovery process, but may include used batteries 9 whose performance recovery process has been omitted, or may include new batteries (new modules). The assembled battery is then sold and shipped to the sales destination 3 (S6).

[0034] If it is determined as not reusable as a result of the degradation evaluation test (NO in S3), the used battery 9 is transported to a recycling factory 4 (S7). In the recycling factory 4, the used battery 9 is dismantled and recycled.

[0035] In this way, the used batteries 9 are stored in the battery cellar 2 until they are collected by the collector 1 and delivered to the buyer 3 or the recycle plant 4, and a deterioration evaluation test is performed during that time. When measuring electrical characteristics such as the full charge capacity of the used batteries 9 in the deterioration evaluation test, the used batteries 9 are charged and discharged. In this embodiment, the charging and discharging uses power exchanged between the battery cellar 2 (and DER 6) and the power grid 5. This allows the battery cellar 2 to function as a VPP (or one of the DERs) and contribute to load leveling of the power grid 5. More specifically, during a time period when there is a surplus of supply relative to demand in the power grid 5, the battery cellar 2 absorbs the power surplus by charging the surplus power to the used batteries 9. On the other hand, when there is a shortage of supply relative to demand in the power grid 5, the battery cellar 2 alleviates the power shortage by discharging the shortage of power from the used batteries 9.

[0036] However, the battery seller 2 does not have to be configured to contribute to both absorbing surplus power and alleviating power shortages in the power grid 5. The battery seller 2 may be configured to contribute to only one of absorbing surplus power and alleviating power shortages. For example, the battery seller 2 can charge the used batteries 9 with surplus power in the power grid 5, while discharging the used batteries 9 to destinations that do not include the power grid 5. The used batteries 9 may be discharged only to the DER 6, for example.

[0037] <Storage of used batteries> The collected used batteries 9 are stored in the battery cellar 2 while waiting to be shipped to a reuse destination. Since the used batteries 9 used for running vehicles are large, a large storage space is required in the battery cellar 2. Furthermore, the rank required for the used batteries 9 varies depending on the intended use at the reuse destination, such as for vehicles or stationary use. For this reason, it is desirable for the battery cellar 2 to keep a stock of used batteries 9 of various ranks. This also increases the storage space required for the battery cellar 2. Therefore, in this embodiment, a stationary battery installed at the base of a user 32, which is one of the buyers of the used batteries 9, is used as storage space for the used batteries 9.

[0038] Fig. 4 is a conceptual diagram for explaining the manner of selling and shipping used batteries 9 in this embodiment. Fig. 5 is a flowchart showing the selling and shipping process (see S6 in Fig. 3) in this embodiment. With reference to Figs. 4 and 5, the assembled battery sold from the battery seller 2 to the user 32 is used as a stationary battery at the base of the user 32.

[0039] Generally, in a stationary battery pack, a certain percentage of the many modules will have abnormalities (failures). Therefore, stationary battery packs are inspected periodically, and any modules found to be abnormal are replaced. From the standpoint of ease of maintenance, stationary battery packs are constructed so that abnormal modules can be easily removed and normal modules can be easily installed.

[0040] In this embodiment, in addition to the used batteries 9 of the rank requested by the user 32, used batteries 9 of a rank higher than the rank requested by the user 32 are mixed in the assembled battery shipped from the battery seller 2 and installed at the base of the user 32 (S61). For example, even if the user 32 only requests used batteries 9 of rank C, the assembled battery is mixed with used batteries 9 of rank S, rank A and / or rank B in addition to the used batteries 9 of rank C. This allows used batteries 9 of various ranks to be stored at the base of the user 32 to which the assembled battery from the battery seller 2 is sold (S62).

[0041] The server 20 also monitors the assembled battery installed at the base of the user 32. For example, the server 20 acquires the full charge capacity of each of the multiple used batteries 9 constituting the assembled battery from a server (a server owned by the user 32) that manages the assembled battery, and updates the ranking of each used battery 9 as appropriate. Then, when the server 20 receives a purchase request for a used battery 9 from another user (e.g., a new customer), it considers whether to ship a used battery 9 of the required rank to the base of the other user from among the used batteries 9 stored in the battery seller 2 and the used batteries 9 stored at the base of the user 32. More specifically, the server 20 determines whether the transportation cost and / or delivery date satisfy a predetermined condition when shipping the used battery 9 stored in the battery seller 2 (S63).

[0042] If the transportation cost and / or delivery date satisfy the predetermined condition (YES in S63), the server 20 selects the used battery 9 stored in the battery seller 2 as a used battery for shipment to the other user (S64). For example, if the transportation cost is below a predetermined amount and the delivery date is also below a predetermined number of days when the used battery 9 is shipped from the base of the user 32 and the used battery 9 is shipped from the battery seller 2, the server 20 can select the used battery 9 stored in the battery seller 2.

[0043] On the other hand, if the transportation cost and / or delivery date do not satisfy the predetermined condition (NO in S63), the server 20 selects the used battery 9 stored at the base of the user 32 as a used battery for shipment to the other user (S65). For example, when shipping the used battery 9 from the base of the user 32 can reduce the transportation cost or shorten the delivery date compared to shipping the used battery 9 from the battery seller 2, the server 20 can select the used battery 9 stored at the base of the user 32. After the used battery 9 is shipped, new used batteries 9 are replenished at the base of the user 32.

[0044] Although not shown, the used batteries 9 stored in the battery seller 2 may be combined with the used batteries 9 stored at the base of the user 32 to be shipped to the other user.

[0045] Thus, in this embodiment, the operator of the battery seller 2 can use the base of the user 32 in addition to the battery seller 2 as storage space for used batteries 9, making it easier to secure storage space for large quantities of used batteries 9 and to secure inventory of various ranks.

[0046] On the other hand, the user 32 can receive used batteries 9 of a higher rank than the user 32 desires, and can therefore purchase the assembled battery at a substantially lower price. Furthermore, if the same used batteries 9 are continuously used in the assembled battery of the user 32, the deterioration of each used battery 9 progresses over time or with repeated charging and discharging. In contrast, in this embodiment, the used batteries 9 constituting the assembled battery of the user 32 are appropriately replaced, and the effect of deterioration can be reduced.

[0047] The location of the user 32 corresponds to a "first user location" according to the present disclosure. The locations of the other users correspond to a "second user location" according to the present disclosure.

[0048] <Battery cellar system configuration> Fig. 6 is a system configuration diagram showing the electrical configuration of the battery cellar 2. The battery cellar 2 comprises, for example, a storage unit 21, an AC / DC converter 22, a DC / DC converter 23, and a server 20. Note that due to space limitations, only one storage unit 21 is shown in Fig. 6, but a typical battery cellar 2 comprises multiple storage units 21, as shown in Fig. 2.

[0049] The storage unit 21 stores a plurality of used batteries 9. In Fig. 6, the plurality of used batteries 9 are connected in parallel to each other, but this is merely an example, and the connection manner of the plurality of used batteries 9 is not particularly limited. The plurality of used batteries 9 may be connected in series, or may be a combination of series and parallel connections. The storage unit 21 includes a voltage sensor 211, a current sensor 212, and a relay 213.

[0050] The voltage sensor 211 detects the voltage VB of the used battery 9 and outputs the detected value to the server 20. The current sensor 212 detects the current IB charged to and discharged from the used battery and outputs the detected value to the server 20. If temperature is used to evaluate the deterioration of the used battery 9, the storage unit 21 may further include a temperature sensor (not shown). Each sensor may be a sensor attached to the used battery 9.

[0051] The relay 213 includes, for example, a first relay electrically connected to the positive electrode side of the used battery 9 and a second relay electrically connected to the negative electrode side of the used battery 9. This allows any used battery 9 to be electrically disconnected even while other used batteries 9 are being charged or discharged, and the used battery 9 can be removed from the storage unit 21.

[0052] The AC / DC converter 22 is electrically connected between the power system 5 and the DC / DC converter 23. The AC / DC converter 22 is configured to be capable of performing bidirectional power conversion operations for charging and discharging the used batteries 9 stored in the storage unit in accordance with a control command (charge / discharge command) from the server 20. More specifically, the AC / DC converter 22 converts AC power supplied from the power system 5 into DC power for charging the used batteries 9. The AC / DC converter 22 also converts DC power discharged from the used batteries 9 into AC power for supplying to the power system 5.

[0053] The DC / DC converter 23 is electrically connected between the AC / DC converter 22 and the storage unit 21, and is also electrically connected between the DER 6 and the storage unit 21. Like the AC / DC converter 22, the DC / DC converter 23 is configured to be capable of performing bidirectional power conversion operations in accordance with a control command (charge / discharge command) from the server 20. The DC / DC converter 23 can charge the used battery 9 with DC power from the AC / DC converter 22 and / or the DER 6, and can discharge the DC power stored in the used battery 9 to the AC / DC converter 22 and / or the DER 6.

[0054] The server 20 includes a processor such as a CPU (Central Processing Unit), memories such as a ROM (Read Only Memory) and a RAM (Random Access Memory), and input / output ports (none of which are shown) through which various signals are input and output. The server 20 executes various controls based on signals received from each sensor and programs and maps stored in the memory. The server 20 includes a battery data storage unit 201, a deterioration evaluation unit 202, a power adjustment unit 203, a timing adjustment unit 204, and a display unit 205.

[0055] The battery data storage unit 201 stores battery data used for managing the used batteries 9 in the battery seller 2 .

[0056] 7 is a diagram showing an example of the data structure of the battery data. The battery data is stored, for example, in a map format. The battery data includes, as parameters, for example, identification information (battery ID) for identifying the used battery 9, the model number of the used battery 9, the manufacturing date, the current SOC (State Of Charge), the full charge capacity, the rank, and the degradation evaluation date and time (the most recent date and time when a degradation evaluation test was performed).

[0057] In this embodiment, the battery data further includes information on the storage base (base of the battery cellar 2 / user 32) and identification information of the storage unit in which the used battery 9 is stored. Note that the battery data may include parameters other than those described above (such as the internal resistance of the used battery 9 and an index ΣD indicating the bias of the salt concentration distribution in the electrolyte of the used battery 9).

[0058] 6 again, the deterioration assessment unit 202 performs a deterioration assessment test on the used battery 9 based on the voltage VB and the current IB detected by the voltage sensor 211 and the current sensor 212, respectively, during charging and discharging of the used battery 9. An example of this assessment method will be described with reference to FIG.

[0059] The power adjustment unit 203 adjusts power between the battery cellar 2 (and DER 6) and the power grid 5. More specifically, the server 20 selects, from among a plurality of used batteries 9, a used battery 9 to be charged or discharged in response to a demand response (DR) request from the business operator server 50 (see FIG. 1). The power adjustment unit 203 outputs commands to the relay 213, the AC / DC converter 22, and the DC / DC converter 23 so that the selected used battery 9 is charged or discharged. An example of this control method will be described with reference to FIG. 9.

[0060] The timing adjustment unit 204 adjusts the timing of the deterioration evaluation test of the used battery 9 by the deterioration evaluation unit 202 and the timing of the power adjustment between the battery cellar 2 and the power grid 5 by the power adjustment unit 203. More specifically, the timing adjustment unit 204 adjusts the timing so that the deterioration evaluation test of the used battery 9 is performed in accordance with the timing of DR of the battery cellar 2 in response to a DR request from the business operator server 50. Note that what is performed in accordance with the DR of the battery cellar 2 is not limited to the deterioration evaluation test of the used battery 9, and a performance recovery process (see S4 in FIG. 3) may be performed in addition to the deterioration evaluation test.

[0061] The display unit 205 displays battery data (see FIG. 7) in response to operations by the manager of the battery cellar 2 (which may be a worker working in the battery cellar 2). The display unit 205 also displays the progress and results of the deterioration evaluation test performed by the deterioration evaluation unit 202, allowing the manager to understand the status of the deterioration evaluation test. Furthermore, the display unit 205 displays the status of the used batteries 9 selected by the power adjustment unit 203 and being charged or discharged, allowing the manager to understand the status of power adjustment between the battery cellar 2 and the power grid 5.

[0062] Server 20 corresponds to a "control device" according to the present disclosure. AC / DC converter 22 and DC / DC converter 23 correspond to a "power conversion device" according to the present disclosure.

[0063] <Deterioration evaluation> 8 is a functional block diagram of the server 20 (deterioration evaluation unit 202) related to the deterioration evaluation of a used battery 9. In the following, for simplicity of explanation, the description focuses on one used battery 9. However, in reality, when there are multiple used batteries 9 for which deterioration evaluation has not been performed, the same process may be executed simultaneously for those used batteries 9. The deterioration evaluation unit 202 includes a current integration unit 71, an OCV (Open Circuit Voltage) calculation unit 72, an SOC change amount calculation unit 73, a full charge capacity calculation unit 74, and a ranking unit 75.

[0064] The current integrator 71 calculates an integrated value (integrated current amount) ΔAh (unit: Ah) of the current charged and discharged to the used battery 9 from when the start condition of the current integration is satisfied until the end condition is satisfied, based on the current IB detected by the current sensor 212. In this embodiment, as described above, the used battery 9 is charged and discharged in response to a DR request from the business entity server 50, and the current flowing during the DR is integrated. More specifically, when an upward DR (a request for an increase in power demand) is performed, the used battery 9 is charged to increase the power demand of the battery cellar 2, and the charging current at that time is integrated. On the other hand, when a downward DR is performed, the used battery 9 is discharged to reduce the power demand of the battery cellar 2, and the discharging current at that time is integrated. The current integrator 71 outputs the calculated integrated current amount ΔAh to the full charge capacity calculator 74.

[0065] The OCV calculation unit 72 calculates the OCV of the used battery 9 at the start of current integration and the OCV of the used battery 9 at the end of current integration. The OCV can be calculated, for example, according to the following formula (1). OCV = VB - ΔVp - IB × R (1)

[0066] In formula (1), the internal resistance of the used battery 9 is written as R, and the polarization voltage is written as Vp. At the start of current integration (immediately before the start of charging and discharging), the current IB=0. If the used battery 9 is left without being charged or discharged before the start of current integration, the polarization voltage Vp can be approximated as 0. Therefore, the OCV at the start of current integration can be calculated based on the voltage VB detected by the voltage sensor 211. On the other hand, the internal resistance R can be determined from the relationship between the voltage VB and the current IB (Ohm's law). If the used battery 9 is charged or discharged at a constant current, the polarization voltage Vp can also be determined from the current IB detected by the current sensor 212 by measuring the relationship between the current and the polarization voltage Vp in advance. Therefore, the OCV of the used battery 9 at the end of current integration can also be calculated based on the voltage VB and the current IB. The OCV calculation unit 72 outputs the two calculated OCVs to the SOC change amount calculation unit 73.

[0067] The SOC change amount calculation unit 73 calculates the SOC change amount ΔSOC of the used battery 9 from the start of current integration to the end of current integration based on the two OCVs. The SOC change amount calculation unit 73 has in advance a characteristic curve (OCV-SOC curve) that indicates the SOC dependency of the OCV. Therefore, by referring to the OCV-SOC curve, the SOC change amount calculation unit 73 can read out the SOC corresponding to the OCV at the start of current integration and the SOC corresponding to the OCV at the end of current integration, and calculate the difference between these SOCs as ΔSOC. The SOC change amount calculation unit 73 outputs the calculated ΔSOC to the full charge capacity calculation unit 74.

[0068] The full charge capacity calculation unit 74 calculates the full charge capacity C of the used battery 9 based on ΔAh from the current integration unit 71 and ΔSOC from the SOC change amount calculation unit 73. In detail, the full charge capacity C of the used battery 9 can be calculated according to the following formula (2) in which the ratio of ΔAh to ΔSOC is equal to the ratio of the full charge capacity C to ΔSOC=100%. Since the full charge capacity C0 in the initial state is known from the specifications of the used battery 9, the full charge capacity calculation unit 74 may further calculate the capacity maintenance rate Q from the full charge capacity C (Q=C / C0). The full charge capacity calculation unit 74 outputs the calculated full charge capacity C to the ranking unit 75. C = ΔAh / ΔSOC × 100 (2)

[0069] The ranking unit 75 ranks the used batteries 9 according to the full charge capacity C. The ranking unit 75 can record the date and time of ranking in the battery data (see FIG. 7) as the degradation assessment date and time.

[0070] The rank of the used battery 9 is displayed on the display unit 205 together with the battery ID, storage location, etc. of the used battery 9. This allows a worker working in the battery cellar 2 to take out from the storage location a used battery 9 of a rank that meets the request of the buyer 3 when a request for purchase of a used battery 9 is received from the buyer 3. By taking out used batteries to be sold from the storage unit 21 as appropriate, it is possible to prevent the storage unit 21 from becoming full.

[0071] The above method of calculating the full charge capacity C is merely an example. Any method can be used to calculate the full charge capacity C, as long as it uses the voltage VB and current IB detected as the used battery 9 is charged and discharged. The ranking unit 75 may determine the rank of the used battery 9 based on other characteristics (such as the internal resistance of the used battery 9 and an index ΣD indicating the bias of the electrolyte concentration in a lithium-ion battery) instead of or in addition to the full charge capacity C. The ranking unit 75 may determine the rank of the used battery 9 according to the length of time the used battery 9 has been charged and discharged and / or the number of times the used battery 9 has been charged and discharged. The ranking unit 75 may determine the rank of the used battery 9 according to the elapsed time since the used battery 9 was manufactured, although the accuracy may be somewhat reduced. The ranking unit 75 may also determine the rank of the used battery 9 by combining the above elements (such as the full charge capacity C, the internal resistance R, the index ΣD, the charge and discharge time, the number of times the used battery 9 has been charged and discharged, and the elapsed time since the used battery 9 was manufactured).

[0072] <Power adjustment> 9 is a functional block diagram of the server 20 (power adjustment unit 203) related to power adjustment between the battery cellar 2 and the power grid 5. In this example, for ease of understanding, a situation will be described assuming that the DER 6 is a power generation type DER (particularly a naturally fluctuating power source such as a solar power generation facility). The power adjustment unit 203 includes an overall adjustment amount calculation unit 81, a DER adjustment amount calculation unit 82, a battery cellar adjustment amount calculation unit 83, a used battery selection unit 84, a conversion operation unit 85, and a command generation unit 86.

[0073] The total adjustment amount calculation unit 81 receives a DR request from the business operator server 50 and calculates the total amount of power that requires power adjustment during a predetermined period (e.g., 30 minutes) using the battery cell 2 and the DER 6. This amount of power is hereinafter referred to as the total adjustment amount, and is also written as kWh (total). The total adjustment amount calculation unit 81 outputs the calculated kWh (total) to the battery cell adjustment amount calculation unit 83.

[0074] The DER adjustment amount calculation unit 82 acquires the operating state of each DER 6 (more specifically, the expected amount of power generated by each DER 6 during a predetermined period) by communicating with that DER 6. Hereinafter, this amount of power will be referred to as the DER adjustment amount, and will also be written as kWh(DER). The DER adjustment amount calculation unit 82 outputs the acquired kWh(DER) to the battery cellar adjustment amount calculation unit 83.

[0075] The battery cell adjustment amount calculation unit 83 calculates the amount of power that requires power adjustment using the battery cell 2 based on the kWh(total) from the total adjustment amount calculation unit 81 and the kWh(DER) from the DER adjustment amount calculation unit 82. This amount of power is hereinafter referred to as the battery cell adjustment amount, and is also written as kWh(bat). The battery cell adjustment amount calculation unit 83 can calculate, for example, the difference between the above two amounts of power, ΔkWh=kWh(total)-kWh(DER), as the battery cell adjustment amount kWh(bat). The battery cell adjustment amount calculation unit 83 outputs the calculated kWh(bat) to the used battery selection unit 84.

[0076] The used battery selection unit 84 grasps the amount of electric power that can be charged and discharged for each of the many used batteries 9 stored in the multiple storage units 21 (see the battery data in FIG. 7). The used battery selection unit 84 selects used batteries to be used for power adjustment from the many used batteries 9 based on kWh(bat) from the battery cellar adjustment amount calculation unit 83. If kWh(bat)>0, the power shortage of the power system 5 is compensated for by discharging from the battery cellar 2. Therefore, the used battery selection unit 84 selects a quantity of used batteries 9 that can discharge an amount of electric power equal to or greater than kWh(bat). On the other hand, if kWh(bat)<0, the surplus of electric power of the power system 5 is absorbed by charging to the battery cellar 2. Therefore, the used battery selection unit 84 selects a quantity of used batteries 9 that can charge an amount of electric power equal to or greater than kWh(bat) (absolute value). The used battery selection unit 84 outputs the selected used batteries 9 and the amount of electric power allocated to each selected used battery 9 (the amount of electric power adjusted by each used battery 9) to the conversion calculation unit 85.

[0077] The conversion calculation unit 85 calculates the power to be charged and discharged for each used battery 9 selected by the used battery selection unit 84. More specifically, the conversion calculation unit 85 converts the amount of power (unit: kWh) to be adjusted by each used battery 9 into power (unit: kW) using the remaining time of power adjustment. As an example, if the power adjustment amount allocated to a certain used battery 9 is 10 kWh and the remaining time of power adjustment is 15 minutes, it can be calculated as 10 kWh × (60 minutes / 15 minutes) = 40 kW. The conversion calculation unit 85 outputs the power to be charged and discharged for each used battery 9 to the command generation unit 86.

[0078] The command generating unit 86 generates charge / discharge commands to the AC / DC converter 22 and the DC / DC converter 23, and also generates an opening / closing command to the relay 213, based on the calculation result by the conversion calculation unit 85. More specifically, the command generating unit 86 also generates an opening / closing command such that the selected used batteries 9 are electrically connected to the DC / DC converter 23, while the unselected used batteries 9 are electrically disconnected from the DC / DC converter 23. The command generating unit 86 generates a charge / discharge command such that the total power allocated to the selected used batteries 9 is charged or discharged.

[0079] Note that the power adjustment method shown in FIG. 9 is also merely an example, and is described for the sake of clarity. In this example, it is assumed that the DER6 is a power generation type DER, particularly a naturally variable power source whose power generation amount cannot be controlled. Therefore, the battery cell adjustment amount calculation unit 83 calculates the battery cell adjustment amount kWh(bat) based on the difference kWh(total)-kWh(DER) obtained by subtracting the DER adjustment amount kWh(DER) from the total adjustment amount kWh(total). That is, in this example, after the DER adjustment amount kWh(DER) is determined, the final power adjustment is performed by the battery cell adjustment amount kWh(bat). However, for example, when the DER6 includes a storage type DER, the battery cell adjustment amount calculation unit 83 may distribute the total adjustment amount kWh(total) to the DER adjustment amount kWh(DER) and the battery cell adjustment amount kWh(bat), and perform power adjustment using both the DER adjustment amount kWh(DER) and the battery cell adjustment amount kWh(bat).

[0080] As described above, in this embodiment, the degree of deterioration of each used battery 9 is evaluated while it is stored in the storage unit 21. This allows the storage period of the used batteries 9 to be used effectively in terms of time. Furthermore, the charging and discharging of the used batteries 9 for evaluating the degree of deterioration of the used batteries 9 is basically performed in response to a DR request from the business entity server 50. Furthermore, when the number of used batteries 9 is large, a large amount of power is charged and discharged, and this large amount of power is exchanged between the battery cellar 2 and the power system 5 in response to the DR request from the business entity server 50. This allows the operating company of the battery cellar 2 to receive a compensation (incentive) from the power company, and the compensation can be used as the running cost of the battery cellar 2. Alternatively, the operating company of the battery cellar 2 can recover a part of the initial investment (initial cost) of the battery cellar 2. This allows the storage period of the used batteries 9 to be used effectively in terms of money.

[0081] Furthermore, in this embodiment, in addition to the battery seller 2, the base of the user 32 to which the battery pack from the battery seller 2 is sold is also used as storage space for the used batteries 9. This makes it possible to avoid a situation in which there is a shortage of storage space when a large number of used batteries 9 are collected.

[0082] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0083] 100 Battery logistics model, 1 Collection company, 2 Battery cellar, 3 Sales destination, 31 Retailer, 32 User, 33 Retailer, 4 Recycling plant, 5 Power system, 50 Business server, 6 Distributed energy resource (DER), 9 Used battery, 20 Server, 201 Battery data storage unit, 202 Degradation evaluation unit, 203 Power adjustment unit, 204 Timing adjustment unit, 205 Display unit, 21 Storage unit, 211 Voltage sensor, 212 Current sensor, 213 Relay, 22 AC / DC converter, 23 DC / DC converter, 71 Current integration unit, 72 OCV calculation unit, 73 SOC change amount calculation unit, 74 Full charge capacity calculation unit, 75 Ranking unit, 81 Overall adjustment amount calculation unit, 82 Adjustment amount calculation unit, 83 Battery cellar adjustment amount calculation unit, 84 Used battery selection unit, 85 Conversion calculation unit, 86 Command generation section.

Claims

[Claim 1] A battery management method using a server, comprising: A step in which the server charges and discharges the plurality of batteries stored in the storage facility in response to a demand response request from a power grid; a step of the server selecting at least two batteries from the plurality of batteries ranked according to the degree of deterioration, the batteries including a battery having a rank required by a first user location and a battery having a rank higher than the rank required by the first user location; A battery management method including a step in which the server selects a battery from among the ranked plurality of batteries and the at least two batteries according to the required rank of the second user location, while using the at least two selected batteries at the first user location.

Citation Information

Patent Citations

  • Procurement support device, procurement support system, procurement support method and program

    JP2018205873A

  • Systems and methods for electric vehicles with modular battery packs

    US20200231064A1

  • Storage battery system

    WO2019215817A1

  • Selecting device, selecting method, and program

    WO2021029031A1