Support system, support method, and program for inventory management of tunnel construction materials

JP7651389B2Active Publication Date: 2025-03-26FUJIMORI SANGYO CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2021104256
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-23
Publication Date
2025-03-26
Estimated Expiration
2041-06-23

AI Technical Summary

Benefits of technology

【0009】 本発明によれば、トンネル構築のための資材の在庫管理をコンピューターシステムにより支援することによって、在庫管理の労力を軽減できる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007651389000001
    Figure 0007651389000001
  • Figure 0007651389000002
    Figure 0007651389000002
  • Figure 0007651389000003
    Figure 0007651389000003
Patent Text Reader

Abstract

To support a stock management of material for a tunnel construction.SOLUTION: Necessary material information 12b including the kind and quantity of the necessary material according to a geological distribution of a rock mass 2 and an engineering timbering pattern is stored in a store unit 12 of a processor 10. A processing unit 11 of the processor 10 obtains survey data by a survey machine 6 as tunnel excavation progress information, calculates the kind and quantity of the used material on the basis of the necessary material information and the excavation progress information and updates an estimated stock quantity of the material.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system, method, and program for assisting in inventory management of materials for constructing a tunnel in natural ground. [Background technology]

[0002] The construction of mountain tunnels requires various materials such as rock bolts, mortar for fixing rock bolts, shoring, sprayed concrete, quick-setting materials, concrete for lining, rebar for lining, concrete for invert, waterproof sheets, drainage materials, etc. For each material, inventory management, such as checking the quantity at the time of delivery, checking the quantity used during construction, checking the stock amount, and ordering any shortages, is done by the manpower of the person in charge. Therefore, whether inventory management is done properly or not depends on the experience, knowledge, and ability of the person in charge. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2005-023582 A Summary of the Invention [Problem to be solved by the invention]

[0004] Because there are many types of materials required for tunnel construction and a large amount is used per work day, inventory management is complicated and places a heavy burden on those in charge. In view of the above circumstances, the present invention has an object to reduce the labor required for inventory management by supporting inventory management of materials for tunnel construction using a processing device such as a computer. [Means for solving the problem]

[0005] In order to solve the above problems, the present invention provides a system for supporting inventory management of materials for constructing a tunnel in a natural ground, comprising: a storage means for storing necessary material information including types and quantities of necessary materials according to the geological distribution of the natural ground and a design support pattern; An acquisition means for acquiring information on the progress of excavation of the tunnel; an updating means for calculating the type and quantity of materials used based on the required material information and the excavation progress information, and updating an estimated stock quantity of the corresponding materials; The present invention is characterized by comprising:

[0006] The program according to the present invention is a program for supporting inventory management of materials for constructing a tunnel in a natural ground, A process of storing necessary material information including types and quantities of necessary materials according to the geological distribution of the natural ground and a designed support pattern; A process of acquiring information on the progress of excavation of the tunnel; a process of calculating the type and quantity of materials used based on the required material information and the excavation progress information, and updating the estimated inventory quantity of the corresponding materials; The present invention is characterized in that the above-mentioned is executed by a computer.

[0007] The method of the present invention is a method for supporting inventory management of materials for constructing a tunnel in a natural ground by a processing device, the processing device comprising: storing necessary material information including types and quantities of necessary materials according to the geological distribution of the natural ground and a designed support pattern; acquiring information on the progress of excavation of the tunnel; calculating the type and quantity of materials used based on the required material information and the excavation progress information, and updating the estimated inventory quantity of the corresponding materials; The present invention is characterized by carrying out the following steps.

[0008] The excavation progress information may be survey information of the face obtained by a surveying instrument installed inside the tunnel. The tunnel construction schedule information may be used as the excavation progress information. Effect of the Invention

[0009] According to the present invention, inventory management of materials for tunnel construction is assisted by a computer system, thereby reducing the labor required for inventory management. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a conceptual diagram showing an overview of an inventory management support system for tunnel construction materials according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing the configuration of the inventory management support system. [Diagram 3] FIG. 3 is a table showing an example of geological distribution information stored in the storage unit of the inventory management support system. [Figure 4] FIG. 4 is a table showing an example of necessary material information stored in the storage unit of the inventory management support system. [Diagram 5] FIG. 5 is a table showing an example of estimated inventory information stored in the storage unit of the inventory management support system. [Figure 6] FIG. 6 is a flowchart showing a process flow of the inventory management support system. [Figure 7] FIG. 7 is a block diagram showing the configuration of an inventory management support system for tunnel construction materials according to the second embodiment of the present invention. [Figure 8] FIG. 8 is a table showing an example of construction schedule information stored in the storage unit of the inventory management support system according to the second embodiment. [Figure 9] FIG. 9 is a block diagram showing the configuration of an inventory management support system for tunnel construction materials according to the third embodiment of the present invention. [Figure 10] FIG. 10 is a flowchart showing a process flow of the inventory management support system according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. <First embodiment (FIGS. 1 to 6)> As shown in FIG. 1, a mountain tunnel 1 is excavated in natural ground 2. In constructing the mountain tunnel 1, various tunnel construction materials are required, such as arch supports 3, rock bolts 4, and other materials such as mortar for fixing the rock bolts, sprayed concrete, quick-setting materials, waterproof sheets, concrete for lining, rebar for lining, and concrete for invert (not shown). The type and quantity of tunnel construction materials required in the design per unit excavation distance of the tunnel are determined according to the geology 2a to 2e of the natural ground 2. In the case of hard geology that is not prone to collapse, fewer rock bolts and the like are required. In the case of loose geology that is prone to collapse, more rock bolts and the like are required.

[0012] <Tunnel construction materials inventory management support system> The inventory management support system 5 of this embodiment manages the inventory of tunnel construction materials by utilizing the tunnel excavation status measured by the surveying instrument 6. The surveying instrument 6 is permanently installed inside the tunnel 1 under construction in order to measure the tunnel excavation direction, completed shape, tunnel distance (TD), etc.

[0013] The inventory management support system 5 includes a processing device 10. A surveying instrument 6 and the processing device 10 are connected to each other so as to be able to communicate data with each other via a wired or wireless local area network (LAN) 7. The processing device 10 is configured by a personal computer (PC), a smartphone, a tablet, or other computers, and may be configured by cloud computing.

[0014] 2, the processing device 10 includes a processing unit 11, a storage unit 12 (storage means), a communication unit 13, and a display unit 15. The survey instrument 6 is connected to the communication unit 13 via a LAN 7. The processing unit 11 is constituted by a CPU and the like, and has functions as an excavation progress information acquisition means 11b, a material usage calculation means 11c, an estimated stock quantity update means 11d, and the like.

[0015] The memory unit 12 stores geological distribution information 12a, required material information 12b, estimated inventory information 12c, and an inventory management support program 14. As shown in Fig. 3, the geological distribution information 12a is information on the distribution state (Fig. 1) of the geology 2a-2e on the construction plan line 1s of the tunnel 1 in the natural ground 2, and includes the distance from the starting tunnel entrance 1a or the type of rock mass for each section a-e (Fig. 1), the geological grade such as hardness and softness of the natural ground, and other natural ground property data. The geological distribution information 12a is acquired by a prior boring survey or the like. As shown in Fig. 1, the sections a-e are preferably set for each of the geology 2a-2e that the tunnel construction plan line 1s crosses.

[0016] As shown in FIG. 4, the necessary material information 12b is information on materials (such as the number of rock bolts) required for tunnel construction according to the geological distribution and the designed support pattern. The designed support pattern correlates with the geological class. As shown in the figure, the necessary material information 12b may be combined with the geological distribution information 12a (FIG. 3). In other words, the necessary material information 12b may be a database of the type and quantity of materials required per unit excavation distance from the starting tunnel portal 1a of the tunnel 1 to be supported for inventory management or for each section a-e (FIG. 1). The necessary material information 12b may include the geological distribution information 12a. The geological distribution information 12 a and the necessary material information 12 b are acquired prior to the construction of the tunnel 1 or the inventory management support, and are stored in the memory unit 12 .

[0017] As shown in FIG. 5, the estimated stock information 12c is data on the current estimated stock quantity for each type (name) of tunnel construction materials, and is overwritten and updated as needed by the management process of the system 5.

[0018] As shown in FIG. 2, the inventory management support program 14 includes an excavation progress information acquisition processing program 14b, a material usage calculation program 14c, an estimated inventory quantity update processing program 14d, and the like. The excavation progress information acquisition processing program 14b is a program that causes a computer to execute a process for acquiring excavation progress information of the tunnel 1. The material usage calculation program 14c is a program for causing a computer to execute a process for calculating the type and quantity of tunnel construction materials used. The estimated stock quantity update processing program 14d is a program for causing a computer to execute a process for updating the estimated stock quantities of tunnel construction materials.

[0019] <Support method for inventory management of tunnel construction materials> As shown in the flowchart of FIG. 6, inventory management support for tunnel construction materials by the inventory management support system 5 is carried out as follows. The processing unit 11 of the processing device 10 communicates with the surveying instrument 6 by starting the inventory management support program 14 (step 101).

[0020] During the construction of the tunnel 1, the interior of the tunnel 1 and the position of the face 1e are surveyed by the surveying instrument 6. The surveying data is transmitted from the surveying instrument 6 to the processing device 10. The timing of transmission may be each time a survey is conducted, at regular intervals, each time excavation work for one cross section is completed, or when excavation work for one day is completed.

[0021] The processing device 10 receives the survey data ("yes" in step 101). The method of inputting the survey data to the processing device 10 is not limited to network communication, and an operator may read the survey data from the surveying instrument 6 and manually input it to the processing device 10. The survey data from the surveying instrument 6 may be stored in a portable storage medium, and the portable storage medium may be connected to the processing device 10 to read the stored data.

[0022] The processing unit 11 as the excavation progress information acquisition means 11b acquires excavation progress information, which indicates how far the tunnel 1 has been excavated, from the survey data by using the excavation progress information acquisition processing program 14b (step 102).

[0023] Next, the processing unit 11, functioning as a material usage calculation means 11c, calculates, using the material usage calculation program 14c, the types and quantities of materials used since the last update of the estimated inventory quantity, based on the geological distribution information 12a and required material information 12b stored in the memory unit 12, and the excavation progress information (step 103).

[0024] Furthermore, the processing unit 11 as the estimated stock quantity update means 11d updates the estimated stock quantity of the corresponding material by the estimated stock quantity update processing program 14c (step 104). Specifically, the processing unit 11 subtracts the usage quantity calculation value from the estimated stock quantity at the time of the previous update for each material, and overwrites the estimated stock information 12c with the value after the subtraction.

[0025] The estimated stock quantity for each material calculated in this manner is displayed on the display unit 15 (step 111) in response to a display command (step 110). The display may be performed by a web browser. Instead of displaying, the display may be printed out as a report. This allows the person in charge of inventory management to grasp the stock status of each material. There is no need to frequently check the stock status, which reduces the burden of inventory management.

[0026] Next, another embodiment of the present invention will be described. In the following embodiment, the same reference numerals are given to the same components as those in the above-described embodiment, and the description thereof will be omitted as appropriate. <Second embodiment (FIGS. 7 and 8)> As shown in Fig. 7, in addition to geological distribution information 12a and required material information 12b, construction schedule information 12f is stored in the memory unit 12 of the processing device 10 of the inventory management support system 5B in the second embodiment as further pre-acquired information. As shown in Fig. 8, the construction schedule information 12f includes information such as the date or the number of days elapsed since the start of construction, and the planned excavation distance. The processing device 10 may extract the construction schedule information 12f from input data of construction management software stored in the processing device 10. Preferably, the construction schedule information 12f can be modified in accordance with the progress of the actual construction of the tunnel 1.

[0027] In the second embodiment, instead of the survey data of the first embodiment, construction schedule information 12f is used as excavation progress information indicating how far the tunnel 1 has been excavated. The processing unit 11 calculates the usage quantity of each tunnel construction material based on the geological distribution information 12a, the required material information 12b, the construction schedule information 12f, and the calendar function, and further calculates the estimated stock quantity.

[0028] <Third embodiment (FIGS. 9 and 10)> As shown in FIG. 9, an inventory management support system 5C according to the third embodiment can communicate with a management system 8 in which survey data from a surveying instrument 6 is stored. The management system 8 is configured by a computer separate from the processing device 10. An alarm processing program 14f is stored in the program area of ​​the memory unit 12 of the inventory management support system 5C. Construction schedule information 12f is stored in the data area of ​​the memory unit 12. The construction schedule information 12f may be stored in the memory unit of the management system 8, or the inventory management support system 5C may receive the construction schedule information 12f from the management system 8.

[0029] As shown in the flow chart of FIG. 10, the processing unit 11 of the inventory management support system 5C attempts to communicate with the management system 8 and checks whether survey data has been received (step 101a). When survey data has been received, the survey data is used as excavation progress information indicating how far the tunnel 1 has been excavated (step 102). When survey data has not been received, the construction schedule information 12f is read (step 101b) and excavation progress information is obtained from the construction schedule information 12f (step 102). If the construction schedule information 12f has not been stored or is not available as excavation progress information (step 101b: no), the processing unit 11 checks whether excavation progress information has been manually input (step 101c). When data such as the excavation distance data from the starting tunnel entrance 1a has been manually input, the data is adopted as excavation progress information (step 102). Even if survey data has been received or valid construction schedule information 12f is available (step 101a or 101b: "yes"), the system may further check whether excavation progress information has been manually input, and if there has been manual input, the manually input information may be given priority in being adopted as excavation progress information.

[0030] Using the obtained excavation progress information, the estimated stock quantity is updated by steps 103-104 similar to those in the first embodiment (Fig. 6), and then the alarm processing program 14f judges whether an alarm is necessary (step 105). Specifically, it is confirmed for each tunnel construction material whether the estimated stock quantity after the update is below the quantity required for upcoming construction. The quantity required for upcoming construction is preferably calculated by using the construction schedule information 12f (see Fig. 8). Whether or not it is upcoming construction is judged, for example, by whether or not it is construction within the number of days required for delivery after ordering the corresponding tunnel construction material.

[0031] For each tunnel construction material, when the estimated stock quantity is less than the quantity required for the upcoming process, an alarm is output (step 106). The alarm may be output by displaying on the display unit 15 or by sound. In parallel with the alarm in step 106, or in place of the alarm, the processing device 10 may automatically order the required quantity of the tunnel construction materials.

[0032] The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, when the manager actually checks the stock status, the estimated stock quantity in the memory unit 12 may be corrected to the actual checked quantity. The tunnel construction materials to be inventory managed may also include materials for auxiliary construction methods such as fore-receiving steel pipes and injection materials. In the second embodiment (Figures 7 and 8), as in the third embodiment (Figures 9 and 10), it may be possible to use construction schedule information 12f to determine whether the stock quantity of each tunnel construction material is below the quantity required for upcoming construction work, and if so, to output an alarm or automatically place an order. [Industrial Applicability]

[0033] The present invention is applicable, for example, to an inventory management system for materials used in constructing mountain tunnels. [Explanation of symbols]

[0034] 1 Mountain Tunnel 1a Starting tunnel entrance 1e Cutting edge 1s Construction plan part 2. Ground 2a~2e Geology 3 Arch support 4. Rock Bolt 5. Tunnel construction materials inventory management support system 5B Inventory management support system 5C Inventory management support system 6 Surveying equipment 7 Local Area Networks 8. Management Systems 10 Processing equipment 11 Processing section 11b Means of obtaining information on excavation progress 11c Method of calculating materials used 11d. Means of updating estimated inventory quantities 12 Storage unit (storage means) 12a Geological distribution information 12b Required materials information 12c Estimated Stock Information 12F Construction Schedule Information 13. Communications Department 14 Inventory Management Support Program 14b Excavation progress information acquisition and processing program 14c Material Calculation Program 14d Estimated inventory quantity update processing program 14f Alarm Processing Program 15 Display

Claims

1. A system for supporting inventory management of materials for constructing a tunnel in a natural ground, comprising: a storage means for storing geological distribution information that indicates a geological distribution on the construction plan line of the tunnel in the natural ground, and required material information including the types of required materials according to the geology and the design support pattern and the quantity of the required materials per unit excavation distance or for each section along the construction plan line; An acquisition means for acquiring information on the progress of excavation of the tunnel; an updating means for calculating the type and quantity of materials used based on the geological distribution information, the required material information, and the excavation progress information, and updating an estimated inventory quantity of the corresponding materials; A tunnel construction material inventory management support system comprising:

2. A tunnel construction material inventory management support system as described in claim 1, wherein the geological distribution information is included in the necessary material information.

3. A program for supporting inventory management of materials for constructing a tunnel in a natural ground, comprising: A process of storing geological distribution information that represents a geological distribution on the construction plan line of the tunnel in the natural ground, and required material information including the types of required materials according to the geology and the design support pattern and the quantity of the required materials per unit excavation distance or for each section along the construction plan line; A process of receiving input of information on the progress of excavation of the tunnel; a process of calculating the type and quantity of materials used based on the geological distribution information, the required material information, and the excavation progress information, and updating the estimated inventory quantity of the corresponding materials; A tunnel construction material inventory management support program that causes a computer to execute the above steps.

4. A method for supporting inventory management of materials for constructing a tunnel in a natural ground by a processing device, the processing device comprising: storing geological distribution information that indicates a geological distribution on the construction plan line of the tunnel in the natural ground, and required material information including the types of required materials according to the geology and the design support pattern, and the quantities of the required materials per unit excavation distance or for each section along the construction plan line; acquiring information on the progress of excavation of the tunnel; calculating the types and quantities of materials used based on the geological distribution information, the required material information, and the excavation progress information, and updating the estimated inventory quantities of the corresponding materials; A tunnel construction material inventory management support method, comprising:

5. A method for supporting inventory management of tunnel construction materials according to claim 4, characterized in that surveying information of a face obtained by a surveying instrument installed within the tunnel is used as the excavation progress information.

6. A tunnel construction material inventory management support method as described in claim 4, characterized in that the excavation progress information is construction schedule information including information on the planned excavation distance according to dates during the tunnel construction period or the number of days elapsed since the start of construction.

Citation Information

Patent Citations

  • Information management system of construction material

    CN202948475U

  • Physical distribution management system in construction site

    JP2001220892A

  • Execution management method in shield work

    JP2002021496A

  • Transportation managing method of building member for standardized house

    JP2002328968A

  • Material distribution control system, material distribution control method, and program to execute the method by computer

    JP2003216691A